we respect, care and deliver presentation by impala platinum holdings ltd (“implats”) to the...
TRANSCRIPT
We respect, care and deliver
Presentation byPresentation byImpala Platinum Holdings LtdImpala Platinum Holdings Ltd
(“Implats”)(“Implats”)
toto
the Parliamentary Portfoliothe Parliamentary PortfolioCommittee of Mineral Committee of Mineral
ResourcesResources
on on
The Mineral and PetroleumThe Mineral and PetroleumResources Development BillResources Development Bill
[B15-2013[B15-2013]]
18 September 201318 September 2013
We respect, care and deliver
Presentation
• Introducing Implats
• Submissions of Comments to the Mineral and Petroleum Resources Development Amendment Bill (“the Bill”)
• Focus of Implats’ comments and concerns:
o Beneficiationo Concentration of Rightso Processing of Tailings Dams and Dumps
(Reclamation permit and definition of “residue stockpile”)
• Conclusion
2
We respect, care and deliver
Introducing Implats (cont)
• Implats is in the business of mining, refining and marketing platinum group metals and associated base metals
• Produced 1.58 million ounces of platinum in FY2013 equivalent to approximately 20% of global supply
• Employs around 57 000 people (including contractors)
• Generated sales revenue of R30 billion in FY2013
• Employee wages and benefits: R8.5 billion FY2013
• Skills and training R430 million FY2013
• Taxation and Royalty R1.9 billion FY2013
• Socio-economic initiatives in communities R100 million FY2013 (RSA only, including labour sending areas)
4
We respect, care and deliver
Introducing Implats (cont)
Operations are located on
the two prime platinum
deposits
• The Bushveld Complex in South Africa
• The Great Dyke in Zimbabwe
5
We respect, care and deliver
Introducing Implats (cont)Implats Group structure
SA Mine-to-market operations
Impala Refining Services
100%
Marula 73%
Afplats 74%
Two Rivers 45%
Royal Bafokeng Nation / Morokotso Trust
(ESOP)
BEE 26%
BEE 27%
BEE 55%
Impala 100%* BEE 24.4%(26.4%)
Effective Zimplats 87%
Mimosa50%
Implats
* The Morokotso Trust BEE shareholding was reduced from 26.4% to 24.4% primarily due to employees selling 40% shares for cash after July 2011.
All Bee partners are 100% HDSA owned
7
We respect, care and deliver
Introducing Implats (cont)
• Operational Mining Companies:
o Impala Platinum Ltd – Impala Rustenburg Mine, NW Region near Rustenburg / Phokeng
24.4% (26.4%) BEE partner –
21.9% Royal Bafokeng Nation
2.5% (4.5%) Morokotso Trust (ESOP)
o Marula Platinum Limited – Marula Platinum Mine, Limpopo Region near Burgersfort
27% BEE partner –
9% Mmakau Mining
9% Tubatse Platinum
9% Marula Community Trust
8
We respect, care and deliver
Introducing Implats (cont)
• Operational Mining Companies (cont):o Two Rivers Platinum (Pty) Ltd – Two Rivers Mine,
Limpopo Region near Steelpoort BEE partner – 55% ARM
• Mine Project:o Afplats (Pty) Limited – Afplats Leeuwkop Mine Project,
NW Region near Brits BEE partner – 26% Bakwena Ba-Mogopa Community
9
We respect, care and deliver
Impala Platinum Ltd Mining CharterScorecard CY 2012
Reporting Criteria Description Target 2014 Target 2012 Impala 2012 performance
Comment
Ownership Meaningful economic participation of HDSA's
26% 15% 26% As at June 2013 RBN have 13.15% at Implats Group Level
Full shareholder rights of HDSA 26% 15% 26%
Housing and Living Conditions Conversion and upgrade of hostels to attain the occupancy rate of one person per room
100% 50% improvement
79%improvement
As at June 2013 100% occupancy of 1 per room. Over 5000 units produced
Conversion and upgrade of hostels in family units towards 2014 target
N/A N/A 100% As at June 2013 264 family units produced
Facilitate home ownership options of A, B and C level band employees in consultation with organised labour towards 2014 target
N/A N/A No target, however 1717 units have been delivered at these Rustenburg operations
As at June 2013, 1717 units delivered. An additional 2420 planned at Platinum Village
10
We respect, care and deliver
Impala Platinum Ltd Mining CharterScorecard CY 2012 (cont)
Reporting Criteria Description Target 2014 Target 2012 Impala 2012 performance
Comment
Procurement and Enterprise
Development with HDSA's
Capital Goods 40% 20% 37% As at June 2013 55% of Group Discretionary spent was with HDSA's amounting to R 5.5 billion. (27% spent with Local companies)
Consumables 50% 25% 62%
Services 70% 50% 63%
Employment Equity Top Management 40% 30% 31%
Senior Management 40% 30% 46%
Middle Management 40% 40% 42%
Junior Management 40% 40% 55%
Core and Critical Skills 40% 30% 75%
Human Resources Development
Human resources development spend as percentage of payroll for HDSA
5% 4% 6%
Mine Community Development
Expenditure on mine community development projects as per the agree SLP for 2012
100% As per SLP >100%
11
We respect, care and deliver
Impala Platinum Ltd Mining CharterScorecard CY 2012 (cont)
Reporting Criteria Description Target 2014 Target 2012 Impala 2012 performance
Comment
Sustainable Development and growth
Implementation of Approved EMP 100% 100% 90%
Implementation of approved environmental plans
100% 100% 100%
Progress towards implementation of closure plans
100% 100% 100%
FFR per million man hours - ultimately a target of Zero
Continuous improvement in
line with international best
practice
0.03 0.104 As at June 2013 FIFR 0.085 a 25% improvement
Silicosis - zero new cases in previously unexposed individuals
100% 95% of all exposure
results below 0.1 mg/m3 of
respirable silica
100%compliance
No risk of exposure within the Merensky and UG2 reef
NIHL - each individual equipment must not emit sound above 110dB
100% silencing of
equipment to below 110dB
100% 99%achieved
12
We respect, care and deliver
Impala Platinum Ltd Mining Charter Scorecard CY2012 (cont)
Reporting Criteria Descripion Target 2014 Target 1012 Impala 2012 Performance
Comment
Sustainable Development and growth
Implementation of the Cultural Transformation Framework
100% 50% 50%
Percentage of employee embarking on OHS representative training
8% 4% 1.6%
Percentage of leading practices from MOSH learning hub investigated for implementation
100% 100% 100%
Health - Percentage of mandatory occupational health reports submitted
100% 100% 100%
Health - Adherence to HIV/AIDS and TB guidelines
100% 100% 100%
Beneficiation Added production volume contributory to local value addition above the baseline
Baseline established at
10%
Group at 22% local beneficiation
13
We respect, care and deliver
Marula Platinum Ltd Mining Charter Scorecard CY2012
Reporting Criteria Description Target 2014 Target 2012 Marula 2012 performance
Comment
Ownership Meaningful economic participation of HDSA's
26% 15% 27% BEE partners, 9% Tubatse Platinum, 9% Makau Mining, 9% Marula Community Trust
Full shareholder rights of HDSA 26% 15% 27%
Housing and Living Conditions
Conversion and upgrade of hostels to attain the occupancy rate of one person per room
100% 50% improvement
on 2011
N/A No hostels at the operations
Conversion and upgrade of hostels in family units towards 2014 target
N/A N/A N/A No hostels at the operations
Facilitate home ownership options of A, B and C level band employees in consultation with organised labour towards 2014 target
N/A N/A No target 122 units currently under construction at the operation
14
We respect, care and deliver
Marula Platinum Ltd Mining Charter Scorecard CY2012 (cont)
Reporting Criteria Description Target 2014 Target 2012 Marula 2012 performance
Comment
Procurement and Enterprise Development with HDSA's
Capital Goods 40% 20% 62% As at June 2013 55% of Group Discretionary spent was with HDSA's (22% spent with local companies)
Consumables 50% 25% 59%
Services 70% 50% 70%
Employment Equity Top Management 40% 30% 100%
Senior Management 40% 30% 50%
Middle Management 40% 40% 58%
Junior Management 40% 40% 58%
Core and Critical Skills 40% 30% 67%
Human Resources Development Human resources development spend as percentage of payroll for HDSA
5% 4% 3%
Mine Community Development Expenditure on mine community development projects as per the agree SLP for 2012
100% As per SLP >100%
15
We respect, care and deliver
Marula Platinum Ltd Mining Charter Scorecard CY2012 (cont)
Reporting Criteria Description Target 2014 Target 2012 Marula 2012 performance
Comment
Sustainable Development and growth
Implementation of Approved EMP 100% 100% 100%
Implementation of approved environmental plans
100% 100% 100%
Progress towards implementation of closure plans
100% 100% 100%
FFR per million man hours - ultimately a target of Zero
Continuous improvement in
line with international best
practice
0.03 0.00 As at June 2013 FIFR = 0.00
Silicosis - zero new cases in previously unexposed individuals
100% 95% of all exposure results below 0.1 mg/m3 of respirable silic
10o% compliance
No risk of exposure within the Merensky and UG2 reef
NIHL - each individual equipment must not emit sound above 110dB
100% silencing of equipment to below 110dB
97% 67%
16
We respect, care and deliver
Marula Platinum Ltd Mining Charter Scorecard CY2012 (cont)
Reporting Criteria Description Target 2014 Target 2012 Marula 2012 performance
Comment
Sustainable Development and growth
Implementation of the Cultural Transformation Framework
100% 50% 100%
Percentage of employee embarking on OHS representative training
8% 4% 9.5%
Percentage of leading practices from MOSH learning hub investigated for implementation
100% 100% 100%
Health - Percentage of mandatory occupational health reports submitted
100% 100% 100%
Health - Adherence to HIV/AIDS and TB guidelines
100% 100% 100%
Beneficiation Added production volume contributing to local value addition beyond the baseline
Per beneficiation strategy
Beneficiation done through
Impala Platinum Limited
17
We respect, care and deliver
Submission of Comments on Submission of Comments on the Mineral and Petroleum the Mineral and Petroleum Resources Development Resources Development
Amendment Bill [B15-2013]Amendment Bill [B15-2013]
We respect, care and deliver
Implats written submission
• Implats’ written submission dated 10 September 2013 focused on its critical concerns and comments on the Bill, in addition to, and in further support of the comments submitted and presentations made by the Chamber of Mines.
• Implats supports and acknowledge the fundamental principles and objectives which underpin the Bill.
19
We respect, care and deliver
Focus of Implats’ Comments Focus of Implats’ Comments and Concerns and Concerns
We respect, care and deliver
Implats’ Comments and Concerns
• Implats’ 3 critical areas of concerns:
o Beneficiation
o Concentration of Rights
o Processing of Tailings Dams and Dumps
(Reclamation permit and definition of “residue stockpile”)
21
We respect, care and deliver
Implats’ Comments and ConcernsBENEFICIATION
Beneficiation Initiatives•Implats supports the Government’s beneficiation objective and remain committed to assist government to encourage upstream beneficiation. •Established Marula Mine Community Chrome Company, together with its BEE partners - processing chrome from the PGM arisings and in the process of investigating options for local communities to participate in the existing Impala Chrome Company at the Rustenburg operation.•Implats – smelting, refining its PGM's and associated base metals to final product since December 1969 through Mineral Processes and Refineries•Ore is beneficiated to concentrate – to matte – to refined product. •The Bill and the Act is not clear on:
o What constitutes beneficiationo Will the Implats activities of substantial value add qualify as
“beneficiation” in terms of the Bill?
22
We respect, care and deliver
Implats’ Comments and ConcernsBENEFICIATION (cont)
Beneficiation Initiatives
•Implats’ Silplats Jewellery beneficiation projecto Silplats had no success to obtain a small duty free allocation
of Platinum chain into China – DMR undertaking with Chinao Silplats beneficiation project failed even with support of
Implats
23
We respect, care and deliver
Implats’ Comments and Concerns BENEFICIATION (cont)Proposed Pricing and Availability of PMGs for local beneficiation•Negative impact on pricing and availability of Implats Group’s PGM's to be marketed and exported (locally as well as globally)•Unfettered Discretionary Powers by Minister of Mineral Resources
o Prescribe (by regulation) levels of beneficiationo Determine by notice in GG (not by regulation)
such % of mineral commodity, as well asdevelopmental pricing conditions
o Producers to offer % of raw mineral production as prescribed (by regulation) to local beneficiators
•Implats sells at free market prices•Implats supports to make metal available, but at commercial prices and competitive payment terms•Limitation on exports – breach of long term supply agreements with existing customers in Japan and the USA
24
We respect, care and deliver
Implats’ Comments and Concerns BENEFICIATION (cont)
Implats Concerns
•Beneficiation has been a debated topic in various committees, Precious Metals Act, forums, of which Implats has been party to since 2004
•Latest – Beneficiation Strategy 2011
•The unfettered discretionary powers of the Minister – Section 26(2B) and 26(2C) critical concern
•We propose: Alignment of proposals in the Bill, the 2011 Beneficiation Strategy and the existing Precious Metals Act
•DTI, the DMR and mining industry to agree on the levels, pricing and forms of beneficiation – economic balance
25
We respect, care and deliver
Implats’ Comments and Concerns BENEFICIATION (cont)Implats Proposed Way forward•Differential prices:
o Implats in favour of incentive to local beneficiatorso Extended payment terms or leased metalo Producers to determine themselves in arms-length commercial
transactions•Closing thought: MIDP vs APDP
o Historically the successful automotive component industry was created through the MIDP, without pricing support from miners
o New APDP by DTI is rendering this industry less competitive - benefit to OEMs (offshore companies)
o If SA mines need to further subsidise this sector at the expense of the already under pressure SA mines, all this will do is transfer automotive company dividends out of SA
o Negative impact on Implats profitability and the effect it will have on SA pension funds such as the PIC etc.
26
We respect, care and deliver
Implats’ Comments and Concerns BENEFICIATION (cont)
Implats Current Platinum Commitment
•Attached to Implats written submission – Letter dated 2006 as Annex “A”
•Platinum Beneficiation Committee findings and commitment
•Reserve up to 10% of local production for SA delivery in support of beneficiation initiatives
•Currently, Implats have doubled the 10% commitment
•Implats local deliveries now exceed 20% of its local production
Implats continue to encourage its customers to beneficiate in SA, including automotive customers to produce catalysts. However, this require Government support and initiatives, as being discussed with DDG, Mr Mosa Mabuza via the Platinum Beneficiation committee.
27
We respect, care and deliver
Implats’ Comments and Concerns CONCENTRATION OF RIGHTS
New definition – “concentration of rights”
•Minister must refuse granting of applications for Prospecting and Mining Rights, if it will result in:
o “Concentration of rights under the control of the applicant and its associated companies”, and
o “granting of right will defeat objects of section 2(d) of the MPRDA”
•Unfettered Discretionary powers of Minister of Mineral Resources
•No clarity on what will constitute “concentration of rights” or “defeat objects of section 2(d)”
28
We respect, care and deliver
Implats’ Comments and Concerns CONCENTRATION OF RIGHTS (cont)
Implication for Implats
•Linking of applicant and its associated companies
•Regardless of BEE status of applicant
•Implats is second largest platinum producer in world
•Holder of mining rights of single biggest PGM mine
•Local growth might be negatively impacted
•Two hurdles to cross – by application for prospecting right and again by application for a mining right
•Breach of security of tenure if one has prospecting right with exclusive right to apply for mining right
•Also impacts Section 102 extension of rights / Section 11 transfers
29
We respect, care and deliver
Implats’ Comments and Concerns CONCENTRATION OF RIGHTS (cont)
Implats Proposed Way Forward
•Deletion of automatic disqualification criteria in the Bill
•Second prize, clarification in the Bill on what is meant with “concentration of rights” and “defeat objects of section 2(d)”
•IMPLATS as a fully transformed group of companies are extremely concerned of these provisions in the Bill, which will also negatively impact on BEE companies that dominate a specific mineral industry.
•Closing thought:
Compulsory sterilization of existing reserves which are located down dip of exiting mining operations and which can only be mined profitably via existing infrastructure.
30
We respect, care and deliver
Implats’ Comments and Concerns Processing of Tailings Dams and Dumps
• Amendment of definition of “Residue Stockpile”: now includes historic tailings dams and dumps not created in terms of the MPRDA
• Reclamation permit (new) require owners to process:o historic tailings dams and dumps (created prior to 1 May 2004
– MPRDA commencement date), and o Residue Stockpiles (created after 1 May 2004)
Notwithstanding if these dams or dumps are situated on land currently covered by Mining Rights granted or converted in terms of the MPRDA
Notwithstanding if these dams or dumps are covered by approved MWPs, EMPs as part of a mines’ Mining Rights
31
We respect, care and deliver
Implats’ Comments and Concerns Processing of Tailings Dams and Dumps (cont)
Impala Rustenburg Mine – No 1 & 2 Tailings Dam•Dormant; historic dump, created prior to MPRDA under the former Mining Rights Act and Minerals Act•Part of Impala’s converted mining right in our approved MWP to process No 1 & 2 Tailings Dam over life of mine with existing capacity•Approval of EMP is being awaited to include this activity•Earmarked for future processing of PGM's
Impala Rustenburg Mine – No 3 & 4 Tailings Dam•“Live” tailings dam; partly a historic dump and a current dump; created partly under the former Mining Rights Act and Minerals Act, and expanded under the MPRDA since 1 May 2004•Situated on Impala’s converted mining right area•Earmarked for future processing of PGM's, but only once this tailings dam is dormant
32
We respect, care and deliver
Implats’ Comments and Concerns Processing of Tailings Dams and Dumps (cont)
Marula Platinum Mine – Tailings Dam
•“Live” tailings dam; partly a historic dump and a current dump; created partly under the former Mining Rights Act and Minerals Act, and expanded under the MPRDA since 1 May 2004
•Situated on Marula’s converted mining right area
•Earmarked for future processing of PGM's, and chrome, but only once this tailings dam is dormant
Afplats Leeukop Mine Project
No tailings dam – mine in project phase
36
We respect, care and deliver
Implats’ Comments and Concerns Processing of Tailings Dams and Dumps (cont)
Impact of new Reclamation Permit and amendment of definition of “Residue Stockpile”•All of the Implats Group’s operational mines will require a reclamation permit to process its tailings dams, notwithstanding that it forms part of its converted mining rights (including historic dumps).•Limitation of property rights
o Impala and Marula will have an exclusive right to apply, within 2 years from the enactment of the Bill into law, to process its tailings dams in terms of reclamation permits
o Once granted, these operations will have a maximum period of 6 years to process these dumps, where after it will be open for third parties to apply
o To meet the 6 year requirement in the Bill: Impala Rustenburg’s Tailings No 1 & 2 will require a new concentrator to be built; estimated capital expenditure of R1.5bn
37
We respect, care and deliver
Implats’ Comments and Concerns Processing of Tailings Dams and Dumps (cont)
Impact of new Reclamation Permit and amendment of definition of “Residue Stockpile” (cont)•Processing of “live” tailings dams (Impala’s Tailings Dam No 3 & 4 and Marula’s Tailings Dam)•Great risk on stability of tailings dams’ structure•From Safety and Health perspective, Implats decision not to process “live” tailings•On 11 November 1974 – Tailings Dam disaster at Impala Rustenburg Mine (No1 & 2 tailings dam)
o Part of the 20m high embarkments of tailings dam brokeo Tide of slurry swept across Impala mine propertyo Flooded No 4 shaft, situated across tailings damo 13 Men DIEDo Substantial surface, environmental and infrastructure damageso Caused by excessive rainfall
•THUS: Implats cautious re any risks that may impact stability of dams
38
We respect, care and deliver
Implats’ Comments and Concerns Processing of Tailings Dams and Dumps (cont)
Implats Proposed Way Forward
•Definition of “residue stockpile” to be amended to exclude historic dumps (created prior to 1 May 2004)
•Reclamation permit provisions be amended – tailings dams and dumps that forms part of a mining right (including converted mining rights) be excluded from reclamation permitting requirements
39
We respect, care and deliver
Conclusion
• Implats requests Parliamentary Portfolio Committee to address these critical operational concerns in the Bill
• Ensure stability and security of tenure of mining industry in SA
• Implats wishes to thank:o the Minister of Mineral Resourceso The Parliamentary Portfolio Committee of Mineral Resourceso Officials of the DMR
for their commitment to bilateral discussions and consultation with the Mining Industry and affected parties in respect of the Bill, to develop and enhance the mining industry and beneficiation in SA.
41