IntroductionLined DrainsComposite DrainsGrassed SwalePipe DrainsEngineered Waterways

ContentsContents

Page 2: 06 Urban Drainage - Universiti Sains Malaysia

Introduction

Page 3: 06 Urban Drainage - Universiti Sains Malaysia

Existing Drain

Page 4: 06 Urban Drainage - Universiti Sains Malaysia

Rigid Boundary ChannelRigid Boundary Channel

Page 5: 06 Urban Drainage - Universiti Sains Malaysia

Rigid Boundary ChannelRigid Boundary Channel(Dry Period)(Dry Period)

Page 6: 06 Urban Drainage - Universiti Sains Malaysia

Trunk Drain During Dry Period

Rigid Boundary ChannelRigid Boundary Channel

Page 7: 06 Urban Drainage - Universiti Sains Malaysia

Wet PeriodWet Period

Rigid Boundary ChannelRigid Boundary Channel

Page 8: 06 Urban Drainage - Universiti Sains Malaysia

Trunk Drain - Wet Period Rigid Boundary ChannelRigid Boundary Channel

Page 9: 06 Urban Drainage - Universiti Sains Malaysia

Feasibility Study On Drainage Improvement in PraiIndustrial Complex, Seberang Perai Tengah, Penang

Study Area

Page 10: 06 Urban Drainage - Universiti Sains Malaysia

Legend:Primary DrainExisting Pump StationRailway

Pump House A

Pump House B

Existing Primary Drains

Page 11: 06 Urban Drainage - Universiti Sains Malaysia

Legend:Primary DrainExisting Pump StationRailway

Pump House A

Pump House B

Existing Primary Drains

Page 12: 06 Urban Drainage - Universiti Sains Malaysia

Legend:Primary DrainExisting Pump StationRailway

Pump House A

Pump House B

Existing Trunk Drains

Page 13: 06 Urban Drainage - Universiti Sains Malaysia

Legend:Primary DrainExisting Pump StationRailway

Pump House A

Pump House B

Existing Trunk Drains

B-2EL-6B

T-6E

J-2A

Rubber Pitching :Rubber Pitching :Top Width = 30’ - 46’

Depth = 5’ – 13’

Rectangular :Rectangular :Width = 5’ – 8’

Depth = 16’

Page 14: 06 Urban Drainage - Universiti Sains Malaysia

Feasibility Study and Detail Design of Flood Mitigation and Drainage Improvement in Taman Sentul, TamanSentul Jaya, Taman Pinang & Taman Mangga, Juru,

S.P.T, Penang

Study Area

TolJuru

Lebuhraya Utara-Selatan

ParitNo. 5

Perkampungan Juru

KawasanPerusaha

anRingan

Utara

TamanSentulJaya

Taman

Mangga

Taman

Sentul

Taman

Pinang

Page 15: 06 Urban Drainage - Universiti Sains Malaysia

Precast Concrete Drain900mm

Page 16: 06 Urban Drainage - Universiti Sains Malaysia

Precast Concrete Drain1200mm

Page 17: 06 Urban Drainage - Universiti Sains Malaysia

Precast Concrete Covered Drain

1200mm

Page 18: 06 Urban Drainage - Universiti Sains Malaysia

PrecastConcrete

Drain3000mm

Page 19: 06 Urban Drainage - Universiti Sains Malaysia

Feasibility Study of Flood Mitigation and Drainage Improvement in Kampung Tersusun, Juru, Seberang

Perai Tengah, PenangStudy Area

Page 20: 06 Urban Drainage - Universiti Sains Malaysia

Primary Drain

Secondary Drain

Trunk Drain

Natural Waterway

Parit No. 5

Sungai Juru

Page 21: 06 Urban Drainage - Universiti Sains Malaysia

Existing Problems

Feasibility Study of Flood Mitigation and Drainage Improvement in Kampung Tersusun, Juru, Seberang

Perai Tengah, Penang

Page 22: 06 Urban Drainage - Universiti Sains Malaysia

Flooding occurs along the roads of the study areas due to improper drainage design, where roadside drains are not

provided.

Flooding occurs along the roads of the study areas due to improper drainage design, where roadside drains are not

provided.

Normal conditionNormal condition Flood condition on 6th October 2003

Flood condition on 6th October 2003

Page 23: 06 Urban Drainage - Universiti Sains Malaysia

Flooding occurs along the roads of the study areas due to improper drainage design, where roadside drains are not

provided.

Flooding occurs along the roads of the study areas due to improper drainage design, where roadside drains are not

provided.

Normal conditionNormal condition Flood condition on 6th October 2003

Flood condition on 6th October 2003

Page 24: 06 Urban Drainage - Universiti Sains Malaysia

Flooding caused by lack of maintenance and undersized secondary drain.

Flooding caused by lack of maintenance and undersized secondary drain.

Normal conditionNormal condition Flood condition on 6th October 2003

Flood condition on 6th October 2003

Page 25: 06 Urban Drainage - Universiti Sains Malaysia

Normal conditionNormal condition Flood condition on 6th October 2003

Flood condition on 6th October 2003

Flooding caused by overflow of trunk drain.

Flooding caused by overflow of trunk drain.

Page 26: 06 Urban Drainage - Universiti Sains Malaysia

Open Drains Volume 10 (Chapter 26)

Page 27: 06 Urban Drainage - Universiti Sains Malaysia

Design Criteria

Page 28: 06 Urban Drainage - Universiti Sains Malaysia

(a) Grassed Swale

0.5 m

Drainage Reserve

0.5 m Design flow width + freeboardmin min

1.5 m minimum 1.0 m

Drainage Reserve

(b) Lined Open Drain

Reserve Width for Open Drain

Page 29: 06 Urban Drainage - Universiti Sains Malaysia

21

321. SRnAQ =

Manning’s Equation

38

21

.

BS

nQBYv.s

Page 30: 06 Urban Drainage - Universiti Sains Malaysia

Manning’s Roughness Coefficient, n (Design Chart 26.1)

0.0150.012Precast Masonry Blockwork

0.0180.012 Brickwork

0.0300.025Rock Riprap

0.0350.020Random stones in mortar or rubble masonry

0.0170.015Dressed stone in mortar

Stone Pitching

0.0180.013Off form finish

0.0150.011Trowelled finish

Concrete

MaximumMinimum

Suggested n valuesSurface Cover or Finish

Page 31: 06 Urban Drainage - Universiti Sains Malaysia

Solution to Manning Equation for Lined Open Drains

Page 32: 06 Urban Drainage - Universiti Sains Malaysia

Longitudinal Grade, S0 (%)

1

10

1 5

3

4

5

1 20.4

0.6

0.9

0.8

0.7

0.5

0.3

2 3 4

2

3

4

5

6

7

8

9

Des

ign

Flow

, QD

(m3 /s

)

Use 'vee' shaped section

501 1

504

14

1

Base width, B (m)

Swale reserve width, R (m)( including required freeboard )

y

Base width, B (m)

Flow depth, y (m)

1.5

1.5

0.1 0.90.5

Flow Depth, y (m)

0.2 0.3 0.4 0.6 0.7 0.8

1

0.01

0.5

0.1

3

0.005

0.05

2

Valu

e of

Q n

S 01/

2

0.15

Z = 5.5

Z = 6

Z = 5

Z = 4.5

Z = 4

Swale reserve width, R (m)( including required freeboard )

y

z1

z1

'Vee' shaped Section

Page 33: 06 Urban Drainage - Universiti Sains Malaysia

Lined Drains Volume 10 (Chapter 26.3)

Page 34: 06 Urban Drainage - Universiti Sains Malaysia

Design Criteria

Page 35: 06 Urban Drainage - Universiti Sains Malaysia

Uncovered Open Lined Drain (Minor System – Chap. 26)

H max = 0.5 m

B = 0.5 – 1.0 m 1.5 m minimum1.0 m

Drainage Reserve Width

50 mm

Page 36: 06 Urban Drainage - Universiti Sains Malaysia

Covered Open Lined Drain (Minor System – Chap. 26)

H = 0.5 m – 1.0 m

B = 0.5 – 1.0 m 1.5 m minimum1.0 m

Cover

Drainage Reserve Width

50 mm

Page 37: 06 Urban Drainage - Universiti Sains Malaysia

To prevent sedimentation and vegetative growth

Min Average Flow Velocity = 0.6 m/s

Velocity Limitation (Minor System – Chap. 26.3.6)

To prevent Channel Surface Erosion

Max Average Flow Velocity = 4.0 m/s

Note: Average Flow Velocity > 2.0 m/s, drain provided with a handrail fence, or covered with solid or grated cover

Page 38: 06 Urban Drainage - Universiti Sains Malaysia

Composite Drains Volume 10 (Chapter 26.4)

Page 39: 06 Urban Drainage - Universiti Sains Malaysia

C

Design flow width + freeboard

14 min

Qminor

50 mm freeboard

4 min1

Grassed Section

Lined drain

Recommended Composite Drain

• Provided in locations subject to dry-weather base flows which would otherwise damage the invert of a grassed swale, or in areas with highly erodible soils.

•The lined drain section is provided at the drain invert to carry dry-weather base flows and minor flows up to a recommended limit of 50% of the 1 month ARI.

Page 40: 06 Urban Drainage - Universiti Sains Malaysia

Grassed Swale Volume 10 (Chapter 26.2)

Page 41: 06 Urban Drainage - Universiti Sains Malaysia

Constructed Swale

Page 42: 06 Urban Drainage - Universiti Sains Malaysia

Perimeter Perimeter SwaleSwale

Bio-Ecological Drainage SystemUSM, Engineering Campus

Type CType C

Type BType B

Type AType A

Page 43: 06 Urban Drainage - Universiti Sains Malaysia

Design Criteria

Page 44: 06 Urban Drainage - Universiti Sains Malaysia

C

Design flow width + freeboard

4 min1 1

4 min

Qminor

(a) ' Vee' Shaped

300mm freeboard

15050

11

4 min14 min

Batter BatterBase

Qminor

Design flow width + freeboard

(b) Trapezoidal Shaped

C 300mm freeboard

Page 45: 06 Urban Drainage - Universiti Sains Malaysia

Velocity Limitation (Minor System – Chap. 26.2.5)

Max Average Flow Velocity < 2.0 m/s

Freeboard (Minor System – Chap. 26.2.4)

Min freeboard of 50 mm above the design stormwater level

Manning’s Roughness Coefficient, n Design Chart 26.1

0.0500.035Tall grass cover

0.0350.030Short grass cover

Grassed Swales

MaximumMinimum

Suggested n valuesSurface Cover or Finish

Page 46: 06 Urban Drainage - Universiti Sains Malaysia

Worked Example(Application of Bio-Ecological

Drainage System (BIOECODS) in Malaysia)

Page 47: 06 Urban Drainage - Universiti Sains Malaysia

Perimeter Swale

Study Area – BIOECODS, USM Engineering Campus

Page 48: 06 Urban Drainage - Universiti Sains Malaysia

Recommended Grassed Swale Cross-Sections: Side slope = 1:4 min (batter); 1:50 (base)

Figure 26.2

The average flow velocity in a grassed swale shall not exceed 2 m/s.

26.2.5

The depth of a grassed swale shall include a minimum freeboard of 50 mm above the design storm water level in the swale.

26.2.4

In new development areas, the edge of a grassed swale should generally be located 0.5 m from the road reserve or property boundary.

26.2.2

Design CriteriaReference

2.40m

3.60m

3.60m

Page 49: 06 Urban Drainage - Universiti Sains Malaysia

a) Overland flow time:Overland sheet flow path length = 35mSlope of overland surface = (3.60-2.40)/35 = 3.5%Design Chart 14.1, overland flow time, to = 12 minute

Page 50: 06 Urban Drainage - Universiti Sains Malaysia

b) Flow time in channel:

- Reach length of perimeter swale = 130m

- The estimated average velocity = 0.25m/s

- Flow time in ecological swale , td = (130/0.25)/60 = 8.7 minutes

c) Time of concentration

Time of concentration, tc = to + td = 12 + 8.7 = 20.7 minutesAssume : tc = 20 minit

Page 51: 06 Urban Drainage - Universiti Sains Malaysia

d) Design Storm

Minor Storm : 10 year ARIMajor Storm : 50 year ARITable 13.A1 Lacation : Pulau Pinang and equation 13.2 for tc = 20 minute,

Table 13.A1 Coefficients for the IDF Equations for the Different Major Cities and Towns in Malaysia (30 ≤ t ≤ 1000 min)

0.0341-0.56102.24172.7512100

0.0335-0.54692.14562.842950

0.0286-0.47031.76893.325520

0.0241-0.40231.43933.727710

0.0180-0.32401.12843.95995

0.0118-0.23110.67294.514021951-1990

PenangPulauPinang

dcba

Coefficients of the IDF Polynomial EquationsARI (year)

Data Period

LocationState

Page 52: 06 Urban Drainage - Universiti Sains Malaysia

0.000.000.000.000.0030

0.480.320.360.420.4720

0.740.540.620.720.8015

1.030.860.991.131.2810

1.391.401.621.852.085

All≥ 180150120≤ 100(minutes)

East CoastWest Coast

2P24h (mm)Duration

Table 13.3 Values of FD for Equation 13.3

Page 53: 06 Urban Drainage - Universiti Sains Malaysia

Where, 10I30 = 3.7277 + (1.4393) [In(30)] + (-0.4023) [In(30)]2 + (0.0241) [In(30)]310I30 = 136.65 mm/hr

P30 = 136.65/2 = 68.32 mm

And, 10I60 = 3.7277 + (1.4393) [In(60)] + (-0.4023) [In(60)]2 + (0.0241) [In(60)]310I60 = 92.83 mm/hrP60 = 92.83/1 = 92.83 mm

32 ))t(ln(d))t(ln(c)tln(ba)Iln( tR +++=

Thus, P20 = 68.32 – (0.42) (92.83 - 68.32) = 56.80 mm

10I20 = 56.80 (60) / 20 = 170.41 mm/hr

(13.2)

)( 306030 PPFPP Dd −−= dPI d=(13.3) (13.4)

Minor Storm: 10 year ARI:

Page 54: 06 Urban Drainage - Universiti Sains Malaysia

Where, 100I30 = 2.7512 + (2.2417) [In(30)] + (-0.5610) [In(30)]2 + (0.0341) [In(30)]3100I30 = 186.35 mm/hr

P30 = 186.35/2 = 93.17

And, 100I60 = 2.7512 + (2.2417) [In(60)] + (-0.5610) [In(60)]2 + (0.0341) [In(60)]3 100I60 = 129.75 mm/hr

P60 = 129.75 /1 = 129.75

32 ))t(ln(d))t(ln(c)tln(ba)Iln( tR +++=

Thus, P20 = 93.17 – 0.47 (129.75 - 93.17) = 75.99

100I20 = 75.99 (60) / 20 = 220.96 mm/hr

(13.2)

)( 306030 PPFPP Dd −−= dPI d=(13.3) (13.4)

Major Storm: 100 year ARI:

Page 55: 06 Urban Drainage - Universiti Sains Malaysia

e) Runoff Coefficient

Design Chart 14.3 (Landscape: Category 7),

C for minor storm = 0.58I= 170.41 mm/hr

C for major storm = 0.67I= 220.96 mm/hr

1.0

Run

off

Coef

ficie

nt,

C

Rainfall Intensity, I (mm/hr)

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0190 200

2

1

7

6

5

4

3

8Impervious Roofs, ConcreteCity Areas Full and Solidly Built Up

Urban Residential Fully Built Up with Limited Gardens

Surface Clay, Poor Paving, Sandstone RockCommercial & City Areas Closely Built Up

Semi Detached Houses on Bare Earth

Bare Earth, Earth with Sandstone Outcrops

Bare Loam, Suburban Residential with Gardens

Widely Detached Houses on Ordinary LoamSuburban Fully Built Upon Sand Strata

Park Lawns and Meadows

Cultivated Fields with Good GrowthSand Strata

8

7

6

5

4

3

2

1

*I = 200mm/hr, C = 0.63I = 400mm/hr, C = 0.90

(Pavement: Category 1),C for minor & major storm = 0.91

Page 56: 06 Urban Drainage - Universiti Sains Malaysia

f) Average Runoff Coefficient

000,3600AIC t

R

Q ××=

g) Peak flow

By using Rational formula (equation 14.7)

Minor storm,Cavg = [(0.58x4600) + (0.91x1900)] / 6500 = 0.68

Major storm,Cavg = [(0.67x4600) + (0.91x1900)] / 6500 = 0.74

Qminor /2* = C.I.A/ (3600,000) (2) = 0.68 (170.41) (6500) / (3600,000) (2)= 0.10m3/s

Qmajor /2* = C.I.A/( 3600,000) (2) = 0.74 (220.96) (6500) / (3600,000) (2)= 0.15m3/s

* There are two perimeter swale in the catchment area to cater the peak flow.

∑∑

=

== m

i

i

m

i

ii

avg

A

AC

C

1

1

Page 57: 06 Urban Drainage - Universiti Sains Malaysia

g) Perimeter Swale SizingLongitudinal slope = 1:1000; Side slope 1:6 (batter), 1:50 (base); Bottom width, B = 1.8m; Depth, D = 175mm; Manning’s, n = 0.035; Area, A = 0.50 m2,; Wetted Perimeter, P = 3.93m;Hydraulic radius, R = A/P = 0.13m;Average velocity, V = 0.23m/s (<2.0 m/s) …OKQ = 0.11m3/s (> Q10) ... OK

0.1460.240.144.230.604.200.20061.80.001

0.1130.230.133.930.503.900.17561.80.001

0.0840.210.113.620.413.600.15061.80.001

0.0600.190.103.320.323.300.12561.80.001

0.0400.170.083.020.243.000.10061.80.001

0.0240.140.062.710.172.700.07561.80.001

0.0120.110.042.410.112.400.05061.80.001

0.0040.070.022.100.052.100.02561.80.001

0.0000.000.001.800.001.800.00061.80.001

(cumec)(m/s)(m)(m)(sq.m)(m)(m)(m)(m)

QVRPATWDepth, DSide Slope, ZBWSLOPE

Page 58: 06 Urban Drainage - Universiti Sains Malaysia

Freeboard = 300mm; Depth, D = 1200mm; Area, A = 11.64 m2;

Wetted Perimeter, P = 17.10m; Hydraulic radius, R = A/P = 0.68m;Average velocity, V = 0.27m/s (<2.0 m/s) …OKQ = 0.19m3/s (> Q100) ... OK

0.2760.290.185.150.955.100.27561.80.001

0.1910.270.164.540.714.500.22561.80.001

0.1460.240.144.230.604.200.20061.80.001

0.1130.230.133.930.503.900.17561.80.001

0.0840.210.113.620.413.600.15061.80.001

(cumec)(m/s)(m)(m)(sq.m)(m)(m)(m)(m)

QVRPATWDepth, DSide Slope, ZBWSLOPE

Page 59: 06 Urban Drainage - Universiti Sains Malaysia

Pipe DrainsVolume 10 (Chapter 25)

Page 60: 06 Urban Drainage - Universiti Sains Malaysia

Design Criteria

Page 61: 06 Urban Drainage - Universiti Sains Malaysia

Table 25.5 Minimum Pipe Diameters

Diameter

450For a non-self draining underpass, the pipe shall be sized for 10 year ARI and shall not be less than

375Any other pipe

300Pipe draining a stormwater inlet and crossing a footpath alignment *

Diameter (mm)Application

Note: * 300 mm diameter pipes are permitted in this situation only, in order to provide more space in the footpath alignment for other utility services.

Minimum Design Service LifeStormwater pipelines shall be designed for a minimum effective service life of 50 years.

Page 62: 06 Urban Drainage - Universiti Sains Malaysia

Pipe Grades

(a) Maximum Grade

Pipeline grades shall be chosen to limit the pipe full flow velocity to a value less than or equal to 6.0 m/s.

(b) Minimum Grades

Stormwater pipelines shall be designed and constructed to be self cleansing. The desirable minimum grade for pipelines shall be 1.0%.

An absolute minimum grade of 0.5% may be acceptable where steeper grades are not practical.

Page 63: 06 Urban Drainage - Universiti Sains Malaysia

Table 25.7 Pipe Roughness Values (average condition)

0.060.011UPVC

0.150.013Fibre Reinforced Cement

0.30.013Spun Precast Concrete

k (mm)nPipe Material

Pipe Roughness Values

n = Manning roughness coefficientk = Pipe roughness height for Colebrook-White equation

Page 64: 06 Urban Drainage - Universiti Sains Malaysia

Worked Example(Proposed Tuanku Heights Mixed Development of Daerah Seremban,

Negeri Sembilan)

Page 65: 06 Urban Drainage - Universiti Sains Malaysia

System System Layout Layout

Page 66: 06 Urban Drainage - Universiti Sains Malaysia

Forebay

Mini Wetland

RockBaffle

Community Detention Pond

Engineered Waterway

Lot

Pipe DrainEngineered WaterwayEcological Drain

Natural Waterway

SCHEMATIC LAYOUT OF NEW SCHEMATIC LAYOUT OF NEW DRAINAGE SYSTEM, TUANKU DRAINAGE SYSTEM, TUANKU

HEIGHTHEIGHT

Page 67: 06 Urban Drainage - Universiti Sains Malaysia

Subcatchment : 1

Area = 6770m2

Qp1 = 144.39 l/s

k = 0.3 mmTable 25.7

n = 0.013Table 25.7

Minimum grade = 1.0%Sec. 25.3.3 (b)

Maximum Grade : Velocity < 6 m/s.Sec. 25.3.3 (a)

φmin = 375mmTable 25.5

Design CriteriaReference

Calculation for Underground Drain Pipes Sizing

Page 68: 06 Urban Drainage - Universiti Sains Malaysia

From Design Chart 25.B3 (k = 0.3 mm),

With D = 375 mm

Hydraulic gradient 1 %

Q = 230 l/s (> Qp1 …OK)

V = 2 m/s (< 6m/s…OK)

Page 69: 06 Urban Drainage - Universiti Sains Malaysia

(Major System)

Engineered WaterwaysVolume 11 (Chapter 28)

Page 70: 06 Urban Drainage - Universiti Sains Malaysia

Engineered Waterways

H

W VariesVaries

Drainage Reserve Width

300 mm

Page 71: 06 Urban Drainage - Universiti Sains Malaysia

Recommended Waterway Reservefor Maintenance Access

Page 72: 06 Urban Drainage - Universiti Sains Malaysia

To prevent sedimentation and vegetative growth

Min Velocity = 0.8 m/s

To prevent Channel Surface Lining Erosion

Max Velocity = 4.0 m/s (Lined Channel / Low flow invert)

= 2.0 m/s (Floodways and Natural Waterway)

Minimum Longitudinal Slope

0.2 % - Lined Channel0.5 % - Grassed floodways and natural waterway

Page 73: 06 Urban Drainage - Universiti Sains Malaysia

Suggested Values of ManningSuggested Values of Manning’’s s Roughness Coefficient, Roughness Coefficient, nn

0.1200.100Medium to dense

0.0500.040Scattered

Tree cover

0.1600.100Medium to dense

0.0700.050Scattered

Shrub cover

0.0500.035Tall grass

0.0350.030Short grass

Grass cover only

Grassed Floodways

MaximumMinimum

Suggested n valuesSurface Cover

Page 74: 06 Urban Drainage - Universiti Sains Malaysia

Suggested Values of ManningSuggested Values of Manning’’s s Roughness Coefficient, Roughness Coefficient, nn

0.2000.110Dense growth of trees

0.1600.070Medium to dense brush

0.0800.040Light brush and trees

0.0500.030Long pasture grass, no brush

0.0350.025Short pasture grass, no brush

Overbank flow areas

0.1000.035Irregular and rough cross-section

0.0600.025Regular cross-section with no boulders or brush

Large streams

0.0700.030Steep mountain streams with gravel, cobbles, and boulders

0.0800.050Sluggish weedy reaches with deep pools

0.0450.035Clean, winding with some pools and shoals

0.0330.025Straight, uniform and clean

Small streams

Natural Channels

MaximumMinimum

Suggested n valuesSurface Cover

Page 75: 06 Urban Drainage - Universiti Sains Malaysia

Suggested Values of ManningSuggested Values of Manning’’s s Roughness Coefficient, Roughness Coefficient, nn

0.0300.025Rock Riprap

0.0350.020Random stones in mortar or rubble masonry

0.0170.015Dressed stone in mortar

Stone Pitching

0.0250.020Unfinished

0.0250.018Trowelled, wavy

0.0230.016Trowelled, not wavy

Shotcrete

0.0180.013Off form finish

0.0150.011Trowelled finish

Concrete

Lined Channels and Low Flow Inverts

MaximumMinimum

Suggested n valuesSurface Cover

Page 76: 06 Urban Drainage - Universiti Sains Malaysia

Suggested Values of ManningSuggested Values of Manning’’s s Roughness Coefficient, Roughness Coefficient, nn

0.0240.02014 mm stone

0.0190.0177 mm stone

Flush Seal Pavement

0.0170.015Rough

0.0140.012Smooth

Hotmix Pavement

0.0150.011Kerb & Gutter

Roadways

MaximumMinimum

Suggested n valuesSurface Cover

Page 77: 06 Urban Drainage - Universiti Sains Malaysia

I. Composite Waterways(With Increased Capacity - Chap 28)

Page 78: 06 Urban Drainage - Universiti Sains Malaysia

=

== m

i i

i

m

i i

ii

*

PAP

An

n

13/2

3/51

3/2

3/5

where,n* = equivalent Manning’s roughness coefficient for the whole

cross-sectionni = Manning's roughness coefficient for segment iAi = flow area of segment i (m2)P = wetted perimeter of segment i (m)m = total number of segments

(28.1)

Estimate the Overall Roughness Coefficient

Page 79: 06 Urban Drainage - Universiti Sains Malaysia

II. Natural Waterways

To prevent Channel Erosion

Max Velocity = 2.0 m/s

or

Critical Velocity

Minimum Longitudinal Slope0.5 %

Page 80: 06 Urban Drainage - Universiti Sains Malaysia

Velocity Limitation (Major System - Chap 28)

To prevent Channel Erosion

Max Velocity = 2.0 m/s

or

Critical Velocity

Minimum Longitudinal Slope0.5 %

Page 81: 06 Urban Drainage - Universiti Sains Malaysia

Critical Velocities, (m/s) for various conduit materials

Page 82: 06 Urban Drainage - Universiti Sains Malaysia

III. Grassed Floodways

6

1

6

1

15050

1

Batter BatterBase

C Low FlowProvision

Figure 28.3 Typical Grassed Floodway Cross-Section

Qmajor

Qminor

C Terracing

161

50

BatterTerrace Base

Figure 28.4 Typical Grassed Floodway Terracing

Low Flow Provision:Minimum capacity of 50% of the 1 month ARI flow.

Page 83: 06 Urban Drainage - Universiti Sains Malaysia

Design Chart Design Chart 28.228.2

Des

ign

Flow

, (m

3 /s)

15

2025

3035

5055

60

4045

1.2

1.3

1.4

1.5

1.6

1.1

1.0

0.9

0.8

0.7

10

5

Floodway Base Width –Preliminary Estimate(Manning's n = 0.035,

Average Velocity = 2 m/s)

Page 84: 06 Urban Drainage - Universiti Sains Malaysia

Worked Example(Application of Bio-Ecological

Drainage System (BIOECODS) in Malaysia)

Page 85: 06 Urban Drainage - Universiti Sains Malaysia

Ecological Swale

Study Area – BIOECODS, USM Engineering Campus

Page 86: 06 Urban Drainage - Universiti Sains Malaysia

Low flow inverts and pipes shall be sized for a minimum capacity of 50% of the 1 month ARI flow

28.10.4

Side slopes = 1:6 min (batter); 1:50 (base)Side slopes = 1:4 may be provided in special circumstance

28.10.2

Longitudinal grades shall be chosen such that the design storm average flow velocity will not exceed 2 m/s in grassed floodways and natural waterways

28.7.2

The minimum longitudinal grade for engineered waterways = 0.5% for grassed floodways and natural channels;Longitudinal grades shall not produce velocities less than 0.8 m/s if low flow inverts flowing full

28.7.1

The freeboard above the design storm water level shall be a minimum of 300 mm.

28.6

Minimum requirements for maintenance access = 3.7m (One side) and 1.0m (Other Side) for top width of waterway ≤ 6m or Both sides = 3.7m for top width of waterway > 6m

Table 28.1

Design CriteriaReference

Page 87: 06 Urban Drainage - Universiti Sains Malaysia

a) Overland flow time:Overland sheet flow path length = 35mSlope of overland surface = (3.60-2.40)/35 = 3.5%Design Chart 14.1, overland flow time, to = 12 minute

Page 88: 06 Urban Drainage - Universiti Sains Malaysia

b) Flow time in channel:

-Reach length of ecological swale = 920m

- Average velocity for ecological swale is given by Manning equation. The estimated average velocity = 0.35m/s

-Flow time in ecological swale , td = (920/0.35)/60 = 43.8 minutes

c) Time of concentration

Time of concentration, tc = to + td = 12 + 43.8 = 55.8 minutesAssume : tc = 56 minit

Page 89: 06 Urban Drainage - Universiti Sains Malaysia

d) Design StormMinor Storm : 10 year ARIMajor Storm : 100 year ARITable 13.A1 Lacation : Pulau Pinang and equation 13.2 for tc = 56 minute,

Table 13.A1 Coefficients for the IDF Equations for the Different Major Cities and Towns in Malaysia (30 ≤ t ≤ 1000 min)

0.0341-0.56102.24172.7512100

0.0335-0.54692.14562.842950

0.0286-0.47031.76893.325520

0.0241-0.40231.43933.727710

0.0180-0.32401.12843.95995

0.0118-0.23110.67294.514021951-1990

PenangPulauPinang

dcba

Coefficients of the IDF Polynomial EquationsARI (year)

Data Period

LocationState

Page 90: 06 Urban Drainage - Universiti Sains Malaysia

Minor Storm: 10 year ARI:

10I56 = 3.7277 + (1.4393) [In(56)] + (-0.4023) [In(56)]2 + (0.0241) [In(56)]310I56 = 96.99 mm/hr

Major Storm: 100 year ARI:

100I56 = 2.7512 + (2.2417) [In(56)] + (-0.4023) [In(56)]2 + (0.0241) [In(56)]3100I56 = 135.48 mm/hr

32 ))t(ln(d))t(ln(c)tln(ba)Iln( tR +++= (13.2)

Page 91: 06 Urban Drainage - Universiti Sains Malaysia

e) Runoff CoefficientDesign Chart 14.3 (category 5),

Minor storm:(I=96.99mm/hr,)C for = 0.61

Minor storm:(I=135.48mm/hr,)C for = 0.70

1.0

Run

off

Coef

ficie

nt,

C

Rainfall Intensity, I (mm/hr)

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0

190 200

2

1

7

6

5

4

3

8Impervious Roofs, ConcreteCity Areas Full and Solidly Built Up

Urban Residential Fully Built Up with Limited Gardens

Surface Clay, Poor Paving, Sandstone RockCommercial & City Areas Closely Built Up

Semi Detached Houses on Bare Earth

Bare Earth, Earth with Sandstone Outcrops

Bare Loam, Suburban Residential with Gardens

Widely Detached Houses on Ordinary LoamSuburban Fully Built Upon Sand Strata

Park Lawns and Meadows

Cultivated Fields with Good GrowthSand Strata

8

7

6

5

4

3

2

1

Page 92: 06 Urban Drainage - Universiti Sains Malaysia

000,3600AIC t

R

Q ××=

Qminor = C.I.A/3600,000 = 0.61 (96.99) (256,000) / (3600,000) = 4.21m3/sQmajor = C.I.A/3600,000 = 0.70 (135.48) (256,000) / (3600,000) = 6.75m3/s

f) Peak flow

By using Rational formula (equation 14.7), peak flow for minor storm = 4.21 m3/s and peak flow for major storm = 6.75 m3/s

Page 93: 06 Urban Drainage - Universiti Sains Malaysia

g) Ecological Swale SizingLongitudinal slope = 1:1000; Side slope 1:6 (batter), 1:50 (base); Bottom width, B = 2.5m; Depth, D = 900mm; Manning’s, n = 0.035; Area, A = 7.12 m2,; Wetted Perimeter, P = 13.46m;Hydraulic radius, R = A/P = 0.53m;Average velocity, V = 0.59m/s (<2.0 m/s) …OKQ = 4.21m3/s (= Q10) ... OK

5.3290.630.5814.678.5014.501.0062.50.001

4.1910.590.5313.457.1113.300.9062.50.001

3.2150.550.4812.235.8412.100.8062.50.001

2.3910.510.4311.024.6910.900.7062.50.001

1.7090.470.379.803.669.700.6062.50.001

1.1590.420.328.582.758.500.5062.50.001

0.7290.370.277.371.967.300.4062.50.001

0.4090.320.216.151.296.100.3062.50.001

0.1880.250.154.930.744.900.2062.50.001

0.0530.170.083.720.313.700.1062.50.001

0.0000.000.002.500.002.500.0062.50.001

(cumec)(m/s)(m)(m)(sq.m)(m)(m)(m)(m)

QVRPATWDepth, DSide

Slope, ZBWSLOPE

Page 94: 06 Urban Drainage - Universiti Sains Malaysia

Freeboard = 300mm; Depth, D = 1200mm; Area, A = 11.64 m2;

Wetted Perimeter, P = 17.10m; Hydraulic radius, R = A/P = 0.68m;Average velocity, V = 0.70m/s (<2.0 m/s) …OKQ = 8.13m3/s (> Q100) ... OK

8.1280.700.6817.1011.6416.901.2062.50.001

5.3290.630.5814.678.5014.501.0062.50.001

4.1910.590.5313.457.1113.300.9062.50.001

2.3910.510.4311.024.6910.900.7062.50.001

1.7090.470.379.803.669.700.6062.50.001

1.1590.420.328.582.758.500.5062.50.001

0.7290.370.277.371.967.300.4062.50.001

0.4090.320.216.151.296.100.3062.50.001

0.0530.170.083.720.313.700.1062.50.001

0.0000.000.002.500.002.500.0062.50.001

(cumec)(m/s)(m)(m)(sq.m)(m)(m)(m)(m)

QVRPATWDepth,

DSide

Slope, ZBWSLOPE

Page 95: 06 Urban Drainage - Universiti Sains Malaysia

Low Flow Provision: Design Capasity for 1 Month ARI

Design Storm : 2 year ARITable 13.A1 Lacation : Pulau Pinang and equation 13.2 for tc = 56 minute,

2I56 = 69.94 mm/hr

32 ))t(ln(d))t(ln(c)tln(ba)Iln( tR +++=

2I56 = 4.5140 + (0.6729) [In(54)] + (-0.2311) [In(54)]2 + (0.0118) [In(54)]3

1 month ARI rainfall intensity = 0.4x69.94 = 27.98 mm/hr

DD II 2083.0 4.0 ×= 13.5a

Page 96: 06 Urban Drainage - Universiti Sains Malaysia

1.0

Run

off

Coef

ficie

nt,

C

Rainfall Intensity, I (mm/hr)

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0

190 200

2

1

7

6

5

4

3

8Impervious Roofs, ConcreteCity Areas Full and Solidly Built Up

Urban Residential Fully Built Up with Limited Gardens

Surface Clay, Poor Paving, Sandstone RockCommercial & City Areas Closely Built Up

Semi Detached Houses on Bare Earth

Bare Earth, Earth with Sandstone Outcrops

Bare Loam, Suburban Residential with Gardens

Widely Detached Houses on Ordinary LoamSuburban Fully Built Upon Sand Strata

Park Lawns and Meadows

Cultivated Fields with Good GrowthSand Strata

8

7

6

5

4

3

2

1

e) Runoff CoefficientDesign Chart 14.3 (category 5), C for 1 month ARI = 0.30

360AIC t

R

Q ××=

f) Peak flowBy using Rational formula (equation 14.7), peak flow = 0.60 m3/s

Qlow flow = C.I.A/3600,000 = 0.30 (69.94) (256,000)

/ (3600,000) = 0.60m3/s

Page 97: 06 Urban Drainage - Universiti Sains Malaysia

Ecological SwaleDrainage capacity for low flow = 0.30 m3/s.

Thus, no. of module needed = (0.60-0.30) / 0.038 = 8

Page 98: 06 Urban Drainage - Universiti Sains Malaysia