ves-1000 general technical conditions for tender and purchase equipment and materials

17
‘Helping me do my job better’ VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials TS-ENC-STD-0001 VICO Indonesia VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials Author A.R. Thanura(Discipline Engineering Section Head) Reviewer A.Rastiarsa (E&C Manager) Approver P.Stegers (Technical Support Vice President) / Vania De Stefani (Engineering Authority) VMS Primary Element Reference 11.3 VMS Secondary Element Reference Date of Issue 31-Jul-2013 Next Review Date 31-Jul-2016 Revision Number B.01 Document Level 2 - Standard NOT CONTROLLED WHEN PRINTED OR DOWNLOADED

Upload: dwiadi-cahyabudi

Post on 18-Feb-2016

222 views

Category:

Documents


0 download

DESCRIPTION

General Technical Conditions for Tender and Purchase Equipment and Materials

TRANSCRIPT

Page 1: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

‘Helping me do my job better’

VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

TS-ENC-STD-0001VICO Indonesia

VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

Author A.R. Thanura(Discipline Engineering Section Head)

Reviewer A.Rastiarsa (E&C Manager)

ApproverP.Stegers (Technical Support Vice President) / Vania De Stefani (Engineering Authority)

VMS PrimaryElement Reference

11.3VMS SecondaryElement Reference

Date of Issue 31-Jul-2013 Next Review Date 31-Jul-2016Revision Number B.01 Document Level 2 - Standard

NOT CONTROLLED WHEN PRINTED OR DOWNLOADED

Page 2: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

‘Helping me do my job better’

VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

TS-ENC-STD-0001VICO Indonesia

Revision HistoryAmendment Date Revision

NumberAmender Initials & Job Title

Amendment

Related DocumentsDocument Number Document Name

Document RolesRole Name Job TitleReviewer Approver Consulted Informed

Page 3: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

VES - 1000GENERAL TECHNICAL CONDITIONS FOR TENDER AND

PURCHASE EQUIPMENT AND MATERIALS

VES - 1000

GENERAL TECHNICAL CONDITIONS FOR TENDER AND PURCHASE EQUIPMENT AND MATERIALS

E:\Arief R. Thanura\VES-1000-R11.pdf

11 12/’10 Revise the page number of item 3.2 ARIEF R. TH. ANINDA RASTIARSA10 06/’06 Change of Content ANINDA RASTIARSA M. FUADY ABBAS

9 11/02Changed Virginia Indonesia Company to Virginia Indonesia Company LLC and Changed BPPKA/ PERTAMINA to BP

MIGASISDIARSO SUKISWANTO

8 03/94 Section 2.5 s and Appendix 1 Djarot S.S Lukman Mahfud

7 04/’93 Converted from Word Processor No. 120 to Word Perfect. Djarot S.S Lukman Mahfud

6 09/92 Section 2.2c Djarot S.S Lukman Mahfud

5 04/90 Changed HES to VES Djarot S.S Lukman Mahfud

NO. DATE REVISION ENGINEER APPROVED BY

Page 3 of 15

VICO INDONESIA

Page 4: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

APPROVAL SHEET VES – 1000

ATTACHMENTSREVISIONS REVISIONSPAGE07 08 09 10 11

REMARKS PAGE PAGES 07 08 09 10 11REMARKS

1 X 512 X 523 X 534 X 545 X 556 X 567 X 578 X 589 X 59

10 X 6011 X 6112 X 6213 X 6314 X 6415 X 6516 6617 6718 6819 6920 70212223242526272829303132333435363738394041424344454647484950

Page 4 of 15

Page 5: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

──────────

VICO INDONESIA

──────────

DOCUMENT

NUMBER

TITLE

:

:

:

VICO ENGINEERING STANDARD

VES-1000

GENERAL TECHNICAL CONDITIONS FOR TENDER AND PURCHASED EQUIPMENT AND MATERIALS

11 12/10 Revised the Page number of item 3.2 Arief R. Th. Aninda Rastiarsa

10 06/06 Change of content Aninda Rastiarsa M. Fuady Abbas

9 11/02 Changed Virginia Indonesia Company to Virginia Indonesia Company LLC and changed BPPKA/PERTAMINA to BP MIGAS

Isdiarso K. Sukiswanto

8 03/94 Section 2.5.s and Appendix 1 Sukiswanto R.F. Tontey

7 04/93 Converted from Word Processor No. 120 to Word Perfect

Djarot S.S Lukman M.

6 09/92 Section 2.2.c Djarot S.S. Lukman M.

5 04/90 Changed HES to VES Herriwanto D.S. Newson

4 04/89 Section 2.5r B. Gadjuli D.S. Newson

3 02/89 Sections 2.0, 2.2j, 2.5j, 3, 3.1e B. Gadjuli D.S. Newson

2 9/86 Sections 2.2c, 2.3c, 2.5q, 3.1b,c,m, 3.3j,k, 3.5d

J. Carlson L.W. Smith

1 10/85 General Revision J. Carlson G.E. West

NO. DATE REVISION ENGINEER APPROVED BY

Page 5 of 15

Page 6: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

VES-1000

GENERAL TECHNICAL CONDITIONS FOR TENDER AND PURCHASEOF

EQUIPMENT AND MATERIALS

TABLE OF CONTENTS

Page

1.0 SCOPE..................................................................................................................... 3

2.0 INFORMATION AND INSTRUCTIONS TO BIDDERS.................................. 3

2.1 Definitions ................................................................................................... 32.2 General Condition ....................................................................................... 42.3 General Engineering Requirements ............................................................ 52.4 Order of Control of Documents .................................................................. 52.5 Proposal Data and Information Requirements ............................................ 6

3.0 POST ORDER REQUIREMENTS ...................................................................... 7

3.1 Drawings, Data, Documents and Instruction Books ................................... 73.2 Production Schedule and Status Reporting ................................................. 83.3 Inspection, Testing and Documentation...................................................... 93.4 Shipping Preparation ................................................................................... 103.5 Warranty...................................................................................................... 11

APPENDIX - 1…................................................................................................................. 12

Page 6 of 15

Page 7: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

1.0 SCOPE

This document defines the general technical conditions for tender and purchase of equipment and materials. Specific technical requirements for the equipment and materials are defined on the data sheets, drawings, specifications, referenced professional society codes, and the Purchase Order for each particular order.

2.0 INFORMATION AND REQUIREMENTS TO BIDDERS

2.1 Definitions

The following definitions shall be applicable throughout this specification and all other Company documents, unless specifically stated otherwise:

a) Company/Owner/Purchaser/User - Virginia Indonesia Company LLC or a third party which is purchasing equipment and materials on Company's behalf.

b) Vendor/Supplier/Manufacturer/Fabricator - Refers collectively to the Indonesian agent to whom the purchase order is awarded, the manufacturer or fabricator of the primary equipment or materials and all his sub-suppliers, and all other parties involved in the supply of equipment and materials for Company's use.

c) Sub-supplier - Those corporations, firms or persons providing equipment, parts or assemblies to Vendor/Supplier/ Manufacturer/Fabricator.

d) Bidder - Indonesian agent, corporation, firm or person authorized by BP Migas to receive inquiry documents for the purpose of tendering materials to Company.

e) Base Proposal - Vendor's quotation response, prepared with strict adherence to the specifications, data sheets, and drawings defined in the inquiry documents.

f) Alternate Proposal - Vendor's suggested deviation from the specifications, data sheets and/or drawings defined in the inquiry documents.

g) Inquiry Documents/Tender Documents/Bid Documents - All drawings, specifications, codes and standards, and data sheets listed on the Request for Quotation (RFQ) issued by or on the behalf of Company.

h) Late Change Order Date - That date, until which, Purchaser may modify the purchase order, with agreed upon impact of price and delivery. The date is specifically defined as the date on which the final approval drawing is stamped, by Purchaser, "Approved", or "Approved As Noted".

i) Responsible Government Authority - BP MIGAS and all other regulatory agencies with jurisdiction over the design, fabrication, testing, importation and operation of the equipment specified in the Purchase Order.

2.2 General Condition

Page 7 of 15

Page 8: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

The intent of this section is to ensure that the data required for comparative price and engineering analysis of all proposals is submitted. Those Vendors supplying exact detail, as requested, will be given primary consideration. Failure to provide requested data and clarity of detail may result in disqualification of the Bidder's proposal. Bidder’s proposal shall comply with the following general requirements:

a) All brochures, leaflets, catalogue pages and other descriptive literature, supplied with the proposal, shall be clearly marked to identify those specific accessories, characteristics or features applicable to that proposal. Assumptions will not be made by the evaluating parties.

b) Proposals, data, documents, literature, drawings and correspondence shall be presented in the English language or Bahasa Indonesia

c) Company uses a mixture of metric and Imperial units. Therefore, it is required that all proposal drawings, data and documents shall be annotated in the following hybrid system of units:

Gas Flow - Std. Cubic Feet per Hour (SCFH)Liquid Flow - U.S. Gallons per Minute (GPM)Pressure - Pounds per square inch (PSI)Temperature - Degrees Fahrenheit (oF)Length - Millimeters (mm)Pipe size - InchesHead - Feet of liquidPipe wall thickness - InchesWeight - Kilograms (Kg)Force - Pounds (Lb)Power - HorsepowerOther parameters - Imperial units

d) Vendors requiring progress payments for equipment, or letters of credit, must incorporate Company's receipt of satisfactory approval drawings, receipt of certified drawings, critical material deliveries and all final documentation into the payment schedule. In no case will final payment for goods be authorized until all documentation requirements have been satisfied.

e) Should it be necessary for Vendor to take exception to any of the requirements of this inquiry, he shall state such exception on a separate list of "Comments and Exceptions to the Specifications", and the reason for such. Vendor, in his proposal, shall declare "complete compliance with all remaining requirements".

f) If Vendor wishes to make apparent the expense involved in complying with a particular requirement of this inquiry, he may break out the price of that specific item. This price, however, shall also remain in the total price figure of his "Base Proposal".

g) In the event of any conflict between this standard and any referenced specification, drawing, data sheet, code, etc. the order of control shall be per Section 2.4 of this Specification.

h) All equipment and materials shall be new and unused.

Page 8 of 15

Page 9: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

i) Proposals will not be accepted from Vendors who cannot demonstrate that they have been continuously engaged in the manufacture or supply of the specified or similar equipment for a minimum of 2 years. In the case of an association of interests or companies, at least one partner must satisfy the requirement.

2.3 General Engineering Requirements

The following general engineering requirements shall apply to all equipment and materials purchased for Company's use:

a) Sound level - Maximum permissible sound level for any piece of equipment shall be 90 decibels, measured on the "A" weighted scale, at a distance of 920 mm from the edge of the source. In the instance of equipment provided with a full enclosure by Vendor, for the specific purpose of attenuating machinery noise, the 920 mm dimension shall be taken from the external surface of the enclosure.

b) Accessibility for maintenance and control of equipment will be major criteria for judging proposals, approval drawings and acceptability after final inspection. Convenient location of controls, valves, dial indicators, lubrication points, filters, parts requiring service and/or removal during routine maintenance, etc. shall be a fundamental design objective of the supplier.

c) All equipment shall be tropicalized, suitable for a hot, humid, dusty, salt laden environment. Motors shall be tropicalized and furnished with space heaters.

2.4 Order of Control of Documents

The order of control in case of conflict among Company documents shall be as defined in the following, with the uppermost document on the list governing:

a) Purchaser Specified Drawings

b) Engineering Data Sheets

c) Company Standards and Specifications

d) These General Technical Conditions for Tender and Purchase of Equipment and Materials

e) Referenced Codes and Standards

In the event of conflict, Vendor shall immediately notify Purchaser in writing with a complete description of the conflict, and his proposed resolution.

2.5. Proposal Data and Information Requirements

Data and information supplied with the proposal shall include, but not be limited to, the

Page 9 of 15

Page 10: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

following:

a) Firm shipping schedule, provided an order is placed within 120 days of Purchaser's receipt of the quotation.

b) Prices and quantities of all spare parts plus manufacturer's recommended spare parts and special tools for start up and, separately, for two (2) years continuous operation, including liberal quantities of expendable items such as filter elements, V-belts, gaskets, seals, O-rings, etc.

All items shall be unit priced. Vendor shall state the lead time of the longest delivery items in the spare parts quotation. Vendor shall include a statement of guarantee that spare parts will be available for at least ten years after purchase.

c) Field service day rates for (i) normally required installation, start-up and test personnel, and (ii) any special start-up equipment. Estimated number of days personnel and/or equipment will be required.

d) Itemization of any equipment utility requirements for external power, fuel, air, coolant, lubricants, etc.

e) Current worldwide user list of similar systems supplied by Vendor

f) Estimate outline dimensions and weight of the proposed equipment, including spare parts, for freight and crafting cost estimating by Company.

g) Freight cost to Galendrong /Saliki for all equipment manufactured in both of elsewhere outside of Indonesia and local manufacturer. All freight cost shall include, as separate item, export crating and preparation for long term storage.

h) Name of manufacturer and model number of all externally purchased items, such as valves, heat exchangers, pumps, instruments, etc.

i) For any pressure vessels supplied: design calculations covering wall thickness, corrosion allowance, connection sizes, material, design conditions and operating conditions including a description of any vessel internals, design drawings including flow diagram or P&ID and fabrication schedule.

j) The metallurgy of any items exposed to process fluids.

k) Process and mechanical warranties, and price, terms and conditions for any extended warranty programs available from the Supplier or Sub-suppliers.

l) Materials of construction for driven equipment mechanical parts, i.e. bearings, shafts, impellers, couplings, casings, wear parts, seals, etc.

m) Motor nameplate horsepower rating and horsepower requirement of the driven equipment including losses.

n) Listing of Vendor's and Sub-supplier's standard tests, both NDT and performance, and copies of standard test data forms.

o) Other specific data as required by the equipment specifications.

Page 10 of 15

Page 11: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

p) Pricing for supplying all data as specified, if extra charges are applicable.

q) Copy of letter of agent appointment in the case bidder is acting as an agent for manufactured product or is a fabricator of primary equipment or materials and warranty statement from manufacturer or fabricator that the equipment or materials supplied will be delivered on schedule as proposed.

r) In the case of valve and pipe fitting the data and information in the Appendix-1 shall be supplied.

3.0 POST ORDER REQUIREMENTS

3.1 Drawings, Data, Documentation and Instruction Books

a) Within two (2) weeks after the date of the purchase order, Purchaser's representatives shall meet with those of the Supplier at the facility occupied by the Supplier's design group, for the purpose of resolving all schedule and engineering detail. Purchaser may waive the meeting with written or telex notice.

b) Within three (3) weeks after the purchase order date, Vendor shall supply to Purchaser an outline drawing of the base plate or skid base showing only plan and elevation dimensions of both centrelines and faces of all skid edge connections with connection sizes, foundation bolt plan, and estimated completed skidded assembly dry and wet weights.

c) Within four (4) weeks after the purchase order date, approval drawings shall be issued by Vendor, direct to Purchaser. All drawings shall be transmitted in the same mailing. Approval drawings shall be submitted as one (1) original CAD and two (2) copies each stamped "For Approval".

d) Within six (6) weeks after Vendor's receipt of approval drawings marked "Approved" or "Approved as Noted", final drawings stamped "Certified", in the form of one (1) original CAD and two (2) copies, shall be issued to Purchaser.

e) Vendor shall, prior to final shipment of mechanical equipment, issue to Purchaser, three (3) copies each of all required material certificates, certified factory test and inspection reports with any required certified code compliance documents. Purchaser shall be allowed eight (8) days after receipt of said documents and/or data, to either accept or reject shipment of the equipment.

In the case of pressure vessels, all material certificates, certified for construction drawings and design calculations, and hydrotest procedures must be in Purchaser's possession four (4) weeks prior to hydrotesting, for distribution to government authorities who will witness the test.

f) Prior to shipment of the first unit, Vendor shall have transmitted, to Purchaser, two (2) copies of the complete "Installation, Operation and Maintenance Manual", for approval. Each "Installation, Operation and Maintenance Manual" issued by Vendor shall include a full set of "as built" certified drawings, certified test/ inspection reports, complete illustrated priced spare parts lists, unpacking/cleaning

Page 11 of 15

Page 12: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

directions and recommended storage practice for spare parts.

Three (3) copies of Purchaser approved manual shall be issued within three (3) weeks of Vendor's receipt of the original marked "Approved" or "Approved as Noted".

Particularly for pressure vessels, two additional bound sets (one original + 1 copy) of the manufacturing reports containing code compliance documents, certified test/inspection reports, material certificates, design calculations, etc. must be provided for Company distribution to appropriate government authorities for obtaining the operating permit.

g) All "general arrangement" drawings (approved and certified) shall include detailed plan and elevation views, showing conduit entrance sizes (NPT) and centreline locations of all electrical and piping connections, pipe sizes, rotation direction, package dry weight, wet weight, centre of gravity, weights of major components, weight of heaviest piece for maintenance and maximum horizontal/vertical clearances required for maintenance.

h) No drawing will be accepted by Purchaser as certified until all outstanding comments and/or revisions are incorporated in the approval drawing or explained, in writing, to Purchaser's satisfaction.

i) All drawings and data shall be identified with Company's name, Purchaser's name and purchase order number, equipment tag number, AFE number and other data as may be shown on marked-up and returned approval drawings.

j) Vendor drawings shall include diagrams of the maximum moments and forces allowed on the skid process piping connections.

k) It will be required that the successful Vendor prepare all drawings, data, manuals, etc., utilizing the system of units defined in Section 2.2 (c).

l) Vendor shall comply with all other terms and conditions as set forth in the purchase documents, and in addition to those requirements, shall submit also one copy of the packing list to Purchaser.

m) All drawings, data and other documentation prepared by Vendor shall be signed, checked and approved prior to submittal to Purchaser for review and approval. Purchaser will not accept documentation which does not comply with this requirement.

3.2 Production Schedule and Status Reporting

a) Commencing with return of approval drawings, Vendor shall submit engineering and manufacturing status reports to Purchaser every two weeks. Reports shall also include a minimum ten (10) line bar chart indicating current production activities as well as estimated test, final inspection, and shipping dates, for each major fabricated assembly. Reporting shall cease with shipment of the final equipment item and/or the first spare parts order.

b) Vendor shall allow, in his scheduling, four weeks for mail time, review and

Page 12 of 15

Page 13: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

approval of drawings by Purchaser, for each transmittal.

c) Vendor shall notify Purchaser a minimum fourteen (14) days in advance of:

i) Start of fabrication,ii) Start of equipment testing,iii) Final inspection of completed assemblies.

d) Vendor shall, in the case of pressure vessels and shell and tube exchangers, advise Purchaser of any pending hydrotest, at least two (2) weeks in advance, to allow proper notification of government authorities who will witness the test activity.

e) Vendor shall not proceed with fabrication of manufacturing until his receipt of all drawings stamped "Approved" or "Approved As Noted". Vendor may, however, solicit written approval from Purchaser to order "long lead" or "buy out" items affecting delivery of the finished goods prior to receipt of Purchaser approved drawings.

3.3 Inspection, Testing and Documentation

a) Specific inspection and test requirements are outlined in the engineered equipment standards and specifications for each item.

b) Purchaser or its representative shall, with sufficient notice, be allowed access to Vendor's facility, during normal working hours, to observe and inspect any phase of manufacturing, assembly, testing, any required teardown after testing and preparation for shipment. Vendor shall also secure, from his suppliers, the same access privileges for Purchaser.

c) Four (4) weeks prior to the start of equipment and/or pressure vessel testing, Vendor shall provide, to Purchaser, a full test agenda with a corresponding estimated schedule of events.

d) All equipment supplied on a single purchase order shall be accumulated after manufacture for testing at the same time, either simultaneously, or in immediate sequence, unless specific exception is granted, in writing, by Purchaser.

e) Each test performed by Vendor and his suppliers shall result in a certified test report being issued to Purchaser, within one (1) weeks of test completion, and prior to shipment.

f) Vendor shall assume that all tests will be witnessed by Purchaser or its representative. The price for witnessing each test shall be broken out, in the proposal, as a separate item. Purchaser may, at any time, waive witnessing of any test, resulting in an immediate price deduct, equal to the amount quoted by Vendor in his original proposal, provided that notice of such is given to Vendor, at least two weeks in advance of the scheduled witnessed test.

g) All hydrotesting shall be performed with inhibited water. All internals shall be thoroughly dried and preserved after test completion.

h) If it is determined by Purchaser, or its designated representative, during factory testing and/or final inspection of the goods at the factory, that the purchase order documents have not been complied with, the equipment or material will be rejected

Page 13 of 15

Page 14: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

as unacceptable for shipment. Purchaser's representative will then return to his point of origin, until such time as the situation has been declared corrected by Vendor. The travel cost and daily living expenses for Purchaser's representative to repeat any inspection or test trip shall be Vendor's responsibility and will be deducted from Vendor's final invoice amount and withheld by Purchaser.

i) Records of all inspections, heat analyses, radiographs, test results, heat treatment, repair procedures, re-inspection reports, and any further NDT results shall be kept available for reviewed by Company for a minimum of ten years from the date of shipment ex works.

j) Approval of testing and inspection and final acceptance of the equipment by Purchaser shall not relieve Vendor of his warranties or his responsibility to comply with the requirements of the Purchase Order.

k) Vendor shall not ship material or equipment from his factory until written authorization from Purchaser's (Company's Project Engineer in Jakarta) to proceed with shipment has been received.

3.4 Shipping Preparation

a) When specified in the Purchase Order, Vendor shall be responsible for preservation and protection of equipment. A separate price shall be quoted for waterproof export crating. Vendor shall also quoted pricing for protection of equipment for long term storage, in excess of six months, at site conditions.

b) Marking, tag numbers, and special nameplate data will be issued in the Purchase Order.

c) Lifting points shall be boldly identified on all crates and skids.

d) All openings to internals shall be plugged and temporary plugs shall be clearly identified.

e) All exposed, machined surfaces shall be covered with rust preventive which is easily removable with commercial solvent.

f) Special care shall be taken to insure against shock and moisture damage to instrumentation, electrical equipment and controls while in transit.

g) Loose shipping items shall be packed in as few crates as practical, placed on the equipment skid, when possible, and securely fastened. All items shall be forwarded together. No partial shipments shall be allowed without prior written approval from Purchaser. Any item discovered missing from any shipment shall be air freighted to a site designated by Purchaser, at Vendor's expense.

h) The initial spare parts order, when purchased with the equipment, shall be shipped with, and as part of, the original equipment order. Spare parts shall be crated, clearly identified and preserved in a manner suitable for extended storage, not to exceed two years. Storage instructions shall be included in the "Installation, Operation and Maintenance Manual".

3.5 Warranty

Page 14 of 15

Page 15: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

a) Vendor shall provide a written performance guarantee stating that the equipment supplied by him will perform in accordance with the design conditions set forth in the Purchase Order.

b) Vendor shall warrant that all equipment, material and workmanship shall be free of defects for a period of eighteen (18) months from the date of delivery to the job site or twelve (12) months from the date of start-up whichever occurs first. Vendor shall, at his expense, correct any defect to the satisfaction of both Purchaser and Company.

c) The final process design, mechanical design and fabrication of the equipment shall be responsibility of Vendor.

d) Vendor shall pass on to Company all warranties on components purchased from sub-suppliers.

VES - 1000

APPENDIX-1

DATA AND INFORMATION REQUIREMENTFOR VALVE, FLANGE AND PIPE FITTING REQUISITION

Page 15 of 15

Page 16: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

I. Vendor shall state in their proposal that new and genuine material will be supplied. When after Purchase order awarded, it is found that Vendor supplied the fake material then Vendor shall replace with the genuine material. All cost related to the replacement including transportation and inspection cost shall be Vendor’s responsibility.

II. In the case of valve proposal, Vendor shall include in their proposal the detail technical specification of the proposed valve. Valve brand shall be specified and technical brochures may also be included in the bid proposal.

III. For fittings and flanges, Vendor must include with the proposal, a list of proposed distributors and a list of proposed manufacturers. After purchase order award, Vendor may not substitute distributors and/or manufacturers without VICO approval. Unapproved substitutions will be basis for VICO rejection of the Goods.

IV. In the case of flange, pipe fittings and valves, maximum one week after receiving the order, Vendor shall advise the source of the material to be supplied and submit copy of the mill certificate (when the material is in stock) for VICO review. The issuance date of mill certificates shall not more than 3 years. Company may also request for the manufacturer's quality control procedures. If Vendor's supplied document is not satisfactory, Company will reject it and may cancel the order with no cancellation fee.

V. Vendor may submit alternate proposal with a list of comments and exceptions to the specifications stated in the Material Requisition document. Company will consider the alternate proposal if it is advantage technically and commercially to Company.

VI. The material shall be supplied with proper mill certificate and marking as outlined in the following:

1. The marking system applies to valves, fittings, flanges (forged flanges, cast flanges), and unions used in piping connections, which include flanged, welded and threaded joints.

2. Each product of a size and shape permitting legible marking shall be marked in accordance with the provisions of the standard practice of the Manufacturers Standardization Society of the Valve and Fittings Industry, Inc. (MSS SP-25) and ANSI Standard Specifications (ANSI B16-3, B16-5, B16-9, B16-11, B16-34).

3. Each fitting shall be permanently marked (i.e. markings cast, forged, or stamped) to show the following:

a) Manufacturer' Name: Trade Mark or Symbol.

b) Rating Designation: This includes the intent of the expressions "Pressure Rating Class", "Pressure Designation" and "Service Designation".

c) Material and Product Identification: Conforming materials shall be marked in accordance with ASTM, ASME or other recognized materials specifications.

d) Melt Identification: Carbon, alloy and stainless steel castings and forging, used

Page 16 of 15

Page 17: VES-1000 General Technical Conditions for Tender and Purchase Equipment and Materials

VES-1000File: F:\WPDATA\NEWVES\2002\VES-1000 Rev. 11

for fittings, flanges, valve bodies, bonnets and covers shall be marked with a melt identification and material system.

e) Valve Trim Identification: Marking is required on the identification plate for all flange end and butt welding end steel or flanged and ductile iron body.

f) Size Designation: The nominal pipe size shall be given.

g) Schedule Number or Nominal Wall Thickness.

h) Other designation as required by ANSI standard shall be applied preferable located adjacent to the rating designation to indicate conformance to the corresponding ANSI standard (B16, etc.)

4. Vendor shall furnish certified mill test reports for each valve, fitting, or flange. Mill certificates must show the melt number and be traceable to the mail. Material markings do not match the mill certificate, including melt number, the materials shall be rejected.

5. Materials not marked in accordance with this specification shall be rejected.

Page 17 of 15