CHAMC, Inc. 315 Wilkins Dr. Des Plaines, IL 60016 U.S.A. Tel: +1 847 390 6020 Fax: +1 847 390 8760 Email: [email protected] www.CHAMCO.net -------------------------------------------------------------------------------------------- For kind attention: The Mayor & Minister of Energy “Your Country” ------------------------------------------------- Municipal Solid Waste Conversion to Briquette (2500 T/D MSW) Gasification 1 MW Power Plant – Manufacturing Facility & 60 MW Power Plant Future Solar & Biogas Projects

Upload: others

Post on 26-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

CHAMC, Inc.315 Wilkins Dr.Des Plaines, IL 60016U.S.A.Tel: +1 847 390 6020 Fax: +1 847 390 8760Email: [email protected]

--------------------------------------------------------------------------------------------For kind attention:

The Mayor& Minister of Energy

“Your Country”

-------------------------------------------------Municipal Solid Waste Conversion to Briquette

(2500 T/D MSW)Gasification

1 MW Power Plant – Manufacturing Facility & 60 MW Power PlantFuture Solar & Biogas Projects

Page 2: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

The MSW / E process is done in three stages:

(1)Sorting, drying, mixing, crushing, extruding,

to make Briquette

(2)Gasification

Thermal cracking of fuel (briquettes) at a high temp. of1050deg. C to 1100deg. C in the minimal presence of Oxygen to

produce Synthesis Gas or Syn-Gas

(3)Electric Generation

Injecting SynGas directly into gas engine generator,which has been modified exclusively by us to work with syngas

to produce Electricity

Page 3: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Introduction:

Production of the electricity from Municipal Solid Waste (MSW) is environmentalproject and most profitable one in a long run.More expensive than gas and coal power plant, but due to the negative cost of fuel, returnof investment is shorter.

“Your Country” with a population of 24 million produces around 14,000 Tons of MSWper day, which could fuel at least 300 MW of power.We propose to start with the city of ………… with 2500 Tons of MSW per day, 60 MWPower Plant.

It is not easy to finance 60 MW, let alone 300 MW power plant.

To alleviate this problem, we suggest this “Mega Project” to be executed in differentphases:Phase I, 1 MW plant.Phase II, 60 MW plant.Phase III, 300 MW plant.

Reason for this plan is to use 1 MW plant as a show case and collateral to obtainfinancing for 60 MW plant and if willing to go further, financing 300 MW will be an easytask.

Used Tire could also be added to the garbage for either gasification or producing fuel, tostop burning tire and damaging environment more than dumping.

At Phase II Solar Power will be considered to enhance this environmental project.

At Phase II Biogas production from sewer and animal waste could start when ourmanufacturing facility is operational at “Your Country”.

Manufacturing Facility will start at Phase I so that we could manufacture and assemble70% of the project at Phase II and Phase III in “Your Country”.

Page 4: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Project Cost for Phase II:

The total cost of the Sorting and Briquette making facilities, Gasification and PowerPlants including; survey, feasibility study and planning, engineering, procurement,contracting, test, commission and training for 60 MW out put, Turnkey, is approximately$300,000,000.That is $5,000,000 (five million USD) per Mega Watt.

Project Income:

A – “Power Purchase Agreement” (PPA) for electricity, which the national grid pays tothe owner of the plant. For calculation purposes, we will use an average 10 cents perkilowatt hour (KwH). This is derived from 8 Cent for Domestic and 15 Cent forIndustrial use.Assume that the PPA for 60 MW of electrical power generation at a fixed price is $0.10per KWH.Sale of electricity =60 MW(net power generation) x 1000 x 24 (hours) x 365 (days) x $0.10 x0.85(Efficiency Factor) = $44,676,000 gross income from power generation annually.B - Tipping Fee: Municipalities pay the plant operators/owners a tipping fee for each Tonthat they receive and handle per day. The average tipping fee is around $10 / T:Tipping Fee = 1600 (T/D) x $10 (per Ton) x 365 Days = $5,840,000 Annually.C - Operation & Labor Cost. For this project of 60 MW power plants and RDF plant, awork force of about 20 technical and 50 non-technical workers are estimated.Assuming $80,000 per technical and $40,000 per non-technical works, the approximatelabor costs will be: 20 x $80,000 + 50 x $40,000 = $5,200,000D – Spare and Maintenance approximately $1,000,000 per year.

Summary:

Assume 8 years Return Of Investment (ROI)Cost of facilities $300,000,000Income from PPA $44,676,000Income from tipping fee $5,840,000 For special case in “ Y C” $0Labor costs $5,200,000Maintenance costs $1,000,000

ROI =300,000,000/(44,676,000+0–5,200,000–1,000,000) ~ 8 years with zero emission and huge Carbon Credit

Note:Return of investment for coal power plants is more than 20 years.Return of investment for gas power plant is around 10 years.

Page 5: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Project Cost for Phase I:

The total cost of the Sorting and Briquette making facilities, Gasification and PowerPlants including; survey, feasibility study and planning, engineering, procurement,contracting, test, commission and training and also setting up a manufacturing facility is$7,000,000 (seven million USD).

Special offer for “Your Country”:

CHAMCO proposes to build this plant as Pilot Plant of the 60 MW contract withfollowing payment conditions:$3,500,000 payment and $3,500,000 promissory notes to be cashed when expansionfinancing is obtained.

Note:

If after building the Pilot Plant, Phase I, the Government of“Your Country” decides to stop the project, the $3.5 millionshould be paid immediately. Furthermore, if the Governmentof “Your Country” decides to award the expansion of theproject to other companies, $5 million has to be paid toCHAMCO.

Page 6: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Municipal Solid Waste Conversion to RDF

CHAMCO, Inc.

The Municipal Solid Wastes (MSW) should be sorted first into recyclable andcombustible components.

The following picture is a simple and very typical, sorting facility and Briquette makingplant. The Bioreactor is used if composting or making fertilizer.

Depending on the conditions of the MSW, if the moisture is high, it should be dried.The combustible component of the MSW is turned into RDF (Refused Derived Fuel)pellet by shredding, crushing, electromagnetic separations.

Furthermore, if chemicals are needed to be added in the process for specific conditions,then the unit is modified accordingly.

Page 7: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Pictures of few equipments are shown here:

The final product is shown here. This has a caloric value of 3,000 Calories per Kg, whichis the fuel for Gasification unit:

In a coal gasification, our coal gasifier consumes 418 Kg coal with 6000 Kcal/Kg caloricvalue to produce 1 MWH.Therefore:1 MW coal gasification power plant requires 10 Tons of coal / day.Since the caloric value of MSW Briquettes is about 3000 Kcal/Kg, therefore:1 MW MSW gasification power plant needs about 20 Tons of MSW Briquettes / day.

We assume this 20 Tons of briquettes will be derived from around 35 or 40 Tonsof MSW in the proposed site at “Your Country”.

Page 8: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Gasification

CHAMCO, Inc.

Gasification is a flexible, reliable, and clean energy technology that can turn a variety oflow-value feedstock’s into high-value products and can provide a clean alternative sourceof base load electricity.

Gasification has been reliably used on a commercial scale worldwide for more than 50years in the refining, fertilizer, and chemical industries, and for more than 35 years in theelectric power industry.

GASIFIERS- (Pyrolyzers) are receiving backing & subsidies from various Governmentsthe world over. They utilize any type of biomass including MSW, coal, waste wood,sawdust, furniture scraps, bagasse, rice husk, coconut shells, poultry litter, plastic, rubber,tires, or any other combustible material.

In the updraft gasifier, moist biomass fuel is fed at the top and descends though gasesrising through the reactor. In the upper zone a drying process occurs, below whichpyrolysis is taking place. Following this, the material passes through a reduction zone(gasification) and in the zone above the grate an oxidation process is carried out(combustion).

SynGas produced in our system of gasification has the following composition:

CO- 40%, H2- 30%, CH4- 11%, CO2-6 to 8%, N2-8 to 10%which has Caloric value of 1800 Kilo Calories /cubic meter.The Caloric value of Natural Gas is more than twice of Syn-Gas.

1 MW Gasification under Construction

Page 9: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence
Page 10: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Gasification Operation:

To supply air for the combustion process and steam for the gasification process,moist hot air is supplied at the bottom of the reactor. Combustible gas at a lowtemperature (because of the evaporation of moisture in the drying zone) isdischarged at the top of the reactor, and inert ash from the heat-generatingcombustion process is extracted from the reactor bottom through a water lock.

Page 11: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

The final pages of this proposal include certificates.

However, the pictures of the gas burning before and after cleaning are shown here.

Page 12: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Electric Generation

CHAMCO, Inc.

Ultra clean gas is fed into the engines with the help of a microprocessor based, oil to gasconversion system. When a load is activated the dual-fuel mode of operation of theengine will start automatically at 85% gas and 15% furnace oil, for a short duration thenreverts back to 100% gas mode when the load becomes constant.

The exhaust emissions of the engine can be used for a Waste Heat Recovery Boiler.800 Kg Steam at 7kg. Pressure per hr. can be obtained. This excess heat can be put to usefor other thermal applications.

This is our unique know-how!

We modify the natural gas engines to run with low calorie syngas.

This, not only uses nearly 100% energy of the syngas, but also avoid any loses due toboiler and steam loses. Furthermore, it eliminates many of the units such as boiler andsteam turbine and consequently lower cost of the project and operation.

Due to low Caloric value of syngas, we install 20 sets of 3.5 MW Caterpillar gas enginegenerators (3512 Series) to have an output of 40 MW.

Five percent of the output is feed back to the system, which will be compensated by SolarPower to have a constant 60 MW output.

Page 13: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Solar & Wind Power

CHAMCO, Inc.

1 MW output during light hours,Solar Power Farm or more:Total Cost: $2,500,000 per MW.

Page 14: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

A note: Power Generation:

The ultra-clean Syn-gas from the Gasification System is injected through a Gas & Aircontrol valve, directly into the Natural Gas Generating set, exclusively modified by us forSyn-Gas mode of operation. The exhaust gases from the Engine are monitored by an On-line gas analyzer for emission of unburnt CH4, CO, & H2. This is connected to a 4-20Milliampere PLC along with the Gas control valve to adjust automatically the Syn-gas toair ratio.

Synchronization Panel:The Generating set is connected to the Synchronization Panel equipped with variousfeatures viz.:1. Operation of Generating set possible in Island mode.2. If Multiple Generators are installed, it parallels all Generators as also their supply to

National Grid.3. If there is shut down of the grid, then the Gen-set does not get affected.4. If the Gen-set is shut down, then there is no effect on the grid.5. Reverse Power Shut down for the Generating Set6. Overdraw shut down for the Generating set.

Step-up Transformer or Electric Substation: It steps up the voltage of the generatingsets to be equal to the Distribution network voltage of either 33KV or 66KV or higherKV, as the case may be.Thereafter the Power will be evacuated to be fed to the Power house of Distributionnetwork.

Page 15: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Biogas is a fuel gas made from sewer and biomass such as food waste, grass andstraw etc. during the anaerobic fermentation process.

Biogas contains about 55% - 70% methane (CH4), and some carbon dioxide, some water,some hydrogen some carbon monoxide and some hydrogen sulfide (H2S).

The heat value of biogas is 5142 Kcal/m3

Conditions needed for biogas production are:

1- Strict absence of Oxygen.2- Temperature between 8 – 65 Deg. C. Higher the temperature the more active methanebacteria, and the higher biogas production.3- Neutral or slightly alkaline environment, a pH value between 6.8 and 7.5

For a 10 m3 biogas plant to keep a 5 m3/d biogas production, 150 kg cow dung or 110 kgpig dung is needed daily.

The liquid from biogas plant can be recycled.

Biogas residue is good organic fertilizers.

Raw material needed to produce 1 cubic meter biogas:

Pig Manure 4 kg dry = 22.23 kg freshCow Manure 5.26 kg dry = 30.96 kg freshChicken Manure 4 kg dry = 13.34 kg freshHuman Manure 3.33 kg dry = 16.67 kg fresh

Page 16: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Briquette Making

Fresno, California

Raw MSW Ground Material

Cubed Making RDF

Final Product, Briquette

Page 17: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Natural Gas Generator Set

RPM

G3508 638 510 1500

Genset Model kVA Continuous kW - Continuous

G3512 1250 1000 1500

G3512 1000 800 1500

G3512 1500 1200 1500

G3512 1406 1125 1500

G3516 2000 1600 1500

G3516 1750 1400 1500

G3520 2528 2022 1500

G3520 2500 2000 1500

G3612 3213 2570 1000

G3608 2281 1825 1000

Ph:Mail: pss.tiplindia.com

Kolkata 700024, West Bengal

Ph: 91 - 33 - 2469 3732 - 36

1, Taratolla Road

Tractors India Pvt Ltd Plot 11, Site IV, Industrial AreaSahibabad, Ghaziabad 201010

G3616 4563 3650 1000

G3612 3625 2900 1000

G16CM34 8150 6520 750

G3616 4850 3880 1000

91 - 120 - 2777945Methane number of natural gas is at various levels as per supplies

Bio-gas, Propane & other fuel ratings available on request Other ratings in natural gas are available on request

Specification are subject to revisions & improvements

Continuous power in accordance to ISO 8528Continuous power available for unlimited time

Natural gas ratings are at LHV of 35.6 mJ/M3 (905 Btu/Ft3)

PARTNERING YOUR BUSINESS

Page 18: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence
Page 19: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence
Page 20: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Chamco Tribal Corp.

Page 21: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

Chamco Tribal Corp.

Page 22: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

This document is issued by the Company subject to its General Conditions of Service printed overleaf or available upon request andaccessible at ww w .s g s . c o m /t e r m s _and_ c ond i t i ons . h t m. Attention is drawn to the limitations of liability, indemnification and jurisdictionalissues defined therein. Any holder of his document is advised that information contained here on reflect the company finding at the time ofits intervention only and with in the limit of client instructions, if any. The company sole responsibility is to its client and this document doesnot exonerate party to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorizedalteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullestextend of the law. Unless other wise stated the results shown in this test report refer only to the sample(s) tested and such sample(s) areretained for 7 days (in case of perishable items) and 30 days for all other samples. The sample from regulatory bodies are to be retained asspecified. This document cannot be reproduced, except in full, without prior written approval of the Company.

SGS India Pvt Ltd Laboratory Services, 250, Udyog Vihar, Phase IV, Gurgaon - 122015, Haryana (India) Phone : +91-124-60600747 , Fax : 2399765.

Regd & Corp. Off : SGS House, 4B, A.S. Marg, Vikhroli (West), Mumbai-400083. Tel : (022) 25798421 to 28 Fax : (022) 25798431 to 35 www . s g s .c om

Member of the SGS Group (SGS SA)

JOE NUMBER: 1121803441

REPORT NO. GR: GL: 2210010745REPORT CONTROL NO 2215011429DATE: 15/04/2011PAGE … 1…Of …2

S T A CK E M I SS I O N M O N I TO RING D E T A I L S

29. Name & Address of Industry : M/s. Fuel Power Technologies MERRUT CITY – 250002, INDIA

30. Environment/Safety In-Charge : Mr. Rajib Mohan

31. Date of Monitoring : 04.04.2011

32. Time of the day : 22:30Hrs to 23:30hrs

33. Stack Connected to : Flue Gas Engine Exhaust

34. Scope of monitoring : Emission Monitoring

35. Purpose of monitoring : Internal assessment

36. Type /Products manufactured : Electric Power

37. Control measures, if any : N. A.

38. Weather Condition : Clear

39. Ambient Temperature (0C) : 32

40. Name of Plant/Section : Flue Gas Engine Exhaust

41. Normal operating schedule (Hrs/day) : As per requirement

42. Location of sampling point from ground level (m) : --

15. Type of Stack RCC/M.S : MS

Page 23: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

16. Stack Height

From the source of emission ( m) : --

From roof Level (m) : --

From ground level (m) : --

17. Diameter of stack (cm) : 0.1

18. Sampling duration (minutes) : 60

REPORT NO. GR: GL: 2210010745REPORT CONTROL NO: 2215011429DATE: 15/04/2011PAGE … 2…Of …2

19. Operating Conditions at the time of sampling : Under Operation

20. Parameters required : PM, SO2, NOx, H2S,HCL,CL,CO2,O2, CO & Hydrocarbon

21. Fuel Consumption & Capacity ( Lt/Hr) : ---

22. RESULTS

Stack Temperature (°C)

Average Velocity (m/s)

Flow Rate (Nm3/Hr)

Carbon Dioxide (%)

Oxygen (%)

23. P O LLUT A NT C O NCENT R A T I O NS IN FLUE G A S :

: 129

: 12.50

: 249.45

5.4

15.6

PARAMETERS UNITS PROTOCOL RESULTS

1. Particulate Matter (PM) (µg/Nm3) USEPA 17 44.16

2. Sulphur dioxide (SO2) (%) USEPA 6C 0.02203. Oxides of Nitrogen (NOX) (%) USEPA 7E 0.00684. Hydrogen Sulphide (H2S) (µg/Nm3) IS 11255:PART4:1985(Reaff. 1999) 1365. Hydrogen Chloride (HCL) (µg/Nm3) USEPA 26 ND(DL.1.5 µg/Nm

3

6. Chloride (µg/Nm3) USEPA 5050 ND(DL.1.5 µg/Nm3

7. Carbon monoxide(CO) (%) USEPA 10B 1.2058.Hydrocarbon

Methane (%) APHA 2ND

EDN 0.9475Ethane (%) APHA 2

ND EDN 0.01627

Propane (%) APHA 2ND

EDN 0.00280n-Butane (%) APHA 2

ND EDN 0.00388

Iso - Butane (%) APHA 2ND

EDN 0.00083n-Pentane (%) APHA 2

ND EDN 0.00052

Per pro SGS India Private Ltd.

Authorized Signatory

Page 24: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence
Page 25: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence
Page 26: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

This document is issued by the Company subject to its General Conditions of Service printed overleaf or available upon request and accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the limitations of liability, indemnification and jurisdictional issues definedtherein. Any holder of his document is advised that information contained here on reflect the company finding at the time of its intervention onlyand with in the limit of client instructions, if any. The company sole responsibility is to its client and this document does not exonerate party to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extend of the law. Unless other wisestated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 7 days (in case of perishableitems) and 30 days for all other samples. The sample from regulatory bodies are to be retained as specified. This document cannot bereproduced, except in full, without prior written approval of the Company.

SGS India Pvt Ltd Laboratory Services, 250, Udyog Vihar, Phase IV, Gurgaon - 122015, Haryana (India) Phone : +91-124-60600747 , Fax : 2399765.

Regd & Corp. Off : SGS House, 4B, A.S. Marg, Vikhroli (West), Mumbai-400083. Tel : (022) 25798421 to 28 Fax : (022) 25798431 to 35 www.sgs.com

Member of the SGS Group (SGS SA)

TEST REPORT

Report No. GR: GL: 2210010741 DATE : 30/04/2011 JOE No. : 1121803441 Report Control No.: 2215013098

SAMPLE DRAWN BY SGS INDIA PVT. LTD.

SAMPLE IDENTIFIED AS : STACK EMISSION MONITORING

CUSTOMER NAME MR. RAJIB MOHAN

ADDRESS 271/B, DEVPURI, CITY MERRUT - 250002

COUNTRY INDIA

LOCATION PRODUCER GAS AFTER CLEANING

FUEL USED MUNICIPAL SOLID BRIQUETTE WITH 25%PLASTIC CONTENT

SAMPLING DATE 04.04.2011

SAMPLE RECD ON 06.04.2011

TEST START DATE 06.04.2011

TEST END DATE 30.04.2011

TESTS

PROTOCOL

RESULTS

DIOXIN & FURAN

USEPA – 23A/8290A

Separate sheet attached

*****End of Report*****

Per pro SGS India Pvt. Ltd.

Authorized Signatory

Page 27: 1-60-300 MW Your Country Proposal.doc - CHAMCOchamco.net/1-60-300MW UR Country.pdfThe heat value of biogas is 5142 Kcal/m3 Conditions needed for biogas production are: 1-Strict absence

This document is issued by the Company subject to its General Conditions of Service printed overleaf or available upon request and accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the limitations of liability, indemnification and jurisdictional issues definedtherein. Any holder of his document is advised that information contained here on reflect the company finding at the time of its intervention onlyand with in the limit of client instructions, if any. The company sole responsibility is to its client and this document does not exonerate party to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extend of the law. Unless other wisestated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 7 days (in case of perishableitems) and 30 days for all other samples. The sample from regulatory bodies are to be retained as specified. This document cannot bereproduced, except in full, without prior written approval of the Company.

SGS India Pvt Ltd Laboratory Services, 250, Udyog Vihar, Phase IV, Gurgaon - 122015, Haryana (India) Phone : +91-124-60600747 , Fax : 2399765.

Regd & Corp. Off : SGS House, 4B, A.S. Marg, Vikhroli (West), Mumbai-400083. Tel : (022) 25798421 to 28 Fax : (022) 25798431 to 35 www.sgs.com

Member of the SGS Group (SGS SA)

DIOXIN & FURAN :

• Oxygen content : 0.4 (vol-%) • Carbon Dioxide : 13.6 (vol-%) • Moisture : 12.59 (vol-%) • Stack pressure : 309 (mmHg) • Extracted volume : 5.15 (Nm3) (Total)

Congener amount (ng)

I-TEF I-TEQ (ng)

2,3,7,8-TCDF <0.0081 0.1 <0.00081 2,3,7,8-TCDD 0.0093 1 0.0093 1,2,3,7,8-PeCDF <0.0081 0.05 <0.00041 2,3,4,7,8-PeCDF <0.0081 0.5 <0.0041 1,2,3,7,8-PeCDD 0.0085 0.5 0.0043 1,2,3,4,7,8-HxCDF <0.010 0.1 <0.0010 1,2,3,6,7,8-HxCDF <0.010 0.1 <0.0010 2,3,4,6,7,8-HxCDF <0.010 0.1 <0.0010 1,2,3,7,8,9-HxCDF <0.010 0.1 <0.0010 1,2,3,4,7,8-HxCDD <0.018 0.1 <0.0018 1,2,3,6,7,8-HxCDD <0.018 0.1 <0.0018 1,2,3,7,8,9-HxCDD <0.010 0.1 <0.0010 1,2,3,4,6,7,8-HpCDF <0.041 0.01 <0.0041 1,2,3,4,7,8,9-HpCDF <0.041 0.01 <0.0041 1,2,3,4,6,7,8-HpCDD <0.041 0.01 <0.0041 OCDF <0.20 0.001 <0.00020 OCDD <0.20 0.001 <0.00020 TOTAL 0.014-0.029

TOTAL PCDD/PCDF (NGTEQ/Nm3) 0.006 TOTAL PCDD/PCDF (NGTEQ/Nm3) At 11% O2 Ref. 0.003

European Norms for Dioxins in emissions 0.1 NGTEQ/Nm3

Remark: - TEQ = Toxic Equivalent Quoteint, i-TEF = International Toxic Equivalency Factor, ng = Nano Gram

Per Pro SGS INDIA PVT. LTD.

Authorized Signatory