SL 275 Congress Ave May 17, 2016

SL 275 CORRIDOR CONGRESS AVE. May 17, 2016

SL 275 Congress Ave May 17, 2016

May 17, 2016

Victor M. Vargas, P.E. Area Engineer 512-282-2113

[email protected]

SL 275 Congress Ave May 17, 2016

SL 275 Congress Ave

3

SL 275 Congress Ave May 17, 2016

Williamson Creek to Little Texas

4

SL 275 Congress Ave May 17, 2016

Williamson Creek to Little Texas

5

Section Resurfaced and Re-striped in Summer of 2015

Narrowed through lanes to gain:

Left Turn Lanes at Stassney Lane

Shoulder of 2’ - 4’

Current Traffic Volumes

• 22,077 ADT – 2014 (N. Of Stassney Ln)

Currently no additional widening is planned for this area.

SL 275 Congress Ave May 17, 2016

Williamson Creek to Little Texas

6

SL 275 Congress Ave May 17, 2016

Little Texas To Foremost Dr

7

SL 275 Congress Ave May 17, 2016

Little Texas To Foremost Dr

Section Under Construction

Dan Williams Construction

$6.3M

Originally Scheduled for 13 Months

Work Began October 6, 2014

Utility Delays

Anticipated Completion this Summer 2016

8

SL 275 Congress Ave May 17, 2016

Little Texas To Foremost Dr

Section Under Construction

Adding

• Sidewalks through limits

From Eberhart to Foremost

• 6’ - Shoulder/Bike Lane

• Center Turn Lane

• 2-Through Lanes in each direction

Current Traffic Volumes

• 17,244 ADT – 2014 (N of Wm Cannon)

9

SL 275 Congress Ave May 17, 2016

Little Texas To Foremost Dr

10

SL 275 Congress Ave May 17, 2016

Foremost Dr to Slaughter Ln

11

SL 275 Congress Ave May 17, 2016

Foremost Dr to Slaughter Ln

12

SL 275 Congress Ave May 17, 2016

Foremost Dr to Slaughter Ln

Section Constructed Several years ago.

Consist of

• 4’ Shoulder/Bike Lane

• Center Turn Lane

• 2-Through Lanes in each direction

Current Traffic Volumes

• 9,159 ADT – 2014 (N. of Slaughter Ln)

No Current Projects

13

SL 275 Congress Ave May 17, 2016

US 290 Summary & Questions

14

Questions?

Victor M. Vargas, P.E. Area Engineer 512-282-2113