"Thickened Ground", Thesis Research and Project, January - June 2012 "Thickened ground" attempts to look at the inter-relationship between building typology, building code and topography in Hong Kong, and to propose an alternate reality to the status quo.

TRANSCRIPT

  • Re-Groundingreinterpretation of ground, datum and mass

    Thesis ReportCalvin Chan

  • B

  • iRe-Groundingreinterpretation of ground, datum and mass

    Thesis ReportMaster of Architecture 2011- 2012

    University of Hong Kong

    The artificial ground has been thickened by means of shifting datum defined by building code. The ever-shifting datum continuously disengages itself from the idea of ground. Programs are interiorized. Open spaces are rendered as leftover spaces. Is it possible to imagine an alternate scenario: by reinterpreting datum, the thickened ground is also a device to induce intimate spatial relationship between ground and building mass?

  • ii

  • iii

    Content

    Photographic Research 1

    Case Study 3

    First Jury 8

    Building Type 9

    Thesis Statement Thickened Ground 20

    Scale Comparison 24

    Site Selection 28

    Urban Slope 30

    Thickened Ground at site 32

    Second Jury 36

    Site Analysis 37

    Unfolded Journey 50

    Program 52

    Multiple Ground 54

    Multiple Ground Plan 56

    Reshaped Urban Space 58

    Alternate Future 60

    Documentation 62

    Third Jury 76

    Final Jury 77

    Acknowledgements 78

    Bibliography 79

  • Building Plinth on Slopes

    Kwun Tong

    Mid Levels

    Central

  • 55.4 m

    13.2 m

    1

    A Research on Urban Slope High Rise BuildingsHow do high rise buildings reshape the ground to situate themselves on urban slopes?

    In some cases, the building plinths volume in itself is already equivalent to a building in the neighborhood. What is the driving factor behind this phenomenon?

    Is the plinth a genuine representation of what needs to be built?

  • Building Mass

    Structure

    Existing Topography

    Program Space

    2

    Case StudyCase StudyAxonometric studies aims to decode the ingredients of high rises on urban slopes.

  • 3Palm CourtYear of Completion: 1964Lcoation: Mid-LevelsSite Area: 1,674 m2Ground Level Differeence: 18 m

  • 4Tai Hong CourtYear of Completion: 1965Lcoation: Kwun TongSite Area: 2,469 m2Ground Level Differeence: 26 m

  • 5Eastland HeightsYear of Completion: 1976Lcoation: Kowloon TongSite Area: 1,451 m2Ground Level Differeence: 15 m

  • 6Comfort GardensYear of Completion: 1974Lcoation: North PointSite Area: 2,084 m2Ground Level Differeence: 20 m

  • 7Leighton HillYear of Completion: 2002Lcoation: Happy ValleySite Area: 43,143 m2Ground Level Differeence: 30 m

  • Date: February 8th, 2012Panel Members: Alan Smart, Koon Wee

    First Jury

    1. Synopsis of PresentationThe need to develop on hilly topography is a recurring issue for Hong Kong. With the concern of over-reclamation, as well as a lack of flatland in urban areas, it is not difficult to find buildings sitting on a variety of artificial platforms on slopes.

    Axonometric case studies shown as examples

    In the above examples GROUND is considered a separate entity from the building MASS. While in these examples GROUND has a variety of spatial properties, meaning it is not a SURFACE but rather a VOLUME. GROUND is no longer simply a plane for the building to sit on. There exists other types where GROUND and MASS forms an inseparable

    relationship yet to be explored.

    2. Synopsis of Reviewers CommentsKW: Could document Archetypes worldwide with the color-coding of the diagrams and their relationship with the code.KW: Should understand how a slope is reshaped in engineering termsKW: Should revise the criteria in catergorizing types into terms more commonly understood

    3. ResponseNeed a critical understanding about influence of building code on building types.Need a way to revise the catalog to include more useful information. (e.g. level difference/ buidling code/ engineering technique)

  • recreationcarpark

    roadstructure

    Program

    In-between

    Ground/ Access

    Construction

    program

    multiple discontinuous

    multiple continuous

    single discontinuous

    single continuous

    build atopcut and ll

    9

    Building TypeBuilding TypeTo understand the physical, circulatory and programmatic composition of the plinth, four criteria is set up to evaluate each case study.

  • -17.9 m-17.9 m

    Principal Datum(from the lower access)

    Accessible Ground

    -17.9 m-17.9 m

    carparkstructuresingle continuous

    cut and ll

    Hillview GardenYear of Completion: 1963Ground Elevation: 7.7 mPrincipal Datum: -17.9 m

    Principal Datum(from the lower access)

    Accessible Ground10

    Building Type vs Building CodeBuilding Type vs Building CodeFor ease of implementing the code, there is always absolute reference regarded as the Principal Datum for any development in Hong Kong. What is the relationship between this ground with the accessible ground?

  • -17.9 m-17.9 m

    Principal Datum(from the lower access)-17.9 m-17.9 m

    carparkstructuresingle continuous

    cut and ll

    Hillview GardenYear of Completion: 1963Ground Elevation: 7.7 mPrincipal Datum: -17.9 m

    Principal Datum(from the lower access)

    Accessible Ground

    Site

    Bou

    ndar

    ySi

    te B

    ound

    ary

    Site

    Bou

    ndar

    y

    Site

    Bou

    ndar

    ySi

    te B

    ound

    ary

    Site

    Bou

    ndar

    y

    11

  • -17.6 m-17.6 m

    0.0 m0.0 m

    carparkstructuresingle continuous

    build atop carparkroadsingle continuous

    build atop

    Tai Hong Court Palm CourtYear of Completion: 1964Ground Elevation: 13.2 mPrincipal Datum: 0.0 m

    Year of Completion: 1969Ground Elevation: 8.0 mPrincipal Datum: -17.6 m

    12

  • -17.6 m-17.6 m

    0.0 m0.0 m

    carparkstructuresingle continuous

    build atop carparkroadsingle continuous

    build atop

    Tai Hong Court Palm CourtYear of Completion: 1964Ground Elevation: 13.2 mPrincipal Datum: 0.0 m

    Year of Completion: 1969Ground Elevation: 8.0 mPrincipal Datum: -17.6 m

    13

  • 0.0 m0.0 m 0.0 m0.0 m

    carparkroadsingle discontinuous

    build atop carparkprogrammultiple discontinuous

    cut and ll

    Comfort GardensBroadview TerraceYear of Completion: 1977Ground Elevation: 8.3 mPrincipal Datum: 0.0 m

    Year of Completion: 1974Ground Elevation: 20.0 mPrincipal Datum: 0.0 m

    +7.0 m+7.0 m

    single discontinuous

    cut and ll

    Hilltop GardensYear of Completion: 1990Ground Elevation: 24.7 mPrincipal Datum: +7.0 m

    recreationprogram

    14

  • +7.0 m+7.0 m

    single discontinuous

    cut and ll

    Hilltop GardensYear of Completion: 1990Ground Elevation: 24.7 mPrincipal Datum: +7.0 m

    recreationprogram

    15

    15m non-domestic podium...for the non-domestic part of a composite building,on a class A, B or C site may, whatever the height of the building, exceed the permitted percentage site coverage to a height not exceeding 15 m above ground level.Building (Planning)Regulations section20(3)

  • +27.2 m+27.2 m

    recreationroadmultiple discontinuous

    build atop

    Leighton HillYear of Completion: 2000Ground Elevation: 49.8 mPrincipal Datum: +27.2 m

    16

  • +27.2 m+27.2 m

    recreationroadmultiple discontinuous

    build atop

    Leighton HillYear of Completion: 2000Ground Elevation: 49.8 mPrincipal Datum: +27.2 m

    17

  • +35.4 m+35.4 m

    e BelchersYear of Completion: 2002Ground Elevation: 55.4 mPrincipal Datum: +35.4 m

    recreationprogrammultiple discontinuous

    build atop

    18

  • +35.4 m+35.4 m

    e BelchersYear of Completion: 2002Ground Elevation: 55.4 mPrincipal Datum: +35.4 m

    recreationprogrammultiple discontinuous

    build atop

    19

    Datum ShiftThe datum shift is resulted from dividing the development into two; the bottom is dedicated to a shopping mall of commercial purpose while the top is dedicated to residential purpose. The plinth/podium as such is composed of the shopping mall for commerical purpose and a clubhouse for residential purpose.

    The plinth is equivalent to a 20 storey building in itself, which elevates the apartements above a normal building since 70s in its neighborhood.

  • Principal Datum

    2002e Belchers

    1990Hilltop Gardens1977

    Broadview Terrace1963Hillview Gardens

    1997List Policyreplaces annual land sales

    1980Building Planning Regulations

    P.D. +15m non domestic podium

    1984Sino-British Joint Declaration

    Limit land sales < 50 Ha/year

    1966Building Ordinance

    Plot Ratio and Site Coverage

    1955Building OrdinanceSetback Line

    ickened Ground // Datum Shift // Building Code

    +35.4 m

    +56.4 m

    24.7 m

    8.3 m0.0 m

    +7.0 m

    0.0 m-17.9 m

    20

  • Principal Datum

    2002e Belchers

    1990Hilltop Gardens1977

    Broadview Terrace1963Hillview Gardens

    1997List Policyreplaces annual land sales

    1980Building Planning Regulations

    P.D. +15m non domestic podium

    1984Sino-British Joint Declaration

    Limit land sales < 50 Ha/year

    1966Building Ordinance

    Plot Ratio and Site Coverage

    1955Building OrdinanceSetback Line

    ickened Ground // Datum Shift // Building Code

    +35.4 m

    +56.4 m

    24.7 m

    8.3 m0.0 m

    +7.0 m

    0.0 m-17.9 m

    21

    A Critique: Ground Thickening as an economic agenda

    Thickened Ground

    Over the time the artificial ground has been thickened by means of code and injecting optional program. There is a shift from applying building code for practical concern to manipulation to achieve a building mass which shows more economic greed than architectural concern. The ever-shifting datum continuously disengages itself from the idea of ground. Programs are interiorized. Open spaces are rendered as leftover spaces.

    A thickened ground has proven to have economic value in current manifestation. Yet is it possible to re-imagine an alternate scenario: where datum is also a device to induce intimate spatial relationship between ground and building mass?

  • recreation

    recreation

    recreation

    recreation

    carparkcarpark

    carpark

    carpark

    carpark

    mega podiumtransitiontower on slopestage 4stage 3stage 1 stage 2

    1966 19801955

    new ground plane ground plane thickening

    typical podium towers

    Building (Planning) RegulationP.D. +15m non-domestic podium

    1984 Sino British Joint DeclarationLimit land sales < 50 Ha /year

    1997 List Policy replaces annual land sales

    Building OrdinancePlot Ratio & Site Coverage

    Building OrdinanceSetback line

    15m GFA concession shifting datum + extra concession

    roadroad

    road

    structure

    structure

    Flora Garden

    Hilltop Gardens

    Comfort Gardens

    Hillview Garden

    Leighton Hill

    e Legend

    Palm CourtTai Hong Court

    Broadview Terrace

    15m

    p.d.

    e Belchers

    program

    program

    program

    multiple discontinuous

    cut and ll

    cut and ll

    program

    multiple discontinuous

    multiple discontinuous

    single discontinuous

    single discontinuous

    single discontinuous

    single continuous

    single continuous

    single continuous

    build atop

    build atop

    recreationroadmultiple discontinuous

    build atop

    build atopbuild atop

    build atopcut and ll

    cut and ll

    15m

    p.d.

    (20m)

    Ground MassStage 5

    Articial Re-shaping Ground

    Ground as the only Mass

    TransitionTower on slopeStage 1 Stage 2

    Ease of Access/ Construction Program Necessity

    New Ground Plane Ground Plane ickening

    Mega PodiumStage 4Stage 3

    Typical Podium Towers15m Non-Domestic Podium Shifting Datum + Extra Concession

    15m

    p.d.

    15m

    p.d.

    (20m)

    Articial Ground Mass becomes BuildingArticial Ground Mass

    22

  • recreation

    recreation

    recreation

    recreation

    carparkcarpark

    carpark

    carpark

    carpark

    mega podiumtransitiontower on slopestage 4stage 3stage 1 stage 2

    1966 19801955

    new ground plane ground plane thickening

    typical podium towers

    Building (Planning) RegulationP.D. +15m non-domestic podium

    1984 Sino British Joint DeclarationLimit land sales < 50 Ha /year

    1997 List Policy replaces annual land sales

    Building OrdinancePlot Ratio & Site Coverage

    Building OrdinanceSetback line

    15m GFA concession shifting datum + extra concession

    roadroad

    road

    structure

    structure

    Flora Garden

    Hilltop Gardens

    Comfort Gardens

    Hillview Garden

    Leighton Hill

    e Legend

    Palm CourtTai Hong Court

    Broadview Terrace

    15m

    p.d.

    e Belchers

    program

    program

    program

    multiple discontinuous

    cut and ll

    cut and ll

    program

    multiple discontinuous

    multiple discontinuous

    single discontinuous

    single discontinuous

    single discontinuous

    single continuous

    single continuous

    single continuous

    build atop

    build atop

    recreationroadmultiple discontinuous

    build atop

    build atopbuild atop

    build atopcut and ll

    cut and ll

    15m

    p.d.

    (20m)

    Ground MassStage 5

    Articial Re-shaping Ground

    Ground as the only Mass

    Mega PodiumStage 4Stage 3

    Typical Podium Towers15m Non-Domestic Podium Shifting Datum + Extra Concession

    15m

    p.d.

    15m

    p.d.

    (20m)

    Articial Ground Mass becomes BuildingArticial Ground Mass

    Ground MassStage 5

    Articial Re-shaping Ground

    Ground as the only Mass

    23

    The plinth has developed from a ground plane to a building in itself with increasing mass and program content. While the building mass on top has been inert to the ground condition. Is it possible to imagine a scenario where the building as a whole is the plinth that reshape the ground and the space for habitation?

    Thickened Ground as the only building mass

  • 24

    Hilltop Gardens, 1990

    Broadview Terrace, 1977

    Hillview Garden, 1963

  • 25

    The Belchers, 2000

    Scale ComparisonThickened Ground

    Models @ 1: 500

  • Comfort GardensYear of Completion: 1974Site Area: 1,960m2Site Coverage: 85%

    Broadview TerraceYear of Completion: 1977Site Area: 3,060m2Site Coverage: 87%

    Palm CourtYear of Completion: 1964Site Area: 1,590m2Site Coverage: 96%

    Tai Hong CourtYear of Completion: 1969Site Area: 2,210m2Site Coverage: 88%

    Hillview GardensYear of Completion: 1963Site Area: 3,800m2Site Coverage: 60%

  • Comfort GardensYear of Completion: 1974Site Area: 1,960m2Site Coverage: 85%

    Broadview TerraceYear of Completion: 1977Site Area: 3,060m2Site Coverage: 87%

    Palm CourtYear of Completion: 1964Site Area: 1,590m2Site Coverage: 96%

    Tai Hong CourtYear of Completion: 1969Site Area: 2,210m2Site Coverage: 88%

    Hillview GardensYear of Completion: 1963Site Area: 3,800m2Site Coverage: 60%

    26

  • Leighton HillYear of Completion: 2000Site Area: 42,763m2Site Coverage: 33%

    Hilltop GardensYear of Completion: 1990Site Area: 5,540m2Site Coverage: 92%

    e BelchersYear of Completion: 2002Site Area: 31,890m2Site Coverage: 68%

    27

  • Leighton HillYear of Completion: 2000Site Area: 42,763m2Site Coverage: 33%

    Hilltop GardensYear of Completion: 1990Site Area: 5,540m2Site Coverage: 92%

    e BelchersYear of Completion: 2002Site Area: 31,890m2Site Coverage: 68%

  • Ho Man Tin Hill Road, Ho Man Tin

    30.9 m

    17.4 m

    +/- 13.5 mS

    L Tin Hau Temple Road, North Point

    93.9 m

    18.9 m

    +/- 75.0 m

    26.5 m

    28

  • M5.8 m

    62.2 m

    +/- 56.4 m

    20.4 m

    35.1 m

    53.3 m

    Hopewell Center Second Phase, North Point

    32.1 m

    21.3 m

    13.9 m

    18.0 m

    24.5 m

    8.2 m

    +/- 23.9 mL Hong Kong Observatory, Tsim Sha Tsui

    29

    SiteHopewell Center Second Phase is a Thickened Ground Phenomenon; a generic datum with huge level difference within the site

  • Schools and Sports Facilities1:4000

    School

    Swimming Pool

    Site

    Sportsground

    MTR

    Natural Slope

    30

  • Schools and Sports Facilities1:4000

    School

    Swimming Pool

    Site

    Sportsground

    MTR

    Natural Slope

    31

    Urban SlopeUrban SlopeThe site is located on a urban slope with secondary schools in its neighborhood. Frequent movement happens from the urban fabric to upon the slope. The site could act as a mediator in-between.

  • 10 m0

    +4.5 m

    +6.5 m

    To Kennedy Road

    Hopewell Centre

    To Kennedy Road

    To Kennedy Road

    Wu Chung House

    Queen

    s Road

    East

    QRE Plaza

    ickening Device:Footbridge+ 6.5 m

    32

  • 10 m0

    Ship Street

    Nan Koo Terrace+11.7 m

    ickening Device:Landll+ 11.7 m

    33

  • 10 m0

    Queens

    Road Ea

    st

    Kenned

    y Road

    Hopewell Centre

    +6.5 m

    3/F to 17/F+ 42 m

    ickening Device:Express Lift+ 48.5 m

    34

  • 10 m0

    Camelot Height

    +30.0 m

    ickening Device:Driveway Ramp+ 30.0 m

    35

  • 36

    Second Jury

    1. Synopsis of PresentationBuilding Plinth Analysis showing the physical, circulatory and programmatic composition

    A Chronological Study of Building Types together with development of building code was done. By shifting the principal datum with multiple developments in one site and non-domestic podium GFA exemption, the building plinth gains volume. Ground Thickening phenomenon is discovered.

    Several Sites of various scale has been chosen for the Project to test out the idea that Thickened Ground as the Building Mass

    Date: March 26th, 2012Panel Members: Debra Cheung, Tao Zhu

    2. Synopsis of Reviewers CommentsTZ: The current thickened ground separates the building mass and the ground program. Consider the alternative where the ground is dicided into fragments. How the notion of ground can still be conveyed.DC: The datum is where the project reference to.AL: A site like the Belchers should not be defined by one single datum but rather multiple datum. Since the datum is the underlying factor, if the datum definition is different the project should end up with a different massing. If the site is chopped off into lots they could have different datum but still remain as one site.

    3. ResponseThe method used to analyze the case study should be tested out on the site. How the ground is defined instead of having one generic datum has to be developed. Go on to look st how a site can be chopped off.

  • 37

    Site AnalysisSite AnalysisOperations to transform the generic datum to a site specific multiple datum subdivision

  • Specied Street

    Datum Shift!

    Building (Planning) Regulation s23(1)

    The mean level of the street or streets on which it fronts or abuts being a specified street or specified streets not less than 4.5m wide, or where the building abuts on specified streets not less than 4.5m wide having different levels, from the mean level of the lower or lowest of such streets, to the mean height of the roof over usable floor space in the building.

    e mean level of the street or streets on which it fronts or abuts being a specied street... a.k.a. Principal Datum

    P.D.

    0

    20

    40

    m60

    B.L. B.L.

    Datum Shift?Principal Datum - Building Code denition

    38

  • B.L.B.L.

    underground

    ickened GroundGeneric Datum

    Single Datum results in one gigantic building mass and disconnected topography. Program spaces are interiorized and disconnected from the GROUND. Datum is a device to elevate the building

    39

  • Site SubdivisionNew Datums for Individual Lots

    Consider the site divided into INDIVIDUAL LOTS for multiple developments, NEW DATUMS MUST SET UP for each development. e size of the site could be equivalent to 6 individual developments. Internal streets now become specied streets in determining the new datums.

    0

    20

    40

    m60

    Internal street becomes specied street

    40

  • Site SubdivisionNew Datums for Individual Lots

    Consider the site divided into INDIVIDUAL LOTS for multiple developments, NEW DATUMS MUST SET UP for each development. e size of the site could be equivalent to 6 individual developments. Internal streets now become specied streets in determining the new datums.

    0

    20

    40

    m60

    Internal street becomes specied street

    41

  • +43.0 m

    +25.0 m

    Existing Path as Continuous Datum(leading to Nam Koo Terrace)

    Existing Grounds as DatumsPreserved Topography

    Remaining Plinth of Pre WWII houses

    ere are EXISTING GROUNDS where people perceive as absolute reference for existing/demolished buildings. Open grounds of public access prove itself a DATUM for reference

    a reference point, surface, or axis on an object for the measurement of heights and depths. -Oxford Dictionary

    42

  • Sau Wa Fong

    Queens Road EastShip Street

    Pedestrian (Existing)

    Lot Boundary

    New Datum

    New Datum shifted

    Pedestrian (Proposed)

    Vehicular (Existing)

    Vehicular (Proposed)

    Kennedy RoadSecondary School

    To preserve the historic footprint, the datum shifts to conform the existing topography

    Conforming TopographyDatum Shift

    43

  • Pedestrian (Existing)

    Pedestrian (Proposed)

    Vehicular (Existing)

    Vehicular (Proposed)

    Hopewell CentreShopping Mall

    Kennedy Road Kennedy Road

    Sau Wa Fong

    Queens Road EastShip Street Kennedy Road

    Secondary School

    Existing/Possible access to SiteBasis for New Ground

    44

  • Hopewell CentreShopping Mall

    Kennedy Road

    Queens Road EastShip Street

    Pedestrian (Existing)

    Lot Boundary

    New Datum

    New Datum shifted

    Pedestrian (Proposed)

    Vehicular (Existing)

    Vehicular (Proposed)

    Kennedy RoadSecondary School

    e Datum shifts to the level where access is provided

    Conforming AccessDatum Shift

    45

  • Hopewell CentreShopping Mall

    Kennedy Road Kennedy Road

    Sau Wa Fong

    Queens Road EastShip Street

    Pedestrian (Existing)

    Lot Boundary

    Preserved Topography

    New Datum

    Pedestrian (Proposed)

    Vehicular (Existing)

    Vehicular (Proposed)

    Kennedy RoadSecondary School

    SuperimpositionForming the NEW GROUND

    46

  • B.L. B.L.

    Existing Plinth

    Access at boundary

    ickened Ground OtherwiseMultiple Datum

    Building Mass Negotiating Level DierencesBuilding Mass as ickened Ground

    47

  • 48

  • 49

    MethodSite Subdivision

    From One Generic Datum to Multiple Specific Datum

    Models @ 1:500

  • Kennedy Road

    B.L.B.L. B.L.

    Hopewell Centre Shopping Mall

    CommericalCondominium

    Art and CultureCommercial

    Shopping

    C

    M

    Y

    CM

    MY

    CY

    CMY

    K

    unfold section final.ai 2 1/6/2012 0:34:27

    Unfolded Journey

    Ship Street

    B.L. B.L. B.L.

    Art and Culture ParkHotel

    Art and CultureSports

    Sau Wa Fong

    0 10 20 50 m

    B.L.

    C

    M

    Y

    CM

    MY

    CY

    CMY

    K

    unfold section final.ai 3 1/6/2012 0:35:22

  • Kennedy Road

    B.L.B.L. B.L.

    Hopewell Centre Shopping Mall

    CommericalCondominium

    Art and CultureCommercial

    Shopping

    C

    M

    Y

    CM

    MY

    CY

    CMY

    K

    unfold section final.ai 2 1/6/2012 0:34:27

    Unfolded Journey

    Ship Street

    B.L. B.L. B.L.

    Art and Culture ParkHotel

    Art and CultureSports

    Sau Wa Fong

    0 10 20 50 m

    B.L.

    C

    M

    Y

    CM

    MY

    CY

    CMY

    K

    unfold section final.ai 3 1/6/2012 0:35:22

    50

  • Unfolded Journey

    Ship Street

    B.L. B.L. B.L.

    Art and Culture ParkHotel

    Art and CultureSports

    Sau Wa Fong

    0 10 20 50 m

    B.L.

    C

    M

    Y

    CM

    MY

    CY

    CMY

    K

    unfold section final.ai 3 1/6/2012 0:35:22

    51

  • Unfolded Journey

    Ship Street

    B.L. B.L. B.L.

    Art and Culture ParkHotel

    Art and CultureSports

    Sau Wa Fong

    0 10 20 50 m

    B.L.

    C

    M

    Y

    CM

    MY

    CY

    CMY

    K

    unfold section final.ai 3 1/6/2012 0:35:22

  • Commercial

    Site Coverage

    Total

    Outdoor Programme

    Hotel

    Park

    +

    Car Park

    50.6 %

    Commercial

    Site Coverage

    101,667 m2Total

    Outdoor Programme

    Hotel

    Park

    +

    Car Park

    Commercial

    Site Coverage

    Total

    Outdoor Programme

    Hotel

    Park

    +

    Car Park

    52

  • Commercial

    Site Coverage

    Total

    Outdoor Programme

    Hotel

    Park

    +

    Car Park

    Basketball

    Amphitheatre

    Street Market

    X GameHiking TrailRock Climbing

    BackpackerHostel

    BoutiqueHotel

    Commercial

    Hotel

    Residential

    Art & Culture

    Car Park

    Sports

    Swimming poolGym

    Site Coverage

    Total

    Outdoor Programme

    Outdoor Programme

    OceRetailDining

    +

    CondominiumServiced Apartment

    AuditoriumStudio

    50.6 %

    Basketball

    Amphitheatre

    Street Market

    X GameHiking TrailRock Climbing

    BackpackerHostel

    BoutiqueHotel

    Commercial

    Hotel

    Residential

    Art & Culture

    Car Park

    Sports

    Swimming poolGym

    Site Coverage

    101,667 m2Total

    Outdoor Programme

    OceRetailDining

    +

    CondominiumServiced Apartment

    AuditoriumStudio

    53

  • Lot 01

    Shopping Mall Access

    Status QuoSingle Datum

    InterventionMultiple Datum

    Lot 02Existing Plinth

    Lot 03Kennedy Road

    Lot 04Existing Plinth

    Lot 05HistoricNeighborhood

    Lot 06LocalNeighborhood

    0

    220 m

    Original ProposalSingle Datum

    Re-GroundingMultiple Datum

    105

    Queens Road East

    Kennedy Road

    Sau Wa Fong

    HopewellShopping Mall

    HopewellOce

    Site SubdivisionMultiple Ground

    +105.0 m

    +25.0 m

    +56.0 m

    +20.4 m

    +10.4 m

    +43.0 m

    +13.0 m

    54

  • Lot 01

    Shopping Mall Access

    Status QuoSingle Datum

    InterventionMultiple Datum

    Lot 02Existing Plinth

    Lot 03Kennedy Road

    Lot 04Existing Plinth

    Lot 05HistoricNeighborhood

    Lot 06LocalNeighborhood

    0

    220 m

    Original ProposalSingle Datum

    Re-GroundingMultiple Datum

    105

    Queens Road East

    Kennedy Road

    Sau Wa Fong

    HopewellShopping Mall

    HopewellOce

    Site SubdivisionMultiple Ground

    +105.0 m

    +25.0 m

    +56.0 m

    +20.4 m

    +10.4 m

    +43.0 m

    +13.0 m

    55

  • +25.0

    +43.0

    +55.2

    +54.3

    +54.8

    +56.0

    +43.08

    9

    10

    11

    12

    13

    14

    14

    14

    15

    16

    13

    13

    13

    7

    +56.0

    +51.5

    +47.5

    +46.0

    +42.0

    +42.0

    +42.01 Queens Road Dropoff2 Auditorium3 Carparl4 Shopping Mall5 Hostel Lobby6 Street Market7 Plaza8 Cafe9 Amphitheatre10 Office Lobby11 Roof Garden12 Sky Bridge13 Backpackers Hostel14 Gallery Deck15 Basketball Court16 Upper Dropoff17 Kennedy Road Entrance

    0 10 20 50 m

    C M Y CM

    MY

    CY

    CMY

    K

    plan upper lines.pdf 1 31/5/2012 15:00:08

    56

  • +25.0

    +43.0

    +55.2

    +54.3

    +54.8

    +56.0

    +43.08

    9

    10

    11

    12

    13

    14

    14

    14

    15

    16

    13

    13

    13

    7

    +56.0

    +51.5

    +47.5

    +46.0

    +42.0

    +42.0

    +42.01 Queens Road Dropoff2 Auditorium3 Carparl4 Shopping Mall5 Hostel Lobby6 Street Market7 Plaza8 Cafe9 Amphitheatre10 Office Lobby11 Roof Garden12 Sky Bridge13 Backpackers Hostel14 Gallery Deck15 Basketball Court16 Upper Dropoff17 Kennedy Road Entrance

    0 10 20 50 m

    C M Y CM

    MY

    CY

    CMY

    K

    plan upper lines.pdf 1 31/5/2012 15:00:08

    57

  • 58

  • 59

  • 60

  • 61

  • 62

  • 63

  • 64

  • 65

  • 66

    Massing Model @ 1: 500Study Model @ 1: 500

    Case Study Model @ 1: 500

  • 67

    Final Jury Presentation

    Sectional Model @ 1: 200

    Massing Model @ 1: 500

  • 68

  • 69

    Sectional Model @ 1:200

  • 70

    Juxtaposition: Vehicular Ramp/ Shopping Mall Roof @ 1:200

  • 71

    Multiple Ground @ 1:200

    Amphitheatre +43.0m @ 1:200

  • 72

    Current Proposal @ 1:500

    Thickened Ground @ 1:500

    Existing Topography @ 1:500

  • 73

  • 74

    Major Circulation @ 1:500

  • 75

  • 76

    1. Synopsis of PresentationOver the time the artificial ground has been thickened by means of code and injecting optional program. There is a shift from applying building code for practical concern to manipulation to achieve a building mass which shows more economic greed than architectural concern. The ever-shifting datum continuously disengages itself from the idea of ground.

    The interpretation (manipulation) of building code is vital in defining the relationship between ground and building mass. This project aims to methodically interpret datum as physical manifestation.

    Given its size and its hilly topography the site should notbe treated with one generic datum. A research of existing conditions in defining datums and ways to reinterpret them systematically has to be done.

    Date: May 16th, 2012Panel Members: Beisi Jia, Eunice Seng

    2. Synopsis of Reviewers CommentsES: The method of subdividing the site has to be highlight in the presentation.ES: Representation of a comparison of the existing proposal is missing. BSJ: Site analysis is missing. Massing relationship is not visibleAL: 1:200 physical model is helpful for critics to understand how the ground is redefined by the datum subdivision.

    3. ResponseThe benefit of subdividing the site has to be shown through a comparative analysis. Original proposal has to be shown but not too dominant. Site Analysis has to be clearer.

    Third Jury

  • 77

    Date: June 6th, 2012Panel Members: Beisi Jia, Eunice Seng, Aaron Tan , Juan Du

    1. Synopsis of PresentationOver the time the artificial ground has been thickened by means of code and injecting optional program. There is a shift from applying building code for practical concern to manipulation to achieve a building mass which shows more economic greed than architectural concern. The ever-shifting datum continuously disengages itself from the idea of ground.

    The interpretation (manipulation) of building code is vital in defining the relationship between ground and building mass. The site is divided into 6 lots with its datum defined according to the existing datums, access points to the site.

    If this attempt of Thickened Ground set up an example, it is anticipated that the future development on urban slopes will include even larger sites, but broken down into small lots of individual datums.

    2. Synopsis of Reviewers CommentsAT: Value the way to use the slope differently. The shortcoming of the current proposal is the traffic load it brings. The thesis project seeks a compromise which the current proposal is looking for. It creates more public space with the same density.ES: The economic value needs to be addressed as a counter argument to the status quo. The architectural aspect has to be addressed for this new typology.JD: The government, the developer and the user. What each of these party is getting. While more public space is provided, the elongated main circulation is creating more business opportunities.BSJ: Wonder the value of leaning the towerAL: Construction cost-wise the project is defnitely more expensive than the current proposal, while the profit it returns may overcome the current.

    3. ResponseIt is important to present the conflicts for the original development of the status quo to reinforce my project as an alternative.

    Final Jury

  • Acknowledgements

    is esis Project could not be done without the help of:Chen Lok YanLam Pok Yin Je reyChan Wang FungAmanda Ho

    I would like to give thanks to Professor Anderson Lee, my thesis advisor, for given me persistent support and clear guidance along the way.

    I owe my greatest thanks to my parents who have given me freedom and support to strive for my goals.

    Ken Fung

    Iris Lau

    Tommy Gunawan

    Je rey Lam Ian

    Chan

    Chen Lok Yan

    RonaldKam

    Denise Lau

    Chan Wang Fung

    Howell Tsang

    KinKin Cheung

    ARCHOI

    Acknowledgements

    is esis Project could not be done without the help of:Chen Lok YanLam Pok Yin Je reyChan Wang FungAmanda Ho

    I would like to give thanks to Professor Anderson Lee, my thesis advisor, for given me persistent support and clear guidance along the way.

    I owe my greatest thanks to my parents who have given me freedom and support to strive for my goals.

    Ken Fung

    Iris Lau

    Tommy Gunawan

    Je rey Lam Ian

    Chan

    Chen Lok Yan

    RonaldKam

    Denise Lau

    Chan Wang Fung

    Howell Tsang

    KinKin Cheung

    ARCHOI

    78

  • Acknowledgements

    is esis Project could not be done without the help of:Chen Lok YanLam Pok Yin Je reyChan Wang FungAmanda Ho

    I would like to give thanks to Professor Anderson Lee, my thesis advisor, for given me persistent support and clear guidance along the way.

    I owe my greatest thanks to my parents who have given me freedom and support to strive for my goals.

    Ken Fung

    Iris Lau

    Tommy Gunawan

    Je rey Lam Ian

    Chan

    Chen Lok Yan

    RonaldKam

    Denise Lau

    Chan Wang Fung

    Howell Tsang

    KinKin Cheung

    ARCHOI

    79

    BibliogrpahyWillis, Carol. Form Follows Finance. New York: Princeton Architectural Press, 1995

    Vassigh, Shahin. Building systems integration for enhanced environmental performance. FL: J.Ross Publication, 2011

    Gauld, Bryan J.B.. Structures for architects. Harlow, Essex: Longamn Scientific & Technical, 1995

    Leatherbarrow, David. Uncommon groundL architecture, technology and topography. MIT Press, 2000

    The function of the oblique: the architecture of Claude Parent and Paul Virilio, 1963-1969. LondonL AA Publications, 1996

    Allen, Stan and McQuade, Marc. Landfrom building: architectures new terrain. Princeton University School of Architecture, 2011

    Poon, Alice. Land and the ruling class i Hong Kong. Richmond, BC: A.Poon, 2005