The ELDAS system implementation and The ELDAS system implementation and output production at Météo-France output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS ELDAS 2nd progress meetin 2nd progress meeting – INM – INM Madrid Madrid 10-11 december 2003 10-11 december 2003 T 2m t

Upload: suzanna-lloyd

Post on 12-Jan-2016

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

The ELDAS system implementation and output The ELDAS system implementation and output production at Météo-Franceproduction at Météo-France

Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHANGianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN

ELDAS ELDAS 2nd progress meetin2nd progress meeting – INM– INM MadridMadrid 10-11 december 200310-11 december 2003

T2m

t

Page 2: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Plan of the presentationPlan of the presentation

• ELDAS at Météo-FranceELDAS at Météo-France• The implementation of the system

– The NWP model (ARPEGE)– The coupling to atmosphere (Blending)– The data Assimilation technique (Simplified 2D-VAR)

• VALIDATION OF ECOCLIMAP & 2D-VARVALIDATION OF ECOCLIMAP & 2D-VAR• May-June 2003• Comparison of ALADIN and ARPEGE on June 2000• 2000/2003 comparison SWI and NDVI anomaly

• ELDAS EXPERIMENTSELDAS EXPERIMENTS• May-June 2000 without precipitation forcings

– ELDAS FORCINGSELDAS FORCINGS• Use of precipitation forcing• May-June 2000 with precipitation forcings

Page 3: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Variational surface analysisVariational surface analysisMahfouf (1991), Callies et al. (1998), Rhodin et al. (1999),Bouyssel et al. (2000), Hess (2001), Balsamo et al. (2003)

Formalism:

x is the control variables vectory is the observation vectorH is the observation operator

Continuous analysis

T2m

t

Wp

t

RH2m

t

6-h 12-h 18-h 0-h

The analysis is obtained by the minimization of the cost function J(x)

B is the background error covariance matrix

R is the observation error covariance matrix

= ½ (x – xb) T B-1 (x – xb) + ½(y – H(x))T R-1 (y – H(x))

J(x) = J b(x) + J o(x)

Advantages: Easier assim. asynop. obs.Extension on longer assim. Window (24-h)

Page 4: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

ARPEGE: Global spectral stretched model20 to 200 km, 41 levels (1 hPa) , 6h assimilation cycle for Surface VariablesAtmospheric Blending (to avoid full re-analysis)

The NWP model and the ELDAS resolutionThe NWP model and the ELDAS resolution

Cycle 25t1_op3

Operational version of May 2003

(stretching factor 3.5 )

Page 5: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

+6hfcst +6hfcst +6hfcst+6hfcstNew T2m, Rh2m, Ts, Tp, Ws

New Wp

The atmospheric couplingThe atmospheric coupling

• The atmospheric state is not re-analysed but a « Blending » technique is used to save atmospheric feedback of new land surface state

The land surface analysisThe land surface analysis

Page 6: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

The atmospheric couplingThe atmospheric coupling

Restore Restore BlendingBlending

« + »« + »+6hfcst

Archive Atmospheric

Analyse

Atmospheric

guess

New Land Surface Analysis

New Land SurfaceAnalysis

Atmosphericguess

Archive Atmospheric

Analyse

New Land SurfaceAnalysis

Page 7: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Plan of the presentationPlan of the presentation

• ELDAS at Météo-FranceELDAS at Météo-France• The implementation of the system

– The NWP model (ARPEGE)– The coupling to atmosphere (Blending)– The data Assimilation technique (Simplified 2D-VAR)

• VALIDATION OF ECOCLIMAP & 2D-VARVALIDATION OF ECOCLIMAP & 2D-VAR• May-June 2003• Comparison of ALADIN and ARPEGE on June 2000• 2000/2003 comparison SWI and NDVI anomaly

• ELDAS EXPERIMENTSELDAS EXPERIMENTS• May-June 2000 without precipitation forcings

– ELDAS FORCINGSELDAS FORCINGS• Use of precipitation forcing• May-June 2000 with precipitation forcings

Page 8: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Improved Improved OI OI for Wpfor Wp

OpeOperational Physiographyrational Physiography

Improved Improved OIOI for Wp for Wp

EcoEcoclimap Physiographyclimap Physiography

Simplified Simplified 2D-VAR2D-VAR for Wp for Wp

OpeOperational Physiographyrational Physiography

Simplified Simplified 2D-VAR2D-VAR for Wp for Wp

EcoEcoclimap Physiographyclimap Physiography

The experimental frameThe experimental frame

Page 9: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM
Page 10: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM
Page 11: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

1 month score evolution (1 month score evolution (T2m RH2m RMSE(P6-A))T2m RH2m RMSE(P6-A))

Page 12: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Using Backscattering Coefficient of TRMM Precipitation Radar

Seto et al. 2003 (submitted to J. of Geo. Res.)

Comparison of large scale soil moisture with satellite Comparison of large scale soil moisture with satellite derived soil moisture (TRMM) derived soil moisture (TRMM)

Page 13: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Plan of the presentationPlan of the presentation

• ELDAS at Météo-FranceELDAS at Météo-France• The implementation of the system

– The NWP model (ARPEGE)– The coupling to atmosphere (Blending)– The data Assimilation technique (Simplified 2D-VAR)

• VALIDATION OF ECOCLIMAP & 2D-VARVALIDATION OF ECOCLIMAP & 2D-VAR• May-June 2003• Comparison of ALADIN and ARPEGE on June 2000• 2000/2003 comparison SWI and NDVI anomaly

• ELDAS EXPERIMENTSELDAS EXPERIMENTS• May-June 2000 without precipitation forcings

– ELDAS FORCINGSELDAS FORCINGS• Use of precipitation forcing• May-June 2000 with precipitation forcings

Page 14: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Consistency of results over June 2000: I) ALADINConsistency of results over June 2000: I) ALADIN

Habets et al. (2003)Balsamo et al. (2003)

The results obtained with a 2D-VAR assimilation cycle within ALADIN LAM model provided a more realistic soil moisture field compared to the hydrological coupled model, SAFRAN-ISBA-MODCOU (forced by Prec., Rad.)

Page 15: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Consistency of results over June 2000: II) ARPEGEConsistency of results over June 2000: II) ARPEGE

Habets et al. (2003)

The same comparison is produced for the ELDAS soil moisture obtained with the ARPEGE model. An improved

ELDAS cycle (no precipitation)

Page 16: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

June July

(CNES, 2003) Images SPOT/VEGETATION

Variation of NDVI 2003 within respect to 2002

+positive Index 2003/2002 +negative

Variation of SWI at 30 June 2003 compared to 30 June 2000 (ELDAS)

On the 30 June 2003 (exp. 2D-Var + Ecoclimap (Masson et al. 2003))

Drought of summer 2003: Comparison of soil moisture Drought of summer 2003: Comparison of soil moisture and NDVI anomalyand NDVI anomaly

Page 17: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Comparison of large scale soil moisture variation and Comparison of large scale soil moisture variation and NDVI anomalies over AfricaNDVI anomalies over Africa

Variation of SWI at 30 June 2003 compared to 30 June 2000 (ELDAS)

Page 18: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

+6hfcst +6hfcst +6hfcst+6hfcstNew T2m, Rh2m,

Ts, Tp, Ws

New Wp

• In order to fully benefit of the 2D-VAR analysis and the Precipitation

readjustment the two steps are applied sequentially

The 2D-VAR cycle and the Precipitation readjustmentThe 2D-VAR cycle and the Precipitation readjustment

00UTC 06UTC 12UTC 18UTC 00UTC 06UTC00UTC 06UTC 12UTC 18UTC 00UTC 06UTC

Calculation of the 24-h ARPEGE accumulated precipitation and innovation

Page 19: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Usage of ELDAS Precipitation forcings: I stepUsage of ELDAS Precipitation forcings: I step

Wpa - Wp

fWpP24-h P24-hCan we set a coefficient as

Page 20: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

ObservationObservation GuessGuess

ObsObs--GuessGuess

Usage of ELDAS Precipitation forcings: II stepUsage of ELDAS Precipitation forcings: II step

Page 21: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Usage of ELDAS Precipitation forcings: III stepUsage of ELDAS Precipitation forcings: III step

the two cycles without and with Precipitation readjustment are compared

Page 22: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Interpolation to final ELDAS gridInterpolation to final ELDAS grid

the nearest point has been used for MF/INM interpolation and it is planned to be used also for the final production since it avoids post processing and save self consistency of surface fields.

Page 23: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

ConclusionsConclusions

Validation of simplified 2D-Var and ECOCLIMAP database for the summer 2003 with the ARPEGE GCM model

Comparison with results previously obtained with ALADIN-France over Europe.

Production (advance phase) of ELDAS output without and with precipitation forcing

Local archive at 1-h rate and preparation of interpolation/grib procedure for MARS archive.

Page 24: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

Phase IPhase I

2D-VAR soil moisture analysis

on a 24-h window

24-h forecast Arpege GCM

Atmospheric Restore

to the analysis

Surface Update of the new 2D-VAR land

surface variable

Page 25: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

2D-VAR soil moisture analysis

on a 24-h window

24-h forecast Arpege GCM

Atmospheric Restore

(or Blending)

Surface Update of the new 2D-VAR land

surface variable

Phase IIPhase II

Precipitation Obs. forcing

To doTo do Grib and Archiveon MARS

Page 26: The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM

2D-VAR land surface analysis

on a 24-h window

24-h forecast Arpege GCM

Surface Update of the new 2D-VAR land

surface variable(s)

PerspectivPerspectiveses

Rad. Prec Obs. forcing

Heating rates Assimilation

B matrix Update

Atmospheric Restore

(or Blending)

? ?

? ?