Spill Containment, Controls and Countermeasures
Spill Containment, Control and Countermeasures
SPCC
SPCC
• 40 CFR 112• Compliance Dates for all Facilities– on or before August 16, 2002
• maintain its existing SPCC Plan
• amend and implement the SPCC Plan no later than November 10, 2010After that date, plan before/up to 6 months for production
What are the items under SPCC• Petroleum products• Animal fats• Oils – new and used
What is counted?
• Underground storage– 42,000 gallons or
more
• Above ground storage-1,320 in containers larger than 55 gallons.
What is excluded?
Not counted………• Anything below 55
gallons• Mobile sources• pesticide application
equipment and related mix containers.
• any oil storage container that is permanently closed.
Frequently overlooked• Hydraulic reservoirs
on fixed equipment. • Used oil containers
Definition of Loading/UnloadingRack
• EPA finalized a definition for loading/unloading
rack which governs whether a facility is subject to§112.7(h)
• Definition of “loading/ unloading rack” is:
– based on set of characteristics generally associated
with loading/unloading rack– based on both the description in
the SPCC Guidance for Regional Inspectors and a definition suggested by industry representatives
– a slightly modified version of the definition proposed in Oct 07
What is a loading Arm• • Loading/unloading arm is a key component of
a loading/unloading rack.• • A loading/unloading arm typically – is a movable piping assembly that may
include fixed piping or a combination of fixed and flexible piping
– has at least one swivel joint (that is, at least two articulated parts that are connected in such a way that relative movement is feasible to transfer product via top or bottom loading/unloading to a tank truck or rail car).
9
Loading ArmsCertain loading/unloading arm configurations present at
loading racks may include a loading/unloading arm that is a combination of flexible piping (hoses) and rigid piping without a swivel joint. – In this case, a swivel joint is not present on the loading arm because flexible piping is attached directly to the rigid piping of the loading arm and the flexible hose provides the movement needed to conduct loading or unloading operations in lieu of the
Current (1973) RegulatoryDefinition of “Navigable Waters
The term “navigable waters” of the United States means“navigable waters” as defined in section 502(7) of theFWPCA, and includes:
• (1) all navigable waters of the United States, as defined in judicialdecisions prior to the passage of the 1972 Amendments of theFederal Water Pollution Control Act, (FWPCA) (Pub. L. 92-500)also known as the Clean Water Act (CWA), and tributaries ofsuch waters as;
• (2) interstate waters;• (3) intrastate lakes, rivers, and streams which are utilized by
interstate travelers for recreational or other purposes; and• (4) intrastate lakes, rivers, and streams from which fish or
shellfishare taken and sold in interstate commerce.
Self Certifying: who can
• "Tier I" qualified facilities have an additional option to complete and implement a streamlined, self-certified SPCC Plan template (Appendix G to the rule).
Tier I Qualifications • 10,000 gallons or less in aggregate aboveground oil
storage capacity; and• For the 3 years prior to Plan certification, or since
becoming subject to the rule if it has operated for less than 3 years, the facility must not have had:
– A single discharge of oil to navigable waters or adjoining
shorelines exceeding 1,000 U.S. gallons, or – Two discharges of oil to navigable waters or adjoining
shorelines each exceeding 42 U.S. gallons within any 12- month period; and
• Maximum individual aboveground oil storage container capacity of 5,000 U.S. gallons.
Tier I and Tier II: the differences• All qualified facilities that are not Tier I are “Tier II
qualified facilities.”• A Tier I owner/operator would be able to choose Tier I or Tier II status if qualifying criteria are met.• The requirements for Tier II qualified facilities remain
the same as they were when these requirements were
promulgated in December 2006.• Tier II qualified facilities are not able to use the
Appendix G template because it does not include all of the SPCC requirements that may apply for these facilities.
14
Training is important
• Train to the plan
• Annually at least
• Quarterly drills
• Discuss drills both good and bad
15
• http://www.youtube.com/watch?v=rKmS8VfNNgQ
16
Questions Please