Programme Book 2017-18 Page 1 Office of the Director of Scheduled Tribes Development Department, Vikas Bhavan, IVth Floor, Thiruvananthapuram Phone No.: 0471þ2304594, 0471þ2303229, Fax- 2302990 email [email protected] No. PM1/18452/16 Dated, 31/05/2017 BUDGET CIRCULAR Sub:- STDD- Annual Plan 2017-18- Scheme wise Plan & Non-plan Budget Provision - Information / Instructions issued – reg.- Ref:- Budget Estimates 2017-18 In view of the socio-economic condition of the tribals in the State, during 2017-18 Government have allocated an amount which is more than proportionate to the tribal population in the State. During 2017-18, the Annual Plan Outlay for the State of Kerala is Rs. 26500 crores, out of which an outlay of Rs 751.08 crore which is 2.83% of State Outlay is earmarked for Scheduled Tribes Development Department for the holistic development of Scheduled Tribes in the State. As has been done in previous years, during 2017-18 allocation to TSP is divided into two categories. One portion goes to LSGIs and the other portion goes to ST Development Department which has been proposed for meeting the educational expenses, infrastructure facilities, economic activities and basic minimum need of women and children. Infrastructure facilities include providing houses to houseless tribals in the hamlets, water supply, sanitation facilities and resettlement of tribals living in difficult conditions. All possible efforts shall be taken to converge similar schemes like housing, employment

Upload: khangminh22

Post on 01-Feb-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

Programme Book 2017-18 Page 1

Office of the Director of Scheduled Tribes Development

Department, Vikas Bhavan, IVth Floor,

Thiruvananthapuram

Phone No.: 0471þ2304594, 0471þ2303229, Fax- 2302990

email :þ [email protected]

No. PM1/18452/16 Dated, 31/05/2017

BUDGET CIRCULAR

Sub:- STDD- Annual Plan 2017-18- Scheme wise Plan & Non-plan Budget

Provision - Information / Instructions issued – reg.-

Ref:- Budget Estimates 2017-18

In view of the socio-economic condition of the tribals in the State,

during 2017-18 Government have allocated an amount which is more than

proportionate to the tribal population in the State. During 2017-18, the Annual

Plan Outlay for the State of Kerala is Rs. 26500 crores, out of which an

outlay of Rs 751.08 crore which is 2.83% of State Outlay is earmarked for

Scheduled Tribes Development Department for the holistic development of

Scheduled Tribes in the State.

As has been done in previous years, during 2017-18 allocation to TSP is

divided into two categories. One portion goes to LSGIs and the other portion

goes to ST Development Department which has been proposed for meeting

the educational expenses, infrastructure facilities, economic activities and

basic minimum need of women and children. Infrastructure facilities include

providing houses to houseless tribals in the hamlets, water supply, sanitation

facilities and resettlement of tribals living in difficult conditions. All possible

efforts shall be taken to converge similar schemes like housing, employment

Programme Book 2017-18 Page 2

generation , health, education, Kudumbasree schemes, ICDS, NSAP etc

implemented by different Department/Agencies.

In the State Plan outlay, an amount of Rs. 100.00 crore is provided for

Ambedkar Settlement Development Scheme (Erstwhile ATSP Fund/Special

Package). Co-ordination of different departments including Rural

Development, Social Justice, Kudumbasree, NREGS Mission, Health, Education,

Forest etc and Panchayats must be ensured at State, District and Local level.

At the State level the scheme will be monitored by a High Level Committee

headed by the Hon’ble Minister for Scheduled Tribes Development

Department and Hon’ble Vice-Chairman, State Planning Board. The Project

Officers/Tribal Development Officers concerned shall conduct monthly review

meeting with Implementing Agencies so as to ensure the completion of

schemes in a time bound manner. District Collectors shall review the activities

periodically and report to the Principal Secretary, Scheduled Tribes

Development Department.

The Scheme wise Plan write up and budget provision for the year 2017-

2018 is detailed in the Budget Circular. It also contains the funds for

Resettlement of Landless Tribals by the State Tribal Resettlement and

Development Mission, Critical Gap filling scheme (Corpus fund) and Pooled

Fund for Special projects under Tribal Sub Plan, SCA to TSP, and Ambedkar

Settlement Development Scheme (Erstwhile ATSP Fund/Special Package)

during 2017-18.

This document brings the details of development programme for

Scheduled Tribes, which are formulated with the objective of improving their

social status and providing them fuller educational and economic opportunities.

The details of grant-in-aid provided to each and every Local Self Government

Institution are also incorporated in this document for ready reference. This TSP

2017-18 documents will be of immense help for Department officials and other

field level machinery to ensure effective utilisation of the earmarked fund for

Scheduled Tribe population and to monitor the implementation of TSP schemes

through local bodies.

Programme Book 2017-18 Page 3

With the objective to facilitate speedy implementation of the schemes at

the beginning of the financial year itself without waiting for Administrative

Sanction and release of funds, vide G.O (P) No.561/2015/Fin. dated 9th

December 2015, since 2016 plan document has been prepared in Green Book

and Amber Book. The schemes which require high priority and are ready for

implementation shall be included in the Green Book and other schemes in the

Amber Book. The schemes/ project included in the Green Book are in

accordance with the procedure set forth in the guidelines issued by

Government. The details are included in this document.

All the Controlling Officers in the Directorate are requested to

initiate action to fix District wise financial and physical targets under the Plan

and Non-plan schemes dealt with by them and to allocate funds to the

Implementing Officers. Proposals that require Administrative Sanction from

Government based on the Plan Write up 2017-18 should be submitted to

Government by June 2017.

The sections in the Directorate dealing with schemes will keep

continuous monitoring on the progress of implementation of the schemes

[financial and physical] in the context of the provisions.

The Project Officers/Tribal Development Officers will take timely

action to present the projects before the District Level Working Group [DLWG]

for STs, in the case of those schemes which need the approval of the District

Level Working Group [especially for the project proposals to be considered

under the Corpus Fund, Grant-in-aid under Art.275(1) and SCA to TSP]. Prior

to this they may take immediate steps to constitute the Oorukoottams with

the help of Tribal Promoters and discuss the project ideas based on the needs

of each habitat,prepare a micro plan in the District for the development of ST

population, and based on the micro plan formulate projects with the help of

line Departments for placing before the DLWG. The programmes for the

Resettlement and Development of Landless Tribals are to be initiated by the

District Tribal Mission as per the direction of the State Tribal Resettlement and

Development Mission [TRDM].

Programme Book 2017-18 Page 4

The POs/TDOs are also requested to take timely action to assist the

Local Bodies for the formulation and implementation of the schemes under

the TSP Grant-in-aid. All efforts should be taken by them well in advance to

ensure steady progress in the implementation of the schemes right from the

beginning of the financial year.

The Project Officers/ Tribal Development Officers are also requested to

submit minutes of District Level Working Groups, the plan progress report, un-

reconciled expenditure statement, progress report on 20 point programme,

SCA to TSP, Progress Report of Non-Plan schemes, details of Departmental

Institutions, Progress Report on Housing and Educational Concessions [ Post-

matric & Pre-matric], Progress report of the resettlement and development

activities [Financial & Physical] etc in the prescribed proforma. No lapse shall

occur in the timely submission of these progress reports.

The receipt of this circular should be acknowledged by all

concerned.

SD/-

DIRECTOR

To

The Principal Secretary STDD [ with C/L] The Secretary Plg & Eco.Affairs [ with C/L] The Member Secretary, State Planning Board (with C/L) The Chief Engineer (Buildings) PWD (with C/L) The Chief, TRDM (with C/L)

All District Collectors The Director, Plg. & Eco Affairs, CPMU

The Commissioner, RDD [with C/L] The Additional Secretary STDD All District Planning Officers

The Director, KIRTADS The Asst. Exe. Engineer, STDD

All POs/TDOs & TEOs All Controlling Officers/Section Heads/Sections/ All Senior Supdts, MRS, STDD Table of DSTD/ CA to DSTD.

Programme Book 2017-18 Page 5

TRIBAL SUB PLAN 2017-18

I State Plan Schemes

Amount

(Rs. lakh)

State Share of ST Dept.( Including 50 % State Share of

CSS and 40% State Share of SGRY,PMAY by RRD) 57508.00

II Plan Grant to Local Self Govt 17600.00

Total State Plan [I+II] 75108.00

III Central Sector /Centrally Sponsored Schemes

[i] Centrally Sponsored Schemes [ 50 % of CSS] 2129.50

[ii] 100 % Centrally Sponsored Schemes 5559.80

[iii] 60% CSS (Rural Development) 4941.70

[iv] Special Central Assistance to Tribal Sub Plan [ SCA to

TSP) 1300.00

Total III 13931.00

Grant Total [ I+II+III] 89039.00

Programme Book 2017-18 Page 6

Outlay of Various Departments Under TSP

Sch. Tribal Dev. Dept 58113.04

KIRTADS

290.00

PWD Dept

4799.76

Rural Development

8236.20

(Green+Amber Book) 71439.00

TSP to LSGD

17600.00

Total 89039.00

Programme Book 2017-18 Page 7

BapJw

30.01.2017 se k.D.(Fw.Fkv)06/2017 ¹m\nwKv \¼À D¯chv

{]Imcw hniZamb amÀ¤\nÀt±i§tfmsS 2017þ18 hmÀjnI ]²XnÂ

{Ko³_p¡v X¿mdm¡m³ kÀ¡mÀ A\paXn \ÂIn. km¼¯nI

hÀj¯nsâ XpS¡¯n Xs¶ ]²Xn \nÀÆlWw

XzcnXKXnbnem¡p¶Xn\v Cu Bibw e£yanSp¶p.ap´nb

]cnKW\bÀln¡p¶Xpw DS³ \S¸nem¡m³ Ignbp¶Xpamb

]²XnIfmWv {Ko³_p¡n DÄs¸Sp¯p¶Xv. amÀ¤\nÀt±i§Ä

{]Imcw ]²Xn tcJtbmsSm¸w {Ko³_p¡v X¿mdm¡n \nbak`

ap¼msI kaÀ¸nt¡−XmWv. _Päv \nbak` AwKoIcn¨Xn\vtijw

Bkq{XW km¼¯nI ImcyhIp¸v Hcp s]mXp D¯chv

]pds¸Sphn¡pw.AXn\ptijw ]²Xn X¿mdm¡Â {Kq¸pw (]n.]n.Pn)

kvs]jy ]²Xn X¿mdm¡Â {Kq¸pw (Fkv.]n.]n.Pn) AwKoIcn¨

]²XnIfpsS hniZmwi§Ä DÄs¸Sp¯nsIm−v `cWm\paXn

\ÂIpw. Cu ]²XnIÄ \S¸nem¡p¶Xv ho−pw [\Imcy

hIp¸nsâtbm Bkq{XW km¼¯nIImcy hIp¸ntâtbm D]tZiw

Bcmtb−XnÃ.

2017þ18se hmÀjnI ]²XnbpsS `mKambn«mWv {Ko³_p¡v

{]tXyIw {]kn²oIcn¡p¶Xv. kÀ¡mÀ \njvIÀjn¡p¶ amÀ¤

\nÀt±i§Ä {]ImcapÅ kvIoapIÄ/t{]mPIvSpIfmWv

{Ko³_p¡n DÄs¸Sp¯nbncn¡p¶Xv. ]²Xn \nÀÆlWw

XzcnXs¸Sp¯phm\pw ]²XnhnlnXw kab_ÔnXambn

hn\ntbmKn¡psa¶v Dd¸m¡m\pw Cu Bibw hgnsbmcp¡psa¶v

{]Xymin¡p¶p.

Programme Book 2017-18 Page 8

SCHEDULED TRIBES DEVELOPMENT DEPARTMENT

BUDGET 2017-18 - GREEN BOOK

Sl.No Scheme

Code Name of Scheme Head of account

Amount

(Rs Lakh)

0 1 2 3 4

1 WBC290

Incentive and Assistance to

students

i) Special Incentive to

Brilliant students 2225-02-277-40 (01) 100.00

ii) Ayyankali Memorial talent

Search and Development

Scheme

2225-02-277-40 (02) 60.00

(iii) Assistance to study tour

to schools & college going

students

2225-02-277-40 (03) 70.00

(iv)Assistance to Orphans 2225-02-277-40 (04) 100.00

v) Supply of Lap top to

students 2225-02-277-40 (06) 140.00

2 WBC287

Assistance to Tribal Welfare

Institutions 2225-02-102-91 220.00

3

WBC031

Publicity Wing/Information,

Education and

Communication [I.E.C.

Project]

2225-02-277-39 250.00

4 WBC295

Housess to Houseless

2225-02-283-89 11508.00 i) New Houses

ii) Spillover Houses

iii) Repair Houses

Total 12448.00

Programme Book 2017-18 Page 9

TSP PROGRAMMES 2017-18

GREEN BOOK

1. Incentives & Assistance to Students

(Outlay 470.00 lakh)

This scheme comprises of 5 components.

(i) Special Incentive to Brilliant Students

(Outlay: 100.00 lakh)

This is for providing incentives to the brilliant students from ST communities

who perform well in academics and come out with meritorious performance. Under the

scheme, those who secure higher grades/ marks in SSLC, Plus-2, Degree, Post-Graduation

and Research including Professional courses will be awarded incentive at various rates as per

the existing Government order in this regard. Those who excel in the spheres of arts and

sports will also be rewarded with cash incentives/gold medals. During the year 2017-18,

around 2000 students are expected to be assisted under the scheme.

(ii) Ayyankali Memorial Talent Search and Development

(Outlay: 60.00 lakh)

The objective is to provide assistance to talented tribal students (day scholars)

studying from 5th standard to 10th standard are the target group and continuous assistance

will be provided to them to excel in academics and extracurricular activities. Every year, 200

students studying in 5th standards will be selected under this scheme through an intelligence

test to be conducted for them. Assistance for purchase of furniture and books, financial aid

for medical care, monthly stipend, special guidance and counseling will be given to these

selected students for 6 years (from Class 5 to Class 10) as per rate fixed by government from

time to time. During 2017-18, 1200 beneficiaries are expected to be assisted under the

scheme.

(iii) Assistance for Study tour to School & College going Students

(Outlay: 70.00 lakh)

Under this component, ST students of Plus Two, Degree, PG Degree,

Professional,and Diploma courses will be given financial assistance for participating in

excursions and study tours conducted through the educational institutions where they are

studying. Advance amount will be given initially and the balance will be reimbursed on

demand. Also, the scheme intends to conduct Bharat Darshan/All India Tour for selected

tribal students with the approval of the SLWG.

(iv) Assistance to Orphans

(Outlay: 100.00 lakh) This scheme is intended to provide special assistance to the scheduled tribe

children who have no parents to look after. The actual amount required for providing care

Programme Book 2017-18 Page 10

and upbringing of such tribal children will be proposed under this scheme. They will be

provided assistance for education and living till they become adult/wage earners. The fund

will also be utilized for the purpose of survey/identification of such children, for

rehabilitating them and for providing assistance for their upbringing.

(v) Supply of Laptop to Students

(Outlay: 140.00 lakh)

The scheme is envisaged to provide Laptop to ST students studying

professional courses in approved University/institutes. The courses covered for such facility

are MBA, M.Sc Computer Science, MCA, MBBS, BDS, BAMS, BHMS, BVSc.&AH,

B.Tech and M.Tech and other Post Graduation Degrees. Application for the same should be

forwarded through the Principal/ Head of the Institution, provided that the same assistance

has not been received from LSGIs. Laptop will be provided only once to an individual

beneficiary.

An amount of Rs. 470.00 lakh is provided for the above components during 2017-18.

hnZ-ymÀ°n-IÄ¡v t{]mÂkm-l-\hpw klm-bhpw

(hnlnXw : 470.00 e£w cq])

Cu ]²-Xn-bn A©v LS-I-§Ä D−v.

(1) kaÀ°-cmb hnZ-ymÀ°n-IÄ¡v {]tX-yI t{]mÂkm-l-\w.

(hnlnXw : 100.00 e£w cq])

A¡m-Z-an¡v Xe-§-fnepw aäpw anI¨ {]I-S\w ImgvN-h-bv¡p¶

]«nIhÀ¤ hn`mK¯nÂs¸« anSp-¡-cmb hnZ-ymÀ°n-IÄ¡v t{]mÂkm-l\w \ÂIp¶ LS-

I-am-Wn-Xv. \ne-hn-ep-ff kÀ¡mÀ D¯-c-hnse \nc¡v {]Imcw Fkv.-F-kv.-FÂ.-kn, ¹kv

Sp, _ncp-Zw, _ncp-Zm-´c _ncp-Zw, Kth-j-Ww, s{]m^-j-WÂ tImgvkv XpS-§n-b-

hbv¡v IqSq-X amÀ¡v AsÃ-¦n DbÀ¶ t{KUv Ic-Ø-am-¡n-b-hÀ¡v Cu ]²Xn

{]Imcw t{]mÂkm-l\w \ÂIp-¶p. Ie-I-fnepw kvt]mÀSvknepw anI-̈ p-\n¡p-¶-

hÀ¡v Iymjv AhmÀUp-Itfm/ kzÀ® saUtem ]mcn-tXm-jn-I-ambn \ÂIp-¶p.

2017þ18 þÂ GItZiw 2000 Ip«nIsf Cu ]²Xn hgn klmbn¡m³

Dt±in¡p¶p.

(2) A¿-¦mfn sat½m-dn-b Smeâv skÀ¨v Bâv sUhe-̧ vsaâv ]²Xn

(hnlnXw : 60.00 e£w cq])

kaÀ°-cmb ]«n-I-hÀ¤ hnZymÀ°nIsf Ah-cpsS kvIqÄ ]T-\-Im-e¯v

klmbw \ÂIpI F¶-XmWv Cu ]²-Xn-bpsS Dt±-iw. 5 apXÂ 10 hsc-bp-ff ¢mÊp-I-

fn ]Tn-¡p-¶-hcpw ho«n t]mbn hcp-¶-h-cp-amb hnZ-ymÀ°n-Isf e£-y-am¡nbpÅ Cu

]²Xn ]T\¯n\pw ]mtTyXc {]hÀ¯n-I-fnepw XpSÀ¨-bmbn klmbw sN¿m³ Dt±-in-

¡p-¶p. Hmtcm hÀjhpw 5þmw ¢mÊn ]Tn-¡p¶ 200 hnZ-ymÀ°n-Isf _p²niàn ]co-

£-bn-eqsS ]²-Xn-bn-tebv¡v sXc-sª-Sp-¡p-¶p. kÀ¡mÀ D¯-chv {]Im-c-ap-ff

\nc¡v A\pk-cn¨v (5 apXÂ 10 ¢mÊp-h-sc) sXc-sª-Sp-¡p¶ hnZ-ymÀ°n-IÄ¡v Bdv

Programme Book 2017-18 Page 11

hÀj-t¯¡v ^ÀWo-̈ -dp-I-fpw, _p¡p-Ifpw hm§m-\p-ff ss̸âv, {]Xn-amk ss̸âv , sshZ-y-k-lmbw e`n-¡p-¶-Xn-\m-bp-ff km¼-̄ nI klm-bw, {]tX-yI amÀK \nÀt±-ihpw

Iu¬kn-enwKpw XpS-§n-bh ka-bm-k-a-b-§-fn \Â-Ip-¶p.

2017þ18þÂ GI-tZiw 1200 hnZ-ymÀ°n-IÄ¡v Cu ]²Xn {]tbm-P-\-s¸-Sp-sa¶v

{]Xn-£n-¡p-¶p.

(3) kvIqÄ tImtfPv hnZ-ymÀ°n-IÄ¡v ]T\ bm{Xbv¡pff klmbw

(hnlnXw : 70.00 e£w cq])

]«n-I-hÀ¤ hn`m-K-̄ nÂs¸« ¹kv Sp, _ncp-Zw, _ncp-Zm-´c _ncp-Zw, s{]m -̂j-

WÂ,Un-t¹ma tImgvkp-I-fn ]Tn-¡p¶ hnZ-ymÀ°n-IÄ¡v hnZ-ym-̀ -ymk Øm]-\-§Ä hgn

]T\-bm-{Xbv¡pw hnt\m-Z-bm-{Xbv¡pw th−n-bp-ff km¼-̄ nI klmbw \Â-IpI

F¶XmWv Cu ]²-Xn-bpsS e£-yw. ap³Iqdmbn ]Ww \ÂIp-Ibpw ]n¶oSv Bhiy-̄ n-\-

\p-kcn¨v _m¡n ]Ww A\p-h-Zn-¡p-Ibpw sN¿p-¶p. sXc-sª-Sp-¡-s¸-Sp¶ ]«n-I-hÀ¤

hnZ-ymÀ°n-IÄ¡v `mcX- ZÀi\w/C´-y-bn FÃm-bn-S-t¯¡papff ]T-\-bm-{Xbpw kwØm-

\-Xe hÀ¡nwKv {Kq¸nsâ AwKo-Im-c-t¯msS \S-̄ m-\p-ff Dt±-ihpw Cu ]²-Xn-bn-ep-−v.

(4) A\m-Y-cmb Ip«n-IÄ¡p-ff klmbw

(hnlnXw : 100.00 e£w cq])

amXm]nXm-¡Ä t\m¡m-\n-Ãm¯ ]«n-I-hÀ¤-̄ nÂs¸« hnZ-ymÀ°n-IÄ¡v {]tX-yI

klmbw \ÂIp-¶-Xn\p th−n-bmWv Cu ]²Xn e£-y-an-Sp-¶-Xv. C¯cw Ip«n-Isf

t\m¡p-Ibpw Ahsc hfÀ¯p-Ibpw sN¿p-¶-Xn-\m-h-i-y-amb XpI Cu ]²-Xn-bn-eqsS

\ÂIp-¶p. C¯-c-̄ n-ep-ff Ip«n-Isf Is−-¯p-¶-Xn\pw / IW-s¡-Sp¸v \S¯p¶-Xn\pw

Ahsc ]p\-c-[n-h-kn-̧ n-¡p-¶-Xn-\pw, Ahsc hfÀ¯m-\p-ff klm-bhpw CXn \n¶v

hln-¡m-hp-¶-Xm-Wv.

(5) hnZ-ymÀ°n-IÄ¡v em]vtSm¸v hnX-cWw

(hnlnXw : 140.00 e£w cq])

AwKo-IrX bqWnth-gvkn-än-I-fn / Øm]-\-§-fnse s{]m -̂j-W tImgvkp-

I-fn ]Tn-¡p¶ ]«n-I-hÀ¤¡mcmb hnZ-ymÀ°n-IÄ¡v em]vtSm¸v \ÂIm³ Cu ]²Xn

e£-y-an-Sp¶p. Fw.-_n.-F, Fw.-Fkv.kn I¼-yq-«À kb³kv,-Fw.-kn.-F, Fw.-_n.-_n-F-kv,

_n.Un.-F-kv, _n.-F.-Fw.-F-kv, _n.-F-̈ v.-Fw.-F-kv, _n.-hn.F-kv.kn Bâv F.-F-̈ v, _n.sS¡v,

Fw.-sS¡v aäp _ncp-Zm\ -́ c tImgvkp-IÄ¡mWv Cu kuI-cyw \ÂIp-¶-Xv. kvYm]\

ta[mhn /{]n³kn-̧ mÄ aptJ\ At]-£-IÄ kaÀ¸n¡-Ww. Xt±i-̀ -cW Øm]-\-§-fnÂ

\n¶pw em]vtSm¸v e`n-̈ n-«n-söv Dd-̧ m¡Ww. tImgvkv Ime-b-f-hn Hcn-¡Â am{Xta

em]vtSm-¸p-IÄ \Â-Ip-I-bp-f-fp.

2017þ18þ apIfn ]dª LSI§Ä¡mbn 470.00 e£w cq]

hIbncp¯nbn«p−v.

Programme Book 2017-18 Page 12

2. Assistance to Tribal Welfare Institutions

(Outlay: 220.00 lakh) The outlay is for providing grant/ assistance to

i. Priyadarshini Tea Estate, Mananthavady for developing/improving the plantations,

and for running/revamping the tea factory operated by the estate.

ii. Attappady Co-operative Farming Society for projects aimed at revitalization

including extension of plantation to new areas and for developing/ improving

the existing farms.

iii. Ambedkar Memorial Rural Institute for Development (AMRID),Kalpetta, Wayanad

for conducting multifarious leadership training, skill development programmes and

other employment generation activities viz.,production of handicrafts, tailoring,

computer training, printing and book making, coaching to P.S.C Tests, Driving etc.

for the development of Scheduled Tribes.

iv. Running expenses of High School run by the Attappady Co-operative Farming

Society at Chindakky and Tribal Hostel at Chindakky is also proposed under the

scheme. The provision is also for upgradation of facilitiesof the school and hostel.

v. As part of monitoring and revamping of these institutions, conducting an evaluation

study on their financial feasibility is included.

vi. Renovation/Revamping of Tribal societies functioning in sectors like Agriculture,

Coir, and other traditional sectors. Projects aimed at employment and income

generation activities of tribal societies can be given assistance.

An amount of Rs. 220.00 lakh is provided for the scheme during 2017-18.

]«n-I-hÀ¤t£a Øm]-\-§Ä¡p-ff klmbw

(hnlnXw : 220.00 e£w cq])

Cu hnln-X-̄ n-eqsS klmbw \Â-Im-\mbn Dt±-in-¡p-¶-Xv.

• am\- -́hm-Sn-bnse {]nb-ZÀin\n tXbn-e-t¯m«w hnI-k\w, FtÌänsâ A[n-Im-c- ]-cn-[n-bn hcp¶ tXbne ^mÎdnIfpsS \S-̄ n¸pw \ho-I-c-W-hpw.

• \ne-hn-ep-ff ^map-I-fpsS hnI-k-\hpw ¹mtâjs\ ]pXnb taJ-e-I-fn-tebv¡v

hym-]n-̧ n-¡p-Ibpw Ahsb ]p\ÀPn-hn¸n¡p-I-bpw sN¿p¶ t{]mP-IvSp-

IÄ¡m-bp-ff A«¸mSn tImþHm¸td-äohv ^manwKv skmssk-än-bpsS {]hÀ -̄

\-§Ä¡v.

• ]«n-I-hÀ¤ hnI-k-\-̄ n-\p-th−n AX-y-[nIw sshhn-²-y-ap-ff t\Xr-Xz ]cn-io-e-

\-§Ä, ss\]p-Wy hnI-k\ ]cn-]m-Sn-IÄ, AXp-t]m-se-bp-ff sXmgn \Â-

Ip¶ {]hÀ¯-\-§-fmb Ic-Iu-ie hkvXp-I-fpsS D¸m-Z-\w, X¿Â, I¼yq-«À ]cnioe\w, {]n³nwKv _p¡v \nÀ½m-Ww, ]n.-Fkv.kn.]-cn£IÄ¡m-bp-

ff tIm¨nwKv, ss{U-hnwKv F¶nh hb-\m-«nse Awt_-Zv-¡À kvamcI {Kma-hn-

I-k\ C³Ìn-ä-yq«n\v klm-bw.

• Nn−-¡n-bn-ep-ff ]«n-I-hÀ¤ tlmÌepw A«-̧ mSn tImþ-Hm-̧ -td-äohv ^manwKv

skmsskän \S-̄ p¶ sslkvIq-fn-sâ {]hÀ¯-\-§Ä¡p-ff sNehpw Cu

Programme Book 2017-18 Page 13

]²-Xn-bn IqSn \S-¯p-¶p. CXp-Iq-SmsX kvIqfn-sebpw tlmÌ-en-tebpw kuI-c-y-§Ä sa¨-s¸-Sp-¯p-¶-Xn\pw Cu XpI hn\n-tbm-Kn-¡m-hp-¶-Xm-Wv.

• Cu Øm]-\-§-fpsS tamWn-ä-dnw-Knsâ-bpw ]p\-cp-²m-c-W-̄ nsâbpw `mK-ambn

km¼-̄ nI `{ZX kw_Ôn¨pÅ hne-bn-cp-̄ Â ]T\w \S-̄ p-I

• Irjn, IbÀ, aäp-]-c-¼m-cm-KX taJ-e-I-fn {]hÀ¯n-¡p¶ ]«n-I-hÀ¤ kwL-

§-fpsS ]p\-cp-²m-c-W-¯n-\p-ff klm-bhpw Cu ]²-Xn-bn-eqsS sN¿p-¶p.

]«n-I-hÀ¤ kwL-§-fpsS sXmgn-epw, hcp-am-\Zm-b-Ihpamb t{]mP-IvSp-

IÄ¡pw klmbw \ÂIp-¶p.

2017þ18 þÂ Cu ]²Xnbv¡mbn 220.00 e£w cq] hIbncp¯nbncn¡p¶p.

3. Information, Education and Communication Project (IEC)

(Outlay 250.00 lakh) This scheme comprises of two components i.e., (A) Publicity

Wing/Information, Education and Communication Project (IEC); and (B) National Trade &

Art Festival. Major component of the scheme intends to have overall development of the

scheduled tribe and include:

A. Publicity Wing / Information, Education and Communication Project (IEC)

The activities included are:

i. Conduct of cultural programmes, exhibitions, folk art festivals, anti- liquor

propaganda.

ii. Completion of digital documentation including video documentation of Scheduled

Tribes life style, culture and their day to day activities.

iii. Sargotsavam and Kalikkalam (State level youth festival & Sports meet for Secondary

& Higher Secondary students of MRSs and hostels run by theDepartment).

iv. Incentive to ST youths talented in Arts and Sports on the basis of District Level/State

level Certificates - Social Solidarity Programmes

v. Publicity/Advertisement/Documentation/Publications/Programmes on projects of plan

schemes of STDD by the Department or through PRD.

B. National & State Trade fairs – Gadhika

The major objective of which is to promote arts and festivals of tribals. It is

proposed to conduct regional tribal festivals of arts & exhibition cum sale of products

manufactured by the tribal groups. The outlay can also be used for erecting stall & sales

counters and conduct cultural activities.

C. Establishing Tribal & Folk Art Museum

It is proposed to establish a Tribal & Folk Art Museum and associated

facilities in the existing building at Foreshore, Ernakulam.

An amount of Rs. 250.00 lakh is provided for the above activities for 2017-18.

Programme Book 2017-18 Page 14

hnZym`ymk hnhc hn\nab ]²Xn (sF.C.kn)

(hnlnXw : 250.00 e£w cq])

Cu ]²XnIÄ¡v c−v LSI§fp−v. (1) ]»nknän hn`mKw/

C³^Àtaj³,. FUyqt¡j³, I½yqWnt¡j³ t{]mPÎpw (sF.C.kn t{]mPÎv.)

(2)tZiob Iemhym]mctaf. Cu ]²XnbpsS {][m\s¸« LSI¯n ]«nIhÀ¤¡mcpsS

kÀtÆmßpJ hnIk\amWv e£yanSp¶Xv.

F.) ]»nknän hn`mKw / C³^Àtaj³, FUyqt¡j³, I½yqWnt¡j³ t{]mPÎv (sF.C.kn t{]mPÎv )

CXnse {]hÀ¯\§Ä Xmsg]dbp¶hbmWv.

• kmwkvImcnI ]cn]mSnIÄ, FkvIvkn_nj\pIÄ, \mS³ ItemÂkh§Ä, aZyhncp² {]NmcWw XpS§nbh \S¯pI,

• ]«nIhÀ¤¡mcpsS PohnX coXnbnepw kmwkvImcnIhpw ssZ\wZn\hpamb {]hÀ¯\§sf Ipdn¨pÅ UnPnÌ tUmIypsatâj³ tPmenIÄ ]qÀ¯nbm¡pI,

• kÀt¤mÂkhhpw, Ifn¡fhpw ( hIp¸n IognepÅ tamU dknU³jy kvIqfpIfnepw tlmÌepIfnepapÅ sk¡âdn lbÀsk¡âdn hnZymÀ°nIÄ¡pÅ IemImbnIta-fIÄ).

• kwØm\Xe, PnÃmXe kÀ«n^n¡äpIfpsS ASnØm\¯n IemImbnI anIhv ]peÀ¯p¶ ]«nIhÀ¤ hnZymÀ°nIÄ¡pÅ t{]mÕml\hpw(km-aqly sFIy-ZmÀVy ]cn-]m-Sn-IÄ)

• ]«nIhÀ¤ hnIk\ hIp¸nsâtbm / ]n, BÀ.UnbpsStbm ]²Xn ]cn]mSnIsfIpdn¨pÅ t{]mPÎpIÄ¡v {]NmcWw/ ]ckyw/tUmIypsatâj³/ B\pImenI {]kn²oIcW§Ä/ F¶nh \S¯pI,

_n. tZio-b- Xe-¯nepw kwØm\ Xe¯-nepw hym]mctaf K±nI

]«nIhÀ¤¡mcpsS IeIsfbpw DÕh§sfbpw ]cnt]mjn¸n¡m³

Dt±in¨n«pÅXmWv tZiobIem hym]mctaf. ]«nIhÀ¤¡mcpsS IemtafIfpw,

]«nIhÀ¤¡mÀ \nÀ½n¨ DXv]¶§fpsS {]ZÀi\ hn¸\ tafIfpw \S¯m³

Dt±in¡p¶p. ÌmfpIfpw hnÂ]\ Iu−dpIfpw \nÀ½n¡phm\pw kmwkvImcnI

]cn]mSnIÄ \S¯m\papÅ XpI CXn \n¶pw hln¡mhp¶XmWv.

kn. ]«n-I-hÀ¤-¡mcpsS \mS³ Iem {]ZÀi-\m-ebw

Fd-Wm-Ipfw t^mÀtjm-dn ]«n-I-hÀ¤-¡m-cpsS \mS³ Iem-{]-ZÀi-\m-e-bhpw aäv

A\p-_Ô kuI-cy-§fpw \ne-hn-epÅ sI«n-S-̄ n Øm]n-¡m³ Dt±-in-¡p-¶p.

2017-þ18-þ 250.00 e£w cq] apI-fn ]dª {]hÀ¯-\-§Ä¡p-th−n hI-bn-cp-

¯n-bn-cn-¡p-¶p.

Programme Book 2017-18 Page 15

4. Housing

(Outlay: 11508.00 lakh)

This scheme aims at providing financial assistance to the houseless Scheduled Tribes for

construction/ completion/repair of houses. Based on gender disaggregated data 17 per cent

fund will be going to women beneficiaries.

i. Construction of New Houses

It is proposed to assist houseless families to construct new houses during the

financial year 2017-18. Tribal families who do not have livable house/shelter will be

considered in this scheme in 2017-18 as per the Government approved rate. The amount will

be provided in instalments.

ii. Additional Assistance to PMAY Scheme

Additional amount of Rs.1 lakh per houses constructed under the centrally

sponsored programme PMAY since 2015-16 is also included. Required amount will be

provided to the commissionerate of Rural Development.

iii. Completion of Spillover Houses

Providing assistance/ instalment for completion of houses sanctioned in

previous yearsare included in the scheme.

iv. House repair

Renovation of dilapidated and not spacious houses by providing additional

rooms and repair of dilapidated houses are proposed under the scheme. Amount will be

sanctioned according to the requirements and estimates on a case to case basis with a

maximum of `1.50 lakh. It is proposed to assist 500 families during 2017-18. This scheme

will come under the broad umbrella of proposed LIFE Mission. An amount of Rs.11508.00

lakh is provided for the above components of the scheme during 2017-18.

`h-\-\nÀ½mWw

(hnlnXw : 11508.00 e£w cq]) hoSn-Ãm¯ ]«n-I-hÀ¤-¡mÀ¡v ]pXnb hoSv \nÀ½n-¡p-hm³/hoSv ]qÀ¯n-bm-

¡m³/]p\-cp-²m-cWw apX-em-h-bv¡p-ff km¼-̄ nI klm-b-amWv Cu ]²-Xn-bpsS

e£yw.KpW-t`m-àm-¡-fp-sS enwK \nÀWb ØnXn h-§-fpsS ASn-Øm-\-¯n Cu ]²-Xn-

bpsS 17 iX-am-\-t¯mfw h\nXm KpW-t`m-àm-¡Ä¡v e`n-¡p-sa¶v Icp-Xp-¶p.

1. ]pXnb `h-\-§-fpsS \nÀ½mWw

2017þ18þ `h\clnXcmb IpSpw-_-§Ä¡v ]pXnb hoSv \nÀ½n-¡p-hm³

Bhiyamb km¼-̄ nI klmbw sNbvXp sImSp¡-p¶ ]²-Xn-bm-Wn-Xv. 2017þ18 þÂ

hmk-tbmKy-amb hoSp-I-fn-Ãm¯ ]«n-I-hÀ¤ IpSpw-_-§Ä¡v Cu ]²Xn hgn kÀ¡mÀ

Programme Book 2017-18 Page 16

AwKoIcn¨ \nc¡n hoSp-h-bv¡m-\p-ff klmbw sN¿p-¶p. Cu XpI KUp-¡-fmbn \ÂIp-¶p.

2. ]n.-Fw.F.ssh ¡v A[nI [\-k-lmbw

2015-þ16 apXÂ tI{µm-hn-jvIrX ]²-Xn-bmb ]n.-Fw.F.ssh. hgn ]Wn-I-gn-̧ n¨ Hmtcm

hoSn\pw ]«nI hÀK hnI-k\ hIp¸v A[n-I-ambn Hcp e£w cq] \ÂI-Ww. Bh-iy-amb

XpI {Kma hnI-k\ I½o-j-W-td-än-tebv¡v \ÂtI-−-Xm-Wv.

3. kv]n HmhÀ `h-\-§-fpsS ]qÀ¯o-I-cWw

ap³ hÀj-§-fn A\p-h-Zn¨ (kv]n HmhÀ) hoSp-IÄ ]qÀ¯n-bm-¡p-¶-Xn-\p-

th−n [\-k-lm-bhpw Cu ]²Xnbn DÄs¸-Sp-¶p.

4. `h-\-§-fpsS ]p\-cp-²m-cWw

PoÀ®n-̈ Xpw Øe-ku-Icyw Ipd-hmb hoSp-I-fn A[nI apdn-IÄ \nÀ½n¨v \ho-I-

cn-¡p-¶-Xn\pw PoÀ®n¨ `h-\-§-fpsS ]p\-cp-²m-c-Whpw, Cu ]²Xn hgn Dt±-in-¡p-¶p.

Bh-iym-\p-k-cWw FÌn-ta-änsâ ASn-Øm-\-̄ n [\-k-lmbw \ÂIp-¶-Xm-Wv. ]c-am-h[n

1.50 e£w- cq] hsc `h\ \hoI-c-W-̄ n\v \ÂIp¶p. 2017-þ18-þ 500 IpSpw-_-§Äsf Cu

]²Xn hgn klm-bn-¡m³ Dt±-in-¡p-¶p.

Cu ]cn-]mSn sse^v anj-\n DÄs¸-Sp-¶p. 2017-þ18-þ 11508.00 e£w cq] apI-fnÂ

]dª LS-I-§Ä¡mbn hI-bn-cp-̄ n-bn-cn-¡p-¶p.

Programme Book 2017-18 Page 17

SCHEDULED TRIBES DEVELOPMENT DEPARTMENT

BUDGET 2017-18 - AMBER BOOK

(Rs lakh)

Sl.

No

Scheme

Code

Head of

account

Amount

proposed

during

2017-18

Centrally Sponsored Schemes

(50%CSS+60%CSS)

0 1 2 3 4 5

1 WBC 286 Critical Gap filling Schemes [Corpus

Fund] under TSP 2225-02-102-93 5079.00

2 WBC

323

Ambedkar Settlement Development

Scheme (New ATSP fund)

2225-02-102-85 9999.99

i) Infrastructure facilitites

ii) Wage Employment under MNREGs

iii)Health

iv) Expense for the spill over works of

Hamlet Development scheme

implemented by the department since

2013-14 shall also be met from the

scheme

v) P K Kalan 2225-02-102-77 0.01

3 WBC 149 Resettlement of Landless tribals

(TRDM) 2225-02-283-90 5000.00

4 WBC 223 Pooled funds for special projects

proposed by other Depts under TSP 2225-02-102-90 1000.00

5

Umbrella Scheme for education

WBC 236

A). Management cost for the model

residential School and Ashram

school

2225-02-277-49 5500.00

WBC322

B). Promotion of Education among

Sheduled Tribes (T)

2225-02-277-35 1500.00

i) Peripathetic education to PVTGs

ii) Tuitorial Scheme

iii) Gothasarathy

iv) Samuhya Padanamuri (Community

study centre) (New component)

WBC 077 C).Post meric Hostels for Tribal

Students 2225-02-277-73 175.00

WBC 123 D). Improving facilities and renovation

Pre-metric and post meric Hostels 2225-02-277-52 500.00

Programme Book 2017-18 Page 18

0 1 2 3 4 5

6 WBC 292

Comprehensive Health Care

Package

2225-02-282-91 2000.00

i)Running Of Health Care Institution

ii)Medical Assistance Through

Hospitals

iii)Tribal Relief Fund

iv) Health Education programme and

De Adiction campaign in selected tribal

hamlet(New component)

v)Nutrition Rehabiltation Campaign for

Addressing Malnutrition ,Infant

Mortality and Maternal Mortality (New

component

7 WBC 152 Schemes Implemented with Grant-

in-aid under Article 275[1] [OCA] 2225-02-800-29 600.00

8 WBC 072 Food support programme 2225-02-102-92 2500.00

9 WBC271 Assistance for Self Employment and

skill Development training to ST

youths

2225-02-277-42 500.00

10 WBC 288

Honorarium to Tribal Promotors 2225-02-102-89

i) Tribal Promoters 2225-02-102-

89(1) 1360.00

ii) Organisation of Oorukuttoms 2225-02-102-

89(2) 80.00

iii) Honorarium to Management

Trianees and Health management

trainees

2225-02-102-

89(3) 228.00

iv) Honorarium to Counsellors engaged

in the hostels and MRS 2225-02-102-

89(4) 98.00

v) Engaging social workers in tribal

welfare 2225-02-102-

89(5) 125.00

vi) Gothabandhu- Engaging tribal

teachers in primary Schools 2225-02-102-

89(6) 400.00

Programme Book 2017-18 Page 19

0 1 2 3 4 5

11

WBC 320

Assistance to the welfare of

Scheduled Tribes

i) Assistance for the Marriage of ST

girls 2225-02-102-94 250.00

ii) Assistance to Sickle Cell Anemia

patients 2225-02-282-92 175.00

iii) Janani - JanmaRaksha 2225-02-282-89 1500.00

iv) Financial assistance to traditional

tribal healers 2225-02-277-36 25.00

WBC 360 v) Tribal girl child endowment scheme-

Gothra valsalya nidhi 2225-02-102-76 200.00

12 WBC 321

Special Programme for Adiya,

Paniyas Primitive Tribal Groups

and Tribes living in Forest

2225-02-102-86 500.00

i) Adiyas, Paniyas and the primitive

Tribal Groups

ii)Tribes Living in Forest

iii) Destitute Homes

13 WBC 055 Modernisation of Tribal

Development Department 2225-02-001-97 250.00

14 WBC

071

Implementation of Kerala State

Restriction of Transfer of Lands

and Restoration of Alienated Land

Act 1999

2225-02-800-66 50.00

15

Asssistance to Adikala kendra

(KIRTADS)

WBC 079 a) Training / workshop 2225-02-800-56 30.00

b) Wayanad Gothra Bhasha kala

padana kendra 2225-02-277-32 10.00

50% STATE SHARE CENTRALLY

16

(A) WBC238

Construction of buildings for

MRS/Ashram Schools [50% CSS] 4225-02-277-51 1500.00 1500.00

(B) WBC 039 Construction of Boys Hostel [50%

C.S.S] 4225-02-277-96 450.00 450.00

17 WBC 058

Grant-in-aid to Kerala Institute for

Research, Training and

Development studies for SC/ST

(KIRTADS) [50%CSS]

2225-80-001-98 125.00 125.00

18 WBC056 Share Capital contribution to KSDC

for SC/ST [State Share 51%] 4225-02-190-99 25.50 24.50

Programme Book 2017-18 Page 20

0 1 2 3 4 5

19 WBC026 Enforcement of Prevention of

Atrocities Act [State Share 50%]

2225-02-800-68 15.00 15.00

2014-00-103-98 15.00 15.00

Block Panchayat Schemes

20

(1)

PMAY [Block Panchayat] (40%

State share)

2225-02-197-48

(2) S.S 3039.50 4559.20

(2) WBC SGSY / NRLM [Block Panchayat]

(40% State share)

2225-02-197-

48(4) - S.S 255.00 382.50

Total 45060.00 7071.20

21 WBC 046 Special Central Assistance to Tribal

Sub Plan [SCA to TSP] 2225-02-794-98 1300.00

100% Centrally Sponsored Schemes

22 WBC158 Post matric scholarship 2225-02-277-97 3000.00

23 WBC301

Pre-matric Scholarship for Tribal

Students styudying in IX & X

classes

2225-02-277-37 500.00

24 WBC 300 Construction of Girls Hostels 4225-02-277-48 350.00

25 WBC324 Construction of MRS, under art.

275(1) 100% CSS 4225-02-277-45 350.00

26 WBC225

Implementation of STs and other

traditional forest Dwellers

[Recognition of forest] Right Act ,

2006

2225-02-283-86 100.00

27 WBC164 Vocational Training Institute for

Scheduled Tribes 2225-02-277-76 60.00

28 WBC325 Multi purpose hostel for Scheduled

Tribes 4225-02-800-92 199.76

29 WBC166 Conservation cum Development of

Primitive Tribal Group [CCD] 2225-02-794-92 0.01

30 Infrastructure facilities to KIRTADS 2225-02-800-27 0.01

31 WBC174

Grant in aid to the Kerala State

Federation of SCs & STs

Development co-operative Ltd.

2225-80-195-99 0.01

32 WBC162 Upgradation of Merits of ST

students 2225-02-277-62 0.01

33 WBC343 Vanbandhu Kalyan Yojana 2225-02-102-80 1000.00

Total 6859.80 0.00

Total - Amber Book) 51919.80 7071.20

Programme Book 2017-18 Page 21

0 1 2 3 4 5

Grand Total(Green Book +

Amber Book) 64367.80 7071.20

Grand Total(Green Book + Amber Book)

71439.00

Programme Book 2017-18 Page 22

AMBER BOOK

1. Critical Gap Filling Scheme (Corpus Fund) under TSP (Outlay: 5079.00 lakh)

The objective of this scheme is to adopt a project based approach in sanction and

implementation of schemes. This scheme is intended to fund projects received from the

Districts and the Directorate for projects on self employment and skill development,

providing water supply, sanitation, electricity and Community facilitation centres like

community hall, library etc, to tribal people, improving connectivity to inaccessible areas

including construction of roads, bridges, culverts, foot paths etc, technology transfer and

projects for information, communication and education, improvement of health and

sanitation, development of education including soft skills/ vocational training in various

activities and centres for Schedules Tribes with facility of internet, DTP, photostat and FAX

facilities, providing for gap filling that are required in the implementation of schemes

supported by SCA to TSP and for engaging accredited NGO‟s and research institutions for a

third party evaluation of TSP schemes implemented by the Department.

Further, projects for support for meritorious ST students seeking admission in

renowned national/international institutions and assistance to job opportunities abroad in

relevant areas will be considered. Also, projects for development of micro enterprise and

livelihood activities at family level with special priority for rehabilitation of unwed mothers

will be considered. Providing actual rent of lease land to poor ST farmers, who arehaving

below one acre of land and are cultivating lease land, will be part of this scheme. Organizing

Kudumbasree units, assistance for extension of existing Kudumbasree units in Tribal areas

and projects for support for entrepreneurship will also be provided.

One third of the amount would be allocated to Districts on the basis of ST population.

Administrative sanction for schemes up to `25 lakh shall be issued at the Districts, based on

the approval of District Level Committee constituted for Scheduled Caste/Scheduled Tribes.

This amount allotted to districts should not be used for road works and bridges. The project

proposals for the construction of roads & bridges will be considered by the State Level

Working Group based on recommendations of the District Level Committee for Scheduled

Caste/Scheduled Tribes and funds will be provided from the Directorate.

An amount of Rs. 5079.00 lakh is provided for the above programme during 2017-18.

Programme Book 2017-18 Page 23

]«n-I-hÀ¤ D]-]-²Xn {]-Im-c-ap-ff ]cn]mSn-I-fnse \nÀ®m-b-I-amb hnShv \nI¯Â (tImÀ¸kv ^−v) (hnlnXw : 5079.00 e£w cq])

t{]mP-IvS-[n-jvTnX kao-]\w DÄsIm−v ]²-Xn-IÄ¡v AwKo-Imcw \ÂIn

\S-̧ n-em-¡p-I-bmWv Cu ]cn-]m-Sn-bpsS e£yw. PnÃ-I-fn \n¶pw Ub-Îtdän \n¶pw

e`n-¡p¶ t{]m-PIvSpIfn kzbw sXmgnÂ, ss\]p-Wy hnI-k-\w, Pe-hn-X-c-Ww, ipNn-Xzw,

]«n-I-hÀ¤ hn`mK¡mÀ¡p-ff sshZypXo-I-cWw F¯n-s¸-Sm³ {]bm-k-ta-dnb Øe-§-fn-

tebv¡v \S-¸m-X-IÄ, ]me-§Ä, tdmUvv F¶nh \nÀ½n¨v hn\n-ab kuI-cyw sa¨-s¸-Sp-̄ p-

I,kmt¦-XnI hnZymssIam-ähpw hnh-c-§Ä \ÂIp¶Xn\pambn _Ô-s¸« t{]m-P-IvSp-

Ifpw, hmÀ¯m-hn-\n-a-b-hpw, hnZ-ym-̀ -ym-k-hpw, Btcm-K-y-þ-ipNnXz A`nh-y²n, tkm^väv kvInÃp-

IÄ DÄs¸-sS-bp-ff hnZ-ym-̀ -ym-k-̄ nsâ hnI-k-\w, hnhn[ {]hÀ¯n-I-fn sXmgn-e-[n-jvTn-X

]cnioe\w, ]«nIhÀ¤¡mÀ¡pth−n CâÀs\äv, Un.-Sn.]n t^mt«m-Ìm-äv, ^mIvkv kuI-c-y-

§Ä, ]«n-I-hÀ¤ D]-kanXn-bnse {]tXyI tI{µklmbw D]-tbm-Kn-̈ p-ff ]²Xnbnse

hnShp \nI-̄ Â, AwKo-IrX kÀ¡m-cn-Xc GP³kn-I-sfbpw KthjW Øm]\-§-

sfbpw D]tbm-K-s¸-Sp¯n ]«n-I-hÀ¤ hnIk\ hIp¸v \S¸m¡nb ]cn]m-Sn-I-fpsS Hcp

hne-bn-cp-̄ Â XpS§nb t{]mP-IvSp-IÄ¡v XpI \ÂIp-I-bmWv Cu ]²-Xn-bpsS Dt±-iw.

CXp IpSmsX kaÀ°-cmb ]«n-I-hÀ¤ hnZ-ymÀ°nIÄ¡v tZiobXe-

¯nepw A´ÀtZ-iob Xe-̄ nepw anI-hp-ff Øm]-\§fn {]th-i\w t\Sm\pw , hntZ-

i¯v tPmen-¡m-bp-ff Ah-kcw At\-z-jn-¡p¶ ]«n-I-hÀ¤ bph-P-\-§Ä¡v Bh-i-y-

amb klmbw sN¿p-I F¶nh ]cn-K-Wn-¡p-¶p. IpSpw-_m-[n-jvTn-X-ambn XpS-§p¶

kqIvjvakwcw-̀ -§-fp-ambn _Ô-s¸« t{]mPÎpIsfbpw ]cnKWn¡pw. Htc¡dnÂ

Ipdª `qanbpÅ ]«nIhÀ¤ Iyjn¡À¡v AhÀ ]m«¯n\v FSp¯ncn¡p¶ `qanbpsS

bYmÀ° ]m« XpI sImSp¡pI F¶Xpw Cu ]²XnbpsS `mKamWv. ss{S_Â

taJeIfn IpSpw_{io bqWnäv XpS§pIbpw \nehnepÅ IpSpw_{io bqWnäpIfpsS

hn]peoIcWhpw, ]pXnb kwcw`§Ä XpS§phm\pÅ klmbhpw \ÂIp¶XmWv.

]«n-I-hÀ¤ P\-kw-J-y-bpsS ASn-Øm-\-̄ n hnln-X-̄ nsâ aq¶n Hcp-

`mKw PnÃm Xe-̄ n-tebv¡v \o¡n sh¨n-cn-¡p-¶p. 25 e£w cq]-h-sc-bp-ff ]²-Xn-IÄ¡v

]«n-I-hÀ¤ hnI-k-\¯n\pth−n cq]o-I-cn-̈ n-«p-ff PnÃm-Xe I½n-än-IÄ¡v PnÃ-I-fn `c-

Wm-\p-aXn \ÂIm-hp-¶-Xm-Wv. PnÃ-IÄ¡-\p-h-Zn-¡p¶ XpI tdmUv, ]mew F¶n-h-bpsS

\nÀ½mW-̄ n-\mbn D]-tbm-Kn-¡m³ ]mSn-Ã. tdmUp-I-fp-sSbpw, ]me-§-fp-sSbpw,

\nÀ½m-W-̄ n-\p-ff ]²-Xn-IÄ PnÃm-Xe hÀ¡nwKv {Kq¸nsâ ip]mÀi-bpsS ASn-Øm-\-

¯n kwØm-\-Xe hÀ¡nwKv {Kq¸v ]cn-K-Wn-¡p-Ibpw XpI ]«n-I-hÀ¤ hnI-k\

hIp¸n \n¶pw A\p-h-Zn-¡p-Ibpw sN¿p-¶p.

2017þ18 þÂ Cu ]cn-]m-Sn-I-Ä¡mbn 5079.00 e£w cq] hI-bn-cp-̄ n-bn-cn-¡p-¶p.

Programme Book 2017-18 Page 24

2. Ambedkar Settlement Development scheme (Erstwhile ATSP

Fund/Special Package)

(Outlay: 10000.00 lakh)

i. Infrastructure Facilities

It is a scheme for the socio-economic betterment of tribal population living in the

tribal hamlets in the State. It is proposed for meeting the immediate requirements of

infrastructure facilities, economic activities and basic minimum needs of women and

children. Infrastructure facilities include providing houses to houseless tribals in the hamlets,

water supply ,sanitation facilities and resettlement of tribals living in difficult conditions.

ii. Wage Employment under MNREGs

Unemployed tribals may be provided wage employment under MGNREGS and if

needed employment can be provided for 100 plus days. Fund for same may be forwarded to

Commissonerate of Rural Development.

iii. Health

Provision may be extended to health improvement activities, providing nutritious

food

and other basic facilities to women and children wherever necessary under the scheme.

All possible efforts may be taken to converge similar schemes like housing,

employment generation (MNREGS), health, education, Kudumbashree schemes, ICDS,

NSAP, etc implemented by different Department/Agencies.

iv. Expenses for the spill over works of Hamlet Development scheme implemented

by the department since 2013-14 shall also be met from the scheme.

v. P K Kalan Family Benefit Scheme

For the development scattered tribal families, PK Kalan Family benefit Scheme, will

be implemented. Project formulation for each settlement shall be based on a microplan

through participatory rural appraisal tools conducted by Oorokoottams. Extensive

consultations with the line departments is also necessary in participatory rural appraisal and

resource mapping and also in finalizing the implementable action plan. Each micro plan has

to be duly prepared and approved by the District Collector concerned.

Co-ordination of different departments including Rural Devt.,Social Justice, Forest,

Kudumbashree,NREGS Mission,Health,Education etc and Panchayats must be ensured at

Programme Book 2017-18 Page 25

State, District and Local level. At the State level the scheme will be monitored by a High

Level Committee headed by the Hon‟ble Minister for Scheduled Tribes Development and

Hon‟ble Vice - Chairman, State Planning Board. District Collectors shall review the

activities periodically and report to the Principal Secretary, Scheduled Tribes Development

Department. Based on gender disaggregated data 75 per cent fund will be going to women

beneficiaries.

Awt_-Zv¡À skänÂsaâv hnI-k\ ]²Xn. (]p-Xp-¡nb F.än-.Fkv.]n ^−v/ {]tXyI ]mt¡-Pv)

(hnlnXw : 10000.00 e£w cq])

1. ASn-Øm\ kuI-c-y-§Ä

kwØm-\s¯ ]«n-I-hÀ¤ kt¦-X-§-fn hkn-¡p¶ ]«n-I-hÀ¤-¡m-cpsS kmaq-lnI km¼-

¯nI hnI-k-\-amWv Cu ]²-Xn-bn-eqsS e£-y-an-Sp-¶-Xv. ASn-b-´n-c-ambn \S-̧ n-em-t¡− ASn-Øm\ kuI-c-y-§Ä, km¼-̄ nI hnI-k\ {]hÀ¯-\-§Ä, h\n-X-IÄ¡pw, -Ip-«n-

IÄ¡p-apÅ ASn-Øm\ Bh-i-y-§Ä F¶n-h-bmWv \S-̧ n-em-¡m³ Dt±-in-¡p-¶-Xv. ]«n-I-

hÀ¤ kt¦X-§-fn `h-\-c-ln-X-cmb ]«n-I-hÀ¤-¡mÀ¡v `h-\w, IpSn-shÅw,ip-Nn-Xz ]cn-

]m-Sn-IÄ ZpÀLS kml-N-c-y-§-fn hkn-¡p¶ ]«n-I-hÀ¤-¡m-cpsS ]p\-c-[n-hm-k-hpw, ASn-

Øm\ kuI-cy hnI-k-\-¯n DÄs¸-Sp-̄ n-bn-cn-¡p-¶p.

2. Fw.-Pn.-F-³.-BÀ.-C.-Pn.-F-kv. sXmgn-en-\pÅ thX-\w.

alm-ßm-KmÔn {KmaoW sXmgn-ep-d¸p ]²Xn {]Imcw sXmgn cln-X-cmb ]«n-I-hÀ¤-

¡mÀ¡v sXmgn thX\w e`-y-am-¡p-¶-tXm-sSm¸w Bh-i-y-sa-¦n 100 sXm-gnÂZn-\-̄ n\v D]-

cn-bmbn A[nI sXmgn Cu ]²Xn {]Imcw \ÂIp-¶-Xm-Wv. CXn\v Bh-i-y-apÅ XpI

{Kma-hn-I-k\ I½o-j-W-td-än\v ssIam-td-−-Xm-Wv. 3. Btcm-Kyw

sa¨-s¸« Btcm-K-y-{]-hÀ¯-\-§Ä, t]mj-Im-lmcw \ÂI IqSmsX Bh--iysa-

¦n h\n-X-IÄ¡pw Ip«n-IÄ¡pw th− ASn-Øm\ kuI-c-y-§Ä F¶n-hbpw \S-̧ n-em-¡p-

¶-Xm-Wv.

hnhn[ hIp-̧ p-IÄ/GP³kn-IÄ aptJ\ \S-̧ n-em-¡p¶ ]²-Xn-I-fmb `h\ \nÀ½m-Ww,

sXmgnÂZm\w (Fw.-F-³.-BÀ.-C.-Pn.-F-kv) Btcm-K-yw, hnZ-ym-̀ -ym-kw, IpSpw-_{io ]²-Xn-

IÄ, sF.-kn.-Un.-F-kv, F³.- F-kv.-F.]n (s]³j³ kvIoap-IÄ) XpS-§nb ]²-Xn-IÄ

kwtbm-Pn-¸n¨v \S-̧ n-em-¡m-\pÅ {ia-§Ä FSp-t¡−-Xm-Wv.

4. 2013-þ14 apX hIp¸v \S-¸n-em-¡n-bn-cp¶ lmwseäv sUh-e-]vsaâv kvIoansâ kv]nÂ-Hm-hÀ ]Wn-IÄ¡pÅ XpI Cu ]²-Xn-bn \n¶v sNe-hm-¡p-¶-Xm-Wv.

5. ]n.-sI. Imf³ IpSpw-_-t£a ]²Xn

Nn¶n-̈ n-Xdn Xma-kn-¡p¶ tKm{X hn`m-K-§-fpsS hnI-k-\-̄ n-\mbn ]n.-sI. Imf³

IpSpw-_-t£a ]²Xn F¶ t]cn Hcp ]²Xn \S-̧ n-em-¡m³ Dt±-in-¡p-¶p. Hmtcm

Programme Book 2017-18 Page 26

skänÂsaân\pw ]²Xn X¿m-dm-¡p-¶-Xv Ducp-Iq-«-§-fpsS ]¦m-fn¯ {KmaoW hne-bn-cp-¯-ensâ klm-b-t¯msS ssat{Im-¹m³ X¿m-dm-¡n-bmWv ]²Xn \S-¸n-em-¡m³ Dt±-in-¡p-

¶-Xv. ]¦m-fn¯ {KmaoW hne-bn-cp-̄ -en-\mbn hnhn[ hIp-̧ p-I-fp-ambn hni-Z-amb NÀ¨-

Ifpw hn`-h-§Ä tcJ-s¸-Sp¯n \nÀÆ-l-W-¯n\v A\p-tbm-P-y-amb cq]-tcJ A´n-a-am-

¡pI F¶Xv A\n-hm-c-y-am-Wv. Hmtcm ssat{Im-¹m\pw AXmXv PnÃm-I-f-IvS-dpsS AwKo-Imcw

t\tS−-Xm-Wv.

{Kma-hn-I-k\w, kmaq-l-y-\o-Xn, h\w, Btcm-K-yw, hnZ-ym-̀ -ymkw F¶o hnI-k\ hIp-¸p-

Ifpw IpSpw-_-{io anj³ Fw.-F-³.-BÀ.-C.-Pn.-F-kv,]©m-b-̄ p-Ifpw, {]mtZin-I, PnÃm,

kwØm\ Xe-̄ n GtIm-]\w Dd-̧ m-¡p¶-Xm-Wv. ]«n-I-PmXn ]«n-I-hÀ¤ hnI-k\ hIp-

¸p-a-{´n-bp-sSbpw Bkq-{X-W-t_mÀUv sshkv sNbÀam-tâbpw t\X-y-Xr-̄ n kwØm\

Xe-̄ n cq]o-I-cn-̈ n-«pÅ Hcp D¶-X-Xe I½n-än-bmWv kwØm\ Xe-¯n Cu ]cn-]mSn

tamWn-äÀ sN¿p-¶-Xv. PnÃm Xe-̄ n PnÃmIf-IvSÀ Cu ]²-Xn-bpsS {]hÀ¯-\-§Ä

Ah-tem-I\w \S¯n bYm-k-abw ]«n-I-hÀ¤ hnI-k\ hIp¸v {]n³kn-¸Â sk{I-«-dn¡v

dnt¸mÀ«v kaÀ¸n-t¡-−-Xm-Wv. KpW-t`m-àm-¡-fpsS enwK \nÀ®b ØnXn-hn-h-c-§-fpsS

ASn-Øm-\-̄ n Cu ]²-Xn-bpsS 75 iX-am-\-t¯mfw XpI h\nXm KpW-t`m-àm-¡Ä¡v

e`n-¡p-sa¶v Icp-Xp-¶p

3. Resettlement of Landless Tribal People [TRDM] (Outlay: 5000.00 lakh)

The main objective of this scheme is to provide at least one acre of land per family to

landless ST people subject to a ceiling of 5 acres. ST families having less than one acre land

holdings are also eligible under the scheme for availing the remaining extent of land to make

their total holding at least one acre in extent.

In addition to the purchase of land for landless tribal people, various developmental

activities for the rehabilitated tribal people are also considered under this scheme.

Resettlement should be done on project basis with emphasis on planning and implementation

through Oorukoottams.

Projects will be conceived and considered for approval by the Tribal Mission, the

Tribal mission constituted for taking up rehabilitation activities. The key components of

resettlement plan/rehabilitation of ST people are:

• Distribution of land to landless

• Development of minimum needs infrastructure such as housing, drinking water, road,

electricity etc.

• Construction of compound wall along the forest boundary to protect the life and

property of resettlement families.

• Projects for agriculture, animal husbandry, dairy development etc

• Self-employment programme

• Provision of health care

• Intervention on education sector

An amount of Rs.5000.00 lakh is provided during 2017-18 to meet the various

components of the scheme through the State Tribal Resettlement and Development Mission.

Programme Book 2017-18 Page 27

`qclnXcmb ]«nIhÀ¤¡mcpsS ]p\c[nhmkw (än.BÀ.Un.Fw)

(hnlnXw : 5000.00 e£w cq])

`qclnXcmb ]«nIhÀ¤ IpSpw_§Ä¡v IpdªXv Htc¡À `qan apXÂ

5 G¡À hsc `qan \ÂIpI F¶XmWv Cu ]²XnbpsS Dt±iw. Htc¡dn Ipdhv `qan

ssIhiapÅ ]«nIhÀ¤IpSpw_§Ä¡pw Htc¡À Dd¸m¡p¶Xn\mhiyamb `qan

e`n¡p¶Xn\v AÀlXbp−v.

]«nIhÀ¤¯nÂs¸« `qanbnÃm¯ BfpIÄ¡v `qan hm§n¡p¶Xp

IpSmsX ]p\c[nhkn¸n¨ ]«nIhÀ¤¡mcpsS \nch[n hnIk\ {]hÀ¯\§Ä Cu

]²Xnbnep−v. t{]mPÎm[njvTnX coXnbn DucpIq«§Ä hgn ]²XnIÄ Bkq{XWw

sNbvXv \S¸m¡eneqsS ]p\c[nhmkw \S¯p¶p. ]p\c[nhmk

{]hÀ¯\§Ä¡pth−n cq]oIcn¨n«pÅ ss{S_ anj\mb än.BÀ.Un.Fw

t{]mPÎpIÄ kzoIcn¡pIbpw Ahsb AwKoImcw kw_Ôn¨ hniIe\w

\S¯pIbpw sN¿p¶p.

CXnsâ {][m\ LSI§Ä

• `qc-ln-X-cm-b-hÀ¡v `qan hnX-cWw sN¿p-I.

• ASnØm\ kuIcy§fmb hoSv, IpSnshÅw , tdmUv, sshZypXn F¶nhbpsS ]ptcmKXn

• ]p\c[nhkn¡s¸« IpSpw_§fpsS Poh\pw kz¯pw kwc£n¡p¶Xn\pth−n

h\mXnÀ¯nbnepÅ NpäpaXnensâ \nÀ½mWw

• Iyjn, ayK kwc£Ww, £ochnIk\w, F¶nhbv¡pth−nbpÅ t{]mPÎpIÄ

• kzbwsXmgn ]cn]mSnIÄ

• BtcmKy]cn]me\¯n\pth−nbpÅ hyhØ

• hnZym`ymk taJebnse CSs]S kwØm\ ]«nIhÀ¤ ]p\c[nhmk hnIk\ anj³ aptJ\ ]p\c[nhmkhpambn

_Ôs¸« sNehpIÄ¡mbn 2017þ18 þ  5000 e£w cq] hIbncp¯nbncn¡p¶p.

4. Pooled Fund for Special Projects by Other Departments under TSP (Outlay: 1000.00 lakh)

Pooled fund is intended to implement special projects for the benefit of Scheduled

Tribes communities by any Government Departments/ Institutions/ Agencies/ NGOs.

Departments/institutions/agencies/NGOs which require allotment from pooled fund

should submit project proposals with their contribution aiming ST development to State

Planning Board for consideration. If the project is found feasible and admissible, the same

will be forwarded to the ST Development Department by State Planning Board. These

projects will be placed before the SLWG/Special Working Group for consideration and

Programme Book 2017-18 Page 28

approval. The processing, sanctioning, implementation and monitoring etc. will be done by

suitably modifying the existing G.O in this regard.

An amount of Rs.1000.00 lakh is provided for the scheme during 2017-18.

]qÄUv ^−v þ ]«nIhÀ¤ D]]²Xnbn DÄs¸Sp¶Xpw aäv hIp¸pIÄ \nÀt±in¨n«pÅXpamb {]tXyI t{]mPÎpIÄ¡mbpÅ ^−v

(hnlnXw : 1000.00 e£w cq])

]«nIhÀ¤ kaql¯nsâ t£a¯n\pth−n kÀ¡mÀ hIp¸pItfm/

Øm]-\-§-tfm / GP³knItfm/ F³.Pn.H Itfm \nÀt±in¡p¶ {]tXyI t{]mPÎpIÄ

\S¸m¡m³ th−nbpÅXmWv ]qÄUv ^−v.

]qÄUv ^−n \n¶pÅ hnlnXw e`nt¡− hIp¸pIÄ ]«nIhÀ¤ hnIk\s¯

e£yw sh¨pÅ t{]mPÎv kwØm\ Bkq{XW t_mÀUn\v kaÀ¸n¡Ww. t{]mPÎpIÄ

{]mtbmKnIhpw A\paXn sImSp¡m³ ]änbXpamsW¶v Is−¯nbm Bkq{XW

t_mÀUv t{]mPÎpIÄ ]«nIhÀ¤ hnIk\ hIp¸ntebv¡v ssIamdp¶p. Cu

t{]mPÎpIÄ ]n¶oSv kwØm\Xe / kvs]jy hÀ¡nwKv {Kq¸nsâv A\paXnbv¡pw

AwKoImc¯n\pw kaÀ¸n¡p¶p. Cu t{]mPÎpIfpsS hniIe\w `cWm\paXn \ÂIÂ,

\S¸m¡Â, tamWnädowKv F¶nh \ne-hnse kÀ¡mÀ D¯chn A\p-tbm-Py-amb amä§Ä

hcp¯n \S-t¯−Xm-Wv.

5. Umbrella Scheme for the Education of Scheduled Tribes

The components of the scheme are given below.

A. Management Cost for the Running of Model Residential Schools

(Outlay: 5500.00 lakh)

The amount proposed is for meeting the running cost/ management cost for running

17 Model Residential/Ashram Schools, Two Ekalavya and One Special CBSE Model

Residential School. The details of schools are given below.

Sl.No. Name of School

Sl.No.

Name of School

1 Dr. Ambedkar Memorial MRHSS

for Girls, Kattela, Thiruvanthapuram 12

Ashram School, Malamppuzha,

Palakkad

2 Dr. Ambedkar Memorial MRHSS

for Boys, Nalloornad 13

Ashram School, Thirunelli,

Wayand

for Adiyas/Paniyas

3 Rajeev Gandhi Memorial Ashram

HS School, Noolpuzha 14

MRS, Ettumanoor, Kottayam

4 Indira Gandhi Memorial Ashram HS

School, Nilampur 15

MRS, Punalur, Kulathupuzha

5 Silentvalley MRS Mukkali

Attappady 16 MRS Kuttichal

Programme Book 2017-18 Page 29

6 MRHSS Munnar, Idukki

Schools started using grant-in-aid

under Art 275(1) 7

MRHSS South Wayanad,

Kaniyambetta, Kalpetta

8 MRHSS Vadasserikara,

Pathanamthitta

9 MRHSS, Chalakudy, Thrissur 17 Ekalavya MRS, Pookode,

Wayanad

10 MRHSS, Kannur 18 Ekalavya MRS, Idukki

11 MRHSS, Kasargode 19

Dr.Ambedkar Memorial

Vidhyaniketan MRHSS School,

Njaraneeli, Thiruvanathapuram

All expenses relating to cost of running of MRS including cost of establishment

(salaries and allowances) repair and maintenance, minor construction, additional amount for

fuel, cooking gas and provisions, waste management, energy projects, project for

modernization, projects for implementation of e-governance initiatives, extra coaching, skill

development including additional skill acquisition programme and entrepreneurship

development, for group activities like student police cadet, national cadet corps and national

service schemes, e- governance initiatives, purchase of equipments/furniture/computers and

accessories, programmes for soft skill development and for extra/remedial coaching, cost for

conduct of seminar and workshop, cost for meeting travel and allowance to students and staff

for participating in or for conducting various programmes/functions/camps/treks/site

visits/workshops/competitions in India and abroad, cost for meeting study tour of students,

development of health including provision for counselling and special programmes/student

doctor, student police, projects aimed at the overall development of children and cost for

Sahavasa camp for Secondary & Higher Secondary students. The total number of students to

be covered during 2017-18 is 7000.

An amount of Rs.5500.00 lakh is provided for 2017-18 for the running cost/

management cost of the schools.

]«nIhÀ¤¡mcpsS hnZym`ymk¯n\v Hcp IpS¡ogn hcp¶ ]²XnIÄ

Cu ]²XnbpsS LSI§Ä Xmsg sImSp¯ncn¡p¶p.

F). amXr-Im dkn-U³j-y kvIqfp-IÄ \S-̄ p-¶-Xn-\p-ff sNe-hp-IÄ.

(hnlnXw : 5500.00 e£w cq])

17 amXr-I dkn-U³j-yÂ/ B{iaw kvIqfp-IÄ, c−v GI-e-h-y, Hcp {]tX-yI

kn.-_n.-F-kv.C tamU dkn-U³j-y kvIqÄ/B{iaw kvIqfp-IÄ XpS-§n-b-h-bpsS \S-

¯n-̧ n-\p-ff sNe-hp-I-fmWv CXn hI-bn-cp¯nbncn-¡p-¶-Xv.

kvIqfpIfpsS hniZmwi§Ä Xmsg sImSp¡p¶p.

Programme Book 2017-18 Page 30

{Ia \¼À kvIqfnsâ t]cv

( 1 ) ( 2 )

1 tUm. Awt_ZvvIÀ sat½mdnb tamU dkn-U³j-y lbÀ sk¡âdn kvIqÄ (s]¬Ip-«n-IÄ), It«-e, Xncp-h-\-´-]pcw

2 tUm. Awt_ZvvIÀ sat½mdnb tamU dkn-U³j-y lbÀ sk¡âvdn kvIqÄ (B¬Ip-«n-IÄ) \ÃqÀ\mSv

3 cmPohv KmÔn sat½mdnb B{iaw lbÀ sk¡âdn kvIqÄ , \q¸pg

4 Cµncm KmÔn sat½mdnb B{iaw kvIqÄ, \ne¼qÀ

5 sskeâv hmen tamU dkn-U³j-y kvIqÄ, apt¡men, A«-̧ mSn

6 tamU dkn-U³j-y lbÀ sk¡âdn kvIqÄ, CSp¡n

7 tamU dkn-U³j-y lbÀ sk¡âdn kIqÄ, ku¯v hb\mSv, IWnbmw]ä, I¸ä

8 tamU dkn-U³j-y lbÀ sk¡âdn kvIqÄ , hS-tÈ-cn-¡c, ]¯-\w-Xn«

9 tamU dkn-U³j-y lbÀ sk¡âdn kIqÄ , Nme-¡p-Sn, XrÈqÀ

10 tamU dkn-U³j-y lbÀ sk¡âdn kvIqÄ , I®qÀ

11 tamU dkn-U³j-y lbÀ sk¡âdn kIqÄ , ImkÀtKmUv

12 B{iaw kvIqÄ, ae-¼p-g, ]me-¡mSv

13 B{iaw kIqÄ, (A-Snb/]Wn-b) Xncps\Ãn, hb-\mSv

14 tamU dkn-U³j-y lbÀ sk¡âdn kvIqÄ , Gäpam\qÀ, tIm«bw

15 tamU dkn-U³j-y lbÀ sk¡âdn kvIqÄ, ]p\-eqÀ, Ipf-̄ q-̧ pg

16 tamU dknU³jy kvIqÄ, Ipän¨Â, Xncph\´]pcw.

BÀ«n¡nÄ 275(1) {Kmâv C³-þ-FbvUv {]Imcw XpS-§nb kvIqfp-IÄ

17 GI-e-hy tamU dkn-U³j-y kvIqÄ, ]qt¡m-Sv, hb-\mSv

18 GI-e-hy tamU dkn-U³j-y kvIqÄ, CSp¡n

19 tUm. Awt_ZvIÀ sat½mdnb hnZym \ntIX³ tamU dkn-U³j-y kvIqÄ, Rmd\oen, Xncp-h-\- -́]pcw

amXr-Im dkn-U³jy kvIqfp-IÄ \S-̄ p-¶-Xn\mh-i-y-amb FÌm-»n-

jvsaâv (th-X-\hpw , Ae-h³kp-I-fpw) Dĸ-sS-bpff sNe-hp-I-fpw, tISp-]m-Sp-IÄ

XoÀ¡p-I, sNdnb \nÀ½mW {]hÀ¯-\-§Ä, A[nI CÔ-\-̄ n-\m-bp-ff XpI, ]mNI

Programme Book 2017-18 Page 31

hmX-I-̄ n-\p-ff XpI, amen-\y kwkv¡-cWw, DuÀÖ ]cn-]m-Sn-IÄ, \ho-I-c-W-̄ n-\m-bp-ff t{]m-P-IvSp-IÄ, Cþ-K-h-tW³k,v kwcw`-§Ä \S-̧ n-em-¡m-\p-ff t{]mP-IvSp-IÄ,A-[nI

tIm¨nw-Kv, A[nI ss\]p-Wy BÀÖh ]cn-]mSn DÄs¸-sS-bp-ff ss\]p-Wy hnI-k-\w,

kwcw-̀ -I-Xz hnI-k-\w, {Kq¸v {]hr-̄ n-I-fmb ÌpUâv t]meokv tIU-äv, F³.-kn.kn,

F³.-F-kv.-F-kv. Cþ- K-th-W³kv, ^ÀWo-̈ À/I¼-yq-«À/A\p-_Ô km[-\-§Ä hm§n-

¡Â, A[nI tkm^väv kvInÃpIfpsS hnIk\¯n\mbpÅ ]cn-]m-Sn-Ifpw A[nI/]cn-

lmc tIm¨nw-Kp-IÄ, skan-\m-dpw, hÀ¡vtjm¸pw \S-̄ p-¶-Xn-\m-bp-ff sNe-hp-IÄ, hnhn[

]cn-]m-Sn-IÄ/I¼-yq-«dp-IÄ/^oÂUv kµÀi\w/hÀ¡vtjm-̧ p-IÄ/C -́y-bnepw hntZ-i-̄ p-

ap-ff aÕ-c-§Ä XpS-§n-b-hbv¡pff bm{Xm-sNehpw aäv Ae-h³kp-I-fpw, hnZ-ymÀ°n-

I-fpsS ]T-\-bm-{X-bv¡p-ff sNe-hp-IÄ, Btcm-Ky kwc-£Ww DÄs¸sS Iu¬kn-enwKpw

{]tX-yI ]cn-]m-Sn-Ifpw, ÌpUâv tUmÎÀ, ÌpUâv t]meokv, Ip«nIfpsS ka{K hnIk\w,

lbÀ sk¡âdn hnZymÀ°nIÄ¡pÅ klhmk Iym¼v XpS-§n-bh CXn-epÄs¸-Sp-¶p.

2017þ18 þ Â 7000 hnZymÀ°nIsf e£yanSp¶p.

2017þ18þÂ 5500.00 e£w cq] Cu kvIqfpsS \S¯n¸n\mbn hIbncp¯nbncn¡p¶p.

B. Promotion of Education among Scheduled Tribes

(Outlay: 1500.00 lakh)

The scheme comprises of four components. The various components of the scheme

are detailed below.

i. Peripatetic Education to the Primitive Tribes

To impart education to Particularly Vulnerable Tribal Groups and other similar

Scheduled Tribes, 37 peripatetic education centers were started during 2005-06 and the

teachers selected for these centers have been given training through KIRTADS. This scheme

is based on a single teacher programme, and the teacher is expected to visit the identified

settlements and provide education. It is expected that the students will get interested in

education without being uprooted from their isolated settlements. The students covered

would be given hostel accommodation when they reach 2nd and 3rd standards to continue

their education. Thirty single teacher schools and 3 Balavinjana Kendras functioning under

the Department had also been brought under peripatetic education scheme from 2006-07

onwards. A total of 1000 students are targeted.

ii. Tutorial Scheme for Students

The scheme is intended to provide special coaching to students of High School and

Plus I & II classes to increase pass percentage. The monthly tuition fee would be directly

given to parents for providing tuition through nearby tutorials. The target of the scheme is to

cover 6000 ST students of all the above categories. The activities included are:

• Tuition for school going ST students of High School and Plus I & II

• Tuition for SSLC , Plus II and Degree failed Scheduled Tribe students

• Implementation of Gurukulam Programme of the Attappady Co-operative

FarmingSociety, Attappady and Girivikas taken up by Nehru Yuva Kendra, Palakkad.

• One month crash programme before the SSLC & plus two examination (district wise)

under the supervision of Project Officer/ Tribal Development Officers. Food,

accommodation, teaching aids, study materials, honorarium to teachers etc. are met

Programme Book 2017-18 Page 32

from the scheme. The expenditure does not exceed `3500 per student.

• Tuition to students in Pre Matric Hostels.

• Hamlet based tuition system for reducing dropouts.

iii. Gothra Sarathi

Right to Education Act ensures compulsory education up to the age of 14 years, and it

has become the legitimate right of such age group to get education free of cost. As substantial

percentage of the tribal hamlets are in the interior forest and inaccessible areas, majority of

school children are not attending the schools due to threat of wild animals and lack of

transportation facilities. The hostel facility arranged by the department is also inadequate. In

view of these, it has become imperative to arrange transportation facilities to such students in

association with the Education Department, Local Governments and the Parent Teachers

Association. The provision can be utilized only for the benefit of students living in the

interior forest and inaccessible areas.

iv. Samuhya Patanamuri (Community Study centre in tribal hamlets)

(NewComponent)

To create ambience for education in hamlets by setting up community study centre in

each hamlet with provision for tuition. One educated tribal youth (men or women) from the

same locality will be selected and trained to function as tutor with a honorarium of `10000/-

p.m who will work as a facilitator and social worker also. The centre will function in the

already existing community hall or similar structures in the hamlet. It is also proposed to

provide pucca structures wherever needed. Additional facilities including computer with

internet, furniture, reading materials etc. will be provided in each centre for which anticipated

expenditure for establishing the centre in the existing structures comes to ` 5 lakh., including

tutors honorarium/year. The construction cost of new centres would vary with respect to the

site conditions. Light refreshment will also be provided to thestudents.

Based on gender disaggregated data 50 per cent fund will be going to women beneficiaries.

An amount of Rs.1500.00 lakh is provided for the above components of the scheme

during 2017-18.

]«n-I-hÀ¤ hn`m-K-̄ sâ hnZ-ym-̀ -ymkw A`n-hr-²n-s¸-Sp-̄ Â

(hnlnXw : 1500.00 e£w cq])

Cu ]²Xnbn DÄs¸Sp¶ 4 LSI§Ä Xmsg sImSp¯ncn¡p¶p.

1. {]mà\m tKm{X-hÀ¤-¡mÀ¡v s]cn-¸-X-änIv hnZ-ym-̀ -ymkw

{]mà\mtKm{X hn`m-K-̄ nÂs¸« ]«n-I-hÀ¤-¡mÀ¡pw

AXpt]mse kam\amb aäv ]«nIhÀ¤¡mÀ¡pw hnZ-ym-̀ -ymkw \ÂIp-¶-Xn\v th−n

2005þ06þÂ 37 s]cn-̧ -X-änIv hnZ-ym`ymk skâ-dp-IÄ Øm]n-¡p-Ibpw sXc-sªSp¯

Programme Book 2017-18 Page 33

A²ym-]-IÀ¡v InÀ¯mUvkv hgn ]cn-io-e\w \ÂIp-Ibpw sNbvXp- hcp¶p. ]«n-I-hÀ¤-¡msc hnZy A`-y-kn-¸n-¡p-¶-Xn-\mbn sXc-sª-Sp¯ kt¦-X-§-fn A²-ym-]-IÀ

kµÀin¨v ]Tn-¸n-¡p¶ Hcp GIm-²ym-]I ]cn-]m-Sn-bm-WnXv. Hä-s¸« kt¦-X-§-fnse Ip«n-

IÄ¡v kt¦-X-§-fn h¨p Xs¶ hnZ-ym-̀ -ymkw \ÂIn hnZ-ym-̀ -ym-k-̄ n XmXv]-cyw P\n-¸n-

¡p-I-bmWv Cu ]cn-]m-Sn-bpsS e£-yw. c−pw aq¶pw ¢mÊp-I-fn F¯p¶

hnZymÀ°nIÄ¡v XpSÀ¶v ]Tn-¡p-¶-Xn\v tlmÌ kuI-cyw GÀs¸-Sp-̄ p-¶-Xm-Wv.

]«n-I-hÀ¤ hnI-k\ hIp-̧ n-sâ Iogn {]hÀ¯n-¡p¶ 30 GIm-²-ym-]I kvIqfp-Ifpw

3 _me-hn-Úm\ tI{µ-§fpw 2006þ07 apX s]cn-̧ -X-änIv hnZ-ym-̀ -ymk ]²-Xn-bn DÄs¸-

Sp-̄ n-bn-«p-−v. Cu ]cn]mSn 1000 Ip«nIsf e£yanSp¶p.

2. hnZ-ymÀ°n-IÄ¡mbpff Syq-t«m-dn-b ]²Xn

hnP-b-i-X-am\w hÀ²n-̧ n-¡p-¶-Xn-\p-th−n sslkvIq-fn-sebpw ]Xns\m¶v,

]{´−v ¢mÊnepw ]Tn-¡p-¶- hnZymÀ°nIÄ¡v ]co£bv¡mbn {]tXyI Syqj³

\ÂIpI F¶XmWv Cu ]cn]mSnbpsS e£yw. Cu ]cn-]mSn hgn ASp-¯p-ff ]mc-eÂ

tImtf-Pn tNÀ¶v Syq-j³ ]Tn-¡p-¶-Xn-te-¡mbn {]Xn-amkw Syq-j³ ^okv c£m-

IÀ¯m-¡Ä¡v t\cn«v \ÂIp-I-bmWv sN¿p-¶-Xv. apI-fn ]dª hn`m-K-̄ n-ep-ff 6000

]«n-I-hÀ¤ hnZymÀ°n-Isf e£-y-am-¡n-bp-f-f-XmWv Cu ]²-Xn.. CXnse {]hÀ¯-\-§Ä

Xmsg ]d-bp-¶hbmWv.

• sslkv¡q-fp-I-fn-sebpw ]Xns\m¶v, ]{´−v ¢mÊp-I-fn-tebpw ]«n-I-hÀ¤

hnZ-ymÀ°n-IÄ¡v Syq-j³ \ÂIp-I.

• ]cm-PnXcmb Fkv.-F-kv.-FÂ.-kn, ¹kv Sq, Un{Kn ]«n-IhÀ¤ hnZym-À°nIÄ¡v Syq-

j³ \ÂIpI.

• ]me¡m«pÅ s\lvdp bph-tI{µ Gsä-Sp-̄ n-cn-¡p¶ A«¸mSn Kncn- hn-Imkv ]²-Xn,

A«-̧ mSn tIm-þHm-̧ -td-äohv skmsskänbpsS Kpcp-Ipew ]cn-]m-Sn- F¶nh \S-̧ m-¡pI.

• ]«n-I-hÀ¤ hnI-k\ DtZ-ym-K-Ø-À/t{]mPÎv Hm^okÀamÀ F¶nhcpsS taÂt\m-«-

¯n Fkv.-F-kv.-FÂ.-kn, ¹kv Sq ]co£bv¡pap¼mbn Hcp amks¯ Xo{h -]-cn-io-

e\w (Pnà Xncn-̈ v) \S-̄ p-I. Blm-cw, ]mÀ¸n-Sw, ]T-\-k-lm-bn-IÄ, A²-ym-]-I-

cpsS HmW-td-dnbw XpS-§n-bh Cu ]²Xn {]Imcw \ÂIp-¶p. Hcp Ip«n¡v 3500

/þcq]-bn IqSp-X sNe-hm-¡m³ ]mSn-Ã.

• {]osa-{SnIv tlmÌ-ep-I-fnse hnZ-ymÀ°n-IÄ¡v Syq-j³ \ÂIp-I.

• sImgnªpt]m¡v Ipdbp¶Xntebv¡v lmwseäv tI{µoIyX Syqj³ knÌw

\S¸nem¡pI.

3. tKm{X kmcYn

14 hbÊv hsc-bp-ff Ip«n-IÄ¡v hnZ-ym-̀ -ymk Ah-Imi \nb-a-{]-Imcw \nÀ_-

ÔnX hnZ-ym-̀ -ymkw sImSp-¡m³ hy-hØ sN¿p-¶p. CXp hgn AhÀ¡v \nb-am-\p-kr-X-ambn

sNe-hn-ÃmsX Int«− hnZ-ym-̀ -ymkw Dd¸m¡p¶p. ]«n-I-hÀ¤ kt¦-X-§Ä DÄh\-̄ nepw

F¯n-t¨-cm³ ]äm¯ ØeambXn\mepw hml\ KXm-KXw e`-y-a-Ã. AXp-t]mse h\-y-ar-K-

§-fpsS `ojWn sIm−pw kvIqfn F¯n-t¨-cm³ Ign-bp-¶n-Ã. hIp¸v \ÂIp¶

tlmkä kuI-cyw A]-c-ym-]vX-am-Wv. Cu Imcy§Ä I−p-sIm-−v A²ym]I c£

IÀ¯r kwL-S-\-IÄ hgnbpw Xt±-i-kzbw`-cW Øm]-\-§Ä, hnZ-ym-`-ymk hIp-̧ nsâ

klm-b-t¯msS hnZ-ymÀ°n-IÄ¡v KXm-KX kuI-cyw sNbvXp sImSp-t¡-−-Xp−v. DÄh-\-

Programme Book 2017-18 Page 34

§-fnepw F¯n-t¨-cm³ Ign-bm¯ Øe-§-fnepw Xma-kn-¡p¶ hnZ-ymÀ°n-IÄ¡p-th−n am{Xta Cu kuI-cyw D]-tbm-Kn-¡m-hq.

4. kmaq-lnI ]T-\-apdn BZn-hmkn kt¦-X-§-fn kmaqly ]T-\-apdn ( ]pXnb LS-Iw)

]«n-I-hÀ¤ lmwse-äp-I-fn Syqj³ k{¼-Zm-b-t¯msS kmaq-lnI ]T-\-apdn Bcw-

`n¨v hnZym-̀ ym-k-̄ n\pÅ kml-Ncyw ]²Xn hgn Hcp-¡p-¶p.D]-tZ-i-I-\mtbm Sq«-dmtbm

{]hÀ¯n-¡p-¶-Xn\v Hcp bph ]«nI hÀ¤ hn`m-K-̄ nÂs¸-«-bmsf (BtWm/s]t®m) sXc-

sª-Sp¯v amkw tXmdpw 15,000 cq] HmW-td-dnbw hy-h-Ø-bn ]cn-io-e\w \ÂIn \ntbm-Kn-

¡p-¶-Xm-Wv. lmwse-äns\ \ne-hn-ep-ff I½-yq-Wnän lm-fntem kam\ CS-§-fntem {]kvXpX

skâÀ {]hÀ¯n¡pw Bh-iyw th−n-S-̄ v Øncw kuI-cyw \ÂIm\pw Dt±-in-¡p-¶p.

Hmtcm hÀjhpw Sq«-dnsâ HmW-td-dnbw DÄs¸sS A[nI kuI-c-y-§-fmb I¼-yq-«À,

CâÀs\-äv, ^ÀWn-̈ À, hmb\m kma-{Kn-IÄ XpS-§n-b-h-bv¡p-ff sNe-hp-IÄ 5 e£w cq]-

bv¡p-f-fn \nP-s¸-Sp-¯n-s¡m−v XpI A\p-h-Zn-¡p-¶-Xm-Wv. Øe-¯nsâ ØnXn A\p-

k-cn¨v ]pXnb skâ-dp-IfpsS \nÀ½m-W-̄ nsâ sNe-hp-I-fn amäw hcpw. Ip«n-I-Ä¡p-ff

eLp `£-W-̄ n-\p-ff XpI IqSn Cu ]²-Xn-bn DÄs¸-Sp-̄ n-bn-«p-−v. KpW-t`m-àm-¡-

fpsS enwK \nÀ®b kvYnXn hnh-c-§-fpsS ASn-Øm-\-̄ n 50 iX-am\w XpI h\n-X-

IÄ¡v e`n-¡p-¶-Xmbn IW-¡m-¡p¶p.

2017-þ18-þ 1500.00 e£w cq] apI-fn ]dª LS-I-§Ä¡mbn hI-bn-cp-̄ n-bn-cn-

¡p-¶p.

C. Post-matric Hostels for Tribal Students

(Outlay: 175.00 lakh)

The provision is for running the existing three Post-Matric hostels (Boys) at Pattom

(Thiruvananthapuram), Noorani (Palakkad) and East hill (Kozhikode). The sanctioned

strength of three hostels is130 students and at present 163 students are accommodated

(Pattom – 38; Noorani – 90; and East Hill – 35). The recurring cost of new hostels to be

constructed can also be considered under the scheme.

An amount of Rs.175.00 lakh is provided for the scheme during 2017-18.

]«nIhÀ¤ hnZymÀ°nIÄ¡mbpÅ t]mÌv sa{SnIv tlmÌÂ

(hnlnXw : 175.00 e£w cq])

tImgnt¡mSv (CuÌv lnÂ), ]me¡mSv (\qdWn), Xncph\´]pcw (]«w)

F¶nhnS§fn \nehnepÅ 3 B¬Ip«nIÄ¡pÅ t]mÌv sa{SnIv tlmÌepIÄ

\S¯p¶Xn\pth−nbmWv hnlnXw hIbncp¯nbncn¡p¶Xv. 3 tlmÌepIfn kuIcyw

A\phZn¨n«pÅXv 130 hnZymÀ°nIÄ¡mWv. Ct¸mÄ 163 hnZymÀ°nIÄ¡v Xmak

kuIcyw sImSp¯-n-cn¡p¶p. ( ]«wþ 38, \qdWn þ 90, CuÌv ln þ 35) ]pXnb

tlmÌepIfpsS \nÀ½mW¯n\ptijapÅ BhÀ¯\ sNehpIfpw Cu ]²XnbnÂ

\n¶pw hln¡mhp¶XmWv.

2017þ18 þ Â Cu ]²Xnbv¡mbn 175.00 e£w cq] hIbncp¯ncn¡p¶p.

Programme Book 2017-18 Page 35

D. Improving facilities and Renovation of Pre-matric & Post – matric Hostels

(Outlay: 500.00 lakh)

The objective of the scheme is to improve the facilities of pre - matric and post-

matric hostels functioning under the Department to create a good environment for better

education and to provide boarding and lodging facilities to inmates of these hostels. It

includes the cost for minor repairs and maintenance of tribal hostels. Cost for

repair/maintenance work of rain water harvesting system, sanitary napkin incinerator,

installation/repair of roof truss work, purchase of vessels, furniture, computers, repair and

maintenance of hostel, providing electricity/water supply.

Also, all expenses relating to repair and maintenance, additional construction,

additional amount for fuel, cooking gas and provisions, waste management, energy projects,

project for modernization, projects for implementation of e-governance initiatives in the

hostels, purchase of equipments/furniture/computers/ necessary items, development of health

including provision.

For counselling and special programmes/projects aimed at the overall development of

children. Cost for providing extra coaching, programmes for soft skill development and for

extra/remedial coaching, cost for conduct of seminar and workshop, extra coaching, skill

development for the inmates of the hostel are included under the scheme.

An amount of Rs.500.00 lakh is provided for the scheme during 2017-18.

{]osa-{SnIv tlmÌ-ep-I-fp-tSbpw t]mÌv sa{SnIv tlmÌ-ep-I-fp-tSbpw kuI-c-y-§Ä sa -̈s¸-Sp-̄  .

(hnlnXw : 500.00 e£w cq])

]«n-I-hÀ¤ hnI-k\ hIp-̧ nâ Iogn {]hÀ¯n-¡p¶ {]osa-{Sn-Iv-þ-t]m-Ìv-þ-sa--

SnIv tlmÌ-ep-I-fn Xma-kn-¡p¶ hnZ-ymÀ°n-IÄ¡v sa¨-s¸« hnZ-ym-̀ -ymkw t\Sp-¶-Xn-\p-ff

A\p-Iqe kml-N-c-y-§Ä krjvSn-¡p-¶-Xn-te¡v ]«n-I-hÀ¤ tlmÌ-ep-I-fnse kuI-c-y-§Ä

sa¨-s¸-Sp-̄ p-I-bmWv Cu ]²-Xn-bpsS e£-yw, ]«n-I-hÀ¤ tlmÌ-ep-I-fnse sNdnb tISp-

]m-Sp-IÄ XoÀ¡p-¶-Xn-\p-ff sNehpw tlmÌ-ep-I-fpsS ]p\-cp-²m-c-Whpw CXn DÄs¸-

Sp-¶p. hnhn[ ]«n-I-hÀ¤ tlmÌ-ep-I-fnse ag-sh-ff kw`-c-Wn-I-fps ]p\-cp-²m-c-Ww,

h\nXm tlmÌ-ep-I-fn km\n-«dn \m]vIn³ C³kn-\-td-ä-dp-IÄ Øm]n-¡Â, ta¡q-c-I-

fpsS ]p\-cp-²m-c-Ww, ]m{X-§Ä, ^ÀWn-̈ -dp-IÄ, F¶n hm§n-¡p-I, I¼-yq-«-dpIÄ,

tlmÌ-ep-I-fpsS Aä-Ipä ]Wn-IÄ/ ]p\-cp-²m-cWw \S-̄ p-I, sshZ-yp-Xn, IpSn-sh-ffw

XpS-§n-bh \ÂIm\pw Cu ]²-Xn-bn e£-y-an-Sp-¶p.

CXp-Iq-SmsX, tISp-]m-Sp-IÄ XoÀ¡Â, ]p\-cp-²m-c-Whpw A[nI \nÀ½m-Ww,

CÔ-\w, ]mN-I-hm-X-Iw, amen-\y kwkvI-c-Ww, DuÀÖ t{]mP-IvSp-IÄ, \ho-I-c-W-̄ n-\p-

Programme Book 2017-18 Page 36

ff t{]mP-ÎpIÄ, tlmÌ-ep-IÄ¡m-bp-ff Cþ-K-th-W³kv kwcw-̀ -§Ä \S-̧ m-¡m-\p-ff t{]mP-IvSp-IÄ, ^ÀWn-¨-dp-IÄ/I¼-yq-«-dp-IÄ AXp-t]m-se-bp-ff kma-{Kn-IÄ hm§Â,

Iu¬knenwKv XpS§nb {]tXyI ]cn]mSnIÄ AS§nb Atcm¤y hnIk\w, Ip«nIfpsS

ka{K hnIk\¯n\mbpÅ sNe-hp-IÄ, tkm^väv kvInÃp-IÄ hnI-kn-̧ n-¡m-\p-ff A[nI

tIm¨nw-Kp-IÄ, skan-\m-dp-Ifpw hÀ¡vtjm-̧ p-Ifpw \S-̄ m-\m-bp-ff sNe-hp-IÄ, A[nI

tIm¨nw-Kv, tlmÌ-ep-I-fn Xma-kn-¡p-¶-hÀ¡mbn ss\]p-Wy hnI-k\ ¢mÊpIÄ F¶nh

Cu ]²-Xn-bnÂs¸-Sp-¶p.

2017þ18 þ Â Cu ]²Xnbv¡mbn 500.00 e£w cq] hIbncp¯ncn¡p¶p.

6. Comprehensive Tribal Health Care (Outlay: 2000.00 lakh) Outlay is provided for the following components:

i. Running of Health Care Institutions

The Scheduled Tribes Development Department is running five Allopathic

outpatient clinics in the remote scheduled tribe areas of Attappady (2 clinics), Mananthavady

(1 clinic), Chalakudy (1 clinic) and Idukki (1 clinic). More than 24000 ST patients are being

assisted annually through these institutions. Ambulance services and medical camps are also

being conducted through these OP Clinics. The staffs of O.P Clinics are on contract basis

appointed by Scheduled Tribes Development Department. The items in this component are

provision for establishment costs including cost of medicine and other charges for running

these institutions. Also, cost for running medical camps by these OP Clinics is also met from

this scheme.

ii. Medical Assistance through Hospitals

The intention of the scheme is to provide medical care to Scheduled Tribes

people through selected hospital in the state. The outlay is for providing treatment assistance

to tribal people affected by various diseases like Sickle-cell anaemia, TB, Cancer,

Heart/kidney/Brain ailments, Water-borne diseases etc. through approved hospitals in the

state. The allotted amount shall be used for providing/ purchase of medicines, medical

examinations including all types of scanning, provision for medical aids and equipments,

ambulance transportation services in the absence of the same in Government Hospitals. Also,

pocket money for byestanders, food expenses of patients will be proposed in needy cases.

The fund will be distributed through the District Medical Officers concerned

to all 14 District Hospitals, identified Government Hospitals in various districts of the state

where there is substantial ST population, and to the Superintendents of all Government

Medical College Hospitals. Also, fund will be distributed to the Superintendent of two Co-

operative Medical College Hospitals viz. Cochin Medical College and Pariyaram Medical

College, and to the Directors of Sree Chitra Thirunal Institute of Medical Sciences &

Research, Regional Cancer Centre and Malabar Cancer Centre.

iii. Tribal Relief Fund

The scheme is intended to provide financial assistance to the ST population

affected by various diseases and natural calamity.

Financial assistance will be given to the Scheduled Tribes who are below

poverty line and who suffer from various diseases including major diseases like cancer,

heart/kidney/brain ailments etc. They will also be granted assistance as per the Government

Orders issued as „Relief Fund of Hon‟ble Minister‟ up to Rupees one lakh per person.

Financial assistance shall be given to patients producing proper medical certificate obtained

from concerned specialist medical practitioners. Also, it is envisaged to provide a relief to ST

Programme Book 2017-18 Page 37

families in case of emergencies. Expenses incurred for/ financial assistance for organizing

medical camps, transportation of patients to nearby hospitals, provision of nutritious food on

the advice of the doctor, cost of purchase of drugs unavailable in hospitals, cost related to

death/ postmortem, relief for managing disaster/untoward incidents/ accidents, providing

immediate relief to the needy are main components of the scheme. A target of two lakh

beneficiaries expected during 2017-18.

iv. Health Education programmes and de-addiction campaigns in selected tribal

Hamlets: (New Component )

Unhealthy and addictive practices of alcoholism, chewing tobacco or tobacco

based preparations like pan, pan parag etc, are prevailing in many of the tribal groups.

In association with Health Department and Excise Department continuous

campaigning will be organized through medical camps as well as separate health and adult

education sessions. Health education activities and counseling focused on these areas would

be given priority and hospitalisation charges of chronic addicts in de-addiction centres will

also be met from this scheme. It is also proposed to start de-addiction centres near the

existing public health centres. During 2017-18 it is proposed to start three centres in

Wayanad, two in Idukki and one each in Malappuram, Attappady and Thiruvananthapuram.

v. Nutrition Rehabilitation Campaign for Addressing Malnutrition, Infant Mortality

and Maternal Mortality (New Component)

It is proposed to start nutrition rehabilitation campaigns, in association with

Health Department utilizing the services of Mobile Medical Units, in tribal areas where there

is acute malnutrition problem ,The programme will include the following activities.

• Screening

• Nutritional Counselling

• Nutritional Supplementation

• Nutritional Awareness campaign

• Hygiene Awareness.

• Pre-natal and Post natal check ups

• Referral services

This scheme will come under the broad umbrella of proposed Ardram

Mission. An amount of Rs. 2000.00 lakh is provided for the above five components of the

scheme during 2017-18.

ka{K ]«n-I-hÀ¤ Btcm-K-y-kw-c-£Ww

(hnlnXw : 2000.00 e£w cq])

Xmsg ]dbp¶ LSI§Ä¡mWv hnlnXw hIbncp¯nbncn¡p¶Xv.

1) Btcm-K-y-kw-c-£W tI{µ-§-fpsS \S-̄ n¸v

CSp-¡n (1 ¢n\n-Iv), Nme-¡pSn (1 ¢n\n-Iv), am\- -́hmSn (1 ¢n\n-Iv), A«-̧ mSn (2 ¢n\n-Iv)

XpS-§nb hnZqc ]«n-IhÀ¤ taJ-e-I-fn 5 Atem-̧ Xn H.]n ¢n\n-¡p-IÄ hIp¸v \S-̄ p-

¶p. hÀjw-tXmdpw 24,000þ A[nIw tcmKn-Isf Cu tI{µ§Ä hgn klm-bn-¡p-¶p. Cu

Programme Book 2017-18 Page 38

H.]n ¢n\n¡p-IÄ hgn Bw_p-e³kv tkh-\hpw saUn-¡Â Iym-¼p-Ifpw \S-̄ p-¶p. H.-]n. ¢n\n-¡p-I-fn tPmen sN¿p¶ Poh-\-¡msc IcmÀ ASn-Øm-\-̄ n-emWv ]«n-I-hÀ¤

hnI-k\ hIp¸v \nb-an-¡p-¶-Xv. Poh-\-¡m-cpsS i¼fw DÄs¸-sS-bp-ff FÌm-»n-

jvsaâv sNe-hp-Ifpw acp-¶p-I-fpsS hnebpw Cu Øm]\§Ä \S¯n sIm−p t]mIm-

\p-ff aäp sNehv F¶nh Cu ]²-Xn-bpsS LS-I-§-fm-Wv. AXp-t]mse H.]n ¢n\n-¡p-IÄ

\S¯p¶ saUn-¡Â Iym-¼p-IÄ \S-̄ m-\p-ff sNehpw Cu ]²-Xn-bn hI-bn-cp-̄ n-

bn-cn-¡p-¶p.

2) Bip-]-{Xn-IÄ hgn-bp-ff saUn-¡Â klmbw

kwØm-\-s¯ sXcsªSp¯ Bip-]-{Xn-I-fn-eqsS sshZy klmbw ]«n-I-

hÀ¤ hn`m-K-̄ n\v e`yam¡pI F¶-XmWv CXnsâ Dt±-iw. AwKo-IrX Bip-]-{-Xn-IÄ

hgn hnhn[ tcmK§fmb kn¡nÄsk A\oanb, Sn._n. Im³kÀ, lyZbw, Xet¨mÀ,

InUv\n kw_Ôn¨ AkpJ§Ä, PeP\y tcmK§Ä XpS§nbhbpsS ]nSnbnepÅ

]«nIhÀ¤¡mÀ¡v klmbw sN¿p¶p. A\phZn¨ XpI sIm−v acp¶pIÄ hm§pI,

kvIm\nwKv XpS§nb ]cntim[\IÄ \S¯pI, sshZyklmbw e`yam¡pI,

Bw_pe³kv kÀÆokv kÀ¡mÀ Bip]XnIfn e`yam¡pI XpS§nbh sN¿p¶p.

tcmKnIÄ¡v Iq«p\n¡p¶hÀ¡v t]m¡ävaWnbpw BhiyapÅ tcmKnIÄ¡v

Blmc¯nsâ sNehpw \ÂIp¶p.

PnÃm saUn-¡Â Hm^o-kÀamÀ hgn-bmWv 14 PnÃm Bip-]-{Xn-bn-

sebv¡papÅ XpI \ÂIp-¶-Xv. kwØm-\s¯ ]«n-I-hÀ¤ taJ-e-I-fnse sXc-sª-Sp-

¡-s¸« kÀ¡mÀ Bip-]-{Xn-IÄ¡pw, saUn¡Â tImtfPpIÄ¡pw tImþHm¸tdäohv

saUn¡Â tImtfP,v sIm¨n, ]cnbmcw saUn¡Â tImtfPn\pw XpI kq{]−v hgnbpw

sImSp¡p¶p. {ioNn¯nc Xncp-\mÄ saUn-¡Â kb³kv dnkÀ¨v skâ-dnepw doPn-b-

WÂ Iym³kÀ skâ-dnepw ae-_mÀ Iym³kÀ skâ-dnepw Ub-d-IvSÀamÀ aptJ\bpw

XpI sImSp-¡p-¶p.

3) ]«n-I-hÀ¤ Bi-zm-k-\n[n

{]Ir-Xn-t£m-̀ -§fpw hnhn[ tcmK-§fpw _m[n-¡p¶ ]«n-I-hÀ¤-¡mÀ¡v km¼-

¯nI klmbw \Â-Ip-I-bmWv Cu ]²-Xn-bpsS e£yw.

Zmcn-{Z-y-tc-Jbv¡v Xmsg-bp-f-fXpw amc-I-amb Iym³kÀ,

lrZbw/hr¡/akvXnjvI kw_-Ô-amb Akp-J-§Ä sIm−v IjvS-s¸-Sp-¶-Xp-amb ]«n-I-

hÀ¤-¡mÀ¡v km¼-̄ nI klmbw \ÂIp-¶-Xn\v e£-y-an-Sp-¶p. kÀ¡mÀ D¯-chv

{]Imcw _lp-am-\-s¸« a{´n-bpsS Zpcn-Xm-i-zm-k--\n-[n-bn \n¶v HcmÄ¡v Hcp e£w cq]

hsc klmb [\w \ÂIp-¶p. IqSmsX AX-ym-h-iy kµÀ`§-fn ]«n-I-hÀ¤ IpSpw-_-

§Ä¡v Hcm-i-zmkw \ÂIpI F¶Xp IqSn Cu ]²Xn hn`m-h\w sN¿p-¶p. km¼-̄ nI

klmbw \ÂIp-¶Xv _Ô-s¸« kvs]j-y-enÌv saUn-¡Â {]mÎo-j-WÀam-cpsS kÀ«n-^n-¡änsâ ASn-kvYm-\-¯n-em-Wv. saUn-¡Â Iym-¼p-IÄ \S-̄ m-\p-ff km¼-̄ nI klm-

bw, tcmKnsb ASp-̄ p-ff Bip-]-{Xn-bn F¯n-¡m³ klm-bn-¡p-I, tUmIvS-dpsS

\nÀt±-i-{]-Imcw t]mj-I-aq-e-y-§Ä AS-§nb Blmcw \ÂIp-I, Bip-]-{Xn-I-fn e`-y-a-

Ãm¯ acp-¶p-IÄ e`-y-am-¡p-I, t]mÌvamÀ«-̄ n-\m-h-i-y-amb sNe-hp-IÄ, AX-ym-ln-X-§Ä

ssIIm-cyw sN¿m-\p-ff klm-b-\n[n/A{]-Xo-£nX kw`-h-§Ä/A]-I-S-§Ä,Bh-i-y-ap-f-

Programme Book 2017-18 Page 39

f-hÀ¡v s]s«¶v klmbw F¯n-̈ p-sIm-Sp-¡pI F¶n-h-bmWv Cu ]²-Xn-bpsS {][m-\-s¸« LS-I-§Ä 2017-þ18 hÀj¯n c−v e£w KpWt`màm¡sf e£yanSp¶p.

4) Btcm-Ky hnZ-ym-̀ -ymk ]cn-]mSn bpw sXc-sª-Sp-¡-s¸« ]«n-I-hÀK kt¦-X-§-fn el-cn-

hncp² {]NcW ]cn-]m-Sn-IÄ kwL-Sn-¸n-¡pI. (]p-Xnb LS-Iw)

2017-þ18 km¼-̄ n-I-hÀjw ka{K ]«n-I-hÀ¤ Btcm-Ky kwc-£Ww F¶ ioÀj-I-

¯n DÄs¸-Sp¯n A\m-tcm-K-y-]-c-am-bn-«p-ff aZ-y-]m-\w, ]pI-h-en, ]pI-bne Dev]¶-§-fmb

]m³, ]m³]-cmKv F¶n-h-bpsS D]-tbmKw ]«n-I-hÀK kaq-l-̄ n IqSp-X \ne-\n¡p-

¶p.

Btcm-K-y-h-Ip¸pw FIvssk-kv hIp-¸p-ambn tNÀ¶v [mcmfw {]N-c-W-§fpw saUn-¡Â

Iym-¼pw IqSmsX apXnÀ¶-hÀ¡mbn {]tX-yI Btcm-Ky hnZ-ym-̀ -ym-k- ¢m-Êp-Ifpw \S-̄ m³

Dt±-in-¡p-¶p. Cu ]²-Xn-bn \n¶pw Btcm-Ky hnZ-ym-̀ -ymk ]cn-]m-Sn-IÄ¡pw CXp-ambn

_Ô-s¸« {]tX-yI Iu¬kn-enwKn\pw {]m[m-\yw \ÂI-p-Ibpw IqSmsX ZoÀL Ime-am-bn«v

aZ-y-]m-\-̄ n\v ASn-as¸«v elcn hntam-N\ tI{µ-§-fn F¯p-¶-h-cpsS Bip-]-{Xn-sN-

ehpw Is−-̄ m-hp-¶-Xm-Wv. \ne-hn-ep-ff s]mXp-P-\m-tcm-Ky tI{µ-§Ä¡v kao]w elcn

hntam-N\ tI{µ-§Ä XpS-§p-¶-Xn\pw e£-y-an-Sp-¶p. 2017-þ18 km¼-¯n-I-hÀjw CXpambn

_Ô-s¸«v hb-\mSv aq¶v tI{µ-§fpw CSp-¡n-bn 2 tI{µ-§fpw ae-̧ pdw , A«-̧ m-Sn, Xncp-

h\-´-]pcw F¶n-hn-S-§-fn Hmtcm- tI-{µhpw XpS-§p-hm³ Dt±-in-¡p-¶p.

5) t]mjm-Im-lmc¡pd-hv, inip- amXr-a-cW \nc¡v F¶nh Ipd-bv¡p-¶-Xn-\m-bp-ff t]mj-

Imlmc ]p\-c-[n-hmk {]N-cW ]cn-]mSn \yq{So-j³ dolm-_n-en-tä-j³ (]p-Xnb LS-Iw)

KpcpXc t]mj-Im-lm-c-¡p-d-hp-ff ]«n-I-hÀK taJ-e-I-fn Btcm-Ky hIp-¸nsâ

kl-I-c-W-t¯msS k©-cn-¡p¶ saUn-¡Â bqWnäv D]-tbm-Kn¨v t]mj-Im-lmc ]p\-c-[n-

hmk {]N-cWw \S-̧ n-em-¡m³ Dt±-in-¡p-¶p. Cu ]²-Xn-bn DÄs¸-Sp¶ {]hÀ¯-\-§Ä

• ]cn-tim-[\

• t]mj-Im-lmc Iu¬kn-enwKv

• t]mj-Im-lmc ]qcIw \ÂIÂ

• t]mjm-Im-lmc t_m[-h¡-cW {]N-cW ]cn-]mSn

• ipNn-Xz t_m[-h-Xv¡-cWw

• {]k-h-̄ n\v ap¼pw ]n¼p-ap-ff ]cn-tim-[\

• d -̂d tkh\w Cu ]²Xn BÀ{Zw anjsâ ]cn-[n-bn hcp-¶-Xm-Wv. 2017-þ18 apI-fnÂ

]dª A©v LSI§Ä¡pambn 2000.00 e£w cq] hI-bn-cp-̄ n-bn-cn¡p-¶p.

7. Schemes Implemented with Grant – in – Aid under Article 275 [1]

(Outlay: 600.00 lakh)

Activities under this scheme include strengthening the infrastructure in the sectors

critical to enhancement of Human Development Indices such as income generation, health,

education, agriculture, animal husbandry, Human Resource Development in technical and

Programme Book 2017-18 Page 40

vocational spheres, sports promotion, maintenance of schools and hostels, The scheme will

be implemented as per the guidelines issued by GOI.

In addition to the above, the following activities can also be taken up.

• Providing support to organize and register Tribal Arts & Sports clubs.

• Documentation of Tribal Arts and Support for continuance of Scheduled Tribe artists.

The provision is disbursed to the Project Officers/Tribal Development Officers on the

basis of population and Project proposals are submitted with the approval of the District

Level Working Group to the Directorate for placing before the State Level Working Group.

Specific projects pertaining to the above subjects will be scrutinized by the State Level

Working Group headed by the Principal Secretary, ST Development Department for

implementation.

An amount of Rs. 600.00 lakh is provided for the scheme during 2017-18.

BÀ«n¡nÄ 275(1) {]ImcapÅ {Kmâv C³þFbvUv ]²Xn

(hnlnXw : 600.00 e£w cq])

hnZym-̀ ymkw,h-cp-am\ZmbI ]cn-]m-Sn-IÄ, Btcm-Kyw,-Ir-jn,-ar-K-kw-c-£-Ww,-

km-t¦-XnI sXmgn taJ-e-bn-epÅ am\h hn`h tijn hnI-k-\w,-Im-bnI hnI-k-\w,

kv¡qfp-I-fp-sSbpw tlmÌ-ep-I-fp-sSbpw ]cn-]m-e-\w, XpS-§nb am\h hnI-k\ kqN-I-

§-fpsS hfÀ¨sb Xzcn-X-s¸-Sp-̄ p¶ taJ-e-I-fpsS ASn-Øm\ kuI-cy-§Ä Dd-̧ m-¡p-

¶-Xn-\pÅ ]cn-]m-Sn-I-fmWv CXn DÄs¸-Sp-¯p-¶Xv. Cu ]²Xn tI{µ kÀ¡m-cnsâ

amÀ¤ \nÀt±i {]Imcw \S-̧ n-em-¡m-hp-¶-Xm-Wv. CXp IqSmsX Xmsg ]d-bp¶ {]hÀ¯n-

Ifpw Cu ]²-Xn-bn DÄs¸-Sp-̄ mw.

• ]«nIhÀ¤ IemImbnI ¢ºpIÄ¡v \S¯n¸n\pw cPnkvt{Sj\papÅ klmbw

• ]«nIhÀ¤ IeIfpsS {]ZÀi\hpw, ]«nIhÀ¤ IemImc³amÀ¡v {]kvXpX taJebn XpScm\pÅ klmbhpw

Cu hnlnXw P\kwJym\p]mXIambn FÃm t{]mPIv Hm^okÀamÀ¡pw

]«nIhÀ¤ hnIk\ Hm^okÀamÀ¡pw hn`Pn¨p \ÂIp¶Xnsâ ASnØm\¯nÂ

t{]mPÎv PnÃmXe hÀ¡nwKv {Kp¸nsâ AwKoImct¯msS kwØm\Xe hÀ¡nwKv

{Kq¸nsâ AwKoImc¯n\mbn UbdÎtdäntebv¡v Abbv¡p¶p.

apIfn {]kvXmhn¨n«pÅ C\§fnse {]tXyI t{]mPÎpIÄ ]«nIhÀ¤

hnIk\ hIp¸v {]n³kn¸Â sk{I«dn Xeh\mbpÅ kwØm\Xe hÀ¡nwKv {Kq¸nsâ

kqIvjva ]cntim[\bv¡v hnt[bam¡n AwKoImcw \ÂtI−XmWv.

2017þ18 þ Â 600.00 e£w cq] Cu ]²Xnbv¡mbn hIbncp¯ncn¡p¶p

8. Food Support/Security Programme (Outlay 2500.00 lakh)

The scheme is intended for providing food grains in needy tribal areas of all

the Districts in the State and to address the issue of malnutrition and poverty among the STs.

Choice of food items will be decided according to area specific tastes and preferences of the

Programme Book 2017-18 Page 41

tribes and this will be decided at P O / TDO level. Special priority should be given to women

headed families and unwed mothers.

For making the tribal hamlets self-sufficient in food production and to address

the nutritional requirements of the tribal population it is proposed to ensure food security by

encouraging agriculture in the tribal hamlets. In association with Agriculture Department,

site specific packages will be prepared which will include promoting ethnic foodcrops, minor

irrigation, soil and moisture conservation, protection from wild animals, agricultural

extension services, marketing etc, such plans will be implemented by Scheduled Tribes

Development Department in association with Agriculture Department by pooling

ofresources.

In addition to the above, the scheme is also intended for providing fund for the

expenses incurred in transportation and distribution of food kits for the tribal families during

Onam/special occasions. Further, the actual expenditure of transportation charges of statutory

ration to the two ration shops in Idamalakkudy tribal settlement in Idukki District through

Devikulam Girijan Co-operative Society and for meeting similar situations in other remote

tribal areas in the State is also included under the scheme. The provision can also be used for

operating Community Kitchens run by Kudumbashree and other reputed agencies in various

parts of the State.

The provision can be used for nutritional support to needy children, mothers,

bedridden and elderly people etc.

During 2017-18, an amount of Rs. 2500.00 lakh is provided for

implementation of the programme.

`£W¯n\p ff klmb/kpc-£-¡pÅ ]cn-]mSn

(hnlnXw : 2500.00 e£w cq])

Zmcn-{Zy \nÀ½mÀÖ\w e£-y-am¡n kwkvYm-\-¯p-ff FÃm PnÃ-I-fn-tebpw

Bh-i-y-ap-ff ]«n-I-hÀ¤ taJ-e-bn sXmgn e`-y-am-¡p-Ibpw AXp-hgn AhÀ¡v thX\w

]W-ambpw `£-y-[m-\y§fmbpw \ÂIp-¶p. `£y[m\y§Ä {]mtZinI A`ncpNnbpsSbpw

XmXv]cy¯nsâbpw ASnØm\¯n _Ôs¸« ]«nIhÀ¤ Hm^okv Xe¯nÂ

Xocpam\n¡p¶XmWv. `t£ym¸mZ\w hÀ²n¸n¡p¶Xn\v Iyjnbpw A\p_Ô

taJeIÄ¡pw Cu ]²Xnbn {]m[m\yw \ÂIp¶XmWv. ]«nIhÀ¤ anjsâ

]p\c[nhmk hnIk\ ]cn]mSnbpambn `£W klb ]²Xnsb _Ôn¸n¡phm\mWv

Dt±in¡p¶Xv. sXcsªSp¡s¸« `qclnXcpw `h\ clnXcpamb ]«nIhÀ¤

IpSpw_§sf KpWt`màm¡fmbn ]cnKWn¨v BkvXn \nÀ½mW¯n\v Du¶Â

\ÂIp¶Xn\mWv ]²Xn e£yanSp¶Xv.

]«n-I-hÀ¤ kt¦-X-§-fn `£y[m\y-§fn kzbw ]cym-]vXX ssIh-cn-¡p-

¶-Xn\v t]mj-Im-lm-c-¯nsâ Bh-iy-IX A`n-kw-t_m-[\ sN¿p-¶-Xn\pw ]«nIhÀ¤

kt¦-X-§-fn Irjn t{]mÕm-ln-¸n¨v `£y kpc£ Dd-̧ p-h-cp-̄ m³ Dt±-in-¡p-¶p.-C-Xn-te-

¡mbn Hmtcm {]tZ-i-̄ n\pw A\p-kr-X-amb ]mt¡-Pp-IÄ,IÀjI t£a ImÀjnI hnI-

k\ hIp-¸p-ambn kl-I-cn¨v \S-̧ n-em-¡p-¶-Xm-Wv. CXn-te-¡mbn ]c-¼-cm-KX tKm{X `£y

hnf-IÄ sNdp-InS Pe-tk-N-\hpw Pemwi kwc£Whpw, h\y arK-§-fpsS B{I-a-W-̄ nÂ

\n¶pÅ kwc-£-Ww, ImÀjnI hym]\ tkh-\-§Ä, hn]-W\w F¶n-h-b-S-§p¶ taJ-em-[n-

jvTnX ]mt¡-Pp-IÄ DÄs¸-Sp¶ t{]mP-IvSp-IÄ ]«n-I-hÀK hnI-k\ hIp¸v IÀjI

Programme Book 2017-18 Page 42

t£a ImÀjnI hnI-k\ hIp-¸nsâ hn`h kam-l-cWw Iq«n-t¨À¯v ]²-Xn-IÄ \S-̧ n-em-

¡p-¶p.

CXp-IqSmsX HmW¯n\pw AXp-t]m-se-bp-ff {]tX-yI Ah-k-c-§-fnepw

]«n-I-hÀ¤ IpSpw-_-§Ä¡v Blm-c-]mbv-¡-äp-IÄ hnXcWw sN¿p-¶-Xn-\p-ff hnX-cW

sNehpw KXmK-X-sN-ehpw Cu ]²-Xn-bn hI-bn-cp-̄ n-bn-cn-¡p-¶p. tZhn-Ipfw Kncn-P³

tImþ-Hm-̧ tdäohv skmsskän hgn CSp-¡n-bn-ep-ff CS-a-e-¡pSn ]«n-I-h-À¤ A[n-hmk

tI{µn-§-fn -ep-ff c−v -td-j³ I-S-I-fn-tebv¡pw CXp-t]m-ep-ff aäp Øe-§-fn-te¡pw

tdj³ sIm−pt]mIp-¶-Xn-\p-ff KXm-KX sNehpw IpSpw_{io hnPbIcambn

\S¸nem¡ns¡m−ncn¡p¶ I½yqWnän In¨Wv th− XpIbpw Cu ]²Xnbn DÄs¸-Sp-

¯n-bn-cn-¡p-¶p.

t]mj-Im-lm-c-¡p-d-hp-ff Ip«n-IÄ, A½amÀ, InS¸p tcmKnIÄ , hr²-P-

\-§Ä F¶n-hÀ¡pw hnlnXw hn\n-tbm-Kn-¡m-hp-¶-Xm-Wv.

2017þ18þÂ 2500.00 e£w cq] Cu ]²Xn \S¯n¸n\mbn hI-bn-cp-̄ n-bn-cn-¡p¶p.

9. Assistance for Self employment and Skill Development training to ST

youths. (Outlay 500.00 lakh)

As per the Tribal Survey 2008,in Kerala, 107965 tribal families are residing in 4762

settlements comprising a total population of 426208. Among them 1815 families have no

means of subsistence and the unemployed persons in the age group of 15-59 are 84207,

which is 30.27% in that age group. For reducing the intensity of unemployment among the

Scheduled Tribes youth in the State, the Department is proposed to assist ST families for

earning a livelihood by giving assistance for individuals and self help groups for self

employment. Sixty per cent of the beneficiaries should be women and preference will be

given to orphans, widows, unwed mothers and women headed families.

The scheme includes the following.

• Starting of Petty Shops, Photocopier shops, Provision store, Stationery store, Bakery,

DTP Centre, Tailoring units etc.

• Starting of Poultry farm, Goat rearing units, Dairy units, Male calf fattening,

Beekeeping, rabbit units, etc.

• Creation of Labour Bank for various activities of construction sector such as

Carpenter, Mason, Electrician, Plumber etc and for providing training to ST youth for

proper accreditation.

• Training for ST Youths in Para-medical and Nursing courses and other professional

courses under IT and related areas in renowned training centres.

• Training in IT related subjects like DCA, PGDCA, Data Entry, DTP operations, MS

Office, Tally & Computorised Financial Accounting.

• Training for ST Youths in training institutes like Food crafts technology and tourism

technology in KITTS Thiruvananthapuram, Technical Training in NTTF, Training in

Hospitality Management in Hotel Manangement and Catering Technology Institute,

Programme Book 2017-18 Page 43

(Kovalam & Lakkidi) Apparel training courses in KINFRA, and other reputed

institutions. Selection of institution will be as per Govt. norms.

• Coaching for PSC, UPSC, SSC, RRB, Bank examinations.

• Providing skilled teaching including tribal languages.

• Promotion of literacy programmes and non-formal education among STs.

• Entrance oriented coaching to ST students who seek admission for professional

courses

• Training in Ayurveda and traditional healing.

• Pre-engineering training to students

• Provision of Additional Apprenticeship to ITI/ITC passed ST candidates.

• Career Development & orientation classes to Plus Two and Graduate youths.

• Finishing school for skill Development for Under Graduates-Graduates and Post-

Graduate ST students.

• Assistance to educated youths for coaching in Career guidance centres/knowledge

incubation centres and counseling centres for imparting confidence and guidance to

take up new ventures.

• Projects for skill development/entrepreneurship development/ improvement of

personality/special coaching/assistance for job opportunities in India and abroad is

proposed under the scheme.

An amount of Rs.500.00 lakh is provided under the scheme during 2017-18.

]«n-I-hÀ¤ bphm-¡Ä¡v kzbwsXmgn-en\pw ss\]p-WyhnI-k\ ]cn-io-e-\-̄ n-\p-ap-ff klmbw

(hnlnXw : 500.00 e£w cq])

2008þse ss{S_ kÀtÆ A\p-k-cn¨v tIc-f-¯n-ep-ff 107965 ]«n-I-hÀ¤

IpSpw-_-§Ä 4762 kt¦-X-§-fn-embn Ign-bp-¶p. tIc-f-̄ nse sam¯w P\-kw-Jy

426208 ]«nIhÀ¤¡mcp−v. Ah-cn 1815 IpSpw-_-§Ä D]-Po-h-\-amÀ¤w

CÃm-̄ -h-cmWv. 15 apX 59 hb-Ên-\n-S-bn {]mb-ap-ff sXmgnÂc-ln-X-cpsS F®w 84207

BWv. AXm-bXv 30.27 iX-am\w. ]«n-I-hÀ¤ bphXn -bphm¡fnse sXmgnenÃmbva

]cnlcn¡p¶Xn\pw D]-Po-h-\-amÀ¤-̄ n\p th−n kzbw sXmgn kwhn-[m\w hgn

klmbw \ÂIm³ e£-y-an-«n-cn-¡p¶p. CXp-h-gn-bp-ff ]c-am-h[n -k-lmbw 1.5 e£w cq]-

bm-Wv. 60 iX-am-\-t¯mfw KpW-t`m-àm-¡Ä kv{XoI-fm-bn-cn-¡-Ww. A\m-YÀ, hn[-h-

IÄ, Ahn-hm-ln-X-cmb A½-amÀ, kv{XoIÄ Krl-\m-Y-I-fm-bp-ff IpSpw_w F¶n-hÀ¡v

ap³K-W\ \e-Ip-¶-Xm-Wv. Cu ]²-Xn-bpsS LS-I-§Ä Xmsg ]d-bp-¶-h-bm-Wv.

• s]«n-¡-S-IÄ Bcw`n¡Â, t^mt«m-Ìmäv IS-IÄ, s{]mhn-j³ tÌmdp-IÄ, tÌj-

\dn IS-IÄ, t_¡-dn, Un.-Sn.]n. skâ-dp-IÄ ,X-¿Â Øm]-\-§Ä XpS-§n-b-h.

• tImgn hfÀ¯Â tI{µw, BSp-h-fÀ¯Â tI{µw, £oc bqWn-äp-IÄ, I¶p-Ip«n ]cn-]m-e-\w, tX\o¨ hfÀ¯Â, apb hfÀ¯Â XpS-§n-b-h.

• \nÀ½m-W-ta-J-e-bp-ambn _Ô-s¸« Bimcn-¸-Wn (X-̈ ³),takvXncn-, Ce-

Iv{Sojy³, ¹w_À XpS-§nb tPmen-bn-teÀs¸-Sp¶ ]«n-I-hÀ¤ bphm-¡Ä¡v

AwKo-Im-c-]{Xw e`-yam¡m³ te_À _m¦p-IÄ cq]o-I-cn-¡pI apX-em-bh

Programme Book 2017-18 Page 44

• {]ikvvX-amb ]cn-io-e\ tI{µ§-fn ]mcm-sa-Un-¡Â, \gvknwKv tImgvkp-I-fn-te-bv¡pw, sF.-Sn-bp-ambn _Ô-s¸« s{]mjW tImgvkpI-fn-tebv¡pw

]«n-I-hÀ¤ bphm-¡-Ä¡v ]cn-io-e\w \ÂIp-I.

• sF.Sn bpambn _Ô-s¸« hnj-b-§-fmb Un.-kn.-F, ]n.-Pn.-Un.-kn.-F, Umäm F³{Sn,

Un.-Sn.-]n, Fw.-Fkv Hm^o-kv, Smen- &, I¼-yq-«-ssdkvUv ^n\m³j-y A¡u-−nwKv

F¶n-hbv¡v ]cn-io-e\w \ÂIp-I.

• ]«n-I-hÀ¤ bphm-¡Ä¡v ]cn-io-e\ tI{µ-§-fmb Xncp-h-\-́ -]pcs¯ ( Inävkv) `£y kmt¦-XnI hnZy-bnepw F³.än.-än.-F-^v. kmt¦-XnI ]cn-io-e\hpw \ÂIp-I.

tImh-f-s¯bpw e¡n-Sn-bn-tebpw tlm«Â amt\-Pvsaânepw tlmkv¸n-äm-enän

amt\-Pvsaânepw Imä-dnwKv sSIvt\m-f-Pn-bn-epÅ ]cn-io-e-\w,-In³{^-bnse

Xp¶Â ]cn-io-e\w, aäp {]i-kvX-amb Øm]-\-§-fn ]cn-io-e\w \S-¯pI XpS-

§n-bh DÄs¸-Sp-¶p. Øm]-\-§Ä sXc-sª-Sp-¡p-¶Xv kÀ¡mÀ am\-ZWvU

{]Imcambn-cn-¡pw.

• ]n.-F-kv.-kn,-bp.-]n.-F-kv.-kn., Fkv.-F-kv.kn/BÀ.-BÀ._n _m¦v ]co£-I-

Ä¡pÅ ]cnioe-\w.

• tKm{X-hÀ¤ `mj DÄs¸sS ss\]p-Wy in£Ww.

• ]«n-I-hÀ¤-¡mÀ¡p-ff km£-cX ]cn-]m-Sn-Ifpw A\u-tZym-KnI hnZ-ym-̀ -ym-khpw

t{]mÂkm-ln-̧ n-¡pI.

• s{]m -̂j-W tImgvkp-I-fn-te¡v {]thi-\-am-{Kn-¡p¶ ]«n-I-hÀ¤

hnZ-ymÀ°n-IÄ¡v F³{S³kv A[n-jvTnX ]cn-io-e\w \ÂIp-I.

• ]mc¼cy sshZy¯n\pw BbqÀthZ¯n\papÅ ]cnioe\w

• hnZ-ymÀ°n-IÄ¡v F³Pn-\n-b-dowKv tImgvkn-\p-ap¼v ]cnioe\w \ÂIpI.

• sF.-Sn.sF, sF, Sn.-kn. ]mÊmb ]«n-I-hÀ¤ hnZ-ymÀ°n-IÄ¡v A[nI A{]âo-

kvjn¸n\p-ff kuI-c-y-§Ä \ÂIp-I.

• ¹kv.-Sp. _ncp-Z-[m-cn-IÄ XpS-§n-b-hÀ¡v Icn-bÀ hnI-k-\w Hmdn-bt³d-j³ Ivfmkp-Ifpw \ÂIp-I.

• _ncp-Z-[m-cn-IÄ, _ncp-Zm-\- -́_n-cp-Z-[m-cn-IÄ, _ncp-Z-[m-cn-I-f-Ãm-̄ -hÀ XpS-§n-b-

hÀ¡v ss\]p-Wy hnI-k-\-̄ n-\m-bp-ff ^n\n-jnwKv kvIqÄ.

• A`ykvXhnZycmb bphm¡Ä¡v ]pXnb kwcw`§Ä Bcw`n¡p¶Xn\pth−n IcnbÀ ssKU³kv skâvÀ hgnbpÅ ]cnioe\w / Adnhv hfÀ¯pI/

Bßhnizmkw hÀ²n¸n¡p¶Xn\pth−nbpÅ Iu¬knenwKv tI{µw

F¶nhbv¡pÅ klmbw

• ss\]p-Wy hnI-k-\-̄ n-\m-bp-ff t{]mP-IvSp-IÄ/kwcw-̀ -I-X-z hnI-k\w/ hy-àn-

Xz- hn-I-k\w/{]tX-yI tIm¨nw-Kpw, C´-y-bnepw hntZ-i¯pw tPmen-¡p-ff Ah-k-

c-§Ä¡v klmbw \ÂIpI XpS-§nh Cu ]²Xn¡v Iogn hcp-¶p.

2017þ18 þ Â 500.00 e£w cq] Cu ]cn]mSnbv¡mbn hIbncp¯nbncn¡p¶p.

Programme Book 2017-18 Page 45

10. Honorarium to Tribal Promoters (Outlay: 2291.00 lakh) The scheme Honorarium to ST promoters includes the following components viz.

i. ST Promoters

(Outlay: 1360.00 lakh) Tribal promoters are selected and appointed to function as facilitators in tribal

areas for channelizing and extending the benefits of tribal development schemes to the STs.

They will also make a link between the scheduled tribe beneficiaries and the local bodies /

line departments. 1178 tribal youths have been selected and appointed for this purpose (138

youths working as health promoters) and trained in participatory rural appraisal, participatory

monitoring, primary health care and natural resource management. Each promoter will be

given an honorarium of Rs.9000/- and Rs.625 as travelling allowance per month. The

proposed outlay is for giving honorarium to ST promoters, to give them training, for various

awareness generation programmes for the ST promoters

The provision can also be used for providing honorarium to the health

promoters engaged in the hospitals for assisting the scheduled tribe patients.

ii. Organization of Oorukoottams

(Outlay: 80.00 lakh)

The objective of this scheme is to empower ST population by means of creation of

Oorukoottams in all tribal settlements. Oorukottams will meet at least once in a quarter,

meeting expenditure for each oorukootam not exceeding Rs.2500/-. The provision is for

meeting expenditures to be incurred for the purpose and capacity building activies including

giving awareness programmes to the entire members of the Orukoottams.

iii. Honorarium to Management Trainees and Health Management Trainees

(Outlay: 228.00 lakh)

Scheduled Tribes Development Department is providing apprenticeship training to the

educated unemployed youths for one year as per Apprenticeship Act based on the

qualification prescribed from time to time for Management trainees and Health Management

Trainees. During 2017-18 about 140 Management Trainees and 50 Health Management

Trainees will be trained under the component. Based on gender disaggregated data 61.40

percent fund will be going to women beneficiaries.

iv. Honorarium to Counselors engaged in the Hostels and MRS.

(Outlay: 98.00 lakh)

Scheduled Tribes Development Department is giving residential

accommodation for more than 10,000 students in 106 pre-matric hostels, 3 post-matric

hostels and 19 MRSs. As they are coming from economically and socially backward

families, they face the issues of adaptability with the new situations, problems of

adjustments, interpersonal relationships and introvert habits. For addressing their

Programme Book 2017-18 Page 46

psychological problems, Department is engaging 49 student counsellors in these institutions

from 2005-06 onwards. The minimum qualification prescribed for the counsellor is MSW

Degree/M.A Psychology or other qualifications equivalent to the above approved by the

Government of Kerala. Student Counsellors with good track record and counselors from ST

communities will be given preference. Rate of honorarium will be as per the existing G.O in

this regard. Based on gender disaggregateddata 50 per cent fund will be going to women

beneficiaries.

v. Engaging Social Workers in Tribal Welfare

(Outlay: 125.00 lakh)

In this component 100 women social workers preferably SSLC holders will be

engaged in tribal welfare sector as facilitator for counseling, arranging conferences,

increasing resources, spreading public awareness through conducting awareness camps

against the consumption of drugs, alcohols, tobacco etc. in a Community Organization Mode.

Outlay is proposed for providing training and honorarium to women social workers in tribal

areas as per the G.Os in this regard. Based on gender disaggregated data 75 per cent fund will

be going to women beneficiaries.

vi. Gothrabandhu- Engaging Tribal teachers in primary schools

(Outlay: 400.00 lakh)

To ensure proper education to tribal children, one educated tribal youth (men

or women) preferably with TTC/B.Ed qualification from the same locality with knowledge in

tribal dialect and Malayalam will be selected and trained to function as teacher/education

facilitator in all Primary Schools according to the strength of tribal students, with honorarium

of `15000/- p.m. Along with teaching, these teachers will also be entrusted to addressing the

language issues of tribal children, reducing drop outs and ensuring cent per cent enrolment of

tribal children, intensive coaching of tribal students, acting as social worker and facilitator

for tribal children. This person would be able to liaise between the community and the

educational institutions, and at the same time take care of the child.

An amount of Rs.2291.00 lakh is provided for the above components of the

scheme during 2017-18.

ss{S_ s{]mtam-«ÀamÀ¡p-ff HmW-td-dnbw

(hnlnXw : 2291.00 e£w cq])

Cu ]²Xnbn Xmsg ]d-bp¶ LS-I-§-fm-Wp-f-f-Xv.

1. ss{S_Â s{]mtam-«ÀamÀ (hnlnXw : 1360.00 e£w cq])

]«n-I-hÀ¤ hnI-k\ ]²-Xn-I-fpsS KpW- -̂e-§Ä ]«nIhÀ¤KpW-t`m-àm-¡-

fn F¯n-¡m³ th−n sXc-sª-Sp¯p \nba-n-¡p-¶-h-cmWv ]«n-I-hÀ¤ s{]mtam-

«ÀamÀ.KpW-t`m-àm-¡-tfbpw ]©m-b-̄ p-I-tfbpw hnI-k\ hIp-̧ p-I-tfbpw _Ôn-̧ n-

¡p¶ I®n-bmbpw ChÀ {]hÀ¯n-¡p-¶p. 1178 ]«n-I-hÀ¤ bphm-¡sf sXcsªSp¯v

\nb-an-¡p-Ibpw ( sl¯v {]tam«Àamcbn 138 bphm¡Ä tkh\a\pjvSn¡p¶p.)

Programme Book 2017-18 Page 47

AhÀ¡v {KmaoW ]¦m-fn¯ Ah-tem-I-\w, ]¦m-fn¯ tamWn-ä-dnw-Kv, {]mY-anI Btcm-K-y-]-cn-]m-e-\w, {]IrXn hn`-h-§-fpsS amt\-Pvsaâv F¶n-h-bn ]cn-io-e\w \ÂIpw . ChÀ¡v

{]Xn-amkw 9000 cq] HmW-td-dn-bw. 625 /þ cq] bm{Xm _¯bpw \ÂIp¶p−v. ss{S-_Â

s{]mtam-«ÀamÀ¡v HmW-td-dnbw \e-Ip-¶-Xn\pw ]cn-io-e\w \ÂIp¶-Xn-\pw, hnhn[ Ah-

t_m--[\ ]cn]mSn-IÄ \S-̄ p-¶-Xn-\p-ambn XpI hIbncp¯nbncn¡p¶p.

Bip]{Xnbn ]«n-I-hÀ¤ tcmKn-Isf t\m¡p¶ BtcmKy s{]tam-«ÀamÀ¡v

tlmWtddnbw \ÂIp¶Xn\v Cu XpI hn\n-tbm-Kn-¡m-hp-¶-XmWv.

2. Ducp-Iq-«-§-fpsS kwLm-S\w (hnlnXw : 80.00 e£w cq])

]«n-I-hÀ¤¡mcpsS imàn-I-c-W-̄ n-\p-th−n Ducp-Iq-«-§Ä FÃm ]«n-I-

hÀ¤ taJ-e-bnepw cq]o-I-cn-t¡−Xp−v. Ducp-Iq-«-§Ä \mep amk-¯n-sem-cn-¡-se-¦nepw

IptS-−Xpw CXn\v hcp¶ sNe-hv Hmtcm DucpIq«¯n\pw 2500 cq]bn Ihn-b-cp-Xv.

CXn\v th−n-bpff sNe-hp-IÄ \S-̄ m\pw IqSmsX Imcy{]m]vXn sa¨s¸Sp¯p¶Xn\v

FÃm AwK§Ä¡pw Ducp-Iq-«-§-fn Ah-t_m-[\ ]cn-]m-Sn-IÄ \S-¯m\pw XpI hn\n-

tbm-Kn-¡p-¶p.

3. amt\-Pvsaâv ]cn-io-e-IÀ¡pw sl¯v amt\-Pvsaâv ]cn-io-e-I-À-¡p-ap-ff HmW-td-dn-bw.

(hnlnXw : 228.00 e£w cq])

tPmen-bn-Ãm¯ hnZ-ym-̀ -ym-k-ap-ff ]«n-I-hÀ¤ bphm-¡Ä¡v A{]ân-kvjn¸v

\nbaw A\p-k-cn¨v Hcp hÀj-t¯¡v, ka-bm-k-a-b-§-fn ]d-bp¶ tbmK-yX A\p-k-

cn¨v, amt\-Pvsaâv ]cn-io-eIÀ¡pw sl¯v amt\Pvsaâv ]cnioeIÀ¡pw ]«n-I-hÀ¤

hnI-k\ hIp¸v A{]âvnkvjn¸v ]cnioe\w \ÂIp-¶p. 2017þ18 þ Â GItZ-iw 140

at\Pvsaâv ]cnioeIÀ¡pw 50 sl¯v amt\Pvsaâv ]cnioeIÀ¡pw CXp{]Imcw

]cnioe\w \ÂIp¶XmWv. KpW-t`m-àm-¡fpsS enwK \nÀ®b ØnXn hnh-c-§-fpsS ASn-

Øm-\-̄ n Cu ]²-Xn-bpsS 61.40 iX-am\t¯mfw h\nXm KpW-t`m-àm-¡Ä¡v e`n-¡p-

sa¶v Icp-Xp-¶p.

4. tlmÌ-ep-I-fnepwFw.-BÀFÊn-ep-ap-Å Iu¬kn-eÀamÀ¡v HmW-td-dn-bw.

(hnlnXw : 98.00 e£w cq])

]«n-I-hÀ¤ hnI-k\ hIp-̧ nsâ 106 {]nsa-{SnIv tlmÌ-ep-I-fnepw 3 t]mÌv

sa{SnIv tlmÌ-ep-I-fnepw 19 Fw.-BÀ.-FÊpIfn-ep-ambn 10000þ¯n A[nIw hnZ-ymÀ°n-

IÄ Xma-kn¨v ]Tn-¡p-¶p. kmaq-l-y-ambpw km¼-̄ n-I-ambpw ]nt¶m¡w \n¡p¶

IpSpw-_-§-fn \n¶p-ap-ff Ip«n-IÄ¡v ]pXnb kml-N-c-y-§-fpambn

s]mcp¯s¸Sp¶Xn\pÅ {]iv\§Ä, s]mcp¯s¸SepIfnse {]iv\§Ä, A´ÀapJ

kz-̀ m-h-apÅhcpw, hyàn _Ô§fpsams¡ {]iv\§fmbn Xocmdp−vv. Ah-cpsS

C¯cw am\-knI {]iv\-§sf A`n-ap-Jo-I-cn-¡m³ th−n ]«n-I-hÀ¤ hnI-k\ hIp¸v

2005þ06 apX 49 ÌpUâv Iu¬kn-te-gvkns\ GÀs¸-Sp-̄ n. tIcf kÀ¡mÀ

AwKo-I-cn¨ Fw.-F-kv. U_yq/Fw.-F.-ssk-t¡m-fPn AsÃ-¦n X¯p-e-y- tbm-K-y-

XbmWv Iu¬kn-eÀ¡v th− Ipdª tbmK-yX. \à {]hy-̄ n-]-cn-N-b-ap-f-f-hÀ¡pw ]«n-I-hÀ¤-̄ nÂs¸« ÌpUâv Iu¬kneÀamÀ¡pw ap³K-W\ \ÂIp-¶-Xm-Wv. Kh-

Programme Book 2017-18 Page 48

s×âv D¯chv {]Imcw tlmWtddnbw \ÂIp¶XmWv. KpW-t`m-àm-¡fpsS enwK \nÀ®b ØnXn hnh-c-§-fpsS ASn-Øm-\-̄ n Cu ]²-Xn-bpsS 50 iX-am\t¯mfw

h\nXm KpW-t`m-àm-¡Ä¡v e`n-¡p-sa¶v Icp-Xp-¶p.

5. ]«n-I-hÀ¤ t£a-̄ n-\p-th−n kmaq-ly {]hÀ¯-I-cpsS tkh\w D]-tbm-K-s¸-Sp-¯Â.

(hnlnXw : 125.00 e£w cq])

sXc-sª-Sp¯ ]¯mw ¢mÊp-Im-cmb 100 h\nXm tkmjy hÀ¡ÀamÀ ]«nI hÀK

hnI-k\ taJ-e-bn Iu¬kn-enwKv \S-̄ p-¶-Xn-\mbn s^kn-en-tä-ä-dmbn {]hÀ¯n-¡p-¶p.

hn`h kam-l-cWw, tIm¬^-d³kn\v th− kuIcyw GÀs¸-Sp-̄ p-Ibpw,a-Zyw,-e-l-cn,-]pI-

bne XpS-§n-bh D]-tbm-Kn-¡p-¶-Xn-s\-Xnsc A-ht_m[ Iym¼p-IÄ kmaq-lym-[n-jvTn-X-

ambn \S¯n P\-§-fn t_m[-h¡-cWw D−m-¡p-Ibpw sN¿p-¶p.-C-§-s\-bpÅ

h\nXm tkmjy hÀ¡ÀamÀ¡pÅ HmW-td-dnbw kÀ¡mÀ D¯-chv {]Imcw \ÂIp-¶-

Xn\v hnlnXw hI-bn-cp-¯n-bn-cn-¡p-¶p.-Kp-W-t`m-àm-¡-fpsS enwK \nÀ®b ØnXn hnh-c-§-fpsS ASn-Øm-\-̄ n Cu ]²-Xn-bpsS 75 iX-am-\-t¯mfw XpI h\nXm KpW-t`m-àm-

¡Ä¡v e`n-¡p-sa¶v Icp-Xp-¶p.

6. tKm{X-_Ôpþss{]-adn kvIqfp-I-fn tKm{X hn`mK A²-ym-]-I-cpsS tkh\w

(hnlnXw : 400.00 e£w cq])

]«n-I-hÀK hn`m-K-̄ nÂs¸« hnZ-ymÀ°n-I-fp-ff ss{]adn kvIqfp-I-fn Ah-cpsS

F®-̄ nsâ ASn-Øm-\-¯n än.-än.kn/_n.-FUv tbmK-y-X-bp-ff {]tZ-is¯ Hcp bph hnZ-ym-

k-¼-¶s\ (BtWm/s]t®m) BZn-hmkn `mj-bp-sSbpw ae-bmf `mj-bp-sSbpw Adn-hnsâ

ASn-kvYm¯n sXc-sªSp¯v th− ]cn-io-e\w \ÂIn amkw 15000 cq] HmW-td-dnbw

\nc-¡n ss{]adn kvIqfn So¨tdm hnZ-ym-̀ -ymk D]-tZ-i-I-\mtbm {]hÀ¯n-̧ n-¡m³ Cu

]²Xn hgn Dt±-in-¡p-¶p. hnZ-ym-̀ -ymkw \ÂIp-¶-Xn--t\m-sSm¸w tKm{X hn-̀ m-K-̄ n-ep-ff

hnZymÀ°n-I-fpsS `mjm-{]-iv\-§Ä ]cn-l-cn-¡p-Ibpw sImgnªv t]m¡v Ipd-bv¡p-Ibpw

100 iX-am\w BZn-hmkn Ip«n-I-fpsS kvIqÄ {]th-i\w Dd-̧ m¡p-Ibpw Ip«n-IÄ¡p-th−

]cn-io-e\w \ÂIn Hcp tkmj-y hÀ¡-dmbpw D]-tZ-i-I-\mbpw ChÀ {]hÀ¯n-t¡−-

XmWv. IqSmsX hnZymÀ°n-Isf ]cn-N-cn-̈ p-sIm−v kaq-l-̄ n-sâbpw kvIqfn-sâbpw CS-

bn {]hÀ¯n-¡p-¶-h-cp-am-bn-cn-¡-Ww.

2017þ18 þ  2291.00 e£w cq] apIfn ]dª LSI§Ä¡mbn hIbncp¯nbncn¡p¶p.

11. Assistance for the welfare of Scheduled Tribes (Outlay: 2150.00 Lakh) The scheme comprises of 5 components. The various components of the scheme are

detailed below.

i. Assistance to Marriage of ST girls

(Outlay :250.00 lakh)

It is intended to reduce the burden of marriage expenses of daughters of

parents belong to Scheduled Tribe population. The Department provides assistance to parents

as marriage grant. The rate of assistance is `1.00 Lakh per family/adult girl. Priority will be

given to the daughters of widows, unwed mothers and incapacitated parents. The assistance

Programme Book 2017-18 Page 49

to the Scheduled Tribe girls who do not have parents to look after (orphan) will be 1.50 lakh.

This additional provision may be provided subject to Government order. The beneficiary

should produce relevant certificates. The target of this component is to cover approximately

250 families/adult girls during 2017-18.

ii. Assistance for Sickle-cell Anemia Patients

(Outlay: 175.00 lakh) Sickle Cell Anaemia is an inherited lifelong disease prevailing among the

Scheduled Tribes of Wayanad, Palakkad, Kozhikode and Malappurarm districts. Continuous

body pain, mental stress, inability to do hard work, malnutrition are the common problems

faced by these patients. Scheme intended to provide monthly financial assistance of 2000/- to

such patients.

iii. Janani-Janma Raksha

(Outlay:1500.00 lakh)

One of the major concerns in the development of tribal health aspect is that

pertains to the nutritional issues of mother and child. Inadequate pre and post maternal care

ranks top among them and is attributed mainly to the lack of timely financial assistance. The

scheme is envisaged for extending timely assistance @ 2000 per month for 18 months

beginning from third month of the pregnancy to the month in which the child attains one

year. Payment will be made through bank /post office account.

iv. Financial Assistance to Traditional Tribal Healers

(Outlay: 25.00 lakh)

The component is provided for giving annual grant to traditional tribal healers

@ 10000/-. The beneficiaries may be selected with the assistance of KIRTADS. The amount

will be transferred to the Adhar linked bank account of the beneficiary through DBT system.

It is proposed to assist 250 traditional tribal healers during 2017-18.

v. Tribal Girl Child endowment scheme (Gothra valsalyanidhi)

(Outlay: 200.00 lakh)

Objective of the scheme is to start an insurance linked social security scheme

for tribal girl child so as to ensure proper education, improve the capabilities and social status

of girl child of tribal community. It will be a long term deposit scheme which attains maturity

only after the child attains 18 years of age and has at least passed 10th standard. It will ensure

holistic development of ST girl child starting with her birth registration, immunization,

school admission and education upto 10th standard. The insurance amount can be used for

higher education /settling in life. Selection of agency may be as per procurement rule and

G.O in this regard.

Since this is a long term programme, for systematic management of the beneficiaries

and to monitor the flow of premium, a software may be created and put in place.

Programme Book 2017-18 Page 50

Based on gender disaggregated data 90 per cent fund will be going to women

beneficiaries. An amount of 2150.00 Lakh is provided for the above components during

2017-18.

]«n-I-hÀ¤-¡m-cpsS t£a¯n-\m-bp-ff klmbw

(hnlnXw : 2150.00 e£w cq])

Cu ]²Xnbn 5 LSI§fp−v. Cu LSI§Ä Xmsg hniZoIcn¡p¶p.

1. ]«n-I-hÀ¤ bph-Xn-I-fpsS hnhml [\-k-lmbw (hnlnXw : 250.00 e£w cq])

]«n-I-hÀ¤¡mcmb amXm-]n-Xm-¡Ä¡v Ah-cpsS s]¬a-¡-fpsS hnhml

ka-b-̄ p−m--Ip¶ sNe-hp-I-fpsS `mcw Ipd-bv¡m³ th−nbp-ff Hcp ]²-Xn-bm-Wn-Xv.

hIp¸v klmb[\w hnhml {Kmâm-bn«v amXm-]n-Xm-¡Ä¡v \ÂIp¶p. Cu {Kmâv 1,00,000

cq] hoXw Hcp IpSpw-_-¯n\v/{]mb-]qÀ¯n-bmb s]¬Ip-«n¡v klm-b-[\w \ÂIp-¶p.

hn[-h-I-fp-sSbpw Ahn-hm-ln-X-cmb A½-am-cp-sS-bpw, km¼-̄ nI tijn hfsc Ipdª

amXm-]n-Xm-¡-fp-tSbpw s]¬ a-¡Ä¡v ap³K-W\ \ÂIp-¶-Xm-Wv. A\m-Y-cmb ]«n-I-

hÀ¤ s]¬Ip-«n-IÄ¡v Cu ]²Xn hgn 1.50 e£w cq] \ÂIp-¶p. {]kvXpX A[n-I

k-lmbw kÀ¡mÀ D¯-chv hgn \ÂIp-¶p. _Ô-s¸« kÀ«n-^n-¡äp-IÄ KpW-t`m-àm-

¡Ä lmP-cm-t¡-−-Xm-Wv. Cu ]²Xn 2017-þ18 þÂ GItZiw 250 IpSpw_§sf /

hnhml{]mbsa¯nb s]¬Ip«nIsf e£yanSp¶p.

2. kn¡nÄ-þ-sk A\o-anb tcmKn-IÄ¡p-ff klmbw (hnlnXw : 175.00 e£w cq])

hb-\m-Sv, ]me-¡m-Sv, tImgn-t¡m-Sv, ae-̧ pdw F¶o PnÃ-I-fn Xma-kn-¡p¶

]«n-I-hÀ¤-¡mÀ¡n-S-bn I−p hcp¶ BPo-h-\m´ ]mc-¼-cy tcmK-amWv kn¡nÄ skÂ

A\o-an-b. XpSÀ¨-bmb ico-c-th-Z\, am\-knI k½ÀZw, ITn-\-amb tPmen-sN-¿m-\p-ff

_p²n-ap-«v, t]mjm-Im-lm-c-Ip-dhv XpS-§nb {]iv\-§Ä Cu tcmKn-IÄ A\p-̀ -hn-¡p-¶p. Cu

]²Xn hgn kn¡nÄ sk A\o-anb tcmKnIÄ¡v kwØm\ kÀ¡mÀ Hmtcm amkhpw

2000 cq] klmb [\w \ÂIm³ Dt±in¡p¶p.

3. P\\n P·-c£ (hnlnXw : 1500.00 e£w cq])

]«n-I-hÀ¤-¡m-cpsS Btcm-K-ys¯ kw_-Ôn¨ {][m-\-s¸« D¡WvT A½-

bp-tSbpw Ip«n-bp-sSbpw t]mj-Im-c-lm-c-s¯-¡p-dn-̈ p-f-f-Xm-Wv. bYm-k-a-bw km¼-¯nI

klmbw e`n-¡m¯Xv {]kh¯n\v ap³]pw ]n³]pw AhÀ¡v th−{X ]cn-N-cWw In«p¯Xn\v XSÊamIp¶p. BIbm KÀ`n-Wn-bm-b-Xn\ptij-ap-ff aq¶p-amkw apXÂ

]Xns\«pamk Imebfhn Ipªn\v Hcp hbkv XnI-bp-¶-Xp-hsc 2000/þ cq] hoXw

Hmtcm amk-hpw- k-lm-b-[\w \ÂIp-¶Xn\v Cu ]²Xn e£yanSp¶p. CXv _m¦v A¡u−v

hgntbm/t]mÌv Hm^okv A¡u−v hgntbm Bbncn¡pw klmb[\w \ÂtI−Xv.

Programme Book 2017-18 Page 51

4. ]c-¼-cm-KX ]«n-I-hÀ¤ sshZ-y³amÀ¡pff km¼-̄ nI klmbw

(hnlnXw : 25.00 e£w cq])

]c-¼-cm-KX ]«n-I-hÀ¤ sshZ-y³amÀ¡v 10,000/þ cq] hmÀjnI {Kmâmbn Cu

LSIw hgn \ÂIp-¶p. InÀ¯m-Uvknsâ klm-b-t¯m-Sp-IqSn KpW-t`m-àm-¡sf sXc-

sª-Sp-¡p-¶p. XpI KpWt`màmhnsâ B[mÀ ImÀUv A¡u−v hgn Un.-_n.än coXn-

bn _m¦v A¡u-−n-tebv¡v ssIamäw sN¿p-¶p. 2017þ18 þ 250 ]c¼cmKX ss{S_Â

]«nIhÀ¤ sshZy³amsc Cu ]²Xn hgn klmbn¡p¶Xn\v XpI hIbncp¯p¶p.

5. ]«n-I-hÀ¤ s]¬Ip-«n-IÄ¡v F³tUm-hvsaâv ]cn-]mSn (tKm{X hmÕey \n[n)

(hnlnXw : 200.00 e£w cq])

]«n-I-hÀ¤ hn`m-K-̄ nÂs¸« s]¬Ip-«n-IÄ¡v icn-bmb hnZym-̀ ymkw Dd-̧ m-¡Â,-

Ignhv sa¨-s¸-Sp-̄ p-I,-km-aq-lnI ]Zhn DbÀ-¯pI F¶o Imcy-§Ä¡p-th−nbpÅ Hcp

C³jz-d³kv GÀs¸-Sp-¯p-¶-Xn-\p-ff ]²-Xn-bm-Wn-Xv. ]«n-I-hÀ¤ s]¬Ip-«n-I-fpsS

kmaq-lnI km¼-̄ nI hnZym-̀ ymk D¶-a-\-̄ n-\mbn tKm{X-hm-Õ-ey-\n[n F¶ Hcp ZoÀL-

Ime C³jz-d³kv ]²Xn \S-̧ n-em-¡p¶-Xm-Wv. s]¬Ip«n 10-þmw ¢mkv BIp-t¼mtgm 18

hbkv BIp-t¼mtgm Cu ZoÀL-Ime \nt£] ]²Xn ]qÀ¯n-bm-hp-¶-Xm-Wv.CX-\p-k-cn¨v

s]¬Ip-ªnsâ P\\ cPn-kvt{S-j³ XpS§n {]Xn-tcm[ Ip¯n-bv]v, kvIqÄ {]th-i\w

XpS§n ]¯mw ¢mÊv F¯p-¶-tXmsS Hcp ka{K hnI-k-\-amWv e£-y-an-Sp-¶-Xv. C³j-z-

d³kv XpI PohnX \ne-\n-ev]n-\mtbm D¶X hnZ-ym-̀ -ym-k-̄ nt\m D]-tbmKn-¡m-hp-¶-Xm-Wv.

CXn-\m-bp-ffGP³knsb sXc-sª-Sp-¡p-¶Xv hm§Â \S-]-Sn-{I-ahpw kÀ¡mÀ D¯-

chv hgnbpw Bbn-cn-¡-Ww. CsXmcp ZoÀL-Ime ]²Xn Bb-Xn-\m CXn-\m-bn-Hcp tamWn-

«-dnwKv tkm^väv shbÀ cq]o-I-cn¨v KpW-t`màm-¡-fpsS C³j-z-d³kv hcn kwJ-y-bpsS

AShv \nco-£n-t¡-−-Xm-Wv.

KpW-t`m-àm-¡fpsS enwK \nÀ®b ØnXn hnh-c-§-fpsS ASn-Øm-\-¯nÂ

Cu ]²-Xn-bpsS 90 iX-am\t¯mfw h\nXIÄ¡v e`n-¡p-sa¶v IW-¡m-¡p-¶p.

2017þ18 þ  apIfn ]dª LSI§Ä¡mbn sam¯w 2150.00 e£w cq]

hIbncp¯p¶p.

12. Special Programme for Adiyas, Paniyas, PVTGs and Tribes Living in

Forest. (Outlay: 500.00 lakh)

The scheme comprises of three components. The various components of the schemes

are detailed below.

i. Adiyas, Paniyas and the Particularly Vulnerable Tribal Groups

Need based and location specific package programmes for the development of

Adiyas, Paniyas and the Primitive Tribal Groups are envisaged under this scheme. Special

Programme Book 2017-18 Page 52

emphasis will be given for projects on re-habilitation packages, health, food support and

economic development for these special groups. During 2017-18, ST Department proposed

to include the communities like Malapandaram, Aranadan, Hill Pulaya under this

programme. Therefore the scheme would also cover these communities subject to the

approval of Government during 2017-18.

ii. Tribes Living in Forest

Providing gainful employment to ST population living in/ near the forest areas is a

must for improving their living standards. Providing/ ensuring alternative source of income,

protection from wild animals, providing/ensuring health care facilities, providing for

education and awareness, development of infrastructure, connectivity and communication

facilities, rehabilitation of tribal people and for the prevention of degradation of local habitat

for the ST people living in/ near the forest areas etc. are included in this scheme. Suitable

proposals/ projects will be invited from various departments especially from forest

department for implementation in the tribal settlements in the forest. In the absence of

suitable proposals from other departments, the Scheduled Tribes Department will implement

the scheme with suitable projects.

iii. Destitute Homes

The cost for the running of three Destitute Homes functioning under the Scheduled

Tribes Department at Attappady, Mananthavady (Kuzhinilam) and Sugandhagiri (Wayanad)

will be met from this scheme. Also the provision can be used for starting new Destitute

Homes for Adiyas, Paniyas, PVTGs and Scheduled Tribes Living in Forest.

An amount of Rs. 500.00 lakh is provided for the above components of the scheme

during 2017-18 with a target of 50000 beneficiaries.

ASn-b³, ]Wn-b³, -{]m-à-\mtKm{X-hÀ¤-¡mÀ, h\-̄ n Pohn-¡p¶ ]«n-I-hÀ¤-¡mÀ F¶n-hÀ¡p-ff {]tX-yI ]cn-]mSn

(hnlnXw : 500.00 e£w cq]) Cu ]²Xnbn aq¶v LSI§fp−v. Cu LSI§Ä Xmsg hniZoIcn¡p¶p.

1. ASn-b³, ]Wn-b³,-{]m-à-\mtKm{XhÀ¤ hn`mKw

ASn-b³, ]Wn-b³, F¶o hn`mK-§-fnÂs¸« {]màtKm{XhÀ¤¡mcpsS D¶-a-\-

¯n-\mbn Bh-i-ym-[n-jvTnX {]mtZ-inI ]²Xn \S-̧ m-¡m³ e£-y-an-Sp-¶p. Cu {]tX-yI

hn`m-K-¡m-cpsS ]p\-c-[n-hm-k-̄ n-\pf-f ]mt¡-Pv, Btcm-K-yw, `£-W-̄ n\v k-lm-bw,

km¼-̄ nI hnI-k\w apX-emb t{]mP-IvSp-IÄ¡v {]tX-yI ]cn-KW\ e`n-¡p-¶p. ae-¼-

−mcw,A-c-\m-S³, ln ]peb F¶o ]«n-I-hÀ¤ hn`m-K-§sf¡qSn Cu ]²-Xn-bn DÄs -̧

Sp-̄ m³ ]«n-I-hÀ¤ hnI-k\hIp¸v 2017-þ2018-þ Dt±-in-¡p-¶p.2017-þ2018-þ kÀ¡mÀ A\p-

a-Xn-tbmsS {]kvXpX hn`m-K-§-sf-¡qSn Cu ]²-Xn-bn³Iogn sIm−p-h-cm-hp-¶-Xm-Wv.

Programme Book 2017-18 Page 53

2. h\-̄ n-\p-f-fn Xma-kn-¡p¶ ]«n-I-hÀ¤-¡m-cpsS ka{K hnI-k-\w.

h\-̄ n\p-f-fntem/]cn-k-c-{]-tZ-i-§-fntem Pohn-¡p¶ ]«n-I-hÀ¤ kaq-l¯n\v

{]tbm-P-\-s¸Sp¶ sXmgn-ep-IÄ \ÂIn Ah-cpsS PohnX \ne-hmcw sa¨-s¸-Sp-̄ p-¶p. h\-

¯n-\p-f-fntem ]cn-k-c -{]-tZ-i-§-fntem Xma-kn-¡p¶ ]«n-I-hÀ¤-̄ nÂs¸« Bfp-IÄ¡v

sXmgn \ÂIpI/aäp hcp-am-\-amÀ¤w D−m-¡n-sIm-Sp-¡p-I, h\-y-a-r-K-§-fn \n¶v

kwc-£Ww \ÂIp-I, Btcm-K-y-]-cn-c£ Dd-¸m-¡pI, hnZ-ym-̀ -ym-khpw Ah-t_m-[-hpw sImSp-

¡p-I, ASn-Øm\ kuI-c-y-§Ä e`-y-am-¡p-I, IW-Ivän-hn-änbpw aäv hmÀ¯m-hn-\n-ab

kuIcy-§fpw sNbvXp sImSp-¡p-I, ]«n-I-hÀ¤ hn`m-K-̄ nÂs¸« Bfp-Isf ]p\-c-[n-h-

kn-¸n-¡p-I, Ch-cpsS {]mtZ-in-I-amb hmk-Ø-e-§f \in¸n¡p¶Xp XS-bpI XpS-§n-b-h-

bmWv Cu ]²-Xn-bpsS Dt±-i-§Ä. hnhn[ hIp-̧ p-I-fn \n¶pw {]tX-y-In¨v h\w hIp-

¸n \n¶pw ]«n-I-hÀ¤-¯nÂs¸« Bfp-IÄ¡v h\-̄ n-\p-f-fn A[n-h-kn-¡m-\p-ff kuI-

cyw sN¿p¶ {]tX-yI t{]mP-IvSp-IÄ/ \nÀt±-i-§Ä £Wn-¡p-Ibpw sN¿p-¶p. aäp hIp-

¸p-I-fpsS aXn-bmb t{]mP-IvSpIÄ CÃm¯ ]£w ]«n-I-hÀ¤ hIp¸v Xs¶ A\p-tbm-P-y-

amb t{]mP-IvSp-IÄ \S-¸n-em-¡p-¶-Xm-Wv.

3. AKXn aµncw

A«-̧ m-Sn, am\- -́hmSn, (Ip-gn-\n-ew) kpK-Ô-Kncn (h-b-\mSv) F¶n-hn-S-§-fn {]hÀ¯n-

¡p¶ ]«n-I-hÀ¤ hnI-k\ hIp-̧ nsâ Iogn hcp¶ aq¶v AKXn aµn-c-§-fpsS \S-̄ n-̧ n-

\mhiyamb sNehv CXn \n¶v hn\n-tbm-Kn-¡m-hp-¶-Xm-Wv. ASn-b³,]Wn-b³,

{]m-à-\mtKm{X-hÀ¤-¡mÀ, h\-̄ n Pohn-¡p¶ ]«n-I-hÀ¤-¡mÀ F¶n-hÀ¡pth−n

]pXnb AKXn aµn-c-§Ä \nÀ½n-¡p-hm\pw Cu XpI hn\n-tbm-Kn-¡m-hp-¶XmWv.

50000 KpWt`mà¡sf e£yan«psIm−v 2017þ18 þÂ 500.00 e£w taÂ

kqNn¸n¨ 3 LSI§Ä¡mbn hIbncp¯nbncn¡p¶p.

13. Modernization of Tribal Development Department The outlay is provided for the following activities viz.

(Outlay: 250.00 lakh)

• Providing Training to Officers and staff of ST Development Department.

• Purchase of computers, tablet PCs, notebooks, computer peripherals, photo copier,

printer, Office Furniture like table, chair etc. and providing linkage to computer

network in the Directorate and District Offices as per requirement.

• Provision of providing internet/e-mail connection in Directorate.

• Development of software, recurring costs of old software and purchase of hardware

for starting new e-governance initiatives.

• Maintenance of Department Website, IT enabled Services and expenses for engaging

IT Managers (Technical) / Programmers/Hardware Engineers.

• Strengthening of POs/TDOs/TEOs Office/Engineering Wing.

• Providing additional infrastructure facilities to the Offices/ Directorate as per actual

need.

• Strengthening of Planning and Monitoring Cell ( Sub Plan Cell)

• Training on DBT, e-grantz, etc.

• Purchase of new vehicles in replacement of the old as well as condemned vehicles or

hiring of vehicles for field level offices as per government rules.

Programme Book 2017-18 Page 54

• Construction of new office buildings wherever absolutely needed for efficient field

work.

• Purchase of audio visual equipments for continuous campaigning against drug abuse.

An amount of `250.00 lakh is provided for the scheme during 2017-18.

]«n-I-hÀ¤ hnI-k\ hIp-̧ nsâ \ho-I-cWw

(hnlnXw 250.00 e£w cq])

Xmsg¸d-bp¶ ]cn-]m-Sn-IÄ¡mbn hnlnXw hn\n-tbm-Kn-¡m-hp-¶-Xm-Wv.

• ]«n-I-hÀ¤ hIp-̧ n tPmen sN¿p¶ Hm^o-kÀamÀ¡pw, Poh-\-¡mÀ¡pw ]cn-io-e\w

\ÂIp-I.

• I¼yq-«-dp-IÄ,em-]vtSm-̧ p-IÄ.-Sm-_veäv, ]n.-kn.-t\m«v _p¡p-IÄ,-I-¼yq-«À A\p-_Ô

D]-I-c-W-§Ä, t^mt«m tIm¸n-bÀ,-{]nâÀ, taibpw Itk-cbpw hm§m³, Bh-iy-a-\p-k-cn¨v Ub-d-IvS-td-än-tebpw {]mtZ-inI/PnÃm Hm^o-kp-I-sfbpw I¼yq-«À irwJ-e- hgn

_Ôn-¸n-¡Â.

• Ub-d-IvS-td-än CâÀs\äv/Cþ-sabn IW-£³ GÀs¸-Sp-̄ p-I.

• tkm^vävshb-dp-I-fpsS hnI-k\w,]-gb tkm^vävshb-dp-I-fpsS XpSÀ sNe-hp-IÄ,

Cþ Kth-W³kv kwcw-̀ -§Ä XpS-§m-\m-bpÅ lmÀUvshbÀ

• hIp-¸nsâ sh_vsskäv ]cn-]m-en-¡Â,sF.-än-bp-ambn _Ô-s¸« tkh-\-§fpw, sF.än amt\-PÀamÀ(sS-Iv\n-¡Â)/t{]m{Km-aÀamÀ/lmÀUvshbÀ F©n-\obÀ, F¶n-

hsc \ntbm-Kn-¡-ep-ambn _Ô-s¸« sNe-hv.

• ]n.-H./-än.-Un.H/Sn.-C,H Hm^okv/F©n-\o-bÀ hnwKv iàn-s¸-Sp-̄ Â.

• Bh-iy-IX A\p-k-cn¨v Hm^o-kp-I-fnepw/Ub-d-IvS-td-änepw/ASn-Øm\ kuI-cy-§Ä

IqSp-XÂ sa¨-s¸-Sp-̄ p-I.

• ¹m\nwKv Bâv tamWn-ä-dnwKv sk iàn-s¸-Sp-¯Â (k_v ¹m³ skÂ)

• Un.-_n.Sn/C.-{Kmâvkv XpS-§n-b-h-bn ]cn-io-e\w

• kÀ¡mÀ am\-Z-WvU-§Ä A\p-k-cn¨v ^oÂUv DtZym-K-Ø-cpsS Bh-iy-§Ä¡mbn ]gb {]hÀ¯-\-£-a-a-Ãm¯ hml-\-§Äamän hIp-¸n\v ]pXnb hml\w hm§p-Itbm

hmS-Ibv¡v FSp-¡p-Itbm sN¿p-I.

• Imcy-£-a-amb ^oÂUv hÀ¡n\v AXym-h-iy-am-sW¶v D¯a t_m[y-apÅ CS-§-fnÂ

]pXnb Hm^okv sI«nSw \nÀ½n-¡Â.

• XpSÀ¨-bm-bpÅ elcn hncp² Iym¼-bn-\nw-Kn\v th−n BUntbm hnjz D]-I-c-W-

§Ä hm§Â.

2017-þ18-þÂ 250.00 e£w cq] Cu ]²-Xn-¡m-bn- h-I-bn-cp-̄ n-bn-cn-¡p-¶p.

Programme Book 2017-18 Page 55

14. Implementation of Kerala State Restriction in Transfer of Lands and

Restoration of Alienated Land Act 1999 (Outlay: 50.00 lakh)

It is proposed to help the ST population to get the benefits provided under the

Transfer of Lands and Restoration of Alienated Land Act 1999. The act is to provide for

restricting the transfer of lands by members of Scheduled Tribes in the State and for the

restoration of possessions of lands alienated by such members and for matters connected

there with. The outlay is for restoration of alienated land and development activities in the

land, infrastructure facilities etc.

An amount of `50.00 lakh is provided for the scheme during 2017-18.

1999þse `qan ssIamä \nb-{ -́Whpw A\-ym-[o-\-s¸« `qan ]p\:-Øm-]n¨v \ÂIepw \nbaw \S-̧ m ¡-epw.

(hnlnXw : 50.00 e£w cq])

1999þse `qan ssIamä \nb-ahpw A\-ym[o\s¸« `qan ]p\Øm]n¨v \ÂIepw

\nb-a-̄ n³Io-gn ]«n-I-hÀ¤-¡mÀ¡v Int«− t\«-§Ä AhÀ¡v e`-y-am-¡p-¶-Xn\v

klmbw \ÂIm³ Dt±-in-̈ n-«p-f-f-XmWv Cu ]²Xn.. Cu \nba {]Imcw kwkvYm-\s¯ ]«n-

I-hÀ¤ hn`m-K-̄ nÂs¸-«-h-cpsS CS-bn-ep-ff `qan ssIamäw \n{´n-¡p-Ibpw AhÀ¡v

A\ym-[n-\-s¸« `qan ]p\-Øm-]n¨p sImSp-¡p-Ibpw AXp-am-bn«v _Ô-s¸« sNe-hp-IÄ

\S-̄ p-Ibpw sN¿p-¶p. A\-ym-[o-\-s¸« `qan ]p\-Øm-]n¨v \ÂIp-¶-Xn-\pw, `qan-bn-

epff hnI-k\ {]hÀ¯-\-§Ä¡pw, ASn-Øm\ kuI-c-y-§Ä¡p-ambn hnlnXw hI-bn-cp-

¯n-bncn¡p¶p.

2017þ18 þ Â Cu ] ²-Xn-¡mbn 50.00 e£w cq] hIbncp¯nbncn¡p¶p.

15. Adikala Gramam (Outlay: 40.00 lakh)

The scheme is intended to be implemented by KIRTADS.The components of

the scheme includes:

a) Training/workshop

(Outlay: 30.00 lakh)

• 30 days Training programme for the Tribal Youth Artists of the State

for showcasing their Cultural Life.

• Tribal Dance workshop of Scheduled Tribe Communities in Kerala

• Nadankala Mela SC/ST Gadikka (Adi Kala Kendram)

b) Wayanad Gothra Bhasha Kala Padana Kendra

(Outlay: 10.00 lakh)

The rich cultural heritage of tribal communities are to be documented

(including language,art forms and oral literature) by descriptive and analytical

Programme Book 2017-18 Page 56

methodology. Primary and secondary date will be collected through field

works, personal interviews,surveys,official records and documented.

An amount of Rs.40.00 lakh ids provided for the above two components

during 2017-18

BZn-Iem{Kmaw (hnlnXw : 40.00 e£w cq])

InÀ¯mUvkv aptJ-\-bmWv Cu ]²Xn \S-̧ n-em-¡p-¶-Xv. Cu ]²-Xn-bpsS LS-I-§Ä

Xmsg ]d-bp-¶-h-bm-Wv.

F. ]cn-io-e\w/inÂ]-ime (hnlnXw : 30.00 e£w cq])

1. ]«n-I-hÀ¤ bph Iem-Im-c-·mÀ¡v 30 Znh-ks¯ kmwkvIm-cnI Pohn-X-hp-ambn

_Ôs¸« ]cn-io-e-\w.

2. tIc-f-̄ nse ]«n-I-hÀ¤ hn`m-K-¡m-cpsS \r¯ inev]-im-e.

3. \mS³ Iem-ta-fbpw ]«nIPmXn ]«nIhÀ¤ K±n-I(-B-Zn-I-em-{Km-aw).

_n. hb-\mSv tKm{X-̀ mjm ]T-\-tI{µw (hnlnXw : 10.00 e£w cq])

hnh-c-Wm-ßI coXn-bnepw A]-{K-Y-\m-]-c-amb {]hÀ¯\ k{¼-Zm-b-¯n-eqsSbpw

]«n-I-hÀ¤ hn`m-K-¡m-cpsS t{ijvT-amb kmwkvIm-cnI ss]Xr-Is¯ tUmIyp-sa-âv

sN¿pI (`m-jbpw,I-em-cq-]-§fpw hmbvsam-gn-bmb kmln-Xy-s¯bpw). {]mY-anI ZznXob

Xe-̄ n-epÅ HutZym-KnI tcJ-IÄ,kÀsÆ,hy-àn-KX A`n-ap-Jw,-^oÂUv hÀ¡v F¶n-h-

bpsS klm-b-t¯msS tiJ-cn¨v kam-l-cn-¡pw.

2017-þ18þ 40.00 e£w cq] apI-fn ]dª LS-I-§Ä¡mbn hI-bn-cp-¯n-bn-cn-¡p-

¶p.

16. Umbrella Programme for the Development of Scheduled Tribes

(50%SS)

The components of the scheme are given below.

A. Construction of building for Model Residential /Ashram Schools in Tribal Area

[50%SS]

(Outlay: 1500.00 lakh)

Government of India provides 50% of the cost of construction of infrastructure of

Ashram schools. 1500.00 lakh is provided during 2017-18 as 50% State share for

completion/construction of building of the Nine schools as detailed below.

Programme Book 2017-18 Page 57

Sl No Name of School Amount (` in lakh) Amount (` in

lakh)

1 Ashram School, Noolpuzha, Wayanad

1500.00

2 MRS Attappady, Palakkad

3 MRS Kulathupuzha, Kollam

4 MRS Kasaragod

5 MRS Nalloornadu, Wayanad

6 Ashram School, Thirunelli

7 MRS, Kuttichal, Thiruvananthapuram

8 MRS Aralam, Kannur

9 MRS Melukavu, Kottayam

Total 1500.00

In addition to the above, construction of new hostels can be considered in the scheme.

]«nIhÀ¤¡mcpsS hnIk\¯n\v HcpIpSIogn hcp¶ ]²XnIÄ

(50 iXam\w kwØm\ hnlnXw)

Cu ]²XnbpsS LSI§Ä Xmsg sImSp¯ncn¡p¶p.

F. ]«n-I-hÀ¤ taJ-e-bn amXrIm dkn-U³j-y kvIqfp-I-fp-sS-bpw, B{iaw kvIqfp-I- fp-sSbpw \nÀ½mWw (50 iX-am\w kwØm\ hnln-Xw)

(hnlnXw : 1500.00 e£w cq])

B{iaw kvIqfp-I-fpsS ASn-Øm\ kuI-c-y-§Ä¡m-bp-ff \nÀ½mW sNehv 50

iX-am\w C´ym Kh¬saâv \ÂIp¶p. 2017þ18þ Xmsg-̧ -d-bp¶ 9 kvIqÄ sI«n-S-\nÀ½m-

W-tPm-en-IÄ Bcw-̀ n-¡p-¶-Xn\pw/ \nÀ½mWw ]qÀ¯oIcn¡p¶Xn\pambn 50% kwØm\

hnln-X-ambn 1500 e£w cq] hI-bn-cp-̄ p-¶p. CXp IqSmsX ]pXnb tlmÌepIfpsS

\nÀ½mWhpw Cu ]²Xnbn ]cnKWn¡mhp¶XmWv. hni-Zmw-i-§Ä Xmsg sImSp-̄ n-cn-

¡p-¶p.

Programme Book 2017-18 Page 58

B. Construction of Boy’s Hostel [50% SS]

(Outlay: 450 .00 lakh)

Out of the 66 boys hostels run by the Scheduled Tribes Development Department,

only 55 have permanent buildings. The objective of the scheme is to construct permanent

building for hostels functioning in temporary sheds/rented buildings. The list of hostels

where construction in progress is given below.

Sl.

No

Name of Hostel Sl.No

Name of Hostel

1 Pre-matric Hostel, Irumbupalam Idukki 4 Pre-matric Hostel,

Mullankolly, Wayanad

2 Pre-matric Hostel, Sholayur, Palakkad (2

hostels – 60 bedded and 100 bedded)

5 Pre-matric Hostel, Agali,

Attappady

3 Pre-matric Hostel, Pinangode, Wayanad 6 Post matric Hostel, Agali

Attappady (Boys)

{Ia

\¼À

kvIqfnsâ t]cv XpI (cq]

e£¯nÂ)

( 1 ) ( 2 ) ( 3)

1

2

3

4

5

B{iaw kvIqÄ , \q¸pg, hb\mSv

amXyI dknU³jy kvIqÄ A«¸mSn, ]me¡mSv

amXyI dknU³jy kvIqÄ, Ipf¯q¸pg, sImÃw

amXyI dknU³jy kvIqÄ, ImkÀtKmUv

amXyI dknU³jy kvIqÄ, \ÃqÀ\mSv, hb\mSv

1500.00

6

7

8

9

B{iaw kvIqÄ, Xncps\Ãn,

amXyI kvIqÄ, Ipän¨Â, Xncph\´]pcw

amXyI dknU³jy kvIqÄ, Bdfw, I®qÀ

tamU dkn-U³j-y kvIvqÄ, taep¡mhv,

tIm«bw

BsI

1500.00

Programme Book 2017-18 Page 59

In addition to the above, construction of new hostels can be taken in the scheme

(construction of Post matric Hostel at Agali, Attappady (Boys) is merged to Construction of

Boy‟s Hostel [50% SS] from 2014-15 onwards). During 2017-18, Rs.450.00 lakh is provided

as 50% state share for undertaking the construction of new hostels and the completion of

ongoing works.

_n. B¬Ip-«n-I-fpsS tlmÌ \nÀ½mWw (kw-Øm\ hnlnXw 50 iX-am-\w)

(hnlnXw : 450.00 e£w cq])

]«n-I-hÀ¤ hnI-k\ hIp-¸nsâ Iogn {]hÀ¯n-¡p¶ B¬Ip-«n-IÄ¡m-bp-ff 66

tlmÌ-ep-I-fn 55 F®-̄ n\p am{Xta Øncw sI«n-S-§Ä Df-fp. hmS-Ibv¡v/ Xm¡m-

enI sjUp-I-fn {]hÀ¯n-¡p¶ tlmÌ-ep-IÄ¡v Øncw sI«nSw ]Wn-bp-hm³ Cu ]²-

Xn-bn e£-y-an-«n-cn-¡p-¶p. \nÀ½mW ]ptcmKXnbncn¡p¶ tlmÌepIfpsS ]«nI NphsS

tNÀ¯ncn¡p¶p.

{Ia \w tlmÌensâv t]cv

1

{]osa{SnIv tlmÌÂ, Ccp¼p]mew, CSp¡n

2 {]osa{SnIv tlmÌÂ, tjmfbqÀ, ]me¡mSv

(2 tlmÌÂ þ 60 InS¡, 100 InS¡)

3 {]osa{SnIv tlmÌÂ, ]nWt§mSv, hb\mSv

4 {]osa{SnIv tlmÌÂ, apósImÃn, hb\mSv,

5 {]osa{SnIv tlmÌÂ, AKfn, A«¸mSn,

t]mÌv sa{SnIv tlmÌÂ, AKfn, A«¸mSn,

(B¬Ip«nIÄ)

CXp IqSmsX ]pXnb tlmÌepIfpsS \nÀ½mWhpw GsäSp¡mhp¶XmWv.

2014þ15 þ  A«¸mSnbnse AKfnbnepÅ t]mÌv sa{SnIv tlmÌensâv \nÀ½mWhpw, (B¬

Ip«nIÄ) , B¬Ip«nIfpsS tlmÌ \nÀ½mW¯ntebv¡v ebn¸n¨p. (50% kwØm\

hnlnXw). 2017þ18 þ Â 450 e£w cq] 50% kwØm\ hnlnXambn ]pXnb tlmÌepIfpsS

\nÀ½mW¯n\pw {]hy¯n \S¶psIm−ncn¡p¶ tlmÌepIfpsS ]qÀ¯oI-cn-¡p-¶-Xn\pw hI-bn-cp-¯n-bn-cn-¡p-¶p.

17. Grant-in-aid to Kerala Institute for Research, Training and

Development Studies (KIRTADS) for SC/ST [50% SS] (Outlay: 125.00 lakh)

The usual functions of KIRTADS may be classified into two broad categories, viz.,

(i) Training and (ii) Research. Besides, the institute will prepare during 2017-18 separate

Operational Manuals for SC and ST Promoters.

Programme Book 2017-18 Page 60

The training programmes include:

• Strengthening of Oorukuttoms.

• Leadership for Scheduled Tribes youths.

• Workshop on the health issues of Scheduled Tribes.

• Modern Archery

• Coaching for PSC/UPSC examinations appearing by Scheduled Tribes.

• Awareness on Act and Rules relating to empowerment of Scheduled Tribes.

• IT services enabling Scheduled Tribes development.

• Entrepreneurship programmes for Aranadan Community and women entrepreneurs.

• Empowerment of Anganwady workers

• Capacity building of teachers and supporting staff of Ashram Schools, MRS and

wardens of pre-matric and post-matric hostels.

• Training of Revenue Officials on the issue of Community Certificate (SC/ST).

• For STDD officials on plan formulation, implementation and monitoring of TSP

schemes.

• Empowerment of ST Representatives of PRIs.

• Orientation on script writing, photography and video documentation for Scheduled

Tribe youths.

• Empowerment of Scheduled Tribe Women.

The component of research activities consists the following

• Documentation of rituals and practices of Scheduled Tribes and collection and

display of the traditional dress and ornaments of the Scheduled Tribes.

• Impact of FRA on Scheduled Tribes.

• Evaluation of PVTG projects for Scheduled Tribes.

• Status on the unemployment among the Scheduled Tribe youths.

• Award of Junior Research Fellowship.

• Purchase of audio visual equipment and library books.

• Printing/publishing of study reports/journals.

• Seminar on Tribal development issues.

• Quiz Competitions for Scheduled Tribe youths.

A new strategy as outlined below has to be followed for implementing the above

programmes/activities during 2017-18.

A Steering Committee consisting of representatives of Scheduled Caste Development

Department, Scheduled Tribes Development Department, State Planning Board and experts

in SC/ST development may be constituted for preparing the training modules and developing

Programme Book 2017-18 Page 61

methodology for research activities. The reports of the Steering Committee have to be

furnished to the Principal Secretary, SC/ST Development for approval.

The total outlay earmarked to the institute as 50% State Share for 2017-18 is 125.00

lakh. Of this an amount of Rs. 10.00 lakh is set apart for the preparation of Operational

Manuals for SC and ST Promoters.

tIcf kwØm\ ]«n-I-PmXn/]«n-I-hÀ¤ Kth-jW ]cn-io-e\ hnI-k\ C³Ìn-ä-yq-«n\v (InÀ¯m-Uvkv) [\-k-lmbw (kw-Øm\ hnlnXw 50 iX-am-\w)

(hnlnXw : 125.00 e£w cq])

InÀ¯m-Uvknsâ ]Xnhp {]hÀ¯-\-§sf ]cn-io-e-\-§Ä, Kth-jWw F¶n-§s\

c−mbn Xcw-Xn-cn¡mhp-¶-Xm-Wv. CXp-IqSmsX ]«n-I-PmXn,]-«nI hÀ¤ {]tam-«ÀamÀ¡v

Hcp {]hÀ¯\ am\p-h X¿m-dm-¡pI F¶ ZuXyhpw 2017-þ18þ Øm]\w Gsä-Sp-t¡-−-

Xm-Wv.

]cn-io-e\ ]cn-]m-Sn-IÄ

• Ducp-Iq-«-§-fpsS imào-I-cWw

• ]-«nIhÀ¤ bph-P-\-§-fpsS t\Xr-Xz]m-Shw hÀ²n-̧ n-¡Â.

• ]-«nIhÀ¤ hn`mK§fpsS Btcm-Ky-{]-iv\-§sf kw_-Ôn¨v in¸-ime kwL-Sn-̧ n-

¡p-I.

• As¼-bv¯n B[p-\nI ]cn-io-e-\w.

• ]n.-F-kv.kn/bp.-]n.-F-kv.kn ]co-£-I-fn ]s¦-Sp-¡p¶ ]-«nIhÀ¤ hn`m-K-§Ä¡v

]cn-io-e-\w.

• ]-«nIhÀ¤ hn`m-K-§fpsS hnI-k-\-̄ n-\pÅ hnhc kmt¦-XnI {]hÀ¯-\-§Ä.

• Ac-\m-S³ hn`m-K-̄ nÂs¸-«-hÀ¡pw h\nXm kwcw-̀ -IÀ¡pÅ kwcw-̀ -I-Xz-]-cn-]m-Sn.

• AwK³hmSn {]hÀ¯-I-cpsS imào-I-c-Ww.

• Fw.-AÀ.-Fkv/B{iaw kvIqfp-I-fnse A²ym-]-IÀ¡pw A\p-_Ô Poh-\-¡mÀ¡pw {]osa-{SnIv t]mÌv sa{SnIv tlmÌ-ep-I-fnse hmÀU-³amÀ¡pw Imcytijn

hÀ²-\m-]-cn-]mSn.

• ]«n-I-PmXn ]-«nIhÀ¤ kÀ«n-^n-¡äv \ÂIp-¶-Xp-ambn _Ô-s¸« {]iv\-§Ä¡v

dh\yq DtZym-K-ØÀ¡v ]cn-io-e-\w.

• ]-«nIhÀ¤ D]-]-²Xn X¿m-dm-¡Â \S-̧ n-em-¡Â,-tam-Wn-ä-dnwKv F¶o hnj-b-§-fnÂ

]-«nIhÀ¤ hnIk\ hIp-̧ p-tZym-K-ØÀ¡v ]cn-io-e-\w.

• Xt±-i-̀ -cW Øm]-\-§-fnse ]-«nIhÀ¤ P\-hn-̀ m-K-§-fpsS imào-I-c-Ww.

• ]-«nIhÀ¤ bph-P-\-§Ä¡v hoUntbm tUmIyp-sa-tâ-j³,-Xn-c-¡Y X¿m-dm-¡Â,-

t^mt«m {Km^n F¶n-h-bn ]cn-io-e-\w.

• ]-«nIhÀ¤ kv{XoI-fpsS imào-I-c-Ww.

Programme Book 2017-18 Page 62

Kth-jW {]hÀ¯-\-§Ä

• ]-«nIhÀ¤ hn`m-K-¡mcpsS BNm-cm-\p-jvTm-\-§-fpsS tUmIyp-sa-tâ-j³,-Ah-cpsS

]mc-¼cy hkv{X-§-fp-sSbpw B`-c-W-§-fp-sSbpw tiJ-c-Whpw {]Z-Ài-\-hpw.

• ]-«nIhÀ¤ hn`m-K-§Ä h\m-hImi \nbaw ImcWw t\cn-tS−n-h-cp¶ ]cn-Wn-X- -̂e-§Ä.

• ]-«nIhÀ¤ hn`m-K-§fnse {]mà-\-tKm{X hÀ¤ hnI-k\ t{]mP-IvSp-I-fpsS aqey-

\nÀW-bw.

• ]«nI hÀ¤ bphm-¡-fpsS sXmgn-en-Ãm-bva-bpsS Ah-Ø.

• Pq\n-bÀ dnkÀ¨v s^tÃm-jn¸v \ÂIÂ.

• sse{_-dn-bn-te¡v ]pkvX-I-§fpw Zriy -{imhy D]-I-c-W-§fpw hm§Â.

• tPW-ep-IÄ/]T\ dnt¸mÀ«p-IÄ F¶nh A¨-Sn-¡p-Ibpw {]kn-²o-I-cn-¡p-Ibpw

sN¿p-I.

• tKm{X-hÀ¤ hnI-k\ {]iv\§-fn skan-\m-dp-IÄ kwL-Sn-̧ n-¡p-I.

• ]-«nIhÀ¤ bphm-¡Ä¡v Iznkv aÕ-c-§Ä .

apI-fn {]Xn--]m-Zn¨ ]cn-]m-Sn-IÄ \S-̧ n-em-¡p¶Xn\mbn 2017-þ18þ Bhn-jvI-

cn¨n«pÅ Hcp ]pXnb X{´-̄ nsâ cq]-tcJ NphsS \ÂIp-¶p.

]«nI PmXn, ]-«nIhÀ¤ hnI-k\ hIp¸pIÄ,kw-Øm\ Bkq-{X-W-t_mÀUv F¶n-

hn-S-§-fnse {]Xn-\n-[n-Ifpw ]«nI PmXn, ]-«nIhÀ¤ hnI-k\ taJ-e-bnse hnZ-KvZcpw DÄs¸-

Sp¶ Hcp Ìnb-dnwKv I½nän cq]o-I-cn-¡p-Ibpw {]kvXpX kanXn ]«nI PmXn, ]-«nIhÀ¤

hn`m-K-§-fpsS ]cn-io-e\ ]mTyhnj-b-§Ä X¿m-td-t¡-−Xpw B taJ-e-bnse Kth-jW

{]hÀ¯-\-§-fpsS coXn imkv{Xw Bhn-jvI-cn-t¡-−-Xp-am-Wv.- Ìn-b-dnwKv I½n-än-bpsS

ip]mÀi-IÄ ]«nI PmXn, ]-«nIhÀ¤ hnI-k\ hIp-¸v {]n³kn-¸Â sk{I-«-dn-bpsS AwKo-

Im-c-̄ n\v kaÀ¸-Ww.

2017-þ18-þ 50 iX-am\w tI{µ hnln-X-ambn 125.00 e£w cq] apI-fn ]cm-

aÀin¨ LSI§Ä¡mbn {]Xo-£n-¡p-¶p. ]«nI PmXn, ]-«nIhÀ¤ s{]mtam-«À¡v

{]hÀ¯\ am\p h X¿m-dm-¡p-¶-Xn\v 10.00 e£w cq] CXn DÄs¸-Sp-̄ p-¶p.

18. Kerala State Development Corporation for SC/ST Ltd. - TSP (State

Share 51%)

(Outlay: 25.50 lakh) Under this centrally sponsored scheme, share capital contribution is released to the

State Development Corporation for SCs & STs in the ratio 51:49 between State Government

and Central Government. The Central share of equity capital is sent directly to the

Corporation. The Corporation provide finance to employment oriented schemes covering

diverse areas of economic activities. The Corporation has focused their efforts for

identification of eligible ST families and motivating them to undertake suitable economic

development schemes, sponsoring these schemes to financial institutions for credit support,

providing financial assistance in the form of margin money on low rate of interest and

Programme Book 2017-18 Page 63

subsidy in order to reduce their repayment liability and providing necessary link/tie-up with

other poverty alleviation programmes.

An amount of Rs. 25.50 lakh is provided during 2017-18 towards 51% state share for

providing share capital contribution to Kerala State Development Corporation for SCs/STs,

for taking up economic development schemes benefiting Scheduled Tribes.

C. tIcf kwkvYm\ ]«nIPmXn ]«n-I-hÀ¤ hnI-k\ tImÀ¸-td-j³ Hmlcn aqe-[-\w-þ-än.-

F kv.]n (51 iX-am\w kwkvYm\ hnln-Xw) (hnlnXw : 25.50 e£w cq])

tI{µmhn-jvIrX ]²-Xn-I-fpsS ]cn-[n-bnÂs¸-Sp-¶-Xmb Cu ]²-Xn-¡p-ff Hmlcn

aqe-[\w ]«n-I-PmXn ]«n-I-hÀ¤ hnI-k\ tImÀ¸-td-j\v 51:49 A\p-]m-X-̄ n kwØm\

kÀ¡mcpw tI{µ kÀ¡mcpw \Â-Ip-¶p. Hmlcn aqe-[\¯n\v Xpey-amb XpI

tI{µhnln-X-ambn tImÀ¸-td-j\v \ÂIp-¶p. hy-X-y-kvX-§-fmb km¼-¯nI {]h-À-̄ n-

Ifn -sXm-gn-ep-ambn _Ô-s¸-«n-«p-f-f-hÀ¡v tImÀ¸-td-j³ km¼¯nI klmbw sN¿p-

¶p. AÀl-cmb ]«n-I-hÀ¤ IpSpw-_-§sf Is−-̄ p-¶-Xn\pw Ahsc km¼¯nI hnI-

k\ ]²-Xn-I-fn ]¦m-fn-I-fm-¡m\pw Cu ]²Xn-Isf [\-Im-cy Øm]-\-§-fn-te¡v

kvt]m¬kÀ sN¿p-Ibpw AXp-hgn Ipdª \nc-¡n ]Whpw k_vkn-Un-I-fpw e`n-¡p-

Ibpw AXp-hgn Ah-cpsS ]Ww Xncn-̈ -S-bv¡m-\p-ff _m²-yX Ipd-bv¡p-I-bpw Zmcn{Zy

\nÀ½mÀÖ\ ]²-Xn-I-fn Ahsc ]¦m-fnIfm¡m\pw tImÀ¸-td-j³ e£-y-an-Sp-¶p.

2017þ18þ ]«n-I-hÀ¤ hn`m-K-̄ nsâ km¼-̄ nI hnI-k-\-̄ n-\mbn ]«n-I-

PmXn ]«n-I-hÀ¤ hnI-k\ tImÀ¸-td-j³ Hmlcn aqe-[-\-ambn 51 iX-am\w kwØm\

hnln-X-ambn 25.50 e£w cq] hI-bn-cp-̄ n-bn-cn-¡p-¶p.

19. Enforcement of Prevention of Atrocities Act [50% SS] (Outlay: 30.00 lakh)

Special Benches have been constituted in all District Courts for the speedy disposal of

cases registered under the Atrocities Act. Major components of the scheme include.

• Formulation of appropriate schemes for providing compensation and rehabilitation of

the victims of atrocities.

• Providing legal aid to the victims of atrocities.

• Functioning of the special mobile police squad in Wayanad District.

• To start a special court at Wayanad.

• Payment of travelling allowance to witnesses.

An amount of Rs. 30.00 lakh is provided as 50% State Share for the scheme during 2017-18.

Programme Book 2017-18 Page 64

kn. AXn-{I-a-§Ä XS-b \nbaw \S-¸m-¡Â (kw-Øm\ hnlnXw 50 iX-am-\w)

(hnlnXw : 30.00 e£w cq]) AXn-{I-a-§Ä XS-b \nb-a-{]-Imcw cPn-ÌÀ sNbvXn-«p-ff tIkp-IÄ

s]s«¶v XoÀ¸v I¸n-¡p-¶-Xn\v FÃm PnÃm tImS-Xn-I-fnepw kvs]j-y _©p-IÄ

Øm]n-̈ n-«p-−v. Cu ]²-Xn¡v Xmsg-̧ -d-bp¶ {][m\ LS-I-§-fm-Wp-f-f-Xv.

o AXn-{Ia§Ä¡v Cc-bm-Ip-¶-hsc ]p\-c-[n-h-kn-¸n-¡p-hm\pw AhÀ¡v \jvS-]-cn-

lmcw \e-Ip-hm\pw DNn-X-amb ]cn-]m-Sn-IÄ cq]o-I-cn-¡Â.

o AXn-{I-a-§Ä¡v Cc-bm-Ip-¶-hÀ¡v \nb-a-k-lmbw \ÂIÂ.

o hb-\mSv PnÃ-bn k©-cn-¡p¶ {]tX-yI t]meokv kvIzm-Unsâ {]hÀ¯-\w.

o hb-\m«n {]tX-yI tImSXn Øm]n-¡Â.

o km£n-IÄ¡v bm{Xm Ae-h³kp-IÄ \ÂIpI.

2017þ18 þ Â 50 iX-am\w kw-Øm\ hnln-X-ambn 30.00 e£w cq] hIbncp¯nbncn¡p¶p.

20. TSP Plan Schemes-Implementing through LSGIs (Outlay: 3294.50 lakh)

An outlay of Rs. 3294.50 lakh is set apart for the implementation of schemes through

Local Bodies. The scheme details are as given below:-

Sl.

No

Name of Scheme Outlay(` in

lakh)

1 Pradana Manthri Awaz Yojana (Gramin) –(PMAY)TSP (40%

SS)

3039.50

2 NRLM (National Rural Livelihood Mission) - TSP (40% SS) 255.00

Total 3294.50

The write up portion of Rs. 3294.50 lakh has been included in the Appendix IV of the

Budget 2017-18.

Programme Book 2017-18 Page 65

]«n-I-hÀ¤ D]-]-²-Xn-þ-X-t±i `cW Øm]-\-§Ä aptJ\ \S-̧ n-em-¡p¶ ]cn-]m-Sn-IÄ

aäpÅ hIp-¸p-IÄ/GP³kn-IÄ hgn ]²-Xn-IÄ \S-¸n-em-¡p-¶-Xn-\mbn 3294.50 e£w

cq] hI-bn-cp-̄ n-bn-cn-¡p-¶p. ]²-Xn-bpsS hnh-c-§Ä Xmsg sImSp-¯n-cn-¡p-¶p.

{Ia.-\-¼À

]²-Xn-bpsS t]cv

hnlnXw ( cq]

e£-̄ nÂ)

1

{][m\a{´n Bhmkv tbmP\ ({Km-ao¬)-(]n.-Fw.-F.-

ssh) än.-F-kv.-]n.(-kw-Øm\ hnlnXw

40 iX-am-\w)

3039.50

2 F³.-BÀ.-FÂ.-Fw.(-tZ-iob {KmaoW D]-Po-h\ anj³-þ-än.-F-kv.-]n.)

255.00

BsI

3294.50

3294.50 e£w cq]bpsS hni-Zmw-i-§Ä 2017-þ18-þse _UvP-än A\p-_Ôw ivþ tNÀ¯n-«p-−v.

21. Special Central Assistance to Tribal Sub Plan (SCA TO TSP) (Outlay: 1300.00 lakh)

The Special central Assistance to Tribal Sub Plan is mainly meant for filling up

infrastructure incidental thereto, with focus on units run by Self Help Groups and thus raises

the economic and social status of STs as per the guidelines issued by the GOI from time to

time. The stress is on cluster approach and priority is to be given to scheme/programme to

enhance income generating activities through increased productivity and value addition

giving priority in watershed development, minor irrigation, horticulture, food processing,

MFP based activities, medicinal plants preservation etc. Govt. of India insists on the conduct

of concurrent monitoring and evaluation of schemes implemented under SCA to TSP.

Therefore Planning and Monitoring Cell of the Directorate has to be suitably strengthened by

engaging officers from the SPB in addition to the existing Monitoring Cell by meeting

expenses from 3% of the monitoring component for monitoring schemes and LSGD Schemes

with computer laptop and linkage facilities.

Anticipated Central assistance during 2017-18 is Rs. 1300.00 lakh.

]«n-I-hÀ¤ D]-]-²-Xn-¡p-ff {]tX-yI tI{µ-k-lmbw (hnlnXw : 1300.00 e£w cq])

Imem-Im-e-§-fn tI{µ-K-h¬saâv ]pd-s¸-Sp-hn-¡p¶ amÀ¤-tc-Jbv¡v

hnt[-b-ambn kzbw klmb kwL§Ä \S¯p¶ bqWnäpIÄ¡v {]maqJyw \ÂIn

sIm−v hcp-am\ hÀ²-\-hp-−m-¡p¶ sXmgn Gsä-Sp¯v \S-̄ p-t¼mÄ ASn-kvYm\

Programme Book 2017-18 Page 66

kuI-c-y-§-fn-ep-−m-Ip¶ hnS-hp-IÄ \nI-̄ p-¶-Xn-\mWv ]«n-I-hÀ¤ D]-]Zv[Xn-¡p-ff {]tXyI tI{µ klm-b-¯n-eqsS {ian-¡p-¶Xv. ¢ÌÀ kao-]-\-̄ n-eqsS A[nI D¸m-Z-

\w, aqe-y-hÀ²-\hv F¶nh e£-y-an-Sp¶ hcpam-\-Zm-bI ]cn-]mSnIÄ¡v ap³KW\

\ÂtI-−-Xm-Wv. \oÀ¯S hnI-k-\w, sNdp-InS Pe-tk-N\w, DZym\-Ir-jn, `£-y-kw-kv¡-c-

Ww, sNdp-I-nS h\-hn-̀ -h-§sf ASn-kvYm-\-am-¡n-bp-ff ]cn-]m-Sn-IÄ, Huj[ sNSn-I-fpsS

kwc-£Ww apX-em-hbv¡v {]map-Jyw \ÂtI-−-Xm-Wv. C´ym Kh¬saâv Cu ]²XnbpsS

XÕab tamWnädnwKpw, aqey\nÀ®bhpw \njvIÀjn¡p¶p. AXn\m ]«nIhÀ¤

hnIk\ UbdÎtdänse tamWnädnwKv kwhn[m\w iàns¸Sp¯phm\pw e£yanSp¶p.

CXn\mbn tamWnädnwKn\pÅ LSI¯nsâ 3% XpI D]tbmKn¨v kwØm\ Bkq{XW

t_mÀUnse Hm^okÀamsc DÄs¸Sp¯nsIm−v \nehnse tamWnädnwKv skÂ

iàns¸Sp¯n hIp¸v \S¸nem¡p¶ ]²XnIfpw, Xt±i Øm]\§fpsS ]²XnIfpw

I¼yq«À/ em]v tSm¸v aäv iywJehgn ^e{]Zambn tamWnädnwKv sNt¿−XmWv.

2017þ18 hÀjw {]tXyI tI{µklmbambn 1300.00 e£w cq] Cu ]cn]mSnbnÂ

{]Xo£n¡p¶p.

Programme Book 2017-18 Page 67

CENTRALLY SPONSORED SCHEMES HAVING100% CENTRAL

ASSISTANCE

Umbrella Programme for the development of Scheduled Tribes (100% CSS)

22. Post-matric Scholarships for Scheduled Tribe Students (Outlay: 3000.00 lakh)

The scheme is intended for payment of educational assistance to the students

undergoing various post-matric courses in and outside the state. This scholarships are granted

and disbursed through e-grantz (net banking).

• Lump-sum grant

• Stipend

• Hostel Charges

• Pocket money

During 2015-16, 13000 students have given assistance through the scheme. The

scheme was 100% centrally assisted scheme at the time of introducing the scheme by

Government of India. As per the guidelines of Government of India, the state will have to

meet the committed portion (i.e., the total expenditure under the scheme during the final year

of the plan Period is the committed liability of the state). It is targeted to assist 15000

students under the scheme during 2017-18.

An amount of Rs. 3000.00 lakh is anticipated as 100% Central assistance for the year

2017-18.

]«nIhÀK hnZymÀ°nIÄ¡mbpÅ t]mÌv sa{SnIv kvtImfÀjn¸pIÄ:þ

(hnlnXw : 3000.00 e£w cq])

tIcf¯n\I¯pw ]pd¯papÅ hnZymÀ°nIÄ¡v t]mÌvsa{SnIv

tImgvkpIÄ sN¿m\pÅ km¼¯nI klmbw Cu ]²XnbneqsS \S¸m¡p¶p. Cu

kvtImfÀjn¸pIÄ A\phZn¡p¶Xpw hnXcWw sN¿p¶Xpw Cþ{Kmâvkv

aptJ\bmWv.(s\äv _m¦nwKv)

• ew]vkw{Kmâv

• ss̸âv

• tlmÌepIfpsS sNehpIÄ

• t]m¡äv aWn

Programme Book 2017-18 Page 68

2015þ16 hÀj¯n 13000 hnZymÀ°nIÄ¡v Cu ]²Xn hgn klmbw \ÂInbn«p−v. tI{µ kÀ¡mÀ \nba{]Imcw ]²XnbpsS Ahkm\ hÀjs¯ sNehv kwØm\

kÀ¡mÀ NpaXebmbn GsäSpt¡−XmWv. Cu ]²XnbpsS {]mcw`L«¯n CXv 100

iX-am\w C´ym Kh¬saâvnsâ tI{µmhnjvIyX ]²Xnbmbncp¶p.

15000 hnZymÀ°nIsf 2017þ18þ Â klmbn¡pI F¶XmWv Cu ]²XnbpsS e£yw.

2017þ18 þ Â 100 iXam\w tI{µ hnlnXambn 3000.00 e£w cq] {]Xo£n¡p¶p.

23. Pre-matric Scholarship for ST Students Studying in IX & X Classes

(100% CSS)

(Outlay: 500.00 lakh)

During the year 2012-13 Government of India, Ministry of Tribal Affairs has

introduced a new centralised scheme of Pre-Matric Scholarship for needy Scheduled Tribe

Students studying in classes of IX and X through DBT system. This Scheme is effective from

01.07.2012. The scheme is implemented through the State Government which will receive

100% Central Assistance from Government of India for the expenditure under the scheme.

Central assistance will be released to the state on ad-hoc basis. Since the scheme was

a new one the state would have to make expenditure from the State budget against which

reimbursement can be claimed. At present educational assistance such as lump sum grant,

monthly stipend to pre-matric students is proposed from the state‟s own resource i.e., from

the Non-Plan Head of account. The state would have to continue the assistance at the rate

over and above the rate of the above said 100% C.S.S Pre-matric Scholarship Scheme. An

amount of Rs.500.00 lakh is anticipated as 100% CSS during 2017-18.

9þmw¢mÊnepw 10þmw ¢mÊnepw ]Tn¡p¶ ]«nIhÀ¤ hnZymÀ°nIÄ¡mbpÅ {]oþsa{SnIv kvtImfÀjn¸pIÄ (100 iXam\w tI{µ klmb ]²Xn)

(hnlnXw : 500.00 e£w cq]) 2012þ13 þ  C´ym Kh¬saâv tKm{XhÀ¤ Imcya{´mebw hgn Hcp ]pXnb

tI{µmhnjvIyX ]²Xnbmb H³]Xmw ¢mÊnepw ]¯mw ¢mÊnepw ]Tn¡p¶ ]«nIhÀ¤

hnZymÀ°nIÄ¡mbpÅ {]oþsa{SnIv kvtImfÀjn¸pIÄ Bcw`n¨p. 01..07.2012 apXÂ Cu

]²Xn \nehn h¶p. kwØm\ Kh¬saâv \S¸m¡p¶ Cu ]²XnbpsS 100 iXam\w

klmbhpw tI{µ Kh¬saân \n¶v e`n¡p¶p.

tI{µ¯n \n¶pÅ klmbw {]tXyI {Kmâmbn«mWv kwØm\¯n\v e`n¡p¶Xv.

Cu ]²Xn ]pXnbXmbXn\m kwØm\ _Pän \n¶v CXnsâ sNehpIÄ

\S¯pIbpw tI{µ¯n \n¶v CXv Xncn¨pIn«m\pÅ AhImiw D¶bn¡pIbpw

sN¿mhp¶XmWv. Ct¸mÄ hnZym`ymk klmbamb ew]vkw{Kmâv, {]oþsa{SnIv

hnZymÀ°nIÄ¡v amkw tXmdpapÅ ssÌ]âv XpS§nbh kwØm\s¯ t\m¬ ¹m\nÂ

\n¶pamWv hln¡p¶Xv. kwØm\w CtX \nc¡n 100 iXam\w tI{µmhnjvIyX

]²Xnbmb {]oþsa{SnIv kvtImfÀjn¸nsâ sNehpIÄ \S¯p¶p.

2017þ18 Â 500 e£w cq] tI{µ klmbambn {]Xo£n¡p¶p.

Programme Book 2017-18 Page 69

24. Construction of Girl’s Hostel [Central Share 100%] (Outlay: 350.00 lakh)

The scheme aims at construction of permanent buildings for girls hostels in a

phased manner. Out of 44 girls hostels, 43 have permanent buildings/ Govt buildings and the

remaining is housed either in rented buildings or temporary sheds. An amount of Rs.350.00

lakh is anticipated during 2017-18 as 100% Central share for undertaking the construction of

new girls‟ hostels and the completion of the spillover works. In addition to the above,

construction of new hostels can be taken in the scheme. Construction of followinghostels is

being undertaken/anticipated during the year 2017-18.

• Prematric Hostel, Oorkade, Idukki district

• Pre-matric Hostel, Meenakshipuram, Palakkad District

• Pre-matric Hostel, Chalakudy, Thrissur District

• Pre-matric Hostel, Marayoor, Idukki District

• Pre-matric Hostel, Aralam, Kannur District

• Post-matric Hostel, Kattela, Thiruvananthapuram District

s]¬Ip«nIfpsS tlmÌ \nÀ½mWw (100 iXam\w tI{µ klmbw )

(hnlnXw : 350.00 e£w cq]) s]¬Ip«nIfpsS tlmÌen\pth−n Øncw sI«nS§Ä L«wL«ambn \nÀ½n¡m³

e£yam¡p¶ ]²XnbmWnXv. \nehn {]hÀ¯n¨p hcp¶ s]¬Ip«nIfpsS 44

tlmÌepIfn 43 F®¯n\v am{Xta Øncw sI«nS§fpÅq. _m¡nbpÅXv

hmSIbvt¡m Asæn XmXv¡menIamb sjUpIfntem BWv {]hÀ¯n¡p¶Xv.

2017þ18þ ]pXnb tlmÌ \nÀ½n¡p¶Xn\pw kv]nÂHmhÀ tPmenIÄ

XoÀ¡p¶Xn\pambn 100 % tI{µ klmbambn 350 e£w cq] {]Xo£n¡p¶p.

2017þ18þ Xmsg¸dbp¶ tlmÌepIfpsS \nÀ½mW {]hÀ¯\§Ä

Bcw`n¡phm³ Dt±in¡p¶p.

• {]osa{SnIv tlmÌÂ, DuÀ¡mSv, CSp¡n PnÃ

• {]osa{SnIv tlmÌÂ, ao\m£n]pcw, ]me¡mSv PnÃ

• {]osa{SnIv tlmÌÂ, Nme¡pSn, XyÈqÀ PnÃ

• {]osa{SnIv tlmÌÂ adbqÀ, CSp¡n PnÃ

• {]osa{SnIv tlmÌÂ, Bdfw I®qÀ PnÃ

• t]mÌv sa{SnIv tlmÌÂ, It«e, Xncph\´]pcw PnÃ

Programme Book 2017-18 Page 70

25. Construction of Model Residential Schools (100 % CSS under Article

275(1))

(Outlay: 350.00 lakh)

Construction of Model Residential School at Pookode, Wayanad (100% Central

Assistance under Art. 275(1)), Construction of Model Residential School at Idukki (100%

Central Assistance under Art. 275(1)) and Construction of Model Residential School at

Njaraneeli, Thiruvananthapuram under Art 275(1)) are merged and renamed as Construction

of Model Residential Schools (100% Central Assistance under Art. 275(1)).

The MRS Pookode, school was started during 2000-2001. Land for the construction

work has been identified at Pookot. During 2002-03, as the second phase an amount of

Rs.150 lakh was released by GOI for this project. So that the total release by GOI amounts to

Rs.250 lakh. The sanctioned strength is 300 from STD 6 to 10 with 60 students per class with

30 boys and 30 girls in each class.

Model Residential School in Idukki was started in 2001-02 by providing admission to

students in standard VI. The sanctioned strength is 300 from STD 6 to 10 with 60 students

per class with 30 boys and 30 girls in each class.

Model Residential English Medium School, Njaraneeli started functioning in a

temporary building during 2000-01. The School follows CBSE syllabus. The sanctioned

strength is 480 from STD 1 to 12 with 40 students per class .

An amount of 350.00 lakh is anticipated as 100 % central assistance during 2017-18

for the completion of construction works and running expenditure of these

schools.Construction of new MRSs can also be considered under this scheme.

amXrIm dknU³jy kvIqfpIfpsS sI«nS \nÀ½mWw (100% tI{µ klmbw BÀ«ns¡nÄ 275(1) {]Imcw ) :þ

(hnlnXw : 350.00 e£w cq])

`cW LS\bnse BÀ«n¡nÄ 275(1) {]Imcw sI«nS \nÀ½mW¯n\v

sXcsªSp¡s¸« hb\mSv PnÃbnse ]qt¡m«pÅ amXyIm dknU³jy kvIqÄ,

CSp¡n PnÃbnse amXyIm dknU³jy kvIqÄ, Xncph\´]pc¯v Rmd\oenbnepÅ

amXyIm dknU³jy kvIqfpIfpsS sI«nS \nÀ½mWw F¶o ]²XnIÄ ebn¸n¨v

amXyIm dknU³jy kvIqfpIfpsS sI«nS \nÀ½mWw (100 iX-am\w BÀ«n¡nÄ 275(1)

{]Imcw tI{µ klmbw) F¶v ]p\À \maIcWw sNbvXp.

hb\m«nse ]qt¡m«pÅ amXyIm dknU³jy kvIqÄ 2000þ2001 emWv

Bcw`n¨Xv.]qt¡m«pÅ `qanbmWv \nÀ½mW {]hÀ¯\¯n\v sXscsªSp¯Xv.

CXnsâ c−mw L«ambn 2002þ03þ tI{µ kÀ¡mÀ 150 e£w cq] A\phZn¨p. BsI

250.00 e£w cq] tI{µ kÀ¡mÀ A\phZn¨p. Hmtcm ¢mÊpIfnsebpw 60 Ip«nIfn 30

t]À B¬Ip«nIfpw 30 t]À s]¬Ip«nIfpambn sam¯w 300 Ip«nIÄ 6 apXÂ 10

hscbpÅ ¢mkpIfnembn Cu kvIqfn ]Tn¡p¶p.

6þmw ¢mknte¡v Ip«nIÄ¡v {]thi\w \ÂIp¶Xn\mbn 2001þ02þemWv

CSp¡nbnse amXyIm dknU³jy kvIqÄ {]hÀ¯\w Bcw`n¨Xv. Hmtcm

Programme Book 2017-18 Page 71

¢mÊpIfnsebpw 60 Ip«nIfn 30 t]À B¬Ip«nIfpw 30 t]À s]¬Ip«nIfpambn sam¯w 300 Ip«nIÄ 6 apX 10 hscbpÅ ¢mkpIfnembn Cu kvIqfn ]Tn¡p¶p.

Hcp Xm¡menI sI«nS¯n 2000þ2001þemWv Rmd\oenbnfpÅ amXyIm

dknU³jy Cw¥ojv aoUnbw kvIqÄ {]hÀ¯\amcw`n¨Xv. kvIqfn kn_nFkv.C

kne_kmWv XpScp¶Xv. Hmtcm ¢mÊnepw 40 Ip«nIÄ hoXw 480 Ip«nIÄ 1 apXÂ 12

hscbpÅ ¢mÊpIfnembn ]Tn¡p¶p.

2017þ18þÂ 100 iXam\w tI{µ klmbambn 350 e£w cq] {]Xo£n¡p¶p.

apIfn ]dª kvIqfpIfnse \nÀ½mW {]hy¯nIÄ ]qÀ¯oIcn¡p¶Xn\pw XpSÀ

sNehpIÄ¡pw IqSmsX ]pXnb amXyIm dknU³jy kvIqfnsâ \nÀ½mW¯n\pw

hnlnXw hn\ntbmKn¡mhp¶XmWv.

26. Implementation of Scheduled Tribes and other Traditional Forest

Dwellers [Recognition of Forest Right] Act, 2006 under Art. 275[1] (Outlay: 100.00 lakh)

As per the GOI letter No. 14020/10/2008/SG (1) dated 29.7.2008 GOI have released

an amount of `15.94 lakh to the State to incur expenditure for the implementation of

Scheduled Tribes and other Traditional Forest Dwellers [Recognition of Forest Rights] Act,

2006 under the Art 275[1] during 2008-09. The outlay is being utilised for surveying the

land, issuing record of rights, fencing of land under the Act, Development activities &

infrastructure development in the land distributed area under this act etc. The scheme is

implemented in all Districts except Kasaragod & Alappuzha. An amount of Rs.100.00 lakh is

anticipated as Central Assistance for the scheme during 2017-18.

BÀ«n¡nÄ 275(1) {]Imcw ]«nIhÀ¤¡mcpsSbpw aäp ]c¼cmKXambn h\¯n hkn¡p¶hcpsSbpw \nbaw(2006)\S¸m¡Â (h\mhImi \nbaw AwKoIcn¡Â )

(hnlnXw : 100.00 e£w cq])

BÀ«n¡nÄ 275(1) {]Imcw 29..07..2008 þ se Kh¬saâv Hm^v C´ybpsS

I¯v \¼À 14020/10/2008/Fkv.Pn (1) {]Imcw 2008þ09 þ  15.94 e£w cq]

]«nIhÀ¤¡mcpsSbpw aäp ]c¼cmKXambn h\§fn hkn¡p¶hcpsSbpw \nbaw

(2006) \S¸m¡p¶Xn\mbpÅ sNehpIÄ¡mbn kwØm\ Kh¬saâvn\v 2008-----þ09þÂ

\ÂIn (h\mhImiw AwKoIcn¡Â). BÀ«n¡nÄ 275(1) CXnsâ hnlnXw `qanbpsS

kÀsÆbpw, `qanbpsS AhImiw \ÂIp¶Xn\pw, \nba{]Imcw `qan thensI«n

kwcIvjn¡p¶Xn\pw Cu \nba{]ImcapÅ `qanbpsS hnIk\ {]hÀ¯\§Ä¡pw,

`qanbpsS ASnØm\ kuIcy§Ä hnIkn¸n¡p¶Xn\pambn D]tbmKn¡p¶p.

ImkÀtKmUpw Be¸pgbpw Hgn¨pÅ FÃm PnÃIfnepw Cu ]²Xn \S¸m¡n. 2017þ18 þ

 tI{µ klmbambn 100.00 e£w cq] Cu ]²Xnbv¡mbn {]Xo£n¡p¶p.

27. Vocational Training Institute for Scheduled Tribes (Outlay: 60.00 lakh)

At present there are two Vocational Training Institutes for Scheduled Tribe students

functioning at Thiruvananthapuram and Idukki for imparting training in 5 trades approved by

the National Council for Vocational Training. An amount of Rs.60.00 lakh is anticipated as

Programme Book 2017-18 Page 72

100% Central Assistance during 2017-18. Government of India insists on advance spending

and reimbursement later and hence funds have to be released in advance.

]«nIhÀK hnZymÀ°nIÄ¡pff sXmgne[njvTnX ]cnioe\ Øm]\w :þ

(hnlnXw : 60.00 e£w cq])

\mjW Iu¬kn t^mÀ shmt¡jW s{Sbn\nwKnsâ AwKoImcapÅ 5

t{SUpIfn ]«nIhÀK¡mÀ¡v sXmgn ]cnioe\w \ÂIp¶Xn\pth−n c−v

tI{µ§Ä Xncph\´]pc¯pw CSp¡nbnepw \nehn {]hÀ¯n¡p¶p. ap³Iqdmbn

XpI sNehgn¨ tijw XpI \ÂImsa¶v tI{µ Kh¬saâv hyhØbps−¦n am{Xw

XpI ap³Iqdmbn \ÂIp¶XmWv. 2017þ18 þ Â 100 iXam\ambn 60.00 e£w cq]

{]Xo£n¡p¶p.

28. Multi-purpose Hostel for STs (Outlay: 199.76 lakh)

In the changed socio-economic situation of the state more and more women are

leaving their homes in search of employment/ higher education/ apprenticeship training in

cities as well as Urban and Rural areas. One of the main difficulties faced by such women is

lack of safe and conveniently located accommodation. The grant-in-aid from Government of

India is expected for construction of new buildings for providing hostel facilities to working

women in cities, smaller towns and also in rural areas where employment opportunities for

women exist. Students seeking higher education in reputed institutions and apprenticeship

trainees may also be accommodated. Children of working women, up to the age of 18 years

for girls and up to the age of 5 years for boys may be accommodated in such hostels with

their mothers. The proposed multi-purpose hostels are :

1. Multi-pupose hostel, Marampally, Ernakulam District

2. Multi-pupose hostel, Foreshore, Ernakulam.

An amount of Rs.199.76 lakh is anticipated as 100% CSS for the scheme during 2017-18.

]«nIhÀ¤¡mÀ¡pth−n hnhn[ kuIcy§tfmSpIqSnb tlmÌepIÄ

(hnlnXw : 199.76 e£w cq]) kwØm\s¯ kmaqlnI km¼¯nI amä§Ä¡\pkcn¨v IqSpX h\nXIÄ

sXmgnen\pw D¶X ]T\¯n\pw A{]âvokv ]cnioe\¯n\pw th−n \Kc§fnepw

{Kma{]tZi¯pw F¯mdp−v. kuIcy§tfmSpIqSnb kpc£nXambn Xmakn¡pI

F¶XmWv AhÀ A`papJoIcn¡p¶ {][m\ {]iv\w. \Kc§fnepw {Kma{]tZi¯pw

tPmen t\m¡p¶ h\nXIÄ¡v tlmÌÂ kuIcyw GÀs¸Sp¯p¶Xn\pth−n ]pXnb

sI«nS \nÀ½mW¯n\mWv tI{µ kÀ¡mcn \n¶pw [\klmbw {]Xo£n¡p¶Xv.

{]ikvX Øm]\§fn D¶X hnZym`ymkw sN¿p¶hÀ¡pw A{]âvokv ]cnioeIÄ¡pw

Programme Book 2017-18 Page 73

Cu kuIcyw e`n¡p¶XmWv. C¯cw tPmen t\m¡p¶ h\nXIÄ¡v 18 hbÊphscbpÅ s]¬a¡Ä¡pw 5 hbÊphscbpÅ B¬a¡Ä¡pw

A½amtcmsSm¸w Xmakn¡m\pÅ kuIcyw e`n¡p¶XmWv. \nÀt±in¡s¸« hnhn[

kuIcy§tfmSpIqSnb tlmÌepIÄ Xmsg ]dbp¶hbmWv.

• hnhn[ kuIcy§tfmSpIqSnb tlmÌÂ, acw¸Ån, FdWmIpfw PnÃ

• hnhn[ kuIcy§tfmSpIqSnb tlmÌÂ, t^mÀtjmÀ, FdWmIpfw PnÃ

tI{µ kÀ¡mcn \n¶pw {]Xo£n¡p¶ [\klmbw hn\ntbmKn¡p¶Xn\mbn

2017þ18 þ Â Cu ]²Xnbv¡mbn 199.76 e£w cq] tI{µ klmbambn {]Xo£n¡p¶p.

29. Conservation Cum Development (CCD) Plan for PTG’s (Outlay: 0.01 lakh)

The main objective of the scheme is to fill up the gaps occurred in the general

development of Primitive tribals through Tribal Sub Plan. Under the scheme funds will be

released by GOI based on specific projects viz Health, Education, land based agricultural

development programmes etc. During 2009-10 Government of India allotted an amount of

`960 lakh for Conservation Cum Development Plan for Particularly Vulnerable Tribal

Groups, 50% for housing purpose and other 50% for livelihood activities.

An amount of Rs. 0.01 lakh is provided as token provision for this programme for

utilization of the grant anticipated from GOI during 2017-18.

{]mà\ tKm{XhÀ¤¡mÀ¡pÅ kwc£Whpw hnIk\hpw tNÀ¶pÅ ]²Xn

(kn.kn.Un ]²Xn).

(hnlnXw : 0.01 e£w cq]) ss{S_ k_v ¹m³ hgnbpÅ {]mà\ tKm{XhÀ¤¡mcpsS

s]mXphnIk\ ]cn]mSnIÄ¡nSbnepÅ hnShv \nI¯pI F¶XmWv Cu ]²XnbpsS

{][m\ e£yw. Cu ]²Xn hgn C´ym Kh¬saâv {]tXyI t{]mPÎpIfmb BtcmKyw,

hnZym`ymkw, `qan kw_Ôamb ImÀjnI hnIk\ ]cn]mSnIÄ XpS§nbhbv¡mbpÅ XpIIÄ A\phZn¡p¶p. 2009þ10 þ Â C´ym Kh¬saâv 960 e£w cq] Gähpw

tamiamb AhØbn Xmakn¡p¶ {]mà\ tKm{Xhn`mK§Ä¡v

kwc£Wt¯mSpIqSnbpÅ hnIk\ ]²Xn¡mbn A\phZn¡pIbpw AXnse 50

iXam\w `h\ \nÀ½mW¯n\mbpw 50 iXam\w D]Poh\¯n\mbpw amän sh¨ncn¡p¶p. tI{µ kÀ¡mcn \n¶pw {]Xo£n¡p¶ [\klmbw D]tbmKn¡p¶Xn\mbn 2017þ18 þ Â

Cu ]²Xnbv¡v 0.01 e£w cq] hIbncp¯nbncn¡p¶p.

30. Infrastructure Facilities to KIRTADS (Outlay: 0.01 lakh)

During 2005-06 GOI, Ministry of Tribal Affairs sanctioned an amount of Rs.50.00

lakh as one time grant to the State Tribal Research Institute for providing infrastructural -

Programme Book 2017-18 Page 74

facilities to the newly constructed training hall, library and hostel building. The following are

the components for utilising this amount.

• Modernisation of library and museum.

• Purchase of furniture, amplifier, utensils etc., for the newly constructed training hall

and hostel.

The project will spill over to ensuing years, a token provision of Rs.0.01 lakh is kept

anticipated as 100% Central Assistance for 2017-18.

InÀ¯m-Uvkn\v ]Ým-¯e kuI-cy-sam-cp-¡Â

(hnlnXw : 0.01 e£w cq])

2005-þ06 tKm{XhÀ¤ Imcy a{´m-ebw hgn 50 e£w cq] Hä-̄ -hW {Kmâmbn

kwØm\ tKm{X-hÀ¤ Kth-j-I-Øm-]-\-̄ n\v ASn-Øm\ kuI-cy-§-fmb ]cn-io-e\ lmÄ

]pXn-b-Xmbn \nÀ½n-¡p-¶-Xn\pw,sse-{_-dn, tlmÌ sI«n-S-§Ä apX-em-bh \nÀ½n-¡p-¶-

Xn-\p-ambn A\p-h-Zn-̈ p. Xmsg¸d-bp¶ LS-I-§-fn-eqsS Cu XpI hn\n-tbm-Kn-¡p-¶p :

• sse{_-dn-bp-sSbpw ayqkn-b-̄ n-sâbpw \ho-I-cWw

• ]pXp-Xmbn \nÀ½n¨ s{Sbn-\nwKv lmfn-te¡pw, tlmÌente¡pw ^ÀWn-¨-dp-IÄ ,

Bw¹n-̂ -bÀ, ]m{X-§Ä XpS-§n-bh hm§p-¶-Xn-\v.

Cu ]²Xn XpSÀ hÀj-§-fn-te¡v kv]n HmhÀ Bbn-cn-¡pw. tI{µ kÀ¡m-cnÂ

\n¶pw {]Xo-£n-¡p¶ [\-k-lmbw D]-tbm-Kn-¡p-¶-Xn-\mbn 2017-þ18-þÂ Cu ]²-Xn¡v 0.01

e£w cq] hI-bn-cp-̄ n-bn-cn-¡p-¶p.

31. Grant-in-aid to the Kerala State Federation of SCs and STs

Development Cooperative Ltd. (Outlay: 0.01 lakh)

GOI used to give grant in aid to the Kerala State Federation of SCs and STs

Development Co-operative Ltd for Minor Forest Produce Operations. The grant includes:

• Share capital investment

• Procurement of MFP

• Construction of godowns/ware houses.

During 2017-18 a token provision of Rs.0.01 lakh is provided for this programme for

utilization of the grant anticipated from GOI.

Programme Book 2017-18 Page 75

tIcf kwØm\ ]«nIPmXn ]«nIhÀ¤ klIcW s^Utdj\v [\klmbw

(hnlnXw : 0.01 e£w cq])

tIcf kwØm\ ]«nIPmXn ]«nIhÀ¤ klIcW s^Utdj\v sNdp h\ DXv]¶§fpsS tiJcWhpambn _Ôs¸« ]cn]mSnIÄ¡mbn C´ym

Kh¬saâv [\klmbw \ÂImdp−v.

• Hmlcn aqe[\ \nt£]w,

• sNdph\ D¸¶§fpsS tiJcWw,

• tKmUu¬/shbÀ lukv F¶nhbpsS \nÀ½mWw

tI{µ kÀ¡m-cn \n¶pw {]Xo-£n-¡p¶ [\-k-lmbw D]-tbm-Kn-¡p-¶-Xn-

\mbn 2017-þ18-þÂ Cu ]²-Xn¡v 0.01 e£w cq] hI-bn-cp-̄ n-bn-cn-¡p-¶p.

32. Upgradation of Merits of Scheduled Tribe Students (Outlay: 0.01 lakh)

The scheme envisages providing extra coaching to Scheduled Tribe students to

facilitate their admission to professional courses. The scheme is implemented with 100%

Central Assistance, Government of India insists on advance spending and reimburses later.

During 2017-18 a token provision of Rs.0.01 lakh is provided for the programme for

utilization of the grant anticipated from GOI.

]«nIhÀK hnZymÀ°nIfpsS \nehmcw sa¨s¸Sp¯Â :þ

(hnlnXw : 0.01 e£w cq]) s{]m^jW tImgvkpIfn {]thi\w e`n¡p¶Xn\mbn ]«nIhÀK

hnZymÀ°nIÄ¡v A[nI tIm¨nwKv \ÂIm\mbn Cu ]²Xn Dt±in¡p¶p. ap³Iqdmbn

XpI sNehgn¨ tijw XpI \ÂImsa¶v tI{µ Kh¬saâv hyhØbps−¦n am{Xw

XpI ap³Iqdmbn \ÂIp¶XmWv. 100 iXam\w tI{µ klmbt¯mSpIqSnbmWv Cu

]²Xn \S¸m¡p¶Xv. tI{µ kÀ¡mdn \n¶pw {]XoIvjn¡p¶ [\klmbw

D]tbmKn¡p¶Xn\mbn 2017þ18þÂ Cu ]²Xn¡v 0.01 e£w cq] hIbncp¯nbncn¡p¶p.

33. VanbandhuKalyanYojana (Outlay: 1000.00 lakh)

VKY has been launched by the Ministry of Tribal Affairs, Government of India for

holistic development and welfare of tribal population of India. The scheme proposes to bring

tribal population of the country at par with other social groups and include them in overall

progress of the nation. Kerala State has submitted the perspective plan 2015-20 to GOI, an

amount of Rs.300 lakh was released during 2015-16 for Sports and in this regard.

Programme Book 2017-18 Page 76

Activities proposed under the scheme.

• Qualitative and sustainable employment

• Emphasis on quality education and higher education

• Accelerated economic development of tribal areas.

• Health for all

• Housing for all

• Safe Drinking water for all at doorsteps

• Irrigation facilities suited to the terrain

• All weather roads with connectivity to the nearby town/cities.

• Universal availability of electricity

• Urban development

• Promotion of sports in the tribal areas

• Promotion and preservation of tribal culture and heritage

An amount of Rs1000.00 lakh is anticipated as 100% CSS for the scheme during 2017-18.

h\_Ôp IÃym¬ tbmP\

(hnlnXw : 1000.00 e£w cq])

C´ybnse ]«nIhÀ¤ hn`mK§fpsS k¼qÀ® hnIk\¯n\pw

t£a¯n\pambn tI{µ kÀ¡mcnsâ IognepÅ ]«nIhÀ¤ Imcya{´mebw XpS§nb

]²XnbmWnXv. ]«nIhÀ¤¡msc aäp P\t§msSm¸w DbÀ¯ns¡m−ph¶v cmPy¯nsâ

ka{K hnIk\¯nsâ `mKam¡pIbmWv Cu ]²Xn hn`mh\w sN¿p¶Xv. kwØm\

kÀ¡mÀ 2015 þ 20 te¡mbn 300.00 e£w cq]-bpsS Hcp ZoÀL ho£W ]²Xn tI{µ

kÀ¡mcn\v CXntebv¡mbn kaÀ¸n¨n«p−v. Cu ]²Xnbn {]Xn]mZn¡p¶ LSI§Ä

Xmsg sImSp¡p¶p.

• KpW\nehmcapÅXpw kpØnchpamb sXmgnÂ

• KpW\nehmcapÅ hnZym`ymk¯n\pw D¶X hnZym`ymk¯n\pw Du¶Â \ÂIÂ

• ]«nIhÀ¤ taJeIfn km¼¯nI hnIk\w XzcnXs¸Sp¯pI

• k¼qÀ® BtcmKyw

• k¼qÀ® `h\w

• ip²amb IpSnshÅw FÃmhÀ¡pw ho«phmXn¡ e`yam¡pI

• Øe¯n\v A\ptbmPyamb PetkN\ kuIcy§Ä

• ASp¯pÅ Su¬/ knänIsfbpw _Ôn¸n¡p¶Xn\pÅ FÃm ImehØbv¡pw

A\ptbmPyamb tdmUv.

• FÃmhÀ¡pw sshZypXn e`yam¡pI

• \Kc hnIk\w

• ]«nIhÀ¤ taJeIfn ImbnI aÕc§Ä t{]mÂkmln¸n¡pI.

Programme Book 2017-18 Page 77

• ]«nIhÀ¤ kwkvImc¯nsâbpw ss]XyI¯nsâbpw kwc£Whpw t{]mÂkml\hpw.

2017þ18 hÀj¯n 1000.00 e£w cq] 100 iXam\w tI{µ hnlnXambn Cu

]²Xnbv¡v {]Xo£n¡p¶p.

34. Rural Development Schemes

1. Pradan Manthri Awaz Yojana (Gramin)-(PMAY)TSP(60% CSS)

(Outlay: 4559.20 lakh)

The objective of the scheme is to provide houses to Scheduled Tribes under the

centrally sponsored scheme Pradan Manthri Awaz Yojana. Construction of new houses and

upgradation of existing kutcha houses to pucca houses are the two components of the

scheme.

An amount of Rs.4559.20 lakh is anticipated for the programme during 2017-18 as

60% central share. The provision is earmarked to block panchayats. {Kma-hn-I-k\ ]cn-]m-Sn-IÄ

1. {][m³a{´n Bhmkv tbmP\ ({Km-ao¬) ( ]n. Fw. F. ssh)

(]«n-I-hÀ¤ D]-]-²-Xn)

(60 iX-am\w tI{µ hnln-Xw)

(hnlnXw : 4559.20 e£w cq]) ]«nIhÀ¤ hn`mK¯nÂs¸« BfpIÄ¡v hoSpIÄ \ÂIm³ tI{µmhnjvIyX

]²Xnbmb {][m³a{´n Bhmkv tbmP\ ({Kmao¬) (]n.Fw.F.ssh) bneqsS

e£yanSp¶p. ]pXnb hoSpIÄ \nÀ½n¡pIbpw \nehnepÅ tamiamb hoSpIsf \Ã

hoSpIfm¡n \hoIcn¡pIbpamWv Cu ]²XnbpsS c−v LSI§Ä.

2017-þ18-þÂ 4559.20 e£w cq] 60 iX-am\w tI{µ hnln-X-ambn Cu ]cn-]m-Sn-¡p-th−n

{]Xo-£n-¡p-¶p. {Kma ]©m-b-̄ p-IÄ¡mWv hnlnXw hI-bn-cp-̄ p-bn-cn-¡p-¶-Xv.

2. NRLM (National Rural Livelihood Mission)-TSP(60% CSS)

(Outlay: 382.50 lakh)

The centrally sponsored scheme envisages establishing a large number of micro

enterprises in the rural areas. The tribal sub plan share anticipated under this scheme during

2017-18 is Rs.382.50 lakh which is 60% central share. The provision is earmarked to the

block panchayats.

Programme Book 2017-18 Page 78

2. F³.BÀ.FÂ.Fw (tZ-iob {KmaoW D]-Po-h\ anj) ( 60 iXam\w tI{µ hnlnXw)

( hnlnXw : 382.50 e£w cq])

{KmaoW taJebn [mcmfw sNdpInS kwcw`§Ä XpS§m³ Cu tI{µmhnjvIyX

]²XnbneqsS e£yanSp¶p. 2017þ18 þ  ]«nIhÀ¤ D]]²Xn {]Imcw 382.50 e£w cq]

60 iXam\w tI{µ hnlnXambn {]Xo£n¡p¶p. t»m¡v ]©mb¯qIÄ¡mWv hnlnXw

hIbncp¯nbncn¡p¶Xv.

Programme Book 2017-18 Page 79

35. Umbrella Programme for the Development of Scheduled Tribes (50%

CSS)

The components of the scheme are given below.

A. Construction of building for Model Residential /Ashram Schools in Tribal Area

[50% Central Share]

(Outlay: 1500.00 lakh) Government of India provides 50% of the cost of construction of infrastructure of 15 Ashram

schools. Rs.1500.00 lakh is anticipated during 2017-18 as 50% central share for

completion/construction of building of the 9 schools as detailed below.

Sl.No Name of School Amount(Rs.

in Lakh)

1 Ashram school,Noolpuzha, Wayanad

1500.00

2 MRS Attappady, Palakkad

3 MRS kulathupuzha, Kollam

4 MRS Kasargod

5 MRS Nalloornadu, Wayanad

6 Ashram School, Thirunelli

7 MRS Kuttichal, Thiruvananthapuram

8 MRS Aralam, Kannur

9 MRS Melukavu, kottayam

Total 1500.00

In addition to the above, construction of new hostels can also be considered in the scheme.

]«nIhÀ¤¡mcpsS hnIk\¯n\v Hcp IpSIogn hcp¶ ]²XnIÄ

(50 iXam\w tI{µ hnlnXw)

Cu ]²XnbpsS LSI§Ä Xmsg sImSp¯ncn¡p¶p.

F. ]«n-I-hÀ¤ taJ-e-bn amXrIm dkn-U³j-y kvIqfp-I-fp-sS-bpw, B{iaw kvIqfp-I-

fpsSbpw \nÀ½mWw (50 iX-am\w tI{µ hnln-Xw) (hnlnXw : 1500.00 e£w cq])

B{iaw kvIqfp-I-fpsS ASn-Øm\ kuI-c-y-§Ä¡m-bp-ff \nÀ½mW

sNehv 50 iX-am\w C´ym Kh¬saâv \ÂIp¶p. 2017þ18þ Xmsg-¸-d-bp¶ 9 kvIqÄ sI«n-S-\nÀ½m-W-tPm-en-IÄ Bcw-̀ n-¡p-¶-Xn\pw/ \nÀ½mWw ]qÀ¯oIcn¡p¶Xn\pambn

50% tI{µ hnln-X-ambn 1500 e£w cq] -{]Xo£n-¡p¶p. CXp IqSmsX ]pXnb

tlmÌepIfpsS \nÀ½mWhpw Cu ]²Xnbn ]cnKWn¡mhp¶XmWv. hni-Zmw-i-§Ä

Xmsg sImSp-̄ n-cn-¡p-¶p.

Programme Book 2017-18 Page 80

{Ia

\¼À

kvIqfnsâ t]cv XpI(cq])

e£¯nÂ

1 B{iaw kvIqÄ , \q¸pg, hb\mSv

1500.00

2 amXyI dknU³jy kvIqÄ A«¸mSn, ] me¡mSv

3 amXyI dknU³jy kvIqÄ, Ipf¯q¸pg, sImÃw

4 amXyI dknU³jy kvIqÄ, ImkÀtKmUv

5 amXyI dknU³jy kvIqÄ, \ÃqÀ\mSv, hb\mSv

6 B{iakvIqÄ, Xncps\Ãn,

7 amXyI kvIqÄ, Ipän¨Â, Xncph\´]pcw

8 amXyI dknU³jy kvIqÄ, Bdfw, I®qÀ

9 tamU dkn-U³j-y kvIvqÄ, taep¡mhv, tIm«bw

BsI 1500

B. Construction of Boys Hostel [50% Central Share]

(Outlay: 450 .00 lakh) Out of the 66 boys hostels run by the Scheduled Tribes Development Department,

only 55 have permanent buildings. The objective of the scheme is to construct permanent

building for hostels functioning in temporary sheds/ rented buildings. The list of hostels

where construction in progress is given below.

Sl.No. Name of Hostel

1 Prematric Hostel, Irumbupalam,Idukki

2 Pre-matric Hostel, Sholayar, Palakkad

(2 hostels – 60 bedded and 100 bedded)

3 Pre-matric Hostel, Pinangode, Wayanad

4 Pre-matric Hostel, Mullankolly, Wayanad

5 Pre-matric Hostel,Agali, Attappady

6 Post matric Hostel,Agali, Attappady (Boys)

In addition to the above, construction of new hostels can be taken in the

scheme (construction of Post matric Hostel at Agali, Attappady (Boys)is merged to

Construction of Boy’s Hostel [50% CSS] from 2014-15 onwards). During 2017-18, an

Programme Book 2017-18 Page 81

amount of Rs.450.00 lakh is anticipated as 50% central share for undertaking the

construction of new hostels and the completion of ongoing works.

_n. B¬Ip-«n-I-fpsS tlmÌ \nÀ½mWw (tI{µ hnlnXw 50 iX-am-\w)

(hnlnXw : 450.00 e£w cq]) ]«n-I-hÀ¤ hnI-k\ hIp-̧ nsâ Iogn {]hÀ¯n-¡p¶ B¬Ip-«n-IÄ¡m-bp-ff 66

tlmÌ-ep-I-fn 55 F®-̄ n\p am{Xta Øncw sI«n-S-§Ä Df-fp. hmS-Ibv¡v/ Xm¡m-

enI sjUp-I-fn {]hÀ¯n-¡p¶ tlmÌ-ep-IÄ¡v Øncw sI«nSw ]Wn-bp-hm³ Cu ]²-

Xn-bn e£-y-an-«n-cn-¡p-¶p. \nÀ½mWw ]ptcmKXnbnencn¡p¶ tlmÌepIfpsS ]«nI

NphsS tNÀ¯ncn¡p¶p.

{Ia \w tlmÌensâv t]cv

1 {]osav{SnIv tlmÌÂ, Ccp¼p]mew, CSp¡n

2 {]osa{SnIv tlmÌÂ, tjmfbmÀ, ]me¡mSv (2 tlmÌÂ þ 60 InS¡, 100 InS¡)

3 {]osa{SnIv tlmÌÂ, ]nWt§mSv, hb\mSv

4 {]osa{SnIv tlmÌÂ, apósImÃn, hb\mSv,

5 {]osa{SnIv tlmÌÂ, AKfn, A«¸mSn.

6 t]mÌv sa{SnIv tlmÌÂ, AKfn, A«¸mSn, (B¬Ip«nIÄ)

CXp IqSmsX ]pXnb tlmÌepIfpsS \nÀ½mWhpw GsäSp¡mhp¶XmWv. 2014þ15 þ A«¸mSnbnse AKfnbnepÅ t]mÌv sa{SnIv tlmÌensâv \nÀ½mWhpw, (B¬) , B¬Ip«nIfpsS tlmÌ \nÀ½mW¯ntebv¡v ebn¸n¨p. (50% tI{µ hnlnXw). 2017þ18 þ  450 e£w cq] 50% tI{µ hnlnXambn ]pXnb tlmÌepIfpsS \nÀ½mW¯n\pw {]hy¯n \S¶psIm−ncn¡p¶ tlmÌepIÄ ]qÀ¯oIcn¡p¶Xn\pw hIbncp¯nbncn¡p¶p.

C. Enforcement of Prevention of Atrocities Act [50% Central Share]

(Outlay : 30.00 lakh)

Special Benches have been constituted in all District Courts for the speedy

disposal of cases registered under the Atrocities Act. Major components of the scheme

include.

• Formulation of appropriate schemes for providing compensation and rehabilitation of

the victims of atrocities.

• Providing legal aid to the victims of atrocities.

• Functioning of the special mobile police squad in Wayanad District.

• To start a special court at Wayanad.

• Payment of travelling allowance to witnesses.

An amount of Rs.30.00 lakh is anticipated as 50% central share for the scheme

during 2017-18.

Programme Book 2017-18 Page 82

kn. AXn-{I-a-§Ä XS-b \nbaw \S-¸m-¡Â (tI{µ hnlnXw 50 iX-am-\w) (hnlnXw : 30.00 e£w cq])

AXn-{I-a-§Ä XS-b \nb-a-{]-Imcw cPn-ÌÀ sNbvXn-«p-ff tIkp-IÄ

s]s«¶v XoÀ¸v I¸n-¡p-¶-Xn\v FÃm PnÃm tImS-Xn-I-fnepw kvs]j-y _©p-IÄ Øm]n-

¨n-«p-−v. Cu ]²-Xn¡v Xmsg-̧ -d-bp¶ {][m\ LS-I-§-fm-Wp-f-f-Xv.

o AXn-{Ia§Ä¡v Cc-bm-Ip-¶-hsc ]p\-c-[n-h-kn-¸n-¡p-hm\pw AhÀ¡v \jvS-]-cn-

lmcw \e-Ip-hm\pw DNn-X-amb ]cn-]m-Sn-IÄ cq]o-I-cn-¡Â.

o AXn-{I-a-§Ä¡v Cc-bm-Ip-¶-hÀ¡v \nb-a-k-lmbw \ÂIÂ.

o hb-\mSv PnÃ-bn k©-cn-¡p¶ {]tX-yI t]meokv kvIzm-Unsâ {]hÀ¯-\w.

o hb-\m«n {]tX-yI tImSXn Øm]n-¡Â.

o km£n-IÄ¡v bm{Xm Ae-h³kp-IÄ \ÂIpI.

2017þ18 þ Â 50 iX-am-\w tI{µ hnlnXambn 30.00 e£w cq] {]Xo£n-¡p¶p.

D. Grant-in-aid to Kerala Institute for Research, Training and Development

studies(KIRTADS) for SC/ST [50% Central Share]

(Outlay: 125.00 lakh)

The usual functions of KIRTADS may be classified into two broad categories,

viz., (i) Training and (ii) Research. Besides, the institute will prepare during 2017-18

separate Operational Manuals for SC and ST Promoters.

The training programmes include:

• Strengthening of Oorukuttoms.

• Leadership for Scheduled Tribes youths.

• Workshop on the health issues of Scheduled Tribes.

• Modern Archery

• Coaching for PSC/UPSC examinations appearing by Scheduled Tribes.

• Awareness on Act and Rules relating to empowerment of Scheduled Tribes.

• IT services enabling Scheduled Tribes development.

• Entrepreneurship programmes for Aranadan Community and women entrepreneurs.

• Empowerment of Anganwady workers

• Capacity building of teachers and supporting staff of Ashram Schools, MRS and

wardens of pre-matric and post-matric hostels.

• Training of Revenue Officials on the issue of Community Certificate (SC/ST).

• For STDD officials on plan formulation, implementation and monitoring of

TSPschemes.

• Empowerment of ST Representatives of PRIs.

• Orientation on script writing, photography and video documentation for Scheduled

Tribe youths.

• Empowerment of Scheduled Tribe Women.

Programme Book 2017-18 Page 83

The component of research activities consists the following

• Documentation of rituals and practices of Scheduled Tribes and collection and

display of the traditional dress and ornaments of the Scheduled Tribes.

• Impact of FRA on Scheduled Tribes.

• Evaluation of PVTG projects for Scheduled Tribes.

• Status on the unemployment among the Scheduled Tribe youths.

• Award of Junior Research Fellowship.

• Purchase of audio visual equipment and library books.

• Printing/publishing of study reports/journals.

• Seminar on Tribal development issues.

• Quiz Competitions for Scheduled Tribe youths.

A new strategy as outlined below has to be followed for implementing the above

programmes/activities during 2017-18.

A Steering Committee consisting of representatives of Scheduled Caste Development

Department, Scheduled Tribes Development Department, State Planning Board and experts

in SC/ST development may be constituted for preparing the training modules and developing

methodology for research activities. The reports of the Steering Committee have to be

furnished to the Principal Secretary, SC/ST Development for approval.

The total outlay anticipated to the institute as 50% Central Share for 2017-18 is

Rs.125.00 lakh. Of this an amount of Rs.10.00 lakh is set apart for the preparation of

Operational Manuals for SC and ST Promoters.

Un. tIcf kwØm\ ]«n-I-PmXn/]«n-I-hÀ¤ Kth-jW ]cn-io-e\ hnI-k\ C³Ìn-ä-yq-«n\v (InÀ¯m-Uvkv) [\-k-lmbw( tI{µ hnlnXw 50 iX-am-\w)

(hnlnXw : 125.00 e£w cq])

InÀ¯m-Uvknsâ ]Xnhv {]hÀ¯-\-§sf ]cn-io-e-\-§Ä, Kth-jWw F¶n-§s\

c−mbn Xcw- Xn-cn¡mhp-¶-Xm-Wv. CXp-IqSmsX ]«n-I-PmXn,]-«nI hÀ¤ {]tam-«ÀamÀ¡v

Hcp {]hÀ¯\ am\p-h X¿m-dm-¡pI F¶ ZuXyhpw 2017-þ18þ Øm]\w Gsä-Sp-t¡-−-

Xm-Wv.

]cn-io-e\ ]cn-]m-Sn-IÄ

• Ducp-Iq-«-§-fpsS imào-I-cWw

• ]-«nIhÀ¤ bph-P-\-§-fpsS t\Xr-Xz]m-Shw hÀ²n-̧ n-¡Â.

• ]-«nIhÀ¤ hn`mK§fpsS Btcm-Ky- {]-iv\-§sf kw_-Ôn¨v in¸-ime kwL-Sn-̧ n-¡p-I.

• As¼-bv¯n B[p-\nI ]cn-io-e-\w.

• ]n.-F-kv.kn/bp.-]n.-F-kv.kn ]co-£-I-fn ]s¦-Sp-¡p¶ ]-«nIhÀ¤ hn`m-K-§Ä¡v

]cn-io-e-\w.

• ]«n-I-hÀ¤ hn`m-K-§-fpsS imào-I-c-W-̄ n-\pÅ \nb-a-§-fpw,-N-«-§fpw kw_-Ôn¨ t_m[-h¡-c-Ww.

Programme Book 2017-18 Page 84

• ]-«nIhÀ¤ hn`m-K-§fpsS hnI-k-\-̄ n-\pÅ hnhc kmt¦-XnI {]hÀ¯-\-§Ä.

• Ac-\m-S³ hn`m-K-̄ nÂs¸-«-hÀ¡pw h\nXm kwcw-̀ -IÀ¡pÅ kwcw-̀ -I-Xz-]-cn-]m-Sn.

• AwK³hmSn {]hÀ¯-I-cpsS imào-I-c-Ww.

• Fw.-BÀ.-Fkv/B{iaw kvIqfp-I-fnse A²ym-]-IÀ¡pw A\p-_Ô Poh-\-

¡mÀ¡pw {]osa-{SnIv t]mÌv sa{SnIv tlmÌ-ep-I-fnse hmÀU-³amÀ¡pw Imcytijn

hÀ²-\m-]-cn-]mSn.

• ]«n-I-PmXn ]-«nIhÀ¤ kÀ«n-^n-¡äv \ÂIp-¶-Xp-ambn _Ô-s¸« {]iv\-§Ä¡v

dh\yq DtZym-K-ØÀ¡v ]cn-io-e-\w.

• ]-«nIhÀ¤ D]-]-²Xn X¿m-dm-¡Â \S-̧ n-em-¡Â,-tam-Wn-ä-dnwKv F¶o hnj-b-§-fn ]-«nIhÀ¤ hnIk\ hIp-̧ p-tZym-K-ØÀ¡v ]cn-io-e-\w.

• Xt±-i-̀ -cW Øm]-\-§-fnse ]-«nIhÀ¤ P\-{]Xn-\n-[n-I-fpsS imào-I-c-Ww.

• ]-«nIhÀ¤ bph-P-\-§Ä¡v hoUntbm tUmIyp-sa-tâ-j³,-Xn-c-¡Y X¿m-dm-¡Â,-

t^mt«m {Km^n F¶n-h-bn ]cn-io-e-\w.

• ]-«nIhÀ¤ kv{XoI-fpsS imào-I-c-Ww.

Kth-jW {]hÀ¯-\-§Ä

• ]-«nIhÀ¤ hn`m-K-¡mcpsS BNm-cm-\p-jvTm-\-§-fpsS tUmIyp-sa-tâ-j³,-Ah-cpsS

]mc-¼cy hkv{X-§-fp-sSbpw B`-c-W-§-fp-sSbpw tiJ-c-Whpw {]Z-Ài-\-hpw.

• ]-«nIhÀ¤ hn`m-K-§Ä h\m-hImi \nbaw ImcWw t\cn-tS−n-h-cp¶ ]cn-Wn-X -̂ -e-§Ä.

• ]-«nIhÀ¤ hn`m-K-§fnse {]mà-\-tKm{X hÀ¤ hnI-k\ t{]mP-IvSp-I-fpsS aqey-

\nÀW-bw.

• ]«nI hÀ¤ bphm-¡-fpsS sXmgn-en-Ãm-bva-bpsS Ah-Ø.

• Pq\n-bÀ dnkÀ¨v s^tÃm-jn¸v \ÂIÂ.

• sse{_-dn-bn-te¡v ]pkvX-I-§fpw Zriy -{imhy D]-I-c-W-§fpw hm§Â.

• tPW-ep-IÄ/]T\ dnt¸mÀ«p-IÄ F¶nh A¨-Sn-¡p-Ibpw {]kn-²o-I-cn-¡p-Ibpw sN¿p-I.

• tKm{X-hÀ¤ hnI-k\ {]iv\§-fn skan-\m-dp-IÄ kwL-Sn-̧ n-¡p-I.

• ]-«nIhÀ¤ bphm-¡Ä¡v Iznkv aÕ-c-§Ä .

apI-fn {]Xn--]m-Zn¨ ]cn-]m-Sn-IÄ \S-̧ n-em-¡p¶Xn\mbn 2017-þ18þ Bhn-jvI-

cn¨n«pÅ Hcp ]pXnb X{´-̄ nsâ cq]-tcJ NphsS \ÂIp-¶p.

]«nI PmXn, ]-«nIhÀ¤ hnI-k\ hIp¸pIÄ,kw-Øm\ Bkq-{X-W-t_mÀUv F¶n-

hn-S-§-fnse {]Xn-\n-[n-Ifpw ]«nI PmXn, ]-«nIhÀ¤ hnI-k\ taJ-e-bnse hnZ-KvZcpw DÄs¸-

Sp¶ Hcp Ìnb-dnwKv I½nän cq]o-I-cn-¡p-Ibpw {]kvXpX kanXn ]«nI PmXn, ]-«nIhÀ¤

hn`m-K-§-fpsS ]cn-io-e\ ]mTyhnj-b-§Ä X¿m-dmt¡-−Xpw B taJ-e-bnse Kth-jW

{]hÀ¯-\-§-fpsS coXn imkv{Xw Bhn-jvI-cn-t¡-−-Xp-am-Wv.- Ìn-b-dnwKv I½n-än-bpsS

Programme Book 2017-18 Page 85

ip]mÀi-IÄ ]«nI PmXn, ]-«nIhÀ¤ hnI-k\ hIp-¸v {]n³kn-¸Â sk{I-«-dn-bpsS AwKo-

Im-c-̄ n\v kaÀ¸-Ww.

2017-þ18-þ 50 iX-am\w tI{µ hnln-X-ambn 125.00 e£w cq] apI-fn ]cm-aÀin¨ LS-

I-§Ä¡mbn {]Xo-£n-¡p-¶p. ]«nI PmXn, ]-«nIhÀ¤ s{]mtam-«À¡v {]hÀ¯\ am\p-hÂ

X¿m-dm-¡p-¶-Xn\v 10.00 e£w cq] CXn DÄs¸-Sp-¶p.

E. Kerala State Development Corporation for SC/ST Ltd. - TSP (Central Share

49%)

(Outlay: 24.50 lakh)

Under this centrally sponsored scheme, share capital contribution is released

to the State Development Corporation for SCs & STs in the ratio 51:49 between State

Government and Central Government. The Central share of equity capital is sent directly to

the Corporation. The Corporation provides finance to employment oriented schemes

covering diverse areas of economic activities. The Corporation has focused their efforts for

identification of eligible ST families and motivating them to undertake suitable economic

development schemes, sponsoring these schemes to financial institutions for credit support,

providing financial assistance in the form of margin money on low rate of interest and

subsidy in order to reduce their repayment liability and providing necessary link/tie-up with

other poverty alleviation programmes.

An amount of Rs.24.50 lakh is anticipated during 2017-18 towards 49 % as

central share for providing share capital contribution to Kerala State Development

Corporation for SCs/STs, for taking up economic development schemes benefiting

Scheduled Tribes.

C. tIcf kwkvYm\ ]«nIPmXn ]«n-I-hÀ¤ hnI-k\ tImÀ¸-td-j³ Hmlcn aqe-[-\w-þ-än.-

Fkv.]n (49 iX-am\w tI{µ hnln-Xw) (hnlnXw : 24.50 e£w cq]) tI{µmhn-jvIrX ]²-Xn-I-fpsS ]cn-[n-bnÂs¸-Sp-¶-Xmb Cu ]²-Xn-¡p-ff

Hmlcn aqe-[\w ]«n-I-PmXn ]«n-I-hÀ¤ hnI-k\ tImÀ¸-td-j\v 51:49 A\p-]m-X-̄ nÂ

kwØm\ kÀ¡mcpw tI{µ kÀ¡mcpw \Â-Ip-¶p. Hmlcn aqe-[\¯n\v Xpey-amb XpI

tI{µ hnln-X-ambn tImÀ¸-td-j\v \ÂIp-¶p. hy-X-y-kvX-§-fmb km¼-¯nI {]h-À-̄ n-

Ifn -sXm-gn-ep-ambn _Ô-s¸-«n-«p-f-f-hÀ¡v tImÀ¸-td-j³ km¼¯nI klmbw sN¿p-

¶p. AÀl-cmb ]«n-I-hÀ¤ IpSpw-_-§sf Is−-̄ p-¶-Xn\pw Ahsc km¼¯nI hnI-

k\ ]²-Xn-I-fn ]¦m-fn-I-fm-¡m\pw Cu ]²Xn-Isf [\-Im-cy Øm]-\-§-fn-te¡v

kvt]m¬kÀ sN¿p-Ibpw AXp-hgn Ipdª \nc-¡n ]Whpw k_vkn-Un-I-fpw e`n-¡p-

Ibpw AXp-hgn Ah-cpsS ]Ww Xncn-̈ -S-bv¡m-\p-ff _m²-yX Ipd-bv¡p-I-bpw Zmcn{Zy

\nÀ½mÀÖ\ ]²-Xn-I-fn Ahsc ]¦m-fnIfm¡m\pw tImÀ¸-td-j³ e£y-an-Sp-¶p.

2017þ18þ ]«n-I-hÀ¤ hn`m-K-̄ nsâ km¼-̄ nI hnI-k-\-̄ n-\mbn ]«n-I-

PmXn ]«n-I-hÀ¤ hnI-k\ tImÀ¸-td-j³ Hmlcn aqe-[-\-ambn 49 iX-am\w tI{µ hnln-X-

ambn 24.50 e£w cq] hI-bn-cp-̄ n-bn-cn-¡p-¶p.

Programme Book 2017-18 Page 86

SCHEDULED TRIBES DEVELOPMENT DEPARTMENT

SCHEME-WISE BUDGET PROVISION - 2017-18

(Rs. lakh)

Sl.No. Name of Scheme Head of Account

Budget provision Impleme

nting Section

Plan Non-plan

1 2 3 4 5 6

I STATE SECTOR SCHEMES OF SCH.TRIBES DEVELOPMENT DEPARTMENT

(A) 001- DIRECTION & ADMINISTRATION

1 Direction & Administration

2225-02-001-99 0.00 1448.69 Estt

2 Planning & Statistical Cell

2225-02-001-98 76.44 Estt

3 Modernisation of Tribal Development Dept

2225-02-001-97 250.00 0.00 E6

TOTAL A 250.00 1525.13

(B) 277 - EDUCATION

1 Prematriculation Studies

2225-02-277-99 0.00 1650.00 C3

2 Postmatriculation Studies

2225-02-277-98 0.00 630.00 C1

3 Post-matric Scholarship[100% CSS]

2225-02-277-97 3000.00 0.00 C1

4 Supply of Cloth 2225-02-277-96 0.00 15.00 D1

5 Boarding Grants 2225-02-277-95 0.00 20.00 D2

Programme Book 2017-18 Page 87

1 2 3 4 5 6

6 Tribal Hostel/Improvement of tribal hostel OR

2225-02-277-94 0.00 3300.56 D2

Improving facilities and Rennovation of Pre-matric & Post Matric Hostels (OCA)

2225-02-277-52 500.00 0.00 D2

7 Special Incentive to talented students

2225-02-277-92 0.01 C3

8 Incentive to parents of Tribal students

2225-02-277-91 0.00 157.00 D1

9 Nursery Schools 2225-02-277-89 0.00 163.07 C3

10 Special Incentive to Brilliant students

2225-02-277-40

i) Incentive and Assistance to Students

2225-02-277-40 (1) 100.00 0.00 C3

2) Ayyankali Memorial talented Search and Development Scheme

2225-02-277-40 (2) 60.00 0.00 C1

3) Asst. to study tour to schools & colleges going students

2225-02-277-40 (3) 70.00 0.00 C1

4) Asstt to Orphans 2225-02-277-40 (4) 100.00 0.00 C3

6) Supply of Lap top to students

2225-02-277-40(06) 140.00 0.00 C3

11 Vocational Training Institute for STs [100% CSS]

2225-02-277-76 60.00 0.00 C3

12 Post matric hostel for Tribals

2225-02-277-73 175.00 0.00 D2

Programme Book 2017-18 Page 88

1 2 3 4 5 6

13

Model Residential schools/Ashram Schools / CBSE Njaraneeli, Two Ekalavya School (Running) 19 schools

2225-02-277-49 5500.00 0.00 D3

14 Construction of Girls Hostels -100% Central Assistance]

4225-02-277-48 350.00 0.00

D1

15 Construction of Boys Hostels [50% Central Assistance]

4225-02-277-96 900.00 0.00

16 Construction of MRS / Ashram Schools Buildings

4225-02-277-51 3000.00 0.00

17

Construction of MRS under Art 275(1) 100% CSS] (2 EMRS +One CBSE School )

4225-02-277-45 350.00 0.00

18

Promotion of Education among STs

2225-02-277-35 1500.00

i) Peripatetic Edcuation to PTGs

C3

ii) Tuitorial Scheme D1

iii) Gothrasarathy C3

19

Prematric Scholarship for Tribal students studying in IX & X classes

2225-02-277-37 500.00 0.00 C3

20 Financial assistance to traditional tribal healers

2225-02-277-36 25.00 0.00 C3

21 Information, Education and Communication

2225-02-277-39 250.00 0.00 B1

22

Assistance for Self Employment and skill Development training to ST youths

2225-02-277-42 500.00 0.00 PM3

Programme Book 2017-18 Page 89

1 2 3 4 5 6

23 State centre for Tribal Healers

4225-02-277-50 0.00 0.00 C2

24 Industrial Training Centre

2225-02-277-47 0.00 221.46 C3

25 Production-cum-Training Centre

2225-02-277-46 0.00 21.71 C3

26 Upgradation of merits 2225-02-277-62 0.01

27 b) Wayanad Gothra bhasha kala padana kendra

2225-02-277-32 10.00 B2

TOTAL B 17090.01 6178.81

© 282 HEALTH

28 Medical Units 2225-02-282-99 0.00 476.26 C2

29 Mobile Medical Units 2225-02-282-98 0.00 77.52 C2

30

Comprehensive Health Care package

2225-02-282-91

2000.00 0.00

C2

(i Running of Health Care

Institutions

(ii) Medical Assistance

through Hospitals

iii)Tribal Relief Fund

31 Sickle cell Anaemia 2225-02-282-92 175.00

32 Janani-JanmaRaksha 2225-02-282-89 1500.00 0.00

TOTAL - C 3675.00 553.78

(D) 283 HOUSES TO HOUSELESS

33

i)New Houses

2225-02-283-89 11508.00 0 A2 ii)Spillover Houses

(iii) Repair Houses

Programme Book 2017-18 Page 90

1 2 3 4 5

34 Loan from Hudco for the housing scheme for the Homless Tribals

2225-02-283-85 0.01

35 Resettlement of Landless Tribals [TRDM]

2225-02-283-90 5000.00 0.00 A1

36

Implementation of Forest Dewellers Act 2006 under Art. 275[1]

2225-02-283-86 100.00 0.00 A1

TOTAL - D 16608.00 0.01

(E) 794 SPECIAL CENTRAL ASSISTANCE

FOR TRIBAL SUB PLAN

37

Special Central Assistance for Tribal Area Sub Plan Administration

2225-02-794-99 0.00 918.04 Estt

38 Special Central Assistance to Tribal Sub Plan [100% SCA]

2225-02-794-98 1300.00 0.00 A1

39

Conservation Cum Development of Primitive Tribal Groups [100% Central Assistance]

2225-02-794-92 0.01 0.00 PM3 /

B1

TOTAL - E 1300.01 918.04

(F) 800 OTHER EXPENDITURE

40 Vocational Training to most backward tribals

2225-02-800-94 0.00 0.01 C3

41 Tribal Board Member's travel expenses

2225-02-800-92 0.00 0.01 B1

42 Multi-purpose Hostel for STs

4225-02-800-92 199.76 D2

Programme Book 2017-18 Page 91

1 2 3 4 5 6

43 Scheme implemented with funds under Art. 275[1] [OCA]

2225-02-800-29 600.00 0.00 PM1

44

Prevention of Atrocities Act 1989

[50% CSS]

2225-02-800-68 30.00

0.00 B2

2014-00-103-98 30.00

45

Implementation of Kerala State [Restriction in Transfer of lands & Restoration of Alienated lands ] Act 1975

2225-02-800-66 50.00 0.00 A1

46

Adikala kendram [KIRTADS] 2225-02-800-56 30.00 0.00 "

a) Training/ workshop

47 Infarastructure facilities to KIRTADS [100% CSS]

2225-02-800-27 0.01 0.00 "

Total 939.77 0.02

102- Economic Development

48 Cheengeri Extension Scheme

2225-02-102-87 0.00 26.82 A2

49 Assistance to Marriage of ST Girls

2225-02-102-94 250.00 0.00 B3

50 Food Support Programme

2225-02-102-92 2500.00 0.00 A1

51 Crititcal Gap filling scheme (Corpus Fund)under TSP

2225-02-102-93 5079.00 0.00 PM1

Programme Book 2017-18 Page 92

1 2 3 4 5 6

52

Package programme for Adiyans, Paniyans and Primitive Tribes

2225-02-102-86 500.00 0.00

A2 i) Adiyas, Paniyas and the Primitive Tribes Groups

ii) Tribes Living in Forest

PM1

iii) Destitute Homes A2

53

Honorarium to Tribal promoters

2225-02-102-89 0.00

i) Tribal Promoters 2225-02-102-89(1) 1360.00 0.00 F2

ii) Organisation of Oorukoottams

2225-02-102-89(2) 80.00 0.00 B3

iii) Honorarium to Management Trainees and Health management Trainees

2225-02-102-89(03) 228.00 0.00 E6

iv) Horarium to Counsellers engaged in the Hostels and MRS

2225-02-102-89(04) 98.00 0.00 D3

v) Engaging social workers in Tribal Welfare

2225-02-102-89(05) 125.00 0.00 PM1

Gothra Bandhu 2225-02-102-89(06) 400.00 0.00

54 Assistance to Tribal Welfare Institutions

2225-02-102-91 220.00 0.00 PM3

55

Pooled fund for special projects proposed by other Depts under TSP

2225-02-102-90 1000.00 0.00 PM1

56

Ambedkar Settlement Devlopment Scheme (New ATSP fund)

2225-02-102-85 9999.99 0.00 A3

P K Kalan 2225-02-102-77 0.01 PM2

Programme Book 2017-18 Page 93

1 2 3 4 5 6

57 Vanabandhu Kalyan Yojana (VKY)

2225-02-102-80 1000.00 0.00 PM3

Implemnetation of Gender Action Plan

2225-02-102-79 10.00 F

Gothra valsalya Nidhi (new Scheme)

2225-02-102-76 200.00 C1

TOTAL - F 23040.00 36.82

TOTAL - 1- 62902.79 9212.61

II GRANT TO MUNCIPALITY

2225-02-192-50 0.01

A VILLAGE PANCHAYATS

2225-02-198-50

1 Tribal students Travel expense

2225-02-277-93

0.00 0.10 A2

2 Adult Education 2225-02-277-90 0.00 0.01 B1

3 Thatching Grant 2225-02-283-97 0.00 12.00 A2

4 Wells & Water supply 2225-02-800-97 0.00 0.50 A2

5 Subsidy to technically trained hands

2225-02-800-95 0.00 0.15 A2

6 Discresionery grants 2225-02-800-93 0.00 0.15 C2

7 Intercaste Marriage 2225-02-800-90 0.00 10.00 B3

8 Balawadies & Creches 2225-02-800-89 0.00 15.00 C3

TOTAL - A 0.00 37.92

GRAND TOTAL -

STDD [ I + II ]

62902.79 9250.53

Programme Book 2017-18 Page 94

1 2 3 4 5

III OTHER SCHEMES UNDER THE HEAD OF

WELFARE OF STs

1 KIRTADS - Research, Training & Special Projects [50% CSS]

2225-80-001-98 250.00 353.01 B

2

KSDC for SC/ST - share capital contribution [49%CSS]

4225-02-190-99 50.00 0.00 PM3

3

Grant-in-aid to Kerala State Federation of SC & ST Dev.Co-operatives Ltd.

2225-80-195-99 0.01 0.00 PM3

4

Asst. for Kerala State Development Corporation for SC/ST for implementation of arrears loan-waiver scheme in respect of STs

2225-80-190-93 0.01

TOTAL - III -

[KIRTADS, KSDC for SC/ST & KSF SC/ST] 300.01 353.02

1

Loan to Scheduled Tribes for starting on

Industry, Trade or profession

6225-02-800-99 0.01

IV STATE SPONSORED PROGRAMMES FOR

RDD

a) SGSY /NRLM (B.P)

2225-02-197-50

637.50 0.00 Rural

Dev.Dept

b) IAY [ B.P] 7598.70 0.00

TOTAL - IV 8236.20 0.01

GRAND TOTAL 71439.00 9603.56

Programme Book 2017-18 Page 95

SECTOR WISE DETAILS OF PLAN & NON PLAN BUDGET ALLOCATION DURING 2017-18

(Rs. lakhs) Sl.

No Sector Revenue Capital Loan Total Non Plan

a) 001 - Direction & Administration

250.00 0.00 0.00 250.00 1525.13

b) Education 12490.01 4600.00 0.00 17090.01 6178.81

c) Health 3675.00 0.00 0.00 3675.00 553.78

d) Housing 16608.00 0.00 0.00 16608.00 0.01

e) Special Central Assistance

1300.01 0.00 0.00 1300.01 918.04

f) 800 -Other Expenditure

740.01 199.76 0.00 939.77 0.02

g) 102 - Economic Development

23040.00 0.00 0.00 23040.00 36.82

h) Grant to Village Panchayat

0.00 0.00 0.00 0.00 37.91

i)

Rural Development Dept 40% State share

8236.20 0.00 0.00 8236.20 0.00

j) Other schemes 250.01 50.00 0.00 300.01 353.02

k) Grant to Municipality

0.00 0.00 0.00 0.00 0.01

l)

Loan to Scheduled Tribes for starting on Industry, or Trade or profession

0.00 0.00 0.00 0.00 0.01

TOTAL [ PLAN & NON PLAN ]

66589.24 4849.76 0.00 71439.00 9603.56

Programme Book 2017-18 Page 96

SCHEMES UNDER CAPITAL OUTLAY UNDER PWD

(Rs. LAKH)

Sl.No Schemes Head of Account 50% State

Share

50% Central Share

100% Central Share

1 Girls Hostel 4225-02-277-48 350.00

2 Boys Hostel 4225-02-277-96 450.00 450.00

3 Ashram School, Noolpuzha , Wayanad

4225-02-277-51 1500.00 1500.00

4 MRS Attappady, Palakkad

5 MRS Kulathupuzha , Kollam

6 MRS Kasaragod

7 MRS Nalloornadu, Wayanad

8 Ashram School, Thirunelli

9 MRS, Kuttichal, Thiruvananthapuram.

10 MRS Aralam, Kannur

11 MRS Melukavu, Kottayam

12

Construction of MRS under Art. 275(1) 100% CSS (2 EMRS + 1 CBSE Njaraneeli)

4225-02-277-45 0.00 0.00 350.00

13 construction of Multi-purpose Hostel

4225-02-800-92 199.76

TOTAL CAPITAL OUTLAY 1950.00 1950.00 899.76

TOTAL CAPITAL OUTLAY 4799.76

Programme Book 2017-18 Page 97

District-wise details of Plan Fund Allocation to LSGIs under TSP 2017-18

Rs. In Lakhs

Sl.

No. District

Grama

Panchayat

Block

Panchayat

District

Panchayat

Munici-

pality

Corpo-

ration Total

Number of

Institutions 941 152 14 87 6 1200

1 Thiruvananthapuram 576.81 192.29 192.3 0 0.00 961.4

2 Kollam 135.58 45.64 45.56 19.71 0.09 246.58

3 Pathanamthitta 187.07 62.33 62.34 0 311.74

4 Alappuzha 77.25 25.86 25.87 0.27 129.25

5 Kottayam 577.22 193.93 193.94 4.69 969.78

6 Idukki 1506.03 506.06 506.07 12.21 2530.37

7 Ernakulam 211.2 71.22 71.23 27.58 381.23

8 Thrissur 135.7 45.46 45.49 0.68 0.00 227.33

9 Palakkad 1179.27 395.48 395.5 7.14 1977.39

10 Malappuram 344.89 116.39 116.4 28.82 606.5

11 Kozhikode 166.41 57.01 57.02 4.62 285.06

12 Wayanad 3635.65 1328.98 1328.98 497.08 6790.69

13 Kannur 564.1 196.65 196.65 23.95 1.91 983.26

14 Kasaragod 701.23 233.77 233.72 30.7 1199.42

Kerala 9998.41 3471.07 3471.07 657.45 2.00 17600.00

Source: LSGD Budget 2017-18, Finance Department (Appendix IV 2017-18)

Programme Book 2017-18 Page 98

1 Thiruvananthapuram District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-

18

Sl. No. Local Body Outlay under

TSP 2017-18

a

District Panchayat

(1) b Corporation (1) 0

1 Thiruvananthapuram 192.3 1 Thiruvananthapuram 0

c Municipality (4)

1 Varkala 0 3 Nedumangad 0

2 Attingal 0 4 Neyyattinkara 0

d Block Panchayat (11)

1 Varkala 0.16 7 Kazhakuttam 0.35

2 Kilimanoor 1.11 8 Nemom 1.18

3 Chirayinkeezhu 0.09 9 Perumkadavila 3.4

4 Vamanapuram 75.13 10 Athiyannoor 21.05

5 Vellanad 84.24 11 Parassala 0.3

6 Nedumangad 5.28

Programme Book 2017-18 Page 99

1 Thiruvananthapuram District

Grama Panchayat (73)

Sl.No Name of G.P

Amount

( Rs

lakh)

Sl.No Name of G.P

Amount

( Rs

lakh)

1 Varkala Block 0.47 2 Kilimanoor Block 3.33

1 Chemmaruthy 0 8 Kilimanoor 0.03

2 Edava 0.06 9 Pazhayakunnummel 1.35

3 Elakamon 0.11 10 Karavaram 0.09

4 Manamboor 0 11 Madavoor 0

5 Ottoor 0.09 12 Pallickal 0

6 Cherunniyoor 0.21 13 Nagaroor 0

7 Vettoor 0 14 Navaikulam 0.81

15 Pulimath 1.05

3 Chirayinkeezhu Block 0.45 4

Vamanapuram

Block 254.73

16 Anjuthengu 0.09 22 Kallara 0.11

17 Vakkom 0 23 Nellanad 1.71

18 Chirayinkeezhu 0.03 24 Pullampara 1.62

19 Kizhuvilam 0 25 Vamanapuram 32.6

20 Mudakkal 0 26 Pangode 73.21

21 Kadakkavoor 0.33 27 Nanniyode 114.02

28 Peringammala 1.71

29 Manickal 29.75

6 Vellanad Block 223.43 7

Nedumangad

Block 16.03

30 Aryanad 8.13 38 Anad 0.33

31 Poovachal 11.49 39 Aruvikkara 9.2

32 Vellanad 99.39 40 Panavoor 0.59

33 Vithura 1.53 41 Karakulam 5.25

34 Uzhamalackal 34.79 42 Vembayam 0.66

35 Kuttichal 65.5 9 Nemom Block 10.21

36 Tholicode 2.12 48 Balaramapuram 0.46

Programme Book 2017-18 Page 100

37 Kattakada 0.48 49 Pallichal 0.39

8 Kazhakkuttam Block 3.03 50 Maranalloor 2.43

43 Andoorkonam 0.3 51 Malayinkeezh 0.51

44 Kadinamkulam 2.01 52 Vilappil 4.17

45 Mangalapuram 0.57 53 Vilavoorkkal 1.07

46 Pothencode 0 54 Kalliyoor 1.18

47 Azhoor 0.15 11

Athiyannoor

Block 0.91

10 Perumkadavila Block 63.14 63 Athiyannoor 0.46

55 Perumkadavila 0.18 64 Kanjiramkulam 0

56 Kollayil 0.03 65 Karumkulam 0

57 Ottasekharamangalam 3.69 66 Kottukal 0.03

58 Aryancode 0.81 67 Venganoor 0.42

59 Kallikkadu 16.41 12 Parassala Block 1.08

60 Kunnathukal 1.02 68 Chenkal 0.06

61 Vellarada 5.34 69 Karode 0.06

62 Amboori 35.66 70 Kulathoor 0.15

71 Parassala 0.42

72 Thirupuram 0

73 Poovar 0.39

GRAND TOTAL 576.81

Programme Book 2017-18 Page 101

2 Kollam District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under TSP

2017-18

Sl.

No. Local Body

Outlay

under TSP

2017-18

a

District Panchayat

(1) b Corporation (1) 1 Kollam 45.56 1 Kollam 0.09 c Municipality (4) 1 Karunagappally 0 3 Punalur 18.69 2 Paravoor South 0 4 Kottarakara 1.02 d Block Panchayat (11) 1 Oachira 1.37 7 Chittumala 0.95 2 Sasthamcotta 1.26 8 Chavara 0.61 3 Vettikkavala 0.81 9 Mukhathala 0.64 4 Pathanapuram 2.39 10 Ithikkara 2.00

5 Anchal 30.37 11 Chadayamangalam 4.46 6 Kottarakkara 0.78

Programme Book 2017-18 Page 102

2 Kollam district

Grama Panchayat (68)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

1 Oachira Block 4.88 2 Sasthamcotta Block 3.01

1 Oachira 2.19 7 Sasthamcotta 0.46

2 Kulasekharapuram 0.51 8 West Kallada 0

3 Clappana 0 9 Sooranad South 0.7

4 Thazhava 0.54 10 Poruvazhy 0.27

5 Alappad 0.83 11 Kunnathur 1.47

6 Thodiyoor 0.81 12 Sooranad North 0.11

13 Mynagappally 0

3 Vettikkavala Block 2.43 4 Pathanapuram Block 7.17

14 Ummannur 0.03 20 Vilakudy 0.33

15 Vettikkavala 0.03 21 Thalavoor 0.09

16 Melila 0.3 22 Piravanthur 6.75

17 Mylam 0 23 Pattazhi Vadakkekara 0

18 Kulakkada 0.21 24 Pattazhi 0

19 Pavithreswaram 1.86 25 Pathanapuram 0

5 Anchal Block 90.91 6 Kottarakkara Block 1.34

26 Kulathupuzha 55.01 34 Veliyam 0.06

27 Eroor 1.42 35 Pooyappally 0.21

28 Alayamon 1.42 36 Kareepra 0

29 Anchal 0.27 37 Ezhukone 0

30 Edamulakkal 0.66 38 Neduvathur 1.07

31 Karavaloor 0.66

32 Thenmala 15.15

7

Chavara Block 1.91

Programme Book 2017-18 Page 103

33 Aryankavu 16.32 46 Thekkumbhagam 0.27

8 Chittumala Block 2.67 47 Chavara 0.24

39 Perinad 0.27 48 Thevalakkara 0.11

40 Kundara 0.15 49 Panmana 0.46

41 Kizhakkekallada 0.27 50 Neendakara 0.83

42 Perayam 1.74 9 Mukhathala Block 2.6

43 Mundrothuruthu 0.06 51 Mayyanad 0.57

44 Panayam 0 52 Thrikkovilvattom 0.59

45 Thrikkaruva 0.18 53 Kottamkara 0.51

54 Elambalur 0.15

55 Nedumpana 0.78

10 Ithikkara Block 5.21 11

Chadayamangalam

Block 13.45

56 Poothakkulam 0.09 61 Chithara 0.09

57 Kalluvathukkal 1.14 62 Kadakkal 12.98

58 Chathannur 3.89 63 Chadayamangalam 0.06

59 Adichanalloor 0.09 64 Ittiva 0.06

60 Chirakkara 0 65 Velinallur 0.15

66 Elamadu 0

67 Nilamel 0.11

68 Kummil 0

GRAND TOTAL 135.58

Programme Book 2017-18 Page 104

3 Pathanamthitta District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP 2017-

18

Sl.

No. Local Body

Outlay

under

TSP 2017-

18

a

District Panchayat

(1) b Corporation (0)

1 Pathanamthitta 62.34

c Municipality (4)

1 Adoor 0 3 Pathanamthitta 0

2 Thiruvalla 0 4 Pandalam 0

d Block Panchayat (8)

1 Mallappally 1.93 5 Ranni 48.12

2 Pulikeezhu 0.95 6 Konni 4.18

3 Koipram 2.73 7 Pandalam 0.1

4 Elanthur 2.25 8 Parakkode 2.07

Programme Book 2017-18 Page 105

3 Pathanamthitta District

Rs. In Lakhs

Grama Panchayat (53)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

Mallappally

Block 5.8

Ranni Block 144.37

1 Anicadu 1.14

27

Ranni

Pazhavangadi 2.04

2 Kaviyoor 0.18 28 Ranni 2.12

3 Kottanadu 0 29 Ranni Angadi 0.21

4 Kottangal 0.46 30 Ranni Perunad 43.07

5 Kallooppara 0.48 31 Vadasserikkara 2.47

6 Kunnanthanam 1.53 31 Chittar 23.43

7 Mallappally 2.01 32 Seethathodu 5.46

33 Naranamoozhy 53.24

Pulikeezhu Block 2.85 34 Vechuchira 12.33

8 Kadapra 0.27

9 Kuttoor 1.47 Konni Block 12.58

10 Niranam 0 35 Konni 0.24

11 Nedumpram 0.78 36 Aruvapulam 7.8

12 Peringara 0.33 37 Pramadom 4.02

38 Mylapra 0.06

13 Koipram Block 8.2 39 Vallicode 0

14 Ayiroor 0.46 40 Thannithode 0.46

15 Eraviperoor 3.51 41 Malayalapuzha 0

16 Koipuram 2.64

17 Thottapuzhassery 0.46 Pandalam Block 4.39

18 Ezhumattoor 1.02

42

Pandalam

Thekkekara 0

19 Puramattom 0.11 43 Thumpamon 0

44 Aranmula 0.7

Elanthur Block 6.76 45 Mezhuveli 2.16

20 Omallur 0.7 46 Kulanada 1.53

21 Chenneerkara 0

22 Elanthoor 0.75 Parakkode Block 2.12

23 Cherukole 0.7 47 Enadimangalam 0.09

24 Kozhenchery 0 48 Erathu 0.21

Programme Book 2017-18 Page 106

25 Mallapuzhassery 0.24 49 Ezhamkulam 0

26 Naranganam 4.37 50 Kadampanadu 0.06

51 Kalanjoor 0.11

52 Kodumon 1.26

53 Pallickal 0.39

Grand Total 187.07

Programme Book 2017-18 Page 107

4 Alappuzha District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a District Panchayat (1) b Corporation

(0)

1 Alappuzha 25.87

c Municipality (6)

1 Chengannur 0 4 Kayamkulam 0

2 Mavelikara 0 5 Alappuzha 0

3 Cherthala 0 6 Harippad 0.27

d Block Panchayat (12)

1 Thycattussery 2.77 7 Veliyanad 0.23

2 Pattanakkad 4.32 8 Chengannur 0.15

3 Kanjikuzhy 5.76 9 Harippad 2.19

4 Aryad 3.3 10 Mavelikkara 1.82

5 Ambalapuzha 2.35 11 Bharanikkavu 0.24

6 Champakkulam 0.3 12 Muthukulam 2.43

Programme Book 2017-18 Page 108

4 Alappuzha District

Rs. In lakhs

Grama Panchayat (72)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs

lakh)

Thycattussery Block 8.31

Champakkulam

Block 0.9

1 Arookutty 0.39 27 Thalavadi 0.33

2 Chennampallippuram 2.43 28 Edathua 0

3 Panavally 3.12 29 Thakazhi 0.54

4 Perumbalam 1.02 30 Nedumudi 0.03

5 Thaicattussery 1.35 31 Champakulam 0

Pattanakkad Block 15.55 32 Kainakary 0

6 Vayalar 3.99 Veliyanad Block 0.68

7 Pattanakkad 0 33 Muttar 0

8 Thuravoor 1.42 34 Veliyanad 0

9 Kuthiathodu 0.81 35 Neelamperoor 0.11

10 Kodamthuruthu 1.59 36 Kavalam 0.3

11 Ezhupunna 3.48 37 Pulinkunnu 0.27

12 Aroor 4.26 38 Ramankari 0

Kanjikuzhy Block 16.38 Chengannur Block 0.68

13 Mararikulam North 0.96 39 Mulakuzha 0

14 Kanjikuzhi 7.14 40 Venmony 0.11

15 Thanneermukkam 4.77 41 Cheriyanad 0

16 Cherthala South 1.83 42 Ala 0

17 Kadakkarappally 1.68 43 Puliyoor 0

Aryad Block 8.24 44 Budhannoor 0.33

18 Aryad 2.12 45 Pandanad 0

19 Mannanchery 4.56 46 Thiruvanvandur 0.24

20 Mararikulam South 1.38 Harippad Block 9.45

21 Muhamma 0.18 47 Karthigappally 4.2

48 Thrikkunnapuzha 0.66

Ambalapuzha Block 7.04 49 Kumarapuram 0.48

22 Purakkad 1.11 50 Karuvatta 0.35

Programme Book 2017-18 Page 109

23 Ambalapuzha South 1.64 51 Pallippad 0.35

24 Ambalapuzha North 1.92 52 Cheruthana 0.24

25 Punnapra South 0.99 53 Veeyapuram 3.17

26 Punnapra North 1.38 Mavelikkara Block 2.24

54

Mavelikkara

Thekkekara 0.3

Bharanikkavu Block 3.74 55 Chettikulangara 0.11

59 Nooranad 0 56

Chennithala

Thripperumthura 1.62

60 Vallikunnam 0.15 57 Thazhakara 0.21

61 Bharanikavu 0.35 58 Mannar 0

62

Mavelikkara

Thamarakulam 0

63 Chunakkara 0

64 Palamel 3.24

Muthukulam Block 4.04

65 Pathiyoor 0.9

66 Kandalloor 0.27

67 Cheppad 0.66

68 Muthukulam 0.18

69 Arattupuzha 1.31

70 Krishnapuram 0.3

71 Devikulangara 0.42

72 Chingoli 0

Grand total 77.25

Programme Book 2017-18 Page 110

5 Kottayam District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-18

Sl.

No. Local Body

Outlay

under

TSP

2017-18

a

District

Panchayat (1) b Corporation (0)

1 Kottayam 193.94

c Municipality (6)

1 Pala 0 4 Kottayam 0

2 Vaikom 0 5 Ettumanoor 3.51

3 Changanassery 0 6 Erattupetta 1.18

d

Block Panchayat

(11)

1 Vaikom 2.72 7 Pampady 6.42

2 Kaduthuruthy 2.24 8 Pallom 7.77

3 Ettumanoor 5.71 9 Madappally 3.32

4 Uzhavoor 3.53 10 Vazhoor 4.96

5 Lalam 2.34 11 Kanjirappally 73.45

6 Erattupetta 81.47

Programme Book 2017-18 Page 111

5 Kottayam District

Rs. In Lakhs

e Grama Panchayat (70)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

Vaikom Block 8.15 Uzhavoor Block 12.16

1 Thalayazham 0.7 19 Kadaplamattom 2.47

2 Chempu 0.83 20 Marangattupally 1.53

3 Maravanthuruthu 0.35 21 Kanakkari 0.63

4 TV Puram 4.41 22 Veliyannoor 1.8

5 Vechoor 0.18 23 Kuravilangad 1.8

6 Udayanapuram 1.68 24 Uzhavoor 0.99

Kaduthuruthy Block 7.67 25 Ramapuram 2.16

7 Kaduthuruthy 1.53 26 Manjoor 0.78

8 Kallara 0.3 Lalam Block 8.12

9 Mulakulam 0.94 26 Bharananganam 1.68

10 Njeezhoor 2.49 27 Karoor 0.59

11 Thalayolaparambu 0.7 28 Kozhuvanal 0.66

12 Velloor 1.71 29 Kadanad 0.18

Ettumanoor Block 17.31 30 Meenachil 4.2

13 Aimanam 3.27 31 Mutholy 0.81

14 Athirampuzha 0.9

Erattupetta

Block 241.19

15 Arpookara 2.67 32 Melukavu 0.57

16 Neendoor 2.64 33 Moonilavu 86.94

17 Kumarakom 0.78 34 Poonjar 87.9

Programme Book 2017-18 Page 112

18 Thiruvarpu 7.05 35

Poonjar

Thekkekara 1.44

36 Thalappalam 18.09

37 Teekoy 1.71

38 Thalanad 10.2

39 Thidanad 34.34

Pampady Block 12.12

Madappally

Block 11.08

40 Akalakunnam 2.6 53 Madappally 0.03

41 Elikulam 1.71 54 Paippad 0.7

42 Kooroppada 0.94 55 Thrikkodithanam 4.17

43 Pampady 1.77 56 Vakathanam 2.16

44 Pallikkathode 1.77 57 Vazhappally 4.02

45 Meenadom 2.91 Vazhoor Block 15.81

46 Kidangoor 0 58 Chirakkadavu 0.42

47 Manarkkad 0.42 59 Kangazha 3.39

Pallom Block 23.26 60 Nedumkunnam 3.78

48 Ayarkkunnam 2.88 61 Vellavoor 1.18

49 Puthuppally 6.54 62 Vazhoor 2.1

50 Panachikkad 2.47 63 Karukachal 4.94

51 Vijayapuram 8.46

Kanjirappally

Block 220.35

52 Kurichy 2.91 64 Erumeli 50.42

65 Kanjirappally 2.55

66 Kootickal 8.63

67 Manimala 5.28

68 Mundakayam 96.64

69 Parathode 15.74

70 Koruthod 41.09

Grand Total 577.22

Programme Book 2017-18 Page 113

6 Idukki District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under TSP

2017-18

Sl.

No. Local Body

Outlay

under TSP

2017-18

a

District Panchayat

(1) b Corporation (0)

1 Idukki 506.07

c Municipality (2)

1 Thodupuzha 0 2 Kattappana 12.21

d

Block Panchayat

(8)

1 Adimaly 70.21 5 Idukki 90.05

2 Devikulam 117.91 6 Kattappana 50.59

3 Nedumkandam 14.26 7 Thodupuzha 10.67

4 Elamdesam 110.39 8 Azhutha 41.98

Programme Book 2017-18 Page 114

6 Idukki District

Rs. In Lakhs

Grama Panchayat (52)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

Adimaly Block 210.65 Nedumkandam Block 84.83

1 Adimaly 172.43 15 Pampadumpara 6.47

2 Konnathady 13.29 16 Senapathy 61.28

3 Bisonvally 16.59 17 Karunapuram 4.02

4 Vellathooval 6.3 18 Rajakkad 5.34

5 Pallivasal 2.04 19 Nedumkandam 0.75

Devikulam

Block 300.46 20 Udumbanchola 0.46

6 Marayoor 88.57 21 Rajakumari 6.51

7 Munnar 5.7 Elamdesam Block 317.67

8 Kanthalloor 67.48 22 Vannappuram 19.17

9 Vattavada 47.57 23 Udumbanoor 6.57

10 Santhanpara 6.69 24 Kodikulam 65.59

11 Chinnakanal 23.3 25 Alakkode 70.96

12 Mankulam 46.66 26 Velliyamattom 0.11

13 Devikulam 3.39 27 Karimannoor 1.38

14 Edamalakudy 11.1 28 Kudayathoor 153.89

Idukki Block 273.23 Thodupuzha Block 50.59

Programme Book 2017-18 Page 115

29

Idukki

Kanjikuzhy 1.86 41 Muttom 9.68

30 Vathikudy 37.37 42 Kumaramangalam 10.53

31 Arakulam 90.15 43 Edavetty 24.32

32 Kamakshy 21.42 44 Karimkunnam 0.42

33 Vazhathope 121.01 45 Manakkad 2.91

34 Mariyapuram 1.42 46 Purapuzha 2.73

Kattappana

Block 155.51 Azhutha Block 113.09

35 Upputhara 34.79 47 Peruvanthanam 0.57

36 Vandenmed 1.35 48 Kumily 1.05

37 Kanchiyar 64.36 49 Kokkayar 25.68

38 Erattayar 17.13 50 Peerumedu 45.08

39 Ayyappancoil 36.5 51 Elappara 30.99

40 Chakkupallam 1.38 52 Vandiperiyar 9.72

GRAND TOTAL 1506.03

Programme Book 2017-18 Page 116

7 Ernakulam District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP 2017-

18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a

District

Panchayat (1) b Corporation (1) 0

1 Ernakulam 71.23 Kochi

c

Municipality

(13)

1 Kalamassery 0 8 Aluva 0

2 Kothamangalam 0 9 Thrikkakkara 0

3 Angamaly 0 10 Elloor 13.65

4 Tripunithura 0 11 Maradu 6.33

5 Muvattupuzha 0 12 Piravom 0.3

6 North Paravur 4.94 13 Koothattukulam 2.36

7 Perumbavoor 0

d

Block

Panchayat (14)

1 Paravur 5.52 8 Palluruthy 0.35

2 Alangad 2.07 9 Mulamthuruthy 2.63

3 Angamaly 2.79 10 Vadavucode 4.05

4 Koovappady 3.06 11 Kothamangalam 36.56

5 Vazhakkulam 5.49 12 Pampakuda 1.64

6 Edappally 1.62 13 Parakkadavu 0.76

7 Vypin 1.23 14 Muvattupuzha 3.45

Programme Book 2017-18 Page 117

7 Ernakulam District

Rs. In Lakhs

Grama Panchayat (82)

Sl.No Name of G.P

Amount

( Rs

lakh)

Sl.No Name of G.P

Amount

( Rs

lakh)

Paravur Block 16.6 Angamaly Block 7.8

1 Chennamangalam 0.03 10 Mookkannur 1.14

2 Kottuvally 11.43 11 Thuravoor 0.11

3 Ezhikkara 1.68 12 Manjapra 0.11

4 Vadakkekara 2.04 13 Karukutty 0.72

5 Chittattukara 1.42 14 Ayyampuzha 0.83

Alangad Block 6.24 15 Kanjoor 2.55

6 Karumalloor 5.13 16 Kalady 2.23

7 Varapuzha 0.18 17

Malayattoor

Neeleswaram 0.11

8 Alangad 0.66 Koovappady Block 15.28

9 Kodungallur 0.27 18 Asamannoor 0.03

Vazhakkulam

Block 10.3 19 Mudakuzha 7.71

24 Vengola 2.88 20 Vengoor 0.39

25 Vazhakkulam 2.25 21 Rayamangalam 0.46

26 Kizhakkambalam 0.46 22 Koovappady 0.48

27 Choornikkara 3.15 23 Okkal 6.21

28 Edathala 1.53

Programme Book 2017-18 Page 118

29 Keezhmad 0.03

Edappally Block 5.85 Palluruthy Block 6.11

30 Kadamakudy 0.24 39 Chellanam 0.03

31 Cheranallur 0.57 40 Kumbalangy 0.78

32 Mulavucaud 4.02 41 Kumbalam 5.3

33 Elamkunnapuzha 1.02

Mulamthuruthy Bl

4.29

42 Udayamperur 1.35

Vypin Block 2.9 43 Mulamthuruthy 1.26

34 Njarakkal 2.04 44 Chottanikkara 0

35 Nayarambalam 0.48 45 Edakkattuvayal 0.06

36 Edavanakkad 0.03 46 Amballur 0.03

37 Pallippuram 0.11 47 Maneed 1.59

38 Kuzhuppilly 0.24 Vadavucode Block 12.16

Kothamangalam

Block 109.68 48 Puthrukka 3.72

54 Paingottur 0.3 49 Thiruvaniyoor 0.21

55 Nellikuzhi 0.27 50

Vadavucode Puthen

Cruz 3.69

56 Pindimana 0.15 51 Mazhuvannoor 2.71

57 Kottappady 1.64 52 Aikaranad 1.68

58 Kavalangad 3.06 53 Kunnathunad 0.15

59 Varappetty 0.03 Pampakuda Block 0.79

Programme Book 2017-18 Page 119

60 Keerampara 0.94 64 Elanji 0.03

61 Pothanikkad 0.99 65 Thirumarady 0.35

62 Pallarimangalam 0.09 66 Palakuzha 0.09

63 Kuttampuzha 102.21 67 Pampakuda 0.21

68 Ramamangalam 0.11

Parakkadavu Block 2.85

Muvattupuzha

Block 10.35 69 Puthenvelikara 0.21

75 Avoly 0.83 70 Chengamanad 0.54

76 Arakuzha 0.21 71 Nedumbassery 0.15

77 Valakom 0.94 72 Parakkadavu 0.66

78 Paipra 1.44 73 Kunnukara 0.59

79 Kalloorkkad 2.16 74 Sreemoolanagaram 0.7

80 Ayavana 1.83

81 Manjalloor 0.99

82 Marady 1.95

Grand Total 211.2

Programme Book 2017-18 Page 120

8 Thrissur District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a District Panchayat

(1) b Corporation (1)

1 Thrissur 45.49 Thrissur 0

c Municipality (7)

1 Guruvayur 0 5 Irinjalakuda 0

2 Chavakkad 0 6 Kunnamkulam 0

3 Kodungallur 0 7 Vadakkancherry 0.68

4 Chalakkudy 0

d Block Panchayat

(16)

1 Chavakkad 0.28 9 Anthikkad 0.11

2 Chowwannur 0.4 10 Cherpu 0.95

3 Wadakkamchery 0.88 11 Kodakara 7.6

4 Pazhayannur 1.97 12 Irinjalakkuda 0.24

5 Ollukkara 14.44 13 Vellangallur 0.59

6 Puzhakkal 0.96 14 Mathilakam 0.11

7 Mullassery 0.53 15 Mala 0.46

8 Thalikkulam 0.23 16 Chalakkudy 15.71

Programme Book 2017-18 Page 121

8 Thrissur District

Rs. In Lakhs

Grama Panchayat (86)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

1 Chavakkad Block 0.84 2 Chowwannur Block 0.89

1 Kadappuram 0.03 6 Choondal 0.3

2 Orumanayur 0 7 Chowwannur 0

3 Punnayur 0.57 8 Kadavallur 0.09

4 Punnayurkulam 0.24 9 Kandanassery 0.3

5 Vadekkekad 0 10 Kattakambal 0.11

3

Wadakkamchery

Block 2.28 11 Porkulam 0.06

13 Velur 0.03 12 Kadangode 0.03

14 Desamangalam 0.18 4 Pazhayannur Block 5.92

15 Erumapetty 0.18 19 Chelakkara 2.47

16 Mullurkara 0 20 Vallathol Nagar 0.66

17 Thekkumkara 0.54 21 Kondazhy 0.03

18 Varavoor 1.35 22 Panjal 0

5 Ollukkara Block 43.27 23 Pazhayannur 2.58

25 Madakkathara 5.61 24 Thiruvilwamala 0.18

26 Nadathara 29.72 6 Puzhakkal Block 2.6

27 Pananchery 7.91 29 Adat 0.72

28 Puthur 0.03 30 Avanur 0.51

7 Mullassery Block 1.74 31 Kaiparambu 0.21

35 Elavally 0.03 32 Mulamkunnathukavu 0.99

36 Mullassery 1.44 33 Tholur 0.11

37 Pavaratty 0 34 Kolazhy 0.06

38 Venkitangu 0.27 8 Thalikkulam Block 0.42

9 Anthikkad Block 0.78 39 Engandiyur 0.03

44 Anthicad 0.03 40 Vadanappally 0

45 Thanniyam 0.15 41 Thalikulam 0.39

46 Chazhoor 0 42 Nattika 0

47 Manallur 0.18 43 Valappad 0

48 Arimpoor 0.42 10 Cherpu Block 2.85

11 Kodakara Block 22.78 49 Avinissery 0.03

53 Alagappa Nagar 1.83 50 Cherpu 2.36

54 Kodakara 0.03 51 Paralam 0.46

Programme Book 2017-18 Page 122

55 Mattathur 10.01 52 Vallachira 0

56 Nenmanikkara 0.39 12 Irinjalakkuda Block 0.72

57 Pudukkad 0 60 Karalam 0

58 Trikkur 0.99 61 Kattur 0.21

59 Varandarappilly 9.53 62 Muriyad 0.51

13

Vellangallur

Block 1.75 63 Parappukkara 0

64 Padiyur 0.11 14 Mathilakam Block 0.35

65 Poomangalam 0 69 Edathiruthy 0.09

66 Puthenchira 0.15 70 Kaipamangalam 0

67 Vellangallur 0.11 71 Mathilakam 0

68 Vellookkara 1.38 72 Perinjanam 0

15 Mala Block 1.36 73 Sree Narayanapuram 0

76 Alur 0.59 74 Edavilangu 0.15

77 Annamanada 0.03 75 Eriyad 0.11

78 Kuzhur 0.09 16 Chalakkudy Block 47.15

79 Mala 0.54 81 Kadukutty 0

80 Poyya 0.11 82 Kodassery 13.74

83 Koratty 1.68

84 Melur 0.27

85 Pariyaram 1.26

86 Athirappally 30.2

GRAND TOTAL 135.7

Programme Book 2017-18 Page 123

9 Palakkad District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a

District Panchayat

(1) b

Corporation

(0)

1 Palakkad 395.5

c Municipality (7)

1 Ottappalam 0 5 Pattambi 0.03

2 Shornur 0 6 Cherplachery 0.3

3

Chittur

Thathamangalam 0 7 Mannarkkad 6.81

4 Palakkad 0

d

Block Panchayat

(13)

1 Thrithala 0.13 8 Kuzhalmannam 1.4

2 Pattambi 0.25 9 Chittur 32.52

3 Ottappalam 0.08 10 Kollamgode 39.01

4 Sreekrishnapuram 1.26 11 Nenmara 14.07

5 Mannarkkad 14.88 12 Alathur 0.59

6 Attappady 271.14 13 Malampuzha 19.06

7 Palakkad 1.09

Programme Book 2017-18 Page 124

9 Palakkad District

Rs. In Lakhs

Grama Panchayat (88)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs

lakh)

Thrithala Block 0.39 Mannarkkad Block 30.82

1 Anakkara 0 29 Alanallur 0

2 Chalisseri 0 30 Karimba 1.77

3 Kappur 0 31 Kottoppadam 1.8

4 Nagalassery 0 32 Kumaramputhur 2.88

5 Pattithara 0 33 Kanjirappuzha 16.85

Thirumittacode 0 34 Thachanattukara 0.03

6 Thrithala 0.39 35 Tachampara 5.9

7 Pattambi Block 0.58 36 Thenkara 1.59

8 Koppam 0.3 TOTAL

9 Kulukkallur 0.11 Attappady Block 553.47

10 Muthuthala 0 37 Agali 5.97

11 Ongallur 0.11 38 Pudur 305.59

12 Parudur 0 39 Sholayar 241.91

13 Thiruvegapuram 0.06 Palakkad Block 3.28

14 Vilayur 0 40 Keralassery 0

Ottappalam Block 6.46 41 Kongad 1.42

15 Ambalapara 0 42 Mankara 0.09

16 Ananganadi 0.03 43 Mannur 0

17 Chalavara 0 44 Mundur 0.15

18 Lakkidiperur 0 45 Parali 1.35

19 Vaniamkulam 0 46 Pirayiri 0.27

20 Thrikkadeeri 0.42

Kuzhalmannam

Block 4.18

21 Vallapuzha 0.21 47 Kottai 0

22 Nellaya 0.11 48 Kuthanoor 1.31

23 Kadampazhipuram 0 49 Kuzhalmannam 2.36

24 Karimpuzha 1.35 50 Mathur 0.03

25 Pookkottukavu 0 51 Peringottukurissi 0.48

26 Sreekrishnapuram 0 52 Thenkurissy 0

27 Vellinezhi 1.74 53 Kannadi 0

28 Karakurissi 2.6

Alathur Block 6.99

Chittur Block 75.91 75 Alathur 0.15

Programme Book 2017-18 Page 125

54 Eruthempathy 6.93 76 Erimayur 0

55 Kozhinjampara 18.71 77 Kavassery 4.8

56 Nalleppilly 2.34 78 Kizhakkenchery 0.9

57 Perumatty 20.33 79 Puducode 0.18

58 Vadakarapathy 0.72 80 Tarur 0

59 Elappully 1.53 81 Vadakkanchery 0.96

60 Polpully 25.35 82 Kannambra 0

Kollamgode Block 182.2

Malampuzha

Block 270.73

61 Kollenkode 3.17 83 Akathethara 0

62 Koduvayur 8 84 Malampuzha 0.57

63 Muthalamada 0 85 Marutharoad 0.06

64 Puthunagaram 101.14 86 Puduppariyaram 3.24

65 Vadavannur 0 87 Pudussery 0.96

66 Pattenchery 45.35 88 Kodumbu 265.9

67 Peruvembu 24.54

GRAND

TOTAL 1179.27 Nenmara Block 44.26

68 Ayiloor 0.11

69 Nelliampathy 7.8

70 Elavenchery 0

71 Pallassana 4.92

72 Melarcode 30.23

73 Nenmara 1.2

74 Vandazhy 0

Programme Book 2017-18 Page 126

10 Malappuram District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-

18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a

District

Panchayat (1) b Corporation (0)

1 Malappuram 116.4

c

Municipality

(12)

1 Perinthalmanna 0 7 Kottakkal 0

2 Ponnani 0 8 Kondotty 3.03

3 Manjeri 0 9 Tanur 0.15

4 Tirur 0 10 Parappanangadi 0.48

5 Malappuram 0 11 Valancherry 0.18

6 Nilambur 24.56 12 Thirurangadi 0.42

d

Block

Panchayat (15)

1 Nilambur 68.18 9 Kuttippuram 0.32

2 Kalikavu 0.08 10 Vengara 0.32

3 Vandoor 19.52 11 Tirurangadi 0.54

4 Kondotty 10.53 12 Thanur 0.52

5 Areekkode 2.53 13 Tirur 0.2

6 Malappuram 11.54 14 Ponnani 0.83

7 Perinthalmanna 0.16 15 Perumpadappu 0.06

8 Mankada 1.06

Programme Book 2017-18 Page 127

10 Malappuram District

Rs. In Lakhs

Grama Panchayat (95)

Sl.No Name of G.P

Amount

( Rs

lakh)

Sl.No Name of G.P Amount

( Rs lakh)

Nilambur Block 152.03 Areekkode Block 52.9

1 Chaliyar 43.55 27 Urungattiri 0.09

2 Chungathara 17.85 28 Kavannur 23.78

3 Moothedam 19.91 29 Kizhuparambu 0.96

4 Vazhikkadavu 48.71 30 Pulpatta 0.06

5 Edakkara 20.81 31 Chekkode 0.06

6 Pothukal 1.2 32 Kuzhimanna 0.09

Kalikavu Block 106.42 33 Areekode 0.06

7 Amarambalam 53.78 34 Edavanna 27.8

8 Karulai 20.76

Malappuram

Block 9.95

9 Kalikavu 18.9 35 Anakkayam 0.11

10 Chokkadu 12.39 36 Morayur 9.48

11 Karuvarakundu 0.21 37 Ponmala 0.33

12 Thuvvur 0.27 38 Pookkottur 0

13 Edappatta 0.11 39 Kodoor 0

Vandoor Block 8.56 40 Othukkungal 0.03

14 Mambad 5.07

Perinthalmanna

Block 1.09

15 Pandikkad 0 41 Aliparambu 0.03

16 Porur 0.06 42 Elamkulam 0

17 Trikkalangode 0.11 43 Melattur 0

18 Thiruvali 1.88 44 Keezhattur 0

19 Vandoor 1.44 45 Thazhekode 0.06

Kondotty Block 4.47 46 Vettathur 0

20 Chelambra 0 47 Pulamanthole 0.54

21 Cherukavu 0.06 48 Angadipuram 0.46

22 Pallikkal 0.57 Mankada Block 3.05

23 Vazhayur 0.03 49 Kuruva 2.4

24 Vazhakkad 3.75 50 Mankada 0.06

25 Pulikkal 0.06 51 Makkaraparamba 0.11

26 Muthuvallur 0 52 Moorkkanad 0.48

53 Koottilangadi 0

54 Puzhakkattiri 0

Programme Book 2017-18 Page 128

Kuttippuram

Block 0.72 Thanur Block 0.57

55 Athavanad 0 73 Cheriyamundam 0.15

56 Edayoor 0.03 74 Ozhur 0

57 Irimbilayam 0.06 75 Tanalur 0.03

58 Marakkara 0.42 76 Valavannur 0.09

59 Kuttippuram 0.21 77 Ponmundam 0.3

60 Kalpakancheri 0 78 Niramaruthur 0

Vengara Block 0.21 79 Perumannaclari 0

61

Abdul Rahiman

Nagar 0

62 Edarikode 0.06 Tirur Block 2.49

63 Parappur 0 80 Purathur 0.03

64 Thennala 0 81 Thalakkad 0.03

65 Vengara 0.03 82 Triprangode 0

66 Kannamangalam 0.09 83 Vettom 2.1

67 Urakam 0.03 84 Thirunavaya 0.03

Tirurangadi

Block 1.97 85 Mangalam 0.3

68 Thenhippalam 1.07 Ponnani Block 0.26

69 Vallikkunnu 0.39 86 Tavanur 0.06

70 Moonniyur 0.33 87 Vattamkulam 0

71 Nannambra 0 88 Edappal 0.09

72 Peruvalloor 0.18 89 Kalady 0.11

Perumpadappu

Block 0.2

90 Alamcode 0.09

91 Marancheri 0

93 Nannamukku 0.11

94 Perumpadappa 0

95 Veliyancode 0

GRAND TOTAL 344.89

Programme Book 2017-18 Page 129

11 Kozhikode District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP

2017-

18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a

District

Panchayat (1) b Corporation (1)

1 Kozhikode 57.02 1 Kozhikode 0

c

Municipality

(7)

1 Vadakara 0 5 Ramanattukara 0.48

2 Koyilandy 0 6 Koduvally 0

3 Feroke 0.03 7 Mukkam 0.96

4 Payyoli 3.15

d

Block

Panchayat

(12)

1 Vadakara 0.21 7 Balussery 0.99

2 Thuneri 14.96 8 Panthalayani 0

3 Kunnummal 5.64 9 Chelannur 0.04

4 Thodannur 0.11 10 Koduvally 23.73

5 Melady 1.06 11 Kunnamangalam 7.14

6 Perambra 2.88 12 Kozhikode 0.25

Programme Book 2017-18 Page 130

11 Kozhikode District

Rs. In Lakhs

Grama Panchayat (69)

Sl.No Name of G.P Amount Sl.No Name of G.P Amount

Vadakara Block 0.66 Melady Block 0.03

1 Azhiyoor 0.03 23 Thurayur 0

2 Chorode 0.63 24 Keezhariyoor 0

3 Eramala 0 25 Thikkodi 0

4 Onchiyam 0 26 Meppayyur 0.03

Perambra Block 8.63

Thuneri Block 44.9 27 Cheruvannur 0

5 Chekkiad 5.94 28 Nochad 0

6 Edacheri 0 29 Changaroth 1.64

7 Purameri 0 30 Kayanna 0

8 Thuneri 0 31 Kuthali 0

9 Valayam 7.08 32 Perambra 0.15

10 Vanimel 31.85 33 Chakkittapara 6.84

11 Nadapuram 0.03

Balussery

Block 2.82

Kunnummal Block 16.89 34 Balussery 0.09

12 Kunnummal 0 34 Naduvannur 0

13 Kayakkodi 0.54 35 Ulliyeri 0

14 Kavilumpara 7.17 36 Kottur 0

15 Kuttiadi 0.03 37 Unnikulam 0.63

16 Maruthomkara 3.57 38 Panangad 2.1

17 Velom 0 39 Koorachundu 0

18 Narippetta 5.58

Panthalayani

Block 0.15

Thodannur Block 0.33 40 Chemanchery 0

19 Ayancheri 0.27 41 Arikkulam 0

20 Villiappally 0 42 Moodadi 0

21 Maniyoor 0.06 43 Chengottukavu 0

22 Thiruvallur 0 44 Atholi 0.15

Chelannur Block 0.11

Koduvally

Block 40.93

45 Kakkodi 0 51 Thiruvambadi 8.19

46 Chelannur 0 52 Koodaranji 11.45

47 Kakkur 0 53 Kizhakkoth 0.15

Programme Book 2017-18 Page 131

48 Nanmanda 0 54 Madavoor 0.09

49 Narikkuni 0.11 55 Puduppady 14.21

50 Thalakkulathur 0 56 Thamarassery 5.37

Kunnamangalam

Block 50.9 57 Omassery 0.09

60 Kodiyathur 6.6 58 Kattippara 0.24

61 Kuruvattur 25.04 59 Kodenchery 1.14

62 Mavoor 0.78

63 Karassery 0.06

64 Kunnamangalam 0.21

65 Chathamangalam 17.66

66 Peruvayal 0.46

67 Perumanna 0.09

Kozhikode Block 0.06

68 Kadalundi 0.06

69 Olavanna 0

GRAND TOTAL 166.41

Programme Book 2017-18 Page 132

12 Wayanad District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under TSP

2017-18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a

District

Panchayat (1) b

Corporation

(0)

1 Wayanad 1328.98 0

c Municipality (3)

1 Kalpetta 145.79 3

Sulthan

Bathery 146.78

2 Mananthavady 204.51

d

Block Panchayat

(4)

1 Mananthavady 397.8 3

Sulthan

Bathery 332.28

2 Panamaram 257.57 4 Kalpetta 341.33

Programme Book 2017-18 Page 133

12 Wayanad District

Rs. In Lakhs

Grama Panchayat (23)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

Mananthavady

Block

1 Vellamunda 171.55 Kalpetta Block

2 Thirunelly 335.25 15 Kottathara 308.56

3 Thondernad 131.19 16 Vengappally 137.96

4 Edavaka 147.26 17 Vythiri 79.81

5 Thavinhal 203.64 18 Mutil 26.25

988.89 19 Pozhuthana 136.83

Panamaram Block 20 Thariyode 97.95

6 Panamaram 301.59 21 Padinharethara 79.44

7 Poothadi 181 22 Meppadi 79.39

8 Mullamkolly 212.53 23 Muppainadu 29.63

9 Pulpalli 143.21 975.82

10 Kaniambetta 105.45 Grand Total 3635.65

943.78

Sulthan Bathery

Block

11 Meenangadi 217.8

12 Nenmeni 82.21

13 Ambalavayal 214.24

14 Noolpuzha 212.91

727.16

Programme Book 2017-18 Page 134

13 Kannur District

Rs. In Lakhs

Sl. No. Local Body Outlay under

TSP 2017-18 Sl. No. Local Body

Outlay

under

TSP

2017-18

a District Panchayat

(1) b Corporation (1)

1 Kannur 196.65 Kannur 1.69

c Municipality (9)

1 Mattannur 0 6 Anthoor 0

2 Thalipparamba 0 7 Iritty 22.64

3 Koothuparamba 0 8 Panoor 1.31

4 Payyannur 0 9 Sreekandapuram 0

5 Thalassery 0

d Block Panchayat

(11)

1 Payyannur 0.05 7 Thalassery 0.75

2 Kallyassery 48.43 8 Panoor 100.71

3 Thaliparamba 0.47 9 Koothuparamba 0.44

4 Irikkur 1.16 10 Iritty 0.71

5 Kannur 16.99 11 Peravoor 26.43

6 Edakkad 0.51

Programme Book 2017-18 Page 135

13 Kannur District

Rs. In Lakhs

Grama Panchayat (71)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

Payyannur Block 0.92 Thaliparamba Block 2.56

1 Kunhimangalam 0.09 16 Pattuvam 0.03

2 Ramanthali 0 17 Chengalai 0.06

3 Karivellur Paralam 0.11 18 Kurumathur 0.09

4

Kankole

Alapadamba 0.03 19 Pariyaram 0.06

5 Eramam Kuttoor 0.33 20 Chapparapadavu 0.46

6

Peringome

Vayakkara 0.09 21 Naduvil 1.53

7 Cherupuzha 0.27 22 Udayagiri 0.24

23 Alakode 0.09

Kallyassery Block 1.48 24

Kadannapally

Panapuzha 0

8 Cheruthazham 0

9 Ezhone 0 Irikkur Block 51.17

10 Madayi 0 25 Eruvessi 0.11

11 Mattool 0.06 26 Irikkur 0.03

12 Cherukunnu 0.3 27 Malapattom 12.39

13 Kalliasseri 0.24 28 Payyavoor 0

14 Kannapuram 0.42 29 Kuttiattor 21.96

15 Narath 0.46 30 Mayyil 16.26

31 Padiyurkalliad 0.42

32 Ulickal 0

Programme Book 2017-18 Page 136

14 Kasaragod District

Rs. In Lakhs

Sl.

No. Local Body

Outlay

under

TSP 2017-

18

Sl.

No. Local Body

Outlay under

TSP 2017-18

a District Panchayat

(1) b

Corporation

(0)

1 Kasaragod 233.72 0

c Municipality (3)

1 Kanhangad 30.7 3 Nileshwaram 0

2 Kasaragod 0

d Block Panchayat

(6)

1 Manjeswaram 39.42 4 Kanhangad 49.23

2 Karadukka 62.28 5 Parappa 1.20

3 Kasaragod 80.64 6 Neeleswaram 1.00

Programme Book 2017-18 Page 137

14 Kasaragod District

Rs. In Lakhs

Grama Panchayat (38)

Sl.No Name of G.P Amount

( Rs lakh) Sl.No Name of G.P

Amount

( Rs lakh)

Manjeswaram Block 120.01 Kanhangad Block 152.4

1 Mangalpady 21.98 21 Uduma 0.83

2 Vorkady 2.16 22 Ajanoor 0.57

3 Puthige 5.4 23 Madikkai 1.09

4 Meenja 60.8 24 Pallikkara 1.71

5 Manjeswhar 5.85 25 Pullurperiya 148.2

6 Paivalike 15.06 Parappa Block 35.41

7 Enmakaje 8.76 26 Balal 0.34

Karadukka Block 387.76 27 Kodom-Beloor 0.16

8 Belloor 5.37 28 Panathady 0.34

9 Kumbadaje 16.7 29 Kallar 33.43

10 Muliyar 132.24 30 East Eleri 0.13

11 Karadka 1.74 31 West Eleri 0.34

12 Delampady 26.01 32 Kinanoor Karindalam 0.67

13 Bedaduka 13.07 Neeleswaram Block 5.65

14 Kuttikol 4.8 33 Cheruvathur 2.72

15 Chengala 33.86 34 Kayyur Cheemeni 0.34

16 Chemnad 0.72 35 Pilicode 0.49

17 Madhur 0.59 36 Thrikkaripur 1.47

18 Mogral Puthur 94.5 37 Valiyaparamba 0.63

19 Badiyadka 20.61 38 Padne 0

20 Kumbala 37.55 Grand total 701.23

Programme Book 2017-18 Page 138

]«n-I-hÀ¤ hnI-k\ hIp-¸nsâ Iogn {]hÀ¯n-¡p¶ {]osa-{SnIv/ t]mÌvsa-{SnIv tlmkvä-ep-Ifn A[n-h-kn-¡p¶ At´-hm-kn-I-fpsS

F®w Pnà Xncn¨v NphsS tNÀ¡p-¶p.

I t{]mPIvSv Hm^okv s\Sp-a-§m-Sv(-Xn-cph\-´-]pcw -Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 ]n.-Fw.-F-̈ v.-Rm-d-\oen 50 73 2 ]n.-Fw.F¨v.-\-µn-tbmSv 40 43 3 t]mÌv sa{SnIv -]«w 35 35

BsI 125 151

II&III ss{S_Â sUh-e-]vsaâv Hm^okv ]p\-eqÀ (sImÃw,-B-e-¸pg) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ Aar-X-Ip-fw,-sImÃw

40 55

2 {]osa-{Sn-Ivtlm-ÌÂ Ipf-̄ q-̧ pg,-sImÃw

40 51

3 {]osa-{Sn-Ivtlm-Ì A¨³tIm-hn , sImÃw

40 48

4 {]osa-{Sn-Ivtlm-ÌÂ Ddp-Ip¶v sImÃw

40 40

5 {]osa-{Sn-Ivtlm-ÌÂ ambn-̄ d ,Be-̧ pg

40 38

BsI 200 232

IV ss{S_Â sUh-e-]vsaâv Hm^okv dm¶n (- ]¯-\w-Xn« PnÃ) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)NnämÀ

40 64

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) ISp-ao³Nnd

40 29

BsI 80 93

Programme Book 2017-18 Page 139

V t{]mPIvSv Hm^okv CSp¡n (-CSp¡n -Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) sXmSp-]pg

40 82

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv) sXmSp-]pg

40 68

3 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)]qame

40 70

4 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv)ASn-amen

40 104

5 {]oþ-sa-{Sn-Ivtlm-ÌÂ tKÄkv)ASn-amen

90 114

6 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) Ccp-¼p-]mew

40 36

7 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)aqe-aäw

80 75

8 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) hmg-t¯m-̧ v

40 43

9 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)ad-bqÀ

40 54

10 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) ZWvUp-sIm¼v

40 101

11 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) tImSm-en-̧ md

40 35

12 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv)Ipanfn

80 54

BsI 610 836

VI t{]mPIvSv Hm^okv Imªn-c-¸-ffn(-tIm«bw Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 apcp-¡pw-h-b 40 31 2 tImcp-t¯mSv 35 29

BsI 75 60

Programme Book 2017-18 Page 140

VII ss{S_Â sUh-e-]vsaâv Hm^okv aqhm-äp-]pg (- Fd-Wm-Ipfw PnÃ) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv)CS-a-e-bmÀ

40 54

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)-t\-c-y-aw-Kew

40 102

3 {]oþ-sa-{Sn-Ivtlm-Ì (t_mbvkv) ]nW-hqÀ¡pSn

40 75

4 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)amXn-c-̧ n-ffn

40 83

BsI 160 314

VIII ss{S_Â sUh-e-]vsaâv Hm^okv Nme-¡p-Sn(-Xr-ÈqÀ PnÃ) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)]o¨n

60 63

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkvv)-Nph-¶-a®v

60 71

3 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv)shän-e-̧ md

60 98

4 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv) hmg-̈ mÂ

40 24

5 {]oþ-sa-{Sn-Ivtlm-ÌÂ Nme-¡p-Sn(-tKÄkv)

60 74

BsI 280 330

Programme Book 2017-18 Page 141

IX ss{S_Â sUh-e-]vsaâv Hm^okvv A«-¸mSn(-]me-¡mSv .-Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)-AKfn (1)

80 200

2 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)AKfn (2)

40 90

3 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)- AKfn

60 89

4 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) ap¡men

40 66

5 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)Nn¡n

40 75

6 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkvv)- Ip¡w-]m-fbw

40 99

7 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)-tjmf-bqÀ (1)

40 143

8 {]osa-{Sn-Ivtlm-ÌÂ(tKÄkv)- tjmf-bqÀ (2)

40 80

9 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)- tjmf-bqÀ (2)

40 49

10 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)- tjmf-bqÀ(1)

40 74

11 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)-tIm«-̄ d

60 123

12 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-tIm«-̄ d

40 66

13 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-]pXqÀ

60 116

14 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-apffn

40 27

15 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)- sKm«n-bmÀIn

40 45

16 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)- B\-hmbv

40 47

BsI 740 1389

Programme Book 2017-18 Page 142

X ss{S_Â sUh-e-]vsaâv Hm^okvv ]me-¡mSv(-]me-¡mSv -Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ (_m-bvkv)-]-«-t©cn

40 68

2 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)Abn-eqÀ

40 70

3 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-apX-e-aS

40 77

4 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv )Ae-\-ÃqÀ

40 70

5 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv) FÂ.-F³.-]pcw

120 169

6 {]osa-{Sn-Ivtlm-ÌÂ (_m-bvkv&tKÄkv)- kp¦w

40 49

7 {]osa-{Sn-Ivtlm-ÌÂ (_m-bvkv) ]dfn

40 79

8 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)-\qdmWn

60 99

BsI 420 681

XI t{]mPIvSv Hm^okv \ne-¼qÀ (-ae-¸pdw.-Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-tKÄkv) t]m¯p-IÃv

60 89

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-tKÄkv) Np¦-̄ d

60 61

3 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-tKÄkv) aWn-aqfn

40 74

4 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-tKÄkv) \ne-¼qÀ

60 78

5 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-t_mbvkvv) FS-¡c

40 52

6 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-t_mbvkvv) ]qt¡m-«pw-]mSw

60 59

Programme Book 2017-18 Page 143

7 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-t_mbvkvvv) a¼mSv

40 66

8 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-t_mbvkvv) HmS-¡bw

40 21

9 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-t_mbvkvv) \ne-¼qÀ

40 59

10 {]oþ-sa-{Sn-Ivtlm-ÌÂ (-t_mbvkvv) Np¦-̄ d

40 61

BsI 480 620

XIIss{S_Â sUh-e-]vsaâv Hm^okvvþtIm-gn-t¡m-Sv(-tIm-gn-t¡mSv PnÃ) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-]pXp-̧ mSn

40 45

2 {]osa-{Sn-Ivtlm-ÌÂ (t_mbvkv) Ipµ-aw-Kew

40 38

3 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-hS-Ic

40 34

4 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv) CuÌvlnÂ

90 130

5 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) tImgn-t¡mSv

30 38

BsI 240 285

XIII t{]mPIvSv Hm^okv I®qÀ(-I®qÀ PnÃ) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv) shffn-am\w

75 84

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)Ccn«n

60 75

3 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)tImf-bmSv

60 79

4 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv)a¿nÂ

60 77

5 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) hb-̄ qÀ

40 34

6 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv)\Sp-hnÂ

40 37

Programme Book 2017-18 Page 144

7 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_mbvkv)tI-fIw

40 40

BsI 375 426

XIVt{]mPIvSv Hm^okv I¸ä(-hb-\mSv .-Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]oþ-sa-{Sn-Ivtlm-ÌÂ (tKÄkv) Imhp-aµw

60 73

2 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) Im¡-h-bÂ

60 66

3 {]oþ-sa-{Sn-Ivtlm-Ì (t_m-bvkv) IWn-bm-¼ä

60 69

4 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) ta¸mSn

60 66

5 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) Xrss¡s-̧ ä

40 43

6 {]oþ-sa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)]nW-t§mSv aptcn

60 71

BsI 340 388 ss{S_Â sUh-e-]vsaâv Hm^okvvþam\-´-hm-Sn(-h-b-\m-SvPn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)]\-acw

60 85

2 {]osa-{Sn-Ivtlm-ÌÂ (t_mbvkv)]\-acw

60 80

3 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)- A©p-Ip¶v

40 76

4 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv) am\-́ -hmSn

40 55

5 {]osa-{Sn-Ivtlm-ÌÂ 60 75

Programme Book 2017-18 Page 145

(tKÄkv) Ff-fp-aµw 6 {]osa-{Sn-Ivtlm-ÌÂ

(tKÄkv) hmtfcn 60 92

7 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-Im«n¡pfw

60 79

8 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv) XrÈn-tecn

80 120

9 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-Xe-̧ pg

60 100

10 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv)-sXmÀ\mSv

60 68

BsI 580 830

XVss{S_ sUh-e-]vsaâv Hm^okv kp¯m³_-t¯-cn (-h-b-\m-Sv-þ-Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)A¼-e-h-bÂ

60 80

2 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)a«-̧ md

30 44

3 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)NocmÂ

60 76

4 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv) hmtIcn

60 85

5 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)then-b¼w

60 97

6 {]osa-{Sn-Ivtlm-Ì (tKÄkv) kp¯m³_-t¯cn

40 24

7 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) hSp-h³NmÂ

30 43

8 {]osa-{Sn-Ivtlm-ÌÂ B\-̧ md

40 68

9 {]osa-{Sn-Ivtlm-Ì (t_m-bvkv)]p¸-ffn

40 36

10 {]osa-{Sn-Ivtlm-ÌÂ (t_m-bvkv) apf-f³sImÃn

40 68

11 {]osa-{Sn-Ivtlm-ÌÂ ao\-§mSn

40 57

BsI 500 678

Programme Book 2017-18 Page 146

XVI ss{S_Â sUh-e-]vsaâv Hm^okv ImkÀtKm-Uv(-Im-kÀtKm-Uv Pn-Ã) {Ia \w.

tlmÌ-ensâ t]cv A\p-h-Z-\o-b-amb Ip«n-I-fpsS F®w

\ne-hnse Ip«n-I-fpsS F®w

1 {]osa-{Sn-Ivtlm-ÌÂ (tKÄkv)Ipän-t¡mÂ

30 37

2 {]osa-{Sn-Ivtlm-ÌÂ »mt´mSv 30 41

3 {]osa-{Sn-Ivtlm-ÌÂ hmWn-\-KÀ

60 43

BsI 120 121

Programme Book 2017-18 Page 147

LIST OF TRIBAL EXTENSION OFFICE OF SCHEDULED TRIBES DEVELOPMENT DEPARTMENT

SL No Jurisdiction of TEO Office District Name of

PO/TDOs Office

1 Tribal Extension Office, Kattakkada

Thiruvananthapuram ITDP,

Nedumangad

2 Tribal Extension Office, Vamanapuram

3 Tribal Extension Office, Neduamangad

4 Tribal Extension Office, Kulathupuzha Kollam

ITDP Punalur 5 Tribal Extension Office,

Alappuazha Alappuzha

6 Tribal Extension Office,

Ranni Pathanamthitta TDO Ranni

7 Tribal Extension Office,

Punchavayal

Kottayam ITDP,

Kanjirappally

8 Tribal Extension Office, Melukavu

9 Tribal Extension Office, Vaikkam

10 Tribal Extension Office, Adimaly

Idukki

TDO Adimaly 11 Tribal Extension Office,

Marayoor

12 Tribal Extension Office, Moonar

13 Tribal Extension Office, Idukki

ITDP, Idukki

14 Tribal Extension Officer, Peerumedu

15 Tribal Extension Office, Kattappana

16 Tribal Extension Office, Poomala

Programme Book 2017-18 Page 148

17 Tribal Extension Office, Aluva

Ernakulam TDO

Muvattupuzha 18 Tribal Extension Office, Edamalayar

19 Tribal Extension Office, Amballoor Thrissur TDO Chalakudy

20 Tribal Extension Office,

Agali

Palakkad

ITDP Attappady 21 Tribal Extension Office,

Sholayoor

22 Tribal Extension Office, Puthoor

23 Tribal Extension Office, Palakkad

TDO Palakkad 24 Tribal Extension Office,

Chitoor

25 Tribal Extension Office, Kollamcode

26 Tribal Extension Office, Nilambur

Malappuram ITDP Nilambur 27 Tribal Extension Office,

Edavanna

28 Tribal Extension Office, Perinthalmanna

29 Tribal Extension Office, Kodancheri

Kozhikode TDO Kozhikode 30 Tribal Extension Office,

Perambra.

Programme Book 2017-18 Page 149

31 Tribal Extension Office, Kalpetta

Wayanadu

ITDP KALPETTA

32 Tribal Extension Office, Pinangodu

33 Tribal Extension Office, Vythiri

34 Tribal Extension Office,

Padinjarathara

35 Tribal Extension Office, Panamaram

36 Tribal Extension Office, Kaniyampetta

37 Tribal Extension Officer, Mananthavady

TDO Manathavady

38 Tribal Extension Office, Thavinjal

39 Tribal Extension Officer, Kattikulam

40 Tribal Extension Office, Kunchome

41 Tribal Extension Office, Sulthan Bathary

TDO Sulthan Bathery

42 Tribal Extension Office, Pulpally

43 Tribal Extension Office ,Noolpuzha

44 Tribal Extension Office, Poothady

45 Tribal Extension Office, Cheengeri

46 Tribal Extension Office, Paravoor

Kannur ITDP Kannur

47 Tribal Extension Office,

Koothuparambu

48 Tribal Extension Office, Iritty

49 Tribal Extension Office,Thaliparambu

Programme Book 2017-18 Page 150

50 Tribal Extension Office, Kasargod

Kasargod TDO

Kasaragod

51 Tribal Extension Office, Panathady

52 Tribal Extension Office, Enmakaje

53 Tribal Extension Office,

Neeleswaram.

Programme Book 2017-18 Page 151

SCHEDULED TRIBES DEVELOPMENT DEPARTMENT

Budget speech 2017-18

81. One feature that distinguishes this budget from the budget of other states and

central budget is the thrust on the welfare schemes of SC/ST. Rs. 2600 crore for

SCP and Rs. 751 crore for 36 TSP are earmarked. 9.810/o of total outlay is being

earmarked for SC population, who comprise 9.1% of total population. Same way,

2.83% is earmarked for STs who form 1.45% of the population. Rs. 188 crore for

Scheduled Castes and Rs. 366 crore for Scheduled Tribe has been allocated in

excess of the proportionate normative share. This allocation is higher than that

of any other State in India.

82. The population of Scheduled Caste in India is 16.6% and that of the Scheduled

Tribe is 8.6% and the total comes to 25.2%. But the Central Government

allocates only half of the eligible allocation as per the proportionate population.

The Central allocation had been 14.4o/o in 2014-15, 10.9% in 20'15-16 and

11.5% in 2016- 2017. This scheme itself has been dispensed with during the

current financial year by Government of India. Only the gross amount for the

welfare of Scheduled Castes and Scheduled Tribes has been indicated. This

comes to Rs. 84,311 crore. According to the Union Finance Minister, this

allocation has been enhanced by 34% over that of the previous year. But here it

is suppressed that the allocation of Rs.84,311 crore involves both plan and non

plan expenditures, while Rs. 62,838 crore allocated in 2016-17 was for plan

expenditure alone. Even then, the present allocation is only a nominal

enhancement than the S.C.P - T.S.P allocation of Rs. 82,935 crore during 2014-

15. But the approach of Kerala is in stark contrast to this.

83. The social welfare indicators of Scheduled caste lag behind the average for

Kerala. But they are much higher than the national indicators of SC/ST. In fact,

the indicator on quantity of life of Scheduled Caste in Kerala is even higher than

that of the general quality of life indicator of other north Indian states. lt is when

we consider the economic status of the SC that, their backwardness becomes

glaring. Since their issues relating to land could not be resolved, their main

means of subsistence in rural area still remains manual labour. On social welfare

status of Scheduled Tribes to, they lag behind considerably. lt is to solve this

backwardness, a larger provision has been earmarked in the budget for S.C.P &

T.S.P comparatively.

Programme Book 2017-18 Page 152

84. An amount of Rs. 1,172 crore out of Rs. 2,600 under S.C.P and Rs. 176 crore out

of Rs. 751 crore under T.S.P will be expended through the Local Self Government

Institutions. This huge allocation downwards is with the intention giving ample

chance to Scheduled Castes and Scheduled Tribes to actively participate in the

formulation of different schemes according to their aspirations. The decisions

taken by the 'Oorukootam' in TSP cannot be superseded by the Panchayat.

Efforts need to be made for their collective intervention in local planning.

85. Prime importance is given to housing in the scheme. Rs. 180 crore for purchase

of land and Rs. 5OO crore for construction of house have been provided under

S.C.P. In addition to this, Rs. 60 crore has been included as part of Pradhan

Manthri Awas yojana. In T.S.P, Rs. | 15 crore for housing, Rs. 50 crore for the

rehabilitation of landless tribals has been set apart. After providing housing to all

the homeless families, there will also be a scheme for constructing an additional

study room for families with students in it.

86. The next priority after housing is for education. . Under S.C.P, Rs. 459 crore and

under T.S.P, Rs. 122 crore has been provided for educational schemes. The main

expenditure under these schemes is for educational grants and scholarships to

students. In addition to this, Rs. 286 crore has been provided under SCP for Post-

metric Scholarship of Central Government. Project for renovation of model

residential schools, post-matric and pre metric hostels are under the

consideration of KllFB.

87. A school will be started in Edamalakkudy Tribal Panchayat. A special scheme for

equivalent examination under the auspices of Saksharatha Mission will be

started for the school dropout tribal children.

88. A social security scheme linked with insurance policy, for the girls belonging to

Scheduled Caste, in the name 'Valsalyanidhi' will be launched. This scheme

ensures all insurance coverage such as birth, health care; education etc. and

tribal assured amount of Rs.1 lakh will be given either on completion of the 10th

standard or attaining the age of 18.

Programme Book 2017-18 Page 153

GOVERNOR’S ADDRESS 2017-18

193. My Government has attained significant success in reducing malnutrition

and child mortally among scheduled tribes mainly through nutrition centers and

community kitchens. The aim of this Government will be to provide land to all

landless tribal 81 families. For this the provisions of The Scheduled Tribes and other

Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 will also be used.

Priority will be given for completing the incomplete houses taken up so far under

various schemes. Tribal Start-ups will be encouraged to ensure self-employment and

entrepreneurship, My Government also intends to revamp co-operative societies run

by the STs. Attempt will be made to enable all educated tribal youth to get gainful

permanent employment. For others, Government will guarantee 2OO days per

families under MGNREGS.

194. A mechanism will be devised to market Tribal’s products after value

addition.

195. A new scheme in the form of Tribal Girl Child Endowment Scheme - the

Gothra Valsalyanidhi will be launched. To enhance infrastructural facilities in tribal

homes conducive for the child’s education. Community Study centre in tribal hamlets

Samuhya Padanamuri - will be launched. Nutritional security of the tribes will be

ensured through nutritional screen in g, supplementation and awareness.

196. My Government shall build a strategic partnership with the sports

Authority of India for talent spotting and scientific coaching of gifted tribal boys and

girls in the Model Residential Schools and Hostels run by the Department. To

promote National Integration through tribal arts and crafts, a five day festival will be

organized inviting tribal artisans and craftsmen from various parts of the country. A

modern museum socialized in Tribal and Folk Arts, for the first time in Kerala, will be

set up at the Tribal Abode complex, Ernakulam.

197. A special package for the remote hamlet of Edamalakudy in Idukki will be

formulated for implementation.

198. 'Live with Freedom' will be the policy of my Government for the tribal

habitations, so that they are left free of outsider influence to choose the path of

development they desire.

Programme Book 2017-18 Page 154

DETAILS OF PROJECT OFFICES/ TRIBAL DEVELOPMENT OFFICES

Sl.No. PLACE NAME OF PO/TDO OFFICE No. MOBILE No.

1 P.O. ITDP,NEDUMANGAD Sri. K. SURENDRA BABU 0472 2812557 9496070328

2 TDO ,PUNALUR Sri. SREEKUMARAN.T 0475 2222353 9496070335

3 TDO,RANNI Sri. C.VINODKUMAR 04735 227703 9496070336

4 P.O.ITDP, KANJIRAPPALLY Sri. C.U JOHN 04828 202751 9496070329

5 P.O.ITDP,IDUKKI Smt. SREEREKHA 04862 222399 9496070330

6 TDO ADIMALY Sri. G.ANILKUMAR 04864224399 9446301448

7 TDO,MOOVATTUPUZHA Sri. G.ANILKUMAR

(Additional In charge) 0485 2814957 9496070337

8 TDO,CHALAKKUDY Sri. SANTHOSHKUMAR E.R. 0480 2706100 9496070338

9 TDO, PALAKKAD Sri. SURESHKUMAR. 0491 2505383 9496070339

10 P.O.,ITDP, ATTAPPADY Sri. AJEESH.P.K. 04924 254382 9496070332

11 P.O,ITDP,NILAMBUR Sri. K.KRISHNAN 04931 220315 9496070331

12 TDO. KOZHIKKODE Sri. B RAJEEV KUMAR 0495 2376364 9496070340

13 P.O,ITDP, KALPETTA Sri. P.VANIDAS 04936 202232 9496070333

14 TDO, SULTHAN BATHERY Sri. MADHU 04936 221074 9496070341

15 TDO, MANANTHAVADY Sri. S. SANTHOSHKUMAR 04935 240210 9496070342

16 P.O,ITDP, KANNUR Smt. J ACQUELINE SHINNY

FERNANDEZ

0497 2700357 9496070334

17 TDO, KASARGODU Sri. K.KRISHNAPRAKASH 04994 255466 9496070343