pacific partnership 2012 this brief is classified: unclassified 01 nov 11 opt brief

28
PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

Upload: franklin-hudson

Post on 27-Dec-2015

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

PACIFIC PARTNERSHIP 2012

This brief is classified:UNCLASSIFIED

01 NOV 11OPT Brief

Page 2: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

2

UNCLASSIFIED

UNCLASSIFIED

Roll Call

• CDS-7• State Dept – Mr. Weinz• PACOM• USARPAC• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka

• C7F• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• HSC-23• MCAST

Page 3: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

3

UNCLASSIFIED

UNCLASSIFIED

PP 12 Weekly Planning Rhythm

Thurs Fri SatSun

1300-1500W OPT VTC

1000W read ahead slides

posted to APAN

0900W CA WG

1300W LOG WG

1200W MED WG

1300W FP WG Every other week

Mon Tues Wed

1000W COMMS WG

1000W Comm Integration WGCPF N33 Update

CPF N3

Semi-Monthly Update

1200W ENG WG

Page 4: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

4

UNCLASSIFIED

UNCLASSIFIED

SEP

OCT

NOV

DEC

JAN

FEB MAR

APR

MAY

JUN

JUL AUG

Mission Planning/CONOPS (CPF)

Meetings/Conferences (CPF/CDS)

Force Sourcing (CPFN3)

Interagency Coord (CPF N5)

NGO Coordination (CPF N5)

Partner Nations (CPF/C7F)

Transit Plan (CPF/CDS)

Funding/Authorizations (CPF)

Communications (CPF N6)

Assessment (CPF MAG)

Detailed CONOPS (CDS)

PDSS/Advanced Echelon (CDS)

Deployment (CDS)

Planning Timeline

PDSS Advanced Echelon

Deployment

MOU Letters Signed

PN Invitation letters

Assessment plan

PLANORD EXORD

Requirements Systems

Final

FSLO Letter

CPF RFF

Mid Planning Conference

Initial Planning Conference

Initial

Page 5: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

5

UNCLASSIFIED

UNCLASSIFIED

ADF Planning Status

General Planning• CJOPS Decision Brief for PP12 signed

Command

Engineering

Medical • ADF Health manning to PP12 planning under way

No Change

Page 6: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

6

UNCLASSIFIED

UNCLASSIFIED

ADF Participation

Australia

• Command Element

• Engineering Section

• Medical Personnel contribution of 15 – 20 pers in each contingent

Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines

Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the

conclusion of mission in Cambodia

Health manning TBC in late November

HQJOC Health PP12 POC:CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans)

[email protected]

MAJ Dominic Wade (SO2 Joint Ex Hlth Plans) [email protected] (until 2

Dec 11)

No Change

Page 7: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

7

UNCLASSIFIED

UNCLASSIFIED

PP12 RFI Tracker

Number Status Date Req Responsible

Question Other

ADF-001

No Change

Page 8: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

8

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities             - Decision after completion of

PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130   or KC-767× 1)

Medical team       - Approximately 20~30

No Change

Page 9: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

9

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• PDSS - 5 persons / each country Philippine and Vietnam Planners - MED, Ship visit, and others

• Humanitarian community in Japan - Not yet access

• POC LCDR Haga   [email protected] DSN:224-7714 or

7723

No Change

Page 10: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

10

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

Number Status date WG Requests/Questions Comments

JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam

No Change

Page 12: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

13

Medical Update

• Medical WG Telcon re-scheduled for Wed, 2 Nov 11, 1200 hrs

• NSTR

Page 13: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

14

UNCLASSIFIED

UNCLASSIFIED

Engineering Update

Engineering Working Group conducted telecon 31 Oct

PDSS teams- tracking, no issues

CONOPS being developed to determine FIE/SIE feasibility.

Possible engagement in Exercise Pacific Angel, VNM phase.

Australian Defence Force approval is approximately 90% complete.- PDSS person has already been identified once approved

- SQNLDR Owen Gardner has joined the team as the PP12 JOC representative

Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 14: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

15

UNCLASSIFIED

UNCLASSIFIED

Logistics Update

• PDSS:– PDSS Logistic team set for departure

• Husbanding Requirements – ongoing discussions with SUPPO

MERCY, FLC Yokosuka and FLC Singapore – Potential long-lead time requirements– Ports under Contracted support vs non-contracted

No Change

Page 15: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

16

UNCLASSIFIED

UNCLASSIFIED

Civil Affairs Working Group

No Change

COMPACFLT VTC CONFIRMATION SHEET VTC HELP DESK PHONE NUMBER (808) 474-8506 / 4941

EMAIL [email protected] Set-up time for this VTC: ONE HOUR

VTC CLASSIFICATION

UNCLASSED CONFERENCE

VTC Date and Time:

17 OCT 1930Z – 2100Z / 0930-1100 HST  

HOST and Participants, Area Code VTC DIAL-UP NUMBER  SPEED 

1. (HOST)       COMPACFLT 808 474-1760 1282. Participant:       Commander Destoyer

Squardon 7808 474-1761 128

3. Participant:       USNS MERCY 808 474-1762 1284. Participant:       US ARMY 351st 808 474-1763 1285. Participant:       MCAST 808 484-4910 1286. Participant:       Naval Post Grad School 808 484-4911 1287. Participant:       COE 808 484-4912 1289. Participant:       AUDIO ONLY FOR UP TO

9 PARTICIPANTS808-471-2663

Host Code 8506

WG time changed to 0900 Hawaii standard time.Location changed to Main VTC room

Page 16: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

17 17 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

IT & Radio Operator Manning

CPF N3/ CDS /

01DEC11 - CPF N3 Global Force Manager FORAC: Each MEDCAP = 2-IT (CHIME), 1-JCSE IEP (TBD).4 MEDCAPS maximum (8 ITs, 4 IEP).

Annex K / COMM Plan

CPF N6/C7F/ C3F/CDS

PRE-MPC

- IAW NTTP 3-57 Navy HCA OPS-Based on PN/HN COMM interoperability assessments and simultaneous missions.-OPTASK COMMS required.

BGAN SATCOM

CPF N6/CDS PRE-MPC

- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (JAN12).- Develop CONOPS for BGAN use.

Host Nation Spectrum Mgt

C7F N6 /CDS PRE-MPC

-Determine frequency restrictions for each host nation.

PP12 CIS Information Systems Status(01NOV11)

Page 17: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

PAO Network CPF PAO/N6/ CDS/MERCY

PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO determine if available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. Verifying current IATO cert.

PN-NGO Business Center(SSC LANT CHARLESTON)

CPF N6 / CDS/MERCY

APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. Determine coat/SOW.- CDS procure printer consumables for entire mission.-IA/business rules.

Partner Nation Interoperability

CPF N6 / CDS

POST-MPC

-Verify Partner Nation (PN) CIS POCs.-Verify APAN accounts for all PN CIS WG team members.-PN CIS capability review.-Develop CIS Interoperability Matrix in Annex K.

HumanitarianElectronic Record System (HERS)

CIS WG/CDS N6

TBD -Mission funded by MARFORPAC Experimental Center (MEC)-PDSS Automated Data Collection training complete 21OCT11 at CPF. ADC capability deploying w/ PDSS.

PP12 CIS Information Systems Status(01NOV11)

Page 18: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Remote MED-DENCAP /CC Comms Arch

CDS / CPF/ JCSE

TBD -UHF data and voice SATCOM/LOS Comms for CAP to air/ship.-JCSE IEP dynamic solution approval in progress.

Host Nation MIL C4

PDSS OIC

PDSS -PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.

Host NationCIVIL Comms

PDSS OIC

PDSS -PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.

Remote Site US Mission CISAssessment

PDSS OIC/AOIC

PDSS -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.-Command Center (CC) Comms assessment.-Training provided to Blue Team 21OCT11.

PDSS CISComms

CPF/ CDS PDSS OICs

PRE-PDSS

-Iridium Phones: CPF N6 issued phone to Blue OIC.-In country cell phones: MERCY to provide from PP10 mission phones.-Automated Data Collection (8 cell phones app) issued to Blue OIC.

PP12 CIS Information Systems Status(01NOV11)

Page 19: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

20 20 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Knowledge Management /Data Protection

CDS/MERCY

TBD -MEDCAP/CDS/Mission Data storage and protection

Command Center Ashore CIS

CDS PDSS -Identify configuration and location in each country.

IT SMEERequests

CDS PDSS -PDSS determine scope (SYSADMIN, repair, training, etc.).

SATCOM Requests

C3F/C7F/CDS

FEB12 -Standard USN process.

MERCY COMMs Suite Groom

CDS /MERCY

APR12 -Determine groom requirements

PP12 CIS Information Systems Status(01NOV11)

Page 20: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

FSET on MERCY

CPF /MSC

TBD - Field Service Engineering Team (FSET) rqmt determination by CDS-7 pending-Funding transfer to SPAWAR TBD

End of Mission CIS Exit Plan

CPF/CDS

TBD -Transfer custody of loaned CIS items back to CPF

Knowledge Management /Data Protection

CDS/MERCY

TBD -MEDCAP/CDS/Mission Data storage and protection

PP12 CIS Information Systems Status(01NOV11)

Page 21: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

22

UNCLASSIFIED

UNCLASSIFIED

Force Protection Update

• Next FPWG, 8 Nov

• PDSS Pre-Travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B

• NCIS/Security Requirements: Informal N2 RFI

Page 22: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

23

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

- Request PAO workspace in Bldg 55

- ADSW on track for 1 DEC start• Integrate with CPF staff 7-23 NOV

- Media Coordination• Discovery Channel embark- waiting on paperwork from

Discovery’s end• Thai Channel 5 embark• Social media embeds

- Coordinate DVIDS training for PA team• Equipment request

- CPF Band• Embark/Disembark HI• About 17 personnel

Page 23: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

24

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

Initial Stakeholder analysis complete

Working draft communication “plan” to include assessment

Communication Framework:• Pacific Partnership (2012) brings enhanced capability, opportunity for subject

matter expert exchange and a venue for broadened regional relationship building at HN invitation

The story of Pacific Partnership (2012):• Will have shared ownership (providers, recipients, enablers) and be told from

these individual perspectives• Will be told by the HN, PNs and NGOs• Will be focused on key, distinctive audiences vice single audience saturation

and will leverage emerging media• Will be synchronized across time and space to ensure consistency (or

approach and message) and stakeholder engagement to achieve desired goals• Will be echoed by other activities, operations and engagements (PVST, SMEE)• Will be captured, assessed and archived

No Change

Page 24: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

25

Mission Commander Priorities

• CMOC

– Mission Statement– Structure/Deliverable/Cell Manning?

• PDSS Blue

– Philippines site survey; Cambodia survey preparations/site selection.– OIC and AOIC concerned/feedback from Engineers is that current Cambodia Itinerary

is un-executable as written.

• PDSS Gold Preparations

– Confirm / Finalize Participants– Status of: VISAs, FP requirements, medical requirements, passports, travel

arrangements

• PDSS Planning

– Welcome Aboard Package/Pre-deployment Handbook• Putting on APAN website is only a partial solution/select mailings should also

be considered.

– Main Planning Conference (30-31 Jan in San Diego)• What was CPF legal issue with funding Admiral Kidd CC that they had to work

through?

Page 25: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

26

Mission Commander Priorities

• Mission Training

– Mission Rehearsal (March 2012)

• Ship to Shore movements (ADVON, Main Body, Teams, etc.)• Communications (Ship, shore and PA releasable products)• MEDCAP• DENCAP• VETCAP• Engineering• COMREL• Partner Nation Interoperability• AT/FP• Key Leader Engagements

– PA/Integrated communications training– Cultural awareness training

• Budget

– Confirm what current funding is available– Concerned a clear path for COMREL funding for mission has not been arranged.– Execution plan?

• Meetings

– CDS 7 (others?) with ETGLANT (07-10 NOV)

– CDS 7 with Project Handclasp (09 DEC)

Page 26: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

27

Engineering Lead Planner Comments (Ref: Cambodia PDSS)

• We have concerns about the feasibility of the proposed Cambodian PDSS itinerary as proposed by the ODC. The draft itinerary sent out will not work given the 1 week timeframe. The proposed itinerary is not feasible for the following reasons:

• It is virtually impossible to link MEDCAP and ENCAP site surveys together. There is a huge difference in the amount of time required at each site location. The engineers will need 3-4 hours at each proposed site to conduct detailed planning. This has been tried before and inevitably the medical planners and waiting for the engineers. It makes absolutely no sense to have the whole team standing around waiting for the engineers

• For planning purposes each portion of this PDSS needs to conduct site surveys independently i.e. medical, engineer, logistics, ops, etc

• If there are 2 or more sites per province the engineers need 4 hours per site plus 3-4 hours per province to conduct research WRT materials and services required for construction.

• Bottom line we can survey 2 potential sites per day. That is 2 construction projects not 2 provinces. If the project proposal is complicated we could spend as much as 8 hours on one site. The problem is we only get one visit to measure, plan, calculate, etc.

Page 27: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

28

Engineering Lead Planner Comments (Ref: Cambodia PDSS)

– We also need time to identify the following in the vicinity of each project site:

– Hotels– Hospitals for MEDEVAC– Vendors: Hardware, fuel, services, food, etc.– **These are all required to determine feasibility

• Recommendation: Look at 6-7 sites (not provinces) and ultimately select 3-4. It’s imperative that in order to have MEDEVAC capability and logistics support the sites need to be within 1 hour of Phnom Penh or Sianoukville. This is also important because 50% of the engineers will be aboard Mercy transiting back and forth. Assumption is that the mission commander would like to do site visits during the mission and attend ribbon cutting ceremonies.

Page 28: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 01 NOV 11 OPT Brief

29

UNCLASSIFIED

UNCLASSIFIED

Closing Questions/Comments

• CPF Staff• State Dept – Mr. Weinz• PACOM• USARPAC• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka

• C7F• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• HSC-23• MCAST• CDS-7