pacific partnership 2012 this brief is classified: unclassified 25 jan 12 opt brief

42
PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

Upload: asher-jessie-dennis

Post on 26-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

PACIFIC PARTNERSHIP 2012

This brief is classified:UNCLASSIFIED

25 JAN 12OPT Brief

Page 2: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

2

Roll Call

• CDS-7• State Dept – Mr. Weinz• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F

• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• ETG• 30th NCR• HSC-21 DET 2• MCAST

Blue: Normal participants not expected to attend VTC due to scheduling conflict.

Page 3: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

3

PP 12 Weekly Planning Rhythm

Thurs Fri SatSun

1300-1500W OPT VTC

1100W read ahead slides

posted to APAN

1000W CA WG

1300W LOG WG

1200W MED WG

1300W FP WG Every other week

Mon Tues Wed

1000W COMMS WG

1430W Comm Integration WG

CPF N3 Semi-Monthly Update

1200W ENG WG

Effective 09 JAN

Page 4: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

4

UNCLASSIFIED

UNCLASSIFIED

SE

P

OC

T

NO

V

DE

C

JA

N

FE

B

MA

R

AP

R

MA

Y

JU

N

JU

L

AU

G

Mission Planning/CONOPS (CPF)

Meetings/Conferences (CPF/CDS)

Force Sourcing (CPFN3)

Interagency Coord (CPF N5)

NGO Coordination (CPF N5)

Partner Nations (CPF N5/C7F)

Final Transit Plan (CDS)

Funding/Authorizations (CPF)

Communications (CPF N6)

Assessment (CPF MAG)

Detailed CONOPS (CDS)

PDSS/Advanced Echelon (CDS)

Deployment (CDS)

Planning Timeline

Advanced Echelon

Deployment

MOU Letters Signed

Assessment plan

EXORD

Systems

CPF RFF

Mid Planning Conference

Initial Planning Conference

Initial

PLANORD

PDSS

FSLO Letter

Final

Requirements

PN Invitation letters

Page 5: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

5

ADF Planning Status

General Planning• CJOPS Decision Brief for PP12 signed.

Command• Nomination of O-5 for position of COMASC submitted.• Call for nominations for ASNCE staff sent via signal.

Engineering• Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting

Post Activity Report.• Authorization to lead as FIE for Indonesia mission still to come from

IPDIV.

Medical • Awaiting nominations for ADF Health PP12 positions from Services.

No Change

Page 6: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

6

ADF Participation

Australia

• Command Element

• Engineering Section

• Medical Personnel contribution of 15 – 20 pers in each contingent

Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines

Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the

conclusion of mission in Cambodia

Health manning TBC in late November

HQJOC Health PP12 POC:

CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) [email protected]

No Change

Page 7: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

7

UNCLASSIFIED

UNCLASSIFIED

PP12 RFI Tracker

Number Status Date Req Responsible

Question Other

ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary

ADF-002 Open 11 Nov 11 PACFLT Status of Partner Nation invitation letter

No Change

Page 8: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

8

JSDF Planning Status

• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities             - Decision after completion of PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130   or KC-767× 1)             

Medical team       - Approximately 20~30

No Change

Page 9: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

9

JSDF Planning Status

• PDSS-Request re-survey Philippines with U.S. survey team in FEB or MAR 2012

• Humanitarian community in Japan - Not yet access

• POC PRI :  LCDR Haga : [email protected] DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : [email protected]

No Change

Page 10: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

10

JSDF Planning Status

Number Status date WG Requests/Questions Comments

JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam

JPN-002 30 NOV PDSSReq. re-survey with US survey member in FEB or MAR.

No Change

Page 11: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

11

NZDF Planning Status

Decision by COMD Joint Forces New Zealand is to deploy a small multi-disciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12.

Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam.

MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego)as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts.

Medical Personnel contribution: Manning TBC in early December (8 – 12 pers)

New HQJFNZ Health PP12 POC: MAJ Andrew BROOKSDDI: +64 4 529 [email protected]

No Change

Page 12: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

12

CPF FOPS Update

Manning Update-FFC change in sourcing priorities

-Augmentation package was due back from Joint Sourcing on 23 Jan

-Army input still outstanding, needed for 351st (16 pax) and 807th (25 pax)

support -FFC Staffing not submitted

-Commitment received for med personnel

-CPF PLANORD released

Page 13: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

13

Medical Update• Medical WG Telcon held Tuesday, 24 January 2012, 1200 hrs

• LT JG Ward to attend MPC and stay to assist with Medical CONOPS development– Funding provided by CPF and MERCY

• Medical assessment to Philippines is GTG

• Per ODC during 1/24 telcon, medical assessment to Cambodia rescheduled– 26 March – 3 April

Page 14: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

14

Engineering Update

Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic Seawall-Dr. LinCambodia 3 health centers Bldg; P&E; CCADIndonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety

Australian Defence Force approval is approximately 90% complete. -ADF determination of FIE will follow site survey report

Philippine Project Package preparation (ACB1 lead- BUC Sarmiento)

Cambodia Project Package preparation (NMCB40 lead)

Indonesia Project Package preparation (ADF lead/NMCB40 Alt)

Vietnam Project Package preparation (NMCB40 lead)

Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 15: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

15

Engineering Update

Indonesia SMEEs:

1.Seismic Construction Practices 2.Disaster Response Plans

Philippine SMEEs:

1.Project planning training using Microsoft Projects software 2.Repair and/or reconstruction of seawalls

Vietnam SMEEs:

1.Construction Safety Practices2.Engineer Disaster Response Plans

Cambodia SMEEs:

1.Building Plan Development 2.Water Quality

Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 16: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

16

Logistics Update

• Logistics WG held 24 Jan 12

• Reviewing proposed Medical CONOPS to develop logistics support plan(s)

• Funding– APRI (No Change)

• MTF MERCY received $600K of required $1.9M • Pharmaceuticals and Consumables

– Working with DLA to assign Call Numbers for initial orders• Donation Material (No Change)

• Next Logistics WG meeting scheduled for 7 Feb 12

Page 17: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

17

PP12 Supply and Logistics StatusFUNDING (25 JAN12)

17 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

APRI CPF/

SUPPO

31JAN12 - APRI ($600K of $1.9M required received)

ORF C7F/

CDS-7/

SUPPO

07FEB12 - Requirements review in progress

OCO CPF/

SUPPO

15APR12 - Requirements review in progress

NO CHANGE

Page 18: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

18 18

Item / Task Status Action Date Req Notes

Indonesia Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Working with DLA to assign Call Numbers for requisitioning of standard consumable items

Philippines Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s)

- Working with DLA to assign Call Numbers for requisitioning of standard pharmaceutical and consumable items

Vietnam Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Working with DLA to assign Call Numbers for requisitioning of standard consumable items

Cambodia Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s)

- Working with DLA to assign Call Numbers for requisitioning of standard pharmaceutical and consumable items

18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (25JAN12)

Page 19: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

19 19

Item / Task Status Action Date Req Notes

Load Plan MSC/

SUPPO

31JAN12 - Load plan developed pending MSC MERCY approval- 240 pallet maximum established

Project Handclasp

SUPPO 15MAR12 - Preparations ongoing with POC

LDS SUPPO 15FEB12 - Preparations ongoing with POC

Worldwide VETs

SUPPO 15MAR12 - Preparations ongoing with POC

19 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 Supply and Logistics StatusDONATION MATERIAL (25JAN12)

NO CHANGE

Page 20: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

20 20

Item / Task Status Action Date Req Notes

IT & Radio Operator Manning

CPF N3/ CDS /

15JAN12 -Each MEDCAP = 1-IT (HEIS) - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC- 4+Remote MEDCAP manning review.-Ashore Command Center

Annex K /

COMM Plan

CPF/ C3F/CTF-76/CDS

PRE-MPC

- IAW NTTP 3-57 Navy HCA OPS-Based on PN/HN COMM interoperability assessments and simultaneous missions.-OPTASK COMMS required.

BGAN SATCOM

CPF N6/

CDS POST-MPC

- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (FEB12).- Develop CONOPS for BGAN use.

Host Nation Spectrum Mgt

C7F/CTF-76 /CDS

PRE-MPC -Determine frequency restrictions for each host nation.

20 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 CIS Information Systems Status(25JAN12)

No Change

Page 21: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

21 21

Item / Task Status Action Date Req

Notes

PAO Network CPF PAO/N6

/ CDS/

MERCY

PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist requested

PN-NGO Business Center

(SSC LANT CHARLESTON)

CPF N6 / CDS

/MERCY

APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12).- CDS procure printer consumables for entire mission.-IA/business rules provided CDS-7 N6 03NOV11.

Partner Nation Interoperability

CPF N6 / CDS

POST-MPC

-Verify Partner Nation (PN) CIS POCs.-Verify APAN accounts for all PN CIS WG team members.-PN CIS capability review.-Develop CIS Interoperability Matrix in Annex K.

Health Engagement Information System (HEIS)

CIS WG/

CDS N6

TBD -HERS funded by MARFORPAC Experimental Center (MEC) is not available. -CIS and Medical WG reviewing alternatives.

21 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 CIS Information Systems Status(25JAN12)

Page 22: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

22 22

Item / Task Status Action Date Req

Notes

Remote MED-DENCAP /CC Comms Arch

CDS / CPF

PRE-MPC

-Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12)

Host Nation

MIL C4

PDSS OIC

PDSS AAR

-PDSS OICs for assessment action.

-Training provided to Blue Team 21OCT11.

Host Nation

CIVIL Comms

PDSS OIC

PDSS AAR

-PDSS OICs for assessment action.

-Training provided to Blue Team 21OCT11.

Remote Site US Mission CIS

Assessment

PDSS OIC/

AOIC

PDSS

AAR

-JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.-Command Center (CC) Comms assessment.-Training provided to Blue Team 21OCT11.

PDSS CIS

Comms

CPF/ CDS PDSS OICs

PRE-PDSS

-Iridium Phones: CPF N6 issued phone to Blue OIC.-In country cell phones: MERCY to provide from PP10 mission phones.-Automated Data Collection (8 cell phones app) issued to OIC.

22 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 CIS Information Systems Status(25JAN12)

Page 23: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

23 23

Item / Task Status Action Date Req

Notes

Knowledge Management /Data Protection

CDS/

MERCY

TBD -MEDCAP/CDS/Mission Data storage and protection

Command Center Ashore CIS

CDS PDSS

AAR

-Identify configuration and location in each country.

IT SMEE

Requests

CDS PDSS AAR

-PDSS determine scope (SYSADMIN, repair, training, etc.).

SATCOM Requests

C3F/

C7F/

CDS

FEB12 -Standard USN process.

Mission COMMs Readiness

CDS /

MERCY

APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite)

23 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 CIS Information Systems Status (25JAN12)

No Change

Page 24: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

24 24

Item / Task Status Action Date Req

Notes

FSET on MERCY

CPF /

MSC

TBD - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 11JAN12. SD-Guam SOW requested 20JAN12..

-Funding transfer to SPAWAR TBD

End of Mission CIS Exit Plan

CPF/

CDS

TBD - Hardware: Transfer custody of loaned CIS items back to CPF-Data Exit Plan: TBD

VHF Handheld Radios

CPF/

CDS

FEB12 -CDS determine required quantities

ADVON CIS CDS Pre-MPC -CDS determine requirements.

Embarked Documentary Team

CDS Ongoing -CDS determine requirements and set expectations

-Afloat connectivity limited to NGO Business Center

24 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 CIS Information Systems Status(25JAN12)

Page 25: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

25

Force Protection Update

• MFP Sourcing: Four Marines, possibly participation at MPC

– C7F/CTF-76 tasking to re-analyze manning needs

• PIVA update

• MPC coordination

• Pre-Deployment travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B

Page 26: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

26

Public Affairs Update

- Admin• Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS

meetings/coordination for mission roll-out

- Media Coordination• CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and

NAVINFO WEST in LA 25 JAN

Page 27: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

27

Public Affairs Update

Item/Task Status Action Suspense Date

Notes

PAG CDS PACPF PA

TBD Draft to CDRE 15 DECRouting will happen D-30 to 45 days

DC media trip/mission announcement

NS CDS PA APR 2012

PP Fact Sheet CDS PA, CPF PA

30 DEC Mission info to NAVINFO WEST for vetting

Smartphone SOP

NS CIWG, CPF Social Media

15 MAR

Online presence brief

CDS PA, CPF PA

9 DEC Social media, websites, etc

27 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 28: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

28

Public Affairs Update

Item/Task Status Action Suspense Date

Notes

Equipment requirements

CDS PA, NPASE

TBD Dialogue initiated w/ MERCY on 04 JAN

PO&AM inputs CDS PA, CPF PA

14 DEC Due to FOPS.PA-specific updates in progress

Media Training Plan

CDS PA

TBD Training to CDS leadership and mission participants

COMREL purchase list

CPF PA

TBD Will request final approval after MPC

28 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 29: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

29

CAWG Update (25 JAN)

Item / Task Status Action Date Req Notes

CJ-CMCC Concept Paper Dev CPF N5 10 FEB

-Awaiting chops from MTF - Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -Next action: CMCC concept document will finalized during MPC TTX.

CMCC Battle Rhythm Sych DESRON 19 JAN - Inputs submitted to DESRON.

Non-Medical SMEE CONOPS Draft Plan CAWG 23 JAN

-Complete- Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON.

Operational Assessment Plan CAWG MAR 12

- Assessment WG has produced draft task list which will be socialized and refined during WGs.-Geared toward MOPs

Strategic Assessment Plan CAWG APR 12

- Geared towards Theater Strategic Objectives

NGO and Partner Nation Engagement Process

CAWG /

CPF N5

MPC

- 80% plan post MPC but add-ins will be ongoing.

Page 30: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

30

Projected Host and Partner Nation Participation by Port Projected Host and Partner Nation Participation by Port

Host / Partner Nation

Material / Platform Support

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

Indonesia FP, Engineers, Medical                    LCDR Chris [email protected]

PhilippinesFP, Engineers, Medical

                 LCDR Scott [email protected]

VietnamFP, Engineers, Medical

                   LTC Wayne [email protected]

CambodiaFP, Engineers, Medical

                   LTC Kristin Means [email protected]

AustraliaLead for ID Engineer FIEMedical 15-20 PAXEngineer Section

                   

CMDR Kenneth Walters:[email protected] Owen Gardner, [email protected].

Canada Medical/Dental 9 May

15 Pax

15 Pax

15 Pax

4 July

15 Pax

15 Pax

15 Pax

4 Sep

CAPT Lee Gagne [email protected]

Japan

JMSDF Ship Aircraft (C-130 or KC-767)

Medical Team: 20-30 pax                    

LCDR Haga : [email protected] Haga : [email protected]

New Zealand 8-12 PAX Medical Team                    MAJ Andrew [email protected]

Singapore Medical teamMajor Chow Weien: [email protected]

ThailandMedical, Engineers and CA

LCDR Jason Starmer [email protected]

Chile 1 Pax Medical5

July24

JulyLCDR Julian [email protected]

Page 31: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

31

Projected NGO Participation by Port Projected NGO Participation by Port

NGOExpected

Contribution

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

UCSD PreDental Society Dental, Translators                      

Dr. Irv Silverstein: 619-840-3288 [email protected]

LDS Charities Medical

                     

Dr Susan Puls: [email protected] Mr. Fred Riley: [email protected] 801-240-8580

Project Hope Medical                     

Mr. Matt Petersen: [email protected] 540-467-5524/ 540-837-9554

Hope World Wide

Translators for Indonesia (awaiting number required from DESRON )                      

Mr. Charles Ham: [email protected] Office: 62-21-600-9091

Project Handclasp TBD

                     

Mr. Paul Brown / Lt Aron Rotklein: [email protected] 619-532-1492

Vets Without Borders

TBD                     

Dr Thomas Graham: [email protected] Office 916-769-3696

World VetsTBD

                     

Dr Katie Horn: [email protected] 509-290-0509 / 505-8949-4093

University of Hawaii

Medical, Engineers                     

UNCLASSIFIED

UNCLASSIFIED

Page 32: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

32

Projected NGO Participation by Port Projected NGO Participation by Port

NGOExpected

Contribution

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

EWC TBD Vricella, Gene [email protected]

VMAP5 doctors fluent in Vietnamese and translators

Nguyen K. NguyenPresident of VNMAP Program [email protected]

Global Grins Donation of toothbrushes

EWOB Engineers

UNCLASSIFIED

UNCLASSIFIED

Page 33: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

33

PP12 APRI/OHDACA Status: 17JAN11

PP12 PACOM approved APRI budget $2,500,000.00

APRI Expended by PACFLT $727,786.25

APRI on-hand at PACFLT $522,213.75

APRI remaining at PACOM $1,250,000.00

Total APRI Remaining$1,772,213.75

PP12 PACOM Tentative OHDACA budget $912,000.00

OHDACA Expended by PACFLT $0.00

OHDACA on-hand at PACFLT $0.00

OHDACA remaining at PACOM $912,000.00

Total OHDACA Remaining $912,000.00

APRI Summary

OHDACA Summary

Page 34: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

34

Canadian Team

• Two CA Teams– Team One: HS support to Indonesia and Philippians

• Duration - 8 May to 3 Jul 12• Embark - PEARL HARBOR 9 May 12• Disembark - SUBIC BAY 4 Jul 12

– Team Two: HS support to Vietnam and Cambodia• Duration – 3 Jul to 4 Sep 12• Embark – SUBIC BAY 4 Jul 12• Disembark – PEARL HARBOR 4 Sep 12

Page 35: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

35

Canada: HSS TO&E *Focus – Primary Care*

1x GDMO (Capt/Maj) 1x DO (Capt/Maj)

1x Liaison Officer (Capt) 1x Physio (Lt/Capt)

3x GDNO (Lt/Capt) 1x Dent Tech (Cpl/Sgt)

7x Med Tech (1x Sgt QL6A, 2x MCpl QL5A, 4x Cpl/Pte)

TOTAL: 15

Page 36: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

36

PP12 Communication Integration

• Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN)

• Coordinating communication assessment support for PP12 (MAY – SEP 12)

– Include “baseline” and post-mission support– Linguist support

• Next CIWG meeting scheduled for: 26 JAN 12

• AMEMB Cambodia, Vietnam Telecons being coordinated

Page 37: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

37

PP12 Communication Integration

37 Completed

On-track Off-Track/RecoverableOff-Track not recoverable

Item / Task Status Action Date Req Notes

Stakeholder Analysis

CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.

Characterize Information Environment

CPF N2/N39

15 NOV – 30 JAN

-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 99%, Philippines 95%.

Communication Strategy/ Implementation Plan

CPF N2/N39

31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan.

Identify/Coordinate key messaging events

CIWG 15 JAN - Identified; coordinating CIWG support:-- ETG Leadership Training-- MPC Assessment planning-- SLV support

Develop messaging products

CIWG/ CPF N2/N39, PA

15 APR - Not started.

Page 38: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

38

PP12 Communication Integration

38 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Develop communication MOE Indicators

CIWG/ N2/N39

15 JAN - Part of overall PP12 assessment effort.

Define Communication assessment methodology

CPF N2/N39

30 JAN - Part of overall PP12 assessment effort.

Coordinate and monitor communication during execution

CPF N2/N39

During PP12

- Not started. Part of overall PP12 assessment effort.

Conduct communication assessment

CIWG During PP12

- Not started.

Develop AAR CPF N2/N39, PA

30 SEP - Not started.

Page 39: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

39 39

Planning Timeline

UPDATED: 18JAN12 INDICATES UPDATE

Page 40: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

40

Mission Commander Priorities

• Country CONOPS Development– 30-Jan-12 MPC (PRESENT DRAFT CONOPS)

• Mid Planning Conference (29-31JAN)– 29JAN Civilian Participant Planning and Discussion (USNS MERCY)– 30-31JAN MPC Agenda (next slide) (ADMIRAL KIDD CONF CENTER)

• CMCC TTX (01FEB12)– Notification/agenda/objectives provided; participants confirm via RSVP

• SLV preparations– Big-block travel arrangements made– Issues:

• CPF participant requested• Vietnam Visas (What is the backup plan?)• Agenda / KLE

• Miscellaneous– Manning / billet gaps (lacks a clear path to resolution)– Landside FP sourcing (lacks a clear path to resolution)– Proposed Mission Planning Rhythm in development– CMCC Watchfloor products in development:

• SORM / SOPs / Watchbills / PPRs

Page 41: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

41

PP12 MPC Agenda

30JAN12• 0700-0800 REGISTRATION• 0800-0805 PP12 MISSION COMMANDER

OPENING REMARKS (CDS7 N00)• 0805-0815 ADMIN REMARKS (CDS7 N3)• 0815-0900 CONOPS - INDONESIA (CDS7

PDSS/ADVON GOLD OIC)• 0900-0910 BREAK• 0910-0955 CONOPS - PHILIPPINES (CDS7

PDSS/ADVON BLUE OIC)• 0955-1005 BREAK• 1005-1050 CONOPS - VIETNAM (CDS7

PDSS/ADVON GOLD OIC)• 1050-1100 BREAK• 1100-1145 CONOPS - CAMBODIA (CDS7

PDSS/ADVON BLUE OIC)• 1145-1300 MPC GROUP PHOTO / LUNCH

BREAK• 1300-1600 FUNCTIONAL WORKING GROUPS• 1600-1630 WRAP UP MEETING / WAY AHEAD

FOR 31JAN (WORKING GROUP LEADS, PDSS/ADVON OIC/AOIC, COORDINATORS)

• 1800-2000 SOCIAL (SAMMY'S WOODFIRED PIZZA, POINT LOMA/LIBERTY STATION)

31JAN12• 0730-0745 ADMIN REMARKS (CDS7 N3)• 0745-1200 FUNCTIONAL WORKING

GROUPS (CONT)• 1200-1300 LUNCH• 1300-1530 FUNCTIONAL WORKING

GROUPS (CONT)• 1530-1550 DELIVERABLES / WRAP-UP

(CDS7 N3)• 1550-1600 PP12 MISSION COMMANDER

CLOSING REMARKS (CDS7 N00)

Page 42: PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

42

Closing Questions/Comments

• CPF Staff• State Dept – Mr. Weinz• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F• C3F• CTF 76

• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• ETG• HSC-21 DET 2• MCAST• USNS MERCY• CDS-7