development; developinnations; *economic · t a. indian projects funded by eda `lb. august 26, 1965...
TRANSCRIPT
DOCUMENT RESUME
ED 165 966Y
TITLE Indian Projects Funded by EDA, August 26,1965 - September 30, 1977..
INSTITUTION Economic Development Administration (DOC) ,
-Washington, D.C.PUB DATE Dec 77NOTE 134p.
EDRS PRICE MF-$0.83 HC-$7.35 Plus Postage.DESCRIPTORS Alaska Natives; *American Indians: Community
Development; Developin"Nations; *EconomicDevelopment; Federal Aid; Financial Support; *Grants;Industrialization; Projects; Reservations (Indian) ;.*Resource Allocations; *Statistics; Tables (Data);
AI *TribesIDENTIFIERS *Economic elopmeant Administration
BC 011 151'
ABSTRACTSince 1967 the Economic Development Administration'
(EDA) has carried out an Indian program that emphasized economicdevelopment of Indian reservations and trust lands. In the past 12years Indian tribes in.32 states have received community andindustrial development grants_to assist then in developing a viableeconomic base on their lands. Tribes in AriZona have received thegreatest amount of assistance with $113,263,174 awarded in the periodfrom August 26, 1965 to September 30, 1977. New Mexico tribal groupsreceived $37,927,795,.and Indians in Washington received $37,467,572.Indians in Massachusetts received the smallest amount of assistance:$146,050. EDA grants were made for such projects as ,planning andimpact studies, water and sewer systeni, touriam facilities,industrial parks,*and community.facilities such as fire stations,community centers, and health centers. assistance was also given tonational Indian groups for confeiences, training prograise studies,and other types of activities, including hose related to industrialdevelopment. In addition to listing the total Indian project fundingby state for the 12 year period, this document itemizes the amountsand kinds 'of assistance given to specific tribes in each state!. Italso lists the amounts and kinds of aid awarded to the national level.projects. (DS)
f
..*****************,************************************************* Reproductions supplied by EDRS are the best that can be made ** fro -the original document. , t ************************************************************************.. \
-4
1111111011MININININIMVIanwszennawalla
INDIAN PROJECTSFUNDED BY EDA
August 26, 1965-September 30,1977
tta OF cotlk _
4v
NST
4->. -A TEs 0-
U S OEIPARTMENT OF HEALTH,EDUCATION IL WELFARENATIONAL INSTITUTE OF
EDUCATION
THIS DOCUMENT HAS BEEN REPRO-DUCED EXACTLY AS RECEIVED FROMrNE PERSON OR ORGANIZATION ORIGIN-ATING IT POINTS OF VIEW OR OPINIONSSTATED DO-NOT NECESSARILY REPRE-SENT OFFICIAL NATIONAL INSTITUTE OFEDUCATION POSITION OR POLICY
U.S. DEPARTMENT OF COMMERCEEconomic Development Administration
t
a
INDIAN PROJECTS
FUNDED BY EDA
`lb
August 26, 1965 - September 30, 1977
Compiled by EDA Indian Desk
-s
3V
December 1977
CONTENTS
FOREWORD 1 EBRASKA 54
LEGEND 2 EVADA 56
TOTACANdliP PROJECT FUNDING BY STATE 3 NEW MEXICO 59
ALASKA 4 NEWl'ORK ' 68
ARIZONA 14 NORTH CAROLINA 70
CALIFORNIA. 26 NORTH DAKOTA 71
COLORADO 32 OKLAHOMA 76
FLORIDA 34 OREGON 82
IDAHO 36 SOUTH CAROLINA, 8
IOWA 39 SOUTH DAKOTA 84
KANSAS 39 TEXAS .89
LOUISIANA 40 UTAH 90
MAINE 41 VIRGINIA 91
MASSACHUSETTS 42 WASHINGTON 92
MICHIGAN 43 WISCONSIN 100
MINNESOTA' 44 WYOMING 104
MISSISSIPPI 47 NATIONAL 105
MONTANA 48
ti
4
FOREWORD
The American India is known today as the poor;est segmentwithin the populat on of the United States. Although theIndian tribes hav a and base unlike any other ethnic group,their annual inco are far below and their unemploymentrates 'are far above any other groupsof citizens of this
4-country. . r
Beginning in 1967, the Economic Development Administrationdeveloped an Indian, program with epeci al' emphasis on economicdevelopment on Indian reservations and trust lands, which alsoincludes community and industrial development.. Thedirection of this program encompasses all of the Agency'sprograms.
A listing of all projects approved py,EDA for Indian tribesand groups as of September 30, 1977, indicates the vitalmission this Agency carries on in assisting the Indian tribesto develop a viable economic base on their land. It willtake time for the total impact of these projects to be fel ,
as identified-in employ nt opportunities, improved liviconditions, and vital co unity activities-.
I
c
TOTAL INDIAN 'PROJECT FUNDING BY STATE
Fiscal Year 1966 - Fiscal Year 1977
a
ALASKA
ARIZONA
CALIFORNIA
$ 36,0102304
113,263;174
15,877,203
COLORADO 5,205,300
FLORIDA 4,618,298
IDAHO 10,788,179
IOWA 796,000
KANSAS ' 1,841,969
LOUISItA 221 0,00
MAINE 3,727,362
MASSACHUSETTS... 146,050
MICHIGAN 5,654,295
MINNESOTA 16,928,579
MISSISSIPPI 3,481,575
MONTANA 31,929,133
NEBRASKA 8,054,300
NEVADA $ 8,477,533
411kW MEXICO 37,927,795
NEW YORK 9,821,820
NORTH CAROLINA . . . 4,057,705
NORTH DAKOTA 23,865,492
OKLAHOMA 32,551,495
OREGON 10,209,891
SOUTH CAROLINA 259,130
SOUTH DAKOTA 24,481,227
TE* 4,117,690
UTAH 6,709,504
VIRGINIA 195,000
WASHINGTON 3714672572
WISCONSIN 20,769,120
WYOMIPG 6,166,214
NATIONAL 10,066,734
$ 495,696,653
I
LEGEND OF 1R0Q.ECT SYMBOLS OF TYPE OF ASSISTINCE
PW Pub1:111c Works.
PWIP -Public Works Impact Program (Special Assistancefor area's impacte0 by concentrated unemploy--'Twit and low in mm).
./ .
.
Bt. Busi nest Development Assistance (BusinessLoan)
TA
PG
DG
TQ
Special Economic Development and AdjustmentProgram (Title IX)
Technical As
Planning Grant
District. Grant (planning)
Transitional Quarter (July 1-- September 30, 1976)
X- Job Opportunities Program (Title X)-
LPW I
LPW II
DRP
**
Local Public Works Capital Development andInvestment Program (Congress appropriated$2-billion nationwide for this program)
Second phase of Local Public Works CapitalDevelopment and Investment Program ($4 billionwas appropriated for this program. $100 millionwas set aside for-Indians).
Drought Relief Program
disbursementmadeproject not started.
50 percent grant and 50 percent loan.-
Figures 0651Z-n are for approved amounts, and do not reflectactual expenditures.
-3-
4ALASKA
1AHTNA, INC. (Copper River Native Association)
FY 74FY 75FY 76
AKIACHAK
Pipeline Impact studyInvestment study*Investment antlysis
$ 42,45045,96850,171
TATATA
$138,589
FY 77 Municipal Office & Community Center $233,480 LPW II
ALAKNUK
FY 77 Community Facility $269,930 LPW II
ALEUT LEAGUE
FY 74 Aquaculture study! $ 2,500 TA
FY 75 Aquaculture/hydrologic study 25,500 TA
FY 76 Aquaculture/hydrologic study 5 000 TA
$33,000
ANGOON
FY 75 General Purpose Dock $600,000 PW
FY Z7 Munfcipal Building 415.743 LPWI
$1 ,015,743
ANIAK
FY 77
ARCTIC SLOPE NATIVE
Community Center
ASSOCIATION
$232,940 LPW II
FY 73 Planning grant $ 50,000 PG
FY 74 Planning grant supplement 3,000 PG
FY 75 Planning grant 29,500 PG
FY 76 Planning grant -27,800 PG
$110,300
BARROW
FY 74FY 77
BETHEL
FY 74FY 75 .
FY 77
Additions to fire house stationFfre Station
J
$ 237,000 PWIP695.450 LPW II
$9i2,450
Municipal Dock $ 500,000 PWIPImprovements to cooperative barge
(Kuskokwlm Fishermen, Inc.) 277,000 PWIRecreation Center 702,_000 LPW II
BRISTOL BAY
1 .
$1,479,000.
FY 73 Planning grant $ 50,000 PGFY 76 Planning grant 50,000 PGFY 76-TQ Planning grant supplement 12,500 PGFY177 Planning grant 45,000 PG
$157,500
CHEVAK
Community Building $258,320 LPW IIs'.FY 7
CRAIG
Water andesewer system $ 507,000 . PWFY 66FY 74 Water system improvements 446,000 PWFY 76-TO Water system improvements-overrun 10,000 r PW
DILLINGWAM
FY 76 Dock facilityFY 77 Renovate Dock
$963,000
$ 650,000 PW333,110 LPW II
$983,110
EMONAK
FY 77 Fire Station ` $281,810 LPW II
EYAK
FY 77 Community Center-- $238,610 LPW II
ft -5-
9
FORT YUKON
FY 77 Renovate Community Center $287,210 LPW II
GELENA
FY 77
GAMBELL
City Garage
v
$237.530 LPW II
FY 77 Community Center $241,310 LPW II
HOONAH
FY 73_ Public dock/warehouse $632,000 PWtFY 74 Overrun--public dock/warehouse 21,000 PMFY 77 Cultural Center 313,1'30 LPW II.
-
.
.
.S966,130.
HOOPER BAY
FY 77 Community Center . $299,360 LPW II
HYDABURG.
FY 73 Smokery feasibility study $ '12,500 TAFY 74 Dock facilities including 10-ton
hoist and municipal warehouse 241,000 pw 'FY 75 Overrun--dock facilities 72,300 PWFY 75 'Municipal building 278,000 PWIPFY 76 Overrun--municipal building 83,000 PWIPFY 77 School facility 1,322,000 LPW I
JUNEAU (Native Village)
KAKE
$1 ,998,800
FY 77 Community Center -$761,060 LPW II
FY 70 Water systemFY 72 Municipal buildingFY 77 Recreation /Service Center
..-6- 10
$530,000 PW201,000 PWIP720.600 LPW I
$1.,459,6004-
-
KASIGLUK
FY 77 Community Center
KENAI NATIVES ASSOCATION
FY 77
KETCHIKAN
Roads. Street Lights
FY 74 Multi-purpose buildingFY 76 Overrun--multi-purpose buildingFY 77 Lot at Parks; Tribal Service Center
KIANA
FY 77
KING COVE
FY 77
KIPNUK
FY 77
KLAWOCK
FY 70FY 73FY 77
Community Building
Electrical System
Electric Power Plant
Water system.Overrun--watei. systemCivic Center
KODIAK AREA NATIVE ASSOCIATION
FY 76FY 77FY 77
KOTLIK
FY 77
Preliminary Utility SiteworkPlanning GrantElectrical Distribution System
Community Meeting Hall
$227.270 LPW II
$284,510 LPW II
$288,000 PW199,200 PW651 440 L'PW II
$1,138,640
$22.5,380 LPW II
$218,090 LWP I I
$239,426 LPW II
$639,000 PW65,000 PW
214,580 LPW II
£918;,580
$100,00050,000
227,000
$377,000
X
PGLPW II
$219,980" LPW II
VTZEBUE
. FY 74 Fish processing emiluation study S 18,396 TAFY 75 \Street Improvements - 200.000 PWIPFY 76 Industrial park feasibility study 20.000 TAFY 77 Recreation Center & Offices 589.070 LPW II
$827,466
PowENLUK
FY 77 Odcupational Community Center $931:122 LPW I
MAUNELUK ASSOCIATION
FY 73 Planning grant ., S 50.000FY 74 Planning grant supplement 15.000FY 75 Planning grant 42.000FY 76 Planning grant 41.670FY 76 Five snowmobile.aarages . 308.000FY 16-TO Planning grant supplement '12,500FY 77 ...- Planning grant . ,50,000
$519,170
METLAKATLA (Annette Island)
Barge pier. docking fac ity andFY 67access-road 5442.000
FY 68 Loading ramp to coMplime t piv .
and docking fmility 54,000.,--
FY 69 Fish processinr5nd cold storage"and facility 585,000
FY 70 Water system 600,000FY 72 ftn1cipb1 building
-
f"' 293,000FY-72 Over6in--fish processing and
cold storage 70,264FY 73 Overrun--water system 25,000FY 73 Planning grant 34,8300FY .14 Restoration of the interior 6f the
Duncan Cottage 77,000FY 74 Planning grant supplement 7,700'FY 75 Planning grant 27,000FY 75 Health clink and service center 319,000FY 75 Tourism/recreation study . 2,500
' FY 76 Planning grant .. 40,000
FY 76 Overrun--health clinic and servicecenter 47,000
FY 76-TO . Planning grant 10.000
PW
PW'.1
PUL
PWPWIP
PWPWPG
PWIPPGPGPWTAPG
PWPG
.14ETLAKATIA. continued
FY .77
FY_ 77t- ... FY 77
if
,
77 .
FY -774
11." Ir
ME KOR YUK
FY 77
MOUNTAIN' VILLAGE
FY 77FY 77
NAPAKIAK.,
FY 77
NEW STUYAHOK..,
FY 77
d
Tsirapshean LonghouseExpansion of -Annette 141and
Packing .Company - -Planning. 'rapt;Economic adjustmen .pl
dopnectioli with closfog ofcoot Guard Setti on
Playground 81 Athletic Field. Timbep Manufacturing' Study-
NOATAK IRA COUNCIL
FY 77
NOME
FY---77FY 77
NOORV I K
FY 77
...or
Community Center 8t- City.
Ball Bui lain.g ;
Community Center .-
Fish Butchering House
4444;,Snowmobile Maintenance Garage
City. Offi ce Bui 1 di ng
Health Cl inic
Communi ty Office Bui 1 di ngWater/Sewer Facility
S.
417,687 - LPW I
-. .432,500 , PW
40,000 PG .-
75,000 . IX. 19,643 LPW460 ; TA11111
A3,.624,1?4.
$21 7 , 820 LPW II'
$1 36 ,568 LPW II129,852 LPW II
$266,420
$214,310 LPW II
$226 9199 LPW II
$21 9,980 LPW II
$207,550 LPW II447,400- LPW
$654 ,950
Occupational Community Center. $955,183. -LPW I
NULATO
-Mtdidl Clinic _ '$228,000 LPW II.FY 77-
NUNAPITCHIK IRA
FY 77 Community Building 5233,210. LPW II
OLD HARBOR \.
FY 77 Electrical Distributjon System '$220,790 LPW II
PETERBURG
FY 77. * Expansion of Comrunity Building $238,070 LPW IILPILOT STATIONFY 77 Community Center $227,000 LPW II
'POINT HOPE
FY 77 Medical Clinic $251,570 LPWII;
PORT GRAHAM
FY 77 Community. Service Building $882,997 "LPW I
QUINHAGAK
FY 77 Community Center $251,570 LPW II
ST. MARYS
FY 77 ) ,City .Center$234,830 LPW AI
ST. PAUL
Ft 72 Economic Study. $ 9,000 TA
FY 77 Civic Center 267,770 LPW II
$276,770
SAND POINT
FY 77 Roads $239,150 . LPW II
-10-
14
/
SAVOONGA -
:FY 77--
SELAWIK IRA
FY 77.
SHISMAREF
FY 77
SITKA
FY 77FY 77
Civic Center
Community Cen
Community dial 1,
Community CenterCommercial Laundryfeasibility study
SOUTHWEST ALASKA NATIVES ASSOCIATION
*$249,140 LPW II
`$267,500 , LPW II
$222,140 LPW II
$626,600
9,000 TA
$635,600-
-LPW II
FY 73
STATEWIDE
Planning grant
Technical assistance to establish
$5B400
1
_PG
FY. 69
Alaskan Federation of Nativeseconomic development program $ 83,600 TA ')
FY 70 AFN economic development program 90,000 TAFY 75FY /6
0 .Anchorage OId--Project HigherWildwood management and industrial
77,000 TA
develbpment program 100,000 TAFY -76-TQ Roads and trails in native villages 400,000' PWIP
$750,000
/STEBBINS 1
FY-77 Office & Community Center $239,150 LPW II
TANANk (Native Village)r
FY 77 Fire Station $254,000 LPW II-
TANANA CHIEFS ASSOCIATION
$ 35,0004
i?40011FY 73 Plann ng grant
FY 74 Plann ng grant supplement 11,700
FY 75 Planning grant 40,000
FY 76 Planning grant . 33,400
FY 76 -TQ Planning grant supplemedt 10,000
'FY 77 grant . 40,000.Plannipg.
$170,100
TLINGIT HAIDA
% $ 81,000
) FY 70 Technical assistance for study todevelop economic plan.for use ofjudgment funds
FY 71 Establishment of Indian office for .
development planning to implementeconomic plan 55,000,
FY 72 Continuation of economic development /
program office 64,000
FY 73 Planning grantFY 75 Planning grant,
50,oido56000/
FY 76 Planning grant 61,000
FY 76' Coldstorage feasibility study -1 9,000'
FY 76-T4 Planning grant supplement 1'5,250
FY 77 Planning grant. /55/900(
$457,150
TOGIAK
FY 77
TOKSOOK BAY
FY 77
TUNUNAK'
-FY 77
Office Building
Community Center
/-
Community Building & SnowmobileRepair -Shop
UNALAKLEET IRA
FY 77 Health:aenter
`
PGPG-
PGPGPG,PG'
TA
/ TA/ PG
PGPGTAPGPG
$254,810- LPW II
$220,520` LPW-II
$215,930 LPW II-
$279,920 `LPW II
UNALASKA
'-FY 75FY 76
WAINWRIGHT'.
Enlarge water systemOverrun--water system
. .$800,000 PW176,000 -PW
$976,000
FY 77 New Power System b 4601,800 LPW Ih.
WRANGELL (Coop Association)
. :
FY 77. Remodel Building for CommunityCenter $295,310 LPW II '3
,
YAKUTAT t
Ir,
FY 973 Expand water system $171,000 PW,FY 74 , Overrun--water system 43,000 PWFY 76 Cold storage facility 73,500 PW IFY 77 Reconstruction of Cargo Dock 30,000 LPW II t-FY 77 Restoration of 'Community Hall 185,390 LPW r.
. $502,890
' Alaska State Total : $36,010,304
r.
AKCHIN
FY 72FY-77
FY 77FY 77
CAMP- VERDE
Ff 72FY 73
. FY 76-TQ
FY 77.
COCOPAH
FY 70FY 72FY 74FY 75
FY 76
FY 77FY 77
COLORADO RIVER
FY 68
f
FY 69FY 70FY 71
.FY 73FY 72FY 76-TO
ARIZONA
120-acre Industrtil ParkWell, irrigatio2/ditch lining and
repair/storaCommunity Recreation Park.Small Airfield
JICommercial center studyTribal.efice buildingVisitor center, recreati9n vehicle
park and commercial centerCommunity Building
Multi-purpose training buildingCommunity buildingOffice.building/cultural centerOverrunOffice building/cuykral
center.Overrunoffice building/cultAl
centerMulti-purpose community centerEquipment Repair service center
50-acre industrial park andindustrial sewer/treatmentfacilities (supplement to EPA)
Railroad spur into industrial parkWaste treatment plantSewer sXstem line .(Supplement to
HUD)Ceremonial cry houseOverrun--waste treatment plantPlanning grant supplement
-14-
, $ 742,000 PW)
336,000 PW134,060 LPW II96 420' LPW II
..$1,308,480
$27,_000 TA36,000 PWIP
800,000 PW265,880 LPW II
$1,148,880
$ 30,80020;000152,000
PWPWIPPW
30,000 PW
26,0611 - PW
154,850 LPW II123,720 LPW II
$531 ,370
$384;00028,000
306,490
376,14058,000.494;960
6,665
PWPWPW
PWPWIPPWPG
'COLORADO RIVER
1FY 77
4FY 77. .
FY 77
FORT APACHE
FY 67
FY 67..FY 67
FY- 68
FY 68
FY 68
FY 68FY 70
FY 70,
. FY ,71
FY 72-FY. 72
FY 72
FY 72
FY 73.
FY 74FY 74
continued
a
Planning grant supplement -
Phase I - Bluewater Plan andexpand Tribal Judicial Building
)Recreation Vehicle Campground Parker)
32,000
300,000245,330
$2,231,585
Business loan to Western WoodProducts
Forest industry studyArchitect and engineering services
fotdesign of recreation areaft. vocational skill
training facilitySunrise Park tourism complex to
include 54-unit motel, trailerpark-, campground, ski lodge, andother recreation facilities(Phase I)
Access road and bridge to triballyowned-sawmill
Forest resource studyBusiness loan to tribally owned
Ft. Apache Lumber Co. forconstruction of a small log mill
Overrun=Sunrise Park tourism complex(Phase I)
Second phase of Sunrise Park tourismcomplex to include 52 additionalrooms
Overrun--access road and bridgeRecreation area development andthinning of tribe] foresis
Consulting assistance,for SunrisePark tourism complex
OverriTn--Sunrise Park tourism(Phase II )
Industrial and comthunity fireprotection and water system
Sunrise Park expansion studyManagement assistance for Sunrise
Park
f104t000150:000
1,000,
290,000
complex
-15-
20
P9
LPW II.
BLTA
TA
PW
1,588,000, PW
324,000.20,000
PWTA
1,507,700 BL
96,000 PW
1,1.16,000 PW'sk1 z200 PW
280,000 PiIIP
2,500 TA
.130,000 PW
612,0002,50
50;090
PWTA
TA
.
FORT APACHE continued_
$ 1%616,0002,500
PWTA
-.FY 74 -
FY 75FY 75
Sunrise Park expansion, Phaise\III\Shopping certer study r
,-.
Apache Timber Co. noise.Ft.abatement control study 2,500 TA
FY 76 Ft. Apache Timber Co. noise
FY 76-tQAbatement.program .
.
pverrun--Sunrise Park expansion-441,000 I.
(Phase III) 500,000 PW'FY 76-TQ Planning grant supplemnnt
. '4 6,665 PG:FY 77 Clastroom Facilities ,290,300 LPW IFY 77 Planning 'grant supplement 32,000 -PGFY 77 Community Center(Cibique),, 702,230 LPW II
V74
FORT McDOWELL'
FY 73 ;;Community CenterFY 77 4!Expansion of Community-CenterFY 77 40',Water System-Improvements and
J
,Extension
FORT MOJAVE (land tan Arizona, California and Nevada)
FY 68FY 70FY 71FY 73FY 74FY 76.FY 77FY 77
;4
/1
,
$10018,695. ,
$ 157,r.
000 PWIP30:0,000 PW
LPW II'240 770
.$697,770
Community building $282,000' PW-Overrun--community building 29,000 PWMarina development study 2,500 TAExpansion of community building 225,000 PWCry house 77,000 PWFarm land clearing 170,000 XElderly Group Home - 170,000 LPW"IIEquipment Repair Service Center 91,290 LPW II
FORT YUMA (land in.Arizona and Californiai
,Multi-purpose buildingOverrun--multiATurpose building
',Overrun-4ultt-purpose building
.11-:D46;790
$330,00080,000.50,000
PWPWPW
FYit9 .
FY 70FY 72FY '72 . .- , Environmental controlled farm 272-500 PWFY 72 . Water system- 1 '72%000 PW.-.FY 72 , Sewer system (supplement to EPA) 86,400 PWFY 73 _Overrun --environmental.fahrci , 102,500 PWFY 74- Dverrun--water.syitem . 85,000. PWFY 74 -Tourism development study 9,500 TAFY 75 Expansion of environmental farm .350,000 PW
716-
20
FORT YUMA continued
PYFY 7,7
FY 77.FY 77
GIq RIVER
FY 67FY 67FY 67- .
FY 67FY 67
FY 67
FY 67
FY 67'FY 67FY GO
FY'69
. ). FY 69
-FY 70FY 70FY 70
-FY -71
FY 71 _
Manning -grant supplementPlanning grant supplement.
(serves Cocopah and Ft. Mojaire)Tribal Administration BuildingEnvironments Farm Re4ov4 ation
Community buildings (2)Industrial park study .
Industrial park studyIndustrial park studyYouth training and rehabilitation-center
400-:,acre Pima-Coolidge IndustrialPark .
156-acre Pima-chandler IndustrialPark and connecting lines tosewer system
320-acre San 'Tan Industrial ParkBusiness loan to Trimble Cattle Co.Tourist facility including arts andcrafts center, museum, restaurant,and office space
SalleyValley Marina recreation project,ihtlo ing a 135 surface-acre lake,
tigdocki g and boat launch facilities,res urant, rest rooms andadministrative offices
60,000-sq.ft. skill training center,including four vocationaltechnical laboratories; 18 class-rooms, library, day-care center,cafeteria, kitchen, lounge andadministrative'offices
Overrun -- tourist facilityInterstate gighway studyOverriun--Pima Chandler Industrial
Pa'k -
Ove run-Sun Valley Marina projethaie I)
EY nsion and park improvements of.ima- Coolidge Industrial Park
7,2904 PG
qpoolp PG289,270 LPW II ,
, 100,000 LPW II
$2,518,460
-17 -.
85,0001,0003,0d0
929
48,000
554,000
860,000525,000115,000
605,000
536,000
PWTATATA
PW
PW
PWPWBL
PW
PW
1,150,000 PW
13,600 PW28,000. v TA
95,000 PW
296,000 PW
286,600 PW
r
GILA RIVER continued
FY Z2-FY 72
FY 72 ,
FY 73'
FY 73
FY ?3
FY 73
FY 74FY 74FY 76FY 76
s.
,Crop storage-and marketing facilities 496,000Consultant assistance and evaluationof Sun Valley Marina project 2,500"
Sun-Valley Marina project - Phase II 725,000 ,
Overrun - -efpansion- and park improve-;.ments of PtMa -Coolidge IndustrialPark
Management assistance. for- Valley-Marirya - A. .24500
overrun--:croP storage and marketing 1facility . '
69,000
107,000.,OgerrUn - -expansion and park-improve- -
?gents of Pima-Coolidge IndustrialPark - - , i58,356
dareer center dormitory .708,000'
Overrun -...-Stin Valley Marina, Phase II'''. 737,000Historical parks feasibility study . . 15,000.,
Expansion of,Pima Chandler Industrial --
FY 76-TQFY 76-TQFY 77FY 77FY 77
FY 77FY 77FY 77FY 77FY 77
7
1
ParkPlanning grant supplement.Planning grant supplementFire Station (Sacaton)Fire Station (St. Johns)Fire Station (Blackwater)Fire Station (Casa Blanca)."Sun Valley Marina ImprovementCommercial Center (ton)Court Facility (Sacafon)Recreation Development (Sacaton).Recreation Development (St. Johns)
'goo-646,0006,660
$193,0,003.55,
55,000- -. 55",000
420.030304,580252,000250,000
- 250,000
$10,651 ,125
HAVASUPAI
68'FY 74
. F1.76Fr 77
FY 77
-Multi-purpose buildingTribal store:Range fenc(ng and water tanksPhase. I - Basic Sewage DisposalPlant
Develop springs and install tanks
at*
-18- 22
PW -
TAPW
PW
TA
PW
PWPWPW -.-
TA
SPWFGPG
LPW IILPW IILPW II
-LPWLPW II-LPW IILPW IILPW II
4 70,000' .PW150,000 PWIP202,000 X
255,620 LPW II41 000 bRP
$718,620
FY 68
FY 70FY 71FY- 71*
FY 72
FY 74FY 74FY-74 OPFY 75.
FY 76FY 76LTQ
.FY 7FY 77
FY 77FY 77FY 77
HUALAPAI
Cultural center which includesmotel rooms,, restaurant, Aseum4nderts and crafts shops
Overrun- -cultural center.Overrun --cultural.centerLand use plan.Management assistance for cultura
center,Electronic plantexpansion studyOvernight campground facilities13 miles of barbed wire fencingVillage restoration and access;mad improvements '-
Community building.,Planning grant supplementPlanning grant supplementOvernight Campground facilities -overrun
Child Care CenterAdministration CenterAdministrative'Office'Complex
*
a
,,IA582,000 PW59,000 PW
129,600 PW.2,500 TA
21500 TA2,7500' TA
218,000 PWIP.27,000 PWIP
504,000 PW1,000,000 ." PW
6,665 PG32,000 PG.
5,000 PW198,750 LPW II
-150,800 LPW II1,358,400 LPW II
$4,278,715
I
FY 67 Multi-purpose building $100,-000 PWFY '69- Overrun--Multi-purpose building 20,000 PWFY 73 Shopping center 138,000 PWFY 74 Overrun--shopping center 19,100 PW .FY 76-TQ Planning grant supplement 6,665 PGFY 77 Planning grant supplement -
(serves Mavasupai) 32,000FY 7 Administration Building ` 341 200 LPW II
$656,965
INDIAN DEVELOPMENT DISTRICT OF_ ARIZONA (IDDA)
FY 68 Planning grant $16,940 *PGFY 68 Planning grant supplement 7,220 PGFY 68 TechniCal assistance forestablishment of rehabilitationcenter 10,000 TA"'
FY 69 Indian Business DexploplptProgram 188,500 . TAFY 69 Planning grant /- 210,190 PG."
FY*70, Planning grant 102,840 PGFY 70 Funding of intern position forbusiness development program. 11,000 TA
INDIAN DEVELOPMENT DISTRICT OF ARIZONA (IDDA).conti.nue'd
FY 71FY 71
FY r72FY 72-
FY 72.
FY 73 .
FY 73FY 74FY. 74
FY 76-4FY 76FY
KAIBAB
FY 70FY 72
FY 73FY 74FT 74FY 76FY 76FY 76-TQFY 77FY 77
Planning grantContinuation of busi nest
development programKann antContinual on of_bus:Iness.
nt ifrogramStudy upper and middle
manageoient Positions apdcapabi 1 i ties relevant to
-"kreserifaVon business inter-prises .and tribal government
$ .205,680 PG
125,000 TA230,680 PG
.136,000, TA
40Planni -grantPlannin grant supplement-Planning grant supplement
57,670222,450410,000186,800
Planning grant ., 280,000Planning grant 93,300Planning g ant 184' 786
'.$2.515,056
Water resource study $ -2,500Tourism /recreation feasibility
study 2,500Visitors center/campground- 164,500
-15 miles of barbed wire fencing- 25,000Hydrology study 30,000Overrun--visitors center/campground 14,000Community center 263,000Planning grant supplement 4,170Community Center - overrun 235,x000Planning grant supplement 2 ,0-000
$760;670
NAVAJO- (land in Arizona, New.Mesico and Utah)
Business loan for expansion of Ito
e TAPGPGPGPGPGPGPG
TA
TAPitPW
TAPWPW
PG
PW
PG
mill for Nation ForestProducts-, Inc. $475,000 BL
FY 67 50-acre industrial park atFt. Defiance, Arizona 126,000 PW
67 50-acre imdustrial park atShiprock, New Mexico 153,000 PWFY 67' Industrial water/sewer- systemfor Shiprock, New Mexico 1,650,000 PW
-NAVAJO Continued
FY 67FY Z7
FY 67
FY.-67.:FY 68
.FY 68
FY op
FY 68FY 68
,ee
. Foresic7nagement study
-r---vmdwomMunitLake &vela-recreation,
'Water/sewerTowgibite imp
, New MexicoBusines% loanfacilities at
.Ntater stcratt-f
Techni assistance in developmentnter design-for water siortd
ultingservftesvements for Narif.10:
or comiercialvajo, New Mexicoit at Kayenta
CommunityWater and sewer system-for-Tuba CityIndustrial sewer system for Shiprock
(supplement to EPA)FY 68 Business loan mr Fairchild Semi-
conductor Plant-at ShiprockFY 69 Business loan for Fairchild semi -
condu r PlantFY 69 Servic rcpd to mining operation
in Mc itiley CountyFY 69 Water system improvements at Buell.
ParkFY 69 Planning grant -
FY 70 Water and Sewer system at ChinleFY .70 Water and sewer improvements at
Chinle (supplement to EPA),FT 70 Water and sewer system at
Ft. DefianceFY 70 Water system improvements, at
Tuba CityFY 70 Water and sewer improVements at
Tuba City ( supplement to EPA).F{76`) Business loan for industrialbuilding at Shiprock for., FairchildSemiconductor,
FY 70 Overrun -- industrial sewer system for-Shiprock
FY 71:- Water system for Navajo CommunityCollege -
FY 71, Sewer improvements'for NavajoOPCommunity College (supplement toEPA)
FY 71 Planning grantFY 71 Water and sewer improvements at
. Shiprock
.70,000 P- ETA
1;000 JA
- PW1,000 4Th
430,000
270,300
225,00092,000
600,400
548,467
130,000
1,783,200
256,00075,000
1,000,000
280,000
2,000,000
-910,000
310,063
462,800
84,000
1,190,000
309,88070,00.0
684,00
Phi
BL
PW
BL
BL
PW
PWPGPW
PW
PW
PW
PW
BL
PW
PW_
PW .
PG
PW
NAVAJO continued
FY 71
FY 72
FY. 72
FY72
f Design study for communit devel'Opmentimprovements it Ship .
errpma-water and sewer system att. Defiancerand. sewer improvement's for-I.:
t Defiance and Window Rock-areisWater and sewer -tmprovements at
. .
ShiptockFY 72 Overrun - -water aftariewer.system at
FY` 73 Manning grant"''FY 73 Oyerra - -water sysiem,imp rovements
et Tuba CityFY 73 "Feasibility study for recreation
-developmentFY 73 Particle Board Plant and equtpnient
for Navajo Forest ProductsFY= 73 Shopping center (Window Rock)
FY 74 Buildings and necessary, equipment.to establish a Navajo Wool ersMarketing Program )
FY 74 Facilities and site improv nts forShiprock industrial annex
FY 74, Water system to serve'Ganado, ArizonaFY 74 Planning -grant supplementFY 74 Planning grant supplementFY 74 Management assistance for Navajo
Wool Growers marketing programFY 74FY 74
Construction material supply-studyFeasibility study for.Luepp
Industrial ParkFY 75 Planning grantFY 75 Community center at CanoncitoFT 75 Overrun - -buildings and equipment for
Navajo Wool Groweet macketingprogram
75: Headquarters for farming operation75 . Feasibility study for skill center75 Overrun - -Navajo Forest Products
particleboard plantFY 75 Planning grant
.FY 76 Fencing for irrigation projectFY 76 Overrun - -siie improvements to
Shiprock industrial_ annexFY 76 Occupational training centerFY 76*d Thref baseball fieldsFY76-TQ ,Planning grant supplement
FY
1. FYFY
--22-26
7,500
29i,800
4.299,900'
108,000
198,330 PW69,382 PG
60,000
2,500
3,285,000 PW
1,088,000 PW
TA
PW
PW
7
TA
697,000 PW
279,000 PW1,200,000 PW
11.700. PG86,000 PG
25,000 TA27,504 TA
25 000125,000188,000
703,000933,00030,000
1,885,000150,000212,000
41,0003,841,000
320,00037,500
I
TAPG.
PW,
PWPWTA
PW
-XPG
PWPWPWPG
NAVAJO continued
FY 77FY 77FY 77
.FY 77FY 77FY 77FY.77FY 77FY 77FY 77FY 77FY 77FY 77FY 77FY 77
Planning grantPlanOng grant supplementLiveitock Production FeasibilityStudy
Water/Waste Facility (Mexican Hat)Judicial Building (Chinle)Judicial Building (Tuba City)Court Facilities (Shiprock)Water System (Kayenta)/4e-School (Monument Valley)Senior Citizens Center (Tuba City)fire Station (Ft. Defiance)Campground (Monument Valley)._Water System (Window Rock) °
, Mal,ti-purpose Building (Luepp)Access Road Improvement
(Monument Valley)FY 77 Apartments (Window Rock)FY 77 Waoter System (Many Farms)FY 77 Water System (Kayeg/a)'FY 77 ,High School (TohatE911)FY 77 Furniture Plant and WarihouseFY 77 Swimming PoolFY 77 - Administrative Headquarters
(Farmington')FY 77 Block 2 Headquarters (NIIP)FY .77 Fertilizer and Pellet Mill (NAPI)FY -77 'booster Station - Water (Shiprock)FY 77.1
. .Water System (lewcomb)
FY 77 Skill Center - Phase II (Crownpoint)FY 77 Day Care-Center (Shiprock)FY 77 (Crownpoint)FY 77 Lodg Renovation (Window RockiFY 77 '' NECA Headquarters Building (Shiprock)FY 77 Pre-School (Todahodakeenie)FY .77 Head Start Center (Montezuma Creek)FY 77 Emergency Water Supply
PAPAGO
FY 68FY 69FY 76
FY 73 j
_FY 73
Community building33.4cre San Xavier Industrial ParkTechniO41 assistance for developmentof San Xavier Industrial Park
Foed warehouse and distributi011center
Livestock comPlex for cattle feedingand marketing
ti
75,000 PG65,000 PG
36,400295,000409,570409,570407,143
2,436;030114,173276,633216,973922,677526,330469,560
1,200,000502,705
.1,241,860423,000
1,539,796286,610353,442
1,042,7102,000;0001,700,000
499,570222,960
2,150,000273,094860,000125,230344,737114,173114,173
2,605,000
$55,346,124
$164,000214,000
21,000
104,000
663,000
TALPWILPW ILPW ILPW I
LPW II.LPW IILPW IILPW IILPW IILPW IILPW II
LPW IILPW IILPW IILPW IILPW IILPW IILPW II
LPW IILPW IILPW IILPW ITLAW II
---ILPW II
LPW IIOW II.LPW IILPW IILPW II,LPW IIORP
PWPW
TA
PWIP-
PW
PAPAGO continued
FY 74
FY 74FY 75FY 75
FY 76Fr 76-TQFY 77FY 77FY 77FY 77FY 77
FY 77
SALT RIVER
FY 67FY 67
FY 67
FY 70' :FY 72-.'FY 73
FY, 75
76-TQ
F 77-
FY 77
FY 77
SAN adios
FY 66.FY 67
Management assistance for cattleoperation
Kitt Peak tourism studyOverrun -- livestock complexTribal center
Improve and expand industrial parkPlanning grant supplementPlanning grant supplementEducation centerMulti-health complexCommunity education centerTribal court/juvenile detention
facilityTwo new wells, 10 rehabilitatedwells with pump Jacks, 3 watertransport vehicles.
$ 15,000 TA2,500 TA
198,000 PW664,000 PW
411,000 PW6,665 PG
32,000 PG$600,500 LPW I
1,200,000 LPW II260,530 IN II
350,000 LPW II
571,500 DRP
30-acre industrial parkFeasibility study to determine'potential for recreation.
$5,477,695
$157,000
development 22,000 TAArchitect and engineeringtechnical assistance for signof airport facilities . 1,000 TA
Water system 172,000 PWOverrunwater system 40,000 PWNeighborhood recreation center/
parks 100,000 PWIPOverrun--neighborhood recreationcenter/parks 60,000 PWIP
Planning grant supplement 6,665 PGMulti-purpose public works building 2.16,000 PWPlanning grant supplement (servesFt. McDowell and Tonto-Apache) 32,000 PG
Water system improvements 793,460 LPW III
$1,600,125
Industrial park development study $.29,000- TA.
50-acre industrial park 220;000 PW
SAN CARLOS continued
FY 67FY 69
FY .69
FY 69
FY 70
FY.72FY 72FY 76
FY 76-TQFY 76-TQFY 77FY 77
FY 77FY 77FY 77FY 77
Training centers (4)"Tourism facility at Seneca Lake toinclude store, restaurant,spicnicareas, boating facilities, etc.
Overrun--training centersRecreation facilities at Soda Canyon
to include marina, boat ramp,restaurant, picnic and campingareas, roads, and related improve-mentS
Reservation industrial developmentstudy
Reservation boundary fenceReservation, tree thinning programRepair and construct cattle range
fencingPl-anning grant supplementWater system (Soda Canyon)Planning grant supplementUpgrade Sewer and Water Facilityand electricity
Seneca Park ImprovementsRecreational ComplexDam
Improvements to existing wellsand power supplies; reservoirs.and new--irells; work on existingwater tanks, a dam and aqueduct
TONTO APACHE (Payson)
FY 74-ry 76.-TQFY 77
Tribal :ommunity buildingOverrun -- tribal community buildingCommunity Building - overrun
YAVAPAL PRESCOTT APACHE-
FY 71. .
Y 73FY 74FY 74FY 75FY 76 -TQFY 77
$ .181,000
542,00030,000
572,000
20,00048,000
121,000
269,0006,665
250,00032,000
896,000432,140649,000
4,000,000
1,900,000
$10,197,805
Commercial parkCommunity building qupplement to HUD)Dverruncommercial parkMobile home park study,Phase II of commercial parkPlanning grant supplementPlanning grant supplemeht" 4
$ 90,00011;0005,000
$106000
$196,00037,67953,0002,500
225,0006,665
32,000
$552,844
Arizona State Total: $113',263,174
-25-
29
PW
PWPW
PW
TA:POPPWIP
XPG
PWIPPG
LPW ILPW IILPW IIDRP
DRP
PWIPPWIPPWIP
PWPWPWTAPWPGPG
CAMPO -
FY 77
FY 77
CHEMEHUEVI.'
FY 76FY 77
COLUSA
CALIF.ORNIA P
4 Commercial Development FeasibilityStudy
Rehabilitate wells, buy and trans-port water, purchase a truck ,a44three tank trailers and developa radio system
$ 5,000 TA
62,000 DRP
$67,000
TrashsremovaT and planing of trees $ 120,000 XWater Treatment Facility 2 436 240 LPW II
. $2,556 240
FY 77 Fire tank truck and pump $17,000 DRP
DRY CREEK
FY 77 Drill and equip well $3,960 DRP
FT. BIDWELL ""
FY 74 Community center . $131,000 PWIP
FT. INDEPENDENCE
FY 74 Campgrounds $286,000 PWIPFY 76 Overrun--campgrounds 50,000 PWIP
$336,000
GRINDSTONE
FY 76 Renovate community center $ 93,000 PWFY 77 Bridge 333,795 LPW I
$426,795
726-
30
HOOPA VALLEY
FY 70 Reservation forest use study 2 ,500 TAFY 73 Community building (supplement to HUD) 253,335 PWFY 73 Planning grant 30,000 PGFY 73 10-acre site for shopping center 406,000 PWFY 73 Water/sewer system 194;000 PW.FY 74 Planning grant supplement 6',700 PGFY 75 Overrun--shopping center 235,000 PWFY 75 Planning grant 29,500 PG'FY 75 Overrun--water/sewer system 56,000 PWFY 75 Management assistance-for shopping
center 20,000 TAFY 76 Planning grant 29,200 PGFY 76-TQ Planning grant supplement 8,750 PGFY 76-TQ Forest industry complex 1,593,500 IXFY 77 Planning grant . 35,000 PGFY 77 Planning grant 35,000 PGFY 77 Upgrading Water System to match
IHS 511,580 LpW IIFY 77 Water System Development 537,000 DRP
$3,983,065
INTER-TRIBAL COUNCIL bF CApFORNIA
.FY 71 Campground feasibility study $. 2,500 TAFY 73 Planning grant 75,000 PGFY 74 Planning grant supplement 39,291 PGrFY 75 Planning grant . 104,500 PGFY 76 Planning grant 150,000 PGFY 76 Planning grant supplement 25,609 .PGFY 76-TQ Planning'grant supplement sp,000 PGFY 77 Planning grant 100,000 PG
$546,900
LA JOLLA1
FY 74 Campground facilities $ 83,000 PWIPFY 76 Overrun--campground facilities 50,000 PWIPFY 77,e
771(Purchase water tanker truckWell, storage tanks, pipeline
20,000, DRP
ano chlorination station 1165 750 DRP
1318 9750
.
LAYTONVILLE
FY 76
LONE PINE .
FY 77
MANZANITA
'FY 77
MORONGO
FY*74FY 77
FY 77
One mile access road and bridge
Sewer System
Purchase water tanker truck.
Addition to health clinicTribal office and Classroom
BuildinsDrill well and install' pumpwaterline
ORLEANS KAROK TRIBAL COUNCIL
FY 77FY 77
.#
Community CenterPurchase trucks and water, buildstorage tans and addlinister awater conservation program
OWENS VALLEY (Bipop)
FY 72FY 73
FY 73FY 74FY 75FY 75
FY 75. FY 76FY 76
Shopping Center feasibility studyMulti-purpose building (supplement to
HUD) (Bishop)Plannin-g grantMuseum/cultural center (Bishop)Planning grantOverrunmulti-purpose building
(Bishop) .
Planning grant supplementPlanning grantSite preparation and storage forcultural center and sitepreparation and outdoor refreationfacilities for multi-purposebuilding (Bishop).
$112,000 PW
$448,000. PW
$20,000 DRP
63,000 NIP
218,900, LPW II
22,600 DRP
$304,500
$171,840.'
208,500
$380,34
LPW I
DRP
I$ 5,506 TA
132,445 PM27,000 PG
398,000 PWIP29,500 PG
94,500 PW1,400 PG
43,000 PG
2594300 IIPW
OWENS VALLEY (Bishop) continued
FY 76-TQ Planning trant supplement $ 10,750 PGFY 77 Planning grant- 43,000 PGFY 77 Buy trucks to transport water. 124,000 DRPFY 77 Professional Builbing (Bishop) 960,1`00 .LPW I
PALA
FY 72 Community centerFY 73 Overruncommunity centerFY 77 Irrigation Project - Phase I
$2,128,195
$ 60,500 PWIP139,500 NIP5229,700 LPW II.
$429,700
PAUMA BAND OF MISSION INDIANS
FY 77 Tribal Hall $228,927 LPW IFY 77 Wrchase a water truck 20,000 DRPFY 77 Will, pumphouse and waterline 31,000 DRP
$279,927
PLUMAS COUNTY INDIANS, INC.)(
FY 77 Faciiity
RINCON
$174,790 LPW. I
FY 76 Community center .. $316,000 'PWFY 77 Community center - overrun 54,000. PW
$370,000
ROUND VALLEY (Coirelo)
FY 76 Community center . $260,000 PWFY 77 Recreation facilities 239,960 LPW II
$499,960
SANTA ROSA (Mission)
:7FY 77 Purchase water truck and constructa trough- for cattle $ 17,900 DRP
sosom
FY 77FY 77
STATEWIDE
FY 70
FY 71
FY 72FY 72
J
FY 73
FY 77
FY 77
FY 77
FY77
FY77
SULPHUR BANK
FY 76
TULE RIVER
FY 72FY 74FY 77FY 77
FY 77
Community CenterDrill well, replace water, lines,
and build storage tank
Development of Indian Entrepreneurialprogram by Urban Indian. DevelopmentAssociatioll in Los Angeles, Calif.
Continuation of Indian Entrepreneur al
program.Indian campgrounds development progrTechnical evaluation'by,University of
California of Indian planning programconference
Supplement to Indian campgroundsdevelopment
C ntral Valley Indian Health Service,
Inc. - -Buy water, trucks, and.containers
Mendocino County Indian Health Service
Inc. - Build 7 storage tanks,purchase 3 water trucks andadminister a water conservationprogram -
Mendocino-Lake Counties Tribes (Multi-
Indian Tribes, Inc.) - Planninggrant
Northern Valle,y Indian Health ServiceInc. - Buy trucks for waterdeliveries
United Indian Health Service, Inc. -
Drill well, buy trucks, tanks,pipes, pumps, water and foradministrative ex0enses
ti
Tribal center
Community. centerCommercial centerPlanning grantTrout hatchery and fish processing
pl feasibility study.rovements
$218,360 , LPW-II
121 ,060 DRP
$339,420
$ 50,000 TA
80;000 TA
'60,000 TA.2,500 TA
65,000 TA
163,700 DRP
136,313 DRP
40,000 PG
27.000 DRP
200,000 DRP
$824,513
$158,000 PW
$?45,888' PWIP\50,700 PWIP17,500 PG
46,500 TA
273.440 LWP-II
$634,028
TUOLUMNE
FY 75FY 76FY 77
Community centerOverrun--community centerPurchase water, water systemimprovements and buy equipment'
$133,000 PU37,000 PW156,900 DRP
$326,900
VtEJAS(C...
FY 77 Planning grant $ 39,880 PG
WENEPEM MAIDU
FY 73. Feasibility study of potential \. $ ,500 TArecreation development \
ii
\.
4
California State Total: S15;877,203;
`.
35-31-
ti
SOUTHERN UTE
FY 69FY 70
FY 71
FY 72
FY 73FY,74FY 74
FY 74FY 74FY 75FY 75
FY 75FY 75
FY 76FY- 76-TQ
FY 76-TQFY 77FY 77FY 77FY 77FY 77
XI FY 77FY 77
,UTE MOUNTAIN
FY 72FY 73' -
FY 74FY 74FY 75FY 76FY 76FY 76-TQ
COLORADO
Planning grant-Tourism complex, including/40-unit
motel, pool, restaurant, arts andcrafts center, gift ?shop
Planning grantWater supply system (Ignacio)
(supplement to EPA)Planning grant
-Tourism complex studyHorse training and conditioning centerstudy
Horse training and conditioning centerPlanning grantRenovation of two tribal buildingsOverrun-renovation of two tribal
. -buildingsPlanning grantTourisvirecreation study for Chimney
Rock'areaPlanning grantOverrun--renovation of two tribalbuildings
Planning grant supplementPlanning grantSheltered workshop'Industrial parkHorse training center - Phase IIAddition to Heads tart building.Addition to tribal justice buildingIrrigation system improvements, anintake structure, water tank truck,and storage facilities
Mancos Canyon development studyPlanning grant'
-I
Planning grant supplementIndustrial parkPlanning, grantPlanning grantExpansion of'pottery plantPlanning-grant supplement
-32-
36
$ 19,200 -
6,00019,230
511,250
36,2502,500
2,500668,00020,000
500,000
50,00029,000
25,00043,000
125,00010,75043,0005,000
120,000790,50048,000322,910
103,000
$4,050,090
$ 35,00030,00026,700
112,00036,00043,000
125,00011,670
PG
PVPGPW
PGTA
TAPW
*PG
PW
PW
PG
TAPG
Fit
PG
PG
PW
PW
PWLPW IILPW II
DRP
TAPGPGPWIPPG
PGPW
PG
UTE MOUNTAIN continued
FY 77 Planning grant S 25,300 PGFY 77 Completion ofindustrial park 138,000 PWFY 77 Recreation buildi.pg restoration 521,540 LPW IFY 77 Irrigation system- 50,,000 DRP-------$1,155,210'
Colorado State Total: $5 205 300
o
LORI OA
MICCOSUKEE4
FY 67 Tribal center feasibility study S 5,000 TAFY 71 Economic development alternatives 2,500 TAFl 73 Tri bal center 222,000 PWIPFY 73 Planning grant 24,000 PGFY 74 Planning grant 21,300 PGFY 74 v Arts and crafts store . 130,000 PW-
FY 75 Improvements to community building 31,318 PWFY 75 Li brary 152,000 PWFY 75 Napping project 2,500 ," TAFY 76 Plannfing grant 35 ,000 PGFY 76 Restevv4 renovation 125,000 PWFY 76 Sidewa1V . , 50,000 X
FY 76 Water improvements 185,000 X
FY 76-TQ Planning grant supplement . 8,750 PGFY 77 ....._ Planning grant 27,000 PGFY 77 Tennis courts, lighting for softball
field and basketball court 75,000 PWFY 77 High School building 336,160 LPN IFY 77 Recreation center 144,540 .LPN I
SEMINOLE .4
Puaculture feasibility develop4nt/40-acre industrial park at Brighton
:.
and 71 camping pads
S1 ,577,068
i
$180,759
1.,074,000
TA
PW
FY 70FY 71
FY 72 Overrem--industrial park . 43E4000 PWFY 72 Aquaculture development project 29,935 TAFY 73 Community building at Brighton 85,000 PWIPFY 73' Planning grant 36,000 PGFT 73 Development of aquaculture industries 45,575 TAFY 74 Development of aquaculture industries 54,979 TAFY 74 Community building at Big Cypress 150 ,000 PWIPFY 74 Reservation range fence 55,500 PWFY 74 - Planning grant 32,000 .PG
FY 75 Development of aquaculture industries 50,311 TAFY 75 Catfish production farm 101,000 PWFY 75 - Li brary - Big Cypress 51,00() PWFY 75. Planning grant 25,000 PGFY 75 Swimming pool - Brighton 51,000 PWFY 76 Planning grant . 50,000 PGFY 76 Sidewalks - Hollywood 50,000 X
FY- 76-TQ Planning grant supplement 12,500 PG
SEMINOLE contihued
FY 76-TO Industrial park ;-erighton S 14,501 PWFY 77 Planning grant 26,300 PGFY 77 Aquacul ture project -- Brighton 200,000 LPW IIFY 77 4.H Complex - Brighton . 212,870 LPW IIFY 77 Cross fencing - Big Cypress 2S 000 OW II
$3,051,30
1
Florida State Total :
ti
..0
COEUR D'ALENE
'I A.M 0
S 82,335\
27.75042.300114,000
000.111 00026 500
PW
PGPG.TA
PWPMPG
Multi-purpose building(supplement .to HUD)
Planning grantPlanning grant supplementResource development program.Tribal administration building andwater system facilities
Overrun -- administration buildingPlanning grantContinUation of resource development
FY 72
FY 73FY 74FY 74FY 74
FY 75FY 75FY 76
FY 76program
aGrain/shop storage facilities
88.000472:000
TAFig
FY 76 Planning vent 15,000 PGFY 76-TQ Planning grant supplement 8,750FY 77 txpand tribal farm °ovation" 5,40.000- PMFY 77 Overrun- -farm 22,000 PWFY 77 Planning grant 29,200 PGFY 77 Resource development program 67,100 TAFY 77 Paving, grain elevators, tribal
farm headquarters 183,496 .LPW IFY77 Community building 86,164 . LPW IIFY 77 AurChascfire truck, construct
garage and build fire breaks 146.000 DRP
$2.355,595
FORT HALL
FT 67 Sewage collection system study 963 TA -FY 67 ter' treatment facility study 974 . TAFY 67 r system study 990 TA,FY 67 Commercial water system 171,000 PWFY 67 Sewage collection entem 131,000 PWFY 67 Water treatment facility 48,000 PW
(supplement to HUD)FY 67 Business loan to Fort Hall Potato Co.
for construction of fresh potatostorage facility 160,000 BL
FY 72' Fairground expansion , 113,000 PWIPFY- 72 Human resources development and
training center facility 882,000 PWFY 72 Economic feasibility study for
industrial end tourism development 20,000 TAFY 73 Overrun,- - fairground expansion 26,000 PMIPFY 73 Planning grant 24,000 , PGFY 74 Planning grant supplement 5,300 PG
-36-
40
FORT MALL continued
FY ,75FY 75FY 75
FY 75FY' 76- TQFY 77
'FY , 77
Pl anning grant --Planning grant"Livestock -fad 1,i ty and range
improvementtFarming enterprise studyPlanning -grant supplementLand preparation projectBuildings and other facilities
$ 29,500 PG35,000 PG
416,00050,000 ... TA8,750 PG
230,000 PW
for tribal farming enterprise 688,000 ,PWFT 77- Planning grant . . :., , 32,100 PG_F,Y 77 Tilbal office 1,509,99,7 LPW tFY 77 Transmission 1 i nes , storage-,- facility and fire hydrants 346,000 DRP It.,
s.
KOOTENAI
FY 46FY 76- TQFY 77
NEZ PERCE
FY 6666
FY 67FY 67FY 69
A7v' F 'Y
FY ..70
FY 70
FY 71
.FY 71
FY 72
EY .-73FY 73FY 73
FY, 74
$4;928,574
Community centerOverrun--communi ty centerOverrun--community center
4
Sewage collection systemInterceptor sewer lines
(supplement to EPA'}Water metersWater storage tank'Business loan to Idaho Ti,ee Products
for industry expansion -onreservation
Water and sewer system improvements -
Water and sewage treatment facility(suppl ement ,to , HUD ) -
Employment coordination program fortraining and job pl acement
Remodeling andreno ation of three'tri.641-Community buildiAs and construction of:forestry Aand t:esourceicomplex
fi
.
Expansiow.and improve----ments to Sig Eddy Marina
Conti nuation of employment -_coordination program
uation of tourism/recreation complex_
Planning grantConti nuat; on employment ccrordination
program ,
P1 anni ng grant s Uppl en-lent
;1
0
$114,00020,00012-000.
$146,000.
PW
PW
PW
$ 84,000 PW
22,000 PW
a
14,000 PW
29,000 PW
345 ,40P117,000 ,19,96.0
BLPW
PW
r 29,000 TA
,154,000 PW.
378,000 PW
33,000 TA2,500 TA
27,000 PG
31,000- TA. 18,000 PG
NEZ PERCE continued
FY. 74 Continuation of employment toordination-program 24,000 TA
FY 74 20.3 miles of barbed wire .-"C" 63,000 PWFY 75 Overrun--fencing project 10,000 PW-
FY 75 PlInni ng grant . - 26,500 PGFY 75 Tourism/recreation study 2,500 -TA----
FY 76 Planning grant . 17,500 PG.
FY 76-TQ Planning grant supplement 8,750 PG
FY 76-TQ Land-use study and agri-business plan 41,000 faFY n Planning grant 32,100 PGFY 77 , Tribal office building 480,800 LPW II
$3,010,010
-
STATEWIDE (University of Idaho)
FY 72 Business development center $ 87,000 TA.
FY 73 Continuation of business developmentcenter 44,000 TA
FY 74 Continuation of business developmentcenter 114,000 TA
. FY 76 Continuation of business developmentcenter .7 103,000 TA
$348,000
Idaho State Total: $10,188.179
9?
IOWA
SAC AND FOX
FY 77 Tribal office building $796,000 OW I
ry
-?
KICKAPOO
KANSAS
FY 77 Water systemFY 77 Shopping center (Horton)
Iowa State Total: $796,000
PRAIRIE BAND POTAWATOMI
"FY 77 Multi-purpose community center
$1,200,000 PW378,519 --LPW I
$1,578,51,9
$263,450 'LPW II
=1iir
Kansas State Total: $1,841 ,969
LOUISIA,NA
CHITIMA.CHA
FY -73 Tri bal center $ 77,000 PWIP
FY 75 Crafts workshcip 'buil ding 50,000 PWIP
FY 76 Overrun-- crafts workshop 15,000 PWIP
PaoSW
$142,090
COUSHATTA
'FY 76 Cultural center $ 24,800 PWIP
FY 76-TQ . Cultural center - .overrun 16,800 PWIP
$ 41,600
STATEWIDE ( Indian Affairs Commissidn
FY 73 Indian human resources study $ 2,500 TA
FY 74 Ecconomi c development program 35 000 TA
$ 37,500
'lb
Louisiana State Total : $221,100
41.
PASSAMAQUODDY
FY 68
FY 68
FY 68
FY '70
FY 71
-FY 73
FY -73
FY 73FY 74
FY 74
FY 74
ItY 74
Y 75Ky 76FN6Fr
FY 76FY 76-TQ-FY 76-TQFY 77FY 77FY 77FY 77FY 77 ,
M A I N E
(Peter Dana Point, Princeton Strip and Pleasant Point)
Sewer cokection and water mainsat Pleasant' Point
Sewage t_ reatment plant at PleasantPoint .
Water distribution, sewage treatment'system at Peter Dana Point
Study on Passamaquoddy ' s physical,natural and human resources
Sewage collection/treatment andwater distribution at Princeton Strip
Planning grant to Penobscot/Passamaquoddy Tribal Planning Board
Community .building at Pleasant PointBasket co-op studyRenovation of basket co-op at
Indian Township',Museum and arts/crafts building
at Pleasant PointCampground, 15 four-bed cabins,administrati,on building at IndianTownship
Planning grant supplementPlanning grantOverrun-- campground complexMunicipal building at Indian TownshipOverrun--museum and arts/craftsbuilding
PI anni ng grant
Community center at Pleasant Point.P1 ann i ng grant supplementPI anni ng grant
Planning grantMobile home development'Fish processing plantWater/sewer at Indian Township
PENOBSCOT L(Indi an Is 1 and )
Fk72 Engineering study for community__
facilityFY 73 Community center (supplement to HUD)FY 73 Waste treatment plant (supplement
' to EPA and State),"
API
-41-
1
$254,000
30,000
150 ;000
13,373
436 :00Q
PW
PW
.P1(
TA
PW.
32,000 PG117,600 PW50,000 *0 TA
56,000
150,00p.
200,00021 ,400
37,000100,000158Apo
50,00037,000
168,0009,250
37,00045 ,000.
185 ,200343,44478,250
,517
PW
PW
PWPGPGPWPW
PW
PW. PGPGPG.
LPW ILPN ILPW II
$ 3,700 TA
117,600 PW
66,045 PW
4
PENOBSCOT continued
FY 73 Water and sewer system expansion $ 60,900 PW(supplement to HUD)
FY 74 . Two small campsites with 25 canoes 55,000 PW
FY 75 -Furniture plant study 7,500. TAFY 76 Tribal- office building 1'92,000 PW
FY 77 Health and social service building 4664 00 LPW I
WAMPANOAG
FY 76FY 77
1
4
$968,845
Maine State Total: $3 727 362
MASSACHUSETTS
Scallop_ production studyScallop productiovstudy
O
-t70,000 TA76 050, TA
$i46,050
Massachusetts State Total: $146,050
, MICHIGAN
BAY MILLS
FY 75- Fish processing plant $393,000 PWFY 77 Overrun--fish processing plant 70,000 . PWFY 77 Multi-purpose building 1 ,154,000 LPW I
HANNAHYILLE
FY 75 Swine farm$127,000 PWFY 76 Ohm land clearing- 100,000, XFY 77 Street and road improvement program 442,000 PWFY 77 Overrun--swine farm
. 29,000 PW
$698;000
,ISABELLA (Mt. Pleasant)
FY 73 Community center (supplement to HUD) $ 10,000 PWFY 75 Campgrounds314,000 PWFY 77 , Overrun--campgrounds 65,000 PWFY 77 Expand tribal center 877,900 .LPW I
KEWEENAW BAY (L'Anse)/
-. FY 73 Community center renovation at $ 58,000 PWL'Anse (supplement to HUD)
FY 75 Campgrounds .. '27,000 PWFY 76 .
Road improvements539,500 PWFY 77 Multi-purpose building 204,800 - LPW IFY 77 Resurfaciqg of road (Zeba)109,680 .LPW IIFY 77 Purctte54 two fire trucks- 4 141,000 DRP **
$1 ,3i6 ,900
MICHIGAN INTER-TRIBAL COUNCIL
J
FY 73FY 74FY 75FY 76FY 76-TQFY 77
4
Planning grantPlanning grant supplementPlanning grantPlanning grant/Planning gran supplementPlanning grant
$1,479,980
$ 40;000 PG8,900 PG.
41,500 PG50,425 PG13,750 PG50 400 PG
-$204,975
SAU LT STE. MARIE
FY 77
FOND DU LAC
ree community centers $327,440 LPW II
_Michigan. State Total : $5,654,295
MINNESOTA
FY 69 ' Industrial park si e survey $ 2,500 1 TA
FY- 74 Campgrounds & 250,000 PW
f FY 76 Improvements to recreation area 150,000 X
FY -76-TQ Industrial building 400,000 PW
FY 77 Roadway, building process, facility 300,000 LPW I
FY 77 Furnace manufacturing plant improve. 11,780 LPW II
FY 77 Buy and transport water, buy truck,lease well drilling equipment,and conduct a water conservationprogram 90.000 DRP
/GRAND PORTAGE
$1,264,280
FY 73 Motel feasibilitg study $ 2,178 TA
FY 73 Environmental impactttudy on tourism 9,670 TA
FY 73 Tourism complex; motel, campgrounds 2,790,000 PW
FY 74 Tourist information center 244,000 PW
FY 74 Harbor/marina study 7,000 TA
FY 75 Working capital loan for motel 37,500 BL
FY 75 Overruntourism complex 376,000 PW,
FY 76 Recreation facilities 250,000
, FY 77 Addition to hotel and staff housing 608 000 .PW
$4,324,348
LEECH LAKEf
FY 69 Recreation complex; marina, boatstorage, campgrounds andtrailer spaces
$7 0 7,0 00
FY 70 Community center (supplement to HUD) 116,858 PW
FY 72 Overrun--recreation complex 131,000. PW
-44-
"
LEECH LAKE coriiinued
IFY 73 '/ OverruncommunityFY 73FY 74FY 76FY 77
MINNESOTA CHIPPEIMA TRIBE
Overrun--comm nityBowling allCampground mproveAdminist ion buil
FY 7FY 4FY 5.
FY 75F 76
76-TQF* 7
MILLE LACS
FY 69FY 70FY 72FY 72FY 74FY 76
76
FY 77Y 77
NETT LAKE
FY 74FY 74FY 76FY 77FY 77
buildingbui 1 g
s
ding expansion
$ 18,250 PW14,500 PW
289,000 PW100,000 X
1,398,253 LPW I
$2,774,861
.
Planning grantPlanning grant suppl menuCattle ranch- (White th)Planning grantPlanning grant..
Planning grant supplementPlanning grant
$150,000t ,300 '..
359,000146,000175,00072,915
145.900
PG
PGPW
PGPG
PG'
PG
$1,082,115
Industrial /traini ng buil di ng $100,000 PWOverrun-- industrial /traini ng building 17,500 PWElectronics production assembly study 2,500 TAElectronics plant accounting stud:fr 2,500 TA,Electronics building expansion 130,200 PWOverrun--electronics building expansion 13,837 PWCampground 365,000Municipal /Dental office 308,503Storage/garage for boats at tribalmarina 36,487 LPW
) $97t ,527
Sawmill and logging cooperative $279,500 PWOverrun -- sawmill and logging co-op 24,000 PWRoad and lake shore improvement 200,000 XReview-tawmill operation 5,000 TATribal administration building 366,320 LPW II
$874,820
-45-
t
RED LAKE
FY 66FY 66FY 67
.
FY 68FY 70FY 70
Furniture plant studyvRebuild sawmillIndustrial park (97 acres), water /-sewer
Planning grantForest resources studyAccounting study for cedar fence plant
$ 3,000200,000
225,00035,90026,2005,000
TABT.,
PWPGTATA
FY 70 Natural resources study 10,000 TAFY 72 Mill operations accounting study 2,500 TAFY 72 Forest utilization study 2,500 TAFY 72 Sawmill complex expansion 784,600 PW
FY 73 Planning grant 30,000 PG
FY 74 Neighborhood facility (supimementto HUD) -
224,577 PW
FY 74 Fish processing plant 864,000 PWFY 74 Planning grant supplement 6,700 .PG
FY 75 Planning grant 32,700 PG
FY 76 Planning grant .
(
39,425 PG
FY 76 Forestry road improvements.. j 200;000 X
FY 76-TQ Planning grant supplement 21,500 PGFY 76 -TQ' Housing component manufacturing
feasibility study. 5,000 / TA
FY 77 Planning grant 32,300 PGFY J7 Planning grant 43,000 PG
FY 77 Humanities center addition 1 063,830 LPW I
$3,857,732\
WHITE EARTH
FY 69 Water distribution and sewagecollection
$330,800 PW
FY 72 Community center 165,462 .PWFY 77 School-multi-purpose 1 ,337,634 LPW I
4
$1,833,896'
Minnesota State Total: $16,928,579
-46-
. 5u
MISSISSIPPI
-CHOCTAW
Tourism studyForest inventory progre,Industrial park includitig water,
$ 32,0002,500
-
...,
TA.TA
FY 67v.--FY 70
FY 71
sewer and roads 606,000 PWFY 72 Community center 289,725 PWIPFY 73 Planning grant to the East Central
-Economic Developmiht District 24,000 PG. FY 74 Planning grant supplement. 4,700 PG
FY 74 Community building 395,000 PWFY 74 Overrun --community building 26,300 PWFY 76 Two community buildings
-a.
.275,000 PWFY 76 Community building ' 424,000 PWFY 76 Planning grant to .Choctaw Tribe 29,170 PGFY 76-TQ Planning. grant supplement 8,750 PGFY. 77 Community building_ (Tucker) 500,000 PWFY 77. ; Planning grant 26,300 PGFY 77 Industrial park improvements 577,000 LPW I..FY 77 Office complek!expansion (Pear iver) 265,330 LPW LI
575 ,
-----
Mississippi State Total: $3.481.515
-47-
s.
M 0 ft T A N A ,
BEAR PIKW ECONOMIC DEVELOPMENT DISTRICT
FY 73
FY 75FY 76FY 76-T0FY 77
Planning grant supplement todistrict grant for Ft. Belknapand Rocky Boy's Reservations
Supplement to district grant.Supple:Lerto district -grantSupple t to district grant'Supplement to district grant
BIG HORN ECONOMIC DEVELOPMENT DISTRICT
FY 73
BLACKFEET
FY 66
FY 67FY 67FY.68
FY 69FY 69FY 69-FY 70
'FY 71FY 71FY 71
FY 71
FY 71FY 72FY 72FY 72
FY 73
Planning grant supplement todistrict ,grant for Crow andNorthern Cheyenne Reservations
67-acre industrial park, includingwater, sewer and roads
Lumber millPlanning grantStreets and storm sewers forBrowning
Livestock marketing center studyOverrun--street and storm sewersPlanning grantPlanning grantTourism market potOtial studyPlanning grant100 trailer camp sites; picnic area;boat launch; swimming pool (St. MaryLake) (supplement to BOR)
Water, sewer, roads, and relatedsite development for St. Mary'sLake
Pencil manufacturingfacilityLivestock salei rinPlanning grantRailroad siding to serve industrial
parkStudy to determine feasibility ofproceeding with tourism /recreationfacility as described above
-48-
's
$ 25,000
20,90025,0006,25025,000
$102,150
PG
PGPGPGPG
$ 25,000 PG
$356,000
146,0004g,000
670,0002,00050,00040,53539,7002,50039,350
362,500
920.000357,500500,00039,350
114,000
2,500
PW
BLPG
PWTAPWPGPGTA
PW
PWBLPWPG
PW
TA
BLACKFEET continued
FY 73FY 73FY 73
FY 73FY 73
Planning grantOverrun--livestock sales ringCultural, campingo.and recreational.
area, parkWinter_sports stud!,Working capital guarantee to
52,650140,000
435,0002,500
PGPW
PWIPTA
Breat Western Pencil Factory 350,000 BLFY 74 Planning grant supplement 26,700 PGFY 74 _Management assistance to Great
Western Industries 20,000 z. TAFY 75 Beef processing plant study 17,500 TAFY 75 Planning grant 50,000 PGFY 76 planning grant 50,000 : PGFY 76 Pave roads and parking areas;
install storm drainage system;lighting and fencing forindustrial park 506,000 PW
FY 76-1Q Planning grant supplement 62,500 PGFY 77 Recreation improvement 693,000 LPW IFY 77 Tribal programs office building 250,000 LPW IIFY 77 Starr School improvements 286,000 LPW IIFY 77 Recreation improvements(TwoMedicine Lake) 250,530 LPW IIFY 77 Wells, fire trucks and water
tank trucks 200,000 DRP'
CROW
$7,083,315
FY 66 45-acre industrial park $241 ,000 PWFY 67 Alfalfa pelletizing mill 667,000 BLFY 67 Meat packing plant study 2,000 TA f
FY 67 Carpet manufacturing mill 715,000 BLFY 68 Youth training camp 290,000 PWFY 69 Overrun--youth training camp 36,000 PWFY 69 60-unit lodge, restaurant and
. tepee village, concession area,
.-and public service utilities(Custer Complex) (See FY 70 marinaproject) 770,000 PW
FY 69 Grandstand 682,000 PWFY 70 Overrun--Custer complex 33,000 PWFY 70 Water needs study 2,500 TA.FY 70 Waste treatment facility expansion
to serve industrial park andCrow Agency (supplement to EPA) 223,300 PW
FY 70 Repairs, alterations, andimprovements:to lodge facility 394,000 PW
FY 72 Recreational complex study 2,500 TAFY 72 Fencing and management facilities for
tribal.buffalo herd -310,000 PWIP
1
-49-,
CROW continued
FY 73 Management assistance for SUn LodgeFY 74 / Management assistance for Sun LodgeFY 75 Iiprovements and repairs to Sun LodgeFY 77 Planning grantFY 77 Tribal centerFY 77 Water supply improvementsFY 77 Community services building
....
FLATHEAD
FY 68FY 69FY 71
Planning grantPlanning grant
.... .
Water and sewer system and waste. treatment facility at Pablo
(including supplement to EPA)FY 71 Hospital feasibility study (HotFY 714 Planning grant,FY 72 . Water and sewer system (Dixon)FY 72 Planning grantFY 73 Planning grantFY 74 Planning grant supplementFY 75 Planning grantFY 75 Tribal office center,FY 76 Framing grantFY 76 -TQ Planning grant supplementFY 77 Planning grantFY 77 Community buildings
FORT BELKNAP
FY 69
FY 72
FY 72FY 73FY 73FY 74FY 77FY 77FY 77
El
$ 41,70041,267
'45,00035,000
750,000868,000214.630
$6,363,897
TA,TA
1PW
PGPW
LPW. II
LPW II
$ 35,000 PG36,170 PG
621,600 PW
Springs)* 2,500 TA35.569 PG
406,000 PW35,569 PG51,100 PG.26,700 PG46,000 PG
555,000 PW45,850 PG
20,835 PG37,500 PG
1,970,278 LPW I
$3,925,671
Air industrial park with associatedairport improvements (supplementto EPA)
Management assistance study for. Fort Belknap BuildersShopping center feasibility studyWater system for shopping centerShopping centerCommunity center (supplement to HUD)Tribal office buildingCommunity center expansionWells, windmills, and trough
$608,000 PW
20,0002,500
463,000670,00080-,000
844,000600,000113.500
$3,401,000
TATAPW
PWPW
PW
LPW IDRP
FY 68 -FY 68
68Y69Y 69
FY 69FY 70-FY 71
tt ,71FY -71-FY471
.FY 724-
"-- ...FY 73fY 73
:FY 73'FY 73FY 749.FY 75FY 75FY 75FY 76 -
FY 76;TQFY 77`
. 'FY -77FY 77FY 77FY 77
FY 77
. .Sewer and water system : $155,000 PW.
Sanitaiy..sewse collection and,-disposal system (supplement to EPA) 28,000 PW -
. Planning grant .35,000 PGSubmarine net 'manufacturing study - 15,000' TA
rniing grant . 36,740 PGIn trial' park 283.200.,
,PW
'Pia in g grant 34;980 PGWa house building 187,600 PWTourismitecreation -study- - 2,500 TA
..,_Planning gearit- ., .--. 34,980 PG
Culturgal/touilsmimulti7purposebuildings at Poplat and Brockton . 900,000
.
PWPlanning grant I 34,980 PGTourism study 2,500- TASkill center (supplement,to..HUD) y 37,500. PWJewelry manufacturing study . 2,485 TAPlannins grant .. 40,000 PGPlanning grant supplement 8,900 PGPlanning grant i '-, 46,000 . PGRenovati OIL of -industrial building 224,000 PWRa4lroad spur into tndUstrial park 322.,000 PWManning grinf.: 45,850 PGPlanning gr-ant sUppliment 20,835 PGParking lot, enl&rge,buildingc,and_
renovate storage aildIngl.';-----.. 246,000 PW- Planning ant : --.. 37,500 PGPlanning grant Ate;
. . .0.. 50,000 PG
Bus gars es 2) ... 207,000 LPW IExpansion d renovati'on-of" -:-
community facilities . "-'-''''-''Develop recreation -facilities -
...
NORTHERN CHEYENNE
FY 70 1Touris alevelOpment stiziel -FY 71 Skill r- '-'"---.'FY 73 Apprais ur-im 'potential, .. Crazy, Head SpringsFY-73 Timber, thinning a
, FY 73 -Skill center, supplsupplement '-4f ;,
-FY 73. Rebuild burned-out sawmill .i. --FY' 74 -Paving for _tribal -building 44ith ,,,
., 670,000 .LPW iI321,460 . LPW 14
.- ,.. .... . ..
$4,029,410 .. ,.. ,
, ...e
site improvement and"landkape .-zr.-.. ..4* ,.. development .,,----
FY74 . - -7, Timbei: thinning, -fe ing:range land'.--
..-0 ...- and development- ,tering areas
FY 75 r Coal feasi bi 1 i ts-tFY 75 -..*---Additions-to trib ;',11 omPTex-r, , ...........j .... .., .
$ 2,500 TA216,000- - PW
2,500 TA296;000 PWIP119,00a PW
482-,625 BL,3
.)14,croo. ink
214,000- PWIP2,500 TA
550,000 PW
IktORT-14C--RN-CitE-YENNE contimmed
-:-
FY 76 be4lopMent of model irrigationFY-76 Two tribally-owned farms
-FY 76 Timber thinning program-rY 76 Overrun--tribal office complexFY 77 Planni ng grantFY 77 Communi ty/Soci al Service center
ROCKY BOY'
FYFY. 68
FY 69FY 69FY 70FY 72FY 72FY 72
FY 73FY 73FY 74FY 75FY 76-TOFY 77
FY 77FY 77FY. 7?
STATEWIDE
FY 76
FY. 76 .-
,
farm t 2,500 TA350,000 PW350,000 X75,000 PW
. 35,000 PG991,950 LPW I
Tourism/recreation development studyPublic recreation facilities includirl.camping d picnicking sites, '' -Iis
V;Fepark 4,- sWimmipg.pool,rdam toprovi- eke 'fot cbodttng aid -fishfni,. ii_ersenial seryiced;.-00P-s
9cafe,vgeneral stare', dofffs.ces,.,1,Water and:sillier', study -: ', - .:- -!!-Mul ti =purpose bui 1 di ng 9L. ' iS,'..4 .
Overrun-- recreati on faci 14 tilosLodit
.:Ski i .potential studyAddi oir
study.
ns and madifitattons torecreational facility
Overrun -- multi- purpose buildingilyerrun-- recreati on facilitiesPost and pole plant studyFarming enterprisePost and pole plant study updateImprovement to industrial _Wiling,tree thinning and -fencing , ,
Operating budget for post' and-pole- plantRocky Boy's ski areaSenior-citizens center
$3603,575
Indian- Cattlemen' s.-Corisoriium x'
Economic Adjustment-Assistance'(Title Indigitcpttl,emen.in Montana, North Dakatti,' andSouth Dakota
Prel imi nary- agri cul.tural study
(inclucWS' North and South pakott)-Agricultural potential of six -
reservations in Mon_tAna and ,
South Dakota: Ft. Belknap, Mo#tana;Cheyeffne Riven, Crow Creek, LoWer---7Brule, Sisseton'end Yankton,South Dakota
3,000 TA
335,0002,500
545 ,doo100,0002,5002.,500
737 jpo11 ,200-
8,6002,500
506,0001,145 .TA
PWTA
PWPWTATA-
.. PW.Pt(
258,6001,080
405,-66611T-524
-
$3 ,039 ,81 5
V.
A
5 6
-See National
PWTA,
LPW--
-LPW -II
X.-
4,500 TA
150,000 TA
t
4
41I
STATEWIDE continued
FY 77 : Indian-Cattlemen's Consortium -'Economic Adjustment Assistance(Title IX) supplement for drought ".assistance
FY 77 Review committee for study ofagricultural potential of sixreservations in Montana andSouth Dakota
IP
j
at
See National
800 TA
$155,300
Montana State Tl; $31,929,1 33
r.
.0
-53-
Ala
S.
4P
ar
INDIAN CENTER, INC.
--, Community. Service Center, Lincoln,Nebraska
NEBRASKA' INDIAN I NTtR- IBAL DE 'OPMENS_ORPORATION
$1 ,025,000
*.
PWIP
FY 70 Planning g4-ant (for. Omaha., Sahteeand Wi nneba go Reservations.
$ 31,920 PG
FY 72 Planning grefot 31,690 PG /FY 73 Planning grant 53,490 PGFY, 74 Planning grant supplement 30,000 PGFY 75 Planning grant .50,000 PGFY 76FY 76- TQ
Planning grantP1 arming grant suppl ement
55,00015,009-\
PG
FY 77. Planning grant 60 OM PG
OMAHA
al&FY -67
FY 67
Study for establishing industrialpl ant
Cattle feeding facility study69 Water and sewer system for i ndustri al
area
FY- 75FY 76FY 77
SANTEE
FY
FY '72FY 74-FY 76- TQFY 77
Street improvements and renovatepow wow grounds
'tComrminity enterPark and campsites -
.Tri bal- heel thou:filter (Macy)
Publi c campgrounds. and recreational.facility
Communi ty building (supplement to HUD)Industrial park _
Sewer systemExpand, community center
-54-I .
434 ,200
$ 4,000
9,000
224,000
TA,
TA
. .
338,000 PI C%
576,000 PW
308,000 r X
1,699 ,POO LPW. I
$3,158,000
$145,000 PWIP
120-,050 \t, PW430A00 . PW
53911M00. PW
605.600 LPW I
$1,839,650
WINNEBAGO .
FY 66 Sewage treatment facilities(supp ment to EPA)
.FY 69 Sewage tr twat .plant and outfallsewer li industrial park(supplement to EPA)
FY 69 NatecriZreatment facilitiesFY 69 19-a industrial parkFY n Water studyFY' 72 j Coinmunity building (supplement to HUD)FY 74 _,Street and community park 'improvementsFY 75 . Minishopping center study .fot-
Winnebago and -Rosebud.,South Dakota-FY 76 Overnight campground and culturalcetemonial facility'
FY 77 Education center
ti
r
st,\.
.$ 45,000
1
49;00039,000
196;8002,500
224,500306,00p"
20,0.Q0.
300,000522 650
$1 ,705 ,450
Nebraska State Total: $8,054,300
-55-
J4
.
ay. ,
PW
PPW1P'S
ETA
X
LPG. II
DUCK VALLEY
Y.73
Rim
FY-73FY 73
FY 75
FY g6FYFY 77
.DUCKWATER
FY 77
FALLON
FY 72FY 76.
INK 77FY 77
(land
FORT- McDERMITT
FY 76.FY 76FY 77
MOAPA,
EYADA
located in Nevada and Idaho)
Recreational) facilities at 78,000Mountain View Reservoir, Idaho -
to include camping and picnickingimProvements
4,000 sq. ft... training and skill center 822,.070.
Overrun -- recreational faci 1 i ti esMountain View Reservoir 9,000
Camping sites and roads at SheetCreek Reservoir "200:08e;
Overrun--camping sites and roads 60,000 .
Range improvement program. 170,000Tribal. headquarters building
$1
-1
,130,800
Multi-purpose building? $312,000
34-acre industrial. park $ 98,000Multi-purpose building and
training center 384,000Marketing distribution center 1274,919Educational wing addition 227,000
41.
$983,919
Water resource studySupplement to-water resource studyRecreational facility
1i1estock fencing` and
.FY 74 Feedlot development and farm operationFY 75 Community -butt ding '
FY 76 ,Overrun--feedlot development and firm
irribati.on di tchei
operation
.
* -56-
$ 68,00015,000
267,770
$350 ;770
$ 81,000
110,000228,000
20.000
$439,000
PWIP
PW
PWIP
pWPWX
LPW I
PW
.aPW
LPW ILPW I
41.
TATA
LPW II
PW
-PW
PWIP
PW
NEVADA INTER.71RIBAL COUNCILIINC.
FY 69 Planning grantFY 70 PlaRning grantFY 71 PlaMing grantFY 72: Planning grantFY 713 Planning grantFY 74 Planning grant supplementFY 74 Feedlot'sUdy-FY 75 Planning r. tFY 76 Pl:nning.g ant-
.FY 76-TO Plannin ., supplementFY 77 .Planning
PYRAMID LAKE
FY 68 .
FY 68.FY 69
FY 76
FY 76 (FY 77
RENO-SPARKS
FY 72,FY 77
0
At
Water resource studyCommunity building injdswoth,Nevada
ausiness loan to Nevtco Printing;Inc., for establishment ofplant on reservation
Communitty certe r in Nixon,.Nevada75-acre industrial park .'
Recreational areas and tourism_facilities at Pyramid Lake
Enlarge water system at industrialpark 1 200,000
Repair and replace livestock fencing 250,000Trial administration building 279,650
$1,609,450
AIL
$ 44,68047,61543,10043,10060,0006,70030,00070,00085,000.21,250
412291-
$529,345
PG
PGPGPG
PG
PS
PGPGP4 '
$ 400 . 'TA
45,000 PW
298,800 --46,000
(
250,0
Community facility (supplement to HUD)Recreation facility
4 1.
(iitCludes Battle Mountajp. Elico.Colony, Sou h Fork and Odgers Ranch)
BLPW
PW
PW
PW4P'X'
LPW II
$ 29,309 PW315,830 tir 'OW II
$345,1*%
-t,_ :,
FY 73 Recrea4onalltgurism study ( ti!. e. $..2,50o. TA
-, .,
Fork andAdgers Ranch)FY 74 Community: burl di (South Fork and
Odgers Ranch)FY 74 Arts/crafts building (Elko Colony) 111-,000 PWFY 76 Repair and replace range fencing,'
Water tanks and reservoirs(South Fork and Odgers,Ranch)
123,000 is PWIP
'104,000 X
--57=
Cunti nue
FY 77FY 77FY 77
WALKER RIVER
FYFY 77FY 77
Tribal headquarters (Battle Mountain)A istration building (Elko Colony)
ony Buildinegeneral store -(South Fork)
//)
Water resource development)ecreationalhree wells, rehabilitation ofsix existing wells; suppleqpntalwater storage
WASHOE NATION (includes Alpine,. Carson Colony, Dresslervil
150,000Mik73,600
OWNLPW II
73,500 LPW II
t633,500,
$ 40,000271,280
TALPW FI
100,000 DRP'
$411 ,280
le, and Woodsford). .
FY 72 Tourism/recreation Study $ 2,500 TA!.
FY 7p...... .
Recreation park including roadsystem, campsites, service
,, ..: building, and trailer park 256,000 PWFY 75. Community center (Woodsford)- 176,000 PWFY 76-TQ Community center (Carson Colony) 190,000 PWFY 77 Overrun -- recreation park .148,000 PWFY 77 Recreational park improvements 150,000 LPW IFY 77 Senior citizens center (Dresslerville) 133,430 LPW II
YERINGTON,
. -
-YOMBA
FY 77-.
FY 76 -
7
Multi-purpose building
Community building
Reservation resource StudyJob development program - NevadaUrban Indians
$1,054,940
4
LPW I
$223,000. PWIP
.TA
'51 400 . TA`
$ 54,400 ,
Nevada State Total: $8,477,533
62,.=.1. 11.
A
ACOMA
FY 67
FY. 68
FY 72.FY 73FY 73FY 74FY 74FY 74FY 75FY 76FY 76FY 76 -TQFY 77FY.77FY 77
FY 77'FY 77FY 77
LANO (Navkjo)
N!W MEXICO
Feasibility study on trainingand employment center
Training employment ante!0verrun-t ining and ehploreniWater resource evaluation stillPlanning grantPlanning grant supplementVisitor's center (Sky City)Commercial complexPlanning grantOverrun--commercial co_mp exPlanning grantPlanning.grant suppleilePlanning grantTribal adminiItration buildingWater wells, pipes, generator, andstorage4aaa
Staff housing for hospitalYehiClp maintenance shopWell, storage facility t'd water
$ 25 TA
PWcenter 125,000 PW -it
2,500 i)25,000 PG5,400' PG
150,000 PWO90,000 PWIR29,500 PG ,
25,000 PWIP29,200 PG8,750 PG
32,100 PG357,953 LPW I
46,100 LPW II159,447 LPW II136,000 LPW II
line 196,000 DRP
$1.618.875.
FY 67 Community center study
.
ALL INDIAN PUEBLO COUNCIVINDIAN PUEBLO CULTURAL CENTER, INC.
FY 72FY 7,4FY 76FY 76FY 7T
CANONCITO (Navajo)
FY 67
Cultural center'
MAnagement assistanceOverrun-- cultural. center
-ftpagement assistance-.Program assistanCe'
ommunity center study
-59-
63 1,
$ 925 TA
$1 ,640,000
50,000360,000
. 56,00035 450
$2,141,450,
PWTAPWTATA
$ 843 TA
4
COCHITI
FY 75FY 77FY 7.
1.410
.
Comm centerIrrigationsystem'imPromementsCommunity warehouse facTlity
EIGHT NORTHERN PUEBLO
FY 72 Nursery studyFY 73 Planning grantFY 74 Planning grant supplementFY 75 Planning grant.FY 76 'Adobe brick production training ..
FY 76 Planning_prant76-TO Planning grant supplemat.
fY 7 Site-development for adobebrick enterprise
-Planning grantPlanning grant supplement
FY 7FY 77"
GALLUP INDIAN COMMUNITY
FY 71 Indian business development center
GALLUP INTr.TRIBAL ASSOCIATION
FY 66 Tourism/recriation surveyFY 68 Tourism/recreation survey
ISLETA
FY 67FY 67.
FY 67FY. 68
FY 68FY 68FY 72
,FY 73
FY 73FY 74FY 75FY 75
Tourism/recreation studyMulti-purpose building studyManagement assistance (C.S. Packing CoTourism/recreation facilitiesCommunity centerPaper plant studyExpansion of recrea.tion program studyExpansion of fishing and camping
facilitiesPlanning grantPlanning gramt supplementArts/crafts buildingPlanning grant
-60- .
$352,000 PW .
160,960 LPW II160 000 LPW II
$672:960
$ 2,500- TA40,000 PG11,100 PG42,000 PG
100,000 X
50,000 PG
'12,500 PG
167,000 PW50,000 PG5 000 PG
$480;100
$ 58,500 TA
$ 47,000. TA9.000 TA
$ 56,000.
$ 913925
) 5,000351,200166,00047,0002,500
182,Q0015,844.-
5,000158,000.32,500
TATATAPWPWTATA
PWPG
PG
4141PG
Isam continued
Commercial centerPlanning grantPlanning grant supplementPlanning grantImprovements to recreftien siterecreational vehicle camPgropnd
20,20035,80010W5043,000
71)650
FY 76FY 76ry/FY 76 -1to
77 .
77
$2,034,682
JEMEZ
st
67
FY 69FY 70FY.72
FY 73FY 73
FY 74it 75
FY 76
FY 7
F 7
JICARILLA
. FY 68
FY 69 16FY 70FY '70
FY70
FY 72
Feaeitility study trainingemployment t center
Training and employment center'Movie studio feilsibility studyManagement and qbarketing assistance
for fribal enterpriseCampgrounds and recreation facilitiesIndustrial building for tribalenterprise
Outdoor sports recreational facilityCommunity center and expansion' of
Holy Ghost fishing areaz tribal enterprise--management
and technical assistanceW ter lineImp ve roadway, install cattlegua
Irri tion improvements
() \
S 874
230,0002
2,50050,000
55,000
152 ,000
3,400187,500
129,370310,000
S1,171,144
Develop tourism facility on lower .$166,400Mundo Lake including water, supply
Sawmill leaiibility-study. 85,000
Sawmill feasibility spudy supplement 1,000Recrdation facility at Stone Lake
including motel, restaurant andcomplementary facilities
Sewage treatment facilites forStone Lake complex (supplement to EPA)
Overrun- -Stone Lake 'recreationfacilities .
V.
968,000
47,100
358'9960
PWPGPG'PG
1-1.PW ar
TA
PWTA
TAPWIP
PWPWIP
PW
TALPW II
LPW IILPW II
4
PW
TA
PW
Phi
JICARILLA continued
FY 73
V
7475
Y 75FY 76FY 76}
11/7.
-FYFY 77FY 77
LAGUNA
FY 67FY 68
r\FY 73FY 73FY 75e,0' FY 76FY 76FY 76
. Sewage Treatment Facilities -
Stone Lake complex(suppl ntto EPA) - Ovegrun
Planning grant. 30..0
Plannfhg grant supplement 10,600Ma9agemilint Assistance for Stonetake Lodge 32,000,
Planning grant 29,500Planning grant 35,000 .
Water supply development -
Stone Lake Lodge 295,000 PWPlanning grant supplement 8.750 PGPlanning ragt 29,200 PGGame and F sff\Building 60,444 LPW IIWater Tre nt Plant (Dulce) 505,f19 LPW IILake Improvements 21, 617 LPW II
`FY 7.6-TQY 77
FY 77
MESCALERO
FY 67FY 68
68FY 69'
. FY 69FY 69
FY 70FY 70
Water system, feasibilidstudyWater storm tank and distri
linesWater resources evaluation studPlanning grantPlanning grantPlinnin4 grantRenovate arts/crafts buildingNew well and expansion of community'
centerPlanning grant supplementPlanning gra-ntVillage Community Development.
--S
Community buildingTraining center)Cattle, fencing projectCommercial park
(trcial buildingdi; and desijn of recreationaldam (
Earthen dam and lakeStudy And design of recreational
dam - supplement
-62-
S2,694,200
918
96,0002.500
25,00035,00035,000
112,000
237,00010,750
.43,000.1..059.140
$1,656,308
. $575,000281,000144,000212,800108,485
-15,0002,297,600
3,500- - 'TA
TA
PWTA
.PGPG .
PG
PW
PW
PGPG
UV IX
PWPWPWPM.BL
TA. .
PW
.1
MESCALERO contihued
FY 71FY 71
71
-FY 71
FY 72FY 73FY 73
FY 74
FY 74FY 75FY 76FY 76FY 76FY 76FY 76-TQ
0 FY 77FY.77FY 77.
NAMB E
. FY 67
FY 74
FY 75
Overrun--commercial buildingPlanning grantResort hotel with gi;estaurant,
18-hole golf course. nd.complementary facili es
Study and design of rec ationaldam.- supplement
Planning grahtResort Motel --OverrunCommunity recreational complexplanning grantExpansion of water system f9r
industrial parkPlanning grant supplement /*-...Planning grantOverrun-- dam/lakeOverrun--tourism complexOverrun--recreation complexPlanning grantPlanning-grant supplementPlanning grantRecreation ImprovementsPaying of community building
parking lot
VIP
1
ourism/recreation camping facility
study toevelopment of Nambe Falls, recreation
areaAddition to community center
.1\
NEW MEXICO ARTS COPIMISSION
FY 76 Grafts marketing proposal
PICURIS
FY 67FY 61:t
Community center feasibility studyCommunity center, including arts/crafts facilities and museum
-
39,60027,213
1,965,000
111.
PG
P14
500 TA27_1213 P6._.._
PWIP37,176 PG
05,000 PW19,800 PG36,215 PG
376,000 PW779,000 PW845,000 PW43,000 PG10,750 PG43,000 PG604,00 LPW I
26 384 LPW II
512,502,232
$ 843 TA'
.009000 PWIP150,000 PW
. $250,843
$2,000
$ 925
*v.
TA
TA
101,000 PW
IliCURIS continued,
. J .FY 74 Picnic sites, fish holding tank,
landscaping. paving. and entrancegates S 75,Q00 PMIP
FY 75 Camping facilities 51.000 PWFY 76 - General site iMprov s 206 000 PW
, . $433.9i5,
1(71
FY 72FY 75
SAN -FELIPE
Industrial park including water andsewer (supplement to EPA) $308,900 PW
Overrun--industrial park 58.000 PWAddition to community center and .additional paving for commercial
park 92 000 PM ill
ler $458,900
FY 67 Community center studyFY 74 Community service building and
baseball fieldFY 75 Addition\ to community centerFY 77 Multipurpose-purpose faci 1 i ty
I
-SAN ILDEFONSO
FY 67FY 74
FY 77
Community center studyCommunity building/job- trainingcenter
Multi-purpose/recreation facility'
$ 891 TA
48,000 PWIP165,000 PM546 950 LPW II
$760,841
1
S 891 TA .
304 ;000 PWIP240,230 LPW II
SAN JUAN
6ommunity center studyMulti-purpose training center
$545,121
$ 92475,200
FY 67FY" 69FY 72 Arta and crafts center 1160,000FY- 73 Restoration of Pueblo's town . f
center ..:. 100,000FY 74 General store . ... _ 25,000FY 74 Multi-purpose. building - 152,000FY 75 / Addition to community faCility 1. 153,000FY 75 Overrun--multi-purpose building 30,000
'TAPW
PW
.
PWIPPWIP
- PWIPPW -1
PWIP
1r
SAN JUAN ,continued
FY 76
"FY 77
. r
SANDIA.
'Maintenance-shop-Wilding andaddition to multi-purposebuilding ir
Water lines, medical bui I ding; .ecreation facility. and ...
addition to building or . , 499,970 LPW. II$1,455,094
259,000
FY,67 Community center feasibility -,
study ;. . _ $ 896 TA.FY, 74 Outdoor -sports; recrea*ion facility 54,000: PWIPFY 77 Multi-purpose building, landscaping
and parking area . , 24300j .PW..-
...s.
.., $297:896
SANTA. ANA
FY 67FY-74FY 75
FY 77
-SANTA CLARA
FY 67FY 67FY 71.FY 71
FY. 73.FY 76FY 7,6'FY 77
SANTO DOMINGO
Vocational school feasibility study.Outdoor sports' recreation-rfac.ility-, Community building and water system
improvementsAddition to community cent*. ,
s
al
$ .40348;000
172 ,-000242,120
-$46341.3
TA,PWIP
PW
-1.PW II
Community center fe,asibil-itystudy 925 TARecreation devel opnnt,, plan 3,000 . TA
rixuye tliff Ruins tourism center 368000 PWPfillman ,car conversion -study- .
(includes Rosebud,.South Dakota) -.- 21,600 TA:Community center; (sypplement to HUD) 76,627 - PW'Water supply development , 326,000 PW"Tourist facilities 188,000 PWRemodel nei ghborhood facility 409,790 LPW II
$17.393,942
-FY 66. Business Joan for Aspen WoodProducts $618,000 BL
Fr 66 Working capital for Aspen Wood -. Products - 360,000 BL
-65-
69
4
SAN qpmnica continuedI.
.-FY 67FY 67-
f( 67
FY*
FY 69
FY 76'FY 77
Community center studyWorking capital for Aspen Wood
ProductsManagement assistance for )4'spen
Wood ProductsWorking capital for-Aspen Wood
Products^. 41
American Aspen Corp. Work49Capital
Multi-purpose huildingPost Offide
SIX SANDOVAL INDIAN PUEBLOS .
. . .
.1AOS0
FY 67!.
FY,74FY 74
:';-TY .74
FY 76-TOFY .77
FY 73 ,FY 74FY-75.FY 76FY 76-TQFY /7
11.
Planning,grantPlanning grant supplementPlanning grantPlinning grant.Planning grant.supplementPlanning grant
Community center studyMoccasin tribal enterprise studyLeatheicraft-enterprise studyMulti-purpose bdildingOverrq--multi-purpose building-Storage/Maintenance facility
and tribal-Offices
73 CaMpground75 Community center
r
.925
915,00a
6,000
-135,000
-270,000, BL303,00071,206 LPW II
$1,854,131
$ 3096§0-9,000 PG
42,000 %.
.PG
.37,500 PG12,500 PG"45,900 PG'
$177,590
$ 925- 2,5002,500
30000035,000
523,460
'$864,385
$294,000
PW
PW
ZIA
FY 67
FT 73
FY 74
FY 77FY 77
zuNI .
FY 67FY 68'
-FY 69FY 69FY-69FY 70
FY 71FY 71FY 72FY 73'FY 74 '-FY 75FY, 75FY 76FY 76 -TQ.FY'77
.FY 77FY 77
Multi - purpose: buildingfeasibility study
Campground and recreationfacility
Mul ti-purpose buil ding/healthcomplex
Addition. to community building:F7ir.e Houses and related equipment
Community center studyIndustrial_ park-Overrunindustrial park.Training tsviityAirport i, ovementsLeatheri and textiles
feasi 611 fty study -.-
Planning grantShopping cente site deyelopment`Planning grant. .
Planning grant ,
Planning grant supplement?Planning grantCampground facfl i VI etPlanning grantPlanning, grant sPlanning graCommunity centerCommunity- recreation center
element
New Mexico State Total:
918
50,000
1Q0,000227,000278,03Q
$ 925-246;50065,000-
254,400196,000
2,50026,-02198,000'26,021
27,0006,000
50,000187,00021,00012,500.50,000
750;000909,080
$2,927;947
$3/,927,795
. TA
PWIP
PWIPPW
:LPW II.
TA"PliPW
-PWPW.
TAPGPW
PG
PG.PGPG
PW
PGPG
PG
LPW I'LPW TI
ST. REGIS
.-FY 74Y- 74-
FY 75FY 75FY 76FY 76FY '76
FY 76-TQFY 77FY -77
- FY- 77
NEW YORK
Planning IfantSteel fabritatio plant
feasibility studyPlanninglrantCommunity.buildingCommpity building -:overrunWater system'Planning ;giantPlanning grant. supplementWater-line .
PlanningArantWater OsteM,installation
-
SENECA NATION (Allegany and Cittaraugus Reservations)
FY .67.
`FY 67. FY 70
FY 75
FY 75FY 76
FY 76FY 76FY 76-TQFY 77FY 77FY 77
FY 77
FY 7i
SHINNECOCK
FY 76FY 77'
45 -acre Industrial park -Cattaraugus
Tourism study .-"AlleganySchool building study -
CbttaraugusCampground (Phase I)(-Allegany
Planning grantCampground (Phase. II) -Allegany
Museum - AlleganyPlanning grant-Planning_grant supplementPlanning grantImprove water systemWater .System (ThoMas'IndianSchool)
Primary Electrical:System(Thomas Indian School)
Water System (Jimerstown)
Seafood production studyDevelopment of seafood ,industry
20,000 PG-
2,50023,500
300,000i 50,000
488,000-35,000
8,750242,500.35,000
1,060,000
$2,265,250
' $29700027,000-
PG -
PWPWCUI
PG
PWPG
LPW I
PW'
TA4'
2,500 TA
450,000 PW17,000 PG
112,000- PW-190,000 'PW
37,600 PG12,500 PG.50000 PG
234,390- LPW
-.423,000 LPW II
178-400381 000- AL
$2,411,990
LPW IILPW II
$ 90,000 TA70,940 TA
$160,940
'STATEWIDE
77
,
Cultural/Tourism Center(Native American-Center-forLiving Arts, Inc.) . $4,983,640 LPW I
New-York State Total-: $9,821,820
4
-69-
.
NORTH-- CARO'LINA
CHEROKEE.
FY 68 Planning grant 26,000 PG
FY 69 Planning grant.
28,300 PG
FY 70 Water resources study 2,500 TA
FY 70 Water ti sewer distributi,onfacility 304,200 PW
FY 70 Planning grant N -28,080,
PG
FY 71 Site improvement for shopping
FY 71 Planning grant 28,080aenter 82,000
FY Z2 Plannirrg grant..,
2)3,080 PG
FY 73 White-Shield-Enterprises 286,000 BL ---
FY'73 Planning grant _ 40,000 PG
FY 73 Planning grant supplement 5,960 PG
FY 74 Museum/cultural center 600,000 PW
FY 75 Overrun --museum/cultural center 210,000 PW
EY 75 , Planning grant 50,000 '' PG
FY 75 Ski resort study . - 24460 'TA
FY 75 Community building - Snow.Bird 137,t00 PWFY.76 Woodcrafts building ,., . . 152,600 PW
FY'76, , Community building (Murphy) 73,600 PW
FY 76 Planninvgrant . 50,000 PG
FY_76 -Sidewalks 113,140 X'
FY 76 -TQ Planning grant supplement 27,500 PG
FY 77 Warrior Woodcrafts building -overrun 131,000 PW
ey 77 Community buildin§ - overrun 21,725 PW .,
FY 77 Planning grant 55,000 PG962,500 LPW IFY 77 Cultural/ceremonial grounds
FY.77 Twin theaters 591 280 LPW II
MR,
$4,057,705
North Carolina State Total: $4,057,70
-70-
NORTH DAkOTA.
FORT BERTHOLD
FY 68 Clay product's studyFY 68 Community building at Mandaree
(supplement to HUD)FY 69 Water and sewer system-; tourist
tomplex including 40g-unit motel,restaurant, pool, utilitybuilding, service statfpn, trailerpark, marina, sewagd collecttonsystem and lagoomAsupplement toEPA for sewage facility)
FY 714., Overrun-tourist complex. andsewage calectioo system
FY 71 Community building at WhiteShield (supplement to HUD)
FY 71 Tourism complex studyFY 72. Management assistance for
tourism complexFY 72 Overrun-A.-water and sewer
systems --FY 72 Tourism/recreation study.FY 73 Planning grantFY 743 Management assistance for.
tourism complex .
FY 73 Overrun--tourist complex andsewage collection system
FY 74 Extiansion of water system fortourist complex
FY 74 Utilities buildingFY 74 Planning grant supplementFY 74 Roping and exhibition arena
plus a.spectator galleryFY 75 Overrun--,roping and exhibition
- arenaFY 75 Community improvementsFY 75 Overrun--utilities buildingFY 75 Planning-grantFY 76 Planning grantFY 76-TQ Planning grant supplementFY 77 Expansion of water system
for tRurist complex -overrun.
4
-71-
$ 2,000 TA
20,000.
1,122,420
455,550
128,6382,500
50,000
40,0002,500
30,000
50,879
127,930
134,000166,00020,000.
74,000
47,000540,00018,00029,50032,10011,670
70,000
PW
PW
IA
PWTA.PG
:TA
PW
PSI
PWPG
PW
PW
PWPWPGPGPG
PW
FORT BERTHOLD continued
_FY 77
FY 77FY 77.
FY 77FY 77
FORT TOTTEN4
fY 71
FY 73FY .73
FY 74
IP
Water intake, transmission andtreatment facilities fortourist complex
Planning grantAdministration center
(New Town)Modify intake structureInstall a pipeline
Community building't(supplement to HUD)PliAnning grantButiness loan for industrial:buildingTourism/recreation and shopping
. center studyFY 74 Planning grant supplementFY 74 Expansion ofivater/sewer-
lines for industrial building-FY 75 Planning grantFY 76 Planning grantFY 76 Utilities building and warehouseFY 76-YQ Planning grant supplementFY 76-TO Overrun--utilities building
. and warehouseFY 77 Demonstration tribal farming
operationFY 77 Planning grantFY 77 Planning grantFY 77
1"Road Improvements
STANDING ROCK
FY 70
FY 70
Water transmission lines, firehydrants, and sewer system(Ft;' Yates)
Reidrt complex at Grand IslandPeninsula on Oahe .Reservoir.Complex'consists of 46-unitlodge, boat dock, tepeevillage, and outdooramphitheater
-72-.
15,000 PW26,300 PG
1-,242,120 LPW.l62,000. DRP
345,0Q0 . DRP
$4,865,107
$10,54025,380
750,000
-11 51Z11,601)-
206,00037,000,32,100
282,00014,585
75,000
400,00026,30035,000
1,099,360
$3,205,377
'PM-P4
BL
TAPG
PWPG
. PGPWPG
PW
PWPGPG
I_PW I
$ 96,000. PW
1,219,000
--a ao
PW
STANDING ROCK
FY 70 Sewage treatment facility forrecreation complex.(supplement to EPA)
.
FY 71' Multirpurpose building._(supplement to. HUD '' 105 00 PW
FY 71 Skill center.
515 PWFY 72 L Resort complex supplement 300, 0 PWFY 72 ' Overrun -- Sewage treatment
facility fon recreation.. .
complex. (supplement to EPA) 410 PW
4;73 Planning grant , 9,A90
131;000PG
Overrun--resdrt complex PWFY 73 Management assistance for
resort complex 41,650 TAFY 74 Atrport facility at Ft. Yates
(supplement to FAA). 73,000 492WF, 74 -*Mknagedentassistance for
resort complex 41,650 TAFY 74 ' Planning grant supplethent 19,700 PGFY 74 Phase II of resort complex--
standby generator; sprinklingsystem; remodeling 'of museumfor conference space; expansion.
.
\\FY 74
FY 75.FY 75
FY 76
FY 75
Warehouse and office
Overrun--yduth development
Planning grant
Improvements to youth development
facilities
facilities
.
.
..
'-2187147885:::8700500001
332,00050,000 PG
PW
PW
PW
PWof marina dock
Planning grant PGFY 76-T9- 'Planning grart supplement 20,835 PGFY 77 Mobile home park feasibility -
study 10,000 TAFY 77 Housing shortage study 1,329 TAFY 77 Planning grant , 37,500 PGFY 77 High school additibn 1,900,000 LPW IFY 77 Two wells', pumphouse, pipe line
.
and storagevfacility . DRP115,000
35,700 PW
TURTLE MOUNTAINi
FY 66FY 71
'FY73
$5 ,628,014
.
Community building $425,000 PWAccess roads to community.center 70,000 .PW
Reclaim Indian land for hay .i
crop and beautification 383,000 PWIP
-73-
TURTLE MOUNTAIN eamtinued ..
Renovate a former PHS hospitalfor use as community center
-. .
Fy 73
(supplement to .,HUD) $ 83,277 PWFY 73 Planning grant . .37,500 PGFY 74 Planning grant'supplement 37,000 PGFY 74 Renovate convent'for'human
developmOnt programs 410,000. PMFY, 74 Recreational study - . 5,000 TAFY 74 Streets, curb and gutters,
sidewalks and street lighting 280,000 PWFY 75 Planning grant . 60,000 PGFY 75 Renovition.of.warehouse.facility- 120,000 PWFY 75 Water and sewer.ilprovemllts 709,000 PWFY 76 Planning grant 59,000 PGFY 76 Shopping mall 828,000 PWFY 76' Recreational area andpow wow site 200,000 XFY 76-TQ Planning grant supplement 16,000 PGFY 77 Planning grant r 64,000 PGFY 77 Shopping mal 1 -' Overrun 60,000 PWFY 77 Utility Building 2,695,000 LPW I
UNITED TRIBES OF NORTH DAKOTA DEVELOPMENT CORPORATION
$6,541,777
FY 68 Planning grant for Fort Berthold,.
Fort Totten, Standing,-Rock, and .
.
1 Turtle Mountain ReserVations $ 88,000 PSG
FY 69 Planning grant 107,627 ;.PG
FY 70 . Planning grant 50,838 PGFY 71 Planning grant 101,676 PGFY _72 Planning grant - 101,676 PGFY 73 Vocational-Technical
FY,74Education Center ,
Upgrade water/sewer facilities2,500,000 PWIP
for voc/tech center 375,000 PWIPFY 75' Lignite manpower study 105,000 .TAFY-77 Upgrade water/sewer facilities
for voc/tech center -- Overrun 140,000 PWIP
$3,569,217
I-STATEWIDE
I.
FY 75
FY 76FY 77,
. - .
North Dikota State University :-Ce ter for economic development 56,000Ce
Cattlemen's Consortium (See National)TA
Ind nIn Cattlemen's Consortium (See National)
North Dakota State Total: S23#5,492
mg,
OKLAHOMA
ABSENTEE SHAWNEE
FY 74 Recreation vehicle parkFY 77 Energy conservation and
. parking lotsFY 77 _Utilities for recreation vehicle-
park
CHEROKEE
$200,000 PWIP
235,500 LPW II111,380 LPW II
$546,880
,FY 72 Indian. museum $580,000 P14;:
FY73 90-acre industrial park 445,700 PWFAY`` Industrial park - overrun ` 196,200 , "PW
FY 77 Museum and arboretum/herbgarden . -165,0006 PW
FY 77 Renovation and expansion of cityhall'and court house -(City of Tahlequah) . 910,000 LPW II
FY 77 Gas Line. at Stillwell 191,500 LPW. II
. FY 77 Three community centers , , 300,000 LPW IIFY 77 Tie and nallet mills 290,940 LPW II
FY 77 Day care certers 100,000 LPW II
FY 77 Community buildings . 2,588,000 LPW II
FY 77, Utility improvementssfor' t
tribal complex 625,000 LPW IIFY 77 Street improvements 400,000 LPW IIFY 77 CNI expansion of building soo,oqo LPW IIFY.77 Improve water works (Tahlequah
Public Works Authority 287,000 LPW IIFY 77 Pottery ;plant 1,000,000 LPW IIFY 77 Jay 425,000 LPW II
.
,
$9,003,840
CHEYENNE AND ARAPAHO
FY 72 Catfish farm study- . $ 2,-500 TA
FY 74 Recreation' vehicle park 262,000 PW
FY 75 Restoration of tribal museum 297,000 . PW
FY 75 Overrunrecreation vehicle park 150,000 PWFY 77 -Administration center 464,00b, LPW IFY 77 Hydroponics farm operation". 138,776 LPW II
FY 77 _Expansion of administration center 352,954 LPW II
$1 ,667,230
-76-
8u
CHICKASAW ,0(
FY_73 -' Analysis of motel operation '2,500 TAFY 3.
. Management analysis andoperating manual 15,000 TA
Housing assistance study - 2,500 TAMpdular home plant acquisition.-study 2,500 TA
( Management analysis for motor-ir9 is,00d . TAMulti-purpose building . 515,000 . PW'Tribal office.addition. 361,893 'LPW I
-Health Clinic 531 737 *LPW II
FY 73FY
FY#74FY, 75
EY 77'Y 77
CTAW
$1,446,130
FY 72 Development of recreationCampground facilities $140,000 PWIP
FY 73 Industrial park 293,800 PW. FY 74 Council house restoration and .
construction of recreationvehicle park 150,000 PWIPv FY 77
.
Renciation of tribal complex 1,210,000 LPW IIFY 77 Community center 82,330 LPW IIFY 77 . Lane school district 39,653 LPW II
EY 77 Tribal house --,,, 311,800 LPW IIFY 77 ,
Nursing home - out patient ;-.- c0 clinic ,.., . 937,077 LPW II.
$3,164,660
CITIZEN BAND POTAWATOMI
FY 75.FY 77
CREEK
I
Community centerDay care /community center
FY 76-TQ Extension of water and sewer. lines; roads
FY 77 Agency buildingFY 77 Community buildingFY 77 GarageFY 77 Agri-business complex
-77-
$305,000 PW485,000 LPW II
090,000
$508,000 PW786,244 LPW II351,717 LPW II240,089 LPW II
1,554,890 LPW II
EASTERN SHAWNEE
FY 77 Industrial building
FIVE CIVILIZED TRIBES FOUNDATION, INC.
FY 73FY 74FY 75FY 76FY 76-TQFY 77
Planning grantPlanning grant supplementPlanning grantPlanning grantPlanning grant supplementPlanning grant
INTER-TRIBAL COUNCIL, INC.
FY 75FY 76FY 76-7QFY 76-TQFY 77 .
FY 77O
KICKAPOO
PlanningPlanningCulturalPlanningPlanningCultural
grantgrantcentergrant supplement(grantcenter overOn
$222,140 LPW II.
$ 50,000 PG11,100 PG29,500 PG35,000 PG8,750 -PG
3?,100 PG
$166,450
5-20,000 PG26,300 PG
510,000. PW8,750 PG
. 32,100. PG48,000 PW
$645,150
FY 77 Community buildingFY, 77 Hydroponics operation
KIOWA, COMANCHE AND APACHE
5375,000282,620
PWLPW II
$657,620
FY 74 -Cattle study -$ 12,000 TA.
FY 74 Land developmert study 3,000 . TA eFY 74 56-acre industrial park 200,000 PWIP.FY 75 Community building (Comanche) 158,000 PW_FY. 76 Overrun - community building
(Comanche) 28,000 PWFY 77 Educational/administration
com01 ex (Comanche) ) 825,300 . LPW IIFY 77 Tri01 community center/duseum
complex (Kiowa) 864,200 LPW IIFY 77 Community center (Apache - Plains) 274,790 -LPW II
$2,365,290
4
OKLAHOMA STATE INDIAN AFFAIRS COMMISSION.,.
FY -73 Feasibility study on -industrial ..
,.....-1 si it 4ralys I s .. " $ -2,500 TA.FY 74 ..Study on the legal status of
Oklahoma Indians 2,000 TA
OSAGE
....FY 76 Adminfstriati ve buil &ling 00 P14FY 77.. Overrun 4.- administrative building- 0 P.FY 77 ...Medi cal /dental clinic . 30,0 0 OW-FY 77 Industrial .park . 087 500 LPW II
.$2,003,500
$ 4;500
OTOE-.MISSOURIA
Ft 77
4
Cultural Center' (Red Roo()
. :PAWNEE ) ,-.c---, ''...
FY 76 1 Renovate til bal 1)01 di n-g- .FY 477 - Overrunrenovate tribal buildingFY 77 -.
Routed houge, roof4, remodel .,. community heal th representative.. office and pave parking area
-
PONCA7 / ., .FY 71- Regovate -comma m
. ,bttill ding . -$127 ,qQa MI PFY 74 OrieiNition `manual for Small home
. cOhstruction company-A` .-- - 2,500 TA,6 74 20-acre industrial=park. , 25g.,000/ -PWFY 76. Overruni qustri al park .Z. 28'400 ,4% PW. 77 Cul tural center . ,r, - , 490 000 ,r LPW I
i360,,000 LPW I,
-$300-,000 PWrj 78,000
288.830
$666,8304
LPW II
QUAP44'.
Ft 74.-FY 75$FY 77..
. #T / fr
111.-acre 'industrial parkOverrunindustrial park
.Furniturrmanufacturing factory. . .1 4
-f - $899,509
$437,000. PW
60,000.. PW
263,450 LPW II
$760,450MT,
1
SAC AND FOX
FY 75FY 77
I
SEMINDLE.
' FY 75.FY 77
SENECA-CAVUGA.
FY .f7
.FY 77
Recreation vehicle parkCultural heritage center
$394,000 PW357,140 LPW II
$751,140
Site development- for -Mekusukey Mission $350,000 .PWAdministration.center,building . 460,0'00 LPW I
. -
Triba3 office compfixtural development
. -
THLOPTHLOCCO TRIBAL TOWN ,,(Creek)
FY 72 Feasibility study of paper box plant:-.
TON KAWA
FY 74.FY 76-
.4/
,Preliminary _recreation center. studyCultural center
TRIBE$ 0 W STERN OKCAHQMA AND NSAS
4.
..
FY. 73FY 74
Planning grantStudy to determine feasibility'of a
, hog bristle preparatip" and -brushmanufacturing operation
Demonstration technical assi 4anc,e. programPlanning grantPlanning' grant .
Natural -b.5i.stle processing and.markeikTiotintial study'
410; plannin4: -supplementPlanning. grant
FY 75 75 .
FY$76FY 76FY -76
-
, FY 76,TQFY 77
$810,000
$247,946 irpti. II32,250
$280,190-
2,500 TA
$ 2,500"258,000
$260,500
$ 50,000
.
12,000
75,00050,,00060,000
'TASPW
PG-
TA ,
TAPGPG
5,000 TA.15,000 PG60,000 .
$327000 -
WICHITA, ckpoo AND DELAWARE_
FY 73FY 73FY 74
'FY 75FY 77
FY 77FY 77
WYANDOTTE
FY 77
Restaurant feasibility studyIndustrial parkMulti-purpose buildingWater storage facilityOil and gas development feasibility
studyCultural building (Caddo)
, Cultural/administrative center(Wichita)
Tribal office building, crafts. -and community center
y
$ 1,875 TA270,000 PW150,000. .PWIP166,000 PW
5 ;obo TA254,810 OW II
244 010 LPW II
$1,090 695
$218,360 LPW II
Oklahoma State TOtal: $32.551.495
.
,a
-810-
t'
a
f.
11.
)BURNS- PAIUTE
OR tGON
FY' 74 Drainage system, ailverts, stock $ 38,000 PWIPponds and fencing
FY 76 Administration building and culturalcenter , 1 218,000 PW
FY- 76- TQ Overrun -- cultural center 91,800 PWFY 76- TQ Overrun--cultural crter 30 200 PW
UMATILLA
FY 68FY 72FY 73
a
C
Ecoromi c resources studyCothrnuni ty facilitiesPlanning grant
_- $378 700
$ -33,00Q TA533,000- PWIP25,106 . PG
TA4.Y 74'FY
Cabbage Hi 11 Cam Park studyoutdoor recreation facility to
include .softball diamond, littleleague field, tennis courts,playground area, horseshoe pits;.
- 2,500
fY 74and wading, pool 4/.
Planning gra t supplement.16,000
5,600FY 75 Pl anni ng gra 16,000FY 75 Cathpground fac`F.1 ities to include
34 trailer pads, 126 tent spaces,and 100 day use/wilts - i94,000
FY 75 I AgricultUre developthent,study 25,300FY 76. P1 anni ng grant 35,000FY 76 Planning grant iupplernent 6,000FY 76- TQ Health clinic expansi-on 983,000
) Fif. 76- TQ Planing grant supplement 10,750FY 77 Planning grant 43,000FY 77 Water resource- study . 46,960FY 77 Health clinic expansion - overrun 71 ,opoFY
1 Tribal 'Ceremonial 1 onghouse 368.750.77114
$2,674,966
WARM SPRING'S'''.
tit
FY 67
FT, 613\Y.'41.
FY. 72FY 73FY 58
PWIP-PGPG
PW
TAPGPGPW
PGPG,
TAPW
LPW' II
Kah-Nee-Ta Resort and. Convention,
$3080 ,000 .PW,Center.ke .
Dverrun-- Kah-Nee-Ta Resort 1,220,000 PWRedesign Of Kah-Net-Ta ,Resort 8,000 TA
. Overruri--!Kah-Nee-Ta Resort fr. 568 4000 r PWPlanning arant 27,000 PGRedesign of Kah-Nee-Ta ResOrt S7,000 TA
.:.
ea.
WARM SPRINGS continued
FY 74FY 74_FY 75
FY 75FY 75
Expansion of Kah-Nee-Ta ResortPlanning grant supplemeetOverrun--expansion of Kah-Nee-Ta Resort
, Planning grantWinter sports study
FY 76 1 Shopping center feasibility studyFY 76 flanning-grantFY 76-TQ Planrifng grant supplementFY W Planning grantFY 7.7. Phase I - Industrial parkFY 77 -Dr 11 sells, two reservoirs,
t ansmission lines, booster pump,ansportatipn of water,.treatmentlant, mains, fire hydrants, and
-related equipment
-600,00012,000
PWPO
118,000 PW32,500 -'-: PG27,500 TA5,000 TA
39,425 PG10,750 PG43,000 PG
638,750 LPW 1I
720,000 DRP **
$7056,925
Oregon State_ Total. :. $10,209,891
- 4
SOUTH-CAROLINA
CATAWBA
Pi FY 77- Multi--purpose building $259,130
\\
South Carolina State Total: $259-130
I
-83-
-
8
2
LPW II
SOUTH OAKOTA
CHEYENNE RIVER ti
FY 69FY 70.
Planning grant $ 36,200 PG
Rip rap water intake for JobCorps center 63,200 PW
-FY Planning grant 36,420 PGFY Planning grant 36,420 OPGFY 1 Waste disposal system at .Eagle .
-Butte (supplement to EPA) 71,730 PW
FY 2 *'" Engineering study 16,267 TAFY 72 Community building (supplement to HUD) 70,500 PW
FY 72 Plahning grant . 36,450 PGFY 73 Eight publ ic. recreational areas 202,000 PWIPFY73 -21-mile wader .pipeline at Eagle , -
Butte (supplement to HUD) ` 1,320,000 .PW.,.T
FY 73. Planning grant - 40,000 PG .-
FY 74 Planning grant supplement . 15,000 PG44FY 75 Emergency water system 84,000 PWIP,FY .75 Planning grant - 50,000 PGFY 76 Planning grant a 45,850 PGFY 76- Irrigation system . . 376,000 PW
.. FY 76-TQ -. Planning grant supplement 20,835FY 77 Planning grant 2. 37,500"FY 77 Planning grant . '50,000 "*. PGFY 77- Administrative office addition 620,337 LPW IFY7.77 Hospital addition, 370,000 LPW II'FY: 77 Swimming pool 452 203 LPW II
e
400
.CROW CREEK -. -. .,...
FY 67 Industrial park including water. '' $ 58,000 IPPW
aniksewerFY 69 Recreational complex consisting of
b.. 40-unit motel, service station,,restaurant, camping faci 1 i ti es , . ,
. . ..replica, of Old Fort Thompson,,
businesSigomplex; and associatedi 4
. water; seam, and roads. ' FY 69 Engineering study for recreational
complex'FY 71 . Water storage -facilities for
X.9,255.
industrial ,park and Fort Thompson, .. .community . 153,009 PW,.
-FY.71 Planni.ng grant. .14 - . 23,000 -JIG
.FY 72 Recreational compl ex study, : 2 ,500 TA .
FY 72 . %Ill a.nni n q 'grant- 15,000 IN
$44,050,912_
.
287;600 PW-
TA
.16
CROW CREEK continued
FY 73FY. 73FY 74FY 75FY 75FY 75
FY.75"FY 76FY 76FY 76-TOFY 77FY 77
LOWER BRULE
Planning 'grant.Recreational complex studyPlanning grant supplementIrrigation studyPlanning grantAnalysis of damage and repair
cost of tourism complexWinterization of tourism complexPlanning grantIrrigation systemPlanning grant supplementPlanning grantCommunity centers (3)
9
FY 67 Industrial parkFY 72 Expand industrial park and increase
water storage-capacityFY 73 Planning grantFY 73 Overrun -- industrial parkFY 74 Co-op study
....% FY 74 Planning grant supplementFY 74. Street improvements, park development
and renovation of recreationalfacilities
FY 75 Planning grantFY 76 Recreation areasFY 76 Irrigation systemFY 76 Planning grantFY 76-TO Planning grant supplementFY 77 Merrunirrigation systemFY 77 - Planning grantFY 77 Outdoor recreation facilities
ID
CROW CREETOWER BRULE
FY 69 Joint planning grantFY 70 s. Planning grant
30,0002,5005,0007,500
23,500
16,78050,00032,100
360,00011,67026,300995.000
$2,716,705
PGTAPG,TAPG
TAPWPGPWPGPG
LPW I
$ 19,0Q9 PW
181,000 PW30,000 PG27,000 PM-s,goo 'TA
14'4,15 PG
386,00036,000
250,000677,00035,85017,91545,00032,300
322 520
$2,078,660
$ 23,33021,400
$ 48,730
PWPGXPMPGPGPWPG
LPM II
PINE RIDGE
FY 67.FY 68
FY 68FY 68
Industrial parkSewage treatment facility
(supplement to EPA)"Tourism/recreation studyAirport pavement, taxiways, parking
for aircraft and automobiles,
$ 34,000
102,00010,000
PW
PW,
TA
lighting and access roads 169,1p0 PWFY 6$ Planning grant 40,0DD ..PG
FY 69 Overran -- airport 21,000 'PWFY 70 Planning grant 38,550 PG
FY 70 ,Overrun -- industrial park 4,000 PWFY 71 Planning grant 38,630 PGFY 71 Survey of timberlands 2,500 TAFY 72 Planning.grant 38,63 PGFY 72 Tourism potential study 50,00 TAFY 73 Cedar Pass Lodge expansion study 2,500 TAFY 73 Planning grant 40,000 PGFY 74_ Planning grant supplement 30,700 PGFY 74 Manufacturing building .including
equipment 200,000 PWFY 74 Street andkidewalk iniprovements 614,000 PWFY 75 Community impftvements. 500,000 PWFY 75 Planning grant
44.60,000 PG
FY 76 Planning grant 60,000 PGFY 76 Timber clearing 252,900 X
FY 76 Mini-market shopping center study 15,000 TAFY 77 Overrun--equipment for manufacturing
plastic items, building, accessroad and parking lot 37,000 PW
FY 77 Planning grant 37',500 PGFY 77FY 77
40, Mini-market shopping center studyFarm production feasibility study
2,50025,000
TATA
FY 77 Administrative/service center 4 91-8 303 LPN I
$7,344,213
ROSEBUD
FY 67 Remodel nd renovate buildingto be used for skill training
$ 40,000 PW
---
FY 67 Planning grant 49,000 PGFY 68 29 Industrial park at St. Francis II" 90,000 PW-FY 68 Fabrication 'plant study 33,000FY 68 Access road to industrial area -
Antelope 51,500 .PW -
Remodel and expand skill trainingcenter 28,800 PN
FY 69 Planning grant 42;816 PGFY 69 Airport (supplement to FAA) 77,505 PWFY 69 . Engineering study, for tourism complex 2,880 TAFY 70, Manufacturing building- 84,000 N
CI&
ROSEBUD continued
FY 70FY 70FY 71FY 73FY 74FY 74FY 75FY 75FY 75FY 76FY. 76-TQFY 77FY 77
FY 77
SISSETON
FY 66 30-bed community hospital, $180t000 PW
(supple nt to HEW)(7-- FY 67 Sewage col ection system at Peever 36,000 PWi, FY 67 Sewage t atment plant and lift
stati at Peever (supplementto EPA) 20,000 PW
FY 69 Improvements to local air t(supplement too FAA) 24,000 PW
FY 69 Seisage treatment lines at Sisseton(supplement to EPA) 238,000 PW
FY 69 Planning grant 27,020 /PG
FY 71 Planning grant 27,980 PGFY 71 Renovate community center (supple-
ment to HUD)- 10,000, PWFY 72 Planning grant 27,980 PGFY 73 Recreational parks development 156,000 PWIPFY 73 Planning grant 14 32,500 PG
-FY-74 20-acre industrial park 250,000 PWFY 74 Planning grant supplement 21,700 PGFY 75 to Planning. grant 29,500 PG°FY 76 Planning grant 29,200 PGFY 76 Tribally owned cattle ranch
arld farm 294,750 PWFY 76 Multi-purpose buildings (7) 260,000 XFY 76-TO Planning grant supplement 43,750 PGFY 77. . Vocationa-1 training centeri 631,800 LPWFY 77, Alcohlo(1 rehabilitation ce er 374,150 LPW
/
i. $2,714,330
lik&
Planning grantOverrun--access roadPullman car conversion studyPlanning grant.Planning grant supplementWater' and sewer facilitiesIrrigatidn system for tribal farmPlanning grantMini shopping center studyPlanning grantPlanning grant supplementPlanning grantEducation/community resource
facilittpsCourt Howie
40,100 iPG4,000 PW
See Santa Clara, N.M.53,400 PG22,700 PG460,000 PW135,000 PW37,500 PG
See Winnebago, Nebraska41,700 PG .
20,835 PG37,500 PG
2,159,390 LPW II'360 720 LPW II
$3,872,346
92-87-
YANKTON
FY 71 Planning grant $ 23,636 4 PGFY 72 Industrial park -406,000 PWFY 72 Waste facilities (supple-latment
ment t EPA) 94,78a PWFY 73 Planning grant 36,825 PGFY 74 Planning grant supplement 20,000 PGFY 74- CommUnity facility and cultural center 346,000 PWFY 75. Overrun--comm ity facility and
cultural cen er 66.000 PWFY 75 Meat processin operation study 31.865 TAFY 75 Planning gran 36.000 PGFY 76 Plan ing gr 43,000 PGFY 76-TQ Plann rant supplement 53,750 PGFY 77 Beef plant study 225 TAFY 77 4-Gymnasium and fire alarms 463 250 LPW II
STATEWIDE
FY 69FY 73
FY 76
FY 76FY 77
FY 77
Pow
yper studyrant to United Sioux Tribes ,toassist in providing technicalassistance to aid tribes in theState
United Sioux Tribes economicadjustment program
Indian Catttemen's ConsortiumAgricultural study of six
reservationsIndian Cattlemen's Consortio-
supplement
South Dakota Staieiicital:
$1,621,331
$ 6,500 TA
2,500 TA
25,000 IX
See National
See Montana-statewlde'See National
$ 34,000
$24,481,,227
\.
ALABAMA-COUSHATTA
FY 66FY '68
FY 71FY 73
FY 73
FL 77
TIGUA
TEXAS
Tourism/recreation feasibility study 27,000Tourism/recreation facilities
(Phase I) 209,000Tourism /recreation project (Phase II) 285,000Clearing of underbrush and
landscaping 70,000Tourism/recreation project (Phase III
and Phase IV) 2,123,000Renovate and improve EDA-fundedprojects 276,680
FY 74 Tourism/recreation and culturalfacility consisting of an assemblyarea, arts/crafts salloPerea, amuseum and living Indian village
FY 75 Restoration of stagecoach stop-andrenovation of existing buildings
FY 76 Completion of tourism co p- 41111
FY 77 Educational/cultural centerrwFY`77 Pave parking lots and landsPhping- \
I
-
S2,990,680
$579,000
0.4
-140,000128,000'266,17513.745
S1,126,920 .
Texas State total': X4,117,8'00
-
TA
PWPW
PWIP
PW
LPW II
PW
PWX
LPW ILPW II
UTAH
GOSHUTE
FY 72 Job developmeRlocenterFY 76
SOUTHERN PAIUTE
Community center.
FY 73 Multi- purpose buildings (3FY 77 Tribal office building
UINTAH AND OURAY
FY 67
FY 67
FfYFY 7FY 72FY 73FY 73FY 73FY 73FY 14FY 74
'FY 74
FY 75FY 76-FY 76 -TQFY 77FY 77 -
**4
$)00,000348,800
$448,800
$514,001f281,00P
$795.000
Tourism lacilitycincluding 455surface-acre lake, campingfacilities, picnic area and-dock trailer park, cultural'center, 42.-unit motel, restaurantand ated facilities
$1 ,360 000
Sewaktfall and waste water,ponds (supplement to HUD) 19,000
Urea fertilizer manufacturing sturdy 38,000Overrun tourism complex 16,294Water distrfbution lines 205,000Tourism complex. expansion study
-,Water needs study2,5002;500
Industriat-WW ' '/ 470,000Manufacturing-building.for Ute Fab 251',000Planning. grant 30,000Expansion of tourism complex 895,000Planning grant supplement.- 10,000Collateral pfotection forptourismcomplex .25
Planning grant 17,500Planning grant 35,000Planntng.grant supplement ,14,585Plannin! ant \ 26,300Tribal bu ng 2 073 000
a-90-*
5,466,704
State total: $6 709 504
-
PWIPX
PWILPW II
PWTAPW
PWIPTATAPWPWPG
,14.4PG
PWPGPGPG-
Nei
a
PAMUNKEY
FY 77.
.11
tr.
fri
VIRGINIA-'.11 .
Community center and renovationof two buildings
$795,000 PWIP
Virginia State Total: 1195,000
1
21
J
.-91-
41.
_1
*1
'
...
WASHf1 TC) N
CHEHALIS \)/
IMO
I
FY 74 Aquaculture study $ 665 TAFY 74 Multi- purpose building 116,000 PWIPFY 75 Overrun -- multi- purpose building 32,000 PWIPFY 75 Smokehouse feasibility study, 2,500 TAFY 77 Road improvement program 223,760 Oim II
$374,925
CULVIL\E
FY -72 Timber management program" $128,000 PWIPFY 72- Economic resource study 2,500FY 73 30,000
TAPlanning grant . . PG
FY 74 Planning grant supplement 6,700 PG.
FY 74 . Community center at Nespelem 392,000 PWIP, FY 74 Tourism feasibility_study 30,000 TA
FY 75 Community center at Keller 216,100 PWFY 75 Planning grant 29,500 PGFY 76 Expansion of farming oribrations ( -
'study _..._,, i2,000 TAFY 76 . Fruit production study '21,000 TAFY,76 Planning grant? 35,000 PG -.
i
FY'76- Overruncommunity center' at _Nespelem -N . 200,000 PWIP
FY 76 Planning grant suPplement _ .. 11450 PGFY 76-t() Planning grant supplement, 12,500FY 77 . 50,000
PGPlannfing grant , PG
, F 77 planning grants 50,000 PO
77 z
!pAdditions
to tribal ComityCenter (Omsk)
.- 466,960.- PW
FY 77fl .Community center A overrun (Omak) 48,000 RWFr 77, Community center pidditon 256,949 LPWIFr 77 pommuntty. center= . - .4z .141,298 I
FY 77 Convalescent facility _ 575,034 L 11.
FY 77 Four now wells, four storage tanks,and transmisstion lines -1,215,000 DRP i.
To haul water to rural families , 125,000 DRP **Renovate and rehabilitate pumping .
;
equipment and storamfacilities'at wells and springs on reserva- .t
tiOn 176,000 .
FY 77FY 77
S4 ,31'1
.4C
.
e
DR
4.
eta
KAL1SPEL
Ft' 72
FY 72FY 73
FY 74FY 75FY 75FY 76
FY 76
Ceremonial and recreationalpark facilities expansion $ 98,000 PWIP
Industrial feasibility study 2,500 TAPlanning grant (joint grant with
Spokane) 34,000, PGPlanning grant supplement 10,000 PGPlanning grant . 46,000 PGAgriculture resources development 155,000 PWOverrun--agriculture resources
development 73,000 PWPlanning grant 25,000 PG
$443,500
LOWER.
FY 77 Community°Center . $1,377,845 LPW IFY 77 Wells, pumps, generator and .
"other equipment 251,500 DRP
$1,629,345
LUMMI
FY 69 Aquaculture program . $143,000 TAFY 70 Aquaculture program continuation 180,000 TA ,
FY 70 Aquaculture facility including adike, intake and outlet gates,feeding stations and related
1
structures 1,500,000 Pie
Aquacultureprogram continuation 180,000 TATidelands fish farm 367,000 PWOyster hatchery 334,000 PWOverrun--oyster hatchery 74,000 , PW
FY 71FY 72FY 72FY 72Fr 72
FY 73
FY 7FY 74FY 74FY 75FY 76FY 76
FY 76
Neighborhood-facility. fsupplement to HUD) 103,175 PW
tTransporting and, loading apparatusand related structure foraquacuTture program . . 174,000 `PWIP
Planning grant. , 27,000 : PG)
Planning grant supplement 6,000- PG
Rroduction.laboratory 97,000 PWIPPlanning grant, supplement 11,600 PG
Planning grant , PG
Reconsthiction of accunting-records . 5,000 T
Renovate buildings, restore dikesA
and add fish pens (4) to Lummiseaponds
e325,000
, r.
-93-
LUMMI continued
FY 76-TO Planning grant supplement $' 8,750 4PGFY 77 Planning grant
- PGFY 77 Modular float system
.35,000835,000 LPW I
$4 ,437 5
MAKAH
FY 67 Renovation of pier $FY 67 Fishing pier 141,000 PW"FY 67 Business loan to Cape Flattery
Company for fishing industry 650,000FY 67 Working capital guarantee to . .
Cape Flattery Company 135,000 BC:
FY 69 Water system 406,000 PWFY 72 Forest resource study 2,500 TAFY 73 Planning grant 25,000 PGFY 74 Sewer collection system 315,000 PWFY 74 Planning grant -supplement 5,600 PGFY 75 Planning grant 32,500 PGFY 75 Museum/cultural center 958,000 PWFY 76 Planning grant 29,200 PGFY 77 Planning grant 26,300 PGFY 77 Museum and cultural center -
Overrun a 492,000 PWFY 77 Professional building. 340,130 LPW IIFY 77 Steel tank reservoir and to
pay cost of leak detectionsurrey, conservation campaignand fire protection program 250,000 DRP
$3,809,230
MUCKLESHOOT
FY 73
FY 77FY 77
Comunity building (supplementto HUD)
Administration buildingPurchase land with water rightsfor incubation and release ofhatching salmon
-94-
$ 50,000389,000
42'500
$481,500 -
PWLPW II.
DRP
I
NISQUALLY
FY 75 Fish net repair feasibilitystudy
FY 77 Net hanging facilityFY 77 Fish rearing facility
NOOKSACK
FY 77 Community support facility
PbRT GAMBLE KLALLUM
FY 77FY 77 r
PUYALLUP
FY 77
QUILEUTE
PY 72'
FY 73FY 74
FY75-F 75
FY. 76
FY,76.-TQFY 77 .
FY 77FY 77
FY 77
flf
Public Safety FacilityWater system improvements
and.fire preyention equipment,
)1Pre-school/elementary sc ool
- Econowic development/resourceanalysis
Planning grant /
Cultural center (Sikplementto flUD)
Planning _grant /Se4ge collect/On and treatment. systemPlanning grantPlanning grant supplementTwo-story office/fish processing
buildingPlanning grantReservoir, renovation of boat
house.Purchase of fire suppressionequ40Ment
-95-
99
$1 12;000',712,145/386, opo
$1 olplo 45
TALPW IDR P
/$663,567. LPW II
$243,200 LPW II,
140,000 DRP-
$383,200
$519,680 II
$. 2,50025,000
80 000029,Ep
197,90035,0008,750
280,80026,300
TAPG
PWIPPG
PW'PGPG
PWPG.
214,310- LPW II
3,500 DRP.(
.$903,560
QUINAULT*
FY 71 Resource development programFY 72 Resource development programFY 73 Water and sewer-systemFY 73 Seafood processing plantFY 73 Planning grantFY 73 Resource development program
$ 99,000115,000166,000260,00030,00058,000
TATAPWPWPGTA
\
FY 74 Overrun-/-seafood processingplant . 160,000 PW
FY 74 ResourceAevelopment program 110,000 TAFY. 74 Arts and crafts marketing study 2,500 TAFY 74 Addition to shake mill 36,000 PWIP'FY 74 Arts and crafts wilding 77,000- PWIPFY 74 Planning grant supplement 14,700 PGFY 75 Community center (Queets) 250,000 PWFY 75 Foreqpt resource development
program 120,000 TAFY 75 Arts and ',hafts marketing study 2,500 TAFY '75 Planning grant 42,000 PGFY 76 Planning grant 41,700 PG '
.FY 76-TQ planning grant supplement 12,500 PGFY 76-TQ Forest resource development
program 90,000 TAFY 77 Planning grant 50,000 PGFY 77 Fisheries propagation 465,950 LPW It
$2,202,850
SKOKOMISH
FY 73 Shell fish study. .
$ 2,500
,
TA
-c,
FY 74 Mdhagement assistance for seafoodprocessing ,plant , -- 31,000 , TA
FY 75 Fishing development study 2,500 . TAFY 76 Renoitation of tribal center 70,000 XFY 76 Management assistance for seafood ..
processing plantFY- 77 Firehall
..5,000
92,701TA
LPW IFY 77 Fisheries adAinistration building
4r
145,099 LPW II
$348,800c, --.,
SMALL TRIBES ORGANIZATION OF WESTERN WASHINGTON (STOWW)
FY 72 Development of aquaculture program $ 36,000 TAFY 73. Aquaculture program P . 85,000 TAFY 73 Planning grant 42,000 PGFY 74 Aquaculture program 65,000 TA
.FY, 74 Planning grant supplement 14,000 PG
-96-
SMALL TRIBES ORGANIZATION OF WESTERN WASHINGTON continued
FY 75FY 76FY 76-TQFY 77
SPOKANE
FY 72FY 73
FY 73
FY 74
FY 74FY 75
FY 76FY 76-TQ
FY 77FY 77
FY 77
FY 77
FY 77
SQUAXIN ISLAND
FY 75FY 75FY 77FY 77
Plating grantPla ning grantPlanning grant supplementPlanning grant
Ceremonial grounds facilitiesMulti-purpose facility (supplement
to HUD)Planning grant (joint with
Kalispel)
\
Planning,grant tjoint with'-- Kalispel)
Fencing and water developmentPlanning grant (joint with
Kalispel)Planning grantPlanning grant supplementTrading PostWell, distribution system,
Storage tank and hauling potablewater
Site clearing, crop planting andfertilizing, two barns and aservice building
Purchase of farm equipment/machinery
Planning grant
Aquaculture programAquaculture study -
Oyster processing facilityConstruction and renovation of
floating salmon rearing pens
c
-97-
$ 46,00045,85012,50050.000
$396,350
PGPGPGPG
$ 166,000 PWIP
273,382 PW
See Kalispel
See Kalispel161,000 PWIP
See Kalispel32,1008,750
430,850
358,000
58,000
420,00035,000-
. $1,943,082
$ 35,0005,000
229,700
132 500
$402,200
PGPG
LPW II
DRP **
PW
PWPG
TATA
LPW II-
DRP
STATEWIDE
FY 74 Museum/cultural center- United_Indians of all TribesFoundation (UIATF) 250,000 PCP
FY 74 Utility installation pnoject-:-UIATF 2,500 TA
FY 74 Soil test borings - UIATF 2%200 TA
FY 74 Management assistance fdr Pacific.
Northwest Indian Center, Inc. 75,000 TA
FY 76 Overrun--museum/cultural center -.U.IATF lip
62,000 PW .)
$391 ,700
SuQuAMISH
FY 77
SWINOMISH
Community center $1,067,791 LPW II
FY 71 Industrial potentials study 2,500 TA
FY 72,
40-acre industrial park 460,000 PWFY 73 Planning grant '25,500 PGFY 74 Planning grant supplement 18,500 PGFY 74 Management assistance for seafood
procesilng plant 39,000. TA'FY 75 Expand industrial park 313,000 PWFY 75 Planning grant 32,500 'PGFY .76 Planning grant . ' 43,000 PGFY 76-TQ Planning grant supplement 10,75QL:- PGFY 77 -Longhouse market 340,000 PWFY 77 -Planning grant 43,000 . PGFY 77 Community center complex 1 ,31.0,941 LPW-II
.4TULALIP
FY 75 Planning grantFY 75 Soils Spoils disposal study.FY.76
. , Planning grant 4.
. FY 76-TQ Planning grant supplement 44 *.- FY 77
FY.77FY 77FY 77
1
I .
S2,638,791
$ 18,000 'PGi2,500 TA r
,, 32,100- PG
/ .<Z3,750 PG .5
Expansion.of tribal salmonrearing program - 365,000 PW
Industrial park study '
- 36,000- TAPlanning grant 35,db0 PGMission Hill develo.pment 286,400 LPW II
.
-98-.1 U2
. 1783,750
YAKIMA'
FY 66 'IBuiiness loin to White SWan-----, Industries' for industrial
.......0,.f . -,expansion $ 195,000 BL
FY 66 Working capita) guarantee to . .
White Swan 'Industries 360,000 BL ..
FY 67 1-14-acre indtistrial park 151,000 . PW
FY 67 Industrial waste facilitiesand industrial park im-provements . 139,060 PW
FY 69 .._ Water system, fire protectionsyitem; And industrial park
'improvements g 277,000 PW.
FY 70 Bus.inees- ldan to S.W. Hardwoods b
- ' for Ilinufacturirtg plant 546,000 BLFY 71,. 'Summer youth camp 600,000 PW
FY 73 Planning grant 30,000 PG
FY 74 Water system at White Swan 837,000 PW
FY 74 Planning grant sluppl einent 4,500 PG
FY 75 Planning- grant .. 42,000 PG
FY -76 Planning grant-. : 45,850 PGFY 76 Overrun - -water system . 135 0 PW
FY 76-TQ Planning grant suppleme-nt--/ .1 500 PG
fY 77' . Planning fruit -:50,000 PGFY 77 Cultural center " 4 800 000 LPW I I
"'
I
$8,224,850
Washington. State Total: 537,467,572
'
WISCONSIN
BAD RIVER
FY 74 Community building $ 182,055 PWFY 76 Fish hatching program 11,266 TAFY 76 River clean-up 250,000 XFY 76 Fire station ,212,000 PWFY 77 Fire station - overrun 30,000 PWFY 77 Street improvements, softball
field, tennis courts, and afire truck 365,780 LPW II.
FY 77 Fire truck, portable tank,pump and other equipment 38,750 DRP
$1,089,851
'EAT LAKES INTER-TRIBAL COUNCIL (Includes all Wisconsin Indian Reservations)
FY 68FY 69'FY 69FY 70FY 71FY 7f
Planning grant'Planning grantEconomic development studyPlanning grant 9
Planning grantOverrun--economic development
study
$ 19,00026,31864,85031,55930,825
1 ,500
PGPGTAPGP9
TAFY 72 planning grant 30,825 PGFY 73 Planning grant 54,975 PGFY 75 Planning grant 100,000 PGFY 76 Planning grant 75,000 PG'FY -76-TQ Planning grant suppledent 62,500 PGFY 77 Planning grant 125,000. PG
$622,352
LAC COURTE OREILLES
FY 72 "Cranberrym study $ 2,500 TAFY 73 Cranberry marsh improvements 28,000 -PMFY 76 Fish hatchery study 15,000 TAFY 76 Forest improvements 100,000 , XFY 77 High School - Stone Lake 843,376- LPW I
-100-
Ap88,876
LAC DU FLAMBEAU
FY 71 Community building $ 112,050 PWFY 73 Recreation vhicle park;
campgrounds 304,000 PWFY 73 Overrun -- community building 12,989 PWFY 74 Renovate fish hatchery 120,000 PWFY 74
.
Scenic park and Indian bowl 189,000 PWFY 76 Community' building . 350,000 PWFY 76 Fish rearing ponds 20,000 TAFY 77 . Community center building 750,000 LPW I
$1,858,039
MENOMINEE
FY 66 Recreation development
FY 68program study
Overrun--recreation development$ 24,935, TA
study 25,000 TAFY 68 Visitor destination center 1,023,000 PWFY 70 Overrun--recreation development
study 22,500 TAFY 76 Rebuild sawmill
-...,
150,000 XFY 76 novation of .sawmill 5,850,000 IXFY 77 verrun--renovation of sawmill 1,100,000 IXFY 77 care center (2) 947,114 LPW I
$9,142,549'
MOLE LAKE (Sokaogon:Chippewa).4
-,
_ 1
FY 76 Community building $166,000 PWFY 76 Sidewalks; park improvements 100,000 eWIPFY 77 Modify bookkeeping system . 5,00000 TA
del.... $2p,000
ONEIDA
FY 68 Industrial park (27 acres) $352,000 - PWFY 72 Community center-' 97,157 PWFY 73 Polystyrepe'plant study 2,500 TAFY 73 Smftliwall modular building
.k_ components market study 2,500 TAFY 75 Multi- purpose building - . 251,000 PWFY 76 Paper forms plant study 30,000 TA
1!),5
ONEIDA continued4
FY 77 Mlultt=purpose buiTding - overrunFY f7 Health care centerFY 77 Water and sewer lines
POTAWATOMI (Forest County)
FY 75!"' Chipping/debarking buildingsFY 77 Community building
RED CLIFF
$ 40,000. PW .
525,250 LPW -I
148.330 LPW II
$1 ,448,737
5468,000 PW275,300 LPW I
$743,300 a
FY 72
FY 77/ FY 77
FY 77
Campgrounds; arts and craftsshoin. boat dock
` Pier-(BUffalo Bay)Tribal centerPurchase fire pumper and tanker
. $837,000794,000598,700
PWPW
' LPW I
trucks 67 000 DRP **
. , $2,296,700
ST. mu-
FY 71 Community building $ 79,305 PW .
FY 73 Overrun--community building 34,356 PWFY 74 Training center , 145,000 PWFY 77 Training center - overrun 21,600 PWFY 77 Fire station 360,000' 'LPW IFY 77 Tank truck acrd forest fire .
'fighting equipment 83,000 DRP **
.$723,261 .
STOCKBRIDGE-MUNSEE
FY 73 Health c16 center $236,000 PW
FY 74 Sawmill 237,825 PWFY 76 Community building 168,000 PW
FY 77 Oidge 272,360 LPW II
$914,185
WINNEBAGO
Ft 76
FY 77FY 77FY 77
FY 77
FY 77FY 77
Improve buildings. and pow wowgrounds $200.000 X
Black River Falls sidewalks 115,159- LPW IICommunity center (Wittenberg) 78,318 'OW IICeremonial grounds (Black Riverl
Falls) 119,159 LPW IISoamiunity center additian
(Wisconsin Dells) 56,158 LPW IISidewalks (Wisconsin Dells) 36,158 LPW IICommunity center (Wisconsin
Rapids) ,.. 6 5 318 LPW II.
I
$670,270
Wisconsin State Total: $20 769 120
-103-
-AM
WYOMINGWIND RIVER
Water supply. storage anddistribution Yac11ltles (Riierton)
Sewage outfall lines and modificationof existing treatment plant(supplement teEPA)
Industrial perkSewage treatment facilities for
industrial park (suppler/matto EPA)
$162.000
63%000218,710
f6 ;000.
PW
PWPW
PM
FY 68
FY 68
FY 69FY 69'
FY 71 Overrun -- serfage facility 5,000 - PW
FY 72 Community center (supplement to HUD) -91,075 PW
FY 72 Tribal administrative 5enter 655,000 PWICFY 73 Bull'Lake touriim/recreation eudy 2,500 TA
FY 73 Public recreation area 454,000 PWIPFY 73 Planning grant . 37;500 PG
FY 73 Sewer;. wafer, and paving forshopping center *53,000.- PW
FY 74 Community ftctlity -(Cr Heart) 570,000 PW
FY 75 Planning grant. 25,000 -PG
FY 76 Planning grant 45 ,850 PG'
FY 76 Expaniion of water tem 756,000 . PW
FY 76 Overrun--community.center (Crow. Heart) 90,000 PW
FY 76-TQ Planning grant supplement 16.670. PG
FY 77 ,Planning grant 37,500 PG
FY 77 Water system expansion (Shoshone) 614,280 LPW I.
FY 77 Medical services wing (Shoshone/Arapahoe)' 335.417 LPW I
`4Y 77FY 77
Community hat expansion (Arapahoe)Education/recreation complex
1,041,290 LPW I
(Arapahoe) '565,719 LPW I
FY77 Swimming pool (Arapahoe) 304.703 LPW I
I$6,166,214
No.
Wyoming State Total: $6 166 214
.
- -
-4FY 69-- FY 69
-69 -
FY 70
FY 70. FY 70
-if 71
'FY 71FY0,72
,FY 72FY 72
.PY 72
FY 72
FY'72
FY 72FY 73
FY 73'FY 73FY 73FY 73
FY 73FY 73'FY 73.
FY 74FY 74
FY 74
FY 74
NICTIONAL
.
National Coocil'on Indian Opportaulitydevelopment study for National
Cdpuess of Americin IndiansSupport of Indian industrial development
meetings. ' .
Evaluation of National Congreis of-AmericanIndians' industrial stiow ' "
'-";. Indian Addstrial Intern programLand use study for'Ft.flurial Aritona-
_Implementing industrial develipmenf onIndian industrial" parks - Miner & Assoc,
Industrial- development ttudy,-Obi asonianElstab)ishment of American IndianManagement Institute.
Indian Industrial - Intern ProgramImplementing findustrial development onIndian industrial parks - Smith
National Amerfcan Indian ManagementInstitute for training Indianmanagement personnel
Non-recovery expenses'-of collateral forAspeh Wood ProdgEts and C&S Packing
Implementing indegiip development onIndian industrial parks Miner & Assoc:
Audio-visual-slide studyImplementing industrial development on.
Indian industrial' parks - Miner &Assoc:Audio-visual presentation by IhtermedfaIndian Imdutrial Intern ProgramAmerican Indian National-BankNational American Indian Management.
Institute training program continuedAmerican Indian Travel CommissionAmeriEan Folk Festival - SmithsonianAquaculture .training program - Lummi
ReservationAmerican Indian National Bank -
National American Indian ManagementInstitute training program
Evaluation.of Indian arts/crafts industry -
GreenwaldAmerican Indfan Travel Commission -
management assistance for Fort BertholdReservition
alir
-105-
$ a5,00b
_35006.
7',500
'2 000'59,152
..50,00056,68a
2,50082,000
148,646
243,989
24,00Q
29,8442,250
1-4:1305
85,000300,000 .
243;939100,000
2,500_
127,16589,000
242,011
2 ,500
TA
TA
TA
'TATATA
TATA".
TATA
TA
TA
BL
TATA
. A, TATATATA
TATATA
TATA
TA
ETA
d,964 TA
FY 74 -Audio-visual presentation. by Intermedia 2,090 TA
,FY74 Planning grant to Coalition of EasternNative Americans 39,702 PG
FY 75 Tourism/recreation assistance to theAmerican Indian Travel Commission 37,215 TA
.- FY 75 Tourism/recreation assistance to theAmerican Indian Travel Commission. 16,036. TA
-:FY 75 Tourism/recreation assistance to the-.
Amrican,Indian'Travel CoMmitsion 266,425 TA
'.'" FY 75 Technidal assistance to-the BlackfeetWriting Company 4,770 TA
./ FY.75- ' National American IndiAn Management.-
-.4 Institute training program. 124,181 ,TA
'..,FY 75 Planning grant to the Coalition ofEastern Native Americans 56,250 PG
.- FY" 75 , American Indian arts/crafts show 7,000 TA
Ft 75 Environmental' impact study - Uintah AndOuray Reservation, Utah . 4228 TA
FY 76 Environmental impact study - Uintah andOuray. Reservation, Utah , 7,889 TA
FY 76 ,-Planning grant to the Coalition. ofEastern Native Americans 50,000 PG
...
FY 76 Resource management training program -75,000Americans for Indian Opportunity ' TA.
FY 76 Guayule.study - BIA/University, of Arizona 1;950 TA
FY 76 National Amei-ican Indian Cattlemen'sAssociation resource development program 50;000 .. TA-
FY 76 United Indian Planners Association 75,000 TA
FY 76 Arid lands use study - University ofArizona (Tucson) 150,000 TA
FY .76 Conference on use of-guayule - Universityof Arizona 4,800' TA
FY 76 Water resource study - San-Carlos 2,500 TA
FY 76 Feasibility of snowgobile.garages in NN native villages - Mauneluk 7,865 TA
FY 76 , Native American Learning Center 78,000
'FY 76 ,Indian Cattlemen's.Consortium - Economic
.
PWIP
adjustment assistance for Indiancattlethen in Montana; North Dakota
s
and South Dakota because of winterstorms in Spring of "1975'_ -- .3;5g4,000 .IX
FY 76-TQ American Indian Travel COmmission --National 'tourism development program '280,000 TA
FY 77 Development of arid lands - Universityof Arizona - 169,609 TA
FY 77 National American Indian Cattlemen'sAssociation cattle resource develop-
.. men program 50,000 TA
FY 77 Council ofqnergy Resource Tribes -staff support 100,000 TA
-106-
. I/ 0
FY 77.
FY 77
FY 77FY 77-
. .
Americans for Indian Oppotkunity - -
Resource Management Program 102,15a TAAmerican Indian. Manageme'nt Institute
Economic-development training 37,12Q TAUnited Indian Plahne 'Association 75,000 TAIndian Cattlemen's nsortium - Economic
,
adjustment assis rice --supplement for ,
drought. assistance, . 2 593 650 -. IX
$10,066,734
National Total: $10,066,734
A
O
-107- .
V. S. GOVERNMENT PRINTING OFFICE 1978261-238/458
z
P
11.
1978
ADDENDUM
TO
a
. INDIAN PROJECTS
FUNDED BY EDA
August 26,26, 1965 - September 30, 1977
1 -1.2
TOTAL INDIAN PROJECT- FUNDING B Y ) STATE
FY 1978 FY 1966' 1978ALASKA $' 1,943,000 S 37,953,304ARIZONA 3,004,200 - 116,267,374CALIFORNIA - 2,192,600 18,069,803COLORADO 70,000 5,275,300FLORIDA 120,000 4,748,298a DAHO 712,000 31,500,179I OWA 0 796,000KANSAS 0 1,841,969LOUISIANA 211,000 432,100
, MAI NE 0 3,727,362MASSACHUSETTS 62,000 208,050- MICHIGAN 615,200 6,269,495MINNESOTA 1,143,835 18,072,414MISSISSIPPI 135,000 3,616,575MONTANA 526,500 32,455,633,NEBRAS KA 400, 00 8,454,300NEVADA 860, 0 9,337,533NEW MEXTrO
c
NEW YORK1,954,000
896,65039,881,79510,718,470NORTH CAROLINA 555,000 4,612,705NORTH DAKOTA 403,850 24,269,342
OKLAHOMA 1,478,500 34,029,995OREGON 1,684,000 11,893,891SOUTH CAROLINA 0 259,130SOUTH DAKOTA 2,166,800 26,648,027TEXAS 225,000 OOOOO 4,342,500UTAH 35,000 -6,744,504VIRGINIA 0- 195,000WASHINGTON.. 1,226,000 38,693,572WISCONSIN 1,044,400 21,813,520WYOMING 50,000 6,216,214NATIONAL 789,495 10,856,229
ut-
$24,504,930
113
$520;200,683
-BETHEL
INDIAN PROJECTS FUNDED .BY EDA
Fiscal Year 1978
ALASKA
Water and sewer improvements
AP
BRISTOL BAY
Plarthing. _grant,
IG
Municipat building
KING COVE
Warehouse
KODIAK AREA NATIVE ASSO IATION
Planning grant
?IAUNELUK ASSOCIATION
Installation of storm windows and doors ,insulation, caulking, weather strippingfor public buildings in-villages ofAmbler, Deering, Ki\ana, -Kcibuk, Noatak,Selawik and Shungnak
Planning grant
NO.
f
METLAKATLA (Annette Island)
$490,000
$ 50,000 PG
$454,000 PW
4395,000 PW
$ 50,000 PG
$102 ,000 PWIP
50,000 PG
$152,000
.Planning grant S 40,000 PGExpand existing fish cannery and cold 87,000 PWstorage facilitiesInstallation of storm windows and doors, 85,000 PWIP. insulation, caulking and 'weather stripping
for town hail and housing - $212,000414
TANANA CHIEFS ASSOCIATION
Planning.Planning
grantgrant supplement
TLINGIT-HAIDA
Planning-grant
YAKUTATa
Energy conservation program
.s.
ti
S 20,00020 000
40,000
k
PGPG
$-61.,000 PG
$ 39,000 PWIP
Alaska State TOtal: ST 943 000
ARIZONAFORT APACHE
Planning grantOverrun - Sunrise Park expansionInstallation of electrical power' generating
facilities for lumber mill operation
McDOWELL
Overrun - community center'Planning grant
FORT -YUMA
Planning grant
115
de
$ 32,000 .PG300,000 PW
1;008 500 PW
51,540,500
$ 29,000 PW181906 PG
S
.,.-
S 35,000 PG .
GILA RIVERS..
Planning gra-rit S 32,000 PG5Additions to and extensions of roads,rai 1 roads , sewer and water 1 i nes toindustrial park 5,000 PW
friavAsyRar.
HOPI
$ 437;000
Trai 1 s, campgrounds and related fa cil i ttes $177,000 PWIP
.Multi7-purpose bujIding/ Planning grant $218 ,000 PW32.000 PG
$250 ,000.1%
HUALAPAI
Planni n rant $ 32 ;000 PG
KAIBAB
P1 anni ng grant
'NAVAJO
$ 20,000 PG
P1 anni ng grant $150 ,000 PGEnvironmental impact study for CrotRfpoi nt 50 ,000. TA. .
PAPAGO
Indus tri al buil di ngPl anni ng grant
SALT RIVER
Planning grant
-JP$200,000
$555,00032,000. PG
5587,000.
$ 14,700 PG
SAN CARLOS
, .11-Planning' grant .S 32,000 PePlanning ,grant suptrlement 32 000 . PG
$ 64,000
of.
Arizona State Total: $3,004,200
#
- 0
CALIFORNIA
FT. INDEPENDENCE
Campground. $133;000 MCP .
HOOPA VALLEY
Forest rehattlitation - $736,500 'IX. .
INDIAN PLANNING CONSORTIUM OF CENTRAL CALIFORNIA
Planning grant $ 35,000 PG
LAYTONVILLE
_Road and bridge $l00,000 PW
NORTHERN CALIFORNIA RESERVATION PLANNING ORGANIZATION
Planning grant
OWENS VALLEY (Bishop)
,
$ 80,000 PG
Pl anning grant 5%43,000 PG --
PALA
Tribal agricural enterprise feasibility $ 40,000. TA:study
-.1: 1=7
ISOUTHERN CALIFORNIA---XESER YATION PLANNING ORGANIZATION
Planning grantdo
. STEWART' S POINT
rmmunity center
SYCUAN
Nul ti-Tfrpose building
TRINIDAD
Community center
TUOLUMNE
*,
-S 80 000 PG
S210;000 PWIP
4
$450,000 PW-
S210;000 PWIP
Parking lot and restrooms for community- $ 75,000 = P1,1-1P-'center
California State Total: S2,192,500
ILORADO
MP-
SOUTHERN UTE
Pi anni ng) grant S 35,000 PG
UTE MOUNTAIN
0.
Planning grant 5 35,000 PG
111
Colorado State Total: S 70,000
4-
FLORIDA4.116
MIC.COSUKEE _
Planning grantPlanning grant. supplement,.
ala
SEMINOLE.
Planning grant
_COEUR D'ALENE'km
41B
S 3%0003.000
S.70,000.
PGPG
50,000 PG
Flori da State Total 1120,000
P1 anni ng grantInstallation of storm windows and doors,
insulation, caulking arid- weather strippingfor Desmet community center
FORT HALL
35,000
31 000 OWIP
$ 66,000
Planning grant :" $ %,000 PGCommercial center , 576 400 PW-
- ,S611,000
NEZ PERCE
PI anni ng grant S 35,000 PG
Idaho State Total: $712,000119
.
COUSHATTA.
L 0UISVA N-A
ar
Multi-purpose cantor, S211,000 PW
Louisia tate Total: $211,000
MirkSSACHUSETTS
WAMPANOAG
flo
Continuation-of seafood industry(scallop production) study S 62,000 TA
Massachusetts State Total: S 62,000
MICHIGAN
MICHIGAN INTER-TRIBAL COUNCIL
\--Planning grant S 50,100 PGPlanning grant supplement 60 100 PG
S120,200
ISABELLA (Mt. Pleasant)
Wood products plant $495,000 PW
Michigan State tal: $615,200
MIN-NESO.T-
AMERICAN INDIAN BUSINESS DEYELO-PPIENT CORPORATION
Design Indiin-Owned shoppieg cent- anddevel tioffi ng capaci 1 i ties.
FOND DU
S 24,650 TA
NOW
Feasi ¢i lity study for motion picture industry S 5,000 TA
LEECH LAKE
Records centerowlepluisment storagefacility and d g1 i tti ngw equipmentshelter S247,200 PW
I
MINNESOTA CHIPPEWA TRIBE
Planning grant S175,000 PGFeasibility study for farming /marketing-wild rice 5 000 TA
-S180,000
NETT- LAKE
Expanci and equip sawmill S660,000 PW
RED LAKE CForest products marketing. feasi bi 1 i ty study S 25,985- T'A
ilinesotaState Total: S1 ,143,835
"lb
CHOCTAW
MISSI.S.S'ic.
.,.. .1
Planning grant. , $ 35,000 PGOverrOn - community center. ATUcker) - 1.740000 PW__.:J
..,
$135 ,000
Mississippi State Total : S135 ,000
MONTANA\-/BEAR PAW ECONOMIC DEVELOPMENT DISTRICT
_ anning grant
CROW
Pl anni rig grant
FLATHEAD
Pl anni ng grantPl anni ng- grant
FORT PECK
Overrun - _tourism projectOverrun - tourism project
A S 38,000 PG
35,000 PG
$ 50,000 PG50 000 PG
5100 ,000
13,000 PW13,000 PW
!3 S 26,000
NORTHERN CHEYENNE
Planning.yrant
ROCKY BOY'S
Motpansion of Dry Fork Fram
- STATEWIDE
50 copies of agriculture report(includes Nbrth and South Dakota)
1.«
SANTEE
$ 35,000 PG
$288,000 PW
$ 4,500IA V
Montana State Total: $526,500
.NEBRASKA
TA
Improvements to tribal farm/ranch $400,000 PW
I
DUCKWATER
Ove.rr-un --community building
$400,000
Nebraska State Total: $400,000
N E V-A.D A
$150,000 PW
EL KO
Water and sewer lines; curbs , sidewalks -
and roads
FALLON
Overrun - communi bui 1 di ng
NEVADA INTER-TRIBAL COUNCIL
Planning grant
WALKER RIVER
Tribal center
YOMBA
$166 ,000 PW I P
$ 34 ,000 , PW
$ 85 ,000 . PG
$360,000 PW
Overrun - comniuni ty building - $ 65 ,009 PWil
14.
Nevada State Total: S860,000
NEW MEXICO
ACOMA
Planning grant
EIGHT NORTHERN. PUEBLOS
Planning grant
ISLETA
$ 35 ,000, PG
S 60,000 PG
Planning grant S 35,000 PG
r24
-12-
JEMEZ
C
Heal th clinic S260,000 PW
JICARILLA
Planning grant
LAGUNA
Planning grant
MESCALERO
Planning grantPlanning grant supplement
$ 35,000 PG
$ 43,000 PG
$ 35,000 PG35,000 PG
$ 70,00.0
SAN ILDEFONSO
Fishing lake and outdoor recreational area $407,000 ,
SANTA AM
Renovate and enlarge office -facility $220,000 PW
SANTA CLARA
Headstart /adult education facili'ty' $229,000- PW
SANTO-DOMINGO
Tribal uti 1 i ty bui 1 di hg, warehouse ,slaughterhouse, water well and storagetank $460,000 PW
SIX SANDOVAL INDIAN PUEBLOS
Planning grant $ 50,000 PG
ZUNI
Planning grant . Ia
$ 50,000 °PG
New Mexico State Total : $1,954,000
NEW YORK
ST. AEGIS
Pl anni ng grantPl anni ng grant suppl ementCommunity building
SENECA
Fire stationPlanning grantDevelopment of commercial areasExpansion of i ndustri al ,park
SHINNECOCK
Sea fobd production program
$ 35,00035,000.
250.000
$320,000
PGPGOW
$195,000 PWI P50,000 PG
145,000 PW130,000 PW
'$520,000
$ 56,650 TA
New York State Total : $896,650
126
-14-
NORTH CAROLINA
CHEROKEE
Fire station /emergency service facility c $250,000 PWParking facilities 250,000 PWPlanning grant 55,000 -- PG
'Vmsopo
North Carolina State Total: $555,000
NORTH Dr---OTA
FORT BERTHOLD
Planning grant ,4 $ 35,000 PG .
Water intake, transmission line andtreatment facilities PW
$ 75,000
STATEWIDE
Training conference for American Indianplanners -- State University' Center forEconomic Development
TURTLE MOUNTAIN
Planning grant
$ 7,150 , TA
S 64,0tlig PG
UNITED TRIBES EDUCATIONAL TECHNICAL CENTER
C4inuation of lignite manpower study $-57,700 TAWeatherization of two dorms plus 42 unitsof-campus housing 200,000 PWIP
$257,700-
jam.-North Dakota State Total: $403,850
CHOCTAW
.15-
OKLAH,OKA
jl
Extend water serrvi ces , sewage treatmentfacility and pave parking area fprindustrial park
Industrial building.
EASTERN SHAWNEE
Industry feasibility study
FIVE CIVILIZED TRIBES FOUNDATION, INC-. 4,
Planning grant
INTER - TRIBAL COUNCIL INC.
Planting grant
$300,00 PW702 500 PW
$ 1,002,500
$ 8,000 TA
$ 35,000 PG
43,000 PG
PAWNEE
Industrial park $330 ,000 PW
UNITED INDIAN TRIBES OF WESTERN OKLAHOMA AND KA
Planning grant $ 60,000 PG
Oklahoma State tat : $1 ,478,500
.128
-16-
OREGO N
COLUMBIA RIVER INTER - TRIBAL FISH COMMISSION
Economic adjuitment program aimed atstabilizing the commercial fishing industryof the Warm Springs and Umatilla Tribes ofOregon; the Yakima Nation of Washington;and the Nez Perce Tribe of Idaho. $1,500,000 IX
UMATILLA
Planning grant $ 43,000 PG
WARM SPRINGS
Manning grantPlanning grant supplementFeasibility study for expansion of the
forest products industry
Oregon State Total:
SOUTH DAKOTA
$1
S 43,00043,000
55,000
$141 ,00Q
,684,000
$800,000
$ 12,000
CHEYENNE RIVER
Water treatment plant
CROW CREEK
Planning grant
PGPG
TA
PW
PG
-17-
LOWER BRULE
Planning grant'Plinning grantInsulated roofing, interior walls,insulation and heating control
PINE RIDGE
S 43,000 4. PGA 43,000 PG
170.000 PWIP
5256,000.
Planning grant supplement S 20,800 PGBusiness loan to Wambli Archery.Company, Inc. 350,000 BL
,S370,800
ROSEBUD
Planning grant S 50,000 PG
SISSE; .\.
ilh."''''`.......),-
. Planning grant S 35,000 PGImprovements to tribal farm 600,000 PW
t 5535,000
YANKTON
TI GUA
Planning grant
2S 43,000 PG
South Dakota State Total: 52,156,800 -
TEXAS
Greenhouse, meal building,renovation ofmuseum, and an arts/crafts building 5225,000 P'4
Texas State Total: 5225,000
1-j(),
UINTAH AND OURAY
Planning grant
LUMMI
Planning grantSewer collection lines
-18-
UTAH-
S 35,000 PG
Utah Statt Total: 35,000
WASHINGTON.
$ 35,000 PG600,000 PW
$635,000 4s.
121,0_ '
. tPlanning grant. $ 35,000 PG.Planning grant suppiement '35,000 -PG
$ 70,000
PUGET SOUND ASSOCIATION OF COOPERATING TRIBES
Planning grant $ 25,000 PG
QUILEUTE
Planning grant
QUINAULT
Planning grant
MID
t
131
I
$ 35,000 PG
S 50,900 PG
Ia -19-
SOUTHERN PUGET SOUND INTER-TRIBAL PLANNING AGENCY
. Planning grant S 25,000 PG
-SPOKANE
Planning grantPlanning grant
sguAxIN ISLAND
Floating docks
S 35,000 PG35 000 PG
70,000
S188,000 PWIP
SWINOMISH
Planning grant -$ 43,000 PG
TULALIP
Planning grant
YAKIMA
Planning grant suppleme:
S 35,000 PG
S 50,000 PGt
Washington State Total: $1,226,000,
WISCONSIN
GREAT LAKES INTER-TRIBAL COUNCIL
-Planning grant $150,000 -PG
40-
*LAC DU Fuvi0EAU
industrial ParkCommunity building
MOLE LAKE (sokaogon Chippewa)
Developakent. feasibility study
STOCKBRIDGE.HUMSEE FOREST COUNTyPOTAWATC*41
$5!2,000 pW
12.2_00 pW
$605 .000
S 42.000 TA
Feasibility study for a saki11 and a
chipmill $ 5,000 TA
WINNEBAGO
Building for tribal anterPri PWse $242 ,400
WIND RIVER
Planning grant
Wisc°rIsin State Total $1,044,400
1
$ 50000 PG
liYouring State Totetk S 50,0
-21-4
NATIONAL
Development of and lands - University of Arizona 't 42,495 TA
American Indian Travel Commission Nationaltourism development program (transferred to BIA) 150,000 TA
"Evaluation of EDA's Indian Economic DevelopmentActivities within the Context of Other FederalIndian Economic Development Efforts" byCentaur Management Consultants, Inc.
Council of Energy Resource Tribes (CERT). 297,000 IX(transferred to DOE)
300,000 PAD ***
NatiOnal Total: 5789,495
Fiscal Year 1978 Total: S24,504,030