SL 275 Congress Ave May 17, 2016
May 17, 2016
Victor M. Vargas, P.E. Area Engineer 512-282-2113
SL 275 Congress Ave May 17, 2016
Williamson Creek to Little Texas
5
Section Resurfaced and Re-striped in Summer of 2015
Narrowed through lanes to gain:
Left Turn Lanes at Stassney Lane
Shoulder of 2’ - 4’
Current Traffic Volumes
• 22,077 ADT – 2014 (N. Of Stassney Ln)
Currently no additional widening is planned for this area.
SL 275 Congress Ave May 17, 2016
Little Texas To Foremost Dr
Section Under Construction
Dan Williams Construction
$6.3M
Originally Scheduled for 13 Months
Work Began October 6, 2014
Utility Delays
Anticipated Completion this Summer 2016
8
SL 275 Congress Ave May 17, 2016
Little Texas To Foremost Dr
Section Under Construction
Adding
• Sidewalks through limits
From Eberhart to Foremost
• 6’ - Shoulder/Bike Lane
• Center Turn Lane
• 2-Through Lanes in each direction
Current Traffic Volumes
• 17,244 ADT – 2014 (N of Wm Cannon)
9
SL 275 Congress Ave May 17, 2016
Foremost Dr to Slaughter Ln
Section Constructed Several years ago.
Consist of
• 4’ Shoulder/Bike Lane
• Center Turn Lane
• 2-Through Lanes in each direction
Current Traffic Volumes
• 9,159 ADT – 2014 (N. of Slaughter Ln)
No Current Projects
13
SL 275 Congress Ave May 17, 2016
US 290 Summary & Questions
14
Questions?
Victor M. Vargas, P.E. Area Engineer 512-282-2113