Building Information Modeling
BIM: RETURN ON INVESTMENT
Up to 40% elimination of unbudgeted changeUp to 80% reduction in time taken to generate a cost estimateCost estimate accuracy within 3%A savings of up to 10% of the contract value through clash detections.Up to 7% reduction in project time
*Stanford University Center for Integrated Facil it ies Engineering
•Improved collective understanding of design intent•Reduced subcontractor confl icts•Reduced number of change orders•Cost assurance
CLASH DETECTION
TRADE COORDINATION
DESIGN ASSISTANCE
Real time assessment of the cost and scheduling impacts of design changesValue Management Project Scope Communication
REMODELING EXISTING SPACES