One Team One Vision With Pride

Infrastructure

challenges in SA

Presented by Dali Duma

Page 2: Dali duma   implats - infrastructure

One Team One Vision With Pride

National Development Plan challenges:

• Too few people work

• The standard of education for most black learners is of poor

quality

• The infrastructure is poorly located, under-maintained and

insufficient to foster higher growth

• Spatial patterns exclude the poor from the fruits of development

• The economy is overly and unsustainably resource intensive

• A widespread disease burden is compounded by a failing public

health system

• Public services are uneven and often of poor quality

• Corruption is widespread

• South Africa remains a divided society

Page 3: Dali duma   implats - infrastructure

One Team One Vision With Pride

January 2011 (Sunrise View @ R400 million)

Page 4: Dali duma   implats - infrastructure

One Team One Vision With Pride

Sunrise View – School [Construction phase]

• Project is on track and in budget

Commencement Date : 13 February 2012

Construction Period : 18 Months

Completion Date : 13 August 2013

Contract Amount : R 64,022,796.32 (Excl. Vat)

Site clearance

completed Platform construction

commenced

Page 5: Dali duma   implats - infrastructure

One Team One Vision With Pride

Site layout

Page 6: Dali duma   implats - infrastructure

One Team One Vision With Pride

Boitekong ext 9 and 12 - Roads

Page 7: Dali duma   implats - infrastructure

One Team One Vision With Pride

Boitekong ext 9 and 12 – Roads Handover

Page 8: Dali duma   implats - infrastructure

One Team One Vision With Pride

Sunrise View Bridge Construction (RLM & Impala)

Page 9: Dali duma   implats - infrastructure

One Team One Vision With Pride

Siesta Access Road (R1.4 million)

Page 10: Dali duma   implats - infrastructure

One Team One Vision With Pride

Chaneng road - Before

Page 11: Dali duma   implats - infrastructure

One Team One Vision With Pride

Chaneng road – After (R2.5 million)

Page 12: Dali duma   implats - infrastructure

One Team One Vision With Pride

Newly started - Platinum Village (R1 billion)

2 420 units

School

Business Park

Public open areas

Page 13: Dali duma   implats - infrastructure

One Team One Vision With Pride

Page 14: Dali duma   implats - infrastructure

One Team One Vision With Pride

Marula Platinum

Eastern Limb

Page 15: Dali duma   implats - infrastructure

One Team One Vision With Pride

Scope & Current status

• Two schools have been identified for upgrading:

– Makgamathu High School in Ward 10, which is situated just off the

R37, approximately 110km from Polokwane.

– Mohlalamorudi High School in Ward 8, which is on the other side of

the R37 and behind Marula Mine.

– R12 million project (Funded jointly by Marula & Limpopo DoE)

• Two local micro enterprises were contracted to refurbish the two schools.

• Work at both schools have been completed within Budget.

• Training was done by the Concrete Institute and Certificates were handed out.

• Handover is being planned by stakeholder engagement (Johanna Tau)

Page 16: Dali duma   implats - infrastructure

One Team One Vision With Pride

Project Location

Page 17: Dali duma   implats - infrastructure

One Team One Vision With Pride

Schools - before

Very bad cracks

some buildings deemed unsafe

(demolish and reconstruct)

and other with an urgent need to

repair

Page 18: Dali duma   implats - infrastructure

One Team One Vision With Pride

Schools - before

Buildings with

unsuitable

material

Page 19: Dali duma   implats - infrastructure

One Team One Vision With Pride

Upgraded schools already in use

Page 20: Dali duma   implats - infrastructure

One Team One Vision With Pride

Mohlalamorudi

Water borne sewage available at

newly constructed ablution facilities

Page 21: Dali duma   implats - infrastructure

One Team One Vision With Pride

Special thanks from contractor to

Dave (dedicated Marula clerk of

works – who assisted with quality

control and coaching)

Some members of the

project team

Final completion achieved

Page 22: Dali duma   implats - infrastructure

One Team One Vision With Pride

Makgamathu

Page 23: Dali duma   implats - infrastructure

One Team One Vision With Pride

Schools already in use

Page 24: Dali duma   implats - infrastructure

One Team One Vision With Pride

Electrification Project (estimated 1600 houses)

Page 25: Dali duma   implats - infrastructure

One Team One Vision With Pride

Work in Progress (R14 million)

Page 26: Dali duma   implats - infrastructure

One Team One Vision With Pride

Reservoir and water provision (R16 million)

Page 27: Dali duma   implats - infrastructure

One Team One Vision With Pride

Graphical depiction of work planned

Page 28: Dali duma   implats - infrastructure

One Team One Vision With Pride

Labour Sending Areas Initiatives

• Eastern Cape – Mbadango School

• Eastern Cape – 3 Libraries (8 forecast)

• Taung – Community Multi-Purpose Centre

• Eastern Cape – Fort Hare University Lab

Page 29: Dali duma   implats - infrastructure

One Team One Vision With Pride

Lessons Learnt

• Committment from the top

• Dedicated project team with relevant experience

• Support from a dynamic financial institution

• Internal leadership

• Commercial flexibility

• Experienced service providers

• Rigorous performance management

• Hold hands with the government but lead the

way

Page 30: Dali duma   implats - infrastructure

One Team One Vision With Pride

Conclusion

• Be prepared for dynamic and complex processes when dealing with government

• Full commitment required from the business

• Profound benefits to the business, whilst difficult to measure

• Corporate sector CAN make a difference

Page 31: Dali duma   implats - infrastructure

One Team One Vision With Pride

Recognition received from industry

SAHF Award

- Project of the year 2009 for

units over R80 000

Sunday Times Award

- CSI company of the year

2010

Page 32: Dali duma   implats - infrastructure

One Team One Vision With Pride

Recognition received from the industry

Sunday Times Award

- CSI company of

the year