  • 8/12/2019 Results Framework Document MOPNG 13-14

    1/35

    (Results-Framework Document)

    f

    R F D

    Government of India

  • 8/12/2019 Results Framework Document MOPNG 13-14

    2/35

    f

    Section 1:Vision, Mission, Objectives and Functions

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2013-2014)

    Affordable and secure hydrocarbon energy for fuelling India's growth

    Mission

    1. To formulate conducive policies and provide effective regulatory framework for the growth of hydrocarbon

    sector.2. To accelerate domestic Exploration & Production (E&P) of hydrocarbons as well as equity oil & gas

    abroad.3. To develop the hydrocarbon sector through technology up-gradation and capacity building in

    production, refining, transportation and marketing sectors.4. To develop supply and distribution infrastructure

    for petroleum products, to serve the needs of the economy, including households.5. To enhance service

    standards and to maximize customer satisfaction.6. Promote fuel conservation, clean & green fuels and

    development of alternative sources of energy.

    Objectives

    1 Policy framework for growth of E&P sector

    2 Research & Development for bringing in higher productivity in specific area of Oil and Gas exploration storage transportation by the Oil

    Vision

  • 8/12/2019 Results Framework Document MOPNG 13-14

    3/35

    Section 1:Vision, Mission, Objectives and Functions

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2013-2014)

    1. Exploration for, and exploration of petroleum resources including all forms of Hydrocarbons in any state i.e., natural gas, coal bed

    methane, gas from gas hydrates, shale gas, gas from tight sands, shale oil, bitumen, etc, 2. Production, supply, distribution, marketing

    and pricing of petroleum resources including all forms of hydrocarbons in any state i.e., natural gas, coal bed methane, gas from gas

    hydrates, shale gas, gas from tight sands, shale oil, bitumen etc. and petroleum products. 3. Oil refineries including Lube Plants, Fuel

    quality upgradation. 4. Additives for petroleum and petroleum products, Lube Blending and greases. 5. Marketing, distribution and

    retailing of Bio-fuels and its blended products. 6. Blending and blending prescription for Bio-fuels including laying down the standards forsuch blending. 7. Conservation of Petroleum products. 8. Planning, development, control and assistance to all industries dealt with by the

    Ministry.

    1

    9. Strengthening energy security by acquiring oil, gas and shale gas equity abroad and participation in transnational oil & gas pipeline

    projects. 10. Creation and administration of strategic petroleum reserves. 11. Planning, development and regulation of oilfields services.

    12. Public Sector projects falling under the subjects included in this list except such projects, which are specifically allotted to any other

    Ministry/Department. 13. Supervision and monitoring of following Public Sector Undertakings under the administrative control of Ministry

    of Petroleum & Natural Gas:- 1) Oil & Natural Gas Corporation (ONGC) Limited 2) Oil India Limited (OIL) 3) ONGC Videsh Limited (OVL)

    4) Indian Oil Corporation Limited (IOCL) 5) Bharat Petroleum Corporation Limited (BPCL) 6) Hindustan Petroleum Corporation Limited

    (HPCL) 7) Engineers India Limited (EIL) 8) Gas Authority of India Limited (GAIL) 9) Mangalore Refinery and Petrochemicals Limited

    (MRPL)

    2

    10) Chennai Petroleum Corporation Limited (CPCL) 11) Numaligarh Refinery Limited (NRL) 12) Balmer Lawrie and Company Limited

    (B&L) 13) Biecco Lawrie & Company Limited (BLL) 14) Balmer Lawrie Investment Limited (BLIL) 14. Supervision and monitoring of

    following attached/subordinate /autonomous organizations under the administrative control of Ministry of Petroleum & Natural Gas: (i)

    3

  • 8/12/2019 Results Framework Document MOPNG 13-14

    4/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Policy framework for growth of E&P sector 6.00 Uniform Licensing Policy Submission ofCabinet Note

    Date 31/01/2014 31/03/2014 --28/02/201431/12/20133.00[1] [1.1] [1.1.1]

    Policy for exploration ofCBM from areas under coalmining

    Submission ofCabinet Note

    Date 31/01/2014 31/03/2014 --28/02/201431/12/20131.00[1.2] [1.2.1]

    Exploration of CBM fromareas under coal mining

    Blocks to be offered Numberof blocks

    6 3 2582.00[1.3] [1.3.1]

    Research & Development for bringing inhigher productivity in specific area of Oil andGas exploration, storage, transportation bythe Oil sector companies.

    5.00 Monitoring number ofPatents filed

    Patents filed Number 22 18 1620242.50[2] [2.1] [2.1.1]

    Monitoring investments ofOil sector companies inarea of R&D

    Expenditure on R&Dto be incurred by OilPSUs

    AmountRs. incrore

    450 300 3004005002.50[2.2] [2.2.1]

    Increase in exploration Activities 10.00 Setting up of National DataRepository (NDR)

    Award of NDRcontract

    Date 28/02/2014 31/03/2014 --15/03/201431/01/20144.00[3] [3.1] [3.1.1]

    Undertaking Speculativesurveys

    Number of blocks tobe surveyed

    Numberof blocks

    4 2 1351.00[3.2] [3.2.1]

    Offering of ExplorationBlocks including Shale Gasblocks

    Offering ofexploration blocksincluding Shale Gas

    Numberof blocks

    30 25 2028355.00[3.3] [3.3.1]

    Enhancing Domestic reserves & Production 15.00 Reserve replacement ratio(RRR) by PSUs

    Adding morereserves

    Number 1 0.8 0.70.91.12.00[4] [4.1] [4.1.1]

    Accretion to provenreserves

    MMTOE 55 45 4050603.00[4.1.2]

    31/10/2013 10.49 AMGenerated on

    Page : 4 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    5/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Domestic Crude Oil &Natural Gas production

    Production ofdomestic crude oilby public sector

    MMTOE 27 25 242627.92.50[4.2] [4.2.1]

    Production ofdomestic natural gasby public sector

    BCM 25 23 222426.22.50[4.2.2]

    Production ofdomestic crude oilby private sector

    MMTOE 10 8 79112.50[4.2.3]

    Production ofdomestic natural gas

    by private sector

    BCM 12 10 911142.50[4.2.4]

    Overseas crude oil & natural Gas production 6.00 Overseas Oil Production Overseas productionof crude oil

    MMTOE 4.5 4.3 4.24.44.62.00[5] [5.1] [5.1.1]

    Overseas Gas Product ion Overseas product ionof gas

    BCM 2.5 2.3 2.22.42.61.00[5.2] [5.2.1]

    Investment in acquisition ofoil & gas assets overseas

    New assets to beadded

    AmountofInvestment in US$bill

    4.5 2.5 1.5353.00[5.3] [5.3.1]

    Increasing Capital Investment in Oil & GasSector

    2.00 Plan Investments throughinternal and external

    budgetary resources(IE&BR) of PSUs

    % IE&BR outlayutilized

    % 90 80 7985952.00[6] [6.1] [6.1.1]

    Making the sensitive petroleum products viz.Diesel, PDS Kerosene and Domestic LPGavailable at reasonable prices

    4.00 To modulate retail pricesand also to ensure thefinancial health of the publicsector oil marketing

    Submission of anote to CCPA oninternational crudeprice situation and

    Date 31/12/2013 28/02/2014 31/03/201431/01/201430/11/20132.00[7] [7.1] [7.1.1]

    31/10/2013 10.49 AMGenerated on

    Page : 5 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    6/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    companies throughcompensation of priceunder-recoveries, if any

    pricing of sensitivepetroleum products.

    Operationization of Aadharbased LPG Supply Scheme

    Launch of scheme Date 30/09/2013 30/11/2013 30/12/201330/10/201330/08/20132.00[7.2] [7.2.1]

    Increasing Refinery capacity 3.00 Commissioning of 15MMTPA Paradip Refinery

    Increase in domesticrefining capacity by15 MMTPA

    Date 31/03/2014 -- ----15/03/20143.00[8] [8.1] [8.1.1]

    Improvement of Refinery Performance 6.00 Implementation of Phase II

    of IRBIP in the following 3refineries:(i)HPCL, Mumbai(ii)BPCL, Mumbai(iii)MRPL,Mangalore

    Implementation of

    Phase II of IRBIPwith the followingmilestone: Numberof Projects forimplementation(PFI)

    Number 12 8 710153.00[9] [9.1] [9.1.1]

    Improvement ofperformance parameters ofPSU refineries i. Crudethroughput-MMT ii.Distillate yield-%iii. Specific EnergyConsumption-MBTU/BBL/NRGF

    Crude throughput ofPSU Refineries

    MMT 118 114 1131151201.00[9.2] [9.2.1]

    Average Distillateyield of PSURefineries

    % 75.5 74.5 747576.51.00[9.2.2]

    Average specificenergy consumptionfor PSU refineries

    MBTU/BBL/NRGF

    64 66 676563.51.00[9.2.3]

    31/10/2013 10.49 AMGenerated on

    Page : 6 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    7/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Ensuring availability of petroleum productsacross the nation with respect to marketingand distribution

    9.00 Ensure availability ofpetroleum products i.e.petrol, diesel and LPG

    Quantity of Petrolmade available

    MMT 15.87 15.25 14.9415.5616.22.00[10] [10.1] [10.1.1]

    Quantity of Dieselmade available

    MMT 69.37 66.63 65.2967.9970.792.00[10.1.2]

    Quantity of LPGmade available

    MMT 13.59 10.57 9.0612.0815.12.00[10.1.3]

    Review requirement of PDSKerosene for States/UTs inview of expansion of LPG

    Prepare a paper onrationalizing PDSKerosene allocationto States/UTs

    Date 28/02/2014 22/03/2014 31/03/201415/03/201431/01/20141.50[10.2] [10.2.1]

    Expanding the network ofDomestic LPG to ruralareas

    Issuance of Letter ofIntent for RajivGandhi Gramin LPGVitarak Agencies

    Number 900 700 60080010001.50[10.3] [10.3.1]

    Promoting cleaner and environment friendlyfuels

    2.00 Roll out BS-IV MS & HSDin 10 more identified cities

    Availability of BS-IVMS & HSD in 10more identified cities

    Numberof cities

    9 7 68102.00[11] [11.1] [11.1.1]

    To encourage use of Natural Gas 6.00 Increase in cumulativecapacity of Gas pipelines inthe country.

    Expansion andupgradation of theexisting pipelinesand laying of new

    pipelines

    MMSCMD

    25 16 1220283.00[12] [12.1] [12.1.1]

    Increase in cumulative gastrunk transportationnetwork in the country

    Laying of new trunkpipelines andexpansion ofexisting trunkpipeline network

    KM 500 300 2404005503.00[12.2] [12.2.1]

    31/10/2013 10.49 AMGenerated on

    Page : 7 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    8/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    To promote fuel conservation 3.00 Popularize the adoption ofstar labelled domestic LPGstoves

    Take up with Bureauof Energy Efficiencyand Ministry ofPower fornotification oflabeling norms

    Date 15/09/2013 15/10/2013 31/10/201330/09/201331/08/20131.00[13] [13.1] [13.1.1]

    Adoption of normsproposed for labeling ofagricultural mono setpumps by SteeringCommittee

    Take up with Bureauof Energy Efficiencyfor Adoption ofnorms by SteeringCommittee as perproposal submittedby Technical

    Committee

    Date 15/09/2013 15/10/2013 31/10/201330/09/201331/08/20131.00[13.2] [13.2.1]

    Adoption of normsproposed for labeling of DGsets by Steering Committee

    Take up with Bureauof Energy Efficiencyfor Adoption ofnorms by SteeringCommittee as perproposal submittedby TechnicalCommittee

    Date 15/09/2013 15/10/2013 31/10/201330/09/201331/08/20131.00[13.3] [13.3.1]

    Develop capacity building for 5 MMTOE peryear energy from renewable and

    unconventional hydrocarbon resources tobecome carbon neutral for Oil SectorCompanies

    3.00 Monitoring physicalprogress in work

    programme for developingenergy from renewablesources by Oil & Gas PSUs

    % of targetachievement

    % 95 85 80901001.50[14] [14.1] [14.1.1]

    Monitoring physicalprogress in workprogamme for developingenergy from

    % of targetachievement

    % 95 85 80901001.50[14.2] [14.2.1]

    31/10/2013 10.49 AMGenerated on

    Page : 8 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    9/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Eff ic ient Func tioning of the RFD Sys tem 3.00 Timely submiss ion of Draf t RFD2014-15 for Approval

    On-time submission Date 06/03/2014 08/03/2014 11/03/201407/03/201405/03/20142.0*

    Timely submission of Results for2012-13

    On-time submission Date 02/05/2013 06/05/2013 07/05/201303/05/201301/05/20131.0

    Transparency/Service deliveryMinistry/Department

    3.00 Independent Audit ofimplementation ofCitizens/Clients Charter (CCC)

    % of implementation % 95 85 80901002.0*

    Independent Audit ofimplementation of PublicGrievance Redressal System

    % of implementation % 95 85 80901001.0

    Administrative Reforms 6.00 Implement mitigating strategiesfor reducing potential risk ofcorruption

    % of implementation % 95 85 80901001.0*

    Implement ISO 9001 as per theapproved action plan

    % of implementation % 95 85 80901002.0

    Implement Innovation ActionPlan (IAP)

    % of milestones achieved % 95 85 80901002.0

    Identification of core and non-core activities of theMinistry/Department as per 2ndARC recommendations

    Timely submission Date 28/01/2014 30/01/2014 31/01/201429/01/201427/01/20141.0

    Improving InternalEfficiency/Responsiveness.

    2.00 Update departmental strategy toalign with 12th

    Timely updation of thestrategy

    Date 17/09/2013 01/10/2013 08/10/201324/09/201310/09/20132.0*

    * Mandatory Objective(s)

    unconventionalhydrocarbon sources by Oil& Gas PSUs

    Joint responsibility for power generation 5.00 Give necessary supportand clearance

    Additional capacityinstalled

    MW 18000 16000 --17000185003.00[15] [15.1] [15.1.1]

    Total powergenerated

    BU 1000 920 --95010302.00[15.1.2]

    31/10/2013 10.49 AMGenerated on

    Page : 9 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    10/35

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Plan priorities

    Ensuring compliance to the FinancialAccountability Framework

    1.00 Timely submission of ATNs onAudit paras of C&AG

    Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG .duringthe year.

    % 90 70 60801000.25*

    Timely submission of ATRs tothe PAC Sectt. on PAC Reports.

    Percentage of ATRSsubmitted within due date (6 months) from date ofpresentation of Report to

    Parliament by PAC .duringthe year.

    % 90 70 60801000.25

    Early disposal of pending ATNson Audit Paras of C&AG Reportspresented to Parliament before31.3.2012.

    Percentage of outstandingATNs disposed off duringthe year.

    % 90 70 60801000.25

    Early disposal of pending ATRson PAC Reports presented toParliament before 31.3.2012

    Percentage of outstandingATRS disposed off duringthe year.

    % 90 70 60801000.25

    * Mandatory Objective(s)

    31/10/2013 10.49 AMGenerated on

    Page : 10 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    11/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    - - 31/01/2014DateSubmission of CabinetNote

    Policy framework for growth of E&Psector

    Uniform Licensing Policy -- ----[1] [1.1] [1.1.1]

    - - 31/01/2014DateSubmission of CabinetNote

    Policy for exploration ofCBM from areas undercoal mining

    -- ----[1.2] [1.2.1]

    -- 6Number ofblocks

    Blocks to be offeredExploration of CBM fromareas under coal mining

    3 3--[1.3] [1.3.1]

    -- 400NumberPatents filedResearch & Development for bringingin higher productivity in specific areaof Oil and Gas exploration, storage,

    transportation by the Oil sectorcompanies.

    Monitoring number ofPatents filed

    520 600--[2] [2.1] [2.1.1]

    -- 22AmountRs. incrore

    Expenditure on R&D tobe incurred by OilPSUs

    Monitoring investmentsof Oil sector companiesin area of R&D

    24 2620[2.2] [2.2.1]

    - - 28/02/2014DateAward of NDR contractInc rease in exp loration Ac tiv it ies Set ting up of Nat ionalData Repository (NDR)

    -- ----[3] [3.1] [3.1.1]

    -- 4Number ofblocks

    Number of blocks to besurveyed

    Undertaking Speculativesurveys

    2 2--[3.2] [3.2.1]

    32 30Number ofblocks

    Offering of explorationblocks including ShaleGas

    Offering of ExplorationBlocks including ShaleGas blocks

    30 2021[3.3] [3.3.1]

    1 1NumberAdding more reservesEnhancing Domestic reserves &Production

    Reserve replacementratio (RRR) by PSUs

    1 11.1[4] [4.1] [4.1.1]

    93.84 55MMTOEAccretion to provenreserves

    55 55--[4.1.2]

    31/10/2013 10.49 AMGenerated on

    Page : 11 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    12/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    27.6 27.0MMTOEProduction of domesticcrude oil by publicsector

    Domestic Crude Oil &Natural Gas production

    28.8 27.926.12[4.2] [4.2.1]

    25.94 25.0BCMProduction of domesticnatural gas by publicsector

    27.6 2926.10[4.2.2]

    10.53 10.0MMTOEProduction of domesticcrude oil by privatesector

    11.43 10.8911.65[4.2.3]

    21.61 12.0BCMProduction of domesticnatural gas by private

    sector

    15.0 16.514.79[4.2.4]

    6.21 4.5MMTOEOverseas production ofcrude oil

    Overseas crude oil & natural Gasproduction

    Overseas Oil Production 6.48 7.024.3[5] [5.1] [5.1.1]

    2.53 2.5BCMOverseas production ofgas

    Overseas GasProduction

    2.61 2.792.7[5.2] [5.2.1]

    0.1 4.5Amount ofInvestment in US$bill

    New assets to beadded

    Investment in acquisitionof oil & gas assetsoverseas

    2 3--[5.3] [5.3.1]

    86 90%% IE&BR outlayutilized

    Increasing Capital Investment in Oil &Gas Sector

    Plan Investments throughinternal and externalbudgetary resources(IE&BR) of PSUs

    95 9596[6] [6.1] [6.1.1]

    25/06/2011 31/12/2013DateSubmission of a noteto CCPA oninternational crudeprice situation and

    Making the sensitive petroleumproducts viz. Diesel, PDS Keroseneand Domestic LPG available at

    To modulate retail pricesand also to ensure thefinancial health of thepublic

    -- --17/01/2013[7] [7.1] [7.1.1]

    31/10/2013 10.49 AMGenerated on

    Page : 12 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    13/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    pricing of sensitivepetroleum products.

    reasonable prices sector oil marketingcompanies throughcompensation of priceunder-recoveries, if any

    - - 30/08/2013DateLaunch of schemeOperationization ofAadhar based LPGSupply Scheme

    -- ----[7.2] [7.2.1]

    - - 31/03/2014DateIncrease in domesticrefining capacity by 15MMTPA

    Increasing Refinery capacity Commissioning of 15MMTPA Paradip Refinery

    -- ----[8] [8.1] [8.1.1]

    -- 12NumberImplementation ofPhase II of IRBIP withthe followingmilestone: Number ofProjects forimplementation (PFI)

    Improvement of RefineryPerformance

    Implementation of PhaseII of IRBIP in thefollowing 3 refineries:(i)HPCL, Mumbai(ii)BPCL, Mumbai(iii)MRPL,Mangalore

    -- ----[9] [9.1] [9.1.1]

    121 118MMTCrude throughput ofPSU Refineries

    Improvement ofperformance parametersof PSU refineries i. Crudethroughput-MMT ii.Distillate yield-%iii. Specific EnergyConsumption-

    MBTU/BBL/NRGF

    130 133122[9.2] [9.2.1]

    75 75.5%Average Distillate yieldof PSU Refineries

    76 76.575[9.2.2]

    66 64MBTU/BBL/NRGF

    Average specificenergy consumption

    63.5 6365[9.2.3]

    31/10/2013 10.49 AMGenerated on

    Page : 13 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    14/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    for PSU refineries

    14.99 15.87MMTQuantity of Petrolmade available

    Ensuring availability of petroleumproducts across the nation withrespect to marketing and distribution

    Ensure availability ofpetroleum products i.e.petrol, diesel and LPG

    18.60 21.1013.00[10] [10.1] [10.1.1]

    64.75 69.37MMTQuantity of Dieselmade available

    72.00 75.1057.60[10.1.2]

    14.9 13.59MMTQuantity of LPG madeavailable

    18.3 19.715.1[10.1.3]

    25/05/2011 28/02/2014DatePrepare a paper onrationalizing PDSKerosene allocation toStates/UTs

    Review requirement ofPDS Kerosene forStates/UTs in view ofexpansion of LPG

    -- --28/02/2013[10.2] [10.2.1]

    968 900NumberIssuance of Letter ofIntent for Rajiv GandhiGramin LPG VitarakAgencies

    Expanding the network ofDomestic LPG to ruralareas

    1000 1000900[10.3] [10.3.1]

    7 9Number ofcities

    Availability of BS-IVMS & HSD in 10 moreidentified cities

    Promoting cleaner and environmentfriendly fuels

    Roll out BS-IV MS &HSD in 10 moreidentified cities

    13 1210[11] [11.1] [11.1.1]

    27 25MMSCMDExpansion andupgradation of theexisting pipelines andlaying of new pipelines

    To encourage use of Natural Gas Increase in cumulativecapacity of Gas pipelinesin the country.

    10 1054[12] [12.1] [12.1.1]

    1256 500KMLaying of new trunkpipelines andexpansion of existingtrunk pipeline network

    Increase in cumulativegas trunk transportationnetwork in the country

    954 41001280[12.2] [12.2.1]

    31/10/2013 10.49 AMGenerated on

    Page : 14 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    15/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    - - 15/09/2013DateTake up with Bureau ofEnergy Efficiency andMinistry of Power fornotification of labelingnorms

    To promote fuel conservation Popularize the adoptionof star labelled domesticLPG stoves

    -- ----[13] [13.1] [13.1.1]

    - - 15/09/2013DateTake up with Bureau ofEnergy Efficiency forAdoption of norms bySteering Committee asper proposal submittedby Technical

    Committee

    Adoption of normsproposed for labeling ofagricultural mono setpumps by SteeringCommittee

    -- ----[13.2] [13.2.1]

    - - 15/09/2013DateTake up with Bureau ofEnergy Efficiency forAdoption of norms bySteering Committee asper proposal submittedby TechnicalCommittee

    Adoption of normsproposed for labeling ofDG sets by SteeringCommittee

    -- ----[13.3] [13.3.1]

    -- 95%% of targetachievement

    Develop capacity building for 5MMTOE per year energy fromrenewable and unconventionalhydrocarbon resources to becomecarbon neutral for Oil Sector

    Companies

    Monitoring physicalprogress in workprogramme fordeveloping energy fromrenewable sources by Oil

    & Gas PSUs

    95 95--[14] [14.1] [14.1.1]

    -- 95%% of targetachievement

    Monitoring physicalprogress in workprogamme for developingenergy fromunconventional

    95 95--[14.2] [14.2.1]

    31/10/2013 10.49 AMGenerated on

    Page 15 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    16/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    04/03/2012 06/03/2014DateOn-time submissionEfficient Functioning of the RFDSystem

    Timely submission of DraftRFD 2014-15 for Approval

    -- --06/03/2013*

    26/04/2011 02/05/2013DateOn-time submissionTimely submission of Results

    for 2012-13

    -- --03/05/2012

    -- 95%% of implementationTransparency/Service deliveryMinistry/Department

    Independent Audit ofimplementation ofCitizens/Clients Charter

    -- ----*

    -- 95%% of implementationIndependent Audit ofimplementation of PublicGrievance Redressal System

    -- ----

    -- 95%% of implementationAdministrative Reforms Implement mitigating strategiesfor reducing potential risk ofcorruption

    -- --95*

    -- 95%% of implementationImplement ISO 9001 as perthe approved action plan

    -- --95

    -- 95%% of milestones achievedImplement Innovation ActionPlan (IAP)

    -- ----

    - - 15/10/2013DateTimely submissionIdentification of core and non-core activities of theMinistry/Department as per2nd ARC recommendations

    -- ----

    * Mandatory Objective(s)

    hydrocarbon sources byOil & Gas PSUs

    0 18000MWAdditional capacityinstalled

    Joint responsibility for powergeneration

    Give necessary supportand clearance

    0 00[15] [15.1] [15.1.1]

    0 1000BUTotal power generated 0 00[15.1.2]

    31/10/2013 10.49 AMGenerated on

    P 16 f 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    17/35

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 11/12

    Unit

    FY 13/14FY 12/13 FY 14/15

    Actual Valuefor

    Actual Valuefor

    FY 15/16

    -- 90%Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG .duringthe year.

    Ensuring compliance to the FinancialAccountability Framework

    Timely submission of ATNs onAudit paras of C&AG

    -- ----*

    -- 90%Percentage of ATRSsubmitted within due date ( 6months) from date ofpresentation of Report toParliament by PAC .during theyear.

    Timely submission of ATRs tothe PAC Sectt. on PACReports.

    -- ----

    -- 90%Percentage of outstandingATNs disposed off during theyear.

    Early disposal of pendingATNs on Audit Paras of C&AGReports presented toParliament before 31.3.2012.

    -- ----

    -- 90%Percentage of outstandingATRS disposed off during theyear.

    Early disposal of pendingATRs on PAC Reportspresented to Parliament before31.3.2012

    -- ----

    * Mandatory Objective(s)

    31/10/2013 10.49 AMGenerated on

    P 17 f 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    18/35

    Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    AcronymSI.No Description

    Bharat Petroleum Corporation Limited1BPCL

    Bharat Stage IV2BS-IV

    British Units3BU

    Coal Bed Methane4CBM

    Cabinet Committee on Economic Affairs5CCEA

    Central Mines Planning & Design Institute6 CMPDIL

    P 18 f 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    19/35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    20/35

    Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    AcronymSI.No Description

    Hindustan Petroleum Corporation Limited13HPCL

    High Speed Diesel14HSD

    Internal and External Budgetary Resources15

    IE and BR

    Integrated Refinery Business Improvement Programme16IRBIP

    Kilometer17KM

    Liquefied Natural Gas18 LNG

    P 20 f 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    21/35

    Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    AcronymSI.No Description

    Liqefied Petroleum Gas19LPG

    Million Standard Cubic Meter Per Day20MMSCMD

    Million Metric Tonnes21

    MMT

    Million Tonnes Per Annum22MMTPA

    Ministry of New and Renewable Energy Resources23MNRE

    Ministry of Petroleum & Natural Gas24 MoPNG

    Page : 21 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    22/35

    Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    AcronymSI.No Description

    Mangalore Refinery and Petrochemicals Limited25MRPL

    Motor Spirit26MS

    Mega Watts27

    MW

    National Oil Companies28NOCs

    Oil India Limited29OIL

    Oil & Natural GAs Corporation Limited30 ONGC

    Page : 22 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    23/35

    Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    AcronymSI.No Description

    Public Distribution System31PDS

    Project for Implementation32PFI

    Petroleum LNG Limited33

    PLL

    Petroleum & Natural Gas Rules, 195634PNG Rules

    Petroleum Planning and Analysis Cell35PPAC

    Public Sector Undertakings36 PSUs

    Page : 23 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    24/35

    Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    AcronymSI.No Description

    Rajiv Gandhi Gramin LPG Vitran Yojana37RGGLVY

    Re-gasified Liquefied Natural Gas38RLNG

    Retail Outlets39

    ROs

    Rupees40Rs.

    Page : 24 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    25/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    To submit a draft policy forconsideration of the CCEA to

    evolve uniform licensingpolicy for Hydrocarbon

    exploaration

    To bring uniformity in E&P activitiesfor different modes of Hydrocarbon

    exploration

    1 Date[1.1.1] Submission of Cabinet Note

    To evolve suitable policy forE&P activities for CBM

    To submit a draft policy forconsideration of the Cabinet to to

    evolve suitable policy for E&Pactivities for CBM

    2 Date[1.2.1] Submission of Cabinet Note

    To explore the avaibility ofCBM in coal mining areas

    Blocks to be offered for exploration ofCBM under coal mining areas3 Number of blocks

    [1.3.1] Blocks to be offered

    Filling of necessarydocumentation for obtaining

    patents

    No. of patents filed by Oil PSUs onR&D activites carried out.

    4 Number of patents to be filed[2.1.1] Patents filed

    The amount spent by OilPSUs on R&D activities.

    The amount of expenditure spent byOil PSUs on R&D activities.

    5 Amount in Rs. crore[2.2.1] Expenditure on R&D to be incurred by OilPSUs

    31/10/2013 10.49 AMGenerated on

    Page : 25 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    26/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    To award the contract to theorganizations who will initiate

    the process for creation ofNDR

    The seismic survey data of entiresedimentary basin carried out by the

    Government as well as privateorganizations to be assimilated for

    awarding of exploration andproduction contracts.

    6 Date[3.1.1] Award of NDR contract

    Number of blocks for carryingout speculative survey

    Undertaking speculative surveys inidentified blocks

    7 Number of blocks[3.2.1] Number of blocks to be surveyed

    To launch the Xth round ofthe process for awardingE&P contracts in various

    blocks to be offered underNELP.

    To put the surveyed blocks foroffering to the prospective bidders for

    carrying out E&P activities.

    8 Number of blocks to beoffered.

    [3.3.1] Offering of exploration blocks includingShale Gas

    To add more reserve by wayof exploring newer fields

    To add more reserve by exploringnew fields in terms of reserve

    replacement ratio (RRR) which isratio of hydrocarbon reserve accretionin a year to the oil and gas production

    made in that year

    9 Number[4.1.1] Adding more reserves

    Replacing the exploitedreserves with new reserves

    in volume terms

    To replenish the used reserves of oiland gas by new discoveries

    10 MMTOE[4.1.2] Accretion to proven reserves

    31/10/2013 10.49 AMGenerated on

    Page : 26 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    27/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    Optimum production of crudoil and natural gas from

    maturing fields

    Production from these fields whichwere allotted to Oil PSUs

    11 MMTOE[4.2.1] Production of domestic crude oil by publicsector

    The quantity of natural gasproduced by PSUs

    Production of domestic natural gas bypublic sector oil and gas companies

    12 BCM[4.2.2] Production of domestic natural gas bypublic sector

    Quantity of crude oil

    produced by private sectorcompanies in India

    Production of crude oil by private

    sector companies from domesticfields

    13 MMTOE[4.2.3] Production of domestic crude oil by private

    sector

    Quantity of natural gasproduced by private sector

    companies in India

    Production of natural gas by privatesector companies from domestic

    fields

    14 BCM[4.2.4] Production of domestic natural gas byprivate sector

    Optimum production of crudeoil and natural gas from

    overseas Oil Fields

    Production from the assets acquiredby the Oil PSUs abroad

    15 MMTOE[5.1.1] Overseas production of crude oil

    31/10/2013 10.49 AMGenerated on

    Page : 27 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    28/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    Quantity of gas producedfrom Overseas oil and gasfields by Indian companies

    Production of natural gas/ Shale gasby Indian companies operating in

    foreign companies

    16 BCM[5.2.1] Overseas production of gas

    Investment in acquiring newfields Overseas

    Acquiring new fields for explorationand production by Indian companies

    17 US$ billion[5.3.1] New assets to be added

    Utilization of budgetary outlay

    by individual Oil PSUs

    Plan investment through internal &

    external resouces by PSUs18 %[6.1.1] % IE&BR outlay utilized

    To fix the prices of controlledfuel products like HSD, LPG

    and SKO

    To modulate the retail sales prices ofthese products by submitting a note

    for consideration of CCPA

    19 Date[7.1.1] Submission of a note to CCPA oninternational crude price situation and pricing ofsensitive petroleum products.

    The success of the scheme wouldmainly depend on the number ofAadhar card issued, support from

    State Govts. and bankinginfrastructure available.

    Date of launching of thescheme in select district

    Launching of the Aadhar based DirectCash Subsidy Transfer Scheme for

    domestic LPG supply.

    20 Date[7.2.1] Launch of scheme

    31/10/2013 10.49 AMGenerated on

    Page : 28 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    29/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    To add refining capacity by15 MMTPA to the existing

    capacity

    To enhance the domestic refiningcapacity to meet the growing demand

    of auto fuels.

    21 Date[8.1.1] Increase in domestic refining capacity by 15MMTPA

    To implement the phase II ofIntegrated Refinery BusinessImprovement Programme for

    three Refineries.

    Number of Projects to beimplemented under this programme.

    22 Number[9.1.1] Implementation of Phase II of IRBIP withthe following milestone: Number of Projects forimplementation (PFI)

    Quantity of crude oil

    processed by the PSURefineries

    Crude throughput of PSU Refineries23 MMT[9.2.1] Crude throughput of PSU Refineries

    Quantity of light and middlelevel distillates produced inpercentage of total crude

    quantity processed

    Quantity of light and middle leveldistillates produced

    24 %[9.2.2] Average Distillate yield of PSU Refineries

    The quantity of energyconsumed by the refineries to

    process per barrel of crudeoil

    The quantity of energy consumed bythe refineries to process per barrel of

    crude oil

    25 MBTU/BBL/NRGF[9.2.3] Average specific energy consumption forPSU refineries

    31/10/2013 10.49 AMGenerated on

    Page : 29 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    30/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    Quantity of Auto & Domesticcooking fuels to be madeavailable for consumption

    Sufficient quantity of petrol to bemade available during the year

    26 MMT[10.1.1] Quantity of Petrol made available

    Quantity of Auto & Domesticcooking fuels to be madeavailable for consumption

    Sufficient quantity of Diesel to bemade available during the year

    27 MMT[10.1.2] Quantity of Diesel made available

    Quantity of Auto & Domestic

    cooking fuels to be madeavailable for consumption

    Sufficient quantity of LPG to be made

    available during the year28 MMT[10.1.3] Quantity of LPG made available

    Ensure adequate availabilityof PDS Kerosene

    To rationalize PDS keroseneallocation to different States & UTs inview of network expansion of LPG.

    29 Date[10.2.1] Prepare a paper on rationalizing PDSKerosene allocation to States/UTs

    Issuance of number of Letterof Intents (LOI) under

    RGGLVY

    To expand the network of LPGdistributors in Rural and uncovered

    areas

    30 Number[10.3.1] Issuance of Letter of Intent for RajivGandhi Gramin LPG Vitarak Agencies

    31/10/2013 10.49 AMGenerated on

    Page : 30 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    31/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    To improve the coverage ofBS-IV Auto fuel in more cities

    To introduce BS-IV Auto Fuels in 10more cities

    31 Number[11.1.1] Availability of BS-IV MS & HSD in 10 moreidentified cities

    Expansion and upgradationof the existing pipelines and

    laying of new pipelines

    To increase the cumulative gascarrying capacity of gas pipelines in

    the country

    32 MMSCMD[12.1.1] Expansion and upgradation of the existingpipelines and laying of new pipelines

    Laying of new trunk pipelines

    and expansion of existingtrunk pipeline network

    to increase cumulative gas transport

    network in the country33 KM[12.2.1] Laying of new trunk pipelines and

    expansion of existing trunk pipeline network

    Date by which the proposalwould be submitted

    Take up with Bureau of EnergyEfficiency and Ministry of Power for

    notification of labelling norms

    34 Date[13.1.1] Take up with Bureau of Energy Efficiencyand Ministry of Power for notification of labelingnorms

    The date by which theproposal would be submitted

    Take up with Bureau of EnergyEfficiency for Adoption of norms by

    Steering Committee as per theproposal submitted by technical

    committee

    35 Date[13.2.1] Take up with Bureau of Energy Efficiencyfor Adoption of norms by Steering Committee asper proposal submitted by Technical Committee

    31/10/2013 10.49 AMGenerated on

    Page : 31 of 35

  • 8/12/2019 Results Framework Document MOPNG 13-14

    32/35

    Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Success indicator Description Definition MeasurementSI.No General Comments

    The date by which theproposal would be submitted

    Take up with Bureau of EnergyEfficiency for Adoption of norms bySteering Committee as per porposalsubmitted by Technical Committee

    36 Date[13.3.1] Take up with Bureau of Energy Efficiencyfor Adoption of norms by Steering Committee asper proposal submitted by Technical Committee

    Achievements of set targetsby individual Oil PSUs in

    terms of percentage

    Achievements of set targets byindividual Oil PSUs in terms of

    percentage

    37 %[14.1.1] % of target achievement

    Achievements of set targets

    by individual Oil PSUs interms of percentage

    Achievements of set targets by

    individual Oil PSUs in terms ofpercentage

    38 %[14.2.1] % of target achievement

    It is a team target involving otherMinistries as well.

    The quantity of gas suppliedto power plants to achieve

    this objective.

    Additional capacity installed duringthe year.

    39 MW[15.1.1] Additional capacity installed

    It is a team target involving otherMinistries as well

    The total power generated bythe additional capacity

    installed during the year.

    The total power generated by theadditional capacity installed during

    the year.

    40 BU[15.1.2] Total power generated

    Page : 32 of 35

    R lt F k D t (RFD) f Mi i t f P t l d N t l G (2013 2014)

  • 8/12/2019 Results Framework Document MOPNG 13-14

    33/35

    Section 5 :Specific Performance Requirements from other Departments

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Organisation TypeRelevant Success

    Indicator

    What is yourrequirement fromthis organisation

    Justification for thisrequirement

    LocationType

    Please quantify yourrequirement fromthis Organisation

    What happens ifyour requirement is

    not met.

    State Organisation Name

    More imports of crude oilwill happen

    Increase in oilexploration

    [4.1.1] Adding morereserves

    Increase in requirement ofenergy for economic

    development of the country andacheiving self sufficiency in

    petroleum products

    CentralGovernment

    -Oil and Natural GasCorporation

    Responsibility Centre /Attached office

    Increase in imports of oiland gas

    Increase in oil and gasexploration

    [4.2.1] Production ofdomestic crude oil bypublic sector

    Delay in achieving theobjective

    Necessary statutoryclearances

    [14.1.1] % of targetachievement

    Being nodal ministryMinistry of New andRenewable Energy

    Ministry

    Objective may not beachieved

    Comments on draftCabinet Note

    [1.2.1] Submission ofCabinet Note

    Being nodal Ministry, clearanceis required

    100%Ministry of Coal

    Comments on DraftCabinet Note

    [1.2.1] Submission ofCabinet Note

    Being nodal Ministry, commentsare necessary

    Ministry of Environment andForests

    Page : 33 of 35

    f f G

  • 8/12/2019 Results Framework Document MOPNG 13-14

    34/35

    Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /impact with the following

    department (s) / ministry(ies)

    SuccessIndicator

    FY 11/12 FY 13/14FY 12/13 FY 14/15 FY 15/16Unit

    1 1Adding more reservesEnhancing domestic reserve& production

    ONGC, OIL & GAIL 1 11.11 Number

    25.94 25Gas production (Public Sector) 27.6 2926.10BCM

    6.21 4.5Overseas production of crudeoil

    Overseas crude and Oilproduction

    OVL 6.48 7.024.32 MMTOE

    2.53 2.5Overseas production of naturalgas

    2.61 2.792.7BCM

    26.9 15Additoinal Capacity createdIncreasing Refinery Capacity Oil Refineries 15 -83 MMTPA

    - 200Extension of existing pipelineIncrease in cummulative gastrunk transportation networkin the country

    Petroleum & Natural Gas RegulatoryBoard (PNGRB)

    200 2001824 Km

    - 200Laying of new Trunk pipelines 200 200265Km

    86 90% of budget outlay utilizedPlan investment throughinternal and externalbudgetary resources (IE&BR)of PSUs

    Oil PSUs - -965 %

    - 95% of targets achievedMonitoring physical progressin work programme fordeveloping energy fromrenewable andunconventional sources byOil & Gas PSUs

    Oil & Gas PSUs, MNRE - --6 %

    31/10/2013 10.49 AMGenerated on

    Page : 34 of 35

    R lt F k D t (RFD) f Mi i t f P t l d N t l G (2013 2014)

  • 8/12/2019 Results Framework Document MOPNG 13-14

    35/35

    Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2013-2014)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /impact with the following

    department (s) / ministry(ies)

    SuccessIndicator

    FY 11/12 FY 13/14FY 12/13 FY 14/15 FY 15/16Unit

    37011 37288PML Area accretionArea with proven reserves foroil and gas

    TBD TBD372917 Sq. M

    25.2 24.9% of crude oil demand metfrom domestic sources

    Enhanced oil and gassecurity

    26.5 24.724.28 %

    37.6 41.3Domestic crude oil production 45.57 43.7638MMT

    48.48 TBDPercentage of Natural Gasdemand met from domesticsources

    TBD TBD41.03%

    52.22 43.18Domestic Natural Gasproduction

    43.77 47.1751.67BCM

    9.68 12.12Domestic Production of oil(Private Sector)

    11.51 12.7010.69MMT

    26.77 15.38Domestic Production of Gas(Private Sector)

    14.50 16.5025.58BCM

    34.8 -The Extent of Diversificationachieved in our import basket(TBD) %age of low Sulphurcrude processed by Refineries

    - -31.8%LS

    65.2 -The entent of diversificationachieved in our import basket

    (TBD)-High Sulphur crudeprocessed by refineries

    - -68.2%HS

    31/10/2013 10.49 AMGenerated on