Technical Assistance Consultant’s Report This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. All the views expressed herein may not be incorporated into the proposed project’s design. Project Number: 41450 February 2012 Preparing the Ban Sok–Pleiku Power Transmission Project in the Greater Mekong Subregion (Financed by the Japan Special Fund) Annex 6.2: Land Acquisition and Resettlement Action Plan in Viet Nam (500 KV Transmission Line and Substation) Prepared by Électricité de France Paris, France For Asian Development Bank

Upload: others

Post on 29-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

Technical Assistance Consultant’s Report

This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. All the views expressed herein may not be incorporated into the proposed project’s design.

Project Number: 41450 February 2012

Preparing the Ban Sok–Pleiku Power Transmission Project in the Greater Mekong Subregion (Financed by the Japan Special Fund) Annex 6.2: Land Acquisition and Resettlement Action Plan in Viet Nam (500 KV Transmission Line and Substation)

Prepared by

Électricité de France

Paris, France

For Asian Development Bank

Page 2: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

Ban-sok Pleiku Project CONTRACT DOCUMENTS – TRANSMISSION LINE Package – VIETNAM

Annex 6.2– TL & S/S LARAP in VIETNAM

FINAL REPORT

500kV TRANSMISSION SYSTEM PROJECT

ANNEX 6.2 – 500kV TRANSMISSION LINE &

SUBSTATION Land Acquisition and Resettlement Action Plan (LARAP)

In VIETNAM

Page 3: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

    

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A)  

  

 

 

 

 

 

 

LLaanndd  AAccqquuiissiittiioonn  aanndd  RReesseettttlleemmeenntt  AAccttiioonn  PPllaann  ((LLAARRAAPP))  

VViieettnnaamm    SSeeccttiioonn::   BBaann   HHaattxxaann    ((BBaann ­­SSookk)) ­­PPlleeiikkuu   550000kkVVAA   DDoouubbllee    CCiirrccuuiitt   TThhrreeee   PPhhaasseedd   TTrraannssmmiissssiioonn   LLiinnee   PPrroojjeecctt ::   110033   kkmm,,   KKoonn   TTuumm   aanndd   GGiiaa   LLaaii   PPrroovviinnccee..   

 

As Part of ADB TA No. 6481‐REG: Ban Hatxan (BanSok) LaoPDR to Pleiku Vietnam, 500kVA Transmission Line and Substation Construction Feasibility Study.  

 

Draft:  August 2011 

 

Prepared by the Consultant Electricite du France, PECC4 and Earth Systems, on Behalf of Electricite du Vietnam (EVN) and for the Asian Development Bank (ADB). 

 

The  views  expressed  in  this  LARAP  do  not  necessarily  represent  those  of  ADB’s  Board  of Directors, Management, or staff, and may be preliminary in nature. 

 

Page 4: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 2

 

Table of Contents 

Executive Summary ....................................................................................................................................... 4 

Brief Project Description ...........................................................................................................................  4 

LARAP Objective ........................................................................................................................................ 4 

Summary of Social Impacts ....................................................................................................................... 4 

Mitigation Measures and Implementation Arrangements ....................................................................... 5 

Consultation and Grievance Redress ........................................................................................................ 6 

Monitoring and Evaluation ....................................................................................................................... 6 

1.  Introduction .......................................................................................................................................... 7 

2.  Project Description................................................................................................................................ 8 

3.  Legal and Policy Framework ............................................................................................................... 11 

Government of Vietnam Policies ............................................................................................................ 11 

ADB Policies ............................................................................................................................................ 12 

4.  Socio‐Economic Information and Profile ............................................................................................ 14 

Project Area and Stakeholders ................................................................................................................ 14 

Methodology ........................................................................................................................................... 16 

Socio‐Economic Profile ........................................................................................................................... 17 

5.  Public Consultation and Disclosure ..................................................................................................... 21 

Consultation and Disclosure during Planning ......................................................................................... 21 

Community Attitudes toward the Project .............................................................................................. 22 

Framework for Ongoing Consultation and Participation ........................................................................ 22 

Grievance Redress Mechanisms ............................................................................................................. 22 

6.  Land Acquisition and Resettlement Plan ............................................................................................ 24 

Objective and Scope ............................................................................................................................... 24 

Principles ................................................................................................................................................. 25 

Eligibility Criteria ..................................................................................................................................... 25 

Impacts of the TL ..................................................................................................................................... 26 

Entitlements ............................................................................................................................................ 30 

Compensation, Relocation and Income Restoration .............................................................................. 40 

Other Measures ...................................................................................................................................... 42 

Assistance for Vulnerable Groups ........................................................................................................... 42 

Page 5: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 3

 

HIV / AIDS Awareness and Prevention Measures ................................................................................... 43 

7.  Implementation Arrangements .......................................................................................................... 45 

Institutional Structures ........................................................................................................................... 45 

Calculation of Compensation .................................................................................................................. 47 

Compensation and Allowances Budget .................................................................................................. 47 

Implementation Schedule ....................................................................................................................... 52 

Arrangements for Valuing and Disbursing Compensation .................................................................. 53 

Reporting and Approval .......................................................................................................................... 54 

8.  Monitoring and Evaluation ................................................................................................................. 55 

Internal Monitoring ................................................................................................................................. 55 

External (Independent) Monitoring and Evaluation ............................................................................... 55 

Post Implementation Monitoring and Evaluation .................................................................................. 56 

Annex 1 Results of IOL Surveying ................................................................................................................ 57 

Annex 2 Preliminary Public Consultation Results ....................................................................................... 65 

 

 

Page 6: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 4

 

Executive Summary 

1. This  Land  Acquisition  and  Resettlement  Action  Plan  (LARAP)  has  been  prepared  as  part  of  the technical assistance (TA) to undertake a detailed feasibility study on a planned 500 kV transmission line between Hatxan Substation in Lao PDR and Pleiku Substation in Vietnam.  This LARAP has been prepared in cooperation with PECC4 and EVN.  

2. The LARAP  is for the section of the line between Pleiku substation and the Lao‐Vietnam border.   A parallel  LARAP has  been prepared  for  the  Lao  section of  the  TL  from border  to  the Hatxan  sub‐station. 

3. The policy framework for this LARAP  is that  laid down  in the Laws, Decrees and Regulations of the Government of  the  Socialist Republic Viet Nam  (GoV),  and  in  the ADB Handbook on  Involuntary Resettlement  of  1998  and  subsequent  updates,  including  Appendices  2  and  3  (Involuntary Resettlement  and  Indigenous  Peoples)  of  the  Safeguard  Policy  Statement  (June  2009).  The  key compensation and resettlement policies followed in the project are listed below. 

Brief Project Description 

4. This project  involves  the  construction of a new 500 kV  transmission  line over a 93.3 km distance across  two  provinces  in  Central  Vietnam.    The major work will  be  the  construction  of  over  150 transmission  line  towers,  the placement of 8 conductors  for  the entire  length and clearing of  the corridor. The project  includes the construction of a new substation but no details are available.  In order  to  avoid  delays  to  the main work,  a  separate  social  assessment  and  resettlement  plan  or Vietnamese RSES will be completed for the new substation as soon as data are available. 

5. The  transmission  line  corridor will  cross eleven  communes  in Kon Tum and Gai  Lai, and will pass through mostly  plantation  forests  of  rubber,  coffee  and  eucalyptus  trees,  creating  a  40m‐wide construction corridor. The TL will extend from Kon Tum’s border with Laos, designated as station G0, to the substation located near Pleiku in Gai Lai province, designated as station G30. 

LARAP Objective 

6. The main  objective  of  the  LARAP  is  to  provide  planned  and  time‐bound measures  and  specify resources to restore the  livelihoods of the people  impacted by the TL to at  least their condition of well‐being and income levels prior to the implementation of the project. 

7. The  specific objectives of  this  LARAP are  to provide an effective guideline  for  the GoV  to use  for acquisition  of  land  and  entitlements  to  implement  the  Project  and  ensure  that  the  people  and households affected by  land acquisition are compensated under the prevailing  legal norms of GoV and in compliance with the policies of the GoV as well as MONRE. 

Summary of Social Impacts 

8. The  transmission  line project area  (section  in Vietnam  territory) crosses  through 12 communes, 4 districts, 1 town and 2 provinces.  The 48 displaced households are located in five (5) communes in three (3) districts and two (2) communes in Kon Tum Town (Table 2).  There are 228 people residing 

Page 7: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 5

 

in the 48 households who will be displaced. In addition to 48 displaced households, 786 households spread among  the 11 affected communes will also be affected by  temporary  (501 households) or permanent  (237  households)  loss  of  land  and  /  or  assets  (Table  3).    There  are  a  total  of  3,260 affected persons (Table 4). 

9. Of  the 48 displaced households, 60% are of  the ethnic majority Kinh  (or Viet) and 40% are of the ethnic minorities Gia Rai.   There are more than 15 ethnic groups  living  in Kon Tum.   Kinh (the Viet majority) comprise 47% of  the population.   The  largest ethnic minorities are  the Sê Đăng  (91,719 people), Ba Na (44,196 people), Gia Triêng (28,831 people) and Gia Rai (19,652 people).  Kinh people live mainly  in township, town and along the  large  roads. Gia Lai   Province has Gia Rai and Bahnar indigenous  groups,  which  together  comprise  approximately  45%  of  the  total  population  of  the province. 

10. During  the  design  phase,  potential  social  impact  of  the  line was  considered,  and  the  preferred alignment  of  TL  has  been  selected  because  it minimizes  the  impact  on  villages  and  permanent agricultural  land.    In  consequence  land  and  other  losses  are  minimized.    Nevertheless  786 households  are  affected, most having only  temporary  loss of  land  in  the Right of Way of  the  TL during construction, but with 237 households losing small areas of productive land and    households suffering  losses  through  the  cutting  of  rubber  trees.    Only  42  households will  lose  houses  and require relocation.  The households requiring relocation can be moved within the same village. 

11. There is one village, Plei Duân, with 20 households that, while no household structures are directly affected,  is potentially affected by  the  fact  that  it  is  located between  the 500 kV TL and  the new proposed 500 kV TL.  This village is located along the transmission line section at 22nd turning angle (G22).  The edge of the village is approximately 100 m from the new proposed TL and less than 100 m  from  the existing  line.   The potential need  to  relocate  this village will depend on  the expected cumulative  impact of electro‐magnetic  radiation  from  the  two TLs.   EVN,  in consultation with  the CPC, CARC and local residents, will need to assess whether it is necessary to relocate this village. 

12. Affected household and land estimates in this LARAP are based on a Right of Way (ROW) of 30.6 m, which  is  roughly half  the  internationally  recommended ROW  (which  is also  the ROW  that will be used in the Lao PDR) of 70 m. 

Mitigation Measures and Implementation Arrangements 

13. The  resettlement  principles  and  assistance  have  been  designed  to  cover  compensation  for  lost assets and  restore or enhance  the  livelihoods of all categories of affected people. An Entitlement Matrix  is  provided  in  Chapter  6, which  provides  a  summary  of  the  application  of  the  principles, definition of entitled persons, entitlements and indicates results of actions. 

14. Impact of  the TL  is  likely  to be significant as  it  is on an  important population of Giarai and other indigenous groups.  The LARAP therefore includes an Indigenous Peoples Development Plan (IPDP), which sets out measures to provide compensation  in the  form of support  for the development of the affected ethnic groups.  These measures also endeavor to build on wider measures being taken by the Government of Vietnam (Provincial and sector‐wide programs (e.g. HIV / AIDS, education and health), particularly in the context of hydropower development. 

Page 8: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 6

 

15. National Power Transmission Corp. (directly under EVN) is the Project Owner and authorizes Central Vietnam  Power  Projects Management Board  (CPPMB)  to plan  and  implement  the whole project, including LARAP implementation.  CPPMB will be assisted by and cooperate closely with the PPC of Gia Lai, Kon Tum, and other concerned agencies.  The Compensation, Allowances and Resettlement Committee (CARC) of district people’s committee is the Implementing Agency of the compensation, allowances and resettlement of peoples affected by the TL and substation. 

16. A  total  budget  of  almost  50  billion  VND  (approximately  2.4 million USD)  has  been  identified  as required  for LARAP  implementation.   This  includes 43 billion VND  (approximately 2.1 million USD) for compensation of affected assets and land.   

Consultation and Grievance Redress 

17. Consultation was conducted with APs and with community leaders and officials during the Inventory of Loss  (IOL) survey of affected  land, crops,  trees and structures within  the TL ROW.    Information was provided and discussion undertaken both during the socio‐economic survey and census of loss of the affected households and in meetings with the communities, and with village heads and sub‐district officials, during February 2011.  

18. Most APs expect simply to be treated fairly in terms of compensation.  Perceived benefits of the TL included  increased employment opportunity  related  to  the annual clearing of  the TL corridor and benefits from specific planned measures to restore or enhance any loss of livelihoods.   

19. The Project Owner will undertake grievance resolution in accordance with the Land Law (2003) and its  implementation  decrees  (197/2004/ND‐CP  and  84/2007/ND‐CP)  for  grievances  relating  to disputes  on  land  acquired  by  the  State.    Though  the  decrees  are  specific  to  land  disputes,  this mechanism will be applied to all grievances related to the Project.  The process specific by the Land Law implementation decrees is a four step process – with seeking redress through the court system as  the  final  (fourth) step.   All grievances will  initially be handled via consultations with  the aim of resolving matters through consensus at the project level. 

Monitoring and Evaluation 

20. Monitoring  and  evaluation  (M&E)  is  a major  part  of  the  resettlement management  system.  The Resettlement  Action  Plan  will  be  both  internally  monitored  and  externally  monitored  (by  an independent  agency  such  as  an  NGO  or  research  institution  engaged  for  this  purpose).  In accordance with the ME guidelines, during the project implementation, both internal and external, resettlement monitoring  and  evaluation will  be  carried  out  in  order  to  ensure  that  all  affected people are compensated adequately, effectively and their income and livelihood are better off and at the minimum restored. 

 

Page 9: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 7

 

1. Introduction 

21. Vietnam  has  signed  a Memorandum  of Understanding with  the Government  of  Lao  PDR  for  the purchase of 5,000 MW of electricity per year by 2020  (Powering Progress, 2010).   Vietnam  is also funding a large number of hydroelectric power developments in southern Laos to supply the rapidly growing demand for electricity in Vietnam.  The import of electricity from Lao PDR over the coming decades  is  an  important  aspect  of  economic  cooperation  between  the  two  countries,  and  is important  for  Vietnam's  economic  development,  especially  in  the  south  of  the  country  where electricity shortages impede progress.  The Ban Sok‐Pleiku Transmission Line (TL) Project is critical to insuring that the electricity generated in Laos reaches Vietnam with minimal losses and delays.  This project  is considered an essential part of Vietnam’s power planning over the next decade and will ensure maximum return on its very large investments. 

22. The Project will support the  import of electricity from Lao PDR through the construction of a high‐voltage  TL  from  Ban  Hatxan  in  Attapeu  Province,  Lao  PDR  to  the  Pleiku  sub‐station  in  Gia  Lai Province, Vietnam.   The TL project  includes construction of (i) 150 kilometres of double‐circuit 500 kV  transmission  line  between  Hatxan  sub‐station  and  Pleiku  in  Vietnam;  (ii)  the  new  Hatxan 500/230kV  substation  and  (iii)  the  upgrade  of  an  existing  sub‐station  in  Gia  Lai  Province1.    This LARAP focuses exclusively on the section of the TL between the Lao‐Vietnam border and the Plieku sub‐station. 

23. This  LARAP  forms  part  of  the  IEE  study  for  the  TL,  reflecting  the  regulatory  requirement  of  the Government of Vietnam (GoV) and of ADB for resettlement and compensation,  in accordance with the  national,  local  and  international  social  and  environmental  protection  laws,  regulations  and guidelines. 

24. The  information  in  this  LARAP  comes  largely  from  an  early  version  of  the  Initial  Environmental Examination (IEE) report for Ban Sok ‐ Pleiku 500kV Transmission Line (section in Vietnam territory) prepared  by  Power  Engineering  Consulting  Company  4  (PECC4)  for  EVN.    The  draft  IEE  report  is based largely on secondary data that is data collected from available maps, reports, statistical data and discussions with  involved parties.   Additional  field work was undertaken by  the consultant  in cooperation with PECC4 to confirm the information in draft IEE, to fill gaps and to ensure the work program  was  consistent  with  ADB  standards  (e.g.  appropriate  consultation  and  disclosure  was undertaken). 

25. This project is classified as Involuntary Resettlement Category A, as 786 households are likely to be affected by the  loss of  land and / or other assets.   As such, a full LARAP with assessment of social impacts is required. 

26. This  project  is  classified  as  Indigenous  Peoples  Category A  according  to ADB  Indigenous  Peoples Classification as almost 50% of the affected population  is from ethnic minority groups, and as such requires the preparation of an Indigenous Peoples Development Plan. 

                                                            1 Initial design plans called for the extension of the existing Pleiku sub‐station, however, more recent information from EVN indicated that the exact location of the new sub‐station is currently unknown.  Further safeguard studies will be required once the location of the sub‐station is identified. 

Page 10: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 8

 

2. Project Description 

27. This project  involves  the  construction of a new 500 kV  transmission  line over a 93.3 km distance across  two  provinces  in  Central  Vietnam.    The major work will  be  the  construction  of  over  150 transmission  line  towers,  the placement of 8 conductors  for  the entire  length and clearing of  the corridor. The project  includes the construction of a new substation but no details are available.  In order  to  avoid  delays  to  the main work,  a  separate  social  assessment  and  resettlement  plan  or Vietnamese RSES will be completed for the new substation as soon as data are available. 

28. The transmission line corridor will cross eleven communes in Kon Tum and Gai Lai (Map 1 and Map 2), and will pass through mostly plantation forests of rubber, coffee and eucalyptus trees, creating a 40m‐wide construction corridor. The TL will extend from Kon Tum’s border with Laos, designated as station G0 (Map.1), to the substation  located near Pleiku  in Gai Lai province, designated as station G30 (Map 2). 

29. A new 93.3 km long 500kV transmission line within a 40m wide construction width will require 373 ha of  land.    It  is not  known  if work will  commence at  several  locations at once or be  completed sequentially,  but  at  any  one  time  as many  as  200  people  could  be working  on  site.  The  project planning  work  is  scheduled  for  completion  by  the  end  of  2011.    Aside  from  the  stringing  of conductors, much  of  the  tower  erection will  be  completed  using manual  labour.    The  TL will  be operational in 2014 or 2015, in time to match the start of power generation from the hydroelectric facilities in southern Laos funded by the GoV. 

30. Alternatives  to  the  TL were  not  seriously  considered  since  a  TL was  a  critical  link  to  getting  the power from the hydroelectric stations funded by Vietnam (with one already under construction) to Vietnam’s grid. Without a new 500 kV TL the power was not going to get to Vietnam, since other transmission lines were at a capacity and far away from the power station sites. 

31. Two  alternative  alignments were  considered.  Alignment  1 was  93.38  km with  65  families  to  be relocated and 135 additional houses and/or assets affected in some way. This alternative will need to  cross  water  bodies  twice.    It  crosses  through  smooth  terrain  with  mainly  low  hills.  Main vegetation  cover  is  primeval  forest  (border  area),  and  rubber,  coffee,  and  crops  of  local  people.  Alternative  2  is  95.30  km  in  length,  and  would  require  the  relocation  of  61  families,  plus  an additional 105 whose property will be affected in some way.  Two of the five sections are the same as  for alternative 1. There will only be one water crossing. The section  from G 8 to G18  is  in very complex  terrain,  with  many  deep  canyons,  high  fluctuation  of  altitude  and  access  limitation, requiring access road construction. Main vegetation cover  is thick forest, coffee, rubber, and crops planted by local people. 

32. The length of Alternative 2 exceeds Alternative 1 by 2km.  Access to a section of Alternative 2 would require  additional work  and  land  clearance  to  access  the TL  corridor.   Alternative 1  crosses over smooth  terrain, and  is near an existing  road.   One  section of Alternative 2  (through  the Chu Pah district  in  Gia  Lai  province)  would  affect  more  households  than  the  complimentary  section  in Alternative  1.    This  section  also  negatively  affects  the  master  planning  of  the  residential  area expansion,  and possibly  interferes with  the Ho Chi Minh Highway  in Gia  Lai Province.    For  these reasons, Alternative 1 was selected as the most suitable route. 

Page 11: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 9

 

 Map 1 Land use in the TL corridor in Kon Tum Province. 

Page 12: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAAC 

 

 

BA

 M

 

AO PDR / VIETNAMAsian DevelopmenCONSULTANCY SERVIC

AN SOK – PLEIKU DRAFT

Map 2 Land use in t

M nt Bank CES FOR PREPARING T

T FINAL REPORT_LARAP_

the TL corridor in G

HE BAN-SOK PLEIKU PO

_VIETNAM SIDE- ver 1.0

Gai Lai Province. 

OWER TRANSMISSION

(A)

PROJECT 500 kV OHLL_TA 6481-REG

Page 10

Page 13: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 11

 

3. Legal and Policy Framework 

33. The policy framework for this LARAP  is that  laid down  in the Laws, Decrees and Regulations of the Government of  the  Socialist Republic Viet Nam  (GoV),  and  in  the ADB Handbook on  Involuntary Resettlement  of  1998  and  subsequent  updates,  including  Appendices  2  and  3  (Involuntary Resettlement  and  Indigenous  Peoples)  of  the  Safeguard  Policy  Statement  (June  2009).  The  key compensation and resettlement policies followed in the project are listed below. 

Government of Vietnam Policies 

34. The  LARAP’s  policy  and  legal  framework,  and  entitlement  matrix  are  based  on  Decrees  and Regulations of Government of The Socialist Republic of Viet Nam. The Constitution of the Socialist Republic of Vietnam  (1992)  confirms  the  right of  citizens  to own and protect  the ownership of a house.  The  land  law  (2003)  provides  Vietnam  with  a  comprehensive  land  administration  law. Ownership of  land  in Vietnam  resides with  the  State. The  State exercises  the  right  to  assign and lease land to land users, including individuals, households and organizations. The State delegates to the Provincial People’s Committees (PPCs) the authority to grant land use rights certificates (LURC) to  land  users.    The  Compensation,  Allowances  and  Resettlement  Committee  (CARC)  of  district people’s committee is the Implementing Agency of the compensation, allowances and resettlement of peoples affected by the TL and substation. 

35. The  table below provides the GoV  laws, decrees, circulars and regulations that comprise the  legal framework  for  land acquisition, compensation and  resettlement as well as  information disclosure, dissemination and policies for indigenous peoples (Table 1). 

Table 1 Legal framework for compensation and resettlement in Vietnam.

Law / Policy  Date 

Constitution of Vietnam  1992 

Land Law  2003 

Construction Law  2003 

Decree No. 17/2003/ND‐CP on democracy in communes (including requirement for consultation and participation) 

2003 

Electricity Law  2004 

No.29/2004/QH11 Law on Forest Protection and Development  2004 

No. 153/2004/QD‐TTg Strategic Orientation for Sustainable Development in Vietnam (Vietnam's Agenda 21) 

2004 

Decree 197/2004/ND‐CP on compensation, support and resettlement when land is recovered by the State 

2004 

No. 52/2005/QH11 Environment Protection Law   2005 

Decree 17/2006/ND‐CP amending the Land Law implementation decree  2006 

Page 14: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 12

 

Law / Policy  Date 

Circular 69/2006/RR‐BTC amending the Circular (2004) guiding the implementation of Decree 197/2004/ND‐CP (see above) 

2006 

Decree 84/2007/ND‐CP on revision of issuing LURC, land acquisition, implementation of land use right, procedure for compensation, resettlement and grievance redress when land is acquired by the State 

2007 

Decree 123/2007/ND‐CP amending decree 188/2004/ND‐CP on methods to determine land prices and assorted land price brackets 

2007 

Decree No. 69/2009/NĐ‐CP on supplemental regulation on planning land use, land price, land acquisition, compensation, assistance and resettlement. 

2009 

36. Decree  No.  131/2006/ND‐CP,  on  the management  and  use  of  Official  Development  Assistance, provides  that  in  case  of  “gaps  between  any  provision  in  an  international  treaty  on  Official Development  Assistance,  to  which  the  Socialist  Republic  of  Vietnam  is  a  signatory,  and  the Vietnamese Law, the provision in the international treaty on ODA shall take precedence” (Article 2, Item  5).    ADB’s  “Guidance  Note  for  Review  of  Country  Safeguard  Systems”  will  be  used  as  a reference point for ensuring that measures for the  implementation of the sub‐station and TL meet international safeguard requirements.  Key areas where ADB safeguards will cover gaps  in the GoV safeguard policies include: 

i. The consultation process is participatory – information is provided to affected persons, and their feedback and  input  into mitigation measures  is sought (in contrast with GoV legislation, which only requires provision of information). 

ii. Land users without official documentation (including  ‘non‐legal’  land users) are eligible for  compensation  if  they  have  been  using  the  land  prior  to  the  cut‐off  date.    This includes  providing  compensation  for  houses  constructed  without  permission  and businesses operating without a business certificate. 

iii. Deductions  from  land  and  assets  in  the  Land  Law  and  Decree  197  (e.g.  80% compensation for houses built on land ineligible for compensation) are not applicable – affected property will be compensated at 100%. 

37. Provisions and principles adopted in this LARAP for the project supersede the provisions of relevant decrees currently in force in Vietnam wherever a gap exists. 

ADB Policies 

38. The  ADB  Operational  Policies  (OM  Section  F1/BP March  2010),  Involuntary  Resettlement  Policy (1995)  and  subsequent  handbook  (1998)  aim  to  avoid  or  minimise  involuntary  resettlement wherever possible.   Where  it  is not possible  to avoid  resettlement or  land acquisition,  the policy aims to ensure that affected people achieve a standard of living at least at the level as prior to the Project.  ‘Involuntary resettlement’ is characterized by the ADB as occurring in situations where the development of a project  leads to temporary or permanent social and economic  impacts through: (a)  the  acquisition  of  land  and  other  fixed  assets;  (b)  change  in  use  of  land,  or  (c)  restrictions imposed on land as a result of a project.  

Page 15: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 13

 

39. ‘Affected  People’  are  defined  as  any  people,  households,  firms  or  private  institutions  who,  on account  of  changes  that  result  from  the  project will  have  their:  (a)  standard  of  living  adversely affected; (b) right, title, or interest in any house, land (including residential, commercial, agricultural, forest,  and/or  grazing  land),  water  resources,  or  any  other moveable  or  fixed  assets  acquired, possessed, restricted, or otherwise adversely affected, in full or in part, permanently or temporarily, and/or  (c) business, occupation, place of work or  residence, or habitat adversely affected, with or without displacement. 

40. The three key elements of the ADB policy are (a) compensation to replace lost assets, livelihood and income;  (b)  assistance  for  relocation,  including  the provision of  relocation  sites with  appropriate facilities and services, and (c) assistance for rehabilitation to achieve at least the same level of well‐being with the project as without it. 

Page 16: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 14

 

4. Socio­Economic Information and Profile 

Project Area and Stakeholders 

41. The  transmission  line project area  (section  in Vietnam  territory) crosses  through 11 communes, 4 districts, 1 town and 2 provinces.  The 48 displaced households are located in five (5) communes in three (3) districts and two (2) communes in Kon Tum Town (Table 2).  There are 228 people residing in the 48 households who will be displaced. In addition to 48 displaced households, 786 households spread among  the 11 affected communes will also be affected by  temporary  (501 households) or permanent  (237  households)  loss  of  land  and  /  or  assets  (Table  3).    There  are  a  total  of  3,260 affected persons (Table 4). 

42. Of  the 48 displaced households, 60% are of  the ethnic majority Kinh  (or Viet) and 40% are of the ethnic minority Gia Rai.  There are approximately 250,000 Gia Rai people in Vietnam (compared with almost 60 million Kinh) living primarily in Gia Lai, Kon Tum and Dac Lac Provinces. 

43. Eight (8) rubber plantations are affected by the ROW – five are owned by companies and three by individual households  (Table 5).    IOL surveying  indicated  that 41,806  rubber  trees are  likely  to be affected by the TL. 

 

 Table 2 Households with structures displaced by the ROW . 

Province  District  Commune 

Both House and Auxiliary Structures Affected 

Just House Affected 

Just Auxiliary Structures Affected 

Total No. with Structures Affected 

HH  People  HH  People  HH  People  HH  People 

TOTAL  11  11  51  19  91  18  86  48  228 

Kon Tum  3  7  6  29  16  76  10  48  32  153 

   Ngọc Hồi  2  3  15  6  28  6  29  15  72 

      Đắk Xú  3  15  6  28  5  24  14  67 

      Đắk Kan  0     0     1  5  1  5 

    Sa Thầy  4  3  14  10  48  4  19  17  81 

      Rờ Kơi  0  0  2  9  0  0  2  9 

      Sa Nhơn  0  0  1  5  4  19  5  24 

      Sa Nghĩa  2  9  2  10  0  0  4  19 

      Sa Bình  1  5  5  24  0  0  6  29 

   Kon Tum City  1  0  0  0  0  0  0  0  0 

   Ia Chim  0  0  0  0  0  0  0  0 Gia Lai  1  4  5  22  3  15  8  38  16  75 

   Chư Păh  4  5  22  3  15  8  38  16  75 

      Ia Mơ Nông  0  0  0  0  0  0  0  0 

      Ia Phí  0  0  0  0  3  15  3  15 

Page 17: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 15

 

Province  District  Commune 

Both House and Auxiliary Structures Affected 

Just House Affected 

Just Auxiliary Structures Affected 

Total No. with Structures Affected 

HH  People  HH  People  HH  People  HH  People 

      Ia Kar  0  0  0  0  4  18  4  18 

      Nghĩa Hoà  5  22  3  15  1  5  9  42 

Source: Household Survey Results of PECC4, 2010‐2011 

 Table 3 Households (HH) with land affected within the TL Right of Way . 

Province  District  Commune 

No. with Permanently Affected Land   

No. with Temporarily Affected Land 

HH  People  HH  People 

TOTAL     237  987  501  2405 

Kon Tum  3  7  175  690  343  1645 

   Ngọc Hồi  2  38  140  92  441 

      Đắk Xú  25  90  53  254 

      Đắk Kan  13  50  39  187 

    Sa Thầy  4  123  476  220  1055 

      Rờ Kơi  26  89  49  235 

      Sa Nhơn  43  151  72  345 

      Sa Nghĩa  27  97  51  245 

      Sa Bình  27  139  48  230 

   Kon Tum City  1  14  74  31  149 

   Ia Chim  14  74  31  149 

Gia Lai  1  4  62  297  158  760 

   Chư Păh  4  62  297  158  760       Ia Mơ Nông  11  55  35  168 

      Ia Phí  28  126  66  315 

      Ia Kar  11  61  32  154 

      Nghĩa Hoà  12  55  26  123 

Source: Household Survey Results of PECC4, 2010‐2011 

 Table 4  Summary of Households (HH) Affected Within the Transmission Line Right of Way. 

Province 

HHs losing land 

HHs having temporarily affected 

land 

No. of HHs/people having affected house/structure  

Total number of PAHs/PAPs 

HHs  people  HHs  people  HHs  people  HHs  people Kon Tum   175  690  343  1,645  32  153  550  2,488 

Gia Lai    62  297  158  760  16  75  236  1,132 

TOTAL  237  987  501  405  48  228  786  3,620 

Page 18: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 16

 

Source: Household Survey Results of PECC4, 2010‐2011 

 Table 5 Summary of affected rubber plantations. 

No.  Owner 

Length of TL through Plantation 

Temporary affected area 

(m2) 

Permanent affected area (m2) 

1  Rubber company 372 (Army Corps 15 Ngoc Hoi, Kon Tum)  10,658  326,135  10,924 

2  Households (Ia Kơi commune, Sa Thầy, Kon Tum)  26  796  0 

3  Rubber company 372 (Army Corps 15, Sa Thầy, Kon Tum)  5,159  157,865  5,427 

4  Households (Sa Nhon commune, Sa Thầy, Kon Tum)  1,138  34,823  1,280 

5  Households (Sa Nghia commune, Sa Thầy, Kon Tum)  570  17,442  641 

6  Rubber company 372 (Army Corps 15, Sa Thầy, Kon Tum)  4,471  136,813  5,030 

7  Chư Păh Rubber Company (Chư Păh, Gia Lai)  277  8,476  0 

8  Ia Nhim Rubber One Member Co. Ltd. (Chư Păh, Gia Lai)  2,541  77,755  2,423 

Total     24,840  760,104  25,725 

Source: Household Survey Results of PECC4, 2010‐2011 

 

Methodology 

44. In order to update the  information provided  in the draft  IEE prepared by PECC4 and to  inform the preparation of the LARAP, the following surveys were undertaken in February 2011:  

i. Full census survey of affected households; 

ii. Inventory  of  Loss  (IOL)  survey  (identification  of  affected  households  /  structures  / assets); 

iii. Additional  IOL  Information  and data  collected  from  People’s  committee  at  commune level, and from communes’ socio‐economic documents; 

iv. Consultations  at  the  village  level  with  community  members  including  women  and representatives of all ethnic groups,  local  leaders, EVN officials and  the  land occupier; and 

v. Collection of secondary socio‐economic and  land use data  from Provincial and District statistical records.  

45. The IOL includes a list of affected households, land and assets, which allows calculation of estimated costs  of  compensation  and  mitigation  actions.    The  IOL  also  provides  a  basis  for  the  Detailed Measurement Survey (DMS), which will be undertaken once the location of the sub‐station and the TL alignment are precisely known.   The  IOL  covered 100% of affected households and  included a cadastral survey of  impacted  land, crops and  trees, quantity survey of  impacted structures, and a household questionnaire survey.  The latter provides a basis for the determination of income losses, 

Page 19: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 17

 

poverty  and  vulnerability of  individual households  for purposes of determining  the need  for  any specific assistance. 

46. The data collected do not  include assessment of  land  losses by reference to total  land of affected households to determine those which are severely affected.   Data on percent of  land  loss of each affected  household  (i.e.  lost  land  >10%  of  total  land, which  is  the ADB’s  cut‐off  for  determining significant impact, or lost land >30% of total land, which is the cut‐off in Vietnam’s national policies) will be determined in next stage of the project to determine allowances and income restoration, and specifically to identify measures for vulnerable and severely affected households.  

Socio­Economic Profile 

47. Both Kon Tum and Gia Lai are heavily forested, primarily mountainous areas.  75% of the TL is in Kon Tum and 25% in Gia Lai.  Approximately 70% of the land in Kon Tum is classified as forest – primarily “production  forests”  (41%)  and  “protected  forest”  (21%).    About  15%  of  the  land  is  used  for agriculture, of which 2%  is rice paddy  land and 5%  is perennial crop (including rubber and coffee).  Just over 10% of the land is unproductive – forested mountains, steep slopes, etc. 

Population and Demographics 

48. The total population of Kon Tum Province in 2009 was 432,865, living at a population density of 45 per/km2, of which 33.83% were urban and 66.17% rural.   The natural growth rate of the population is 1.98  in 2009, falling from 2.55  in 2000. The population has, however,  increased by about 30%  in the  past  decade,  from  328,059  in  2000,  largely  reflecting  the  influx  of  Kinh  Vietnamese  under controlled migration and settlement programmes aimed at relieving the population pressure on the land  in  the  Red  River  Delta  and  other  overcrowded  northern  regions  and  at  agricultural development, particularly development of  industrial crops,  including rubber, coffee and cassava, in Kon Tum.   

49. There are more than 15 ethnic groups living in Kon Tum.  Kinh (the Viet majority) comprise 47% of the  population.    The  largest  ethnic minorities  are  the  Sê  Đăng  (91,719  people),  Ba  Na  (44,196 people),  Gia  Triêng  (28,831  people)  and  Gia  Rai  (19,652  people).    Kinh  people  live  mainly  in township, town and along the large roads.  

50. Gia Lai Province has an estimated 1.1 million people –  including the  largest populations of Gia Rai and Bahnar indigenous groups, which together comprise approximately 45% of the total population of the province. 

51. The communes affected by the TL ROW have populations ranging from 5,268 people (La Phi in Chu Păh District)  to 1,048  (La Chim  in Kon Tum  town)  (Table 6).   Population densities  range  from 189 persons per km2 (Nghia Hoa in Chu Păh) to 17.4 persons per km2 (La Chim in Kon Tum town).  For the most  part,  population  densities were  higher  in  the  communes  in Gia  Lai  Province,  compared  to those in Kon Tum. 

 Table 6 Population and population density in the Districts and Communes affected by the TL. 

Place name  Area (km2)  Population (persons)  Density (persons / km2) 

Page 20: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 18

 

Place name  Area (km2)  Population (persons)  Density (persons / km2) 

Kon Tum province       

Ngoc Hoi district   99.3  7,275  40.1 

Bo Y commune  122.2  3,984  32.6 

Dak Can commune  93.4  3,291  35.2 

Sa Thay district      11,013    

Ho Moong commune  65.23  4,570  70.1 

Sa Nghia commune   37.46  1,891  50.5 

Sa Binh commune   40.35  4,552  112.8 

Kon Tum town     3,417    

Hoa Binh commune  89.72  2,369  26.4 

Ia Chim commune   60.22  1,048  17.4 

Gia Lai province       

Chu Păh district     14,219    

IaPhi commune  69.95  5,268  75.3 

Hoa Phu commune  54.91  4,973  90.6 

Nghia Hoa commune  21.09  3,978  188.6 

 

Education 

52. In Kon Tum, nearly 100% of primary school‐aged children are currently enrolled in school, with equal number of male and female students.  Figures are lower for secondary school – approximately 66% of  eligible  children  are  enrolled  in  lower  secondary,  and  only  30%  of  those who  attended  lower secondary continue to upper secondary – again with equal numbers of male and female.   Once  in upper secondary, almost 86% graduate.   

53. In Gia Lai, 5 precincts and 1 town have achieved the national standard achievement of compulsory secondary education.  

Health 

54. Kon Tum Province has 11 Provincial or District hospitals, 950 Health Centres  and 140 polyclinics.  These are  staffed by 249 qualified physicians, 426 assistant physicians, 547 nurses, 191 midwives and 179 pharmaceutical staff.  In 2000, it was reported that there were almost 5 physicians per ten thousand  people.    The  vaccination  program  has  been  implemented  in  100%  of  the  communes, precincts and towns.   The rate of malnourished children  in 2000 was 37%.   Data collected  in 2006 indicates that there are 99 cases of HIV and 72 cases of AIDS in the Province.   

55. Gia Lai Province reported a total of 2,150 health staff (of which, 322 are physicians) in the Province in 2000.  100% of the communes have an infirmary / clinic and, in 2000, 90% of children were fully vaccinated.  In 2005, just over 300 cases of HIV and almost 90 cases of AIDS were reported. 

Page 21: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 19

 

Income and Livelihood Systems 

56. Both Provinces have seen economic growth since 2000.   This  is  in part due to the planned  inward migration, increased agricultural productivity and the development of industrial crops.  The average GDP per capita in Kon Tum was 201 USD / person in 2002 and, in Gia Lai, 275 USD / person in 2000. 

57. The  population  of  both  Provinces  are  predominantly  engaged  in  agriculture  (approximately  two thirds of the workforce), mainly in food and industrial upland crops and rubber production.   

58. Forestry  is  strictly  controlled  in  Kon  Tum  and  provides  little  livelihood  support,  hunting  and  the collection of non‐timber forest products having largely declined with the consolidation of indigenous peoples’ villages and control of production and protective forests over the past 30 years.  In Gia Lai, forestry‐based  livelihoods have  shifted  from exploiting  forestry  resources  to protecting  remaining forests  and  reforesting  denuded  areas.    Over  4,000  have  participated  in  reforesting  a  total  of 129,000 hectares of forest area. 

59. Other  significant  occupations  in  Kon  Tum  are  trading,  construction,  manufacturing  and  public services,  including educational and health professionals and administration.  Approximately 14% of the  workforce  in  Kon  Tum  is  employed  by  the  state.    Main  industrial  activities  other  than construction  are  mining  or  in  food  and  beverages  and  garments  production,  leather  tanning, furniture, and in electricity, gas and water supply.  The main export products from Kon Tum include coffee, refined wood and garments. 

60. In Gia Lai,  limestone quarries have been developed  for  the cement producing  industry. Presently, there are 2  factories producing cement with the capacity of 140,000  tons per year.   Processing of forestry products, largely with wood imported from Cambodia and Lao, is also undertaken in Gia Lai. 

61. Economic and social changes  in both Provinces have been dramatic  in the past decade, with most change  taking place  in  agricultural  and  especially  industrial  crop production,  and with  associated changes  in  labour  force  deployment.    While  areas  under  crops  has  increased  by  about  50%, agricultural production by value has increased six‐fold since 2000, both of perennial crops, including rubber, which constitutes slightly over fifty per cent of production value in 2009, and of food crops production of which has increased four‐fold during the decade. 

Access and Infrastructure 

62. Presently,  in Kon Tum, 100% communes, precincts,  towns have been connected with  the national power grid.  In  the TL area, approximately 95% of households  reported using electricity on a daily basis in 2010.  The rate of population using fresh water was estimated to be between 85% and 90% in 2010.  The rate of freshwater usage is likely lower in rural areas.  

63. In Gia Lai, in 2000, all district centers and 137 of 175 communes, precincts and township had been connected  with  the  national  power  grid.    Approximately  54%  of  households  reported  using electricity – though this figure is significantly lower for ethnic minority households (which reported that only 10 – 12% of households used electricity.  Approximately 60% of the population uses fresh water. 

Page 22: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 20

 

Safety and Unexploded Ordinance (UXO) 

64. Since  the TL  is  close  to  the border with  Lao PDR,  there  is  likely  to be  the danger of unexploded ordinance (UXO) in the vicinity of the communes affected by the TL and within the RoW.  

Page 23: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 21

 

5. Public Consultation and Disclosure 

65. The approach is participatory, in providing to the affected people the opportunity to understand the impact  of  the  project  and  in  seeking  their  needs  and  expectations  of measures  and  resources needed  for  resettlement or  for  the  restoration or  improvement of wellbeing,  resources,  facilities and livelihoods affected by the project. 

Consultation and Disclosure during Planning 

66. Consultation was conducted with APs and with community  leaders and officials during the  IEE and survey of affected  land, crops, trees and structures within the TL ROW.    Information was provided and discussion undertaken both during the socio‐economic survey and census of loss of the affected households and in meetings with the communities, and with village heads and sub‐district officials, during February 2011.  

67. Consultation meetings were held at project affected communes with participation of inhabitants of the communes. Details of the dates, matters discussed at each meeting and  the people attending are attached in Annex 2. 

i. The composition of these groups  in areas of ethnic peoples was that of the  indigenous groups  living  in each village, so  that  it was not considered necessary  to hold separate meetings with different ethnic groups.   

ii. The meetings had  two main purposes:    first  to  ensure  that  they were  fully  informed about the transmission line project and its impact, and secondly in order to understand community’s  response  to  the  project,  perceived  benefits  and  impacts,  local needs/options, project options and choices. 

68. Discussion of  the  latter questions was specifically  related  to  the communities’ ethnic composition and to impact on their culture, social structure and livelihoods system.  Focus group meetings with village  leaders and with women and older men were directed particularly  to exchanging views on impact  of  the  TL  and  sub‐station,  and measures which  both mitigate  impact  and  contribute  to sustainable development.  Particular attention was paid to considering measures which in the view of  the  leaders  and  members  of  the  ethnic  groups  would  sustain  traditional  ways  of  life  and livelihoods.   Discussion with  their  leaders,  and  separately with men  and women, was  addressed particularly to their dependency on and observances towards the forest environment.  

69. Information  about  the  TL  construction,  its  route  and  location  of  land  impacted  by  towers  and substation, and  information about  its operating characteristics, and  information about the method of  calculation and negotiating  compensation  rates and about  the mechanism  for grievances have been compiled into a brochure and distributed to local group leaders and to household heads of one in  six  households.    They were  also  displayed  as  posters  at  the  village  headmen’s  houses,  village meetings  rooms  and  the  District  and  Sub‐district  Centres.    As  above,  this  information was  also conveyed  verbally  during  consultation  meetings.    Consultation  meetings  and  IOL  and  socio‐economic surveys also included question and answer sessions.  APs and village headmen and elders were  also  informed  that  the  LARAP would be made  available  for  consultation at  the District and Commune Centres. 

Page 24: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 22

 

70. A ‘needs assessment’ was also undertaken where APs and the community at large were asked, both in the socio‐economic questionnaire survey and  in consultation meetings, to  identify their specific needs,  to  discuss  any  impact  of  the  TL  on  well‐being,  and  to  suggest measures  for  assistance, improvement  of  livelihoods,  strengthening  of  services  and  the  local  economy.    These  suggested measures  were  used  to  inform  the  preparation  of  the  income  restoration  programme.    The assessment was  also  undertaken  specifically  for  indigenous  groups  and  women  to  ensure  their concerns and needs are addressed in the IPDP and GDP prepared as part of the LARAP. 

Community Attitudes toward the Project 

71. Responses of the APs to the Project were based on  information which they have had about the TL during  the past  two years, and on the provision of a  leaflet and consultation meetings during  the IOL.   Most expect simply to be treated  fairly  in terms of compensation, but  in response to careful questioning a number of options were generally agreed to be valuable  in restoring  losses of forest and in compensating for the impact of the TL and will be provided for in the detailed IPGDP.   

72. Perceived  benefits  of  the  TL  include  increased  employment  opportunity  related  to  the  annual clearing of the TL corridor and benefits from specific planned measures to restore or enhance any loss of  livelihoods.   Planned measures  that have been discussed with community are described  in outline  below  as  aspects  of  the  LARAP  and  of  the  integrated  Indigenous  Peoples  and  Gender Development Plan  (IPGDP),  including  improved access to health  facilities, training and educational programs and water supply. 

Framework for Ongoing Consultation and Participation 

73. Consultation will continue to take place, with the affected people and their leaders, at every stage of preparation  and  implementation  of  the  LARAP.    Proposals  and  institutional  structures,  including participative management and grievance mechanisms, are set out within this report and have been disclosed  to  APs  during  consultation  to  ensure  continued  consultation  throughout  the implementation of the LARAP. 

Grievance Redress Mechanisms 

74. Despite  participatory  planning  of  land  acquisition  and  resettlement  activities,  during implementation, various  issues might be encountered by  the affected people.  In order  to  resolve these concerns effectively and timely, a grievance redress mechanism shall be set up. The affected people will be notified about such mechanism before the resettlement implementation. 

75. The Project Owner will undertake grievance resolution in accordance with the Land Law (2003) and its  implementation  decrees  (197/2004/ND‐CP  and  84/2007/ND‐CP)  for  grievances  relating  to disputes  on  land  acquired  by  the  State.    Though  the  decrees  are  specific  to  land  disputes,  this mechanism will be applied to all grievances related to the Project.  The process specific by the Land Law implementation decrees is a four step process – with seeking redress through the court system as  the  final  (fourth) step.   All grievances will  initially be handled via consultations with  the aim of resolving matters through consensus at the project level. 

Page 25: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 23

 

76. The grievance  redress mechanism  for  the TL Project  is provided  in Figure 1.    It  is expected  that a majority of grievances will be resolved at steps 1 or 2, with only a small number progressing to step 3 and even fewer to step 4.  The four steps are: 

i. If a person is not satisfied with his or her compensation or rehabilitation measure, he or she could voice (oral or written) his or her complaint to the village head or directly to the Commune Peoples Committee  (CPC).   The  village head  / CPC will  respond  to  the grievance within 15 days of receiving the complaint. 

ii. If  the  affected  person  is  not  satisfied  with  the  decision  by  the  village  head  /  EMU (Commune Level), then the person can appeal to the District Peoples Committee (DPC).  The DPC will decide on the complaint and respond to the complainant within 15 days. 

iii. If the affected person  is not satisfied with the ruling of the DPC, the complaint can be appealed  to  the  Provincial  People’s  Committee  (PPC).    The  PPC will  respond  to  the complaint within 45 days. 

iv. If the affected person still does not agree with the decision, then he / she could go the court for settling the matter. 

 

 

 Figure 1 Grievance redress mechanism 

Page 26: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 24

 

6. Land Acquisition and Resettlement Plan 

Objective and Scope 

77. The main  objective  of  the  LARAP  is  to  provide  planned  and  time‐bound measures  and  specify resources to restore the  livelihoods of the people  impacted by the TL to at  least their condition of well‐being and income levels prior to the implementation of the project. 

78. The  specific objectives of  this  LARAP are  to provide an effective guideline  for  the GoV  to use  for acquisition  of  land  and  entitlements  to  implement  the  Project  and  ensure  that  the  people  and households affected by  land acquisition are compensated under the prevailing  legal norms of GoV and in compliance with the policies of the GoV as well as MONRE. 

79. For  this  purpose,  the  LARAP  has  been  prepared  taking  into  account  the  findings  of  the  socio‐economic survey data, field visits, census data and meetings with stakeholders  in the project area. The  LARAP  identifies  (i)  the  impacts  and  extent  of  losses;  (ii)  principles  and  legal  framework applicable  for  mitigation  of  losses;  (iii)  provisions  restoration  of  income/livelihood;  and  (iv) responsibilities for delivery and monitoring of the LARAP process. 

80. The LARAP is directed to mitigating the impact of the construction and operation of the Pleiku sub‐station  and  TL  and  to  providing  fair  compensation  and  replacement  of  resources  and means  of livelihood to affected households and communities, including: 

i. Compensation for temporary and permanent agricultural land loss; 

ii. Compensation for loss of crops and trees; 

iii. Restoration and improvement of livelihoods affected by loss of access to the forest and to forest products and to hunting grounds; 

iv. Compensatory measures for impact on cultural and religious sites and practices; 

v. Developmental measures for impact on the livelihoods and wellbeing of women; 

vi. Developmental measures  for  improvement of agricultural and  related production and post‐harvest systems; 

vii. Provision for earning opportunities related to the project; 

viii. Land and water resource development and provision of title to permanent land rights; 

ix. Artisanal and small‐scale trading opportunities related to the opening up of the territory of ethnic groups; 

x. The financing of an HIV/AIDS Awareness and Prevention Program to strengthen existing Provincial Government  CHAS  services  in  the  context  of  the  impact  of  incoming work forces both of the TL construction and of associated hydropower projects. 

 

Page 27: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 25

 

Principles 

81. The LARAP embodies the following principles: 

i. Impact of the TL on social assets, displacement and resettlement will be avoided as far as  possible  at  the  stages  of  project  design  and  implementation,  and  steps  taken  to mitigate impact and losses wherever they occur; 

ii. Fair compensation will be provided for all land and fixed assets and for livelihoods lost in the implementation or operation of the TL and sub‐station and will be set out in a time‐bound LARAP; 

iii. The LARAP will be based on consultation with and full disclosure to affected people and on their participation in decisions about mitigation and restoration measures; 

iv. Compensation for land loss will be provided to affected people regardless of their legal status or title as owners and users of the impacted land; 

v. Specific  provision  will  be  made  for  assistance  to  vulnerable  (including  women  and indigenous peoples) and severely affected households; 

vi. Resettlement will  be  planned  as  an  integral  part  of  the  project  and will  so  far  as  is possible be developmental  in character and execution,  leading  to  improvement  in the pre‐project social and economic situation of affected people; 

vii. Specific measures will  be  taken  to  provide  for  the  participation  of  and  benefit  from employment  and  income  generation  activities  arising  from  the  construction  and operation of the transmission line; and 

viii. The  LARAP  and  its  institutional  arrangements  will  include  provision  for  a  grievance mechanism known and available to affected people  to permit the communication and redress of  any  complaint or dissatisfaction  in  respect of disclosure  and  availability of compensation or assistance or with  the basis  in  survey, measurement and negotiated agreement on which compensation has been based.  

82. The  over‐riding  principle  of  the  LARAP  is  that  where  a  person  or  group  is  affected  by  land acquisition, damage to income generating assets/activities or resettlement as a result of the project, fair compensation will be provided in order that assets are replaced and livelihoods are the same or better than before the project. The entitlement matrix, resettlement policies and procedures set out in this LARAP reflect this principle. 

Eligibility Criteria 

83. The LARAP covers all areas and people directly affected by the Project including: 

i. Any person, legal entity, or organisation who/which will be directly or indirectly affected by a project due to requisition of lands or real estate, changes in land category, and/or impacts on ecological and environmental systems in their areas; and  

Page 28: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 26

 

ii. Any person or entity or organization affected by a project, who in the context of acquisition of assets or  change  in  land use before  the project  commencement date, would have  their:  (i) standard of living adversely affected; (ii) right, title or interest in all or any part of a house, land (including  residential,  commercial,  agricultural,  plantations,  forest  and  grazing  land)  water resources  or  any  other moveable  or  fixed  assets  acquired  or  possessed,  in  full  or  in  part, permanently  or  temporarily  adversely  affected;  (iii)  business,  occupation,  place  of work  or residence  areas    adversely  affected with    or without  displacement;  and/or  (iv)  community resources adversely affected. 

iii. People later accepted for inclusion by the Grievance Procedure. 

84. People found to be residing  in, doing business or cultivating  land within the project area after the cut‐off date (note: excluding other relatives previously residing outside the area) are not eligible for compensation. 

Impacts of the TL 

85. The discussion of impacts in this section is based largely on the IEE prepared by PECC4 for EVN.  Field visits were also undertaken by the TA consultant to confirm the impacts identified by PECC4 and to identify and fill any gaps  in the PECC4 report.    Identification of  impacts has been based on a ROW width of 30.6 m – which is significantly smaller than the internationally recognized safe ROW width for a 500 kV TL (60 – 70 m).  The PECC4 IEE can provisionally be retained as the basis of estimated impacts and of compensation and budgeting for the LARAP.   However, this work will be subject to amendment when the  location of the sub‐station and the TL alignment are precisely known and a Detailed Measurement Survey conducted by or on behalf of EVN.   

86. Throughout the design phase, potential  impacts on households and villages have been considered, and  the design  and  alignment optimised  to  avoid or minimise  impact  (e.g.  adoption of  structure designs with  the  least  land  acquisition  requirement  and planning  the  TL  route  to  run  along  land borders and avoid residential land where possible). 

87. The TL travels through two provinces, three districts and one town and affects land in 11 communes (Table 7).  75% of the line (approximately 70 km) is in the Kon Tum Province and 25% (approximately 24 km) is in the Gia Lai Province.  The TL ROW will affect 213.6 ha of land in Kon Tum Province and 72.5 ha of land in Gia Lai. 

 Table 7 Summary of length of TL and area of ROW within each affected commune. 

Province  District  Commune  Length (m)  Area (m2)*  Area (ha)* 

Kon Tum        69,814  2,136,308  213.63 

   Ngọc Hồi Dỉstict     31,012  948,967  94.90 

      Đắk Sú commune  16,962  519,037  51.90 

      Đắk Kan commune  14,050  429,930  42.99 

   Sa Thầy district     33,633  1,029,170  102.92 

      Rờ Kơi commune  5,933  181,550  18.15 

      Sa Nhơn commune  15,800  483,480  48.35 

Page 29: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 27

 

Province  District  Commune  Length (m)  Area (m2)*  Area (ha)* 

      Sa Nghĩa commune  6,522  199,573  19.96 

      Sa Bình commune  5,378  164,567  16.46 

   Kon Tum city     5,169  158,171  15.82 

      Ia Chim commune  5,169  158,171  15.82 

Gia Lai        23,686  724,792  72.48 

   Chư Pah district     23,686  724,792  72.48 

      Ia Mơ Nông commune  3931  120,289  12.03 

      Ia Phí commune  9700  296,820  29.68 

      Ia Kar commune  4700  143,820  14.38 

      Nghĩa Hoà commune  5355  163,863  16.39 

TOTAL        93,500  2,861,100  286.11 

*Area is based on a ROW of 30.6 m. 

 

88. The adverse impacts from the TL include: 

i. Relocation of 30 houses and 12 ancillary buildings within the ROW (Table 5); 

ii. Temporary loss of crop lands, crops and incomes during construction (Table 7); 

iii. Permanent  loss of crop  lands, crops and  incomes  for  the  tower  footprint  (100 m2 per tower) and access tracks; 

iv. Permanent loss of rubber trees within the ROW and tower footprints; 

v. Permanent loss of timber trees and other trees (as these will need to be trimmed within the ROW) with associated impact on forest resource use in the TL corridor, including 58 ha of forest; and 

vi. Other  social  and  cultural  impacts  of  the  construction,  maintenance  and  presence, including potential health impacts and land use restrictions associated with the electro‐magnetic  field, construction disturbance  (noise, air quality), visual amenity  impact and disruption to the social and cultural life of the affected ethnic groups. 

89. The TL will displace thirty (30) households and affect auxiliary structures of a further 18 households (with a total area of 2,241 m2) are  located within the ROW, and will have to be relocated (refer to Table 2 in Chapter 4).  Of the 30 households with houses affected, 11 also have auxiliary structures affected (this is in addition to the 18 households with only auxiliary structures affected).  Displaced households  and  households  with  affected  structures  are  scattered  along  the  length  of  the  TL (located  in nine communes  in two provinces and three different districts).    IOL surveying  indicates that displaced households can be relocated within the existing village settlement area – no separate resettlement sites are required.  The number of households affected in each commune ranges from 14 households in the Dak Xu commune to 1 household in Dak Kan commune (refer to Table 2). 

Page 30: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 28

 

90. A majority of the affected houses within the ROW are considered class 4 structures: brick masonry walls,  tile  roof or  corrugated  iron  roof,  cement mortar  floor.   Some of  the houses are  temporary structures (i.e. cottage roof, wooden walls, soil floor).  The average area of each house is 40 ‐ 45 m2 per house,  the price  for new  construction of each house  is  calculated  to be approximately 5,000 USD2.  Some houses also have small breeding facilities. 

91. Within the ROW, a total area of 286.11 ha will be affected (Table 8), of which: 

i. 43% (121.75 ha) is crop land is 121.75 hectares, about 42.56%;  

ii. 33% (93.3 ha) is plantation (perennial industrial tree);  

iii. 20% (57.54 ha) is forested land (secondary forest, protective forest and productive forest);  

iv. 4% (10.2 ha) is river, lake and the vacant land; and 

v. 1% (2.94 ha) is residential land. 

 Table 8 Land use within the ROW. 

Land use  Area (m2)  % of Total Land in ROW 

Paddy field  209,273  7.31 

Annual crops  1,008,270  35.24 

Fruit tree  3,825  0.13 

Industrial tree  932,841  32.6 

Productive natural forest   407,623  14.25 

Productive artificial forest   167,841  5.87 

River, canal  102,051  3.57 

Residential area  29,376  1.03 

Total  2,861,100  100.00 

 

92. A total of 89 ha of land within the ROW will be permanently affected (i.e. by tower footprints and / or because  that  land use will not be permitted under  the TL – e.g.  residential and  industrial  tree plantation) (Table 8).  This land will require compensation.  Approximately 6.2 ha of rice paddy land will be permanently affected, while a  further 38 ha of  rice paddy are expected  to be  temporarily affected during construction of the TL.   Approximately 30 ha of  field crops and 30 ha of perennial tree plantation (primarily rubber) will also be permanently affected.  A further 188 ha of field crops will be temporarily affected during construction (Table 9). 

                                                            2 This estimate is for the structure only.  It does not include the value of land and cultivated plants. 

Page 31: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 29

 

93. Inventory of  Loss  (IOL)  surveying  indicated  that  there  are  almost  42,000  rubber  trees within  the ROW.   These  trees will be  removed, and will have  to be compensated.   Over 90% of  the affected rubber plantations are owned by companies – with over 80% owned by Rubber Company 372.  The remaining  just  less  than 10%  is owned by  individual and groups of households  (Table 9 and  refer back to Table 5 in Chapter 4). 

 Table 9 Summary of impacts of the TL in each District. 

Item  Unit 

District / Town 

Total Ngoc Hoi  Sa Thay Kon Tum Town 

Chu Pah  

Land Affected  m2  34,003  33,990  5,224  15,767  88,984 

Residential land  m2  378  459  0  94  931 

Paddy land  m2  1,786  2,191  405  1,785  6,167 

Field crops land   m2  5,857  17,232  1,234  6,335  30,659 

Perennial tree land  m2  12,373  9,626  3,210  5,071  30,280 

Productive artificial forest land  m2  13608  4,483  375  2481  20947 

Crops  m2  51,522  130,928  12,284  68,310  263,045 

Temporary Loss     43,879  111,505  10,645  60,190  226,219 

Rice  m2  10,252  12,578  2,327  13,233  38,390 

Field Crops  m2  33,627  98,927  8,318  46,957  187,829 

Permanent Loss     7,643  19,423  1,639  8,120  36,826 

Rice  m2  1,786  2,191  405  1,785  6,167 

Field crops  m2  5,857  17,232  1,234  6,335  30,659 

Trees  tree  37,044  20,841  5,581  21,096  84,562 

Cashew  tree 0  230  0  2,214  2,444 

Fruit tree  tree 0  574  0  0  574 

Eucalyptus  tree 3,048  288  0  1,392  4,728 

Pine  tree 14,625  3,249  0  0  17,874 

Rubber  tree 16,981  14,972  5,110  4,743  41,806 

Coffee  tree  2,390  1,528  471  12,747  17,136 

Structures  m2  554  920  0  767  2,241 

Brick walls, tile/corrugated iron roof  m2  228  761  0  512  1,501 

Partition wall,  tile/corrugated iron roof  m2  174  54  0  0  228 

cottage roof  m2  83  24  0  0  107 

Auxiliary buildings (breeding facilities, kitchen)  m2  69  81  0  255  405 

 

94. Nine  (9) hamlets are  located within 120 m of  the TL, and,  therefore, may be affected by electro‐magnetic  radiation  (Table 10).    There  are  two hamlets  that will be particularly  vulnerable  to  the 

Page 32: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 30

 

impacts  of  electro‐magnetic  radiation  (Plei  Duân  in  La  Chim  commune  and  Plei  Grút  in  La  Phi commune).   These 2 settlements are  located between the existing Pleiku ‐ Da Nang 500 kV TL and the new proposed Pleiku ‐ Ban Sok (Ban Hatxan) TL.  Plei Duân village is located along the TL at the 22nd turning angle (G22).  The 20 households in this village are particularly vulnerable, as the edge of this village  is only 100 m  from the new proposed TL and approximately 71 m  from the existing line.   The potential need to relocate this village will depend on the expected cumulative  impact of electro‐magnetic radiation from the two TLs.  EVN, in consultation with the EMU and local residents, will need to assess whether it is necessary to relocate this village. 

 Table 10 List of villages within 120 m of the TL (EMR potential Impact Zone). 

Village Name  Distance from TL ROW 

Phie Phap Hamlet – Dak Su Commune  100 m 

Workers house rubber 372 Company – Dak Su Commune  120 m 

Anh Dung Hamlet – Sa Nghia Commune  110 m 

Nghia Long Hamlet – Sa Nghia Commune  50 m 

Ka Bay Hamlet – Sa Binh Commune  50 m 

Wer (Plei Duan) Hamlet – La Chim Commune  71 m 

Plei Grut Hamlet – La Phi Commune  91 m 

Hamlet 1 – Nghia Hoa Commune  50 m 

Hamlet 3 – Sa Nghia Hoa Commune  41 m 

 

Entitlements 

95. The  resettlement  principles  and  assistance  have  been  designed  to  cover  compensation  for  lost assets  and  restore  or  enhance  the  livelihoods  of  all  categories  of  affected  people.  Table  10 (Entitlement Matrix) provides a summary of the application of the principles, definition of entitled persons, entitlements and indicates results of actions. 

96. Affected  households will  be  compensated  prior  to  onset  of  construction.    They will  be  given  3 months from this time to salvage any trees or crops from the acquired land.  After the expiry of the deadline,  Project  Owner  /  EVN  or  its  contractor  can  take  action  to  clear  the  acquired  land  in preparation for construction.  Project Owner / EVN or its contractor may clear any structures, crops or trees planted on the acquired  land after the cut off date. Any grievances and objections will be referred  to  the  Grievance  Redress  Committee.    If,  following  the  contractor’s  detailed  design, categories  of  loss  are  identified which  are  not  covered  by  the  Entitlement Matrix,  policies  and entitlements in this RAP should be updated with reference to the Project Resettlement Framework. 

Page 33: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 31

 

Table 11 Entitlement Matrix. 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

(a) Arable land   Permanent Loss Less than 20% of total landholding to 

be acquired (marginal impact on household income and living standards). 

a) Legal user of affected land with permanent land rights, and AP’s who meet the criteria for permanent land use rights and will therefore be issued with permanent LURC in due time. 

Cash compensation for crops and trees at market price, AND Cash compensation for acquired land at 100% of replacement cost. 

b) Legal user of affected land with temporary land rights (unlegalizable).  

Cash compensation for crops and trees at market price; AND  (a) cash compensation for affected land corresponding to 100% of the replacement cost of affected land; OR  (b) cash assistance for lost income from the affected land for the remaining period of the temporary land use right. 

c) Legal user of affected land with lease land rights (unlegalizable).  

Cash compensation for crops and trees at market price; AND Cash assistance for loss income for the remaining lease period. 

More than 20% of total land holding and remaining land is rendered unviable for continued use (severe impact on household income and living standards).  

a) Legal user of affected land with permanent land rights, and AP’s who meet the criteria for permanent land use rights and will therefore be issued with permanent LURC in due time. 

Cash compensation for crops and trees at market price;   (a) full title to land of equal productivity at location acceptable to AP’s, wherever available; OR 

 (b) cash compensation for lost land at 100% replacement cost at the informed request of AP’s;  Transport allowance to shift  to relocation site;

Subsistence allowance for six months; 

Page 34: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 32

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

Rehabilitation package (training for one family member in current or new occupation and training allowance / agricultural extension services, and farm inputs to increase productivity on remaining land, or any other type of suitable assistance) 

b) Legal user of affected land with temporary land rights (unlegalizable).  

AP’s will be entitled to:

Cash compensation for crops and trees at market price;  Cash equivalent to 100% of the replacement cost of the affected land;  Transport allowance;

Subsistence Allowance for 6 months,  

A rehabilitation package (training for one family member in current or new occupation and training allowance / agricultural extension services, and farm inputs to increase productivity on the farm land, or any other suitable assistance); OR Cash assistance to provide for lost income from the land for the remaining period of temporary land use right. 

c) Legal user of affected land with lease land rights (unlegalizable). 

APs  will be entitled to:

Cash compensation for loss of crops and trees at market prices;  Land for land compensation of equivalent productive capacity at location acceptable to the APs and on a similar lease basis if available; OR Cash equivalent to provide for lost income from affected land for the remaining lease period; Transport allowance;

Page 35: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 33

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

Subsistence allowance for each family member for 6 months;   

d) Legal user of affected land with rights of rotational use (swidden) 

Rehabilitation package (training for one family member in current or new occupation and training allowance OR agricultural extension services, and farm inputs to increase productivity on the farm land OR any other suitable assistance). 

as for b)

Temporary loss   Loss of use of the land for a period up to a maximum of 1 year. 

a)Legal user of affected agricultural land  Cash compensation for loss of crops at market prices  

b) Legal user of affected land with rights of rotational use (swidden) 

Cash compensation for loss of crops at market prices 

(b) Residential and/or commercial land (without structures built thereon) 

Loss of residential or commercial land due to the project works 

Legal land user with permanent rights or temporary rights (but legalizable).  

APs will be entitled to cash compensation at 100% of replacement cost of the affected land. 

Legal land user with temporary right (unlegalizable).  

APs will be entitled to cash assistance equivalent to 30% of replacement cost of the affected land. 

(c) Residential and/or commercial land (with structures built thereon) 

Loss of residential or commercial land.  

a) Legal user of affected land with permanent use rights or temporary use rights that will be legalized in due time. 

Cash compensation for land lost at 100% of replacement cost;  

With remaining legal residential and/or commercial land sufficient to reorganize (at least equal to 100 m2 in rural area) 

Subsistence allowance for 3 months;

Repair cost to re‐build the house front if structures partially affected;  APs who are allowed to reorganize will be issued a permanent LURC in case not yet obtained. 

Page 36: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 34

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

In exceptional cases, permission may be given to APs to reorganize on their remaining legal land in area less than the standard. APs will be entitled to a special allowance equivalent in value to the difference in land area between the standard plot size and the remaining area on which AP is reorganizing, at the rate of replacement. APs are also entitled to repair costs for partially demolished structures. 

(d) Loss of residential or commercial land (with structure) 

APs has remaining permanently legal or legalizable residential and/or commercial land less than 100m2  

a) Legal APs of the affected land with permanent use rights.  

Group Relocation: 

Land for land compensation of full title to a standard size plot, on a project sponsored  relocation site, (for residential or residential and commercial 100 m2; and for commercial only 14 m2) of land of the same quality (or better) as the affected land and for their remaining legal land (not less than the minimum standard plot size). APs losing an area greater than the plot in RS will receive compensation in cash for the difference; Sites will be serviced with electricity, water, drainage, access and internal road, and will provide the same access to services (health, education, market) as at the former location, either on site or in the vicinity; OR 

Self Relocation: At the informed request of the APs they may make their own arrangements for relocation and will be entitled to: 

Cash in lieu of land at 100 % replacement cost ;  

Transport allowance;

Subsistence allowance for a period of 6 months; 

Page 37: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 35

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

APs who have their business affected will be entitled to a special income rehabilitation allowance (USD 100 per household) to provide for loss of income during the transition period. 

Assistance from local authorities to locate possible plots and to purchase land for resettlement. Re‐organization: Only in exceptional cases permission may be given to APs to organize on their remaining legal land in less than standard area. APs will be entitled to a special allowance equivalent in value to the difference in land area between the standard plot size on a RS and the remaining area on which AP is reorganizing, at the rate of RS land. Reorganizing APs will get subsistence allowance for three months.  

Residential or commercial land (continued) 

less than 100m2 b) Legal APs of the affected land with temporary use rights (but unlegalizable). 

AP’s will be entitled to:

(same as above) Group Relocation: same as for entitled persons category a) ; OR Self Relocation: At the informed request of APs they may make their own arrangements for relocation and will be entitled to: 

‐ Cash equivalent to 100% of the replacement cost of their lost land;  ‐ Cash compensation to 100% of replacement cost of structures;  ‐ Subsistence allowance for 6 months;

‐ Transport allowance;

Page 38: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 36

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

‐ APs who had business at their affected location and who must relocate are entitled to a special income rehabilitation allowance of USD 100 to provide for loss of income during the transition period;  

‐ Assistance from local authorities to locate possible plots and to purchase land for resettlement. 

Residential or commercial land (continued) 

Less than 100m2

(same as above) c) Illegal APs with no rights to use the affected land and not legalizable.  

APs who have no rights to use the land acquired and no legal or legalizable land remaining will be entitled to one of the following options: Group relocation: same as for entitled persons category a); OR Self‐Relocation: At the informed request of APs they  may  make  their  own  arrangements  for relocation and will be entitled to: ‐ Cash assistance equivalent to the actual cost of a plot in resettlement site;   ‐ Cash compensation at replacement cost for their structures; ‐ Transport allowance to relocation site;

‐ Subsistence allowance; 

‐ APs who are entitled  to relocation and who have  business  affected  will  be  entitled  to  a special  income  rehabilitation  allowance  of USD100  to  provide  for  loss  of  income  during the transition period;  

‐ Assistance  from  local  authorities  to  locate possible  plots  and  to  purchase  land  for resettlement. 

Page 39: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 37

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

(e) Structures Structures affected by the project  a) Legal owner of the affected structure.  ‐ APs with legal right to build the affected structure will be entitled to compensation at 100% of replacement cost of the affected structure, including material, cash or a combination of the two. No deduction will be made for depreciation or for salvageable materials. 

‐ Partially affected structures will be compensated for the affected part at replacement cost and additional cash assistance (Repair allowance) will be made to cover the cost of repairing the structure. 

a) Tenants of leased affected structure ‐ Tenants of structures will be entitled to 3 months rent allowance and assistance in finding alternate rental accommodation 

(f) Independent shop owners 

Shops located in the project area (with residences at a different location). 

a) Legal owner of the shop with permanent rights to use the affected land.  

APs will be entitled to one of the following options: Group Relocation: 

‐ Land  for  land compensation of  full title to a plot of land on a group resettlement site of the same  area  and  quality  as  the  area  lost (minimum  14  m2)  on  the  site  suitable  for restoring business or at a market place; 

‐ Cash compensation for affected structure at replacement cost; ‐ Transport allowance;

‐ Subsistence allowance for 6 months;

‐ Special  income  rehabilitation  allowance  of US$ 100 to provide for  lost  income during the transition period; ‐ Suitable rehabilitation assistance;

OR

Page 40: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 38

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

Self relocation: At the informed request of APs they  may  make  their  own  arrangements  for relocation and will be entitled to: ‐ Cash compensation at replacement cost for their land lost:  ‐ Cash compensation for their structures;

‐ Transport allowance;

‐ Subsistence allowance; 

‐ Suitable rehabilitation assistance; 

‐ Special  income  rehabilitation  allowance  of US$ 100 to provide for  lost  income during the transition period. ‐ Assistance  from  local  authorities  in identifying individual resettlement sites 

Independent shop owners (continued) 

   b)  Illegal owner of the shop with no land use rights 

APs  will be entitled to one of the following options: Group relocation:

‐ Assistance  to  relocate  to  suitable  site  or  at market place; ‐ Cash compensation for affected structure;

‐ Transport assistance;

‐ Special  income rehabilitation allowance USD 50  to  provide  for  lost  income  during  the transition period; ‐ Subsistence allowance;

‐ Suitable rehabilitation assistance. OR

Self relocation: At the informed request of AP’s they  may  make  their  own  arrangements  for relocation and will be entitled to: ‐ Cash assistance at 100% of replacement cost for their structures; 

Page 41: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 39

 

TYPE OF LOSS  APPLICATION DEFINITION OF ENTITLED PERSON COMPENSATION POLICY

‐ Transport allowance;

‐ Subsistence allowance; 

‐ Special  income rehabilitation allowance USD 50  to  provide  for  lost  income  during  the transition period; 

‐ Suitable rehabilitation assistance;

‐ Assistance from local authorities in identifying individual resettlement sites. 

Graves  Graves located in the area acquired.  Household who owns the graves APs are entitled to cash compensation for all costs of excavation, movement and reburial including payment for consecration. 

Private wells Wells located in area acquired. Household who owns the well. Cash compensation at replacement cost or a replacement well if requested by the AP. 

Crops Affected Crops  Owner of affected crops  Compensation in cash at current market prices  (farm gate price of the harvested crops plus cost of production) 

Perennial Trees Affected Trees Owner of trees APs will be entitled to:

A lump sum amount for young non‐fruit bearing trees to cover for the cost of maintenance and inputs; 

For fruit bearing trees compensation at 3 years production value at current market prices.     For timber trees:  compensation at the current market value of the trees, or the cost of replacement and cultivation of young trees plus the calculated current market value of the trees. 

 

 

Page 42: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 40

 

Compensation, Relocation and Income Restoration 

97. Based  on  the  laws,  regulations,  and  compensation  principles  outlined  above,  and  on  successful implementation  experience  of  previous  projects,  a  set  of  compensation  standards  and  valuation methods have been developed for the proposed Project as follows: 

i. Permanent  Land Acquisition – For permanent  land acquisition, different  compensation will be paid based on different  types of  land  areas.  It  is  agreed  that  for productive  farmland, mainly paddy land, the basic compensation the area of acquired land. Refer to Formula 1 in Chapter  7  for  detailed  formulae  of  estimating  the  unit  compensation  rate  for  permanent compensation cost. 

Given  the different  yield of paddy and market price  in different  towns and provinces,  the actual compensation  rate will vary  from province to province. For example,  in some paddy fields near the town, with good irrigation, crops could be harvested twice a year. As a result, the annual yield and output value of such paddy  land will be much more  than  those areas with only one time harvest each year. 

For acquired scrub  land and garden  land, the compensation rate will be set at one third of compensation rate for paddy land.  

ii. Temporary  Land  Occupation  –  In  addition  to  the  income  losses  from  permanent  land acquisition,  there will  be  income  losses  from  temporary  land  occupation  or  disturbances during project construction. For such losses, compensation of lost crops at replacement value and cost of restoring land into original conditions will be paid by the project owner. 

Depending on length of such occupation, most of impacts will be limited to one crop loss, but for some cases, such occupation might take up more than one year with multiple crop losses. The compensation will be based on average yield and market price of lost crops. Efforts will be made by  the project owner  to minimize  the  impacts of  temporary  land occupation by timing  the  construction after planting  season. Project Owner will also minimise  temporary impacts by using  (and  / or  improving)  existing  track,  rather  than  constructing  a new one.  Requirements  to minimise  temporary  impacts will  be  included  in  construction  contracts. Refer to Chapter 7 for unit cost details. 

iii. Structures and Assets – The basic compensation principle will be to provide compensation at replacement  value,  which  will  include  (i)  cash  for  lost  structures  sufficient  to  replace materials and  labor  to build replacement structures  to an equivalent size and standard;  (ii) housing  plot  to  build  the  replacement  structure;  and  (iii)  allowance  for  the  expense  of relocation and lost of income during transfer. 

iv. Economic Trees and Cash Crops – Trees and cash crops will be compensated based on cost of removing and replacement and maintenance (refer to Formula 2 provided in Chapter 7).   

v. Other Compensation and Assistance – No loss of infrastructure facilities, community services and  other  community  assets,  such  as  roads,  bridges,  schools,  electricity, water  has  been identified.  In the event that any such loss is found during the DMS, Project Owner / EDV will 

Page 43: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 41

 

provide  in‐kind  compensation or by  rebuilding  these  facilities  to  their original  status. Such replacement will be completed prior to the construction of transmission projects, so that the daily life of concerned communities will not be affected. 

In case of the transmission line passing the cultural area of the villages like “spirit forest” area and  cemetery area, Project Owner  / EDV will  consult with villages  to arrange a  traditional moving ceremony according to village practice, and Project Owner / EDV will be responsible for any cost related to the  relocation. Any cemetery on the ROW alignment, especially any human death kiln will need to be moved. 

98. A report on the Detailed Measurement Survey (DMS) will be prepared providing detail on the assets affected (type and age of land, trees, and structures) and the proposed market price for all assets.  The  report will  be  submitted  to  the  Provincial  Peoples  Committee  (PPC)  and  Provincial  Financial Department for approval.   The report will also be provided to the  Independent Monitoring Agency (IMA). 

Compensation for Land Losses 

99. Land losses in the TL ROW will be compensated in cash.  This is because there is little available land in  the  vicinity of  the TL, and  it  is probable  that  the Provincial Government would not be able  to identify or procure  replacement  land within  farming  reach of  the  concerned  families.    It  is more likely that the affected households will be able to adjust their land use, purchasing or clearing with community approval, in a more or  less traditional pattern.   Agricultural extension and land officers should be assisted to undertake support and monitoring to ensure that viable farming systems are maintained as a result of this measure. 

100. Loss  level of  land  impacted  in  the ROW will be measured during  the DMS  to determine  their level  of  land‐holding,  other  livelihood  sources  and  income  levels,  to  determine  the  severity  of impacts.  

101. A land market price survey will be conducted by the Provincial Resettlement Committee at the time of the DMS with assistance from the Consultant and EDV Environmental Management Unit, to determine the market prices of land area by area. 

Compensation for Rubber Trees 

102. The number and age of rubber trees has been identified during the IOL survey.  Rubber trees will be compensated  in cash at market price.  Compensation will be based on the number of trees and their age  (as per the formula provided  in Chapter 7).   The market price will be determined by the Provincial Resettlement Committee at the time of the DMS, and will be submitted to the Provincial Peoples Committee (PPC) for approval. 

Compensation for Forest Trees 

103. All  forest trees under the ROW will have to be cleared.   During the DMS, artificial  (plantation) forests will be surveyed at the household level to determine the number, type and age of trees to be cut.  Given the fairly small amount of forest to be disturbed, compensation will be in cash at market prices.  Market price will be determined during the DMS and submitted to the PPC for approval. 

Page 44: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 42

 

104. Natural  forest  will  be  compensated  as  in  provincial  regulation.  Lost  forest  area  will  be additionally  planted  at  a  location which will  be  identified  by  the  Project Owner  /  EVN  and  local authorities. Cost for this reforestation is included in the project construction capital.  

Compensation for structures 

105. The  types  and  quantity  of  houses within  the  ROW  have  been  identified  and  photographed during the IOL survey (Annex 1).  These figures will be confirmed during the DMS.  Compensation for structures will  be  provided  in  cash.    Affected  households will  also  receive  relocation  assistance. Compensation will be calculated on  the basis of house  type, size and quality of materials, and on that  of  the  cost  of  materials  and  construction  as  “new  build”,  without  deduction  of  salvaged materials. 

Income Restoration 

106. Income restoration will be primarily through the provision of cash compensation for temporary or permanent  land  losses and  loss of trees and crops, permitting the affected households to meet the cost of the  loss. Compensation at market prices will permit the replacement of  lost  livelihoods through the purchase of new land or through increased productivity on remaining land through, for example, purchase of farming inputs. 

107. Additional  income  restoration  measures  have  been  prepared  to  assist  vulnerable  groups, primarily  indigenous peoples with  incomes below  the poverty  line who are already  suffering  land shortages  and  food  deficiencies,  and women.    These measures will  be  provided  in  the  detailed IPGDP, to be prepared following the DMS based on the ADB CRLIP measures and structures.  

Other Measures 

108. During the DMS, the EMU of EVN, or a contracting agency such as PECC4, will assess the impact of  the  physical  and  visual  presence  of  the  TL  and  the  impact  of  the  electro‐magnetic  field  on affected  settlements  and  settlements  in  the  vicinity  of  the  line  (within  1  km)  but  not  directly affected  by  land  or  asset  loss.    Further measures may  be  required  if  vulnerable  households  are identified. 

109. Throughout the DMS, construction and operation of the line, EMU/EVN will regularly assess the effect of the TL on the people  living  in close proximity to the  line.   Additional measures,  including information  programmes  and  consultation, may  be  required  to  allay  fears  of  adverse  long‐term effects or any immediate unacceptable impact. 

110. To minimise any safety impacts from UXO, construction area clearing will take place prior to any other activity and workers will be allowed  to  start work only after clearance  is given by  the UXO team. 

Assistance for Vulnerable Groups 

Indigenous Peoples and Gender Development Planning 

111. Based  on  the  common  nature  of  issues  facing  all  vulnerable  groups,  including  indigenous peoples  and women,  as well  as  the  central  role  of women  among  the  indigenous  groups  in  the 

Page 45: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 43

 

affected area, it is recommended that the IPDP and the GDP be combined into an integrated IPGDP.  It is believed that an integrated program will be more effective in addressing vulnerability, and will also result in more efficient use and distribution of resources. 

112. Access  to  local populations  and  specifically  to  indigenous peoples  and  to women, during  the study phase has not been  sufficient  to  support  the preparation of a  separate  Indigenous Peoples Development Plan or Gender Development Plan.  Instead, it is recommended that the measures and structures (such as Project Management Units – PMUs – and Community Facilitators) developed by a  recent  ADB  Project,  the  Central  Region  Livelihoods  Improvement  Project  (CRLIP)  be  used  to support  IPGDP  implementation for the TL.   The measures and structures developed by CRLIP have been designed based on extensive research and consultation with local residents – including people affected by the TL.  This approach (of using CRLIP measures and structures) has been discussed and agreed with the project Vietnamese consultants and concerned agencies in the affected areas. 

113. It  is  recommended  that  a  detailed  IPGDP  be  prepared  following  surveying  and  consultation undertaken during the DMS.  As above, the IPGDP would look to resume and strengthen community development, literacy and language training, health and livelihoods development measures initially implemented under the CRLIP.   In the LARAP budget (Table 15), a  lump‐sum of $100,000 has been allocated for the implementation of the IPGDP. 

114. Assistance specifically for women and women headed households will be incorporated into the IPGDP, and will  include provision of medical supplies and supplementary staffing  for dispensaries; training of traditional midwives; mosquito nets and preventive spraying; mother‐child health classes and  support  for  nutritional  development  and  child  care;  handicrafts  production  and marketing; literacy/Vietnamese language training; and extension, training and micro‐credit for agricultural and small enterprise development. 

HIV / AIDS Awareness and Prevention Measures 

115. Separate provision  is made  for  financial support  for a Province‐wide HIV/AIDS Awareness and Prevention  Programme,  which  will  be  provided  through  support  to  the  existing  Provincial programme of the Provincial Health Department.  

116. Subject to further study, it has been provisionally (verbally) agreed with the national Ministry of Health  that  there  should  be  one  programme which  the  project would  support, which would  be Province‐wide, integrated with other action being taken and would be subject to the agreement of the Central and Provincial Health Authorities, an HIV/AIDS Awareness and Prevention Programme will  include  all  of  the  elements  which  are  currently  promoted  in  the  programmes  of  the  two Provinces: 

i. Peer  education  groups  among  high  risk  groups,  including  hydropower  workers,  and service women (the term employed in Vietnam for women working in restaurants, bars, karaoke and massage parlours) and among ethnic peoples’ men’s and women’s groups; 

ii. 100% condom use in these enterprises and related free or low‐cost availability to groups at risk; 

Page 46: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 44

 

iii. Information  and  publicity  programmes  in Vietnamese  and  in  local  languages  through radio, TV and press Teaching about HIV/AIDS and STD prevention  in MCH groups and handicraft groups; and 

iv. Voluntary and free counselling and testing. 

 

Page 47: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 45

 

7. Implementation Arrangements 

Institutional Structures 

117. National Power  Transmission Corp.  (directly under  EVN)  is  the Project Owner  and  authorizes Central  Vietnam  Power  Projects Management  Board  (CPPMB)  to  plan  and  implement  the whole project, including LARAP implementation.  CPPMB will be assisted by and cooperate closely with the PPC of Gia Lai, Kon Tum, and other concerned authorities. 

118. Power Engineering Consulting  J.S Company 4  (PECC4)  is  assigned  to  implement  investigation, survey,  inventory,  data  collection,  resettlement  plan  preparation  and  coordinate with  CPPMB  to arrange public consultation. 

119. The Provincial Peoples Committee (PPC) of Gia Lai and Kon Tum will be responsible for:  

i. Providing guidance  to  the  relevant agencies  to  coordinate with District Peoples Committees (DPCs) and the Project Owner in LARAP implementation; 

ii. Approving  compensation  and  assistance  unit  prices,  and  establishing  Evaluation  and Compensation Committee at all levels; 

iii. Approving all land acquisitions and transfers in the area of province; and 

iv. Recording and resolving complaints and grievances. 

120. Department of Finance (DOF) will be responsible for coordinating with PECC4 (and other project consultants)  for  the  study  and  establishment  of  compensation  unit  prices.    DOF  will  facilitate submission of the recommended unit prices to the PPC.   DOF will also coordinate closely with the Department  of  Natural  Resources  and  Environment  (DONRE),  Department  of  Planning  and Investment  (DPI),  the Tax Bureau  (TB) and  the PPC as  required during  the  implementation of  the LARAP to adjust compensation units (if necessary) to ensure that the compensation is a fair market price (equal to replacement price) at the time of payment. 

121. CPPMB  will  pay  for  the  expenses  of  the  Compensation,  Allowances  and  Resettlement Committee  (CARC).    CPPMB  will  also  be  responsible  for  providing  CARC  with  information  and supporting  coordination with GOV, provincial and district agencies.   The PPC and  the CPPMB will supervise LARAP  implementation activities,  including CARC’s decisions, to ensure  that the LARAP’s terms and provisions are respected both  in principle and  in practice.   CPPMB will organize or hire consultants  to  carry  out  survey,  inventory  and  information  disclosure;  implement  internal supervision and maintains  frequently contact with  independent monitoring consultancies.   CPPMB will maintain direct  contact with affected households and  communities’  representatives.   CPPMB will work with CPCs, DPCs and PPCs to resolve complaints and grievances that may occur. 

122. District CARCs will consist of relevant Government staff and staff experienced  in compensation and site clearance (Table 11).  CARCs will be responsible for:  

i. Arranging  staffs  to  carry  out  survey, measurement  and  inventory  in  details  for  the  project affected houses and assets for every project affected households (PAH); 

Page 48: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 46

 

ii. Checking  compensation  unit  price  applied  in  LARAP,  proposing  unit  price  adjustment  in accordance with market price/replacement price (if necessary); 

iii. Cooperating  with  CPPMB  to  hold  meetings  with  affected  people,  the  local  authorities, disseminates forms to affected people (PAPs);  

iv. Based  on  the  approved  reports  and  policies  on  LARAP  to  prepare  implementation  plan  in details  (quarter,  semi‐annual,  and  annual  plans)  and  coordinate  with  CPPMB  to  pay compensation on time; 

v. Collecting  PAP’s  grievances  and  complaints,  resolving  any  difficulties  during  project implementation process. 

Table 12 District CARC’s institutional arrangement at district level in project area. 

No.  Institutional arrangement  Number of people 

Position in CARC  Working time 

1  Chairman or deputy chairman of DPC   1  Chairman  Part time  

2  District compensation and site clearance Board 

1  Vice chairman  Part time 

3  Chief of district Finance‐Planning Department 

1  Member  Part time 

4  Chief of district Natural Resources and Environment Department  

1  Member  Part time 

5  Chief of district Infrastructure and Economy Department  

1  Member  Part time 

6  Commune People’s Committee  1  Member  Part time 

7  CPPMB  2  Member  Part time 

8  Representative of PAPs  1  Member  Part time 

Total  9     Part time 

Note: The number of  staff  for each organization only  includes  the number of people  responsible  for compensation and site clearance implementation under this project.  The project runs across 11 districts corresponding to 11 CARCs with total number of 99 staff working simultaneously. 

 

123. Commune Peoples Committees (CPCs) are responsible for: 

i. Providing information, contributing to survey and inventory works. 

ii. Cooperating with district CARC to hold public consultation meetings, disclose information, pay cash compensation, and allowance to PAPs; 

Page 49: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 47

 

iii. Transfering all  feedbacks by PAPs  to district CARC and  solving  complaints at commune  level and proposing solutions for the existing problems (if any) 

124. PAPs are  responsible  for considering and certifying  the accuracy of  their damaged assets and entitlement.   PAPs are also responsible for not rising assets on  land after cut‐off date.   PAPs must hand over land immediately after receiving cash compensation and allowance. 

125. Independent  monitoring  agency  (IMA)  will  be  responsible  for  monitoring  LARAP implementation,  compensation unit price applied  in  LARAP, providing  reports on  implementation progress, and assessing the quality of the executed works to CPPMB. 

Calculation of Compensation 

126. The methods used to estimate indicative compensation costs for this project have been broadly applied in similar previous power projects and have been satisfactory for both sides (project owner and affected villagers).  However, the final methodology for compensation estimate will need to be agreed upon and finalized by CARCs in consultation with the DPCs, concerned local authorities and villagers as well as the Project Owner and it will be set‐up in a final compensation agreement (to be approved  by  the  PPCs),  well  before  the  construction  is  taking  place.  The  actual  final  cost  for compensation varies from place to place and from district to district. 

Compensation for land losses 

127. The formula for calculating compensation of land is provided below (Formula 1).  Suggested unit prices are provided in Table 12. 

Formula 1:  

Compensation Cost = [Area of lost Land (ha or m2)] x [land unit price per one ha (or per one m2)] 

Compensation for structures 

128. Compensation per house has provisionally been estimated during the  IEE and  in discussions of PECC4  with  EDV  EMU  as  $5,000  per  house,  plus  the  cost  of  land  and  land  preparation  and utilities/infrastructure,  giving  a  total  provisional  sum  per  house  of  $7.000.    These  figures  are consistent with compensation paid in recent similar projects. 

Compensation for Economic Trees and Cash Crops 

129. The formula for compensation of economic trees and cash crops is provided in Formula 2. 

Formula 2: 

Cost = [Land Clearing Cost + Cost of Seedling] + [(Maintenance Cost) x (Year of Maturity)]. 

Compensation and Allowances Budget 

Page 50: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 48

 

130. The cost of potential land acquisition and resettlement will be included in the total project cost for the transmission project. Project Owner / EVN will be sure sufficient funding is available to cover all resettlement related cost for the Project. 

131. During project  implementation, detailed  cost estimate of  the  compensation and  resettlement will be developed after detailed survey. The  total  resettlement budget submitted by CARC will be reviewed and approved by Project Owner  / EVN Headquarters and  then  sent  to  the PPC  for  final approval. After  receiving  the  letter of approval  from  the PPC,  the Project Owner will make  funds available to CARC for implementing land acquisition and resettlement. 

132. If  it  is  impossible  for  some  technical  reasons,  the  consultation  for  relocation with  village will need  to  be  considered,  taking  into  consideration  all  traditions  and  custom  of  the  village.  The estimated amount for compensation of land or for traditional protocol is presented in Table 12. 

133. Proposed compensation unit  rates are provided  for each district  in Table 12.   These  rates are based on the following regulations and decisions: 

i. Decision  No.  56/2009/QĐ‐UBND,  dated  on  September  24,  2009  on  promulgating regulation on compensation, allowances and resettlement when the State acquires land in Gia Lai Province; 

ii.  Decision  No.  19/2010/QĐ‐UBND,  by  Gia  Lai  PPC  dated  28/9/2010  on  promulgating allowances  level  for  house,  structure  for  household/individual  life  and  for  land,  trees under ROW of voltage T/L due to use limitation in Gia Lai Province; 

iii.  Decision  No.  818/QĐ‐UBND,  by  Gia  Lai  PPC  dated  30/11/2010  on  promulgating compensation unit price for tree, crops in Gia Lai Province. 

iv.  Decision No. 37/2010/QĐ‐UBND by Gia Lai PPC dated 20/12/2010 on promulgating unit price of land types in Gia Lai Province in 2011; 

v.  Decision  No.  407/QĐ‐UBND  by  Gia  Lai  PPC  dated    21/6/2010  on  promulgating compensation price table for house, structure and buildings on land; 

vi. Decision No. 63/2009/QĐ‐UBND dated  01/12/2009 by Kon Tum PPC on promulgating on stipulating allowance  level  for acquired agricultural  land  in  residential area, and garden land,  lake which are not recognized as residential  labd, allowance for occupation change and creating job stipulated in Article 21 and 22 of Decree No. 69/2009/NĐ‐CP; 

vii. Decision No. 44/2010/QĐ‐UBND dated 22/12/2010 by Kon Tum PPC on promulgating unit price of land types in 2011 in Kon Tum province; 

viii. Decision  No.  16/2008/QĐ‐UBND  dated  29/4/2008  by  Kon  Tum  PPC  on  promulgating compensation price table for house, structure and buildings on land in Kon Tum province; 

ix. Decision No. 04/2010/QĐ‐UBND dated 10/02/2010 by Kon Tum PPC on amendment of compensation  price  table  for  house,  structure  and  buildings  on  land  at  Decision  No. 16/2008/QĐ‐UBND dated 29/4/2008 by Kon Tum PPC; 

Page 51: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 49

 

x. Decision No. 17/2008/QĐ‐UBND dated 07/5/2008 by Kon Tum PPC on promulgating unit price of tree types in Kon Tum province; 

xi. Decision No.  51/2009/QĐ‐UBND dated  27/8/2009 by Kon  Tum PPC on  adjustment  and amendment of unit price of tree types in Kon Tum province. 

134. The Project Owner will also allocate funds for undertaking the DMS and other field work (such as market price survey)  required  to  finalise  the LARAP.   These  funds, and  then a summary of  the total budget for the implementation of the LARAP are provided in Tables 13 and 14. 

 

 

Page 52: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE Page 50

 

Table 13 Estimated cost of compensation, allowances, resettlement at the project districts. 

Item  Unit 

Loss volume Compensation unit price 

(1000 VND) Value (1000 VND) 

Ngoc Hoi district 

sa Thay district 

Kon Tum city 

Chu Pah district 

Ngoc Hoi dist 

sa Thay dist 

Kon Tum city 

Chu Pah district 

Ngoc Hoi district 

sa Thay district 

Kon Tum city 

Chu Pah district 

COMPENSATION, ALLOWANCES, RESETTLEMENT   

                        12,024,005  11,323,404  2,798,199  9,062,817 

COMPENSATION FOR LAND    34,002.59  33,990.28  5,223.84  15,767              346,645  251,400  92,562  188,079 

Residential land  m2  377.97  458.82  0.00  94.15  380  150  150  250.0  143,628  68,823  0  23,539 

Paddy land  m2  1,785.75  2,191.00  405.25  1,785.37  12  11  26  35.0  21,429  24,101  10,537  62,488 

Field crops land   m2  5,857.49  17,231.90  1,233.95  6,335.45  6.5  5.5  18.0  7.5  38,074  94,775  22,211  47,516 

Perennial tree land  m2  12,373.49  9,626.05  3,209.70  5,070.78  5.0  5.5  17.0  8.7  61,867  52,943  54,565  44,116 

productive artificial forest land  m2  13,607.90  4,482.51  374.94  2,481.25  6.0  2.4  14.0  4.2  81,647  10,758  5,249  10,421 

COMPENSATION FOR TREES                            5,777,647  5,026,049  1,614,061  3,990,381 

Compensation for temporary loss                                       

Rice  m2  10,252  12,578  2,327  13,233  1.8  1.8  1.8  1.9267  18,454  22,640  4,189  25,495 

Field crops  m2  33,627  98,927  8,318  46,957  1.0  1.0  1.0  0.828  33,627  98,927  8,318  38,880 

Compensation for permanent loss                                       

Rice  m2  1,786  2,191  405  1,785  1.8  1.8  1.8  1.9267  3,214  3,944  729  3,440 

Field crops  m2  5,857  17,232  1,234  6,335  1.0  1.0  1.0  0.828  5,857  17,232  1,234  5,246 

Cashew  tree  0  230  0  2,214  250.0  250.0  250.0  110.0  0  57,375  0  243,564 

Fruit tree  tree  0  574  0  0  110.0  110.0  110.0  0.0  0  63,113  0  0 

Eucalyptus  tree  3,048  288  0  1,392  11.0  11.0  11.0  6.9  33,528  3,168  0  9,570 

Pine  tree  14,625  3,249  0  0  11.0  11.0  11.0  0.0  160,875  35,739  0  0 

Rubber  tree  16,981  14,972  5,110  4,743  290.0  290.0  290.0  368.2  4,924,626  4,341,871  1,481,781  1,746,388 

Coffee  tree  2,390  1,528  471  12,747  250.0  250.0  250.0  150.5  597,465  382,041  117,810  1,917,798 

Page 53: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE Page 51

 

Item  Unit 

Loss volume Compensation unit price 

(1000 VND) Value (1000 VND) 

Ngoc Hoi district 

sa Thay district 

Kon Tum city 

Chu Pah district 

Ngoc Hoi dist 

sa Thay dist 

Kon Tum city 

Chu Pah district 

Ngoc Hoi district 

sa Thay district 

Kon Tum city 

Chu Pah district 

COMPENSATION FOR STRUCTURES                             554,215  1,092,857  0  857,066 

Brick walls, tile/corrugated iron roof  m2  228  761  0  512  1,294  1,294  1,294  1,500  295,291  984,734  0  767,475 

Partition wall,  tile/corrugated iron roof  m2  174  54  0  0  946  946  946  644  164,604  51,084  0  0 

cottage roof  m2  83  24  0  0  733  733  733  130  60,839  17,592  0  0 

Auxiliary  works  (breeding  facilities, kitchens…) 

m2  69  81  0  255  487  487  487  352  33,481  39,447  0  89,591 

ALLOWANCES                            5,345,498  4,953,097  1,091,576  4,027,290 

Allowances  for  land  under  ROW  due  to use limitation (According to item 6, article 1 decree No. 81/2009/NĐ‐CP of GOV)   

                         

4,024,671   

2,540,949   

536,838    

1,674,329  

Relocation  allowances  (According  to No. 69/2009/NĐ‐CP dated on August 13, 2009 by GOV)  

                          70,200  101,400  0  148,800 

 Resettlement allowances                             360,000  520,000  0  640,000 

Allowances  for  life  and  production stability 

                          93,777  316,649  48,176  375,629 

Allowances  for  occupation  change  and creating job 

                          606,851  859,099  436,563  878,532 

Other allowances                            190,000  615,000  70,000  310,000 

COST FOR CARC ( 2% x Compensation)                            240,480  226,468  55,964  181,256 

CONTINGENCY  COST    (10%  x  (CARC  + Compensation)) 

                          1,226,449  1,154,987  285,416  924,407 

COST  OF  INFLATION  RESERVE  (10%  x (CARC + Compensation) per one year) 

                          1,226,449  1,154,987  285,416  924,407 

TOTAL                            14,717,383  13,859,846  3,424,995  11,092,888 

 

Page 54: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 52

 

Table 14 Budget Estimate for DMS and other fieldwork of CARC and consultants. 

Cost Item  Cost VN Dong  Cost USD* 

Management Expense : DMS  430,940,000  20,696 

Supervision expense : DMS and Compensation  914,000,000  43,895 

Technical Assistance (consultancy)  822,600,000  39,506 

Total  2,167,540,000  104,096 *1.00 U.S. Dollar = 20,822.50 Vietnam Dongs (August 2011)  Table 15 Summary of total budget for LARAP implementation.

Items  Cost VN Dong  Cost USD 

Expense for LARAP preparation ‐Estimation  2,586,000,000  124,193 

Total compensation, allowance costs   43,094,000,000  2,069,588 

DMS and fieldwork (Table 14)  2,167,540,000  104,096 

IPGDP – renewal of CRLIP in affected communes  2,082,250,000  100,000 

Total   49,929,790,000  2,397,877 *1.00 U.S. Dollar = 20,822.50 Vietnam Dongs (August 2011) 

 

Implementation Schedule 

135. The following steps will be taken in order to ensure the resettlement policy framework is being complied with. 

i. Detailed Measurement  Survey.    Although  the  project  will  generate  only minor  impacts according  to  the  result of  the  IOL,  further detailed  site  survey  is  required before  starting project  construction  and  this will  help  confirm  of  the  existing  data.  Contractors  for  the project under the supervision and guidance of the environmental management committee will  conduct  detailed  site  survey  to  identify  objects  to  be  compensated  and  to  collect detailed data  concerning  the  loss of  assets  and  compensation  cost,  in  collaboration with local authorities. 

ii. Review of Resettlement Action Plan. Based on the data and information collected during the detailed site survey, this RAP will be reviewed. Following the resettlement policy framework above and consultation between PROJECT OWNER/EVN and CARC, a data sheet needs to be prepared and updated which include three basic sections (i) the scope of impacts (name and quantities of affected assets)  (ii) detailed compensation  rates and  rehabilitation measures for affected assets, and (iii) total amount to pay to the affected people. 

iii. Consultation  with  Affected  People.  The  prepared  data  sheets  and  resettlement  plan  or compensation  policies  will  be  consulted  with  local  governments,  affected  villages  and 

Page 55: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 53

 

individuals. The comments and  feedback  from  local governments and affected people will be reviewed by PROJECT OWNER/EVN management and considered  in the RAP finalization before implemented of the project. 

iv. Signing of Compensation Contract and Payment of Compensation  to  the Affected People. The final step of resettlement implementation is to sign compensation contract and delivery payment  to  the  affected  people,  which  should  be  completed  prior  to  project implementation. However,  if house  relocation and substantial  land  loss  taking place, such payment need to be completed at  least  few months prior  to construction, which will give the affected people  reasonable  time  to complete new houses and move  their belongings. During  the  implementation, PROJECT OWNER/EVN will pay  such  amount directly  to each affected household in the presence of local government representatives. 

136. While  implementing  the  Project,  EVN  will  initiate  advance  actions  like  the  identification  of responsible district staff, establishment of CARC. This LARAP will be updated after detailed design is approved to  include new  loss assessment data and budget and submitted to the PROJECT OWNER for approval prior to this LARAP’s implementation. 

137. The project will provide adequate advance notification  to  the affected people and will pay all due  resettlement benefits,  including  relocation  and  income  restoration/assistance  as  appropriate, prior  to  issuing  right  of  way  documents  for  construction  work.  All  activities  related  to  land acquisition and resettlement will be completed prior to construction commencement. 

138. For land acquisition, the project office will survey the lands to be acquired as per the contractor’s agreed detailed design and  in conjunction with the district authorities  in the project area, make an initial assessment of  the  compensation amount and prepare a  requisition  to be  submitted  to  the Project Owner / EVN along with a request for land title transfer preparation to Vientiane Capital Land Office.  EVN  will  notify  the  compensation  committee  of  the  total  amount  assessed,  who  upon reaching  agreement  and  settling  any  grievances, will  request Project Owner  /  EVN’s payment   of compensation to the entitled APs/PAFs The compensation committee will assist Project Owner / EVN with actions required to facilitate acquiring the identified land/s from the respective landowners and paying the due compensation to the affected landowners and tenants, according to procedures laid down in this LARAP, and defined in the Entitlement Matrix. Once the land has been acquired and the compensation paid  to  the APs/PAFs, APs/PAFs will hand over possession of  the acquired  lands  to EVN for occupation by contractors. Payment of compensation for other types of losses, for example for documented trees and crops, structures, income loss, income restoration, etc will be paid directly by the EMU through its District offices. This process will be monitored and verified to Project Owner / EVN by an External Monitoring Agency  in order to obtain Project Owner / EVN’s “No Objection”, which allows EVN to advise contractors to begin the construction works.  

Arrangements for Valuing and Disbursing Compensation 

139. As part of the DMS, the Project Owner / EVN with local authorities and consultants (e.g. PECC4) will carry out census and profile of APs based on the final design and, at that time, will quantify all categories  of  loss.    CARC  in  cooperation  with  the  DPC  and  PPC  will  then  agree  on  level  of compensation  for  land,  crops  and  buildings,  and  oversee  the  compensation  process.  The composition of CARC is provided in Table 11. 

Page 56: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 54

 

140. Project Owner / EVN will estimate total compensation and relocation funds as agreed with APs, update the RAP budget and submit a final compensation budget proposal to request funds to Project Owner / EVN management  for approval. Once approval has been gained, the EVN Finance Section releases  funds  for  compensation payments, and Project Owner  / EVN disburses  the  funds  to APs, obtaining the necessary receipts. Once compensation has been received, APs will hand over/vacate the land within two months. The title of the land is then transferred to Project Owner / EVN by the Provincial  Land  Office.    Project  Owner  /  EVN  will  maintain  file  copies  of  all  AP  contracts, compensation  receipts and RoW notices, and  furnish  the same  to AP signatories  for  their housing relocated.35% of the total loss was estimated for house moving.

Reporting and Approval 

141. During  the  feasibility  study  of  the  Project,  the  Initial  Environmental  Examination  (IEE)  was conducted.  This  RAP  is  prepared  as  a  part  of  this  study.  Before  starting  of  construction  works, detailed survey/loss data confirmation will be conducted in collaboration with local authorities under the  supervision  of  the  Project  Environmental  Management  Committee  (EMU),  and  then consultations will be conducted between the committee and project‐affected people. Project Owner / EVN office will prepare all datasheet  and  records of  consultations with project‐affected people. EMU of  Project Owner  /  EVN will  summarize  all  the  information  to  review  this RAP  if  any major changes from this RAP.  

 

 

Page 57: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 55

 

8. Monitoring and Evaluation 

142. Monitoring and evaluation (M&E) is a major part of the resettlement management system. The Resettlement  Action  Plan  will  be  both  internally  monitored  and  externally  monitored  (by  an independent agency such as an NGO or research institution engaged for this purpose). In accordance with the ME guidelines, during the project implementation, both internal and external, resettlement monitoring  and  evaluation  will  be  carried  out  in  order  to  ensure  that  all  affected  people  are compensated  adequately,  effectively  and  their  income  and  livelihood  are  better  off  and  at  the minimum restored. 

Internal Monitoring 

143. The  following  periodic monitoring  of  LARAP  activities will  be  carried  out  by  CARC,  Provincial People’s Committee and the Project Owner / EVN. During the monitoring, progress of resettlement implementation and compensation for affected people will be monitored and evaluated. 

i. Monthly monitoring:  Project Owner / EVN will send their staff to the project site once a month to consult with the Commune Peoples Committee (CPC) and village  leaders, participate  in  field work and conduct interview with the project affected villagers. 

ii. Three month monitoring: A  joint monitoring and evaluation between Project Owner / EVN and CARC will be conducted at the project site once in three months. The purpose of the monitoring is to review the progress of LARAP work, to adjust the LARAP effectiveness and to consult with village representatives and project affected villagers. 

iii. Six  month  monitoring:  A  joint monitoring  and  evaluation  of  Provincial  People’s  Committee, Project  Owner  /  EVN  and  CARC  will  be  conducted  once  in  six months.  The  purpose  of  the monitoring  is  to  review  the  entire  recommendations made  by  the monthly  and  three month monitoring and evaluate reports, to consult with the CPC and village leaders, to consult with the project affected villagers, to evaluate, review and modify if required the LARAP implementation plan. 

External (Independent) Monitoring and Evaluation 

144. Base  on  the  MONRE’s  guidelines  for  independent  review  (or  third  party  review),  external monitoring  and  evaluation  will  be  conducted  by  an  independent  third  party  (the  ‘Independent Monitoring Agency). Project Owner / EVN will select an  independent  institution, which consists of social  specialists, with  approval of  the Project Owner  / EVN. The  selected  institution  should have extensive experience  in similar activities.   The main objective  is to provide  independent monitoring and evaluation of the resettlement implementation program, to see whether the work carried out by CARC, and E others concerned reflects the resettlement and the environmental management policy and  the  conceived  plan  is  achieved.    The  scope  of  monitoring  and  evaluation  includes  the implementation  progress,  resettlement  policies,  delivery  of  compensation  and  replacement  land, changes  of  income  and  livelihood  among  affected  people,  consultation  and  participation  and development of  local communities. The method of resettlement monitoring and evaluation will be based on a combination of sample household survey and rapid appraisal in the field. 

Page 58: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 56

 

Post Implementation Monitoring and Evaluation 

145. Six months  to  one  year  after  the  end of  resettlement  activities,  the  Independent Monitoring Body shall conduct an evaluation study of severely affected APs and the vulnerable groups among the affected population to determine whether or not the objectives of the Resettlement Action Plan, in  terms of  restoration of  incomes and  living standards have been achieved. The methodology  for the evaluation study will be based on the follow up socio‐economic survey to determine the impact of the Project on APs  income  levels and  living standards of those severely affected by the Project. Survey  data  at  post  evaluation  stage  will  be  compared  with  the  baseline  survey  at  the  RAP preparation stage. The Post  Implementation Evaluation Study may propose additional assistance to severely  affected  persons  if  resettlement  measures  were  not  adequate  and  may  also  provide recommendations for future resettlement planning. 

Page 59: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 57

 

Annex 1 Results of IOL Surveying 

 

Table 1. The length of TL by communities affected by the project 

Province  District  Commune  Length (m) Area (m2)*  Area (ha)*

Kon Tum        69,814  2,136,308  213.63 

   Ngọc Hồi Dỉstict     31,012  948,967  94.90 

      Đắk Sú commune  16,962  519,037  51.90 

      Đắk Kan commune  14,050  429,930  42.99 

   Sa Thầy district     33,633  1,029,170  102.92 

      Rờ Kơi commune  5,933  181,550  18.15 

      Sa Nhơn commune  15,800  483,480  48.35 

      Sa Nghĩa commune  6,522  199,573  19.96 

      Sa Bình commune  5,378  164,567  16.46 

   Kon Tum city     5,169  158,171  15.82 

      Ia Chim commune  5,169  158,171  15.82 

Gia Lai        23,686  724,792  72.48 

   Chư Pah district     23,686  724,792  72.48 

      Ia Mơ Nông commune  3931  120,289  12.03 

      Ia Phí commune  9700  296,820  29.68 

      Ia Kar commune  4700  143,820  14.38 

      Nghĩa Hoà commune  5355  163,863  16.39 

TOTAL        93,500  2,861,100  286.11 

*Area is based on a ROW of 30.6 m. 

 

Table 2. House characteristics of project affected households  

No.  Name of the owner  Address 

Structure characteristics

Building materials of roof 

Building materials of wall 

Building materials of 

the foundation 

Alternative 1 

1  Nghiêm Minh Tuấn  Đăk Sú commune‐ Ngọc hồi district ‐Kon Tum Province 

Metal  building  cement 

2  Lê Tấn Thành  As above  Metal  Plank  cement 

3  Trần Văn Hoán  As above  Metal  building  cement 

4  Nông Văn Hoèn  As above  Cottage  building  cement 

5  Đàm Thị Hoan  As above  Metal  building  cement 

6  Hoàng Văn Trường  As above  Cottage  Bamboo  soil 

Page 60: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 58

 

No.  Name of the owner  Address 

Structure characteristics

Building materials of roof 

Building materials of wall 

Building materials of 

the foundation 

7  Hoàng Văn Học  As above  Metal  Bamboo  soil 

8  Hoàng Văn Chức  As above  Tiling  Plank  soil 

9  Triệu Văn Hải  As above  Metal  building  cement 

10  Owner absent  Rờ Kơi commune ‐ Sa Thầy district  Cottage  Bamboo  soil 

11  Vi Văn Tiệp  As above  Metal  Bamboo  soil 

12 Ng Hữu Chính 

Nhân Nghĩa‐Sa Thầy‐Kon Tum  Metal  building Enamelled 

tile 

13 Nguyễn Thanh Hùng 

A Dung village ‐ Sa Nghĩa commune‐Sa Thầy district 

Metal  building  cement 

14  Lê Công Bình  As above  Metal  building  cement 

15 Võ Thộc 

Village3‐ Nghĩa Hoà commune‐ Chư Pah district 

Metal  building  cement 

16 Võ Giới 

Village3‐ Nghĩa Hoà commune‐ Chư Pah district 

Metal  building  tile 

17 A Thành 

Ka Bay village ‐ Sa Bình commune‐ Sa Thầy dist 

Tiling  building  cement 

18  A Sen  As above  Tiling  building  cement 

19  A Điều  As above  Tiling  building  cement 

20  A Đưới  As above  Tiling  building  cement 

21  A Meng  As above  Tiling  building  cement 

22  A Hy  As above  Tiling  building  cement 

23   Nương Văn Đặt  Village3‐ Nghĩa Hoà commune‐ Chư Pah district 

Tiling  building  cement 

24   Nguyễn Mậu Duyền  As above  Tiling  building  cement 

25   Nguyễn Mậu Lên  As above  Tiling  building  cement 

26   Nguyễn Mậu Quyết  As above  Tiling  building  cement 

27   Nguyễn Đăng Trình  As above  Tiling  building  cement 

28   Phạm Huệ  As above  Metal  building  cement 

29  Phạm Đăng Chương  As above  Concrete  building  cement 

30   Trần Thị Chức  As above  Tiling  building  cement 

Page 61: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 59

 

 

Table 3. Characteristics of project affected ancillary structures  

No.  Name of the owner  Address 

Structure characteristics 

Building materials of roof 

Building materials of wall 

Building materials of 

the foundation 

Alternative 1 

1  Owner absent Đăk Sú commune‐ Ngọc hồi district ‐Kon 

Tum Province Cottage  Plank  Soil 

2  Nông Văn Tình  As above  Cottage  building  cement 

3  Hoàng Văn Đồng  As above  Metal  building  soil 

4  A Vớ Đăk Kan commune‐ Ngọc hồi district ‐

Kon Tum Province Cottage  Bamboo  Soil 

5  A Pho  Sa Thầy town‐Kon Tum city  Metal  Plank  soil 

6  Trần Văn Tuệ  Village3‐Sa Thầy town‐Kon Tum city  Metal  building  Cement 

7  Võ Văn Tạo  As above  Tiling  building  Cement 

8  A Liễu Nhơn Bình village‐Sa Thầy town‐Kon 

Tum city Tiling  Plank  soil 

9  A Nhặt Kép village‐ IaPhi commune‐Chư Pah 

distirct Tiling  wood  Bamboo 

10  Ô Man MRông Ngó village‐IaPhi commune‐Chư 

Pah distirct Metal  Bamboo  Bamboo 

11  Owner absent  Village 4 –IaKa commune‐Chư Pah district 

Cottage  Bamboo  soil 

12  Owner absent  Village3‐ Nghĩa Hoà commune‐ Chư Pah district 

Metal  building  Cement 

Page 62: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 60

 

Table 4. Land use situation of the affected communes/districts along Ban Sok – Plei Ku 500kV (in 2005) 

No  Place 

Sum of  natural  area 

Agricultural land 

Residential land 

Forestland  Other land (bare land, lake, river, 

etc.) 

Sum of agricultural 

land  

Annual tree land  Perennial tree land 

Other land 

Total  Wet rice 

Upland rice 

Field crops 

    Total Preservative forest land  

Protective  forest land  

  Ngọc Hồi district  84.382  12.766 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 57.602 ‐ ‐ 12.497 

1  Pờ Y commune  9.930  1.261 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7.733 ‐ ‐ 695 

2  Đăk Can commune  9.342  3.111 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.328 ‐ ‐ 2.741 

  Đăk Tô district  50.924  11.631 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 24.999 ‐ ‐ 12.367 

3  Tân Cảnh commune  5.159,6  2.658 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.315 ‐ ‐ 444 

4  Pô Kô commune  10.119  1.559 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.014 ‐ ‐ 6.227 

   Sa Thay district     

5  Hơ Moong commune  6.523  ‐ 2.500 72 2.428  250 ‐ 56 1.450 0 0 2.267 

6  Sa Nghĩa commune  3.746  ‐ 1.202,11 51 15 93,43 782,34 ‐ 40 1.469 0 0 0 

7  Sa Bình commune  4.035,2  ‐ 2.777,81 76 2.701,81  178,21 ‐ 45 466,88 0 567,3 0 

  Kon Tum town     

8  Hòa Bình commune  6.022  ‐ 4.763,54 ‐ ‐ ‐ 0 ‐ 513,52 0 0 0 744,94 

9  Ia Chim commune  8.972  ‐ 1414,9 237,5 57,5 1.119,6 3.291,3 ‐ 83,65 377,54 3,0 10,0 0 

  Gia Lai province     

  Chu Păh district  98129,7  ‐ 8.425 4350  4075 13.251 ‐ ‐ 29.649 ‐ ‐ 36.335 

10   Ia Phi commune  6.995  ‐ 1.040 557  483 428,5 ‐ ‐ 221 ‐ ‐ 3.379 

11  Hòa Phú commune  5.491  ‐ 505 180  325 782,5 ‐ ‐ 2.425 ‐ ‐ 1.228 

12  Nghĩa Hòa commune  2.109  ‐  ‐  ‐  ‐  ‐  ‐  ‐  0  ‐  ‐  410 

Page 63: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 61

 

Table 5. Gross output of some economic activities (in 2005) 

No  Place 

Agriculture  Forestry  Fishery  Industry  Retail sales value of good and turnover of services 

Total  Cultivation  Animal Service 

husbandry Total 

Afforestation, forest 

breeding 

Exploitation of wood and forest product

Other forestry 

Total  Aquaculture Aquatic 

exploitation Total 

Domestic economic sector 

1 Ngọc Hồi district 

62.197  33.946  28.085  166  7.735  1860  1.300  4.576  3.215  3.107  108  27.859  27.859  40.478 

2 Đăk Tô district 

120.647,5  76.711,7  19.357,8  8.130,0  14.849  7.211  4.807  2.831  1.343  1.135  208  65.098  65.098  41.128 

3 Sa Th�y district 

83.426  60.498  20.655  2.273  18.130,4  9.227  8.819  84,4  5.148  2.160  2.988  11.540  11.540  32.875 

4 Ch� Păh district 

352.027  310.606  36.862  4.559  12.883  3.816  4.547  4.520  1.829  595  1.234  134.170  134.170  ‐ 

5 Kon Tum town 

‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  459.274  459.274  767.086 

   

Page 64: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 62

 

Table 6. Area, yield, gross output of some cultivated crops and domestic animal of project affected communities 

  Paddy   Maize  Sugar cane  Peanut  Rubber  Coffee  Pig  Poultry Buffalo, 

ox 

District Area (ha) 

Yield (quintal   /ha) 

Gross output (ton) 

Area (ha) 

Yield (quintal   /ha) 

Gross output (ton) 

Area (ha) 

Yield (quintal  /ha) 

Gross output (ton) 

Area (ha)

Yield (quintal  /ha) 

Gross output (ton) 

Area (ha) 

Gross output (ton) 

Area (ha) 

Gross output (ton)

Number (head) 

Gross output of living 

livestocks (ton) 

Number (head)

Gross output (ton) 

Number (head) 

Chư Păh district  4350 37,3  16280  950  37  3498  330  450  14850  150 11  165  3747 5397  8200 10660 21509  1138  57641 60  16012 

Sa Thầy district  2361 24,2  5705  751  22,79  1712  78    1512  33  7  24  4277 107  451  216  9954  605  38029 31  7373 

Đăk Tô district  1857 32,4  6015  690  33,58  2317  17    640  4  10  4  2807 382  682  479  11370  851  30256 30  8909 

Ngọc Hồi district 2711 29,5  7984  725  39,61  2872  0  0  0  30  10  30  4107 1602  862  870  8710  489  35792 30  6523 

Kon Tum town  2646 33,8  8931  1838 39,28  7220  2534 437,2  110785 126 11  138  5044 3873  780  688  35747  3763      24283 

Page 65: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 63

 

Table 7. Some economic ‐ social indicators of communes, districts, town in area where transmission line crosses 

No  Kon Tum province 

Population (pers) Natural growth rate (%0) 

Employment by kind of economic activities 

Gross output of food per 

capita (kg/pers/year) 

Average income per 

capita (VND/year) 

Number of the hunger and poverty households 

(%) 

Percentage of households using well‐water for activities 

Percentage of 

households  having a sanitary security toilet 

Total  Male  Female  Total  Agriculture and forestry 

Manufacturing 

  Ngọc Hồi district  33.036  16.683 16.353 25 16226 12566 199 310  

1  PoY commune  3.986  197.309  193.323                   

2  Đăk Can commune  3.291  166.195  162.904                   

   Đăk Tô district  35.902  19.472  16.428  19,19  17237  11818  407  232         

3  Tân C�nh commune  6.713  3.640  3073            5.400.000  30,48  21,42  25,8 

4  Pô Kô commune  2.955  1.602  1353                   

  Sa Thay district  32.732  16.115  16.617  21,14  15676  13194  115  226          

5  H� Moong commune  4.570  2.250  2.500              ‐  100  86,39 

6  Sa Nghĩa commune 1.891  931 960   5.200.000 13,53 60 61,31 

7  Sa Bình commune 4.552  2.241 2.311   3.360.000 50,11 90 33 

   Kon Tum town      

8  Hòa Bình commune 5325  ‐  ‐   6.268.000 100 77,67 

9  Ia Chim commune  ‐  ‐  ‐            4.700.000  10,81  85  90 

  Gia Lai province      

  Chu Păh district 64.846  33.524 31.322 19,21 30099 22344 929  407 4.104.000 38,54  

10  Ia Phi commune 5.268  2.572 2.696    

11  Hòa Phú commune 4.973  2.532 2.441    

12  Nghĩa Hòa commune  3.978  2.011  1.967                   

Page 66: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 64

 

Table 8. Infrastructure  

No  Commune Electric route 

(km) Substation  (subs) 

Percentage of electric used 

households (%)

Length of road (km) 

Number of school  

Medical station  

1   Ia Chim commune  15  1 93,5 45 5  1

2  Sa Nghĩa commune  0,3  1  100  4,1 (Gravel and earth road) 

4  1 

3  Hoà Bình commune  ‐  ‐ 93,4 ‐ 4  1

4  Tân Cảnh commune  ‐  ‐ ‐ ‐ 3  1

5  Sa Bình commune  15  6  100  23  3  1 

Notes:  

‐  100%  project  affected  communes,  districts  having  electricity  and  having motor  way  to  commune centre. 

Page 67: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 65

 

Annex 2 Preliminary Public Consultation Results 

1. Document

- Safeguard Policy Statement (June 2009) of Asian Development Bank;

- Summary report about issues such as: compensation, assistance, resettlement plan; ethnic minority development plan; environmental management plan based on ADB’s safeguard policy statement.

2. Consultation way

- Informing Commune People’s Committees in the project area (CPCs) of implementing public consultation with local people as well as time and content of the consultation.

- Organizing meeting: representative of CPCs states reason of the meeting, consultant’s representative presents the following contents:

a. The project information

b. The project description (construction and operation phases)

c. The project’s impacts on environment

d. Compensation, assistance, resettlement plan and Policies of ADB and the Government of Vietnam.

e. Compensation, resettlement plan.

f. Ethnic minority development plan.

g. Environmental management plan.

h. Complaint and grievance.

- Feedbacks of inhabitants in the project area

‐ These feedback are screened and put into contents of the meeting minutes. 

 

Table 1. Summarizing public consultation result    

No.  Commune  Result  Feedback  Number of participants 

A  GIA LAI PROVINCE 

I  Chư Păh District 

1  Nghia Hoa commune (on February 16, 2011) 

Local people and authorities support and agree with the chosen project 

‐ Now, unit price issused by PPC is lower than the fact. Thus, it should have assistance alternative to ensure PAHs’ interestss 

Total number of participants of consultation meeting is 13 people. In which: 

‐ 01 Chief of Nghia Hoa 

Page 68: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 66

 

No.  Commune  Result  Feedback Number of participantsT/L alternative.  ‐ Resetlement plan has to 

be agreed by CPC and PAHs  

‐ PAHs affected by electromagnetic field have to be displaced to new place. There are site rehabilitation methods after finishing construction. 

‐ Appointing staff who will carry out site clearance and compensation to take part in training before carrying out.  

‐ Assisting machines, equipments such as photocopy machine, fax, and printer to conduct the project.  

commune: 

‐ 12 local people  

• 7 males 

• 5 females 

All participants include:  

1. Cao Minh Hoà ‐ Vice‐chairman 

2. Lò Văn Long 

3. Nguyễn Quốc Thuận 

4. Lò Văn Niệm 

5. Nguyễn Văn Ninh 

6. Nguyễn Mậu Duyền 

7. Nguyễn Mậu Quyết 

8. Nguyễn Đăng Trình 

9. Phạm Huệ 

10. Phạm Chiến 

11. Nguyễn Văn Phòng 

12. Nguyễn Văn Thủy 

13. Phạm Văn Độ 

 

2  Ia Ka commune (on February 18, 2011) 

Local people and authorities support and agree with the chosen T/L alternative. 

‐ It should assist compensation price to PAHs in order to ensure their real interests  

‐ Appointing staff who will carry out site clearance and compensation to take part in training before carrying out.  

‐ Assist construction of a contact room to solve complaint and grievance regarding to the project 

Total number of participants of consultation meeting is 12 people. In which: 

‐ 01 communal chief: 

‐ 11 local people  

• 8 males 

• 3 females 

Including: 

1. Rơ Chăm GRiưh ‐ Chairman  

2. Rơ Châm Alel 

3. Ksos Prok 

Page 69: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 67

 

No.  Commune  Result  Feedback Number of participants

4. Rơ Châm Sui 

5. Rơ Châm Chưng 

6. Rơ Châm Theo 

7. Rơ Châm Uch 

8. Rơ Châm Wuk 

9. Rơ Châm H’yát 

10. Rơ Châm Hunh 

11. Rơ Châm Khưn 

12. Rơ Châm Hrú 

3  Ia Phi commune 

(on February 20, 2011) 

Local people and authorities support and agree with the chosen project alternative. 

‐ It should have an assistance alternative to PAHs in order to ensure their real interests  

‐ Appointing staff who will carry out site clearance and compensation to take part in training in compensation, allowance and resettlement policy before carrying out.  

‐ It should have an assistance on machines, equipments to CPC in order to cooperate the project implementation. 

‐ Suggesting more regularly mearsuring electromagnetic field at residential areas where the T/L crosses over. 

Total participants of consultation meeting is 27 people. In which: 

‐ 01 Communal chief: 

‐ 26 local people 

• 18 males 

• 8 females 

All participants consist of: 

1. Rơ Chăm Wich ‐ Vice chairman  

2. Rơ Châm Phe 

3. Rơ Châm Myip 

4. Rơ Châm Huông 

5. Rơ Châm Hiu 

6. Rơ Châm Huynh 

7. Rơ Châm Plôi 

8. Rơ Châm Byer 

9. Rơ Châm Klinh 

10. Rơ Châm Nhùi 

11. Rơ Châm Blông 

12. Rơ Châm Im 

13. Rơ Châm Phúc 

Page 70: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 68

 

No.  Commune  Result  Feedback Number of participants

14. Rơ Châm Dêl 

15. Rơ Châm Anich 

16. Rơ Châm Anìu 

17. Rơ Châm Ình 

18. Rơ Châm Djriêu 

19. Rơ Châm BlơiH 

20. Rơ Châm Hai 

21. Rơ Châm DJăng 

22. Rơ Châm Chép 

23. Rơ Châm Hnót 

24. Rơ Châm Ameo 

25. Rơ Châm Jon 

26. Rơ Châm Phinh 

27. Rơ Châm Bớt 

28. Rơ Châm Chép 

4  Ia Mo Nong commune 

Not implement consultation yet 

B  KON TUM PROVINCE 

I  Pleiku City 

1  Ia Chim commune 

(on February 21, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Suggesting that it should have an compensation price assistance to PAHs in order to ensure their real interests  

‐ Suggesting that it should appoint local stafves to train in compensation, allowances and resettlement 

‐ Weh village should be assisted to rehabilitate some traditional cultural characteristics 

‐ Suggesting that it should 

Total participants of consultation meeting is 20 people. In which: 

‐ 02 Communal chieves: 

‐ 18 local people 

• 11 males 

• 7 females 

All participants include: 

1. A Tưp ‐ Vice chairman 

2. Hùynh Thanh Tùng ‐ Land staff 

3. Trần Thị Hồng 

Page 71: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 69

 

No.  Commune  Result  Feedback Number of participantsassist machines, equipments such as photocopy machine, fax, printer to conduct the project.  

‐ To ensure sustainable development for PAHs, it should allow residents to borrow capital with no interest rate in long‐term period for reinvestmnet for production 

‐ Suggesting that it should implement according to approved EIA  

4. Nguyễn Tĩnh 

5. Nguyễn Văn Thanh 

6. Cao Văn Đạo 

7. Nguyễn Thị Thuỷ 

8. Đỗ Thanh Ngà 

9. Trần Văn Phước 

10. Đỗ Văn Thông 

11. Nguyễn Thị Sơn 

12. Đặng Quang Vinh 

13. Nguyễn Thị Hoà 

14. Nguyễn Văn Hoà 

15. Đỗ Thị Quyên 

16. Nguyễn Thị Lan 

17. Đăng Quang Sang 

18. Nguyễn Thanh Bình 

19. Nguyễn Hữu Phước 

20. Nguyễn Văn Hà 

II  Sa Thay district 

1  Sa Binh commune 

(on February 23, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Suggesting that it should have an compensation price assistance alternative to PAHs in order to ensure their real interests and legal entitlements 

‐ PAHs will self choose resettlement alternative. 

‐ In the project implementation process, it should have amount of cost for local staves who support the project.

‐ Assisting equipments, 

Total participants of consultation meeting is 30 people. In which: 

‐ 03 Communal chieves: 

‐ 27 local people 

• 18males 

• 9 females 

All participants include: 

1. Trần Văn Hữu ‐ Vice‐chairman  

2. Lê Minh Luận ‐ Party committee secretaty 

3. Nguyễn Thanh Tâm ‐ Chief of the secretariat 

Page 72: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 70

 

No.  Commune  Result  Feedback Number of participantsmachines such as photocopy machine, fax. 

‐ Suggesting money assistance to PAHs in order to them reinvest for production and support them contact with capital source having no interest rate in order to PAHs invest for perennial industrial trees development. Assisting for building communal house.   

‐ Suggesting that it should conform to current law on environment protection. 

4. A Blẽo 

5. Aphik 

6. A Mương 

7. A Vũ 

8. A Wit 

9. A Jút 

10. A Kool 

11. A Phik 

12. A Mit 

13. Y Úi 

14. A Dyik 

15. A Huê 

16. A lươn 

17. A Ghê 

18. A Ếch 

19. A TÌnh 

20. A Lui 

21. A Picoh 

22. A Lương 

23. A Nhim 

24. A Phéch 

25. A Cho 

26. A DJưr 

27. A Thưr 

28. Kros Tín 

29. Vanh 

30. Y Bép 

2  Sa Nghia commune (on February 24, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Now, unit price issued by PPC is lower than the fact. Thus, it should have an assistance alternative to ensure PAHs’ interests 

Total participants of consultation meeting is 28 people. In which: 

‐ 01 chief of commune 

‐ 27 local people 

Page 73: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 71

 

No.  Commune  Result  Feedback Number of participants

‐ When implement the project in the locality, it should have an amount of cost for local staves who support the project implementation. 

‐ Suggest to assist CPC with one photocopy machine and one computer. 

• 16 males 

• 11 females 

Consisting of: 

1. Nguyễn Văn Mười ‐ Vice‐chairman 

2. Lê Ngọc Hơn 

3. Đương Thị Chí 

4. Nguyễn Thanh Chung 

5. Vũ Thị Bản 

6. Đỗ Xuân Toàn 

7. Nguyễn Thị Kim Anh 

8. Lê Trọng Sang  

9. Phạm Đước Hiếu 

10. Trần Thị Hồng 

11. Nguyễn Tĩnh 

12. Nguyễn Văn Thanh 

13. Cao Văn Đạo 

14. Nguyễn Thị Thủy 

15. Đỗ Thanh Ngà 

16. Trần Văn Phước 

17. Đỗ Văn Thông 

18. Đỗ Văn Thường 

19. Nguyễn Thị Sơn 

20. Đặng Quang Vinh 

21. Nguyễn Hữu Phước 

22. Nguyễn Thị Hoà 

23. Nguyễn Văn Hoà 

24. Nguyễn Văn Hà 

25. Đỗ Thị Quyên 

26. Nguyễn Thị Lan 

27. Đặng Quang Sang 

Page 74: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 72

 

No.  Commune  Result  Feedback Number of participants

28. Nguyễn Thanh Bình  

3  Sa Nhon commune 

(on February 25, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Now, unit price issued by PPC is lower than the fact. Thus, it should have an assistance alternative to ensure PAHs’ interests 

‐ Appointing staff who will carry out compensation, allowance and resettlement to take part in training before carrying out.  

‐ Conform according to environmental protection law 

‐ Suggesting that it should conform to law on environment protection. 

Total participants of consultation meeting is 37 people. In which: 

‐ 02 Communal chieves: 

• Huỳnh Tấn Tài ‐ Vice‐chairman 

• Bùi Thanh Bình ‐ Vice‐party communittee secretary 

‐ 35 local people 

• 23 males 

• 12 females 

1. Huỳnh Trân Tài 

2. Đặng Thanh Long 

3. Lỗ Văn Mùi 

4. Hồ Văn Tuấn 

5. Lê Thị Trang 

6. Nguyễn Thị Thái 

7. Lê Thị Kim Hoa 

8. Tạ Minh Thông 

9. Nguyễn Thị Bích Liên 

10. Trần Văn Lực 

11. Võ Thanh Sang 

12. Trần Thi Phương 

13. Lê Hữu An  

14. Trần Văn Tý 

15. Phạm Thị Hồng 

16. Cao Thị Trẩy  

17. Phạm Thị Chuộn 

18. Trần Văn Toàn 

19. Trần Cao Cường 

Page 75: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 73

 

No.  Commune  Result  Feedback Number of participants

20. Trần Thị Điều 

21. Nguyễn Thi Ba 

22. Lâm Tín 

23. Nguyễn Phiêu 

24. Trần Ngọc Phiệt 

25. Trần Thị Nở 

26. Nguyễn Văn Bốn 

27. Lê Thị Lan 

28. Trương Thị Điểm 

29. Nguyễn Văn Y 

30. Lại Thị Là  

31. Đỉnh Toán 

32. Nguyễn Thanh Tuấn  

33. Lê Thành Trung 

34. Nguyễn Anh 

35. Trần Trung  

4  Ia Koi commune (on February 27, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Before land acquisition, it should cooperate with local staves to mobilize, and explain for PAHs to understand and implement  

‐ During people mobilization implementation process to acquire land and breaking down house and asset, it should have an amount of cost for local staves’ implementation 

‐ It should have a money assistance for PAHs in order to them to re‐invest for their production 

Total participants of consultation meeting is 27 people. In which: 

‐ 01 Communal chief: 

‐ 26 local people 

• 20 males 

• 6 females 

All paticipants include: 

1. A Him ‐ Chairman  

2. A Băk 

3. Biên 

4. A Bil 

5. A Bdir 

6. A Bền 

7. A Chor 

8. A Đek 

Page 76: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 74

 

No.  Commune  Result  Feedback Number of participants

‐ Having worker management plan when implementing the project. Implementing the project just according to law on environment protection. 

 

9. A Điêm 

10. A Dẻo 

11. A Deop 

12. A Diu 

13. A Đoàn 

14. A Dũng 

15. A Đinh 

16. A Đoán 

17. Nguyễn Văn Đông 

18. Piên 

19. A Biên 

20. A Bik 

21. A Bin 

22. A Rúi 

23. A Sen 

24. A Jip 

25. A Khúc 

26. A Bỉnh 

27. A Gliêm 

III  Ngoc Hoi district 

1  Dak Kan commune (on February 28, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Now, unit price issued by PPC is lower than the fact. Thus, it should have an assistance alternative to ensure PAHs’ interests according to real value. 

‐ Unit price issued by PPC is now lower than the fact. Thus, it should have assistance plan to ensure PAHs’ interests 

‐ Suggesting to implement completely compensation before 

Total participants of consultation meeting is 23 people. In which: 

‐ 05 Communal chieves: 

‐ 13 local people 

• 11 males 

• 2 females 

1. Nguyễn Huy Mót ‐Vice‐chairman 

2. Nguyễn Hải Anh ‐ Vice party committee secretary  

3. Hà Quang Xuân ‐ Land 

Page 77: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 75

 

No.  Commune  Result  Feedback Number of participantsthe project commencement  

‐ It should have an amount of cost for local staves who take part in the project implementation  

‐ Assisting equipments, machines to the locality to implement the project such as photocopy machine, printer.  

‐ Suggesting to implement the project according to law on current environment protection 

staff 

4. Lê Đức Thuyết ‐ Vice‐chairman of Communal Vietnamese Fatherland Front Committee   

5. Nguyễn Quang Ánh ‐ Chairman of farmer association 

6. Lữ Đức Thuỷ  

7. Nguyễn Văn Tướng 

8. Bùi Văn Cầu 

9. Đinh Thị Chầm 

10. Đinh Văn Hương 

11. Đinh Xuân Hương 

12. Xà Thị Hà 

13. A Ú 

14. A Hóc 

15. A Vớ  

16. Ông Chí 

17. Ngô Văn Viễn 

18. Giáp Văn Khoa 

2  Dak Su commune (on February 29, 2011) 

Local people and authorities support and agree with chosen project alternative.  

‐ Suggesting to have suitable compensation, assistance and resettlement alternative in order to ensure PAH’s interests  

‐ Assisting to implement resettlement before the project implementation 

‐ Equipping machines for local staves to implement the project advantageously 

 

Total participants of consultation meeting is 19 people. In which: 

‐ 01 Communal chief  

‐ 18 local people 

• 16 males 

• 2 females 

Including: 

1. Hoàng Trung Kiên 

2. Nghiêm Minh Tuấn 

3. Lê Tuấn Thành 

4. Ngọc Vin 

Page 78: Technical Assistance Consultant’s Report › sites › default › files › project...BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE - ver 1.0 (A) Land Acquisition and

LAO PDR / VIETNAM Asian Development Bank CONSULTANCY SERVICES FOR PREPARING THE BAN-SOK PLEIKU POWER TRANSMISSION PROJECT 500 kV OHL_TA 6481-REG  

 

 

BAN SOK – PLEIKU DRAFT FINAL REPORT_LARAP_VIETNAM SIDE- ver 1.0 (A) Page 76

 

No.  Commune  Result  Feedback Number of participants

5. A Lóc 

6. Hoàng Thị Thơm 

7. Nông Văn Tình 

8. Nông Văn Hoạt 

9. Nông Văn Cường 

10. A Răm 

11. A Kế 

12. A Dế 

13. Đàm Thị Hoan 

14. Nông Văn Hoè 

15. Mã Văn Dính 

16. Hoàng Thu Mối 

17. Nông Văn Long 

18. Nông Văn Lợi 

19. 19. Võ Đông ‐ Chairman