Page 1: Building Information Modeling (BIM)

Overall Project Management & Costing

BUILDING INFORMATION

MODELING

Transparency

EfficiencyQuality

BIM

Page 2: Building Information Modeling (BIM)

Agenda

BIM Introduction

BIM Advantages

BIM Usage

BIM by Examples

Questions & Answers

Page 3: Building Information Modeling (BIM)

Overall Project Management & Costing

BIMINTRODUCTION

Transparency

EfficiencyQuality

BIM

Page 4: Building Information Modeling (BIM)

BIM is not Software

4

Page 5: Building Information Modeling (BIM)

BIM is a methodology of gathering and maintaining information about a project for quick decision making throughout the life cycle or facility cycle of the project

Design Dev./ Construction Management

Page 6: Building Information Modeling (BIM)

Overall Project Management & Costing

BIMADVANTAGES

Transparency

EfficiencyQuality

BIM

Page 7: Building Information Modeling (BIM)

A foundational, intelligent model-based process for business and industry transformation

BIM Advantages

Uses 3D models to capture, explore, and maintain consistent and coordinated planning, design, construction, and operational data

Provides greater project insight for cost, schedule, and constructability

Uses and shares the same consistent data whether you’re at your desk or in the field

Enables prompt response to change with processes that are smarter and faster

Page 8: Building Information Modeling (BIM)

Integrated Project Delivery

Architecture Models

Engineering Models

Contractor Models

Design Models

Documents Models

LEED Models

Facility Management Models

Page 9: Building Information Modeling (BIM)

BIM Strategy in the worldCountry Organization BIM Strategy

USA AIA, GSA, US Coast Guard.State of Wisconsin

Decided in 2008 to migrate to BIM.Implemented in 2009. Guidelines and Standards established

UK CrossRailUK Government

Implemented in 2009.Implement BIM by 2016

CanadaCanBIM Council

Align industry to promote use of BIM

Australia Government Issued “BIM in Australia 2010 Report”

Denmark Government Mandate use of BIM for projects > €2M

Hong Kong/ China HKIBIM & Private sector

Being used by large contractors and developers. Actively studied by public sector, railway operator

UAE Dubai Municipality

Updated mandate to use BIM for consulting firms and contractors and government departments

Page 10: Building Information Modeling (BIM)

Overall Project Management & Costing

BIMUSAGE

Transparency

EfficiencyQuality

BIM

Page 11: Building Information Modeling (BIM)

BIM Usage

3D Model

Energy Model

4D Model - time

5D Model - time and cost

Business Model

Financial Model

Safety plan

Maintenance plan

Page 12: Building Information Modeling (BIM)

Software Tools used to implement BIM

Autodesk Revit

Civil 3D

NavisWorks

Quantity Takeoff

AutoCAD

BIM 360 Cloud

Graphisoft ArchiCAD

BIMCloud

Onuma OPS

Cloud Eco System

Web Services

Google SketchUp

Page 13: Building Information Modeling (BIM)

Overall Project Management & Costing

BIMBY

EXAMPLE

Transparency

EfficiencyQuality

BIM

Page 14: Building Information Modeling (BIM)

BIM by Example

Facility Management Building

Page 15: Building Information Modeling (BIM)

Duct near Grid appears to be going through a beam

Clash Detection

Page 16: Building Information Modeling (BIM)

ClashManagement

Move unit so that corresponding duct work does not go through the ceiling of the 2nd floor corridor

Page 17: Building Information Modeling (BIM)

Solar Study

Page 18: Building Information Modeling (BIM)

Facility Management

Page 19: Building Information Modeling (BIM)

Specification & Costing

Page 20: Building Information Modeling (BIM)

Facility Data that Could Be Included in BIM Planning scenarios and site information

Architectural Program

Floor plans

Space Functions

Classified areas, vaults etc.

Area calculations

Specifications

Contract documents

Legal description

Change orders

Supporting documentation for litigation

Shop drawings

Procurement documents

Progress photographs

Alarm diagrams

Warranty data

Cost Estimates

Invoices

Purchases requests

Organizational occupants

Personnel lists

Seating plans

Handicap designation

Network diagrams

Hazardous materials

Operating manuals

Maintenance records

Inspection records

Electronic 3d model

Simulations

Continuation of operations plan

Disaster Recovery Plans

Contingency plans

Furniture inventory

Page 21: Building Information Modeling (BIM)

The future of BIM (Project lifecycle)The relationship between digital systems and connected physical things will only increase and strengthen

BIM empowers to capitalizeon the Era of Connection Compare design and construction

alternatives in context Leverage the Internet of Things for

ongoing operations Use BIM-enabled efficiencies and

capabilities as a new baseline for owners

Page 22: Building Information Modeling (BIM)