  • MANZANILLO, COLIMA. MEXICO

    I M P A L A

    W A R E H O U S I N G

    BULK CONCENTRATE STORAGE FACILITY

  • Impala Warehousing

    37 acre Development, including:

    Corporate Offices Building

    High Tech Laboratory & Sampling Dock

    50,000 m enclosed storage

    100,000 m open area storage

    Shops & Warehouse for Operations fleet

    maintenance

    6 Scale Weighting Stations linked to the data

    network

    Fuel Station with 40,000 Lt Diesel capacity

  • 8 meter high perimeter wall

    Fiber Optic Telecommunications

    High Tech Global CCTV Closed Circuit Television System

    Hydrant based Fire Fighting System

    1,500 KVA Power Substation with Emergency Power generation at full charge

    500 KVA Laboratory Power Substation with Emergency Power generation at full charge

    Complex wide Storm drainage Treatment Plant

    Precast High flow Storm Trenches system that performs pre-decantation, reinforced grids to support loaded eighteen wheelers transit

    5 Wash Bays with high pressure washing system for incoming and outgoing trucks

    Impala Warehousing

  • 30,000 m structure for Copper storage

    Foundation

    550 tonns of reinforcement steel

    7,750 m of concrete in 15 meter deep piles @ 1.20 m

    average diameter

    10 inch concrete slab reinforced with high strenght

    thermofused 3/8" steel rebar, executed in 50 days

    Structure

    2,250 tonns of A-50 structural steel

    5,000 m roofed storage area delivered to the client

    every 4 weeks, without affecting the operational

    functionality

    Complete storage facility delivered in 6 months

    Transport, Sandblast, Painting and installation of up to

    200 tonns of A-50 structural steel on a typical week

    KR-18 Sheet metal roofing, 180 joint, fully waterproof

    system

  • 10,000 m structure for Zinc storage

    Foundation

    34 tonns of reinforcement steel

    250 m of concrete in 15 meter deep piles @ 1.0

    meter average diameter

    10 inch concrete slab reinforced with high strenght

    thermofused 3/8" steel rebar, executed in 20 days

    Structure

    880 tonns of A-50 structural steel

    Complete storage facility delivered in 3 months

    KR-18 Sheet metal roofing, 180 joint, fully

    waterproof system

  • 2,500 m enclosed storage facility

    for precious metals

    Foundation

    10 tonns of reinforcement steel

    120 m of premixed concrete

    10 inch concrete reinforced with high strenght

    thermofused 3/8" steel rebar, executed in 3 days

    Structure

    450 tonns of A-50 structural steel

    Complete storage facility delivered in 3 months

    KR-18 Sheet metal roofing, 180 joint, fully waterproof

    system

  • 5,000 m Isolated Lead storage facility

    Foundation

    40 tonns of reinforcement steel

    300 m of premixed concrete

    Precast concrete wall system conforms interior

    material holding bays

    10 inch concrete reinforced with high strenght

    thermofused 3/8" steel rebar

    Structure

    1,000 tonns of A-50 structural steel

    Completely isolated storage design facility, All Lead is

    contained within, isolated from the rest of the complex

    This facility is still under construction

    KR-18 Sheet metal roofing, 180 joint, fully waterproof

    system

  • Fuel Station

    40,000 lt Diesel capacity

    2 Wheel loader simultaneous fueling capacity

    Facility constructed under PEMEXs

    standards

    Electronically controlled Fuel supply, linked to

    the main data infrastructure

    Burst proof Enclosure

  • Each piece has 1 meter wide and 11

    meters high

    Each one is constructed with 5.5 m

    of premixed concrete and 350 kg of

    reinforcement steel

    110 m of perimeter wall installation

    in just 12 hours

    620 pieces conform Impala

    Warehousings perimeter

    Precast division, Perimeter Walls

  • Precast Division, Architectural Wall

    2 meter high architectural wall

    20 m installed per day

    300 pieces installed at Impala Warehousing

    2,100 m of concrete parking lot slab, enclosed with

    precast architectural walls, installed in only 21 days

  • Precast Division, Tankreto

    Independant precast cistern system

    12,000 liter storage capacity, with the ability to adjoin pieces

    for increased storage capacity if required

    5.5 m of premixed concrete with 150 kg of reinforcement

    steel

    1128,000 liter capacity installed at Impala Warehousing

  • Precast Division, Storm Trenches

    2.36 m. wide by 3 m. long precast pieces

    Up to 42 Linear meters Installed each day

    High speed flow capacity

    Galvanized Reinforced heavy load Grids

    Easy cleaning

  • Precast Division, Custom design

    J shaped storm trenches that allow pre-

    decantation process by retaining suspended

    solids in the storm system

    Column Protectors to maximize the storage space

    and avoid accidental bumps to the structure

    Movable Precast Walls to divide storage areas

    with ease

    Precast Custom solutions include Post anchors,

    SuperPost footings. Manholes and registers,

    Shade areas and service shacks and booths help

    shorten the construction timeframe

  • General Power Substation

    1,500 KVA installed capacity

    2@750 KVA transformers, each backed up with a 750

    KVA emergency diesel generator, joined together in a

    redundant system that allows maintenance services

    without electrical interruptions that may affect

    operations

    The building has 120 m of premixed concrete with 6

    tonns of reinforcement steel, built in 30 days

    All the equipment was installed in only 6 days

  • 1,670 m premixed concrete

    140 tonns of reinforcement steel

    450 m of Landscaping areas

    5 executive meeting rooms

    80 person Canteen / Dining room

    CCTV & Data Sitte for the Complex

    Completed in 4 Months

    700 m Corporate Offices

  • 800 m Maintenance facility

    Parts warehouse Mezzanine with 1 ton/ m capacity

    Fully equipped shops and maintenance areas,

    including compressed air system and oil change

    ramps

    450 m premixed concrete

    40 tonns of reinforcement steel

    KR-18 Sheet metal roofing, 180 joint, fully

    waterproof system

    Maintenance Shops & Parts Warehouse

  • Lockers, Showers &

    Restrooms

    80 m premixed concrete

    14 tonns of reinforcement steel

    Laundry Area

    Shower & Dressing rooms

    Locker room

    24 hr service facility

    To be Completed in 3 Months

  • Sampling Dock & Laboratory

    800 m High tech facility

    Sampling dock with 6 truck simultaneous capacity

    Fully equipped sampling pre-testing stage, Air extraction and dust recolection process

    Fully equipped Lab, also with Air extraction and dust recolection process

    250 m premixed concrete

    20 tonns of reinforcement steel

    Sampling dock has KR-18 Sheet metal roofing, 180 joint, fully waterproof system

  • Re-Weighting Station &

    Panoramic Supervisor

    Office

    Full Operation views

    Strategically placed

    45 m premixed concrete

    8 tonns of reinforcement steel

  • Support Areas

    4 access/egress exchangeable lanes each with a Weighting Scale and a hidrojet Washbay tunnel to expedite Operations, fully integrated to the Fiber Optic Data network and Particle removal treatment plants to completely clean the water emission

    Particle removal treatment plants to completely clean the water emission

    Wastewater treatmant plants

    Fire Fighting pressurized system

    Presurized Irrigation system

  • OTHER ACTIVE PROJECTS

    01 year Maintenance Contract

    Cleanup, sandblasting and

    rustproofing of upper impeller shield

    and upper turbine shield.

    Sandblasting and rustproofing of

    spillway floodgates

    Santa Rosa Dam Power Plant , CFE

  • 01 year Maintenance Contract

    Fabrication, galvanized rustproofing

    and installation of main intakes

    metallic 65 ton grating

    Agua Prieta Dam Power Plant , CFE

  • 01 year Maintenance Contract

    Puente Grande Dam Power Plant , CFE