SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 10009439 REFRACTORY; CASTABLE 13 T MAKE: ASAHI, JAPAN 22,000 KG SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 10113021 VALVE; W/ACTUATOR TEFLON LINED DN100 Name: Teflon lined diaphragm valve with actuator for water treatment plant CSPE No.: 00GCN17AA004 Valve type: Diaphragm Shut-off valve (with double acting power piston) DN: 100 PN: 10 Material: CI-PTFE lined Actuator type: Piston drive Flange OD: 220mm Flange PCD: 180mm Flange bolt drill size: 18mm Valve body length: 350mm Drawing #: 3.44981 Manufacturer: Erhard, Germany 5 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT TENDER NOTICE K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below; Collection of Tenders as follows : Monday - 09:00 AM to 03:00 PM Thursday - 09:00 AM to 03:00 PM PROCUREMENT OF CASTABLE REFRACTORY 13 T FOR WORKSHOP UNIT 1-6, BQPS-1 PR# 1400024401, FG1291/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019 PROCUREMENT OF DAIPHRAGM TYPE SHUTT OFF VALVES WITH ACTUATOR FOR ACID DOSING SYSTEM OF UNIT 1-6, BQPS-1 PR# 1400024396, FG1292/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019 PROCUREMENT OF UNITROL FCB AUX SWITCH & 3 POSITION CHANGEOVER SWITCH OF BLG PANELS FOR UNIT-5, BQPS-1 PR# 1400024511, FG1293/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

Upload: others

Post on 27-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10009439REFRACTORY; CASTABLE 13 TMAKE: ASAHI, JAPAN 22,000 KG

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10113021

VALVE; W/ACTUATOR TEFLON LINED DN100Name: Teflon lined diaphragm valve with actuator for water treatmentplantCSPE No.: 00GCN17AA004Valve type: Diaphragm Shut-off valve (with double acting power piston)DN: 100PN: 10Material: CI-PTFE linedActuator type: Piston driveFlange OD: 220mmFlange PCD: 180mmFlange bolt drill size: 18mmValve body length: 350mmDrawing #: 3.44981Manufacturer: Erhard, Germany

5 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

TENDER NOTICE

K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below;

Collection of Tenders as follows :

Monday - 09:00 AM to 03:00 PMThursday - 09:00 AM to 03:00 PM

PROCUREMENT OF CASTABLE REFRACTORY 13 T FOR WORKSHOP UNIT 1-6, BQPS-1PR# 1400024401, FG1291/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

PROCUREMENT OF DAIPHRAGM TYPE SHUTT OFF VALVES WITH ACTUATOR FOR ACID DOSING SYSTEM OF UNIT 1-6, BQPS-1PR# 1400024396, FG1292/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

PROCUREMENT OF UNITROL FCB AUX SWITCH & 3 POSITION CHANGEOVER SWITCH OF BLG PANELS FOR UNIT-5, BQPS-1PR# 1400024511, FG1293/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

1 10114879

UNITROL; FCB AUX SWITCH 250VDC 0.15AAuxiliary contacts are available installed on the circuit-breaker, whichenable signaling of the circuit-breaker status. The auxiliary contactsare also available in a special version for application with ratedvoltages Un less than 24V (digital signals).

Characteristics

UN In max T125V DC 0.3A 10ms250V DC 0.15AUn In max Cos theta250V AC 15A 0.3400V AC 3A

It is possible to have electrical signaling of the status (open/closed)of the circuit-breaker using 10 auxiliarycontacts.

2 EA

2 10113828

SWITCH; CHANGE OVER SELECTOR 125A Change over selector switchCurrent = 125AVoltage = 660VFrequency = 50HzPole = 4Positions = 3 (On-off-On)IP Class = 66

10 EA

3 10113558

SELECTOR_CHANGE_OVER_SWITCH_160A Change over selector switch Current = 160AVoltage = 660VFrequency = 50HzPole = 4Positions = 3 (On-off-On)IP Class = 66

6 EA

4 10113488

CHANGE_OVER_SELECTOR_SWITCH_250A Change over selector switchCurrent = 160AVoltage = 660VFrequency = 50HzPole = 4Positions = 3 (On-off-On)IP Class = 66

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT1 HIRING SERVICES FOR DISMANTLING & 1 AU

HIRING SERVICES FOR DISMANTLING & INSTALATION OF 220 VDC / 48 VDC/ ± 24 VDC BATTERY CHARGERS FOR U # 01 AT BQPS-01.

PR# 1300042151, FG1294/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

HIRING SERVICES FOR DISMANTLING &

INSTALATION OF 220 VDC / 48 VDC / ± 24 VDC BATTERY CHARGERS FOR U # 01 AT BQPS-01.Ref: MATERIAL PR No: 1400016952, 1400016865 and 1400016864

BEFORE BIDDING, EACH BIDDER SITE VISIT AT BQPS-I PLANT IS PREFERABLE TO UNDERSTAND COMPLETE WORK SCOPE THAT INCLUDES BUT NOT LIMITED TO FOLLOWING ACTIVITIES:

1.COMPLETE DISMANTLING AND REMOVAL OF POWER AND CONTROL WIRING WITH PROPER TAGGING OF EXISTING 220VDC , 48 VDC AND ± 24 VDC BATTERY CHARGERS.

2.COMPLETE DISMANTLING AND REMOVAL OF EXISTING 220VDC, 48 VDC AND ± 24 VDC BATTERY CHARGERS AND SHIFTING OF LEFT OVER MATERIAL TO DESIGNATED SCRAPE-YARD.

3.SHIFTING OF NEW 220 VDC, 48 VDC AND ± 24 VDC BATTERY CHARGERS FROM STORE TO SWITCHGEAR ROOM.

4.FIXING AND INSTALLATION OF NEW 220 VDC, 48 VDC AND ± 24 VDC BATTERY CHARGERS ON METALLIC BASE.

5.ANY MODIFICATION FOR CIVIL WORK REQUIRED FOR THE INSTALLATION OF NEW PANELS, IS COMPLETE RESPONSIBILITY OF BIDDER IN ALL RESPECT.

6.RE-CONNECTIONS OF POWER AND CONTROL CABLES WITH PROPER TAGGING AND CABLE MARKING.

7.THE TOOLS AND TESTING EQUIPMENT REQUIRED FOR THE JOB MUST BE IN GOOD CONDITION. CONDITION AND HEALTH WILL BE CHECKED BY KE ENGINEERS OR BY THEIR AUTHORIZED REPRESENTATIVE AT SITE.

8.ALL ELECTRICAL TESTING EQUIPMENT MUST BE CALIBRATED AND THEIR CALIBRATION CERTIFICATES IN ORIGINAL MUST BE ACCOMPANIED BY EACH EQUIPMENT. CALIBRATION CERTIFICATES WILL BE VERIFIED BY KE ENGINEERS.

9.ALL LABORERS, LIFTING EQUIPMENT & TOOLS AND RIGGERS REQUIRED TO EXECUTE THE JOB MUST BE ARRANGED BY BIDDER FROM HIS RESOURCES.

10.ALL LABORERS AND TECHNICIANS PROVIDED BY BIDDER FOR THIS JOB, MUST BE SKILLED AND WELL CONVERSANT TO HANDLE THIS JOB.

11.ALL MATERIAL LIKE CABLE LUGS, CABLE TIES, NUTS & BOLTS, WASHERS AND ANY OTHER NECESSARY MATERIAL MUST BE ARRANGED BY THE BIDDER WITHOUT ANY EXTRA CHARGE TO KE. THE QUALITY OF THAT REQUIRED MATERIAL FIRST BE APPROVED BY KE ENGINEERS OR BY THEIR AUTHORIZED REPRESENTATIVE, AT JOB SITE BEFORE APPLYING THEM.

12.THE BIDDER MUST ENSURE COMPLETE SAFETY PROCEDURES AT WORK AS PER KE SAFETY POLICY.

1.1 1 JOB

13.DAILY HOUSEKEEPING AT THE END OF THE DAY AFTER WORK FINISH FOR THAT DAY, MUST BE ENSURED BY THE BIDDER'S STAFF, BEFORE LEAVING JOB PLACE, DURING WHOLE PERIOD OF JOB.

14.AFTER SUCCESSFUL INSTALLATION, TESTING AND COMMISSIONING OF PANELS WILL BE PERFORMED AS PER MANUFACTURER'S INSTRUCTION/GUIDELINE, KEEPING ALL RELEVANT IEC STANDARD PROTOCOLS. FOR COMMISSIONING, A WELL EXPERIENCED COMMISSIONING ENGINEER MUST BE DEPUTED BY BIDDER AT SITE.

15.BEFORE HAND-OVER PANELS FINALLY TO KE AUTHORITIES, THE DEFICIENCIES/PUNCH LIST ITEMS RAISED BY KE ENGINEERS MUST BE COMPLETED BY BIDDER.

16.ALL OTHER ISSUES, EXCEPT ABOVE IF RAISED DURING EXECUTION OF JOB REGARDING ANY MATTER, MUST BE SETTLED/RESOLVED WITH MUTUAL UNDERSTANDING IN VERY GOOD POSITIVE ENVIRONMENT BY BIDDER AND KE PLANT AUTHORITIES. IT SHOULD NOT BE DISPUTED FOR A LONG PERIOD OF TIME, SO AS TO PACE OF WORK SHOULD NOT HALT.

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITSERVICES FOR UNIT # 5 BOILER DUCTS AND Reparing at BQPS-I

Pre-outage check list

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have

knowledge of:i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

SERVICES FOR UNIT # 5 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

PR# 1300042263, FG1295/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

Services1 1 AU

1.1 7200581

INSPECTION FOR REPAIRING OF DUCTSSCOPE OF INSPECTION OF DUCT CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

400 JOB

1.2 7200582

INSPECTION FOR REPAIRING OF BELLOWSSCOPE OF INSPECTION OF BELLOWS CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" CUTTING OF SLIDING PLATES" CLEANING OF BELLOWS FROM DEPOSITED ASH & SOOT." INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER FOR L X B ONLY.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

400 JOB

1.3 7200583

FABRICATION OF BELLOWS

" 2MM SUS 304 SHEET WILL BE USED FOR BELLOW REPLACEMENT AND BIDDER WILL BE RESPONSIBLE FOR FABRICATION OF BELLOWS." BIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMED.ESTIMATED WEIGHT OF 2MM SUS 304 SHEET FOR BELLOWS REPLACEMENT ARE GIVEN IN ROWS (UNIT WISE)

300 JOB

1.4 7200584

WELDING OF BELLOWSWELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

400 JOB

1.5 7200585

FABRICATION OF DUCT6mm M.S SHEET WILL BE USED FOR DUCT REPLACEMENTBIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMEDESTIMATED WEIGHT OF 6 MM M.S SHEET FOR DUCTS REPLACEMENT ARE GIVEN IN ROWS ( UNIT WISE)"

600 JOB

REPAIRING OF DUCTWELDING WILL BE APPLIED FOR REPAIRING OF DUCTSWELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF DUCT REPAIREDESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

NOTE:

PRICES GIVEN ABOVE ARE IN PKR.THE PAYMENT WILL BE ON ACTUAL BASIS FOR ALL WORK PERFORMED.THE COMPLETE DETAILS ARE IN ANNEXURE "A".ALL QUANTITIES ARE AS PER APPROX. MAY BE WORK WILL INCREASE AFTER INSPECTION.

ANNEXURE A

A. CONTRACTORS OBLIGATIONS

1. FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE BOILER FOR INSPECTION/REPAIR/REPLACEMENT OF THE ENTIRE BELLOW & DUCT.

2. REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND REMOVAL OF PROTECTIVE SHEET FROM INSIDE OF THE EXPANSION BELLOW.

3. THOROUGH JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND KE CONCERNED ENGINEERS OF EXPANSION BELLOW AND TO ASSESS THE EXTENT OF DAMAGE TO THE BELLOWS.

4. BEFORE JOINT INSPECTION, CLEANING WORK OF DUCTS AND BELLOWS SHOULD BE COMPLETED BY THE VENDOR.

5. THOROUGH JOINT INSPECTION TO BE CARRIED OUT THE CONTRACTOR & KE CONCERNED ENGINEERS FROM INSIDE OF THE DUCT AND TO ASSESS THE EXTENT OF DAMAGE OF DUCTS.

6. FABRICATION OF COMPLETE BELLOWS/PIECES OF BELLOWS ON SITE (MATERIAL SS 304 OF REQUIRED THICKNESS)

7. COMPLETE REPLACEMENT OF MAJOR DAMAGED BELLOWS WITH LOCALLY FABRICATED BELLOWS.

8. REPAIR OF BELLOWS WITH MINOR DAMAGES.

9. REPLACEMENT OF THE DETERIORATED PORTION OF DUCT BY M. S SHEET OF REQUIRED THICKNESS.

10. SATISFACTORY PERFORMANCE OF AIR LEAK TEST.

11. RE-FIXING OF INSULATION, ALUMINIUM CLADDING AND PROTECTIVE SHEET.

12. REMOVAL OF SCAFFOLDING. SHIFTING OF DAMAGED BELLOWS AT PROPER PLACE INDICATED BY KE CONCERNED ENGINEER.

13. AREA CLEANING AND SHIFTING OF SCRAPE /DEBRIS TO THE SCRAPE / DUMP YARD OR TO ANY OTHER AREA WITH IN THE BQPS-1 PREMISES DECIDED BY GM (M) OR HIS AUTHORISED ENGINEER.

14. WORKING AREA WILL BE CLEANED ON DAILY BASIS.

15. REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF GM(M), WHICH WILL BE ESSENTIALLY REQUIRED TO MAKE THE ACCESS TO THE AREA OF WORK AND THEN RE- FIXING THESE AFTER THE COMPLETION OF JOB FREE OF COST.

16. ANY WORK NOT INDICATED ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF REPLACEMENT/REPAIR WORK OF EXPANSION BELLOWS OF FLUE GAS DUCTS SHOULD BE CLAIMED TO BE INCLUDED IN THE SCOPE OF WORK.

B. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

C. OTHER SPECIFIC TERMS & CONDITIONS

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF D.G.M (BOILER) OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. THE WORK WILL BE CARRIED IN A SPECIFIED TIME GIVEN UNDER THE HEADING OF "COMPLETION PERIOD" WITH FULL STRENGTH OF HIGHLY SKILLED, EXPERIENCED AND QUALIFIED WORKERS UP TO THE ENTIRE SATISFACTION OF KESC ENGINEERS.

3. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING AS WELL AS MATERIAL HANDLING EQUIPMENTS AND SCAFFOLDING ETC. WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL MATERIAL RELATED TO INSULATION& CLADDING WILL BE THE RESPONSIBILITY OF KE.

50072005861.6 Job

5. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY KE FREE OF COST. TO USE ELECTRICITY, WATER, AIR, THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, PIPES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

6. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

7. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

8. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

9. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

10. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS. NO COMPENSATION WILL BE PAID BY KE IN CASE OF FAILURE.

11. PROPER PPES AND SAFE WORKING PROCEDURES ARE COMPLETE RESPONSIBILITY OF THE CONTRACTORS.

12. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

13. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

14. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

15. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

16. MOBILIZATION PERIOD MUST NOT EXCEED 48 HRS. AS INSTRUCTED BY G.M. (MAINTENANCE)

17. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

18. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

19. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

20. OBTAINING THE SECURITY PERMISSION FROM KE SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

21. CREDENTIAL OF WELDERS, FABRICATORS, RIGGERS AND OTHER WORKERS WILL BE VETTED BY KE ENGINEER.

22. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

23. QUALIFIED SAFETY SUPERVISOR WILL BE THE RESPONSIBILITY OF VENDOR, IF WORK WILL BE CARRIED OUT ROUND THE CLOCK, SO IT IS MANDATORY THE DEPUTATION OF SEPARATE SAFETY SUPERVISOR DAY AND NIGHT

D. COMPLETION PERIOD

THE ENTIRE JOB, INCLUDING CLEANING, DISMANTLING, REPAIRING AND ERECTION IS TO BE COMPLETED WITHIN 25 DAYS FOR EACH UNIT. IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME, WORK WILL BE CARRIED OUT IN DAY AND NIGHT SHIFTS ON DAILY BASIS IF REQUIRED; THE WORK SHALL HAVE TO BE CONTINUED ON SUNDAYS & HOLIDAYS AS WELL, WITH THE PERMISSION OF GM (M)/DGM (BOILER).

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITSERVICES FOR UNIT # 6 BOILER DUCTS AND SERVICES FOR UNIT # 6 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

Pre-outage check list

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have

SERVICES FOR UNIT # 6 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

PR# 1300042264, FG1296/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

Services1 1 AU

knowledge of:i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

1.1 7200581

INSPECTION FOR REPAIRING OF DUCTSWELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

400 M2

1.2 7200582

INSPECTION FOR REPAIRING OF BELLOWSSCOPE OF INSPECTION OF BELLOWS CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" CUTTING OF SLIDING PLATES" CLEANING OF BELLOWS FROM DEPOSITED ASH & SOOT." INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER FOR L X B ONLY.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

400 JOB

1.3 7200583

FABRICATION OF BELLOWS

" 2MM SUS 304 SHEET WILL BE USED FOR BELLOW REPLACEMENT AND BIDDER WILL BE RESPONSIBLE FOR FABRICATION OF BELLOWS." BIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMED.ESTIMATED WEIGHT OF 2MM SUS 304 SHEET FOR BELLOWS REPLACEMENT ARE GIVEN IN ROWS (UNIT WISE)

300 JOB

1.4 7200584

WELDING OF BELLOWSWELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

400 JOB

1.5 7200585

FABRICATION OF DUCT6mm M.S SHEET WILL BE USED FOR DUCT REPLACEMENTBIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMEDESTIMATED WEIGHT OF 6 MM M.S SHEET FOR DUCTS REPLACEMENT ARE GIVEN IN ROWS ( UNIT WISE)"

600 JOB

1.6 7200586

REPAIRING OF DUCTWELDING WILL BE APPLIED FOR REPAIRING OF DUCTSWELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF DUCT REPAIREDESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

NOTE:

PRICES GIVEN ABOVE ARE IN PKR.THE PAYMENT WILL BE ON ACTUAL BASIS FOR ALL WORK PERFORMED.THE COMPLETE DETAILS ARE IN ANNEXURE "A".ALL QUANTITIES ARE AS PER APPROX. MAY BE WORK WILL INCREASE AFTER INSPECTION.

500 JOB

ANNEXURE A

A. CONTRACTORS OBLIGATIONS

1. FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE BOILER FOR INSPECTION/REPAIR/REPLACEMENT OF THE ENTIRE BELLOW & DUCT.

2. REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND REMOVAL OF PROTECTIVE SHEET FROM INSIDE OF THE EXPANSION BELLOW.

3. THOROUGH JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND KE CONCERNED ENGINEERS OF EXPANSION BELLOW AND TO ASSESS THE EXTENT OF DAMAGE TO THE BELLOWS.

4. BEFORE JOINT INSPECTION, CLEANING WORK OF DUCTS AND BELLOWS SHOULD BE COMPLETED BY THE VENDOR.

5. THOROUGH JOINT INSPECTION TO BE CARRIED OUT THE CONTRACTOR & KE CONCERNED ENGINEERS FROM INSIDE OF THE DUCT AND TO ASSESS THE EXTENT OF DAMAGE OF DUCTS.

6. FABRICATION OF COMPLETE BELLOWS/PIECES OF BELLOWS ON SITE (MATERIAL SS 304 OF REQUIRED THICKNESS)

7. COMPLETE REPLACEMENT OF MAJOR DAMAGED BELLOWS WITH LOCALLY FABRICATED BELLOWS.

8. REPAIR OF BELLOWS WITH MINOR DAMAGES.

9. REPLACEMENT OF THE DETERIORATED PORTION OF DUCT BY M. S SHEET OF REQUIRED THICKNESS.

10. SATISFACTORY PERFORMANCE OF AIR LEAK TEST.

11. RE-FIXING OF INSULATION, ALUMINIUM CLADDING AND PROTECTIVE SHEET.

12. REMOVAL OF SCAFFOLDING. SHIFTING OF DAMAGED BELLOWS AT PROPER PLACE INDICATED BY KE CONCERNED ENGINEER.

13. AREA CLEANING AND SHIFTING OF SCRAPE /DEBRIS TO THE SCRAPE / DUMP YARD OR TO ANY OTHER AREA WITH IN THE BQPS-1 PREMISES DECIDED BY GM (M) OR HIS AUTHORISED ENGINEER.

14. WORKING AREA WILL BE CLEANED ON DAILY BASIS.

15. REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF GM(M), WHICH WILL BE ESSENTIALLY REQUIRED TO MAKE THE ACCESS TO THE AREA OF WORK AND THEN RE- FIXING THESE AFTER THE COMPLETION OF JOB FREE OF COST.

16. ANY WORK NOT INDICATED ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF REPLACEMENT/REPAIR WORK OF EXPANSION BELLOWS OF FLUE GAS DUCTS SHOULD BE CLAIMED TO BE INCLUDED IN THE SCOPE OF WORK.

B. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

C. OTHER SPECIFIC TERMS & CONDITIONS

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF D.G.M (BOILER) OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. THE WORK WILL BE CARRIED IN A SPECIFIED TIME GIVEN UNDER THE HEADING OF "COMPLETION PERIOD" WITH FULL STRENGTH OF HIGHLY SKILLED, EXPERIENCED AND QUALIFIED WORKERS UP TO THE ENTIRE SATISFACTION OF KESC ENGINEERS.

3. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING AS WELL AS MATERIAL HANDLING EQUIPMENTS AND SCAFFOLDING ETC. WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL MATERIAL RELATED TO INSULATION& CLADDING WILL BE THE RESPONSIBILITY OF KE.

5. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY KE FREE OF COST. TO USE ELECTRICITY, WATER, AIR, THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, PIPES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

6. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

7. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

8. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

9. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

10. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS. NO COMPENSATION WILL BE PAID BY KE IN CASE OF FAILURE.

11. PROPER PPES AND SAFE WORKING PROCEDURES ARE COMPLETE RESPONSIBILITY OF THE CONTRACTORS.

12. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

13. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

14. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

15. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

16. MOBILIZATION PERIOD MUST NOT EXCEED 48 HRS. AS INSTRUCTED BY G.M. (MAINTENANCE)

17. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

18. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

19. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

20. OBTAINING THE SECURITY PERMISSION FROM KE SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

21. CREDENTIAL OF WELDERS, FABRICATORS, RIGGERS AND OTHER WORKERS WILL BE VETTED BY KE ENGINEER.

22. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

23. QUALIFIED SAFETY SUPERVISOR WILL BE THE RESPONSIBILITY OF VENDOR, IF WORK WILL BE CARRIED OUT ROUND THE CLOCK, SO IT IS MANDATORY THE DEPUTATION OF SEPARATE SAFETY SUPERVISOR DAY AND NIGHT

D. COMPLETION PERIOD

THE ENTIRE JOB, INCLUDING CLEANING, DISMANTLING, REPAIRING AND ERECTION IS TO BE COMPLETED WITHIN 25 DAYS FOR EACH UNIT. IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME, WORK WILL BE CARRIED OUT IN DAY AND NIGHT SHIFTS ON DAILY BASIS IF REQUIRED; THE WORK SHALL HAVE TO BE CONTINUED ON SUNDAYS & HOLIDAYS AS WELL, WITH THE PERMISSION OF GM (M)/DGM (BOILER).

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES FOR UNIT # 1 BOILER DUCTS AND SERVICES FOR UNIT # 1 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

Pre-outage check list

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have

knowledge of:i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

SERVICES FOR UNIT # 1 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

PR# 1300042261, FG1297/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

Services1 1 AU

1.1 7200581

INSPECTION FOR REPAIRING OF DUCTSSCOPE OF INSPECTION OF DUCT CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

600 M2

1.2 7200582

INSPECTION FOR REPAIRING OF BELLOWSSCOPE OF INSPECTION OF BELLOWS CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" CUTTING OF SLIDING PLATES" CLEANING OF BELLOWS FROM DEPOSITED ASH & SOOT." INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER FOR L X B ONLY.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

600 JOB

1.3 7200583

FABRICATION OF BELLOWS

" 2MM SUS 304 SHEET WILL BE USED FOR BELLOW REPLACEMENT AND BIDDER WILL BE RESPONSIBLE FOR FABRICATION OF BELLOWS." BIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMED.ESTIMATED WEIGHT OF 2MM SUS 304 SHEET FOR BELLOWS REPLACEMENT ARE GIVEN IN ROWS (UNIT WISE)

800 JOB

1.4 7200584

WELDING OF BELLOWSWELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

500 JOB

1.5 7200585

FABRICATION OF DUCT6mm M.S SHEET WILL BE USED FOR DUCT REPLACEMENTBIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMEDESTIMATED WEIGHT OF 6 MM M.S SHEET FOR DUCTS REPLACEMENT ARE GIVEN IN ROWS ( UNIT WISE)"

600 JOB

1.6 7200586

REPAIRING OF DUCTSERVICES FOR UNIT # 1 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

600 JOB

WELDING WILL BE APPLIED FOR REPAIRING OF DUCTSWELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF DUCT REPAIREDESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

NOTE:

PRICES GIVEN ABOVE ARE IN PKR.THE PAYMENT WILL BE ON ACTUAL BASIS FOR ALL WORK PERFORMED.THE COMPLETE DETAILS ARE IN ANNEXURE "A".ALL QUANTITIES ARE AS PER APPROX. MAY BE WORK WILL INCREASE AFTER INSPECTION.

ANNEXURE A

A. CONTRACTORS OBLIGATIONS

1. FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE BOILER FOR INSPECTION/REPAIR/REPLACEMENT OF THE ENTIRE BELLOW & DUCT.

2. REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND REMOVAL OF PROTECTIVE SHEET FROM INSIDE OF THE EXPANSION BELLOW.

3. THOROUGH JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND KE CONCERNED ENGINEERS OF EXPANSION BELLOW AND TO ASSESS THE EXTENT OF DAMAGE TO THE BELLOWS.

4. BEFORE JOINT INSPECTION, CLEANING WORK OF DUCTS AND BELLOWS SHOULD BE COMPLETED BY THE VENDOR.

5. THOROUGH JOINT INSPECTION TO BE CARRIED OUT THE CONTRACTOR & KE CONCERNED ENGINEERS FROM INSIDE OF THE DUCT AND TO ASSESS THE EXTENT OF DAMAGE OF DUCTS.

6. FABRICATION OF COMPLETE BELLOWS/PIECES OF BELLOWS ON SITE (MATERIAL SS 304 OF REQUIRED THICKNESS)

7. COMPLETE REPLACEMENT OF MAJOR DAMAGED BELLOWS WITH LOCALLY FABRICATED BELLOWS.

8. REPAIR OF BELLOWS WITH MINOR DAMAGES.

9. REPLACEMENT OF THE DETERIORATED PORTION OF DUCT BY M. S SHEET OF REQUIRED THICKNESS.

10. SATISFACTORY PERFORMANCE OF AIR LEAK TEST.

11. RE-FIXING OF INSULATION, ALUMINIUM CLADDING AND PROTECTIVE SHEET.

12. REMOVAL OF SCAFFOLDING. SHIFTING OF DAMAGED BELLOWS AT PROPER PLACE INDICATED BY KE CONCERNED ENGINEER.

13. AREA CLEANING AND SHIFTING OF SCRAPE /DEBRIS TO THE SCRAPE / DUMP YARD OR TO ANY OTHER AREA WITH IN THE BQPS-1 PREMISES DECIDED BY GM (M) OR HIS AUTHORISED ENGINEER.

14. WORKING AREA WILL BE CLEANED ON DAILY BASIS.

15. REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF GM(M), WHICH WILL BE ESSENTIALLY REQUIRED TO MAKE THE ACCESS TO THE AREA OF WORK AND THEN RE- FIXING THESE AFTER THE COMPLETION OF JOB FREE OF COST.

16. ANY WORK NOT INDICATED ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF REPLACEMENT/REPAIR WORK OF EXPANSION BELLOWS OF FLUE GAS DUCTS SHOULD BE CLAIMED TO BE INCLUDED IN THE SCOPE OF WORK.

B. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

C. OTHER SPECIFIC TERMS & CONDITIONS

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF D.G.M (BOILER) OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. THE WORK WILL BE CARRIED IN A SPECIFIED TIME GIVEN UNDER THE HEADING OF "COMPLETION PERIOD" WITH FULL STRENGTH OF HIGHLY SKILLED, EXPERIENCED AND QUALIFIED WORKERS UP TO THE ENTIRE SATISFACTION OF KESC ENGINEERS.

3. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING AS WELL AS MATERIAL HANDLING EQUIPMENTS AND SCAFFOLDING ETC. WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL MATERIAL RELATED TO INSULATION& CLADDING WILL BE THE RESPONSIBILITY OF KE.

5. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY KE FREE OF COST. TO USE ELECTRICITY, WATER, AIR, THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, PIPES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

6. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

7. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

8. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

9. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

10. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS. NO COMPENSATION WILL BE PAID BY KE IN CASE OF FAILURE.

11. PROPER PPES AND SAFE WORKING PROCEDURES ARE COMPLETE RESPONSIBILITY OF THE CONTRACTORS.

12. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

13. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

14. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

15. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

16. MOBILIZATION PERIOD MUST NOT EXCEED 48 HRS. AS INSTRUCTED BY G.M. (MAINTENANCE)

17. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

18. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

19. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

20. OBTAINING THE SECURITY PERMISSION FROM KE SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

21. CREDENTIAL OF WELDERS, FABRICATORS, RIGGERS AND OTHER WORKERS WILL BE VETTED BY KE ENGINEER.

22. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

23. QUALIFIED SAFETY SUPERVISOR WILL BE THE RESPONSIBILITY OF VENDOR, IF WORK WILL BE CARRIED OUT ROUND THE CLOCK, SO IT IS MANDATORY THE DEPUTATION OF SEPARATE SAFETY SUPERVISOR DAY AND NIGHT

D. COMPLETION PERIOD

THE ENTIRE JOB, INCLUDING CLEANING, DISMANTLING, REPAIRING AND ERECTION IS TO BE COMPLETED WITHIN 25 DAYS FOR EACH UNIT. IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME, WORK WILL BE CARRIED OUT IN DAY AND NIGHT SHIFTS ON DAILY BASIS IF REQUIRED; THE WORK SHALL HAVE TO BE CONTINUED ON SUNDAYS & HOLIDAYS AS WELL, WITH THE PERMISSION OF GM (M)/DGM (BOILER).

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10034884

TUBE;SUPERHEATER 10CrMo910 OD:38MM T:4MMNAME:SUPER HEATER TUBE,10CrMo910

SPECIFICATION:OD:38MMTHICKNESS:4MMLENGTH:10 METERMATERIAL:10CrMo910MAKE:EU/USA/JAPAN

600 EA

2 10103276

TUBE; SUPPORT ECO. INLET HEADER U3&4Tube; support Eco. Inlet header U34.

Specification.Tube; support Economizer Inlet header U# 3&4.OD: 21.3 mmThickness: 5 mmDesign pressure: 174 bar.Design Temp: 379 degree centigrade.Length: 7 meter.Material: 15MO3 / ST 35.8 III.

50 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

TUBE;HEATED SAMPLE LINEWITH SPLICING KITItem Code: FTP

HEATED SAMPLE LINE WITH SPLICING KIT

Heated sample line/tube c/w connection accessories.

Specification:

Size : 1/4 inch.Length : 30 metersMaterial : PTFEOperating voltage: 230 Vac

Heated sample line/tube for transportation of sample gas CEMS¼" PTFE heated traced tube along with following accessories.

Junction box with metallic glands IP68, End Boots. 02 sets, Terminationboots 02 sets, RTV sealant 02, RTV-2 Sealant, Heat resis Tape 04 rolls,Connection lugs 08 no, Tube connector 1/4 inch, PTFE/SS Along with nutferrule

Make: THERMON, USA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PROCUREMENT OF CALIBRATION GASES ALONG WITH REGULATOR FOR OXYGEN ANALYZERS AND CEMS BOILER, UNIT 1-6, BPQS-11

PR# 1400024470, FG1305/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

PROCUREMENT OF ECONOMIZER TUBES FOR U#3 FOR BQPS-1

PR# 1400024766, FG1302/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

PROCUREMENT OF HEATED SAMPLE LINE FOR UNIT-5 CEMS PROJECT, BQPS-1PR# 1400024472, FG1304/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

101148191 30 M

1 10114812

KIT; PORTABLE CAL GAS KIT FOR O2 ANALYZE

KIT; PORTABLE CAL GAS KIT FOR O2 ANALYZER

Calibration gas kit portable for Oxygen analysers U1~6.

Kit must include following items :a) GAS COMPOSITION: OXYGEN 0.4%,N2 BALANCE.b) GAS COMPOSITION: OXYGEN 8%,N2 BALANCEc) Cylinder regulator c/w connection accessoriesd) Carrying case.Quantity: THREE complete kits.Shelf life: 60 monthsMake : UK/USA/Europe

Note: Cylinder test and gas certificates will be required.

3 EA

2 20001900

GAS; O2 15% C/W CYL & REGULATOR CEMS12

GAS;O2 15% C/W CYL & REGULATOR CEMS12

SPAN CALIBRATION GAS,OXYGEN 15% C/W CULINDER & REGULATOR FOR CEMS12GAS COMPOSITION: OXYGEN 15%,N2 BALANCECYLINDER SPECIFITION:FILL PRESSURE: 150BARVOLUME MIN: 1.5m3CYLINDER SIZE: 10 LITER STEELSHELF LIFE: 60 MONTHSCOO:UK/USA OR EQUIVALENTREGULATOR SPECIFICATION:Description: High Pressure regulator for Oxygen analyser’s calibrationcylinders.Inlet pressure: 300 BarOutlet pressure:0 to 100 psiMaterial: 316 SSSuitable for : Oxygen Gas,SO2,NO & N2Make: TescomCountry: GermanyNote: Cylinder test and gas certificates will be required.

1 EA

3 20001901

GAS; NO,SO2 C/W CYL & REGULATOR CEMS12GAS; NO,SO2 C/W CYL & REGULATOR CEMS12

SPAN CALIBRATION GAS,SULFUR DI OXIDE & NITROGEN OXIDE C/W CYLINDER &REGULATOR FOR CEMS12GAS COMPOSITION:NO =3000ppmSO2 =5000ppmN2 =BALANCE

CYLINDER SPECIFITION:FILL PRESSURE: 150BARVOLUME MIN: 1.5m3CYLINDER SIZE: 10 LITER STEELSHELF LIFE: 60 MONTHSCOO:UK/USA/EROUPE OR EQUIVALENTREGULATOR SPECIFICATION:Description: High Pressure regulator for Oxygen analyser’s calibrationcylinders.Inlet pressure: 300 BarOutlet pressure:0 to 100 psiMaterial: 316 SSSuitable for : Oxygen Gas,SO2,NO & N2Make: TescomCountry: Germany

1 EA

4 20001902

GAS;N2 99.999% C/W CYLINDER & REGULATORGAS;N2 99.999% C/W CYLINDER & REGULATOR

ZERO CALIBRATION GAS,NITROGEN N2 C/W CULINDER & REGULATOR FOR CEMS12

GAS COMPOSITION: N2:99.999%CYLINDER SPECIFITION:FILL PRESSURE: 150BARVOLUME MIN: 1.5m3CYLINDER SIZE: 10 LITER STEELSHELF LIFE: 60 MONTHSCOO:UK/USA /EROUPE OR EQUIVALENTREGULATOR SPECIFICATION:Description: High Pressure regulator for Oxygen analyser’s calibrationcylinders.Inlet pressure: 300 BarOutlet pressure:0 to 100 psiMaterial: 316 SSSuitable for : Oxygen Gas,SO2,NO & N2Make: TescomCountry: GermanyNote: Cylinder test and gas certificates will be required.

1 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10001890ELECTRODES; WELDING, LB 26, SIZE 2.6MMMAKE: KOBE STEEL JAPAN 1,000 KG

2 10009000

ELECTRODE; WELDING L B 26 SIZE 3.2MMNAME: WELDING ELECTRODE LB 26SIZE: 3.2MMAWS#: E7016MAKE: KOBE STEEL LTD, JAPAN

250 KG

3 10110674FILLER WIRE; G -65 FOR ARGON FILLER WIRE G -65 FOR ARGON WELDING SIZE: 2.4MM AWS CODE ER70S-2 500 KG

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10035111

ROTOR; POWER (HFO FIRING PUMP) U#1Power Rotor for HFO boiler pump of U#1Pump Type: GH-R4B-485Pump Capacity: 31.5 t/hPump Discharge Pressure: 35.0 bar gRotor material: Carbon steel S45CRotor part # in drawing: 101Pump Drawing #: GHSO 26751Make: Kosaka Laboratory Ltd, Tokyo, Japan

3 EA

PR# 1400024474, FG1303/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

PROCUREMENT OF WELDING ELECTRODES FOR WORKSHOP & SERVICES, BQPS-1PR# 1400024403, FG1306/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

PROCUREMENT OF HFO BOILER PUMP SPARES FOR UNIT 1-2, BQPS-1 (LLI)

2 10035112

ROTOR; IDLER ROTOR (HFO FIRING PUMP) U#1Idler Rotor for HFO boiler pump of U#1Pump Type: GH-R4B-485Pump Capacity: 31.5 t/hPump Discharge Pressure: 35.0 bar gRotor material: S.G Casting FCD55Rotor part # in drawing: 121Pump Drawing #: GHSO 26751Make: Kosaka Laboratory Ltd, Tokyo, Japan

6 EA

3 10035113

SLEEVE; P. NO. 201 (HFO FIRING PUMP) U#1Sleeve for HFO boiler pump of U#1 with O-ringPump Type: GH-R4B-485Pump Capacity: 31.5 t/hPump Discharge Pressure: 35.0 bar gSleeve material: Cast iron FC20Sleeve part # in drawing: 201Pump Drawing #: GHSO 26751Make: Kosaka Laboratory Ltd, Tokyo, Japan

3 EA

4 10114678

COVER; REAR HFO BLR P/P U#12 (P#004)Rear cover for HFO boiler pump of U#1/2Pump Type: GH-R4B-485Pump Capacity: 31.5 t/hPump Discharge Pressure: 35.0 bar gRear cover material: Rolled steel SS41Rear cover part # in drawing: 004Pump Drawing #: GHSO26751Make: Kosaka Laboratory Ltd, Tokyo, Japan

3 EA

5 10114679

COVER; CASING HFO BLR P/P U#12 (P#002)Casing cover for HFO boiler pump of U#1/2Pump Type: GH-R4B-485Pump Capacity: 31.5 t/hPump Discharge Pressure: 35.0 bar gCasing cover material: Rolled steel SS41Casing cover part # in drawing: 002Pump Drawing #: GHSO26751Make: Kosaka Laboratory Ltd, Tokyo, Japan

3 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PROCUREMENT OF HFO BOILER PUMP RELIEF VALVE WITH SPARES FOR UNIT 1,2,5 & 6, BQPS-1 (LLI)PR# 1400024392, FG1307/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

1 10086445

VALVE; RELIEF FOR HFO BOILER PUMPVALVE; RELIEF FOR HFO BOILER PUMP

Specifications:Order : P3-31882Type : RV55-80DCapacity (Nomi) : 31.5 t/hr.R.V Set Pressure : 37 bar (g)Full Open Pressure (max) : 41 bar (g)Return Pressure (min) : 35 bar (g)Hydro Test Pressure: 62 bar (g)

Drawing # : ZDS 031882Make : Kosaka Laboratory Ltd Tokyo Japan.

2 EA

2 10114680

SPRING; HFO RELIEF VALVE, U#1/2 P#707 Spring for HFO boiler pump relief valve, U#1/2Drawing #: ZD0414Part#: 707Material: Spring steel SUP6Make: Kosaka LaboratoryLtd., Tokyo, Japan

3 EA

3 10114681

VALVE; HFO RELIEF VALVE P#704 U#1/2 Valve for HFO boiler pump relief valve, U#1/2Drawing #: ZD0414Part#: 704Material: Carbon steel S45CMake: Kosaka LaboratoryLtd., Tokyo, Japan

3 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10031087

WALL; REAR, TYPE:SE-ER-8ENAME; REAR WALLTYPE: SE-ER-8E MAKE: ABB ALSTOM (FORMERLY TECNOMASIO ITALIANO BROWN BOVERI) ITALY

12 EA

2 10031077

LINK; FLEXIBLE W/MOVING CONTACT, 70 MM 2NAME: FLEXIBLE LINK WITH MOVING CONTACTSIZE: 16E & 24E, (SIZE: 70MM2)MAKE: ABB ALSTOM (FORMERLY TECNOMASIO ITALIANO BROWN BOVERI) ITALY

36 EA

PROCUREMENT OF 0.4KV SWITCHGEAR SPARES FOR UNIT 03, BQPS-1PR# 1400024073, FG1309/BQ1, Tender Cost Rs. 2000/- To Be Opened on 22.08.2019

Payment Term: Delivery Period:Validation: 120 DaysIncoterm: Ex-works/ FOB / CFR Karachi / FOR Plant SiteQUOTATION WILL NOT BE ACCEPTED AFTER THE GIVEN DEADLINE DATE

Tender document containing detailed scope of work, terms and conditions may be obtained on payment of tender fee (non-refundable) from theundersigned.KE reserves the right to reject any or all the bids and to annul the bidding process at any time without thereby incurring anyliability to the affected bidder(s) or any obligation to inform the affected bidder(s).

[email protected] Floor, Procurement Division (Support Building), Block-J,

www.ke.com.pk

Note:− Quote with the reference of the RFQ serial number and men on specs accordingly− Detailed relevant Technical literature (English) must be submi ed with bid.− Quote original make & origin of all above items.− Incomplete quota ons shall not be considered for technical evalua on.− Vendors interested to par cipate in the aforesaid tender may obtain RFQ by purchasing the tender document from 1st Floor, Procurement Division (Support Building), Block-J, Elander Road (Power House) Complex, Karachi, Pakistan

General Manager (Procurement Supply Chain)