2 hon. administrator secretary (power) i/c e.e.(l& v) shri b.p.patel i/c e.e.(dist) shri...
TRANSCRIPT
2
Hon. Administrator
Secretary (Power)
I/c E.E.(L& V)Shri B.P.Patel
I/c E.E.(Dist)Shri H.M.Patel
I/c E.E.(Trans)Shri B.R.Tamboli
Ministerial staff
I/c D.E.(V&L)
I/c D.E.(NZ-I)/II
I/c D.E.(Trans)
I/c D.E.(SZ/ASW)
I/c D.E.(Proj)
H.C Comm.Acct
I/c D.E(comm)
J E 5 Nos J E 2 Nos J E 1 No
J E 2 NoJ E 1 No
Organizational Chart of Electricity Department of UT of D&NH
33
100% electrification of all the villages.
09 Sub-stations of 66/11 KV
02 Sub-stations of 220/66 KV.
Industrial Load (HT/LT) - 97%.
BASIC FACTS
44
Sr. No.
Particulars Nos. of Consumers up to
March-2012
Percentage (%)
1. Domestic 34170 57.392. Commercial 6852 11.513. Agriculture 1048 1.764. L.T. Industry 2306 3.875. H.T. Industry 830 1.396. Public Lighting 227 0.387. LIG (Low
Income Group)14110 23.70
TOTAL 59543 100
Consumer’s Profile
5
Category Wise Consumption ( 2011-12 )
Unit Sold Percentage (%)
Domestic 56.22 1.326
Commercial 27.81 o.656
Ind(LT) 152.19 3.59
Ind(HT) 3990.2 94.17
Agri & Poultry 3.0 0.0708
P.L 5.12 0.12
Temp Supply 2.6 0.061
4237.16 100%
6
Graph of Category wise Consumption(2011-12)
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Domes
tic
Commer
cial
Ind(
LT)
Ind(
HT)
Agri &
Pou
ltry
P.L
Temp
Supply
Unit sold
Percentage
77
Transmission & Distribution Losses.
T & D LOSSES
Year Units Purchased(MUs)
Units Sold (MUs
)
Units Lossed (MUs)
% Losses
2009-10 3594 3329 265 7.37
2010-11 4184 3897 287 6.86
2011-12 4467 4205 262 5.87
88
CTU&
GETCO
DNHDNH
Drawl of 570-620 MW
Direction of Power Flow
Direction of Power Flow
66kV
Bh
ilad
Am
bheti 220kV V
api 66kV
Industrial LoadIndustrial Load
999
400kV 400kV Sub-stationSub-station
Vapi-AmbhetiVapi-AmbhetiPGCIL PGCIL
(CTU Point)(CTU Point)
220kV220kVSub-stationSub-station
Vapi-GETCOVapi-GETCO
220kV220kVSub-stationSub-station
Bhilad-GETCOBhilad-GETCO
66kV66kVSub-stationSub-stationDadra-DNHDadra-DNH
220kV220kVSub-stationSub-station
KharadpadaKharadpada-DNH-DNH
66kV66kVSub-stationSub-station
Athal-DNHAthal-DNH
66kV66kVSub-stationSub-station
Silvassa-DNHSilvassa-DNH
220kV220kVSub-stationSub-station
Khadoli-DNHKhadoli-DNH
Interconnected Lines of GETCO and DNH after commissioning of Interconnected Lines of GETCO and DNH after commissioning of 400 KV Vapi (PGCIL) Sub-station.400 KV Vapi (PGCIL) Sub-station.
220kV Vapi-Kharadpada CTU Line220kV Vapi-Kharadpada CTU Line
66kV S/C 66kV S/C Via-IV PhaseVia-IV Phase
Vapi-Dadra LineVapi-Dadra Line
220kV D/C Line220kV D/C LineFrom AmbhetiFrom Ambheti
66kV D/C 66kV D/C Bhilad-Silvassa LineBhilad-Silvassa Line
40 MW40 MW
40 MW40 MW
50 MW50 MW
127 MW127 MW
127 MW127 MW
220kV 220kV Vapi (PGCIL)-Vapi (PGCIL)-
KhadoliKhadoli D/C LineD/C Line
Kharadpada-Dadra 66 KV LineKharadpada-Dadra 66 KV Line
66kV66kVSub-stationSub-stationMasat-DNHMasat-DNH
66 KV s/s66 KV s/s RakholiRakholi
66KV D/C line66KV D/C line
66 KV s/s66 KV s/s KhadoliKhadoli
66 KV s/s66 KV s/s KhanvelKhanvel
66KV line66KV line
66KV 66KV D/C D/C lineline66KV 66KV
T/C T/C lineline
66kV66kVSub-stationSub-stationSilli-DNHSilli-DNH
1010
220/66kV Sub-stationVapi, GEB
220/66kV Sub-stationBhilad
66/11kV Sub-stationDadra (85 MVA)
66/11kV Sub-stationAmli (65 MVA)
66/11kV Sub-stationMasat (50 MVA)
66/11kV Sub-stationRakholi (55 MVA)
66/11kV Sub-stationKhadoli (70 MVA)
66/11kV Sub-stationKhanvel (30 MVA)
220/66kV Sub-station
Kharadpada(350 MVA)
66/11kV Sub-stationSilli (30 MVA)22
0kV
Tar
apu
r-N
avsa
ri T
r. li
ne
220/66kV S/s
220kV line
66/11kV S/s
66kV Line (Panther)
Proposed 220kV line
Proposed 66kV line
Proposed 220/66kV S/s
400/220kV S/s
66kV proposed S/s
References
400/220kV Sub-stationPGCIL,Vapi
220/66kVS/s Khadoli
120 A
430 A
430 A
595 A
340 A
560
A
560 A
395 A (Wolf)
60 A
359 A on both ckt.
Stan
d b
y
530 A
290 A
Proposed 66/11kV, 2x15MVAS/s Kala
Proposed 66/11kV, 2x15MVAS/s Piparia
Pro
pose
d 2
20kV
D/C
line (M
oose
)
Proposed 66/11kV, 2x15MVA
S/s Waghdhara
Proposed 66/11kV, 2x20MVAS/s Athal
Proposed 220/66kV, S/s Waghchhipa
Proposed LILOArrangement of
220kV Ambheti-Khadoli line
11
Transmission Network
• 220 KV– 4 circuits from Ambheti (PGCIL) to Kharadpada and Khadoli.
• 66 KV – 5 circuits• 2 Circuits from 220/66 KV Bhilad Sub-station (GETCO) to
66/11 KV Amli Sub-station (DNH).
• One Circuit from 220/66 KV Bhilad Sub-station (GETCO) to 66/11 KV Masat Sub-station (DNH).
• 2 circuit from 66/11 KV Vapi IV-Phase Sub-station (GETCO) to 66/11 KV Dadra Sub-station (DNH).
12
Description of Line Length in Circuit (in Kms)
220 KV Line (D/C) 57
66 KV Line 149.60
11 KV Line 636.74
L.T Line 1785.65
Distribution Transformer Center 878 Nos.
Transmission & Distribution Network
1313
Details of Existing 220/66 KV Sub-stations + 66 KV incoming lines from Getco.
220/66 KV Sub-Stations
Sr.No. Sub-Station Capacity
1 220/66 KV Kharadpada Sub-station 4 x 100 = 400 MVA
2 220/66 KV Khadoli Sub-station 2 x 160 = 320 MVA
Total 720 MVA
66 KV Incoming Lines from GETCO.
1 From Bhilad 220/66 KV Sub-station (3 Lines) 130 MVA
2 From Vapi 220/66 KV Sub-station (2 Lines) 50 MVA
Total 180 MVA
GRAND TOTAL 900 MVA
1414
SR.NO. SUB-STATION CAPACITY
11 66/11KV Amli Sub-Station66/11KV Amli Sub-Station : 3 x 15 + 1 X 20= 65 MVA: 3 x 15 + 1 X 20= 65 MVA
22 66/11KV Masat Sub-Station66/11KV Masat Sub-Station : 2 x 15 + 2 x 20 + 1x10 = 80 : 2 x 15 + 2 x 20 + 1x10 = 80 MVAMVA
33 66/11KV Rakholi Sub-Station 66/11KV Rakholi Sub-Station : 1x15+2x20+1x10= 65 MVA: 1x15+2x20+1x10= 65 MVA
44 66/11 KV Khadoli Sub-Station66/11 KV Khadoli Sub-Station : 20+5+4x10+2x15=95 MVA: 20+5+4x10+2x15=95 MVA
55 66/11KV Dadra Sub-Station66/11KV Dadra Sub-Station : 4x20+1x10= 90 MVA: 4x20+1x10= 90 MVA
66 66/11KV Kharadpada Sub-Station 66/11KV Kharadpada Sub-Station : 2x16+1x15+1x20= 67 MVA: 2x16+1x15+1x20= 67 MVA
77 66/11 KV Silli Sub-Station66/11 KV Silli Sub-Station : 2x 15 + 1 x 20= 50 MVA: 2x 15 + 1 x 20= 50 MVA
88 66/11KV Khanvel Sub-Station66/11KV Khanvel Sub-Station : 1x10 + 1x15 = 25 MVA : 1x10 + 1x15 = 25 MVA
99 66/11KV Athal Sub-station66/11KV Athal Sub-station :2 x 20MVA=40MVA:2 x 20MVA=40MVA
TOTAL 577 MVA
Details of existing 66/11 KV Sub-stations of
Electricity Department
15
66 KV Bulk Consumers
Consumers : 30 Nos.Contract Demand : 410 MVA
1616
Sr. No. Line Name Conductor Capacity (Amp.)
Conductor Type
Length of Line (km)
1 66kV Amli - Dadra Line 300 Dog 5.635
2 66kV GIDC Vapi - to Dadra Line 525 Panther 4.948
3 66kV Khadoli - Rakholi Line 525 Panther 9.801
4 66kV Khadoli - Khanvel Line 525 Panther 4.657
5 66kV D/C Khadoli - Khanvel Line 525 Panther 0.904
6 66kV Khadoli - Khanvel Line 525 Panther 1.58
7 66kV Kharadpada - Khadoli Line 525 Panther 19.399
8 66kV D/C Bhilad - Amli Line 525 Panther 12.598
9 66kV Kharadpada - Masat Line 525 Panther 7.592
10 66kV Bhilad - Masat Line 525 Panther 13.075
11 66kV Kharadpada - Rakholi Line 1 525 Panther 14.213
12 66kV Kharadpada - Rakholi Line 2 525 Panther 13.51
13 66kV Amli - Silli Line 525 Panther 5.539
14 66kV Kharadpada - Dadra Line 525 Panther 12.134
15 66kV Masat S/s Tapping (Amli S/s) 525 Panther 7.019
16 66kV Masat S/s to EHV Consumer 400 Wolf 4.657
66kV LinesDistribution Network
1717
Present scenario of power availability and Drawl
Allocation of central sector power (peak) :- 640 MW (Off-peak) :- 542 MWAllocation of power from Bhilai Power Plant :- 100 MWUnallocated power from Bhilai whenever :- 64 MW available and requisite.
Total Connected load :- 1070 MW
Peak Demand of power :- 620 MW
Average drawl of Power :- 550-620 MW
Daily scheduled availability of power :- 550-700 MW from Grid
18
Station wise Allocation of Central Sector Power
Name of Station Peak Hours (1800 hrs to 2200 hrs) MW
Off-peak Hours(0000 to 1800 hrs & 2200hrs to 2400 hrs) MW
KSTPS 82.34 66.66
VSTPS-I 59.06 47.34
VSTPS-II 47.60 38.15
VSTPS-III 50.14 40.57
KGPP 80.99 80.99
GGPP 58.46 58.46
SIPAT-II 48.14 38.57
KAPP 15.17 12.32
TAPP 3&4 55.15 44.71
KSTPS-7 28.83 23.06
SIPAT-I 114.44 91.59
Total 640.30 542.40
However Firm Allocation is only 66.20 MW
19
Station wise Allocation of Power (contd…)
Name of Station Firm Allocation (MW) Un allocated (MW)
Total (MW)
NSPCL ,Bhilai 100 64 164
RGPPL Ratnagiri Dabhol 38 - 38
TATA POWER(Short Term) 70(Up to Sept 2012) - 70
Total 272
Total Allocation (MW)
Firm 100(Bhilai)+38(RGPPL)+66.20(NTPC) 204.20 Total
Un allocated Peak Hours 708.10 912.30
Off-peak Hours 610.20 814.40
20
Short Term Power Purchase from TATA Power
70 MW Since October 2011
@ ` 3.95 per Unit
Effective rate after rebate ` 3.86 per Unit
Required to be renewed w.e.f. 15.09.2012
2121
Sr. No.
Sub-Station Total Transformer Installed Capacity
TotalExisting Proposed
1. 220/66 KV 720 MVA 480 MVA 1200 MVA(1116 MW)
2. 66/11 KV 542 MVA 140 MVA 725 MVA(674 MW)
Total 1925 MVA(1790
MW)
Existing and Proposed Infrastructure
22
Future Power Arrangement for Central Sector Power AllocationSr. No. Name of Power station
Willingness GivenMW
Allocation of Power
MW
ExpectedDate of
Commissioning
1. North Karanpura Super Thermal Power station. - 8 Yet not
Commissioned
2. Kawas & Gandhar Power project - 20Project delayed due to non availability of
Gas to NTPC
3. BARH Power station of NTPC 100 * Delayed
4. Mauda Power station of NTPC 50 - Delayed
5. Dibang Power Plant 100 - After 9 years
6. Vindhyachal STPP Stage-IV 100 - Willingness given PPA signed
7. Solhapur STPP of NTPC 100 - Willingness given PPA signed
8. UMPP, Chhattisgarh 200 50 MOP has allocated 50 MW
9. Vindhyachal STPP Stage-V 200 Willingness given PPA signed
10 Mauda Power station of NTPC=II 100 Willingness given PPA signed
11 LARA STPP of NTPC 100 Willingness given PPA signed
23
Sr. No. Name of Power station Demand
MWAllocation of Power
MW
ExpectedDate of
Commissioning
12 RGPPL Expansion-II of NTPC 100 Willingness given PPA signed
13. Khorba STPP stage –III of NTPC 0 2.2Ministry has
allocated 2.2 MW from this plant of
NTPC
14. Kharegon STPP of NTPC 100 Willingness given PPA signed
15. Gadawara STPP of NTPC 100 Willingness given PPA signed
16. Dhuwaran STPP of NTPC 100 Willingness given PPA signed
17. NSPCL Bokaro,Jharkand 125 Willingness given PPA signed
18. NSPCL,Jagdishpur UP 125 Willingness given PPA signed
19. UMPP Orissa 200 - Willingness given
Total 1900 80.2
Firm Allocation will be as per Gadgil Formula, done by Ministry of Power
• The Administration is in a process to procure 200 MW power on Long-Term Basis through bidding.
• The Administration is also having membership with Indian Energy Exchange for procurement of power by bidding process in case of emergency i.e. on day ahead bidding basis.
Future Power Arrangement
24
2525
YearActual Drawl
Scheduled Drawl
Over Drawl
2004-05 1963.47 1691.17 272.30
2005-06 2373.86 1750.99 622.87
2006-07 2717.99 2239.41 478.58
2007-08 3197.61 2528.61 669.00
2008-09 3279.57 2560.96718.62
2009-10 3594.00 3713.58 119.58
2010-11 4183.00 4380.00 57.32
2011-12 4492.80 4554.49 61.69
Power Drawl(Figures in MUs)
2626
Year Allocation % Utilization
2007-08 17.85 100%
2008-09 11.00 100%
2009-10 38.00 100%
2010-11 26.25 100 %
2011-12 42.00 100%
2012-13 52.00 19% up to Aug 2012
(` in Crore)
Allocation and Expenditure during the 11th plan period
27
Sr.No
Name of the project /work /schemes Estimated cost
Budget allocation during 2012-13
1 Interconnecting Transmission line of 220KV from proposed 400KVA Kala sub-station to 220KV Khadoli sub-station
`13.97 ` 10.00
2 Interconnecting line Transmission line of 220KV from proposed 400KVA Kala sub-station to 220KV Kharadpada sub-station
`19.87 ` 10.00
3 Augmentation of 220/66KV Khadoli sub-station from 2 x 160MVA to 3 x 160MVA capacity
` 14.34 ` 5.00
4 Establishment of 2 x 160MVA, 220/66KV sub-station at Vaghchipa
_ ` 1.00
On going Projects/Future Projects
220/66KV Transmission Division ( ` in crore)
28
Sr.No.
Name of the project /work /schemes Estimated cost Budget allocationduring 2012-13
1 Establishment of 66/11KV, sub-station at village Pipariya ` 15.10 ` 5.0
2 Establishment of 66/11KV, sub-station at village Vaghdhara ` 4.97 ` 0.25
3 Establishment of 66/11KV, sub-station at village Velugam ` 9.69 ` 0.50
4 Establishment of 66/11KV, 2 x 20MVA sub-station at village Kala
` 9.95 ` 4.0
5 Erection of incoming and outgoing bay at 66/11KV sub station at Khanvel
` 0.92 ` 0.75
On going Projects/Future Projects66/11KV Distribution Division ( ` in Crore )
29
Sr. No. Name of the project /work /schemes Estimated cost Budget allocationduring 2012-13
6 Normal Development of HT/LT line,AMR for HT/LT consumers, purchase of meter etc
` 5.75 ` 6.25
7 Construction of New Corporate office building /Office building
` 2.0 ` 2.0
8 Scheme for Integrated Solution for electrical Network
` 19.86 ` 5.0
9 Underground Cabling of Silvassa Town Tender invited for DPRsurvey work.
Token provision of 1.00crore
Other type on going works of Distribution division` in Crore
30
JERCCommission started its functioning for all Union Territories
and Goa State since September,2008 & having its office at Gurgaon, Haryana.
The first tariff order of ED-DNH issued by the Commission on 1st November,2010 for the year 2010-11.
The second tariff order of ED-DNH issued by the Commission on 13th September,2011 for the year 2011-12
The third tariff order of ED-DNH issued by the Commission on 09.08.2012 for the year 2012-13 along with re-determination of tariff order FY 2011-12 as per the order of Hon’ble APTEL.
31
Tariff StructureEnergy Usage
2010-11 2011-12 2012-13
Unit
Domestic Category Consumers
0-50 Units
1.00 1.00 1.10 `/kWh
51-200 Units
1.60 1.60 1.70 `/kWh
201-400 Units
2.00 2.00 2.20 `/kWh
401 & above
2.25 2.25 2.50 `/kWh
LIG 5.00 5.00 5.00 `/Connection
32
Tariff StructureEnergy Usage 2010-11 2011-12 2012-13 Unit
Commercial Category Consumers
1-100 Units 2.05 2.05 2.25 `/kWh
101 and above Units
2.70 2.70 3.00 `/kWh
Agriculture Category Consumers
Load up to 10 HP
0.55 0.55 0.65 `/kWh
Load above 10 HP
0.85 0.85 0.85 `/kWh
Public lighting
1.20 1.20 1.60 `/kWh
33
Energy Usage 2010-11 2011-12 2012-13 Unit
LT Industrial Category Consumers
For all Units 2.40 2.40 3.00 `/kWh
HT industrial Category Consumers
Up to 50000Units
2.95 2.95 3.70 `/kWh
50000 to 500000 Units
3.10 3.10 3.80 `/kWh
Above 500000 Units
3.15 3.15 3.85 `/kWh
Demand Charges
60 60 75 `/KVA
Tariff Structure
34
Energy Usage 2010-11 2011-12 2012-13 Unit
HT Industrial Category Consumers (Ferro metallurgical/steel rolling mill)
First 300 Units/KVA
2.05 2.05 2.70 `/kWh
Next 200 Units/KVA
3.05 3.05 3.40 `/kWh
Above 500 Units/KVA
3.55 3.55 3.70 `/kWh
Demand Charges
450 450 500 `/KVA
Tariff Structure
35
DNH Power Distribution Corporation Ltd
NOC from MHA :- 29th Sept 2011NOC from MOP :- 29th Feb 2012Incorporation of the company :- 13th July 20121st board meeting :- 24th Aug 2012 Grant in Aid :- ` 70 croreShare capital :- ` 40 croreChairman :_Hon’ble AdministratorManaging Director :- Gyanesh Bharti, Secretary
(Power)Director :- Smt.Alaka Divan (MD OIDC)
Further Actions Required:
• Transfer notification to be finalized and to be implemented by 01.10.2012
• To Prepare logo of the corporation, transfer of assests and employees
3636
As per the JERC regulation in 2009 the CGRF of UT of DNH has
started its functioning from 25.08.2011
Chairman:-Shri Lal Singh (Retd)
Member:-Shri T.D. Davda (Retd)
JERC appointed member: Shri M.C.Gandhi(Retd)
Office Address:-Electricity Department, Amli, Silvassa
CGRF
37
Open Access
As per the JERC open access Regulations 2009, the ED-DNH has notified Short term and Long term procedures.
At present there is no any open access customerED-DNH is in a process to formulate open access charges like
transmission /wheeling charges, losses charges, cross sub cidy etc
Ministry of Power has directed that the consumers of 1 MW and above demand are deemed to be open access customer and are not under the preview of regulatory regime as per the opinion given by the Ministry of Law and Justice.
38
Status of Computerization at present
RACE billing software implemented.On line (AMR) reading of bills for 29 bulk 66
KV Consumers.150 HT Consumers are also installed AMR.Any Time Payment machine (ATP) installed.8 Post Offices are designated as collection
centre.Tender for GIS mapping and Energy Audit for
11 KV feeders is under finalization.
39
Future Programme for Computerization
All HT Consumers to be installed with AMR by Oct,2012.
LT Consumers to be installed with AMR by March,2013.
Website is ready, security audit is going on, to be launched in 2 months.
Integrated solutions for electricity networking.
After computerization of integrated solutions , SMART GRID can be implemented.
4040
Thank You