pacific partnership 2012
DESCRIPTION
PACIFIC PARTNERSHIP 2012. 16 NOV 11 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 State Dept – Mr. Weinz PACOM USARPAC USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka. C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR - PowerPoint PPT PresentationTRANSCRIPT
PACIFIC PARTNERSHIP 2012
This brief is classified:UNCLASSIFIED
16 NOV 11OPT Brief
2
UNCLASSIFIED
UNCLASSIFIED
Roll Call
• CDS-7• State Dept – Mr. Weinz• PACOM• USARPAC• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka
• C7F• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• HSC-23• MCAST
RED: Normal participants not expected to attend VTC due to scheduling conflict.
3
UNCLASSIFIED
UNCLASSIFIED
PP 12 Weekly Planning Rhythm
Thurs Fri SatSun
1300-1500W OPT VTC
1000W read ahead slides
posted to APAN
0900W CA WG
1300W LOG WG
1200W MED WG
1300W FP WG Every other week
Mon Tues Wed
1000W COMMS WG
1430W Comm Integration WG
CPF N3
Semi-Monthly Update
1200W ENG WG
4
UNCLASSIFIED
UNCLASSIFIED
SEP
OCT
NOV
DEC
JAN
FEB MAR
APR
MAY
JUN
JUL AUG
Mission Planning/CONOPS (CPF)
Meetings/Conferences (CPF/CDS)
Force Sourcing (CPFN3)
Interagency Coord (CPF N5)
NGO Coordination (CPF N5)
Partner Nations (CPF N5/C7F)
Transit Plan (CPF/CDS)
Funding/Authorizations (CPF)
Communications (CPF N6)
Assessment (CPF MAG)
Detailed CONOPS (CDS)
PDSS/Advanced Echelon (CDS)
Deployment (CDS)
Planning Timeline
PDSS Advanced Echelon
Deployment
MOU Letters Signed
PN Invitation letters
Assessment plan
PLANORD EXORD
Requirements Systems
Final
FSLO Letter
CPF RFF
Mid Planning Conference
Initial Planning Conference
Initial
5
UNCLASSIFIED
UNCLASSIFIED
ADF Planning Status
General Planning• CJOPS Decision Brief for PP12 signed
Command
Engineering• Two (2) ADF engineers authorized to participate in Indonesia PDSS.• Authorization to lead as FIE for Indonesia mission still to come from
IPDIV.
Medical • ADF Health manning to PP12 planning under way
No Change
6
UNCLASSIFIED
UNCLASSIFIED
ADF Participation
Australia
• Command Element
• Engineering Section
• Medical Personnel contribution of 15 – 20 pers in each contingent
Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines
Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion
of mission in Cambodia
Health manning TBC in late November
HQJOC Health PP12 POC:CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) [email protected]
MAJ Dominic Wade (SO2 Joint Ex Hlth Plans) [email protected] (until 2 Dec 11)
No Change
7
UNCLASSIFIED
UNCLASSIFIED
PP12 RFI Tracker
Number Status Date Req Responsible
Question Other
ADF-001 Open 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary
ADF-002 Open 11 Nov 11 PACFLT Status of Partner Nation invitation letter
No Change
8
UNCLASSIFIED
UNCLASSIFIED
JSDF Planning Status
• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities - Decision after completion of
PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130 or KC-767× 1)
Medical team - Aproximately 20~30
No Change
9
UNCLASSIFIED
UNCLASSIFIED
JSDF Planning Status
• PDSS - 5 persons / each country Philippine and Vietnam Planners - MED, Ship visit, and others
• Humanitarian community in Japan - Not yet access
• POC LCDR Haga [email protected] DSN:224-7714 or
7723
No Change
10
UNCLASSIFIED
UNCLASSIFIED
JSDF Planning Status
Number Status date WG Requests/Questions Comments
JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam
Request Vietnam itinerary
No Change
11
UNCLASSIFIED
UNCLASSIFIED
NZDF Planning Status
- Decision brief has been prepared for COMD Joint Forces New Zealand based on FST deployment to Vietnam 10 – 24 Jul 12.
No Change
12
UNCLASSIFIED
UNCLASSIFIED
CPF FOPS Update
71 Unsourced Billets
- Sourcing issues is currently being discussed at O-6 level. Expect to be elevate to Flag level within the next couple of weeks.
EST Sourcing
- Received requirements from FPWG. - Working on timeline to acquire or source through
alternate means (C7F FAST, MSRON-3).
MPC Request- 16NOV: Memo to N5 for signature on request.- 18NOV: N00 approval to conduct MPC.
13
Medical Update
• Medical WG Telcon held Tuesday, 16 Nov 2011, 1200 hrs
• All medical team members on PDSS Gold Team identified; working on completing travel requirements for the veterinarian
• Working out details for the medical assessment plan
- Funding, team composition, dates, etc.
14
UNCLASSIFIED
UNCLASSIFIED
Engineering Update
Engineering Working Group conducted telecon 14 Nov
PDSS teams- tracking, no issues
Philippines SMEE: Seawall construction (Dr. Lin selected as SMEE).
Philippines Site Survey: Projects Recommended: 3 schools & 1 medical clinic.
Australian Defence Force approval is approximately 90% complete. - 2 individuals identified for Indonesia site survey team - ADF determination of FIE will follow site survey report
Philippine Project Package preparation (ACB1 lead- BUC Sarmiento)
Completed On-track Off-Track/Recoverable Off-Track not recoverable
15
UNCLASSIFIED
UNCLASSIFIED
Logistics Update
• PDSS: PDSS logistic team investigating potential life support options.
Joined Engineering team and medical teams for site surveys.
Conducted site visit to Sihanoukville commercial port and pier to review support options.
• Mission Supplies:
Initial APRI funding now available
All veterinary supplies will be purchased and loaded in Hawaii. FLC Yokosuka will provide USNS Mercy Supply HSP contracts for
each mission country
16
Civil Affairs Working Group Summary
Week of 14 November:
Definition of CJ-CMIC positions, processes, business rules and products
Validation of the effects, MOEs, Tasks, MOPs that will dovetail into our broader assessment plan
Awaiting specialty requests for desired NGO capacities
16
17 17 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
IT & Radio Operator Manning
CPF N3/ CDS /
01DEC11 - CPF N3 Global Force Manager FORAC: Each MEDCAP = 2-IT (HERS), 1-JCSE IEP (TBD).4 MEDCAPS maximum (8 ITs, 4 IEP).
Annex K / COMM Plan
CPF N6/C7F/ C3F/CDS
PRE-MPC
- IAW NTTP 3-57 Navy HCA OPS-Based on PN/HN COMM interoperability assessments and simultaneous missions.-OPTASK COMMS required.
BGAN SATCOM
CPF N6/CDS PRE-MPC
- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (JAN12).- Develop CONOPS for BGAN use.
Host Nation Spectrum Mgt
C7F N6 /CDS PRE-MPC
-Determine frequency restrictions for each host nation.
PP12 CIS Information Systems Status(16NOV11)
18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
PAO Network CPF PAO/N6/ CDS/MERCY
PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO determine if available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. Verifying current IATO cert.
PN-NGO Business Center(SSC LANT CHARLESTON)
CPF N6 / CDS/MERCY
APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. Determine coat/SOW.- CDS procure printer consumables for entire mission.-IA/business rules provided CDS-7 N6 03NOV11.
Partner Nation Interoperability
CPF N6 / CDS
POST-MPC
-Verify Partner Nation (PN) CIS POCs.-Verify APAN accounts for all PN CIS WG team members.-PN CIS capability review.-Develop CIS Interoperability Matrix in Annex K.
HumanitarianElectronic Record System (HERS)
CIS WG/CDS N6
TBD -Mission funded by MARFORPAC Experimental Center (MEC)-PDSS Automated Data Collection training complete 21OCT11 at CPF. ADC capability deploying w/ PDSS.
PP12 CIS Information Systems Status(16NOV11)
19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
Remote MED-DENCAP /CC Comms Arch
CDS / CPF/ JCSE
TBD -UHF data and voice SATCOM/LOS Comms for CAP to air/ship.-JCSE IEP dynamic solution approval in progress.
Host Nation MIL C4
PDSS OIC
PDSS -PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.
Host NationCIVIL Comms
PDSS OIC
PDSS -PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.
Remote Site US Mission CISAssessment
PDSS OIC/AOIC
PDSS -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.-Command Center (CC) Comms assessment.-Training provided to Blue Team 21OCT11.
PDSS CISComms
CPF/ CDS PDSS OICs
PRE-PDSS
-Iridium Phones: CPF N6 issued phone to Blue OIC.-In country cell phones: MERCY to provide from PP10 mission phones.-Automated Data Collection (8 cell phones app) issued to Blue OIC.
PP12 CIS Information Systems Status(16NOV11)
20 20 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
Knowledge Management /Data Protection
CDS/MERCY
TBD -MEDCAP/CDS/Mission Data storage and protection
Command Center Ashore CIS
CDS PDSS -Identify configuration and location in each country.
IT SMEERequests
CDS PDSS -PDSS determine scope (SYSADMIN, repair, training, etc.).
SATCOM Requests
C3F/C7F/CDS
FEB12 -Standard USN process.
MERCY COMMs Suite Groom
CDS /MERCY
APR12 -Determine groom requirements
PP12 CIS Information Systems Status(16NOV11)
21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
FSET on MERCY
CPF /MSC
TBD - Field Service Engineering Team (FSET) rqmt determination by CDS-7 pending-Funding transfer to SPAWAR TBD
End of Mission CIS Exit Plan
CPF/CDS
TBD -Transfer custody of loaned CIS items back to CPF
PP12 CIS Information Systems Status(16NOV11)
22
UNCLASSIFIED
UNCLASSIFIED
Force Protection Update
• Manning for Security Forces submitted to CPF FOPS for GFM
• Multinational Force Pro Conference Call: 22 Nov, 1300 HST
• PDSS Pre-Travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B
23
UNCLASSIFIED
UNCLASSIFIED
Public Affairs Update
- Admin• CAPT Breslau PAO Visit to DESRON
♦ 01-02 DEC (tentative)
• Pacific Partnership Certificates
- Media Coordination• MSC coordination w/ CIWG• NAVCO Navy Week – PP12 static display
24
UNCLASSIFIED
UNCLASSIFIED
PP12 Communication Integration• Initial Stakeholder analysis
– Briefing will be provided to Commodore Morgan early Dec• Information environment product development continues
– Cambodia will be the first product completed• 10 NOV CIWG OPT conducted via SIPR DCO
– AMEMB RP providing detailed media landscape
product for Calbayog City– Coordinating with AMEMB/PAT Cambodia on info
environment specifics– Call with AMEMB Indonesia PA team schedule for 29 NOV
• 17 NOV CIWG OPT:– Review upcoming events for CIWG support– Identify potential situations requiring pre-planned responses
We don’t tell the PP12 story – we enable HN, PN and NGO telling of the story
25
PP12 Communication Integration
25 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
Stakeholder Analysis
CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.
Characterize Information Environment
CPF N2/N39
15 NOV – 30 JAN
-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 80%, Indonesia 75%, Vietnam 25%, Philippines 0%.
Communication Strategy/ Implementation Plan
CPF N2/N39
15 DEC - This product will detail integrated approach for internal, external messaging.
Identify/Coordinate key messaging events
CIWG 15 JAN - Not started.
Develop messaging products
CIWG/ CPF N2/N39, PA
15 APR - Not started.
27
UNCLASSIFIED
UNCLASSIFIED
Mission Commander Priorities
• PDSS Blue– Cambodia site survey (in progress)– Philippines site survey after action report/WAY FORWARD/Timeline– Post PDSS:
• Data collection / organization• Country CONOPS preparation (shell NLT MPC)
• PDSS Gold– Final PDSS preparations @ PACFLT
• Roadshow generation• Indonesia / Vietnam scheme of maneuver
– FINAL: Vietnam PDSS composition (12 personnel)• Second Mate Bell (MSC HQ Priority/Mitigation Plan)
• Mid Planning Conference Planning and Execution– MPC (30-31JAN) – approval request status?; (T) Location is ADM Kidd
Conf Center (deadline to confirm reservation is 18 Nov 11)• Mission Training
– PA/Integrated communications training (TBD)– Cultural awareness training (TBD)– 09-13JAN (tentative) NEC Navy Staff Planning Course of Instruction– 13-14MAR (tentative) Mission rehearsal
28
UNCLASSIFIED
UNCLASSIFIED
Mission Commander Priorities (continued)
• Senior Leader Visits– 06-26FEB – Philippines, Cambodia, Vietnam, Indonesia– RFI: Names/titles of leaders– RFI: Talking points (alignment with DOS?)
• CDS7 Meetings– CAPT Breslau (TBD)– Project Handclasp (09DEC)
• Mission Execution Concerns– C2
• Task organization (OPCON/TACON)
– Force Protection• EST status
– Comms• Access
29
UNCLASSIFIED
UNCLASSIFIED
Closing Questions/Comments
• CPF Staff• State Dept – Mr. Weinz• PACOM• USARPAC• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka
• C7F• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• HSC-23• MCAST• CDS-7