The IARC Complex Annual Upkeep Estimated Cost Window cleaning Labor costs for contractor to clean interior and exterior surfaces of glass at the OTE building $5,000 Janitorial work Labor and material costs for services provided beyond normally assigned duties $2,500 Landscaping Maintenance This includes turf, plantings, mulch, hardscapes and vegetated roof $2,500 Snow removal Labor costs associated with routine and extra snow removal efforts in and around complex $2,500 Carpet / Floor cleaning Labor and material costs for services to routinely clean walking and working surfaces in bldgs. $1,250 Overhead doors Maintenance and minor repairs Labor and material costs for planned work and emergency repairs (budget for) $1,200 Roof Inspections, Maintenance and minor repairs Labor and material costs for inspection work and emergency repairs (budget for) $500

Upload: evan-watkins

Post on 17-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building

The IARC Complex Annual Upkeep Estimated Cost

Window cleaning Labor costs for contractor to clean interior and exterior surfaces of glass at the OTE building

$5,000

Janitorial work Labor and material costs for services provided beyond normally assigned duties

$2,500

Landscaping Maintenance This includes turf, plantings, mulch, hardscapes and vegetated roof

$2,500

Snow removal Labor costs associated with routine and extra snow removal efforts in and around complex

$2,500

Carpet / Floor cleaning Labor and material costs for services to routinely clean walking and working surfaces in bldgs.

$1,250

Overhead doors Maintenance and minor repairs

Labor and material costs for planned work and emergency repairs (budget for)

$1,200

Roof Inspections, Maintenance and minor repairs

Labor and material costs for inspection work and emergency repairs (budget for)

$500

Page 2: The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building

The IARC Complex Annual Upkeep Estimated Cost (cont.)

Elevators inspection, maintenance and minor repairs

Labor and material costs for inspection work and emergency repairs (both bldgs.)

$1,000

Parking lot maintenance Labor and material costs for patching, seal coating and striping (Future Fiscal Years - budget $1.5K per )

Routine Electrical maintenance and repairs- FESS OPs

Labor and material costs for inspection, cleaning and planned/ unplanned repair work

$0

Routine HVAC maintenance and repairs- FESS OPs

Labor and material costs for planned work and emergency repairs

$0

Total of IARC Expenses Estimated maintenance and minor repair costs for IARC complex on a fiscal year basis

$16,450

Page 3: The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building

The CDF Annual Crane Maintenance & Inspection Cost

Overhead Cranes inspection Labor cost associated with yearly OSHA type inspections (budget for)

$1,250

Overhead Cranes Maintenance and Repairs

Labor and material costs for planned work and emergency repairs (budget for)

$5,000

Total of CDF Crane Expenses

Estimated maintenance and minor repair costs for IARC complex on a fiscal year basis

$6,250

GRAND TOTAL $22,700

Grand Total of Annual IARC Complex and CDF Crane Upkeep Cost

Page 4: The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building

CDF Infrastructure burdens to be addressed…

Items identified during CDF walkthrough on November 08, 2011 - Fund Source

Replace overhead doors and operators at each end of CDF building GPP

Elevator tank and controls to be replaced GPP

HVAC- Heating upgrades GPP

HVAC- Rebuild or Replace air handling units GPP

Replace ceiling tiles and light fixtures throughout all office areas GPP

Replace carpet throughout building GPP

Concrete repairs to west ramp GPP

Re-lamp hi-bay GPP

Replace west entry door, frame, sidelight and hardware GPP