Building Information Modeling

BIM: RETURN ON INVESTMENT

Up to 40% elimination of unbudgeted changeUp to 80% reduction in time taken to generate a cost estimateCost estimate accuracy within 3%A savings of up to 10% of the contract value through clash detections.Up to 7% reduction in project time

*Stanford University Center for Integrated Facil it ies Engineering

•Improved collective understanding of design intent•Reduced subcontractor confl icts•Reduced number of change orders•Cost assurance

CLASH DETECTION

TRADE COORDINATION

DESIGN ASSISTANCE

Real time assessment of the cost and scheduling impacts of design changesValue Management Project Scope Communication

REMODELING EXISTING SPACES