Page 1: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 ©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice

Twitter hashtag #HPSWU

BTOT-WE-1145-8Twitter hashtag #HPSWU

Page 2: Using QTP for Load and Performance Testing of Rich Client Applications

Stephan Wiesner

Barcelona, 2011

Using QTP for Load and Performance Testing of Rich Client Applications

Page 3: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

3

Page 4: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

4

AGENDA

• Introduction

• Challenges

• Solutions

• Lessons Learned

Page 5: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

5

Performance testing is testing that is performed, to determine how fast some aspect of a system performs under a particular workload

Performance testing definition

PerformanceTesting

Endurance TestingEndurance testing is usually done to determine if the application can sustain the continuous expected load.

Load TestingA load test is usually conducted to understand the behaviour of the application under a specific expected load.

Stress TestingStress testing is used to

understand the upper limits of capacity within

the application landscape.

EvaluationEvaluate results, perform

bottle neck analysis, perform optimisation

Page 6: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

6

Customer performed a major hardware upgrade for it‘s critical trading system based on Standard Software

Customer

Changes

Testproject

■ Large Swiss utility company■ Central trading department■ 7x24 business■ ca. 40 active traders■ Performance crucial for business transactions

■ Replace host database with modern Oracle based database system■ Replace all server hardware ■ Virtualisation of all windows based servers■ Implement high availability measures

■ Perform functional regression testing■ Define and test high availability scenarios■ Plan, test and manage the system migration■ Plan, execute and evaluate extensive performance tests !

Overview of the situation

Page 7: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

7

The (new) system under test is build on a typical 3-tier architecture

Simplified system view

Solaris Systems

Windows Systems

DB Server

System ASystem B…System N

OAS

OAS

LoadBalancer

[...]

Page 8: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

8

QTP 9.2 was already used for automation of functional regression tests on testsystems

Overview of testsystems and -tools

Testsystems

Test Tools

■ New production system■ 5 Testsystems, one of them was an exact duplicate of the Production

■ QC 9.2 for requirements, testcases and testscripts■ QTP 9.2 for automated regression testing

Reqs / Test Cases

■ No formal requirements (standard software)■ Some test cases from old projects

Page 9: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

9

AGENDA

• Introduction

• Challenges

• Solutions

• Lessons Learned

Page 10: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

10

The performance testing faced three major challenges: unclear requirements, budget constraints and old technologies

Major challenges and derived measures

Time & Budget - 4 Weeks of total time- No money for new tools- No inhouse expertise

Successful Performance Testing

Requirements - „double the speed“- critical workflows- number of user

Technology- Client: Oracle Forms 6.0- No API for automation- No testdata generation

Perform GUI based testautomation

Reuse as much as possible

Perform requirements gathering and

priorisation

Page 11: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

11

The (performance) testing of standard software has some very specific challenges

Comparison of custom and standard software concerning testing

Custom Software Standard Software

Functional requirements

•Customer specifies requirements

•Functional test cases derived from requirements

•Customer has “expectations”

•Test cases derived from manual or best practices

Nonfunctional requirements

•Nonfunctional requirements part of contract

•Software is provided on a “as is” basis

Implementing changes

•Contract specifies change process

•Custom release cycle

•Changes can affect all customers

•Regular releases

Testautomation

•Customer can influence development and testautomation can be part of contract (e.g. automatic smoke tests per release)

•Customer has low influence

•Changes have high impact on automation by customer

Requirements and change management are crucial for performance testing of standard software

Page 12: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

12

Database

Reuse of existing automated workflow tests and lack of API support can be a challenge

Workflow

Functions

Testdata

APIBusines

s Logic

API

API

SystemUnderTest

(Black-Box)

GUI

Testdata

Testdata

Sys

tem A

Sys

tem B

Page 13: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

13

QTP simulates real users – using mouse, keyboard and screen

Only ONE instance of QTP can run on any single computer!

Page 14: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

14

AGENDA

• Introduction

• Challenges

• Solutions

• Benefits and Lessons Learned

Page 15: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

15

A subset of already automated workflow test cases was selected for performance testing

Custom

er & T

est Team

Testcase transformation process

Automated Workflow Tests Performance Tests

Select test cases that simulate a realistic workload

1. Select test cases with customer2. Adapt for concurrent execution3. Adapt for perf. testing (data,

logging, etc.)

Page 16: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

16

Using 20 QTP licences and virtual systems enabled us to simulate 20 concurrent usersOverview of test system and usage of QTP

Solaris-SystemsWindows Systems

DB Server

lasttest

lasttest

lasttest

Firewall

OAS

OAS

NLB OAS

VM Client 01

VM Client 02

VM Client 20

[...]

Page 17: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

17

Using QTP for performance tests means a lot of manual work

List of Manual Tasks

1. Log into virtual client2. Start QTP3. Load script4. Start execution

5. Stop execution6. Aggregate log files7. Perform analysis8. Optional: reporting

x 20

Can we automate this?

Page 18: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

18

QualityCenter (QC) can execute distributed test scriptsOverview of test system and usage of QTP

Solaris-SystemsWindows Systems

DB Server

lasttest

lasttest

lasttest

Firewall

OAS

OAS

NLB OAS

VM Client 01

VM Client 02

VM Client 20

[...]

QC 9.2

Page 19: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

19

Performance tests where performed on production data

Production

11. Export production2. Import into test systems and isolation3. DB migration4. Optional: perform data validation5. Optional: duplicate data6. Optional: import into reference database

T03 T05 T06 T07

235

4

Overview data replication and migration process

6

Page 20: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

20

The use of production data on testsystems requires some kind of isolation to ensure safe testing

Isolation of Production Data

Testsystem

Internal systemswith external connections

Internal systems

Partner systems 1. Export productive database2. Select isolation script

depending on target system3. Isolation

The Scripts are reusable, under version control, and use parameters.

The Goal is to control the communication with internal and external Systems

ProductiveData

Isolated Data

1.

Isolation-script2.

3.

[email protected] [email protected]

Page 21: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

21

QC 9.2

Old system

All tests were executed on old and new system to compare the results

Test execution workflow

Data 1.10.200X

New system

Data 1.10.200X

QTP scripts

1. Reset data2. Execute scripts3. Perform reporting

QTP 9.2 on VM clients

Page 22: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

22

Log In and Out should be measured separately

Although the requirements only demanded End2End performance, we introduced several additional points of measurement . . .

Examples of points of measurement

1. Start script

2. Log in

3. Screen 1

4. Screen 2

1. Start calculation

2. End calculation

5. …

6. Screen N

7. Log outLog in and out should be

measured separately

Good entry point for bottle neck

analysis

Customer demanded End2End execution time

(2 x faster)

Page 23: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

23

Log files contained status, duration, workflow ID, etc

Example extract from logfile

Time Instance WF Duration Status08.10.2008 16:51 QTP_01 COE 132.58 PASSED08.10.2008 16:54 QTP_01 CM 130.47 PASSED08.10.2008 16:56 QTP_01 RM 76.98 PASSED08.10.2008 16:57 QTP_01 LI 34.48 PASSED08.10.2008 17:40 QTP_01 FU 52.36 FAILED08.10.2008 17:41 QTP_01 SF 53.73 PASSED08.10.2008 17:42 QTP_01 BS Mess 67.67 PASSED

Page 24: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

24

We defined test scenarios for full load, base load and average load by varying the number of concurrent users (1/2)

Three test scenarios

Don’t change think times!

1

10

20

0

5

10

15

20

25

Base Load Average Load Full Load

Page 25: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

25

We defined test scenarios for full load, base load and average load by varying the number of concurrent users (2/2)

Example report for different test scenarios

0

100

200

300

400

500

600

700

WF A WF B WF C

New Base Load New Average Load New Full Load Old Average Load Old Full Load

Old system was highly sensitive to load differences

New system was not sensitive to load differences

The new database had 32 CPUs (vs. 4) 20 QTP instances proofed that the application supported concurrent execution!

Page 26: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

26

AGENDA

• Introduction

• Challenges

• Solutions

• Lessons Learned

Page 27: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

27

Lesson learned: capture replay is not sufficient – use a central library and global configurations

Use of central library and parameterization

iterations = Environment("v_NumberOfIterations")InitLogWhile Iterations <> 0 RunWorkflow("FU") RunWorkflow("SF") [. . .] If (Iterations > 0)Then Iterations = Iterations - 1 End IfWend

<Variable><Name>v_NumberOfIterations</Name><Value>2</Value>

</Variable>Central

configuration file

Central execution flow

Page 28: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

28

Lesson learned: find a way to stop test execution “smartly”

How to stop running tests using “stop-files”

Modes of performancetest execution:•Number of runs•Time frame•Ramp up (and down)

And in case of error?

Hard stop of QTP scripts using stop button Result: “probably” corrupt data

Better: after each block of code:•Check for existence of stop-file•If file exists perform controlled stop•Else go to next block

Try to preserve consistent data

Page 29: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

29

Lesson learned

Testdata

Test systems

QTP

• Use production data (anonymized and/or isolated)• Define a way to reset the data (fast)

• Virtualisation cuts costs and eases system management

• Use QC test execution controls

• Define central library (logging, bottle neck analysis, error handling, etc.)

• Use read-only-tests (where possible)• Clean data after testruns wherever possible

Page 30: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4 © 2010 Capgemini - All rights reservedHP_BARCELONA_WIESNER_06.PPT

30

Page 31: Using QTP for Load and Performance Testing of Rich Client Applications

www.de.capgemini.com

Thanks!

[email protected]

Page 32: Using QTP for Load and Performance Testing of Rich Client Applications

CEA v6.4

Continue the conversation with your peers at the HP Software Community hp.com/go/swcommunity