SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 10036111 PIPE; 1/2"X6M SCHEDULE 80 MAT. A-106-B NAME: PIPE SIZE: 1/2" LENGTH: 6 METER MATERIAL: A-106-B SCHEDULE: 80 MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD. 15 EA 2 10036107 PIPE; 2"X6M SCHEDULE 80 MAT. A-106-B NAME: PIPE SIZE: 2" LENGTH: 6 METER MATERIAL: A-106-B SCHEDULE: 80 MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD. 9 EA 3 10036106 PIPE; 3"X6M SCHEDULE 80 MAT. A-106-B NAME: PIPE SIZE: 3" LENGTH: 6 METER MATERIAL: A-106-B SCHEDULE: 80 MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD. 11 EA 4 10036102 PIPE; 8"X6M SCHEDULE 80 MAT. A-106-B NAME: PIPE SIZE: 8" LENGTH: 6 METER MATERIAL: A-106-B SCHEDULE: 80 3 EA 5 10025545 BEND; SEAMLESS CARBON STEEL, 1" NAME:SEAMLESS CARBON STEEL BEND SIZE:1",90DEGREE SCHEDULE: 40, END CONNECTION:SOCKET WELDED MATERIAL: SEAMLESS CARBON STEEL/ASTM-105. MAKE: HUFAZZ SEAMLESS PIPE INDUSTRIES LTD. 20 EA 6 10025555 BEND; SEAMLESS CARBON STEEL, 1-1/2" NAME:SEAMLESS CARBON STEEL BEND SIZE: 1-1/2" DEGREE:90 SCHEDULE: 40 MATERIAL: A 106-B MAKE:HUFAZZ SEAMLESS PIPE INDUSTRIES LTD. 20 EA TENDER NOTICE K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below; Collection of Tenders as follows : Monday - 09:00 AM to 03:00 PM Friday - 09:00 AM to 02:00 PM PROCUREMENT OF CARBON STEEL PIPES & FITTINGS FOR U 1-6, BQPS-1 PR# 1400022082, FG1103/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

Upload: others

Post on 24-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10036111

PIPE; 1/2"X6M SCHEDULE 80 MAT. A-106-BNAME: PIPESIZE: 1/2"LENGTH: 6 METERMATERIAL: A-106-BSCHEDULE: 80MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD.

15 EA

2 10036107

PIPE; 2"X6M SCHEDULE 80 MAT. A-106-BNAME: PIPESIZE: 2"LENGTH: 6 METERMATERIAL: A-106-BSCHEDULE: 80MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD.

9 EA

3 10036106

PIPE; 3"X6M SCHEDULE 80 MAT. A-106-BNAME: PIPESIZE: 3"LENGTH: 6 METERMATERIAL: A-106-BSCHEDULE: 80MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD.

11 EA

4 10036102

PIPE; 8"X6M SCHEDULE 80 MAT. A-106-BNAME: PIPESIZE: 8"LENGTH: 6 METERMATERIAL: A-106-BSCHEDULE: 80

3 EA

5 10025545

BEND; SEAMLESS CARBON STEEL, 1"NAME:SEAMLESS CARBON STEEL BENDSIZE:1",90DEGREESCHEDULE: 40,END CONNECTION:SOCKET WELDEDMATERIAL: SEAMLESS CARBON STEEL/ASTM-105.MAKE: HUFAZZ SEAMLESS PIPE INDUSTRIES LTD.

20 EA

6 10025555

BEND; SEAMLESS CARBON STEEL, 1-1/2"NAME:SEAMLESS CARBON STEEL BENDSIZE: 1-1/2"DEGREE:90SCHEDULE: 40MATERIAL: A 106-BMAKE:HUFAZZ SEAMLESS PIPE INDUSTRIES LTD.

20 EA

TENDER NOTICE

K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below;

Collection of Tenders as follows :

Monday - 09:00 AM to 03:00 PMFriday - 09:00 AM to 02:00 PM

PROCUREMENT OF CARBON STEEL PIPES & FITTINGS FOR U 1-6, BQPS-1PR# 1400022082, FG1103/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

7 10025554

BEND; SEAMLESS CARBON STEEL, 1-1/4"NAME:SEAMLESS CARBON STEEL BENDSIZE: 1-1/4"DEGREE:90SCHEDULE: 40MATERIAL: SEAMLESS CARBON STEEL, ASTM A 105MAKE:HUFAZZ SEAMLESS PIPE INDUSTRIES LTD.

20 EA

8 10025556

BEND; SEAMLESS CARBON STEEL, 2"NAME: SEAMLESS CARBON STEEL BENDSIZE: 2" 90 DEGREESCHEDULE: 40,SOCKET TYPEMATERIAL: SEAMLESS CARBON STEEL/ASTM-105.MAKE:HUFAZZ SEAMLESS PIPE INDUSTRIES LTD.

20 EA

9 10025557

BEND; SEAMLESS CARBON STEEL, 2-1/2"NAME: SEAMLESS CARBON STEEL BENDSIZE: 2-1/2" 90 DEGREESCHEDULE: 40MATERIAL: A 106-BMAKE:HUFAZZ SEAMLESS PIPE INDUSTRIES LTD.

12 EA

10 10025558

BEND; SEAMLESS CARBON STEEL, 5"NAME: SEAMLESS CARBON STEEL BENDSIZE: 5"DEGREE:90SCHEDULE:40MATERIAL:A 106-BMAKE:HUFAZZ SEAMLESS PIPE INDUSTRIES LTD.

15 EA

11 10025560

TEE; SEAMLESS CARBON STEEL, 1"NAME: SEAMLESS CARBON STEEL TEESIZE: 1"SCHEDULE: 40,SOCKET TYPEMATERIAL: SEAMLESS CARBON STEEL/ASTM-105.MAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD. PAKISTAN

10 EA

12 10025563

TEE; SEAMLESS CARBON STEEL, 4"NAME: SEAMLESS CARBON STEEL TEESIZE: 4"MATERIAL: A106-BMAKE: HUFFAZ SEAMLESS PIPE INDUSTRIES LTD. PAKISTAN

5 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10025852

COMPRESSOR; MODEL 06DA5372BA0601COMPRESSOR MODEL 06DA5372BA0601

Capacity: 10 tonRefrigerant: R-22Volts: 400VPhase: 03Frequency: 50 HzMake: Carlyle, USA

6 EA

2 10104400

COMPRESSOR; SEMI HARMETIC DISCUS, U#6 NAME:SEMI HERMETIC DISCUS COMPRESSOR, ECB U#6 SPECIFICATION: COMPRESSOR MODEL:4DA3-2000-TSK-235 WITH SENTRONIC FOR OIL PRESSURESENSING SYSTEM NOMINAL HP:20 REFRIGERENT:R-22 PHASE:3 VOLAGE:380-400V FREQUENCY:50HZ LRA:154 MAKE: COPELAND, USA

4 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PROCUREMENT OF SEMI HERMETIC COMPRESSORS FOR HVAC SYSTEM, UNIT 01-06, BQPS IPR# 1400021910, FG1102/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

PROCUREMENT OF GRINDER / TIRES / TROLLEY WHEELS FOR WORKSHOP & SERVICES, BQPS-1PR# 1400021679, FG1101/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

1 10108427

WHEEL; TROLLEY W/SWIVEL BRAKE, SIZE 6" Trolley Wheel Top plate Swivel brake, Unit # 01-06, BQPS1. SPECIFICATION: Material & Type: Stainless Steel top plate swivel andCastor Nylon Wheel, Size: 6 Inch, Make: USA/UK/JAPAN/EU/CHINA

14 EA

2 10108429

WHEEL; TROLLEY FIXED PLATE, SIZE 6" Trolley Wheel Top plate fixed, Unit # 01-06, BQPS1. SPECIFICATION: Material & Type: Stainless Steel top plate fixed and CastorNylon Wheel, Size: 6 Inch, Make: USA/UK/JAPAN/EU/CHINA

14 EA

3 10108428

WHEEL; TROLLEY W/SWIVEL BRAKE, SIZE 8" Trolley Wheel Top plate Swivel brake, Unit # 01-06, BQPS1. SPECIFICATION: Material & Type: Stainless Steel top plate swivel andCastor Nylon Wheel, Size: 8 Inch, Make: USA/UK/JAPAN/EU/CHINA

14 EA

4 10108430

WHEEL; TROLLEY FIXED PLATE, SIZE 8" Trolley Wheel Top plate fixed, Unit # 01-06, BQPS1. SPECIFICATION: Material & Type: Stainless Steel top plate fixed and CastorNylon Wheel, Size: 8 Inch, Make: USA/UK/JAPAN/EU/CHINA

14 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10109244

PUMP; TROLLEY MOUNTED WITH MOTOR & PIPESNAME: TROLLEY MOUNTED WATER PUMP WITH MOTOR, STARTER SYSTEM, ON OFFSWITCH AND ALONG WITH PIPES.

MODEL : JSL/3SUCTION: 3 INCHDISCHARGE: 2 1/2SUCTION PIPE: 10 MDISCHARGE PIPE: 50 M.MAKE: JAWED PUMPS.

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10110808

GAUGE; HFO DAY TANK TEMPERATUREHFO DAY TANK TEMPERATURE GAUGERANGE: 0 - 100 DEG CELSIUSDIAL SIZE: 160 MMENVIRONMENTAL RATING: IP54ENRTY: STEM BACK,BULB DIMENSIONS: 1420 X 6 MMBULB MATERIAL: SS316LCONN TYPE: 1/2" NPT FEMALE UNION TYPEWITH BACK FITTING AND ADJUSTABLE ANGLE CONNECTION

MAKE: HYODA, JAPAN OR EQUIVALENT

4 EA

2 10110855

TRANSDUCER; ULTRASONIC FLOW METER, DMTFBSENSOR FOR DMTFB SERIES CLAMP ON ULTRASONIC FLOW METERMODEL : DB-L-N-N-M-DN1800-20MSENSOR SIZE : 1000mm ~ 4500mmMAX TEMPERATURE : -40 to +121°CSUPPLIED WITHi - COUPLANT FOR EACH TRANSDUCERii- 20 METER CABLE FOR EACH TRANSDUCERiii-BRACKETS FOR MOUNTINGiv -STEEL STRAPS FOR EACH TRANSDUCER

MAKE: DYNAFLOX, CHINA

4 PAA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PROCUREMENT OF PUMP FOR BQPS-1PR# 1400021728, FG1100/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

PROCUREMENT OF PROTECTION RELAYS FOR UNIT 03, BQPS-1PR# 1400021862, FG1094/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

PROCUREMENT OF LFIS FOR CW FLOW AND HFO DAY TANK TEMPERATURE MEASUREMENT AT UNITS 3 AND 4, BQPS-1PR# 1400021304, FG1097/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

1 10033867

RELAY; 2PH DEPEND. TIME OVER MICOM P.220NAME; TWO PHASE DEPENDENT TIME OVER RELAYTYPE: MICOM P.220

8 EA

2 10033869 RELAY; PERCENTAGE DIFFERENTIAL (87M) 2 EA

3 10033870RELAY; 3PH DEFINITE TIME U/V MICOM P.922NAME; THREE PHASE DEFINITE TIME UNDER VOLTAGE RELAYTYEP: MICOM P.922

2 EA

4 10033871RELAY; 1PH DEFINITE TIME U/V MICOM P.225NAME; ONE PHASE DEFINITE TIME UNDER VOLTAGE RELAYTYPE: MICOM P.225

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10112153ROLLER; TRACK FOR U3&4 LIFT Roller :Track roller for U3&4 lift

100 EA

2 10112154HOE; DOOR FOR U3&4 LIFT Shoe; Door shoe for U3&4 lift

100 EA

3 10112155LOCK; DOOR FOR U3&4 LIFT Lock: Door lock for U3&4 lift 12 EA

4 10112156DOOR TRACK ROPE FOR U3&4 LIFT Rope: Door track rope for U3&4 lift

24 EA

5 10112157ROLLER; DOOR FOR U3&4 LIFT Roller; Door roller for U3&4 lift

50 EA

6 10112158RUBBER; COUPLING FOR U3&4 LIFT Rubber: Coupling rubber for U3&4 lift

12 EA

7 10112159TUBE; FLOOR FOR U3&4 LIFT Tube: Floor tube for U3&4 Boiler lift

6 EA

8 10112170CARD; MASTER FOR U3&4 LIFT Card: Master card for U3&4 lift

2 EA

9 10112171SENSOR; PHOTO FOR U3&4 LIFT Sensor: Photo sensor for U3&4 lift

4 EA

10 10112172CONTACTOR; 110V FOR U3&4 LIFT Contactor: 110V contactor for lift

6 EA

11 10112173SENSOR; LEVEL FOR U3&4 LIFT Sensor: Level sensor for U3&4 lift

4 EA

12 10112174CONTACT; OUTSIDE DOOR FOR U3&4 LIFT Contacts: Outside door contacts for U3&4 lift

24 EA

13 10112175ARROW; DIGITAL WITH UP/DOWN FORU3&4 LIFT UP/DOWN ARROW: Digital up/down arrow display for U3&4 lift

4 EA

14 10112176BUTTION;CALL PUSH INSIDE/OUTSIDE FORU3&4 Push Buttons: Inside/outside call push button for U3&4 lift

24 EA

PROCUREMENT OF SPARES FOR UNIT 3&4 BOILER LIFTS, BQPS-1PR# 1400021397, FG1099/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

15 10112177RELAY; LIFT AUX 24 VDC FOR U3&4 LIFT Relay: Aux Relay 24V for U3&4 lift

12 EA

16 10112178BRAKE SHOE MAIN MOTOR FOR U3&4 LIFT Shoe: Brake shoe main motor for U3&4 lift

2 EA

17 10112179DOOR LIMIT SWITCH FOR U3&4 BOILER LIFT Limit switch: Door limit switch for U3&4 lift

12 EA

18 10112180LEAD BAR FOR U3&4 BOILER LIFT Bar: Lead bar for U3&4 boiler lift

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10110762

FILTER; MEMBRANE CEMS P# MF1/MT-33-M1 FILTER;MEMBRANE FILTER FOR CEMS SPECIFICATION: G 1/4' MEMBRANE FILTER WITH MOISTURE DETECTOR(CEMS U12) PART # MF1/MT-33-M1 MAKE: ASE Singapore

2 EA

2 10110768

POWER SUPPLY;CEMS ANALYZER P#PSU-4341-03 SUPPLY;POWER SUPPLY FOR CEMS ANALYZER

SPECIFICATION:AC/DC POWER SUPPLY INPUT :100-240V/50-60HZOUTPUT : 24Vdc/2.5APART #PSU-4341-03MAKE : INPOTRONORIGIN :GERMANY

1 EA

3 10110593

CATALYST;CARTRIDGE FOR NOX CONVERTER CATALYST;CARTRIDGE FOR NOX CONVERTER

SPECIFICATION:CATALYZER TUBE FOR NO2 CONVERTER UNIT OF CEMS U12Replacement catalystcartridge ,SS tube 15mm x 240mm PART # NO2C-20TMAKE : ASEORIGIN : Singapore

2 EA

4 10110592

SCRUBBER; SO3 SCRUBBER FOR CEMS12 SCRUBBER;SO3 SCRUBBER FOR CEMS12 SPECIFICATION:

PART # SUN ABS20.03MAKE : SUN-CONTROL Germany

2 EA

5 10110832

BELLOW; FOR SAMPLE PUMP CEMS12 BELLOW; FOR SAMPLE PUMP CEMS12

SPECIFICATION:Bellow with screw for P2.3-pump, Material: PTFE / V2A Part# 4200015 Forpump model # P2.3TEMP(sample gas) : 160 CMake : Buhler ,Germany

1 EA

PROCUREMENT OF SPARES FOR CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) AT BOILER, UNIT 1&2, BQPS-1PR# 1400021226, FG1098/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

6 10110833

VALVE;NRV FOR SAMPLE GAS PUMP CEMS12 VALVE;NRV FOR SAMPLE GAS PUMP CEMS12

SPECIFICATION:Set of valves for 160 °C, (in- and outlet), 2 pcs. Part#4202002For pumpmodel # P2.3Make : Buhler Germany

1 SET

7 10110834

FILTER;PURGE AIR FILTER FOR OPACITY MTR FILTER;PURGE AIR FILTER FOR OPACITY MTR

SPECIFICATION:FOR DUST/OPACITY METER(DURAG)BLOWER PUMPModel # D-BL100-0-3-10-0-0-00

MAKE : DONALDSON ,USA

1 EA

8 10110835

SPIDER;DIAPHRAM FOR SAMPLE PUMP CEMS12 SPIDER;DIAPHRAM FOR SAMPLE PUMP CEMS12

SPECIFICATION:Flexible spider for coupling,Part# 4220011For pump model #P2.3TEMP(sample gas) : 160 CMake : Buhler ,Germany

1 EA

9 10110836

DRYER;NAFION GAS DRYER 1/4"OD FOR CEMS12 DRYER;NAFION GAS DRYER 1/4"OD FOR CEMS12

SPECIFICATION:1/4" OD NAFION GAS DRYER FOR CEMS SAMPLE HANDLING SYSTEM.LENGTH :144"INCH.PFA SHELL,PVDF FITTINGS. PART#MD-110-144F-RMAKE : PERMA PURE ,USA

2 SET

10 10110573

PUMP; SAMPLE GAS PUMP FOR CEMS12PUMP;SAMPLE GAS PUMP FOR CEMS12

SPECIFICATION:MODEL :P2.3SAMPLE GAS PUMP WITH INLINE FILTER/MOITURE TRAPVOLTAGE :220V 50/60HzMAX TEMP(sample gas) : 160 CTEMP AMBIENT :20C ~60CMAKE :BUHLER TECHNOLOGIES.ORIGIN: GERMANY

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT1 Services ANNUAL RUNNING RATE CONTRACT FOR 1 AU

1.1VOLTAGE REGULATION MODULE CARDS FOR 220VDC BATTERY CHARGERS

3 EA

1.2 ALARM MODULE CARDS FOR 220 VDC BATTERY Charges 3 EA

PR# 1300039942, FG1106/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

ANNUAL RUNNING RATE CONTRACT FOR REPAIRING OF ELECTRONIC MODULESAT BQPS-I

1.3VOLTAGE REGULATION MODULE CARDS FOR24 VDC BATTERY CHARGERS

3 EA

1.4 ALARM MODULE CARDS FOR 24 VDC BATTERY CHARGERS 3 EA

1.5DC/DC CONVERTER MODULES FOR UNITGENERATOR PROTECTION AND DEG PROTECTION PANELS

4 EA

1.6DC/DC CONVERTER MODULES FOR OVER HEADGENERATOR PROTECTION AND DEG PROTECTION PANELS

2 EA

1.7POWER SUPPLY MODULES FOR DEG CONTROLTRANSMISSION LINE PANELS

2 EA

1.8ANNUNCIATION ALARM MODULE OF EXCITATIONSYSTEM U#3

2 EA

1.9 AUTO CHANGE OVER DEVICE POWER SUPPLY MODULE 3 EA1.1 GENERATOR UNDER VOLTAGE RELAY MODULE Unit 1&2 2 EA

1.11 OVER CURRENT MODULE OF HYDROGEN PLANT 1 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITHIRING SERVICES FOR INSTALLATION, 1 AU

TESTING AND COMMISSIONING OF 220 VDC/ 48 VDC / + 24 VDC BATTERY CHARGERS FOR U#1 AT BQPS-1

BEFORE BIDDING,EACH BIDDER SITE VISIT AT BQPS-1,PLANT IS PREFERABLE TO UNDERSTAND COMPLETE WORK SCOPE THAT INCLUDES BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES:

SCOPE OF WORK

1.COMPLETE DISMANTLING AND REMOVAL OF POWER AND CONTROL WIRING WITH PROPER TAGGING OF EXISTING 220 VDC , 48 VDC AND ± 24 VDC BATTERY CHARGES.2.COMPLETE DISMANTLING AND REMOVAL OF EXISTING 220 VDC, 48 VDC AND ± 24 VDC BATTERY CHARGERS AND SHIFTING OF LEFT OVER MATERIAL TO DESIGNATED SCRAPE-YARD.3.SHIFTING OF NEW 220 VDC, 48 VDC AND ± VDC BATTERY CHARGES FROM STORE TO SWITCHGEAR ROOM.4.FIXING AND INSTALLATION OF NEW 220 VDC, 48 VDC AND ± 24 VDC BATTERY CHARGES ON METALLIC BASE.5.ANY MODIFICATION FOR CIVIL WORK REQUIRED FOR THE INSTALLATION OF NEW PANELS, IS COMPLETE RESPONSIBILITY OF BIDDER IN ALL RESPECT.

6.RE-CONNECTIONS OF POWER AND CONTROL CABLES WITH PROPER TAGGING AND CABLE MARKING.7.THE TOOLS AND TESTING EQUIPMENT REQUIRED FOR THE JOB MUST BE IN GOOD CONDITION. CONDITION AND HEALTH WILL BE CHECKED BY KE ENGINEERS OR BY THEIR AUTHORIZED REPRESENTATIVE AT SITE.8.ALL ELECTRICAL TESTING EQUIPMENT MUST BE CALIBRATED THEIR CALIBRATION CERTIFICATES IN ORIGINAL MUST BE ACCOMPANIED BY EACH EQUIPMENT. CALIBRATION CERTIFICATES WILL BE VERIFIED BY KE ENGINEERS.9.ALL LABORERS, LIFTING EQUIPMENT & TOOLS AND RIGGERS REQUIRED TO EXECUTE THE JOB MUST BE ARRANGED BY BIDDER FROM HIS RESOURCES.

HIRING SERVICES FOR INSTALLATION, TESTING AND COMMISSIONING OF 220 VDC/ 48 VDC / + 24 VDC BATTERY CHARGERS FOR U#1 AT BQPS-1PR# 1300039822, FG1107/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

1 Job

10.ALL LABORERS, AND TECHNICIANS PROVIDED BY BIDDER FOR THIS JOB, MUST BE SKILLED AND WELL CONVERSANT TO HANDLE THIS HOB.11.ALL MATERIAL LIKE CABLE LUGS, CABLE TIES, NUTS & BOLTS WASHERS AND OTHER NECESSARY MATERIAL MUST BE ARRANGED BY THE BIDDER WITHOUT ANY EXTRA CHARGE TO KE. THE QUALITY OF THAT REQUIRED MATERIAL FIRST BE APPROVED BY KE ENGINEERS OR BY THEIR AUTHORIZED REPRESENTATIVE, AT JOB SITE BEFORE APPLYING THEM.12.THE BIDDER MUST ENSURE COMPLETE SAFETY PROCEDURES AT WORK AS PER KE SAFETY POLICY.13.DAILY HOUSEKEEPING AT THE END OF THE DAY AFTER WORK FINISH FOR THAT DAY, MUST BE ENSURED BY THE BIDDER'S STAFF, BEFORE LEAVING JOB PLACE, DURING WHOLE PERIOD OF JOB.

14.AFTER SUCCESSFUL INSTALLATION, TESTING AND COMMISSIONING OF PANELS WILL BE PERFORMED AS PER MANUFACTURE'S INSTRUCTION/GUIDELINE, KEEPING ALL RELEVANT IEC STANDARD PROTOCOLS. FOR COMMISSIONING, A WELL EXPERIENCED COMMISSIONING ENGINEER MUST BE DEPUTED BY BIDDER AT SITE.15.BEFORE HAND-OVER PANELS FINALLY TO KE AUTHORITIES, THE DEFICIENCIES/PUNCH LIST ITEMS RAISED BY KE ENGINEERS MUST BE COMPLETED BY BIDDER.16.ALL OTHER ISSUES, EXCEPT ABOVE IF RAISED DURING EXECUTION OF JOB REGARDING ANY MATTER, MUST BE SETTLED/RESOLVED WITH MUTUAL UNDERSTANDING IN VERY GOOD POSITIVE ENVIRONMENT BY BIDDER AND KE PLANT AUTHORITIES. IT SHOULD NOT BE DISPUTED FOR A LONG PERIOD OF TIME, SO AS TO PACE OF WORK SHOULD NOT HALT

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITCONTRACTOR SERVICES FOR MAINTENANCE OF 1 AU

MAINTENANCE OF CRANE/HOIST&GONDOLACRANES, HOIST AND GONDOLA AS PER REQUIREMENT

SCOPE OF WORKTHE CONTRACTOR WILL PROVIDE 12 MONTH REGULAR PREVENTIVE AND CORRECTIVE PREVENTIVE MAINTENANCE / OVERHAULING AS PER PLAN / SCHEDULE TO ENSURE SMOOTH AND SAFE OPERATION OF SUBJECT EQUIPMENT THROUGHOUT THE YEAR IN CASE OF EMERGENCY, AFTER NORMAL WORKING HOURS AND HOLIDAYS, TECHNICIANS WILL BE CALLED BACK AND SHOULD REACH THE STATION THREE HOURS. DURING SHUTDOWNS, TECHNICIANS WILL HAVE TO OVERSTAY AS WELL AS WILL BE AVAILABLE ON SUNDAYS / HOLIDAYS. FROM NOV. TO MARCH, TEAM WILL ALSO BE REQUIRED TO OVER STAY TILL MORNING.

THE WORK REQUIRED FROM CONTRACTOR BUT NOT LIMITED TO THE FOLLOWING:1.MAINTENANCE OF MECHANICAL, ELECTRICAL AND HYDRAULIC SYSTEM.2.MAINTENANCE OF MOTORS, CONTROL RELAYS, CONTRACTORS, BREAKER, LIMIT SWITCHES AND PENDENT BOX.3.MAINTENANCE OF WIRE ROPE, DRUM AND HOOK.4.MAINTENANCE OF SAFETY INTERLOCKING.5.MAINTENANCE OF ELECTRICAL CABLE CARRIAGE SYSTEM (CABLE, CABLE HANGERS, BUS BAR FEEDER TROLLEYS, BUS-BAR ETC.)6.MAINTENANCE OF GEAR BOXES AND OVERHAULING IF REQUIRED.7.OVERHAUL OF ANY MECHANICAL EQUIPMENT IF REQUIRED.8.REMOVAL OF ANY ELECTRICAL / MECHANICAL FAULTS IF OBSERVED.9.CHECKING AND MAINTAIN LUBRICATION SYSTEM OF ALL THE COMPONENTS.

10.MAINTENANCE AND SERVICING OF ELECTRICAL CABLE CARRIAGE SYSTEM (CABLE, CABLE HANGERS, BUS BAR FEEDER TROLLEYS, BUS-BAR ETC.), PENDENT, LOCKOUT SWITCHES, BREAKS, SAFETY INTERLOCKING, ELECTRICAL CONTROL PANEL INCLUDING CONTACTORS, RELAYS, CBS, SWITCHES ETC. MOTOR SERVICING AND BEARING REPLACEMENT.11.DURING MAINTENANCE CONTRACTOR WILL REPLACE THE DEFECTIVE PARTS WITH NEW ONE PROVIDED BY STORE. IN CASE SPARE IS NOT AVAILABLE AT THE STATION, CONTRACTOR WILL ARRANGE IT WITH PRIOR APPROVAL FROM STATION AUTHORITY.12.ANY MAINTENANCE / FIXING WORK OF SUBJECT EQUIPMENT WHICH IS NECESSARY FOR THE EQUIPMENT LIFE WILL BE TREATED AS PART OF WORK SCOPE.

CONTRACTOR SERVICES FOR MAINTENANCE OF CRANES, HOIST & GONDOLA AS PER REQUIREMENT.PR# 1300039826, FG1105/BQ1, Tender Cost Rs. 2000/- To Be Opened on 04.02.2019

12 AU1.1

13.TO COVER ALL ROUTINE PMS OF 0/H CRANES AND HOISTS & GONDOLA; VENDOR MUST VISIT ON MONTHLY BASIS TO PERFORM ALL THE PREVENTIVE MAINTENANCE JOB AND INTIMATE FOR ANY REQUIRED SPARES PRIOR TO ANY PLANNED OR UNPLANNED ACTIVITY.14.TO COVER OUTAGE RELATED JOBS, VENDOR MUST VISIT THREE TIMES IN A MONTH TO GIVE COVERAGE AND SUPPORT FOR PLANTS PLANNED OR UNPLANNED SHUTDOWN ON EMERGENCY CALL IN BASIS.15.ARRANGEMENT FOR CONSUMABLE AND SPARES OF REVEX NATURE ALONG WITH ALL THE PPES AND OTHER SAFETY RELATED EQUIPMENT WILL BE THE VENDOR'S RESPONSIBILITY.16.ARRANGEMENT OF CAPEX NATURE SPARES WILL BE CLIENT'S RESPONSIBILITY BUT THEIR REQUIREMENT AND NEED FOR MAINTENANCE WILL BE INTIMATED EARLIER BY THE VENDOR.

GENERAL TERMS & CONDITIONS1.CONTRACTOR WILL MAINTAIN SERVICE CARD / HISTORY CARD FOR EACH CRANE/HOIST/GONDOLA TO BE SIGNED ON EACH AND EVERY INSPECTION BY AUTHORIZED BQ-1 REPRESENTATIVE AT THE STATION. ALSO WILL SUBMIT MONTHLY REPORT.2.DURING MAINTENANCE CONTRACTOR WILL REPLACE THE DEFECTIVE PARTS WITH NEW ONE PROVIDED BY STORE. IN CASE SPARE IS NOT AVAILABLE AT THE STATION, CONTRACTOR WILL ARRANGE IT WITH PRIOR APPROVAL FROM STATION AUTHORITY.3.MANPOWER REQUIREMENT: FOR NORMAL WORKING HOURS, 02 GROUPS WILL WORK, EACH COMPRISING OF TWO TECHNICIANS (ELECTRICAL, MECHANICAL) AND TWO HELPERS.4.PAYMENT WILL BE DONE AS PER ACTUAL.5.CONTRACTOR WILL COMPLY WITH THE SCOPE OF WORK / TERMS CONDITIONS.6.CONTRACTOR WILL COMPLY WITH THE SAFETY RULES

EMERGENCY MAINTENANCE STAFF

REQUIREMENT DURING OUTAGE (EVENING TO MORNING & HOLIDAYS)

SCOPE OF WORKQTY:2TOTAL DAYS:60TOTAL HOURS FOR 60 DAYS=60X32=1920 HRSCRANES, HOIST & GONDOLA AS PER REQUIREMENTTHE CONTRACTOR WILL PROVIDE 12 MONTH REGULAR PREVENTIVE AND CORRECTIVE PREVENTIVE MAINTENANCE / OVERHAULING AS PER PLAN / SCHEDULE TO ENSURE SMOOTH AND SAFE OPERATION OF SUBJECT EQUIPMENT THROUGHOUT THE YEAR IN CASE OF EMERGENCY, AFTER NORMAL WORKING HOURS AND HOLIDAYS, TECHNICIANS WILL BE CALLED BACK AND SHOULD REACH THE STATION THREE HOURS. DURING SHUTDOWNS, TECHNICIANS WILL HAVE TO OVERSTAY AS WELL AS WILL BE AVAILABLE ON SUNDAYS / HOLIDAYS. FROM NOV. TO MARCH, TEAM WILL ALSO BE REQUIRED TO OVER STAY TILL MORNING.

THE WORK REQUIRED FROM CONTRACTOR BUT NOT LIMITED TO THE FOLLOWING:17.MAINTENANCE OF MECHANICAL, ELECTRICAL AND HYDRAULIC SYSTEM.18.MAINTENANCE OF MOTORS, CONTROL RELAYS, CONTRACTORS, BREAKER, LIMIT SWITCHES AND PENDENT BOX.19.MAINTENANCE OF WIRE ROPE, DRUM AND HOOK.20.MAINTENANCE OF SAFETY INTERLOCKING.21.MAINTENANCE OF ELECTRICAL CABLE CARRIAGE SYSTEM (CABLE, CABLE HANGERS, BUS BAR FEEDER TROLLEYS, BUS-BAR ETC.)22.MAINTENANCE OF GEAR BOXES AND OVERHAULING IF REQUIRED.23.OVERHAUL OF ANY MECHANICAL EQUIPMENT IF REQUIRED.24.REMOVAL OF ANY ELECTRICAL / MECHANICAL FAULTS IF OBSERVED25.CHECKING AND MAINTAIN LUBRICATION SYSTEM OF ALL THE COMPONENTS.

26.MAINTENANCE AND SERVICING OF ELECTRICAL CABLE CARRIAGE SYSTEM (CABLE, CABLE HANGERS, BUS BAR FEEDER TROLLEYS, BUS-BAR ETC.), PENDENT, LOCKOUT SWITCHES, BREAKS, SAFETY INTERLOCKING, ELECTRICAL CONTROL PANEL INCLUDING CONTACTORS, RELAYS, CBS, SWITCHES ETC. MOTOR SERVICING AND BEARING REPLACEMENT.27.DURING MAINTENANCE CONTRACTOR WILL REPLACE THE DEFECTIVE PARTS WITH NEW ONE PROVIDED BY STORE. IN CASE SPARE IS NOT AVAILABLE AT THE STATION, CONTRACTOR WILL ARRANGE IT WITH PRIOR APPROVAL FROM STATION AUTHORITY.28.ANY MAINTENANCE / FIXING WORK OF SUBJECT EQUIPMENT WHICH IS NECESSARY FOR THE EQUIPMENT LIFE WILL BE TREATED AS PART OF WORK SCOPE.29.TO COVER ALL ROUTINE PMS OF 0/H CRANES AND HOISTS & GONDOLA; VENDOR MUST VISIT ON MONTHLY BASIS TO PERFORM ALL THE PREVENTIVE MAINTENANCE JOB AND INTIMATE FOR ANY REQUIRED SPARES PRIOR TO ANY PLANNED OR UNPLANNED ACTIVITY.

30.TO COVER OUTAGE RELATED JOBS, VENDOR MUST VISIT THREE TIMES IN A MONTH TO GIVE COVERAGE AND SUPPORT FOR PLANTS PLANNED OR UNPLANNED SHUTDOWN ON EMERGENCY CALL IN BASIS.31.ARRANGEMENT FOR CONSUMABLE AND SPARES OF REVEX NATURE ALONG WITH ALL THE PPES AND OTHER SAFETY RELATED EQUIPMENT WILL BE THE VENDOR'S RESPONSIBILITY.32.ARRANGEMENT OF CAPEX NATURE SPARES WILL BE CLIENT'S RESPONSIBILITY BUT THEIR REQUIREMENT AND NEED FOR MAINTENANCE WILL BE INTIMATED EARLIER BY THE VENDOR.

GENERAL TERMS & CONDITIONS7.CONTRACTOR WILL MAINTAIN SERVICE CARD / HISTORY CARD FOR EACH CRANE/HOIST/GONDOLA TO BE SIGNED ON EACH AND EVERY INSPECTION BY AUTHORIZED BQ-1 REPRESENTATIVE AT THE STATION. ALSO WILL SUBMIT MONTHLY REPORT.8.DURING MAINTENANCE CONTRACTOR WILL REPLACE THE DEFECTIVE PARTS WITH NEW ONE PROVIDED BY STORE. IN CASE SPARE IS NOT AVAILABLE AT THE STATION, CONTRACTOR WILL ARRANGE IT WITH PRIOR APPROVAL FROM STATION AUTHORITY.9.MANPOWER REQUIREMENT: FOR NORMAL WORKING HOURS, 02 GROUPS WILL WORK, EACH COMPRISING OF TWO TECHNICIANS (ELECTRICAL, MECHANICAL) AND TWO HELPERS.10.PAYMENT WILL BE DONE AS PER ACTUAL.11.CONTRACTOR WILL COMPLY WITH THE SCOPE OF WORK / TERMS CONDITIONS.12.CONTRACTOR WILL COMPLY WITH THE SAFETY RULES.

2.ADDITIONAL AMOUNT CHARGES AS PER ACTUAL DURING THE CONTRACT PERIOD FOR EMERGENCY PURCHASE OF PARTS IF NOT AVAILABLE AT STATION

NOTE:LIST OF ALL CRANES/HOISTS AND GONDOLAS LOCATION WITH CAPACITY MENTIONED BELOW IN ANNEXURE-A. ALL CONSUMABLE I.E. LUBRICANTS, WASTE CLOTH AND KEROSENE OIL SHALL BE PROVIDED BY THE STATION

ANNEXURE - A Name Location CAPACITYHOIST CRANE U#1 FDF # 1-2 7.5 tonHOIST CRANE U#1 GRF-1 10 tonHOIST CRANE U#1 GRF-2 10 tonHOIST CRANE U#1 22M 2 tonHOIST CRANE U#1 43M 6 tonOVERHEAD CRANE DEG BUILDING U#1-2 10 tonHOIST CRANE WT 1-2 3 tonGANTRY CRANE CWP 1-2 30 tonOVERHEAD CRANE CENTRAL W/SHOP 30 ton

1.2 1920 HR

OVERHEAD CRANE STORE 1 30 tonOVERHEAD CRANE UNLODING AREA 5 tonOVERHEAD CRANE TURBINE 1/2/3 AUX 25 tonOVERHEAD CRANE TURBINE 1/2/3 125 tonOVERHEAD CRANE RO PLANT 2 tonHOIST CRANE U#2 FDF # 1-2 7.5 tonHOIST CRANE U#2 GRF 1 10 tonHOIST CRANE U#2 GRF 2 10 tonHOIST CRANE U#2 43 meter 6 tonHOIST CRANE U#3 FDF 1 13 tonHOIST CRANE U#3 FDF 1 - A 10 tonHOIST CRANE U#3 FDF 2 13 tonHOIST CRANE U#3 GRF 1 13 tonHOIST CRANE U#3 GRF 1 8 tonHOIST CRANE U#3 GRF 2 10 tonHOIST CRANE 22 meter U#3 2 tonHOIST CRANE 43 meter U#3 6 ton

OVERHEAD CRANE DIESEL ENGINE BUILDING U#3/4 10 tonOVERHEAD CRANE Compressor Room U # 3 10 tonHOIST CRANE C/P motor U#3 3 tonHOIST CRANE Control Room back side hoist U#3 4 tonHOIST CRANE U#3 -5 M Vacuum Pump 2 tonHOIST CRANE U#3 O/S and C/S hoist -5 meter 2 tonOVERHEAD CRANE SF 6 BUILDING 10 tonHOIST CRANE U#4 FDF 1 hoist crane 13 tonHOIST CRANE U#4 FDF 1 hoist crane 2 11 tonHOIST CRANE U#4 FDF 2 hoist crane 13 tonHOIST CRANE U#4 GRF 1 hoist crane 13 tonHOIST CRANE U#4 GRF 1 hoist crane 2 8 tonHOIST CRANE U#4 GRF 2 hoist crane 13

HOIST CRANE U#4 22 meter hoist crane 2 tonHOIST CRANE U#4 43 meter hoist crane 6 tonOVERHEAD CRANE U#4 Compressor Room no 4 2 tonHOIST CRANE U#4 C/P motor hoist crane 5 tonHOIST CRANE U#4 Control Room back side hoist 4 tonHOIST CRANE U#4 -5 meter hoist vacuum pump 2 tonHOIST CRANE U#4 O/S 1/2hoist -5 meter 2 tonHOIST CRANE U#4 C/S 1/2 hoist -5 meter 2 tonOVERHEAD CRANE TURBINE HALL 4/5/6/ AUX 25 tonOVERHEAD CRANE TURBINE HALL 4/5/6/ 125 tonHOIST CRANE U#5 FDF 1/2 hoist crane 7.5HOIST CRANE U#5 GRF 1 hoist crane 10 tonHOIST CRANE U#5 GRF 2 hoist crane 10 tonHOIST CRANE U#5 22 meter hoist crane 2 tonHOIST CRANE U#5 43 meter hoist crane 6 tonOVERHEAD CRANE U#5 Compressor Room no 5 5 tonOVERHEAD CRANE STORE 2 10 ton

GANTRY CRANE CWP STATION 3 TO 6 30 tonHOIST CRANE U#6 FDF 1-2 hoist crane 7.5 tonHOIST CRANE U#6 FDF 1, 2 & Central 7.5 tonHOIST CRANE U#6 FDF Centre hoist crane 7.5 tonHOIST CRANE U#6 GRF 1 hoist crane 7.5 tonHOIST CRANE U#6 GRF 2 hoist crane 7.5 tonHOIST CRANE U#6 22 meter hoist crane 2 tonHOIST CRANE U#6 43 meter hoist crane 6 tonOVERHEAD CRANE DIESEL ENGINE BUILDING U#5/6 10 tonOVERHEAD CRANE U#6 Compressor Room no 6 5 tonHOIST CRANE U#6 Control Room back side hoist 2 tonHOIST CRANE U#6 -5 meter hoist vacuum pump 1 2 tonHOIST CRANE U#6 -5 meter hoist vacuum pump 2 2 tonHOIST CRANE U#6 O/S 1/2 hoist -5 meter 2 tonHOIST CRANE U#6 C/S 1/2 hoist -5 meter 2 tonHOIST CRANE water treatment 5/6 2 tonHOIST CRANE U#1 -5.5 CP Motor 5 tonHOIST CRANE U#2 -5.5 CP Motor 5 tonHOIST CRANE Chlorine plant 0.5 ton

GONDOLA-1 U#1 to 6 BOILER 400 KGGONDOLA-2 U#1 to 6 BOILER 400 KGGONDOLA-3 U#1 to 6 BOILER 400 KGGONDOLA-1 U#1 to 6 BOILER 200 KG

Payment Term:

[email protected] Floor, Procurement Division (Support Building), Block-J,

Delivery Period:

www.ke.com.pk

Validation: 120 DaysIncoterm: Ex-works/ FOB / CFR Karachi / FOR Plant SiteQUOTATION WILL NOT BE ACCEPTED AFTER THE GIVEN DEADLINE DATE

Tender document containing detailed scope of work, terms and conditions may be obtained on payment of tender fee (non-refundable) from theundersigned.KE reserves the right to reject any or all the bids and to annul the bidding process at any time without thereby incurring anyliability to the affected bidder(s) or any obligation to inform the affected bidder(s).

Note:− Quote with the reference of the RFQ serial number and men on specs accordingly− Detailed relevant Technical literature (English) must be submi ed with bid.− Quote original make & origin of all above items.− Incomplete quota ons shall not be considered for technical evalua on.− Vendors interested to par cipate in the aforesaid tender may obtain RFQ by purchasing the tender document from 1st Floor, Procurement Division (Support Building), Block-J, Elander Road (Power House) Complex, Karachi, Pakistan

General Manager (Procurement Supply Chain)