capacity planning and scheduling · 1.4 Çizelgeleme 1.5 stok planlama 1.6 araç rotalama ve...

4
Real-time follow-up of your business processes! CAPACITY PLANNING AND SCHEDULING

Upload: others

Post on 23-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • Real-time follow-up of your business processes!

    CAPACITY PLANNING AND SCHEDULING

  • A PLAN IN THE SCOPE OF WHICH ANY RESOURCE SHALL NOT REMAIN INACTIVE

    Plans processes from raw material entry to the production, inventory monitoring to the supply by establishing correlation between them and manages them from a single screen. Records all stages experienced by the product and supervises product background. Automatizes planning process having high risk of error and mitigates risks. Optimum planning gaining all resources remaining inactive to production and supply chain. Receipts being specific for complex structure of facilities using multi-resource and channels. Retroactive query by recording all planning related proceedings and improvement of predictions. Memory of the facility is created by providing warning in case of insufficient inventory. If more than one raw material or semi-finished product is used during production, relation of such components is established; error-free scheduling is achieved. Targeted and realized plans are compared and reported. Plans are carried out in integration with each other under capacity, supply, order, sales, inventory, distribution, operator planning, etc. headings. Raw material, human and machines are evaluated in most efficient manner. Scenario based data is created scenarios are created on the basis of variables. Simulation is conducted without causing any interruption in the current plan. The target is achieved through the shortest path by utilization of limited resources. Automatic warning when the level is under predefined inventory levels. Proceeding types being different on the basis of product, machinery usage priority, transition period between the processes and alternative route and machinery information is provided as a result of which complex production process is integrated and planned from a single point. Different productivity criteria can be defined for different processes experienced by each part within the production. Automatic plan may be produced by entry of deadline. Schedules can be viewed by supply network, customers, dealers or users in different units with respect to their level of authorization. Reservation is conducted on the products covered by the inventory and inventory is decreased automatically when the offer turns into sales. Complex production scenarios, large distribution fleets are planned. Uyumsoft Capacity Planning and Scheduling meets your needs!

    CAPACITY PLANNING AND SCHEDULING

    2

  • Standard version

    1. Multi-level production scheduling support 2. Alternative route and product tree 3. Alternative machine 4. Order based configuration information 5. Mold restricted production 6. Alternative machine and prioritization 7. Plan realization and change 8. Factory based shift plan 9. Machine based productivity values 10. Interactive drag and drop based

    exceptional case management

    Optional 11.Limited raw material 12. Dynamic MRP 13. Dynamic warning system 14. Dynamic main performance indicators 15. Data change mechanism

    Comprehensive version

    1. Planlama türleri 1.1 Kapasite planlama 1.2 Tedarik ve sipariş planlama 1.3 Satış planlama 1.4 Çizelgeleme 1.5 Stok planlama 1.6 Araç rotalama ve dağıtım planlama 1.7 Hat dengeleme ve operatör planlama 2. Sınırsız makine parkı, aparat tipi 3. Yan ürün desteği 4. Geri al, yenile ve snapshot özelliği 5. Son kullanma tarihi 6. Teklif planlama 7. İstasyon bazlı vardiya planı 8. Senaryo verisi bazlı / gerçek veri bazlı plan

    Yerel-Küresel (glokal) tedarik zincirleri içinde yer edinmek için altyapı. İş süreçlerinde kalitede kusursuzluk, Ekosisteminizle (tedarikçiler, müşteriler, çalışanlar) iletişim ve erişimde hız, Zaman ve mekandan bağımsız, esnek çalışma avantajı, İşinizde verimlilik ve karlılık, etkinlik,Dünya standartlarında izlenebilir süreçler, ölçeklenebilir, esnek bütçelenebilir ve sürdürülebilir yönetişim yatırımı. Kurumların özgün iş ihtiyaçlarına göre yapılandırılır. 20 yıla yayılan yüzlerce kurumsal bilgi teknolojileri projesi deneyimi. Kurumsal ihtiyaçların analizinden, sistem çıktılarının yorumlanmasına kadar uzanan bütüncül bir yaklaşım.

    Uyumsoft İş Sistemleri ile kontrol sizde!

    CAPACITY PLANNING AND SCHEDULING

    3

  • www.uyumsoft.com.tr |