NA61 beyound 2020: 10x more beam intensity → high radiation doses for PSD
Proposal: replace central part of PSD with new modules designed for CBM experiment:
beam
fragments passed the hole
PSD status
S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019 2
MPSD
FPSD
FPSD + MPSD construction and test on NA61 beam line
3S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
FPSD + MPSD construction and test on NA61 beam line
4S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
MPSD FPSD
• 13 new CBM modules in MPSD• 1 new (central) module with 4 cm hole in scintillators in FPSD
5S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
MPSD module of FEE (modified) ..in process..
New MPPC boardNew FEE board Assembling of one FEE chain for FPSD
Modification of FEE for MPSD and FPSD
(no temperature control.. HV correction instead)
6S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
MPSD and FPSD modules equipped with new FEE electronics
MPPC boards
HV supply with preamps boards
Modified FEE boards
7S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
DRS4 readout boards on tests
In hands (from Sandro): 1 crate box + 5 DRS4 boards + 1 time clock board
8S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
Question 1: Cables from FEE box to DRS4 crate – how long?
Question 2: What is a good place to put DRS4 crate? One crate on top of MPSD? Two separate crates at MPSD and FPSD?
Question3: What is a good place of read-out (DAQ) computers to read DRS4?
MPSD + FPSD FEE and read-out electronics integration
9S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD statusNow the DRS4 board tests are in progress..
FPSD + DRS4, 10 channels, trigger from FEE analog sum
goodsignal
badchannel bad
channel
Next: 3 modules of FEE connection, test of all 5 DRS4 boards..
10S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD statusNow the DRS4 board tests are in progress..
test of 1GHz sampling clock rate (external clock mode)
goodsignal
1μs
11S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
Some problems of baseline.. ??
no signalbelow line
Now the DRS4 board tests are in progress..
12S.Morozov, on behalf of INR RAS Hardware Meeting 18-20 Nov 2019
PSD status
Summary:
- MPSD + FPSD are equipped with new FEE boards
- first 5 DRS4 boards are on test now at FPSD
Outlook:
- open questions:
1) the rest DRS4 boards for PSD (status? when?)
2) place of DRS4 crates, number of DRS4 crates (1 or 2) → cable length
3) DAQ computers for MPSD+ FPSD (read-out mode? place?)
- plans for full MPSD + FPSD system tests (February 2020?)