Prepared for:
BIXBY ROAD
INDUSTRIAL
Traffic Impact Study
February 2022
Stotan Industrial
Canal Winchester, Ohio
Bixby Road Industrial Traffic Impact Study (TIS)February 2022
PREPARED FOR: Jim McGill Stotan Industrial 6250 North River Road, Suite 11-100, Rosemont, IL 60018 Mobile: 847.894.6882, [email protected]
PREPARED BY: Perry Morgan, P.E. Kimley-Horn 7965 N. High Street, Suite 200, Columbus, OH 43235 Direct: 614.472.8551 | Mobile: 614.582.7838 [email protected]
Registered Engineer No. E-59569, Ohio
Date
February 8, 2022
2 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Contents
INTRODUCTION .......................................................................................................................... 4
NO BUILD CONDITIONS ............................................................................................................. 6
Area Land Uses and Existing Roadway Characteristics .................................................................. 6
Traffic Count Data Collection ........................................................................................................... 6
Traffic Volume Adjustment ............................................................................................................... 7
Expected Growth Traffic Assignment ............................................................................................... 7
BUILD CONDITIONS .................................................................................................................. 14
Development Characteristics ......................................................................................................... 14
Trip Generation .............................................................................................................................. 14
Directional Distribution ................................................................................................................... 15
Build Traffic Assignment ................................................................................................................ 16
ANALYSIS .................................................................................................................................. 26
Capacity Analysis ........................................................................................................................... 26
No-Build Condition Capacity Analysis ............................................................................................ 28
Build Condition Capacity Analysis ................................................................................................. 28
No-Build Mitigated Condition Capacity Analysis ............................................................................ 31
Build Mitigated Condition Capacity Analysis .................................................................................. 31
Additional Mitigated Condition Capacity Analysis .......................................................................... 32
Site Contribution to Mitigated Conditions ....................................................................................... 32
Turn-Lane Warrant Analysis .......................................................................................................... 33
CONCLUSIONS .......................................................................................................................... 34
3 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Tables
Table 1: MORPC Growth Rates and Projection Factors .......................................................... 7
Table 2: ITE Trip Generation Data – Warehousing ................................................................ 14
Table 3: Site Generated Traffic Projections ........................................................................... 15
Table 4: Estimated Trip Distribution ....................................................................................... 15
Table 5: Level of Service Grading Descriptions .................................................................... 27
Table 6: Level of Service Grading Criteria .............................................................................. 27
Table 7: Operational Goals of Intersections ........................................................................... 28
Table 8: Weekday AM Peak Hour - Study Intersections Capacity Analysis ........................ 29
Table 9: Weekday PM Peak Hour - Study Intersections Capacity Analysis ........................ 30
Table 10: Weekday Peak Hour Mitigated Conditions- Study Intersections Capacity
Analysis ..................................................................................................................................... 32
Table 11: Additional Peak Hour Mitigated Conditions- Study Intersections Capacity
Analysis ..................................................................................................................................... 32
Table 12: Site Contribution to Peak Hour Mitigated Conditions ........................................... 33
Table 13: Turn Lane Warrant Analysis and Length Summary .............................................. 33
4 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
INTRODUCTION
Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Stotan Industrial to perform a traffic
impact study for a proposed industrial development located south of Winchester Pike and north of Bixby
Road in Canal Winchester, Ohio. The proposed development would replace agriculture land. The
proposed development would include four new access intersections with the existing adjacent streets.
This would include two new intersections with Bixby Road and two new intersections with Winchester
Pike. An aerial view of the study location and the surrounding roadway network is presented in Exhibit 1.
The conceptual site plan is provided in the Appendix.
As part of this study, the existing network was analyzed to determine the current and projected future
traffic operations at the study intersections. Trip generation characteristics for the proposed industrial site
were established for the new development and added to background traffic volumes to assess the site’s
impact on the area roadway network. This report presents and documents Kimley-Horn’s data collection,
summarizes the evaluation of existing and projected future traffic conditions on the surrounding
roadways, and identifies recommendations to address the potential of site-generated traffic on the
adjacent roadway network.
Exhibit 1: Site Location Map
Bixby Industrial
N
36 4
2
1
7
LEGENDSite Location
Intersection ID#
Access Drive AAccess Drive B
Access Drive C
Access Drive D
5
6 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
NO BUILD CONDITIONS
Kimley-Horn conducted a field visit to collect relevant information pertaining to existing land uses in the
surrounding area, the adjacent street system, current traffic volumes and operating conditions, lane
configurations and traffic controls at nearby intersections, and other key roadway characteristics. This
section of the report details information on these existing conditions.
Area Land Uses and Existing Roadway Characteristics
The subject site is located south of Winchester Pike just north of Bixby Road in Canal Winchester, Ohio.
The project would replace agricultural land. The immediate site vicinity generally consists of high density
residential and industrial uses. The study area for this analysis includes the following intersections:
• Winchester Pike and Site Access A
• Winchester Pike and Site Access B
• Winchester Pike and Bixby Road/Brice Road
• Bixby Road and Site Access C
• Bixby Road and Rager Road
• Bixby Road and Site Access D
• US-33 and Bixby Road
Winchester Pike is a two-lane urban minor arterial in the site vicinity and provides one travel lane in each
direction. Regionally, Winchester Pike connects to US-33. At the signalized intersection with Bixby
Road/Brice Road, Winchester Pike includes turn lanes on both approaches. This roadway has a posted
speed limit of 55 miles per hour. Designated sidewalks are present on one side of Winchester Pike.
Bixby Road is a two-lane urban major collector in the site vicinity and provides one travel lane in each
direction. Regionally, Bixby Road connects to US-33. At the signalized intersection with Winchester Pike,
Bixby Road includes a left-turn lane. This roadway has a posted speed limit of 50 miles per hour. No
designated sidewalks are present on either side of Bixby Road.
Brice Road is a two-lane urban minor arterial in the site vicinity and provides one travel lane in each
direction. This roadway has a posted speed limit of 50 miles per hour. Designated sidewalks are present
at the signalized intersection with Winchester Pike.
Brice Road is a two-lane urban local road in the site vicinity and provides one travel lane in each
direction. This roadway has an unposted speed limit of 50 miles per hour. Designated sidewalks are
present on the east of Rager Road at the stop-controlled intersection with Bixby Road.
US-33 is a four-lane divided urban freeway in the site vicinity and provides two travel lane in each
direction. At the unsignalized intersection with Bixby Road, US-33 includes turn lanes on both
approaches. This roadway has a posted speed limit of 60 miles per hour. No designated sidewalks are
present on either side of US-33.
Traffic Count Data Collection
Base Traffic volumes and turning movement counts for the study intersections were obtained from recent
traffic studies performed in the site vicinity. Traffic volumes at the US-33 and Bixby Road intersection
were obtained via Canal Crossing Phase 2 Traffic Impact Study (August 31, 2021). Turning movement
7 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
counts at the Winchester Pike and Bixby Road/Brice Road intersection were obtained from The Franklin County Engineer’s Office (June 18, 2019). Referenced traffic volumes and turning movement counts can be found in the Appendix and are illustrated in Exhibit 2.
Traffic Volume Adjustment Due to circumstances associated with the COVID-19 public health crisis, traffic volumes have been atypically low since mid-March 2020 and slowly increasing toward normal volumes over the past several months. COVID-19 adjustment factors were not obtained for this study since traffic data was collected prior to the COVID-19 health crisis in the United States. The 2022 and 2032 Background vehicular volumes for the study intersection are illustrated in Exhibits 3-4.
Expected Growth Traffic Assignment As development of the Central-Ohio region increases, the expected vehicular volumes are anticipated to increase as well. Linear growth rates were obtained via the Canal Crossing Phase 2 Traffic Impact Study
(December 21, 2021) and were derived based on planning level analysis by using the Mid-Ohio Regional Planning Commission’s (MORPC) regional travel demand model. An excerpt from the Canal Crossing
Phase 2 Traffic Impact Study (December 21, 2021), containing the assumed linear growth rates is provided in the Appendix. The assumed linear growth rates and corresponding factors for the study area are provided Table 1:
Table 1: MORPC Growth Rates and Projection Factors
Segment Linear Annual Growth
Rate 2017 to 2022 2017 to 2032
Winchester Pike East of Bixby Road 1.20% 1.06 1.18
Brice Road North of Winchester Pike 2.40% 1.12 1.36
Winchester Pike West of Bixby Road 1.10% 1.055 1.165
Bixby Road South of Winchester Pike 0.90% 1.045 1.135
These growth rates were based on 2019 counts via the Canal Crossing Phase 2 Traffic Impact Study.
The estimated trip distribution for the anticipated offsite developments were referenced via the Canal
Crossing Phase 2 Traffic Impact Study, Winchester Pike Site Traffic Access Study, Lamp South Traffic Impact Study, and the 5100 Ebright Road Traffic Impact Study. Estimated Trips Distributions for the anticipated offsite developments can be found in the Appendix. The total anticipated offsite trips can be found in Exhibit 5. The 2022 and 2032 background volumes (Exhibits 3-4) were added to the total offsite trips (Exhibit 5) to determine the 2022 and 2032 no-build volumes. The no-build volumes can be found in Exhibits 6-7.
Exhibit 2: 2019 Counts
Bixby Industrial
N
35 4
2
1
67
LEGENDSite Location
Intersection ID#
XX (XX) AM (PM) Peak HourVehicle Volumes
Exhibit 3: 2022 Background Volumes
Bixby Industrial
NWinchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
722 (1364)Overall:
10 (68)
9 (58)
Bixby Rd
Win
ches
ter
Pk
2 (2)
Win
ches
ter
Pk
Brice Rd
20 (
12)
279
(207
)
41 (
146)
80 (44)
77 (41)
110 (161)0 (0
)
77 (
530)
17 (
95)
13
Rager Rd &
Bixby Rd
TL
k qtr
118 (193)
94 (50)
3 (3)
Bixby Rd
2 (
8)
0 (0)
Overall:
Ra
ger
Rd
19 (130)
0 (
2)
Bixby Rd
15
3
5 4
2
1
6
US-33 &
Bixby Rd
RQ S K
k s qr31 (57)
60
(2
9)
36
80
(1
88
1)
1 (
13
)
14
(2
9)
15
88
(4
01
8)
18
(1
19
) US
-33
92 (47)
Bixby Rd
Overall: 5484 (6193)
Bixby Rd
US
-33
17
7
LEGEND
Site Location
Intersection ID#
XX (XX) AM (PM) Peak Hour Vehicle Volumes
Exhibit 4: 2032 Background Volumes
Bixby Industrial
NWinchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
833 (1539)Overall:
11 (74)
10 (63)
Bixby Rd
Win
ches
ter
Pk
2 (2)
Win
ches
ter
Pk
Brice Rd
22 (
14)
311
(231
)
46 (
163)
98 (54)
94 (50)
135 (197)0 (0
)
86 (
586)
18 (
105)
13
Rager Rd &
Bixby Rd
TL
k qtr
126 (207)
99 (49)
3 (3)
Bixby Rd
2 (
10
)
2 (0)
Overall:
Ra
ger
Rd
20 (142)
0 (
3)
Bixby Rd
15
3
5 4
2
1
6
US-33 &
Bixby Rd
RQ S K
k s qr34 (62)
68
(3
3)
42
09
(2
15
1)
1 (
14
)
16
(3
3)
18
16
(4
59
5)
20
(1
36
) US
-33
101 (52)
Bixby Rd
Overall: 6265 (7076)
Bixby Rd
US
-33
17
7
LEGEND
Site Location
Intersection ID#
XX (XX) AM (PM) Peak Hour Vehicle Volumes
Exhibit 5: Total Offsite Trips
Bixby Industrial
NWinchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
516 (606)Overall:
34 (105)
29 (89)
Bixby Rd
Win
ches
ter
Pk
13 (40)
Win
ches
ter
Pk
Brice Rd
92 (
43)
92 (
117)
19 (
49)
0 (0)
104 (53)
42 (26)23 (
10)
68 (
74)
0 (0
)
13
Rager Rd &
Bixby Rd
TL
k qtr
204 (230)
146 (65)
0 (0)
Bixby Rd
0 (
0)
2 (5)
Overall:
Ra
ger
Rd
50 (158)
6 (
2)
Bixby Rd
15
3
5 4
2
1
6
US-33 &
Bixby Rd
RQ S K
k s qr0 (0)
0 (
0)
0 (
0)
0 (
0)
0 (
0)
0 (
0)
31
(4
7) U
S-3
3
43 (28)
Bixby Rd
Overall: 74 (75)
Bixby Rd
US
-33
17
7
LEGEND
Site Location
Intersection ID#
XX (XX) AM (PM) Peak Hour Vehicle Volumes
Exhibit 6: 2022 No-Build
Bixby Industrial
NWinchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
1238 (1970)Overall:
44 (173)
38 (147)
Bixby Rd
Win
ches
ter
Pk
15 (42)
Win
ches
ter
Pk
Brice Rd
112
(55)
371
(324
)
60 (
195)
80 (44)
181 (94)
152 (187)23 (
10)
145
(604
)
17 (
95)
13
Rager Rd &
Bixby Rd
TL
k qtr
322 (423)
240 (115)
3 (3)
Bixby Rd
2 (
8)
2 (5)
Overall:
Ra
ge
r R
d
69 (288)
6 (
4)
Bixby Rd
15
3
5 4
2
1
6
US-33 &
Bixby Rd
RQ S K
k s qr31 (57)
60
(2
9)
36
80
(1
88
1)
1 (
13
)
14
(2
9)
15
88
(4
01
8)
49
(1
66
) US
-33
135 (75)
Bixby Rd
Overall: 5558 (6268)
Bixby Rd
US
-33
17
7
LEGEND
Site Location
Intersection ID#
XX (XX) AM (PM) Peak Hour Vehicle Volumes
Exhibit 7: 2032 No-Build
Bixby Industrial
NWinchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
23 (
10)
154
(660
)
18 (
105)
114
(57)
403
(348
)
65 (
212)
98 (54)
198 (103)
177 (223)
1349 (2145)Overall:
45 (179)
39 (152)
Bixby Rd
Win
ches
ter
Pk
15 (42)
Win
ches
ter
Pk
Brice Rd
13
Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
2 (
10
)
4 (5)
Overall:
Ra
ger
Rd
70 (300)
6 (
5)
245 (114)
3 (3)
Bixby Rd
330 (437)
15
3
5 4
2
1
6
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 6339 (7151)
Bixby Rd
US
-33
34 (62)
68
(3
3)
42
09
(2
15
1)
1 (
14
)
16
(3
3)
18
16
(4
59
5)
51
(1
83
) US
-33
144 (80)
Bixby Rd
17
7
LEGEND
Site Location
Intersection ID#
XX (XX) AM (PM) Peak Hour Vehicle Volumes
14 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
BUILD CONDITIONS
This section of the report outlines the proposed site plan and summarizes site-specific traffic characteristics.
Development Characteristics The 80.6-Acre proposed development would include:
Building A: 49.8-Acre industrial warehouse totaling 627,200 Square Feet
Building B: 30.8-Acre industrial warehouse totaling 312,000 Square Feet
Access to the site includes four site access intersections along Winchester Pike and Bixby Road: Access A and Access B north of the Winchester Pike & Bixby Road/Brice Road intersection, and Access C and Access D west of the Winchester Pike & Bixby Road/Brice Road intersection. As shown on the conceptual site plan, the spacing of the Access A drive along Winchester Pike will be approximately 1,550 feet north of Access B, and Access B will be approximately 1,200 feet north of the Winchester Pike and Bixby Road/Brice Road intersection. Along Bixby Road, Access C and Access D will be separated by approximately 1,100 feet. Access A is to be a right-in/right-out drive. The access configuration is illustrated on the conceptual site plan included in the Appendix.
Trip Generation To calculate trips generated by the proposed industrial development, data was referenced from the Institute of Transportation Engineers (ITE) manual titled Trip Generation, Tenth Edition. Trip generation rates for the ITE Land Use Code (LUC) corresponding to the proposed use are shown in Table 2. Copies of the ITE data are provided in the Appendix.
Table 2: ITE Trip Generation Data – Warehousing
ITE Land Use
Building Unit Vehicle Type Weekday
AM Peak Hour Pm Peak Hour
Warehousing (150)
Building A 627,200 SF
Total 𝑇 = 0.12(𝑋) + 25.32
77% in/23% out
𝑇 = 0.12(𝑋) + 27.82
27% in/73% out
Trucks 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑅𝑎𝑡𝑒: 0.03
52% in/48% out
𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑅𝑎𝑡𝑒: 0.03
52% in/48% out
Building B 312,000 SF
Total 𝑇 = 0.12(𝑋) + 25.32
77% in/23% out
𝑇 = 0.12(𝑋) + 27.82
27% in/73% out
Trucks 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑅𝑎𝑡𝑒: 0.03
52% in/48% out
𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑅𝑎𝑡𝑒: 0.03
52% in/48% out T – Site-generated trips X – KSF of Building
For the purpose of this study, all site generated trips are expected to be “Primary Trips” when traveling to and from the subject site. Primary trips are trips to the proposed industrial site would not normally travel on the study roadways and are considered new trips within the study area. Per these assumptions, site-generated traffic projections are presented in Table 3 and Exhibits 12-18.
15 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Table 3: Site Generated Traffic Projections
ITE Land Use
Building Unit Vehicle Type
AM Peak Hour PM Peak Hour
In Out Total In Out Total
Warehousing (150)
Building A 627,200
SF
Cars 71 17 88 18 66 84
Trucks 7 6 13 10 9 19
Total 78 23 101 28 75 103
Building B 312,000
SF
Cars 46 11 57 13 43 56
Trucks 3 3 6 5 4 9
Total 49 14 63 18 47 65
Directional Distribution The estimated distribution of site-generated traffic on the surrounding roadway network as it approaches
and departs the site is a function of several variables, such as the nature of surrounding land uses,
prevailing traffic volumes/patterns, characteristics of the street system, and the ease with which motorists
can travel over various sections of that system. To determine the percentage of traffic traveling to/from
neighboring towns/cities, a function of total population and distance from site was calculated. The
distribution of trips entering/exiting the proposed site was determined based on internal roadway
geometry, location of access driveways, and Google Maps “fastest route” determinations. Trucks and cars
from Building A and Building B resulted in various estimated trip distributions for the proposed site. The
anticipated directional distributions estimated for the site related trips are outlined in Table 4 and can be
seen in Exhibit 8-11.
Table 4: Estimated Trip Distribution
Traveling To/From:
Estimated Trip Distribution
Building A Building B
Cars Trucks Cars Trucks
West on Winchester Pike 20% 15% 10% 15%
East on Winchester Pike 40% 85% 40% 85%
North on Brice Road 35% - 35% -
South on Bixby Road 5% - 15% -
16 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Build Traffic Assignment
The build traffic assignment represents traffic volumes at the study intersections upon construction of the
proposed development. The 2022 Build traffic assignment consists of the 2022 No-Build trips plus the
total anticipated site generated trips. The 2032 Build traffic assignment consists of the 2032 No-Build trips
plus the total anticipated site generated trips. The 2022 and 2032 Build traffic volumes for the study area
are illustrated in Exhibits 19-20.
Exhibit 8: Site Trips (Building A - Cars)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
0 (0)
0 (0
)
7 (2
)
Win
ches
ter
Pk
0 (0
)
2 (7
)
Overall: 9 (9)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
20 (
6)
0 (0
)
6 (19)
Overall:
7 (2
)
0 (0
)
Win
ches
ter
Pk
Access Drive B
2 (7)
35 (34)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
0 (0
)
4 (1
3)
2 (6
)
14 (
3)
14 (
4)
0 (0
)
6 (2)
19 (4)
0 (0)
68 (62)Overall:
6 (17)
3 (13)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
5 (1
9)
Acc
ess
Dri
ve C
2 (11)
Overall:
0 (0)
20 (5)
13 (2)
Bixby Rd
40 (37)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
2 (11)
0 (0
)
13 (2)
0 (0)
Bixby Rd
15 (13)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
3 (1
0)
0 (0
)
Bixby Rd
2 (1
1)
Acc
ess
Dri
ve D
0 (0)
Overall:
11 (3)
29 (26)
13 (2)
0 (0)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 14 (13)
Bixby Rd
US-
33
0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
11 (3
)
US-
33
3 (10)
Bixby Rd
17
Exhibit 9: Site Trips (Building A - Trucks)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
0 (0)
0 (0
)
1 (2
)
Win
ches
ter
Pk
0 (0
)
1 (1
)
Overall: 2 (3)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
6 (9
)
0 (0
)
5 (8)
Overall:
1 (2
)
0 (0
)
Win
ches
ter
Pk
Access Drive B
1 (1)
13 (20)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
0 (0
)
5 (8
)
0 (0
)
0 (0
)
6 (9
)
0 (0
)
0 (0)
0 (0)
0 (0)
11 (17)Overall:
0 (0)
0 (0)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
0 (0
)
Acc
ess
Dri
ve C
0 (0)
Overall:
0 (0)
0 (0)
0 (0)
Bixby Rd
0 (0)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
0 (0)
0 (0
)
0 (0)
0 (0)
Bixby Rd
0 (0)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
0 (0
)
0 (0
)
Bixby Rd
0 (0
)
Acc
ess
Dri
ve D
0 (0)
Overall:
0 (0)
0 (0)
0 (0)
0 (0)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 0 (0)
Bixby Rd
US-
33
0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
US-
33
0 (0)
Bixby Rd
17
Exhibit 10: Site Trips (Building B - Cars)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
2 (8)
7 (2
)
2 (1
)
Win
ches
ter
Pk
0 (0
)
2 (9
)
Overall: 13 (20)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
34 (
9)
0 (0
)
6 (23)
Overall:
2 (1
)
2 (8
)
Win
ches
ter
Pk
Access Drive B
2 (9)
46 (50)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
0 (0
)
4 (1
6)
4 (1
5)
0 (1
)
18 (
4)
0 (0
)
16 (5)
0 (0)
0 (0)
42 (42)Overall:
0 (0)
0 (1)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
0 (0
)
Acc
ess
Dri
ve C
0 (1)
Overall:
0 (0)
0 (0)
0 (1)
Bixby Rd
0 (2)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
0 (1)
0 (0
)
0 (1)
0 (0)
Bixby Rd
0 (2)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
1 (2
)
0 (0
)
Bixby Rd
0 (1
)
Acc
ess
Dri
ve D
0 (0)
Overall:
2 (1)
3 (5)
0 (1)
0 (0)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 3 (3)
Bixby Rd
US-
33
0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
2 (1
)
US-
33
1 (2)
Bixby Rd
17
Exhibit 11: Site Trips (Building B - Trucks)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
0 (0)
0 (1
)
0 (0
)
Win
ches
ter
Pk
0 (0
)
0 (1
)
Overall: 0 (2)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
3 (4
)
0 (0
)
3 (3)
Overall:
0 (0
)
0 (0
)
Win
ches
ter
Pk
Access Drive B
0 (1)
6 (8)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
0 (0
)
3 (3
)
0 (0
)
0 (0
)
3 (4
)
0 (0
)
0 (0)
0 (0)
0 (0)
6 (7)Overall:
0 (0)
0 (0)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
0 (0
)
Acc
ess
Dri
ve C
0 (0)
Overall:
0 (0)
0 (0)
0 (0)
Bixby Rd
0 (0)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
0 (0)
0 (0
)
0 (0)
0 (0)
Bixby Rd
0 (0)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
0 (0
)
0 (0
)
Bixby Rd
0 (0
)
Acc
ess
Dri
ve D
0 (0)
Overall:
0 (0)
0 (0)
0 (0)
0 (0)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 0 (0)
Bixby Rd
US-
33
0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
US-
33
0 (0)
Bixby Rd
17
Exhibit 12: Site Trips (Building A)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Overall: 11 (12)
0 (0
)
3 (8
)
0 (0
)
8 (4
)
Win
ches
ter
Pk
Access Drive A
Win
ches
ter
Pk
0 (0)
0 (0)
11
Winchester Pk &
Access Drive B
Q S
k slr
48 (54)
8 (4
)
0 (0
)
Win
ches
ter
Pk
Access Drive B
3 (8)
Win
ches
ter
Pk
26 (
15)
0 (0
)
11 (27)
Overall:
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
79 (79)Overall:
6 (17)
3 (13)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
14 (
3)
20 (
13)
0 (0
)
6 (2)
19 (4)
0 (0)0 (0
)
9 (2
1)
2 (6
)
13
Access Drive C &
Bixby Rd
RT
Q K
lt
40 (37)
20 (5)
13 (2)
Bixby Rd
2 (11)
Overall:
0 (0)
0 (0
)
Bixby Rd
5 (1
9)
Acc
ess
Dri
ve C
14Rager Rd &
Bixby Rd
TL
k qtr
15 (13)
13 (2)
0 (0)
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
2 (11)
0 (0
)
Bixby Rd
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
29 (26)
13 (2)
0 (0)
Bixby Rd
0 (0)
Overall:
11 (3)
3 (1
0)
0 (0
)
Bixby Rd
2 (1
1)
Acc
ess
Dri
ve D
Access Drive D &16
7
US-33 &
Bixby Rd
RQ S K
k s qr0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
11 (3
)
US-
33
3 (10)
Bixby Rd
Overall: 14 (13)
Bixby Rd
US-
33
17
Exhibit 13: Site Trips (Building B)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Overall: 13 (22)
0 (0
)
2 (1
0)
7 (3
)
2 (1
)
Win
ches
ter
Pk
Access Drive A
Win
ches
ter
Pk
0 (0)
2 (8)
11
Winchester Pk &
Access Drive B
Q S
k slr
52 (58)
2 (1
)
2 (8
)
Win
ches
ter
Pk
Access Drive B
2 (10)
Win
ches
ter
Pk
37 (
13)
0 (0
)
9 (26)
Overall:
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
48 (49)Overall:
0 (0)
0 (1)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
0 (1
)
21 (
8)
0 (0
)
16 (5)
0 (0)
0 (0)0 (0
)
7 (1
9)
4 (1
5)
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (2)
0 (0)
0 (1)
Bixby Rd
0 (1)
Overall:
0 (0)
0 (0
)
Bixby Rd
0 (0
)
Acc
ess
Dri
ve C
14Rager Rd &
Bixby Rd
TL
k qtr
0 (2)
0 (1)
0 (0)
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
0 (1)
0 (0
)
Bixby Rd
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
3 (5)
0 (1)
0 (0)
Bixby Rd
0 (0)
Overall:
2 (1)
1 (2
)
0 (0
)
Bixby Rd
0 (1
)
Acc
ess
Dri
ve D
Access Drive D &16
7
US-33 &
Bixby Rd
RQ S K
k s qr0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
2 (1
)
US-
33
1 (2)
Bixby Rd
Overall: 3 (3)
Bixby Rd
US-
33
17
Exhibit 14: Site Trips (Total)
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
2 (8)
7 (3
)
10 (
5)
Win
ches
ter
Pk
0 (0
)
5 (1
8)
Overall: 24 (34)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
63 (
28)
0 (0
)
20 (53)
Overall:
10 (
5)
2 (8
)
Win
ches
ter
Pk
Access Drive B
5 (18)
100 (112)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
0 (0
)
16 (
40)
6 (2
1)
14 (
4)
41 (
21)
0 (0
)
22 (7)
19 (4)
0 (0)
125 (128)Overall:
4 (17)
3 (14)
Bixby Rd
Win
ches
ter
Pk
0 (0)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
5 (1
9)
Acc
ess
Dri
ve C
2 (12)
Overall:
0 (0)
20 (5)
13 (3)
Bixby Rd
40 (39)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
0 (0
)
0 (0)
Overall:
Rag
er R
d
2 (12)
0 (0
)
13 (3)
0 (0)
Bixby Rd
15 (15)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
4 (1
2)
0 (0
)
Bixby Rd
2 (1
2)
Acc
ess
Dri
ve D
0 (0)
Overall:
13 (4)
32 (31)
13 (3)
0 (0)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 17 (16)
Bixby Rd
US-
33
0 (0)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
0 (0
)
13 (4
)
US-
33
4 (12)
Bixby Rd
17
Exhibit 15: 2022 Build
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
2 (8)
7 (3
)
195
(714
)
Win
ches
ter
Pk
0 (0
)
471
(428
)
Overall: 675 (1153)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
63 (
28)
466
(410
)
20 (53)
Overall:
10 (
5)
187
(717
)
Win
ches
ter
Pk
Access Drive B
5 (18)
751 (1231)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
23 (
10)
161
(644
)
23 (
116)
126
(59)
412
(345
)
60 (
195)
102 (51)
200 (98)
152 (187)
1363 (2098)Overall:
48 (190)
41 (161)
Bixby Rd
Win
ches
ter
Pk
15 (42)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
5 (1
9)
Acc
ess
Dri
ve C
73 (308)
Overall:
0 (0)
20 (5)
256 (121)
Bixby Rd
354 (453)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
2 (8
)
2 (5)
Overall:
Rag
er R
d
66 (275)
6 (4
)
220 (100)
3 (3)
Bixby Rd
305 (395)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
4 (1
2)
0 (0
)
Bixby Rd
2 (1
2)
Acc
ess
Dri
ve D
58 (253)
Overall:
13 (4)
294 (388)
13 (3)
204 (104)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 5575 (6284)
Bixby Rd
US-
33
31 (57)
60 (2
9)
3680
(18
81)
1 (1
3)
14 (2
9)
1588
(40
18)
62 (1
70) U
S-33
139 (87)
Bixby Rd
17
Exhibit 16: 2032 Build
Bixby Industrial
NWinchester Pk &
Access Drive A
Q S
k slr
Access Drive A
Win
ches
ter
Pk
0 (0)
2 (8)
7 (3
)
205
(780
)
Win
ches
ter
Pk
0 (0
)
521
(462
)
Overall: 735 (1253)
11
Winchester Pk &
Access Drive B
Q S
k slr
Win
ches
ter
Pk
63 (
28)
516
(444
)
20 (53)
Overall:
10 (
5)
197
(783
)
Win
ches
ter
Pk
Access Drive B
5 (18)
811 (1331)
12
Winchester Pk &
Bixby Rd/Brice Rd
RTL
Q S K
k s qltr
23 (
10)
170
(700
)
24 (
126)
128
(61)
444
(369
)
65 (
212)
120 (61)
217 (107)
177 (223)
1474 (2273)Overall:
49 (196)
42 (166)
Bixby Rd
Win
ches
ter
Pk
15 (42)
Win
ches
ter
Pk
Brice Rd
13
Access Drive C &
Bixby Rd
RT
Q K
lt
0 (0
)
Bixby Rd
5 (1
9)
Acc
ess
Dri
ve C
74 (322)
Overall:
0 (0)
20 (5)
261 (120)
Bixby Rd
360 (466)
14Rager Rd &
Bixby Rd
TL
k qtr
Bixby Rd
2 (1
0)
4 (5)
Overall:
Rag
er R
d
72 (312)
6 (5
)
258 (117)
3 (3)
Bixby Rd
302 (414)
15
35 4
2
1
6
LEGEND
Site Location
Intersection ID#
Bixby Rd
RT
Q S K
lt
Access Drive D &
4 (1
2)
0 (0
)
Bixby Rd
2 (1
2)
Acc
ess
Dri
ve D
61 (265)
Overall:
13 (4)
302 (400)
13 (3)
209 (104)
Bixby Rd
16
7
US-33 &
Bixby Rd
RQ S K
k s qr
Overall: 6356 (7167)
Bixby Rd
US-
33
34 (62)
68 (3
3)
4209
(21
51)
1 (1
4)
16 (3
3)
1816
(45
95)
64 (1
87) U
S-33
148 (92)
Bixby Rd
17
26 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
ANALYSIS
This section of the report provides an overview of capacity analysis for the traffic volumes and turn-lane
analysis for the study intersections and identifies recommended transportation improvements to
accommodate the proposed development.
Capacity Analysis A capacity analysis was performed to quantify the delay and level of service at the study intersections
during the weekday AM and PM peak hours. Synchro software was utilized to evaluate capacity of the
proposed study intersections (reported overall and by approach) for the peak hour of site generated
traffic.
The capacity of an intersection quantifies its ability to accommodate traffic volumes and is measured in
average delay per vehicle. It is expressed in terms of level of service (LOS) which ranges from A to F,
with LOS A as the highest (best traffic flow and least delay), LOS E as saturated or at-capacity conditions,
and LOS F as the lowest (oversaturated conditions). The LOS grades shown below, which are provided in
the Transportation Research Board’s Highway Capacity Manual, quantify and categorize the driver’s
discomfort, frustration, fuel consumption, and travel times experienced as a result of intersection control
and the resulting traffic queuing. A detailed description of each LOS rating can be found in Table 5. The
range of control delay for each rating (as detailed in the HCM) is shown in Table 6. Because signalized
intersections are expected to carry a larger volume of vehicles and stopping is required during red
signals, higher delays are tolerated for the corresponding LOS ratings. For unsignalized stop
intersections, the intersection LOS is reported as the worst side street movement.
Traffic models for the following scenarios were developed using Synchro/SimTraffic, and the capacity
analysis (delay and LOS) was evaluated for each scenario. The scenarios that were analyzed are as
follows:
• 2022 (Opening Year) No-Build
• 2032 (Horizon Year) No-Build
• 2022 (Opening Year) Build
• 2032 (Horizon Year) Build
• 2022 (Opening Year) Mitigated No-Build
• 2032 (Horizon Year) Mitigated No-Build
• 2022 (Opening Year) Mitigated Build
• 2032 (Horizon Year) Mitigated Build
27 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Table 5: Level of Service Grading Descriptions
Level of Service Description
A Minimal control delay; traffic operates at primarily free-flow conditions; unimpeded movement within
traffic stream.
B Minor control delay at signalized intersections; traffic operates at a fairly unimpeded level with slightly
restricted movement within traffic stream.
C Moderate control delay; movement within traffic stream more restricted than at LOS B; formation of
queues contributes to lower average travel speeds.
D Considerable control delay that may be substantially increased by small increases in flow; average
travel speeds continue to decrease.
E High control delay; average travel speed no more than 33 percent of free flow speed.
F Extremely high control delay; extensive queuing and high volumes create exceedingly restricted traffic
flow. 1Highway Capacity Manual 2010
Table 6: Level of Service Grading Criteria
Level of Service Average Control Delay (s/veh) at:
Unsignalized Intersections Signalized Intersections
A 0 – 10 0 – 10
B > 10 – 15 > 10 – 20
C > 15 – 25 > 20 – 35
D > 25 – 35 > 35 – 55
E > 35 – 50 > 55 – 80
F2 > 50 > 80 1Highway Capacity Manual 2010 2All movements with a Volume to Capacity (v/C) ratio greater than 1 receive a rating of LOS F.
The ODOT OATS Manual defines operational goals for intersection inside and outside of an MPO.
Additionally, the Franklin County Engineer’s Office designates supplemental operational goals for study
intersections. The study area is inside of Franklin County; therefore, a combination of Franklin County
and ODOT operational Goals were assumed. Table 7 outlines the LOS criteria for intersections which
were assumed in this study.
28 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Table 7: Operational Goals of Intersections
Result Inside an MPO Outside of an MPO
Intersection LOS C or better 1 C of better
Approach LOS D or better2
Movement LOS D or better3
v/c All movements < 1.0 with < 0.93 preferred.
QSR All movements < 1.0 from HCS analysis, otherwise TransModeler may be needed to determine if queuing impacts upstream intersections.
v/c = Volume-To-Capacity Ratio, QSR = Queue-Storage Ratio 1Intersection LOS goal is LOS C or better as defined by the Franklin County Engineers Office. 2Approach LOS goal is LOS D or better as defined by the Franklin County Engineers Office. 3Movement LOS goal is LOS D or better as defined by the Franklin County Engineers Office.
No-Build Condition Capacity Analysis The capacity analysis for the study intersections were completed for the 2022 and 2032 No-Build
conditions and the results are summarized in Tables 8-9. The No-Build capacity analysis assumed the
existing geometry at all study intersections. With the following exceptions, all approaches and
intersections operated at an acceptable LOS, during No Build (2022 and 2032) peak hour conditions. The
Synchro capacity analysis reports are included in the Appendix.
• US-33 and Bixby Road
o Eastbound approach during the 2022 (PM) and 2032 (PM)
o Westbound approach during the 2022 (AM and PM) and 2032 (AM and PM)
o Southbound approach during the 2022 (AM and PM) and 2032 (AM and PM)
o Northbound approach during the 2022 (PM) and 2032 (PM)
• Winchester Pike and Bixby Road/Brice Road
o Southbound approach during the 2032 (PM)
Mitigation measures including a minimum of modified signal timings, and an eastbound right turn lane on
Bixby Road at the Winchester Pike and Bixby Road/Brice Road intersection should be considered to
mitigate the operational impact of the 2022 and 2032 background traffic growth, within the study limits.
Build Condition Capacity Analysis The capacity analysis for the study intersections were completed for the 2022 Build (Opening Year) and
2032 Build (Design Year) are summarized in Tables 8-9. These scenarios assumed no additional
geometric changes to the roadway network, except for the addition of four entrances to the proposed site.
With the following exceptions, all approaches and intersections operated at an acceptable LOS, during
Build (2022 and 2032) peak hour conditions. The Synchro capacity analysis reports are included in the
Appendix.
• US-33 and Bixby Road
o Eastbound approach during the 2022 (PM) and 2032 (PM)
o Westbound approach during the 2022 (AM and PM) and 2032 (AM and PM)
o Southbound approach during the 2022 (AM and PM) and 2032 (AM and PM)
o Northbound approach during the 2022 (PM) and 2032 (PM)
• Winchester Pike and Bixby Road/Brice Road
o Southbound approach during the 2022 (PM) and 2032 (PM)
29 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Mitigation measures including a minimum of modified signal timings, and eastbound right turn lane on
Bixby Road at the Winchester Pike and Bixby Road/Brice Road intersection should be considered to
mitigate the operational impact of the 2022 and 2032 background traffic growth, within the study limits.
Table 8: Weekday AM Peak Hour - Study Intersections Capacity Analysis
30 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Table 9: Weekday PM Peak Hour - Study Intersections Capacity Analysis
31 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
No-Build Mitigated Condition Capacity Analysis No Build Mitigated analysis were used to determine the operational benefits of potential mitigation
measures to offset the background traffic growth.
The No Build Mitigated conditions included the following roadway improvements:
2022 No-Build:
• Modified traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection
2032 No-Build:
• Modified traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection
• Eastbound right turn lane on Bixby Road at the Winchester Pike and Bixby Road/Brice Road
intersection
Analysis consisted of testing additional turn lanes on multiple approaches to add capacity and optimizing
the signal timing cycle length and splits. For the Winchester Pike and Bixby Road/Brice Road intersection
to operate with an acceptable level of service during the 2032 No Build Mitigated condition, an eastbound
right-turn lane on Bixby Road is warranted. Table 10 summarizes the operational results of the No Build
Mitigated conditions. All approaches and intersection operated at an acceptable LOS.
Build Mitigated Condition Capacity Analysis No Build Mitigated analysis were used to determine the operational benefits of potential mitigation
measures to offset the impact of the increased traffic attributed to the proposed development, background
traffic growth, and off-site development.
The mitigated conditions included the following roadway improvements:
2022 Build:
• Modified traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection
• Eastbound right turn lane on Bixby Road at the Winchester Pike and Bixby Road/Brice Road
intersection
• Northbound left turn lane on Winchester Pike at the Winchester Pike and Access B intersection
2032 Build:
• Modified traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection
• Eastbound right turn lane on Bixby Road at the Winchester Pike and Bixby Road/Brice Road
intersection
• Northbound left turn lane on Winchester Pike at the Winchester Pike and Access B intersection
Analysis consisted of testing additional turn lanes on multiple approaches to add capacity and optimizing
the signal timing cycle length and splits. For the Winchester Pike and Bixby Road/Brice Road intersection
to operate with an acceptable level of service during the 2022 and 2032 Build Mitigated condition, an
eastbound right-turn lane on Bixby Road is warranted. Table 10 summarizes the operational results of the
No Build Mitigated conditions. All approaches and intersection operated at an acceptable LOS.
Synchro 11 was used to analyze an additional southbound thru lane on Winchester Pike at the
Winchester Pike and Bixby/Brice Road intersection as a mitigation measure. The intersection and all
32 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
approaches operated at an acceptable LOS during the 2022 and 2032 Build peak hour conditions. The
Synchro 11 reports are included in the Appendix.
Table 10: Weekday Peak Hour Mitigated Conditions- Study Intersections Capacity Analysis
Additional Mitigated Condition Capacity Analysis The Franklin County Engineer’s Office requested an evaluation of the addition of a second southbound
through lane on Winchester Pike at the Winchester Pike and Bixby Road/Brice Road intersection.
Capacity analysis of such an improvement was completed and are provided in Table 11. To achieve
utilization of the second through lane requires that the lane extends approximately 600 feet south of the
intersection before merging into the other southbound lane.
Table 11: Additional Peak Hour Mitigated Conditions- Study Intersections Capacity Analysis
Site Contribution to Mitigated Conditions As part of their review, Franklin County Engineer’s Office requested the percentage of the site traffic
compared to the total traffic be provided for the intersections of Winchester Pike and Bixby Road/Brice
Road and the Winchester Pike and Gender Road intersections. The site and total entering volumes at the
intersections for the 2032 Build condition are shown in Table 12.
33 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
Table 12: Site Contribution to Peak Hour Mitigated Conditions
Winchester Pike and Gender Road Intersection Totals taken from Canal Crossing Phase 2 Traffic Impact Study (December 21, 2021)
Turn-Lane Warrant Analysis The ODOT Location and Design Manual was used to determine if turn-lanes were warranted at the study intersections. A turn-lane analysis was performed at Winchester Pike and Bixby Road/Brice Road, Winchester Pike and Access A, Winchester Pike and Access B, Bixby Road and Access C and the Bixby Road and Access D intersections. Table 11 provides a summary of the turn-lane warrant analysis and calculated storage length per ODOT location and Design Manual Standards. A copy of the turn-lane analysis and turn-lane length calculations are provided in the Appendix.
Table 13: Turn Lane Warrant Analysis and Length Summary
Intersection Movement EX. Length (ft) Warranted Turn Lane Length (ft)
2032 No-Build 2032 Build
Winchester Pike and Bixby Road/Brice Road
NBRT 100 490/550 490/575
NBLT 500 340/550 365/575
SBRT 195 285/800 285/850
SBLT 310 340/800 365/850
EBRT - 3202 3252
EBLT 300 3003 3003
WBRT - - -
WBLT 375 3504 3754
Winchester Pike and Access A SBRT - - -
NBLT - - -
Winchester Pike and Access B SBRT - - -
NBLT - - 2852
Bixby Road and Access C WBRT - - -
EBLT - - -
Bixby Road and Access D WBRT - - -
EBLT - - -
2 See Mitigated Condition Calculated Turn Lane Length / Thru Movement Backup Length
3 Length is limited by the adjacent left turn lane to Olde Bixby Road 4 Length is limited by the location of Sandflow Road
128 2273 5.6
1.1
2032 PM Build
Total Site Trips Total Intersection Volume
Winchester Pike and
Gender Road
Total
Contribution (%)
Winchester Pike and
Bixby/Brice Road
49 4439
Intersection
34 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
CONCLUSIONS
Based on an evaluation of traffic conditions at the study intersections, the addition of site generated traffic from the development anticipated to be complete by the year 2022 is not expected to significantly impact traffic operations compared to the No-Build condition.
The analysis of study intersections with the addition of site generated traffic and anticipated off-site traffic expected to be completed by 2032 is expected to moderately impact traffic operation compared to the 2032 No Build condition.
The following improvements are recommended based on the analysis of this study. Improvements recommended during “No Build conditions” represent improvements which are warranted based on background traffic growth. Improvements recommended during “2022 Build conditions” represent items which were warranted based on the addition of site-generated trips. Improvements recommended during “2032 Build conditions” represent items which were warranted based on the addition of site-generated trips.
2022 No-Build:
• Traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection should be modified
2022 Build: • Traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection should be
modified • Add an eastbound right turn lane on Bixby Road at the Winchester Pike and Bixby Road/Brice
Road intersection. Trips from the proposed site represent less than 9 percent of this this right turn volume (14 of 161) and less than 6 percent of the overall volume at this intersection.
• Construct a 285-foot northbound left turn lane on Winchester Pike at the Winchester Pike and Access B intersection
2032 No-Build: • Traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection should be
modified • Construct a 320-foot eastbound right turn lane on Bixby Road at the Winchester Pike and Bixby
Road/Brice Road intersection • Construct a 285-foot northbound left turn lane on Winchester Pike at the Winchester Pike and
Access B intersection
2032 Build: • Traffic signal timing at the Winchester Pike and Bixby Road/Brice Road intersection should be
modified
35 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
39 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
40 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
41 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
File
Nam
e: w
inch
este
r_pi
ke_&
_bix
by_r
d_br
ice_
rd_6
7012
3_06
-18-
2019
Site
Cod
e:
Star
t Dat
e: 6
/18/
2019
Page
No
: 1
Gro
ups
Prin
ted-
Car
s - T
ruck
s - P
edes
tria
nsB
rice
Rd
Sout
hbou
ndW
inch
este
r Pik
eW
estb
ound
Bix
by R
dN
orth
boun
dW
inch
este
r Pik
eEa
stbo
und
Star
t Tim
eLe
ftTh
ruR
ight
Nor
th
Cro
ssw
alk
App.
Tot
alLe
ftTh
ruR
ight
East
Cro
ssw
alk
App.
Tot
alLe
ftTh
ruR
ight
Sout
h
Cro
ssw
alk
App.
Tot
alLe
ftTh
ruR
ight
Wes
t
Cro
ssw
alk
App.
Tot
alIn
t. To
tal
07:0
0 AM
2112
170
5010
7312
095
10
30
43
120
015
164
07:1
5 AM
2121
240
665
714
080
02
20
45
210
026
176
07:3
0 AM
3216
210
691
617
069
05
30
84
210
025
171
07:4
5 AM
2923
130
653
6417
084
13
10
54
210
025
179
Tota
l10
372
750
250
1926
940
032
82
109
021
1675
00
9169
0
08:0
0 AM
1716
100
439
5015
074
03
00
32
230
025
145
08:1
5 AM
1213
170
428
5217
077
03
00
32
230
025
147
08:3
0 AM
1822
130
534
2511
040
11
00
22
330
035
130
08:4
5 AM
217
50
332
2911
042
04
10
54
322
038
118
Tota
l68
5845
017
123
156
540
233
111
10
1310
111
20
123
540
04:0
0 PM
345
40
433
4826
077
017
140
318
118
10
127
278
04:1
5 PM
2611
80
454
4740
091
18
170
2611
121
00
132
294
04:3
0 PM
338
90
500
3125
056
19
70
1724
117
00
141
264
04:4
5 PM
396
70
522
5132
085
013
100
2318
114
00
132
292
Tota
l13
230
280
190
917
712
30
309
247
480
9761
470
10
532
1128
05:0
0 PM
418
160
655
4647
098
020
170
3716
134
00
150
350
05:1
5 PM
3213
110
563
5639
098
116
170
3430
143
00
173
361
05:3
0 PM
3811
70
562
4723
072
117
120
3028
122
00
150
308
05:4
5 PM
326
90
470
4340
083
217
150
3413
961
011
027
4To
tal
143
3843
022
410
192
149
035
14
7061
013
587
495
10
583
1293
Gra
nd T
otal
446
198
191
083
561
794
366
012
219
138
119
026
617
411
514
013
2936
51Ap
prch
%53
.423
.722
.90
5
6530
0
3.4
51.9
44.7
0
13.1
86.6
0.3
0
Tota
l %12
.25.
45.
20
22.9
1.7
21.7
100
33.4
0.2
3.8
3.3
07.
34.
831
.50.
10
36.4
Car
s44
119
619
00
827
6178
436
50
1210
913
711
90
265
172
1138
40
1314
3616
% C
ars
98.9
9999
.50
9910
098
.799
.70
99.1
100
99.3
100
099
.698
.998
.910
00
98.9
99Tr
ucks
52
10
80
101
011
01
00
12
130
015
35%
Tru
cks
1.1
10.
50
10
1.3
0.3
00.
90
0.7
00
0.4
1.1
1.1
00
1.1
1Pe
dest
rians
00
00
00
00
00
00
00
00
00
00
0%
Ped
estri
ans
00
00
00
00
00
00
00
00
00
00
0
Smar
t Ser
vice
s, In
c.88
Wes
t Chu
rch
Stre
etN
ewar
k, O
H 4
3055
(740
) 345
-470
0
File
Nam
e: w
inch
este
r_pi
ke_&
_bix
by_r
d_br
ice_
rd_6
7012
3_06
-18-
2019
Site
Cod
e:
Star
t Dat
e: 6
/18/
2019
Page
No
: 2
Bric
e R
dSo
uthb
ound
Win
ches
ter P
ike
Wes
tbou
ndB
ixby
Rd
Nor
thbo
und
Win
ches
ter P
ike
East
boun
dSt
art T
ime
Left
Thru
Rig
htN
orth
Cro
ssw
alk
App.
Tot
alLe
ftTh
ruR
ight
East
Cro
ssw
alk
App.
Tot
alLe
ftTh
ruR
ight
Sout
h
Cro
ssw
alk
App.
Tot
alLe
ftTh
ruR
ight
Wes
t
Cro
ssw
alk
App.
Tot
alIn
t. To
tal
Peak
Hou
r Ana
lysi
s Fr
om 0
7:00
AM
to 1
1:45
AM
- Pe
ak 1
of 1
Peak
Hou
r for
Ent
ire In
ters
ectio
n Be
gins
at 0
7:00
AM
07:0
0 AM
2112
170
5010
7312
095
10
30
43
120
015
164
07:1
5 AM
2121
240
665
714
080
02
20
45
210
026
176
07:3
0 AM
3216
210
691
617
069
05
30
84
210
025
171
07:4
5 AM
2923
130
653
6417
084
13
10
54
210
025
179
Tota
l Vol
ume
103
7275
025
019
269
400
328
210
90
2116
750
091
690
% A
pp. T
otal
41.2
28.8
300
5.8
8212
.20
9.5
47.6
42.9
017
.682
.40
0PH
F.8
05.7
83.7
81.0
00.9
06.4
75.9
21.5
88.0
00.8
63.5
00.5
00.7
50.0
00.6
56.8
00.8
93.0
00.0
00.8
75.9
64C
ars
102
7275
024
919
266
400
325
210
90
2116
740
090
685
% C
ars
99.0
100
100
099
.610
098
.910
00
99.1
100
100
100
010
010
098
.70
098
.999
.3Tr
ucks
10
00
10
30
03
00
00
00
10
01
5%
Tru
cks
1.0
00
00.
40
1.1
00
0.9
00
00
00
1.3
00
1.1
0.7
Pede
stria
ns0
00
00
00
00
00
00
00
00
00
00
% P
edes
trian
s0
00
00
00
00
00
00
00
00
00
00
Peak
Hou
r Ana
lysi
s Fr
om 1
2:00
PM
to 0
5:45
PM
- Pe
ak 1
of 1
Peak
Hou
r for
Ent
ire In
ters
ectio
n Be
gins
at 0
4:45
PM
04:4
5 PM
396
70
522
5132
085
013
100
2318
114
00
132
292
05:0
0 PM
418
160
655
4647
098
020
170
3716
134
00
150
350
05:1
5 PM
3213
110
563
5639
098
116
170
3430
143
00
173
361
05:3
0 PM
3811
70
562
4723
072
117
120
3028
122
00
150
308
Tota
l Vol
ume
150
3841
022
912
200
141
035
32
6656
012
492
513
00
605
1311
% A
pp. T
otal
65.5
16.6
17.9
03.
456
.739
.90
1.6
53.2
45.2
015
.284
.80
0PH
F.9
15.7
31.6
41.0
00.8
81.6
00.8
93.7
50.0
00.9
01.5
00.8
25.8
24.0
00.8
38.7
67.8
97.0
00.0
00.8
74.9
08C
ars
149
3741
022
712
198
141
035
12
6656
012
492
510
00
602
1304
% C
ars
99.3
97.4
100
099
.110
099
.010
00
99.4
100
100
100
010
010
099
.40
099
.599
.5Tr
ucks
11
00
20
20
02
00
00
00
30
03
7%
Tru
cks
0.7
2.6
00
0.9
01.
00
00.
60
00
00
00.
60
00.
50.
5Pe
dest
rians
00
00
00
00
00
00
00
00
00
00
0%
Ped
estri
ans
00
00
00
00
00
00
00
00
00
00
0
Smar
t Ser
vice
s, In
c.88
Wes
t Chu
rch
Stre
etN
ewar
k, O
H 4
3055
(740
) 345
-470
0
File
Nam
e: B
ixby
_Rd_
&_R
ager
_Rd_
6701
33_0
6-18
-201
9Si
te C
ode
: St
art D
ate
: 6/1
8/20
19Pa
ge N
o: 1
Gro
ups
Prin
ted-
Car
s - T
ruck
sB
ixby
Rd
Wes
tbou
ndR
ager
Rd
Nor
thbo
und
Bix
by R
dEa
stbo
und
Star
t Tim
eLe
ftTh
ruAp
p. T
otal
Left
Rig
htAp
p. T
otal
Thru
Rig
htAp
p. T
otal
Int.
Tota
l07
:00
AM2
2123
00
03
03
2607
:15
AM1
2526
00
04
04
3007
:30
AM1
1617
00
08
08
2507
:45
AM0
2222
01
13
03
26To
tal
484
880
11
180
1810
7
08:0
0 AM
126
270
11
30
331
08:1
5 AM
120
210
00
30
324
08:3
0 AM
026
260
00
20
228
08:4
5 AM
010
100
11
40
415
Tota
l2
8284
02
212
012
98
04:0
0 PM
010
100
00
300
3040
04:1
5 PM
015
150
22
230
2340
04:3
0 PM
07
70
33
140
1424
04:4
5 PM
26
80
11
220
2231
Tota
l2
3840
06
689
089
135
05:0
0 PM
013
130
33
320
3248
05:1
5 PM
314
170
11
340
3452
05:3
0 PM
013
131
34
270
2744
05:4
5 PM
04
41
01
330
3338
Tota
l3
4447
27
912
60
126
182
Gra
nd T
otal
1124
825
92
1618
245
024
552
2Ap
prch
%4.
295
.811
.188
.910
00
Tota
l %2.
147
.549
.60.
43.
13.
446
.90
46.9
Car
s11
246
257
215
1724
40
244
518
% C
ars
100
99.2
99.2
100
93.8
94.4
99.6
099
.699
.2Tr
ucks
02
20
11
10
14
% T
ruck
s0
0.8
0.8
06.
25.
60.
40
0.4
0.8
Smar
t Ser
vice
s, In
c.88
W. C
hurc
h St
reet
New
ark,
OH
430
55(7
40) 3
45-4
700
File
Nam
e: B
ixby
_Rd_
&_R
ager
_Rd_
6701
33_0
6-18
-201
9Si
te C
ode
: St
art D
ate
: 6/1
8/20
19Pa
ge N
o: 2
Bix
by R
dW
estb
ound
Rag
er R
dN
orth
boun
dB
ixby
Rd
East
boun
dSt
art T
ime
Left
Thru
App.
Tot
alLe
ftR
ight
App.
Tot
alTh
ruR
ight
App.
Tot
alIn
t. To
tal
Peak
Hou
r Ana
lysi
s Fr
om 0
7:00
AM
to 1
1:45
AM
- Pe
ak 1
of 1
Peak
Hou
r for
Ent
ire In
ters
ectio
n Be
gins
at 0
7:15
AM
07:1
5 AM
125
260
00
40
430
07:3
0 AM
116
170
00
80
825
07:4
5 AM
022
220
11
30
326
08:0
0 AM
126
270
11
30
331
Tota
l Vol
ume
389
920
22
180
1811
2%
App
. Tot
al3.
396
.70
100
100
0PH
F.7
50.8
56.8
52.0
00.5
00.5
00.5
63.0
00.5
63.9
03C
ars
389
920
22
180
1811
2%
Car
s10
010
010
00
100
100
100
010
010
0Tr
ucks
00
00
00
00
00
% T
ruck
s0
00
00
00
00
0
Peak
Hou
r Ana
lysi
s Fr
om 1
2:00
PM
to 0
5:45
PM
- Pe
ak 1
of 1
Peak
Hou
r for
Ent
ire In
ters
ectio
n Be
gins
at 0
5:00
PM
05:0
0 PM
013
130
33
320
3248
05:1
5 PM
314
170
11
340
3452
05:3
0 PM
013
131
34
270
2744
05:4
5 PM
04
41
01
330
3338
Tota
l Vol
ume
344
472
79
126
012
618
2%
App
. Tot
al6.
493
.622
.277
.810
00
PHF
.250
.786
.691
.500
.583
.563
.926
.000
.926
.875
Car
s3
4346
27
912
50
125
180
% C
ars
100
97.7
97.9
100
100
100
99.2
099
.298
.9Tr
ucks
01
10
00
10
12
% T
ruck
s0
2.3
2.1
00
00.
80
0.8
1.1
Smar
t Ser
vice
s, In
c.88
W. C
hurc
h St
reet
New
ark,
OH
430
55(7
40) 3
45-4
700
CANAL CROSSING PHASE 2 TRAFFIC IMPACT STUDY
DECEMBER 21, 2021
2022 Background Traffic Volumes
4.0 TRAFFIC VOLUME PROJECTIONS
FIGURE 4A
CANAL CROSSING PHASE 2 TRAFFIC IMPACT STUDY
DECEMBER 21, 2021
2032 Background Traffic Volumes
4.0 TRAFFIC VOLUME PROJECTIONS
FIGURE 4B
CANAL CROSSING PHASE 2 TRAFFIC IMPACT STUDY
DECEMBER 21, 2021
2022 No-Build Traffic Volumes
4.0 TRAFFIC VOLUME PROJECTIONS
FIGURE 4D
CANAL CROSSING PHASE 2 TRAFFIC IMPACT STUDY
DECEMBER 21, 2021
2032 No-Build Traffic Volumes
4.0 TRAFFIC VOLUME PROJECTIONS
FIGURE 4E
CANAL CROSSING PHASE 2 TRAFFIC IMPACT STUDY
DECEMBER 21, 2021
2022 Build Traffic Volumes
4.0 TRAFFIC VOLUME PROJECTIONS
FIGURE 4K
CANAL CROSSING PHASE 2 TRAFFIC IMPACT STUDY
DECEMBER 21, 2021
2032 Build Traffic Volumes
4.0 TRAFFIC VOLUME PROJECTIONS
FIGURE 4L
42 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
LOCATION: Winchester Pike & Bixby-Brice
DATE: 11-19-20 LOCATION: sig#4940 (2019-21)
TYPE OF CONTROLLER: RECORDED BY: WJB
***Winchester Pike is designated as the N-S direction***
Phase: 1 2 3 4 5 6 7 8 NOTES MOVEMENT: NB LT SB EB LT WB SB LT NB WB LT EB
MIN GREEN 5 15 5 8 5 15 5 8
VEH EXT (Initial Gap) 3.0 8.0 3.0 6.0 3.0 8.0 3.0 6.0
MAX 1 (Free-Op) 20 40 20 40 20 40 25 50
VEH CLEAR 3.0 5.1 3.0 4.7 3.0 5.1 3.0 4.7 RED CLEAR 0.5 1.0 0.5 1.0 0.5 1.0 0.5 1.0
Time Before Reduction 5 10 5 6 5 10 5 6
Time to Reduce 10 15 10 8 10 15 10 8 Min Gap 1.0 3.0 1.0 3.0 1.0 3.0 1.0 3.0
WALK - 7 - 7 - 7 - 7 FDW - 20 - 23 - 20 - 23
RECALL - Min - - - Min - -
MEMORY NL NL NL NL NL NL NL NL DETECTORS
All Detectors in Presence Mode Set Detector Delay & Extension times on controller Y+AR interval begins at the end of the FDW Simultaneous Gap: Off
Det #
Loop # Ph Lane Dist. from
S.B. / Size AMP x CH
Mode / Delay Ext.
Det #
Loop # Ph Lane Dist. from
S.B. / Size AMP x CH
Mode / Delay Ext.
1 1 1 NB Lt 50’/ 6x20 1 x 1 5 sec 13 13 7 WB Lt 50’/ 6x20 4 x 1 5 sec 2 2 6 NB Th Near 150’/ 6x6 1 x 2 14 14 4 WB Lt (S.B.) 0’/ 6x20 4 x 2 Call 0.1 3 3 6 NB Th Far 400’/ 6x6 1 x 3 15 16 4 WB Th Near 100’/ 6x6 4 x 3 4 4 4 WB Th (S.B.) 0’/ 6x20 1 x 4 Call 0.1 16 17 4 WB Th Far 350’/ 6x6 4 x 4 5 5 5 SB Lt 50’/ 6x20 2 x 1 5 sec 6 6 2 SB Th Near 150’/ 6x6 2 x 2 7 7 2 SB Th Far 400’/ 6x6 2 x 3 8 9 8 EB Th (S.B.) 0’/ 6x20 2 x 4 Call 0.1 9 10 3 EB Lt 50’/ 6x20 3 x 1 5 sec
10 8 8 EB Lt (S.B.) 0’/ 6x20 3 x 2 Call 0.1 11 11 8 EB Th Near 100’/ 6x6 3 x 3 12 12 8 EB Th Far 350’/ 6x6 3 x 4
43 Bixby Road Industrial Traffic Impact Study │ Canal Winchester, Ohio February 2022 │ Traffic Study
REVIEW
AGENCY
# COMMENT ACTION
Canal 1 Exhibit 1: Add information to this exhibit which labels which access drive is
which, A – D, and add intersection numbers to the list of the study area
intersections on page 6.
Access Drives (A,B,C,D) are labeled on Exhibit 1.
Canal 2 Study Area: Add the intersections of Bixby Road/Rager Road, and
Winchester Pike/Gender Road to the study area for consistency with multi-
jurisdictional efforts to evaluate the impact of several proposed
development sites in this area. Reference traffic counts from the Canal
Crossing Phase 2 Traffic Impact Study, dated December 21, 2021. The
Winchester Pike/Gender Road intersection is within the City of Columbus,
and they will need included in reviews moving forward.
Volumes/analysis for the Bixby/Rager intersection have
been included as part of the study update. For the
Winchester Pike & Gender Road intersection the study
update includes a % of the Stotan site traffic at this
intersection.
Canal 3 Traffic Counts: Upon the second submittal of the Canal Crossing Phase 2,
FCEO allowed the study to use the traffic count at the intersection of
Winchester Pike/Bixby Road/Brice Road performed by Smart Services in
June 2019. Please review with FCEO but we recommend using the 2019
count instead of the 2017 count data that was previously furnished by
FCEO in order to promote consistency between these studies. Update
traffic volumes accordingly.
The study update includes a revision of the volumes at
this intersection using the June 2019 counts
Canal 4 Traffic Counts: For the intersection of Bixby Road/Rager Road, use the
count performed by Smart Services in June 2019 from the Canal Crossing
Phase 2 submittal. Update traffic volumes accordingly.
See Reponse to #2.
Canal 5 Traffic Volumes: Please add a traffic volume exhibit showing the counted
traffic volumes as collected, prior to these volumes being modified using
the growth rates.
The requested exhibit has been added the update study.
Canal 6 Traffic Volumes: Please show the build-up of traffic volumes from the
offsite trips more incrementally with more exhibits/plates for each site.
The traffic volumes for the other developments are
included in the appendix.
Canal 7 Trip Generation: On page 13, change Building 1 and Building 2 to Building
A and Building B, or vice-versa, as well as on any exhibits showing the site,
for consistency throughout the report.
The study text now references only Building A and
Building B.
Canal 8 Trip Generation: On page 13, the sizes of Building 1 and Building 2 add up
to 950,400 sq. ft., while the buildings in Table 2 total 939,200 sq. ft. Please
revise accordingly.
The study text has been updated to reflect the proper
building sizes. (627.2 KSF and 312 KSF)
Canal 9 Trip Distribution: Exhibits 7-8 indicates that Building A is accessed on the
north side of Bixby Road via intersections 4 and 5, but the site plan in
Appendix A shows Building 2 (300,000 sq. ft., while Building A in Table 2
on sheet 13 is listed at 312,000 sq. ft.) is accessed on the west side of
Winchester Pike. Update site trips accordingly.
The study has been updated to better reflect the
Building names.
Canal 10 Trip Distribution: Check Exhibits 9-10 as needed based on the above
comment.
The trip distribution exhibits have been removed from
the study. This information is included in Table 4 on
page 15.
Canal 11 General: The last paragraph under “Development Characteristics” on page
13, there is a minor error at the end of the first line that should read
“Access A and Access B…”
The text has been updated accordingly.
Canal 12 Trip Generation: On page 13, Table 2, the average rates listed for the
trucks in the PM Peak Hour shows 0.02, but per Appendix F, the average
rate is listed as 0.03. Update Table 2 and Table 3 as needed.
Table 2 and Table 3 have been updated.
REVIEW
AGENCY
# COMMENT ACTION
Canal 13 Turn Lane Warrant: Per the turn lane warrant charts in Appendix G, left
turn lanes are warranted for both Site Access A, and Site Access B. Table
11 only lists turn lane lengths at Site Access B.
The traffic volumes and analysis have been updated to
include Access A as a RIRO.
Canal 14 Turn Lane Lengths: Provide turn lane length calculations in support of the
lengths shown in Table 11, and in Appendix G.
Turn lane length calculation tables are provided in the
appendix.
Canal 15 Proposed Roadway Improvements: Please provide exhibits for any
proposed/recommended roadway improvements.
An exhibit of the proposed roadway improvements is
provided.
Canal 16 Signal Timings: Provide current signal timings for signalized intersections in
the appendices.
The current signal timings are provided in the appendix.
Canal 17 Appendix A: The provided site exhibit shows 3 proposed access points,
while the study consists of 4 access points.
The site plan in the appendix has been updated to
reflect the latest site plan.
Canal 18 General: Please provide a comment disposition to each of these
comments and any additional comments issued by other reviewing
agencies, describing the way in which they were addressed or adding any
additional important information in response to these comments.
This document is being provided as a response to
comments by Canal Winchester and Franklin County.
Canal 19 General: Note that development of this site obstructs extension of Rager
Road as provided in the Canal Winchester Thoroughfare Plan.
No Response necessary
Canal 20 Site Plan: Please coordinate access locations with the “Canal Crossing
Phase 2” site currently under study by The Kleingers Group, a portion of
which is across Bixby Road from the subject site. Ensure that access
locations proposed for both sites meet Canal Winchester Thoroughfare
Plan spacing and alignment criteria for Minor Arterials as provided in Table
9 in Section 9 of the Thoroughfare Plan.
The Access locations are shown on the improvements
exhibit.
REVIEW
AGENCY
# COMMENT ACTION
FCEO A Identify Winchester Pk is assumed (N-S or E-W) and retain that
throughout. Same with Bixby Rd and Brice Rd.
The report text is updated so that Winchester Pike is
referenced as North-South.
FCEO B Use 2019 count at Winchester Pk Bixby Brice. Volume plates will be
reviewed more closely once that change is made.
The study update includes a revision of the volumes at
this intersection using the June 2019 counts
FCEO C Double check the numbers in Table 3. Numbers don’t match what the
equations on the prior page calculate.
Tables 2 and 3 have been updated in the revised report.
FCEO D FCEO’s signal requirements for LOS are overall minimum C, and D for
individual movement.
The study has been updated to reflect this requirement.
FCEO E Check turn lane warrant labels. Appears Bixby Rd access points are labeled
as Winchester Pk
The labels on the turn lane warrants has been updated.
FCEO F Evaluate additional south bound thru (Winchester Pk) as a
countermeasure. This would appear to improve the blocking of turn lanes
more than adding length to the turn lanes as suggested. There is little
NBLT (WP) that would overlap well with a WBRT (Bixby) and it would take
time from the largest movement, SBTH (WP).
This additional analysis has been provided. The addition
of a 2nd southbound thru lane doesn't provide a better
LOS than the addition of an eastbound right turn lane on
Bixby Road. Additionally, to obtain high utilization of a
second southbound thru lane would require extending
this lane approximately 600 feet south of the
intersection before it is tapered.
FCEO G Provide % of total WP B B intersection. Off-site improvements will most
likely be a contribution towards a SBTH at this intersection.
The percent of site traffic at the Winchester Pike & Bixby
intersection is provided in the updated study.
FCEO H Provide driveway spacing details. Winchester Pk is 55 mph with requires
495’ of spacing between private driveways.
This information is provided in the report. The spacing of
the drives along WP are ~ 1,550' and 1,100'
FCEO I Provide spacing from intersection details. If the study proposes to
lengthen the SBLT length on Winchester Pk, then how does that spacing
work out with the warranted NBLT for Site Access 2?
This information is illustrated on the improvements
exhibit.
FCEO J Due to high speeds and heavy SBTH volumes on Winchester Pk, although
not warranted, FCEO may require a SBRT lane for the access points.
Discussions are ongoing.
No response necessary.
FCEO K Discussions are also ongoing regarding requiring a NBLT lane for Access 1
as well. Due to high speeds and heavy SBTH volumes, a handful of vehicles
attempting to turn left with limited gaps and no left turn lane gives FCEO
concerns.
Access A has been changed to a RIRO.