MINISTRY OF RAILWAYS RFD 2014-15 Section 1: Ministry’s Vision, mission, objectives and targets. VISION Indian Railways will provide safe, efficient, affordable and customer-focused transportation solution while remaining a vehicle of connecting regions and centres of industry, commerce and tourism across the country with an eye to be of „World Class‟ standards as per Indian Society. MISSION Following are the mission areas identified for realizing the main objectives stated in the Vision: 1. Augmentation of passenger and freight traffic handling capacity with a consistent attention to safety and viability, by taking up necessary works with minimal adverse environmental impact, to ease bottlenecks in the transportation network. . 2 Induction of modern rolling stock in synchronization with up-to-date and affordable technology. 3. Enhancement of customer satisfaction through leveraging of technology and quality of service 4. Improvement of organizational efficiency.

Upload: dothien

Post on 14-Feb-2017

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Results Framework Document 2014-15

MINISTRY OF RAILWAYS

RFD 2014-15

Section 1: Ministry’s Vision, mission, objectives and targets.

VISION

Indian Railways will provide safe, efficient, affordable and

customer-focused transportation solution while remaining a vehicle of connecting regions and centres of industry, commerce and tourism across the country with an eye to be of „World Class‟ standards as per Indian Society.

MISSION

Following are the mission areas identified for realizing the main

objectives stated in the Vision:

1. Augmentation of passenger and freight traffic handling capacity with a

consistent attention to safety and viability, by taking up necessary

works with minimal adverse environmental impact, to ease

bottlenecks in the transportation network. .

2 Induction of modern rolling stock in synchronization with up-to-date

and affordable technology.

3. Enhancement of customer satisfaction through leveraging of

technology and quality of service

4. Improvement of organizational efficiency.

Page 2: Results Framework Document 2014-15

OBJECTIVES

1. To improve financial performance with an eye on financial viability

2. To increase the traffic carried both in terms of freight and passenger

3. To augment infrastructure on a continued basis for creation of transportation

capacity

4. To ensure optimum utilization of assets and enhance employee productivity

5. To improve quality of services provided by the railways to its users for

enhanced customer satisfaction

6. To take up green initiatives and efficient energy management

7. To provide safe and secure transportation

8. To undertake joint responsibility with concerned stakeholder ministries for

increased coal availability and movement contributing to increased power

generation in the country

FUNCTIONS 1. Government Railways- All matters, including those relating to Railway

revenues and expenditure, but excluding Railway Inspectorate and Railway

Audit.

2. Non-Government Railways – Matters in so far as provision for control by the

Ministry of Railways, Railway Board as provided in the Railways Act, 1989

(24 of 1989) or in the contracts between the Government and Railways, or in

any other statutory enactments, namely, regulations in respect of safety,

maximum and minimum rates and fares etc. excluding the item of work

allocated to the Department of Urban Development.

3. Parliament questions/matters regarding offences relating to pilferage of

railway property and offences relating to crime on Government Railways and

non-Government Railways.

4. Administration of pension rules applicable to Railway employees.

Page 3: Results Framework Document 2014-15

Section 2: Key objectives, success indicators and targets:

1 2 3 4 5 6 7 8 9 10 11

Objective W

eig

ht

(%)

Action Success indicator

Unit

We

igh

t

(%)

Target criteria Value (2014-15)

Excellent 100%

V. Good 90%

Good 80%

Fair 70%

Poor 60%

1. To improve

financial

performance

with an eye on

financial

viability

16 % 1.1. Control working

expenditure and boost Earnings

1.1.1. Operating ratio Percent

8 89.8 91 92 93 94

1.1.2 Yield per NTKMs Paise/ NTKm

3 153.68 148.49

148.45

148.40 146.6

1.1.3 Yield per PKMs Paise/ PKms

4 38.29 35.15

35.13

35.11 34.96

1.1.4. Finalisation of Accounting Reforms-Train costing model

Preparing time bound action

plan for implementation

1 01/10/2014 01/12/2014 01/01/2015 01/02/2015 01/03/2015

2. To increase the traffic carried both in terms of freight

15 %

2.1. Volumes

2.1.1. Originating Loading

Million Tonnes 5 1107 1101 1095 1090 1085

2.1.2.Net Transportation

Billion NTKm 5 690 688 684 680 676

2.2. Improved quality and efficient utilization

2.2.1.Productive utilization of available wagons

NTKms per wagon-day

(BG 8-Wheeler) 3 9280 9275 9270 9265 9260

2.3 Establishment of Agri Rail Network-

Movement of perishable trains

2.3.1 Setting up of temperature controlled warehouses for enabling perishable module features

No. of locations 1 4 3 2 1 0

2.4 Diamond Quadrilateral Project of

High Speed Trains

2.4.1 Taking up of preliminary feasibility study on the quadrilateral level

No. of studies 1 4 3 2 1 0

Page 4: Results Framework Document 2014-15

1 2 3 4 5 6 7 8 9 10 11

Objective

We

igh

t

(%)

Action Success indicator

Unit

We

igh

t

(%)

Target criteria Value (2014-15)

Excellent 100%

V. Good 90%

Good 80%

Fair 70%

Poor 60%

3. To increase the traffic carried both in terms of Passenger

4 %

3.1. Volumes

3.1.1.Non-suburban Billion PKms 1 1034 1030.61 1024 1015 1004

3.1.2.Suburban Billion PKms 1 153 151.44 144 143 141

3.1.3 Customer Satisfaction Index Survey

No. of Stations 1 105 100 90 80 70

3.2 Tourist Rail (including Pilgrimage

Rail)

3.2.1 Introduction of additional trains to tourist/pilgrimage stations

No. of trains 1 4 3 2 1 0

4. To augment

infrastructure on a

continued basis

for creation of

transportation

capacity

24 %

4.1.Capacity augmentation and

Asset creation

4.1.1.New lines Kms. 1 325 300 275 260 250

4.1.2.Doubling Kms.

2 720 700 680 660 640

4.1.3.Electrification Kms 1 1300 1170 1040 910 780

4.1.4.Flagship Projects

Completion of listed events in

Table 1 (Nos)

3 4 3 2 1 0

4.1.5.Progress in Critical Projects

(>Rs 150 crores)

Completion of listed events in

Table 2

(Nos)

3 4 3 2 1 0

4.1.6.High Density Network

Completion of listed events in

Table 3 (Nos)

3

4 3 2 1 0

4.1.7.Dedicated Freight Corridor

Completion of listed events in Table 4 (Nos)

4

5

4 3 2 1

4.1.8.Loco manufacturing Numbers 2 630 600 580 560 540

4.1.9.Wagon manufacturing

Number 1 13500 13200 13000 12000 10000

Page 5: Results Framework Document 2014-15

1 2 3 4 5 6 7 8 9 10 11

Objective

We

igh

t

(%)

Action Success indicator

Unit

We

igh

t

(%)

Target criteria Value (2014-15)

Excellent 100%

V. Good 90%

Good 80%

Fair 70%

Poor 60%

4. To augment

infrastructure on a

continued basis

for creation of

transportation

capacity

4.1.10 Coach manufacturing

Numbers

2 4500 4100 3600 3200 2700

4.2.Investment Through PPP

4.2.1.Value of Projects Rs. Crores 1 6000 4000 3000 2000 1000

4.3 Hinterland connectivity to ports

through new networks

4.3.1 Completion of milestones indicated in the

list of port connectivity projects

No. of milestones (As per list) *

1 4 3 2 1 0

5. To ensure

optimum

utilization of

assets and

enhance

employee

productivity

2 %

5.1.Improvement in productivity of staff

5.1.1. All staff Million

(NTKM+PKM). per employee

1 1.36 1.34 1.30 1.28 1.26

5.2. Special focus on developing skilled

human resources to meet future demand

5.2.1 Initial/Refresher training of technical staff in Railways‟ Training Centres % 1 15 12 10 7 5

6. To improve

quality of services

provided by the

railways to its

users customer

satisfaction

10 %

6.1.Amenities Improvement at stations

and on-board

6.1.1. IT in passenger reservations

e-tickets, i-tickets sold

(in lakhs Nos.) 2 1703 1641 1579 1548 1517

6.1.2 Increase in capability of issuing e-ticket/i-ticket on the internet

Increase in no. of tickets issued per minute

2 338 326 313 307 301

6.1.3. Facility for differently- abled

Stations covered 1 620 615 610 605 600

6.1.4. Provision of bio/ controlled discharge toilets in trains

Number of toilets 2

10550

10500 8400 7350 6300

6.1.5 Introduction of premium Trains

Nos. 2 34 30 26 22 18

Page 6: Results Framework Document 2014-15

1 2 3 4 5 6 7 8 9 10 11

Objective

We

igh

t

(%)

Action Success indicator

Unit

We

igh

t

(%)

Target criteria Value (2014-15)

Excellent 100%

V. Good 90%

Good 80%

Fair 70%

Poor 60%

Contd… To improve quality

of services

provided by the

railways to its

users for

enhanced

customer

satisfaction

Contd…

Amenities Improvement at stations and on-board

6.1.6 Stations provided with improved amanities under upgradation scheme (Adarsh Station)

Nos. 1 110 100

90 80 70

7. To take up

green initiatives

and efficient

energy

management

6%

7.1.Improvement in fuel efficiency

7.1.1.SFC Diesel(goods) Ltrs /1000

GTKm 1 1.98 2.13 2.18 2.23 2.28

7.1.2.SEC Electrical (goods)

KWH/ 1000 GTKm.

1 6.7 6.9 7.1 7.3 7.5

7.2.Afforestation 7.2.1.Trees planted Nos (lakhs) 1 71 70 65 60 55

7.3. Non-conventional

Energy and environment improvement initiatives

7.3.1.Production of wind energy

KW hour (in cr) 1 1.6 1.5 1.3 1.2 1.1

7.3.2.No. of Stations provided with solar energy panels during the year

Numbers 1 130 125 120 115 110

7.3.3.No. of level crossing provided with solar energy panels during the year

Numbers 1 650 610 590 580 570

8. To provide safe

and secure

transportation

6%

8.1.Initiatives to reduce accidents

8.1.1.On Board Installations

Number

(Avg.score as per list)

1 5 4 3 2 1

8.1.2. Fixed Installations

Number

(Avg.score as per list)

1 6 5 4 3 2

Page 7: Results Framework Document 2014-15

1 2 3 4 5 6 7 8 9 10 11

Objective

We

igh

t

(%)

Action Success indicator

Unit

We

igh

t

(%)

Target criteria Value (2014-15)

Excellent 100%

V. Good 90%

Good 80%

Fair 70%

Poor 60%

8.2.Elimination of LC gates (level crossing

gates)

8.2.1.Completed in the year

Numbers

3

1050 1000 950 900 850

8.3.Security Initiatives

8.3.1.No. of stations having introduced Integrated Security Services

Numbers 1 110 109 100 95 90

9. To undertake joint

responsibility with

concerned

stakeholder

ministries for

increased coal

availability and

movement

contributing to

increased power

generation in the

country

2 % 9.1.Give necessary support

and clearance

9.1.1.Additional Capacity installed

MW 1 18500 18000 17000 16500 16000

9.1.2.Total power generated BU 1 1030 1000 950e

920 890

Page 8: Results Framework Document 2014-15

Table 1: List of Flagship Projects

Name of the project Target for the year

i. Lumding-Silchar Gauge Conversion

Completion of Lumding-Silchar Gauge Conversion

(121 km)

ii. Suratpura-Hanumangarh-Sriganganagar Gauge Conversion

Completion of Hanumangarh-Ellanabad Gauge

Conversion (43 km)

iii. Koderma-Ranchi New Line Completion of Bes-Mandu & Bes-Kuju

(balance portion) New Line (14 km)

iv. Utretia-Zafrabad Doubling Completion of Utretia-Zafrabad Doubling (60 km)

Table 2: List of Critical Projects

Name of the project Target for the year

i. Villupuram-Dindigul Doubling Completion of 42 km doubling on

Villupuram-Dindigul

ii. Gorakhpur-Gonda Gauge Conversion

Completion of Barhni-Gonda Gauge Conversion

(83 km)

iii. Ranchi-Lohardaga with extn. to Tori Gauge Conversion

Completion of Barkichampi-Tori (29.5 km) new line

iv. Delang-Puri Doubling Completion of Delang-Puri Doubling (28.7 km)

Table 3: List of High Density Network (HDN) projects

Name of the project Target Date

i. Daund-Gulbarga Doubling part (47 km) 31.03.2015

ii. Khurda Road-Barang 3rd line Doubling part (6.3 km) 31.03.2015

iii. Bhopal-Bina 3rd line Doubling (balance 7.7 km) 31.03.2015

iv. Vizianagaram-Kottavalasa 3rd line Doubling part (27 km) 31.03.2015

Table 4: Timelines pertaining to Dedicated Freight Corridor (DFC) projects

Name of the Project Target Date

i. Award of civil contract for Iqbalgarh-Vadodara (305km) of Western DFC

31.03.2015

ii. Award of electrical contract for Rewari –Vadodara section (930 km) of Western DFC

31.03.2015

iii. Award of signaling contract for Rewari – Vadodara section (930 km) of Western DFC

31.03.2015

iv. Award of civil contract for Kanpur-Mughalsarai section (390 km) section of Eastern DFC

31.03.2015

v. Award of systems contract for khurja-Kanpur (343 km)

section of Eastern DFC

31.03.2015

Page 9: Results Framework Document 2014-15

Table 5: Hinterland connectivity to ports through new networks

S.N. Name of the Project

i. Dedicated freight line between Wadala and Kurla

ii. Panvel-Pen doubling

iii. Rajatgarh-Barang doubling

iv. Khurda Road-Barang 3rd line

Table 6: Safety Initiatives

On Board Installation Fixed Installation

i. Train Protection & Warning System

(TPWS)

50 kms:2 (Basin Bridge-

Arrakkonam)

25 kms:1

ii. Train Collision Avoidance System (TCAS): Extended trials on South Central Railway:

>200 Km : 3

100 to 200 Km : 2

50 to 100 Km : 1 iii. Global System for Mobile

Communication/Railways (GSM/R):

>200 Km : 2 (Gaziabad-Mughalsarai & Jalandhar-Jammu Tawi)

150-200 Km : 1 iv. Vigilance Control Device (VCD) on

Diesel Loco – 100% v. Vigilance Control Device (VCD) on

Elec. Loco – 100%

i. Centralised interlocking: 250 stations

(min)=1

ii. Multiple Aspect Colour Light

Signalling (MACLS) with Light

Emitting Diode (LED) lamps: 120

stations (min) =1

iii. Complete track circuiting of station

sections: 500 locations (min)= 2

iv. Block proving by axle counters: 250

block sections (min) =2

v. Interlocking and provision of

telephones at Level Crossings (LCs):

250 nos. (min)=2

vi. Isolation in old crossing stations: 30

stations (min)=2

Table 7: Completion of steps in finalization of Accounting Reforms

i. Preparation of Train costing model for costing trains – March, 2015

Page 10: Results Framework Document 2014-15

Revised Mandatory Success Indicators:

1 2 3 4 5 6 7 8 9 10

Objective Action Success indicator

Unit

Weig

ht

(%)

Target criteria Value.

Excellent 100%

V.Good 90%

Good 80%

Fair 70%

Poor 60%

1

Efficient Functioning of the RFD System

Timely submission of Draft RFD

for 2015-16 for Approval

On – time submission

Date

2 Mar. 5, 2015

Mar. 6, 2015

Mar. 9,

2015

Mar. 10,

2015

Mar. 11,

2015

Timely submission of Results for

2013-14

On – time submission

Date

1 May 1, 2014

May 2, 2014

May 3,

2014

May 6

2014

May 7,

2014

2

Enhanced Transparency/ Improved Service delivery of Ministry/ Department

Rating from Independent Audit of

implementation of

Citizens‟/Clients‟ Charter (CCC)

Degree of implementation of commitments in CCC

%

2 100 95 90 85 80

Independent Audit of implementation of Grievance Redress Management (GRM) system

Degree of success in implementing GRM

%

1 100 95 90 85 80

Page 11: Results Framework Document 2014-15

3

Reforming Administration

Update departmental strategy to

align with revised priorities Date

Date

2 1 Oct.

2014

15 Oct.

2014

31 Oct.

2014

15 Nov.

2014

30 Nov.

2014

Implement agreed milestones of approved Mitigating Strategies for Reduction of potential risk of corruption (MSC)

% of implementation

% 1 100 95 90 85 80

Implement agreed milestones for implementation of ISO 9001

% of implementation

% 2 100 95 90 85 80

% of Responsibility Centers with RFD in RFMS

Responsibility Centers covered

% 1 100 95 90 85 80

Implement agreed milestones of approved Innovation Action Plans (IAPs)

% of implementation

% 2 100 95 90 85 80

Page 12: Results Framework Document 2014-15

4

Improve compliance with the Financial Accountability Framework

Timely submission of ATNs on Audit paras of C&AG

% of ATNs submitted within due date (4 months) from date of presentation of Reports to Parliament by C&AG during the year

% .25 100 90 85 75 70

Timely submission of ATRs to the PAC Sectt. On PAC Reports

% of ATRs submitted within due date (6 months) from date of presentation of Reports to Parliament by PAC during the year

% .25 100 90 85 75 70

Early disposal of pending ATNs on Audit Paras of C&AG Reports presented to Parliament before 31.3.2014

% of outstanding ATNs disposed off during the year

% .25 100 90 85 75 70

Early disposal of pending ATRs on to the PAC Sectt. On PAC Reports presented to Parliament before 31.3.2014

% of outstanding ATRs disposed off during the year

% .25 100 90 85 75 70

Page 13: Results Framework Document 2014-15

Section 3: Trend values of the success indicators:

1 2 3 4 5 6

Objective

Weig

ht

(%)

Action Success indicator

Unit

Weig

ht

(%)

Actual Value

for 2012-13

Actual Value

for 2013-14

Target Value

for 2014-15

Projected Value

for 2015-16

Projected Value

for 2016-17

1. To improve

financial

performance with an

eye on financial

viability

17 % 1.1. Control working

expenditure and boost Earnings

1.1.1. Operating ratio Percent 8

88.8 90.8 91 92 92

1.1.2 Yield per NTKMs

Paise/ NTKm 3 123.27 142.28 148.49 163.2 177.41

1.1.3 Yield per PKMs Paise/ PKms 5 28.52 33.83 35.15 39.83 45.13

1.1.5. Finalisation of Accounting Reforms

Preparing time bound action plan for implementation

1 - -

12/2014

(for train

costing

module)

12/2015

(for other

modules)

12/2016

(for other

modules)

2. To increase the traffic carried both in

terms of freight

15 %

2.1. Volumes

2.1.1. Originating Loading (including KRCL loading)

Million Tonnes 6 1009.83 1052 1101 1150 1200

2.1.2.Net transportation

Billion NTKm 6 641.82 654 688 712 738

2.2. Improved quality and efficient utilization

2.2.1.Productive utilization of available wagons

NTKms per wagon-day (BG 8-Wheeler)

3 9285 9270 9275 9280 9285

3. To increase the traffic carried both

in terms of Passenger

3 %

3.1. Volumes

3.1.1.Non-suburban Billion PKms 1

952

962 1030.61 1061.53 1093.38

3.1.2.Suburban

Billion PKms 1

146

148 151.44 155.41 160.07

Page 14: Results Framework Document 2014-15

1 2 3 4 5 6

Objective

Weig

ht

(%)

Action Success indicator

Unit

Weig

ht

(%)

Actual Value

for 2012-13

Actual Value

for 2013-14

Target Value

for 2014-15

Projected Value

for 2015-16

Projected Value

for 2016-17

3.1.3 Customer Satisfaction Index Survey

No. of Stations 1 SI did not

exist 100 100

Further action will be taken after receipt and study of

survey reports.

4. To augment

infrastructure on a

continued basis for

creation of

transportation

capacity

25 %

4.1.Capacity augmentation and

Asset creation

4.1.1.New lines

Kms. 1 501

450 300 350 350

4.1.2.Doubling

Kms. 2 705

708 700 600 600

4.1.3.Electrification

Kms 1 1317

1350 1170 1300 1300

4.1.4.Flagship Projects

Completion of listed events in Table 1

(Nos) 4 3 4 3 3 3

4.1.5.Progress in Critical Projects (>Rs 150 crores)

Completion of listed events in Table 2

(Nos) 3 3 4 3 3 3

4.1.6.High Density Network

Completion of listed events in Table 3

(Nos) 3 4 4 3 3 3

4.1.7.Dedicated Freight Corridor

Completion of listed events in Table 4 (Nos)

4 2 4 4 3 3

4.1.8.Loco manufacturing

Numbers 2 678 687 600 700 700

4.1.9. Wagon manufacturing

Number 2 16894 9326

13200

12000

11000

4.1.10 Coach manufacturing

Numbers 2 4023 3887

4100

4200

4400

4.2.Investment Through PPP

4.2.1.Value of Projects

Rs. Crores 1 1050 1000 4000 6000 6000

5. To ensure optimum utilization of assets

and enhance employee productivity

1 %

5.1.Improvement in productivity of staff

5.1.1. All staff Million (NTKM+PKM).

per employee 1 1.32 1.32 1.34 1.39 1.45

Page 15: Results Framework Document 2014-15

1 2 3 4 5 6

Objective

Weig

ht

(%)

Action Success indicator

Unit

Weig

ht

(%)

Actual Value

for 2012-13

Actual Value

for 2013-14

Target Value

for 2014-15

Projected Value

for 2015-16

Projected Value

for 2016-17

6. To improve quality of services provided by the railways to its users for enhanced

customer satisfaction

10 %

6.1.Amenities Improvement at stations and on-board

6.1.1. IT in passenger reservations

e-tickets, i-tickets sold (in lakhs Nos.)

2 1406.88 1548 1641 1739 1844

6.1.2 Increase in capability of issuing e-ticket/i-ticket on the internet

Increase in no. of tickets issued per minute

2 268 315 326 340 355

6.1.3. Facility for differently- abled

Stations covered 1 586 595 615 630 650

6.1.4. Provision of bio/ controlled discharge toilets in trains

Number of toilets 2 1337 8024 10500 13000 17000

6.1.5 Introduction of premium Trains Number 2

Scheme did not exist

4 34 38 42

6.1.6 Stations provided with improved amanities under upgradation scheme (Adarsh Station)

Number 1 181 98 100 100 16 (Due to completion of scope)

7. To take up green initiatives and efficient energy management

6%

7.1.Improvement in fuel efficiency

7.1.1.SFC Diesel(goods)

Ltrs /1000 GTKm 1 2.18 2.15 2.13 2.11 2.09

7.1.2.SEC Electrical (goods)

KWH/ 1000 GTKm. 1 6.73 7 6.9 6.8 6.7

7.2.Afforestation 7.2.1.Trees planted Nos (lakhs) 1 68.27 70 70 65 60

7.3. Non-conventional Energy and environment improvement initiatives

7.3.1.Production of wind energy

KW hour (in cr) 1 2 1.23 1.5 1.75 2.0

7.3.2.No. of Stations provided with solar energy panels during the year

Numbers 1 68 63 125 100 50

Page 16: Results Framework Document 2014-15

1 2 3 4 5 6

Objective

Weig

ht

(%)

Action Success indicator

Unit

Weig

ht

(%)

Actual Value

for 2012-13

Actual Value

for 2013-14

Target Value

for 2014-15

Projected Value

for 2015-16

Projected Value

for 2016-17

7.3.3.No. of level crossing provided with solar energy panels during the year

Numbers 1 550 600 610 800 400

8. To provide safe and

secure transportation

6%

8.1.Initiatives to reduce accidents

8.1.1.On Board Installations

Number (Avg.score as per list)

1 8 7 4 5 5

8.1.2. Fixed Installations

Number (Avg.score as per list)

1 8 7 5 6 6

8.2.Elimination of LC gates (level crossing gates)

8.2.1.Completed in the year

Numbers 3 957 720 1000 1100 1200

8.3.Security Initiatives

8.3.1.No. of stations having introduced Integrated Security Services

Numbers 1 75 93 109 100 100

9. To undertake joint responsibility with

concerned stakeholder ministries for

increased coal availability and

movement contributing to

increased power generation in the

country

2 % 9.1.Give necessary support

and clearance

9.1.1.Additional Capacity installed

MW 1 18500 18000 17000 16500 16000

9.1.2.Total power generated

BU 1 1030 1000 950e

920 890

Page 17: Results Framework Document 2014-15

Section 4 Description and definition of success indicators and measurement methodology:

Freight services constitute the most important segment of activity of railway business. The earnings from freight account for more than two-thirds of the total earnings. Accordingly, the weight-age has been fixed at 15%. As visualized in the Vision 2020 Document, increase in volumes as well as increase in speed is the objective of improving the services. The success indicators identified are:

i) Originating Traffic ii) Net transportation

These are described below: 1.1.1 Operating ratio: It means number of rupees spent to earn Rs. 100. Lesser the

operating ratio, better is the financial health of the Railways.

Extracts from Finance code Volume I

434. Percentage of Working Expenses to Earnings - Operating Ratio. - A statement showing percentage of working expenses to earnings in respect of the entire system (i. e. including Working Lines) should also be submitted with the Appropriation Accounts. This statement should contain brief notes explaining the variation in the percentage for the year as compared with that for the previous year. The percentage should be worked out on the following basis.-

Total Gross Earnings. (1) as defined in item (v) of para 308.

Total Gross Working Expenses (2) as defined in item (xiii) of para 308.

Percentage = (2) x 100/(1)

(308) Glossary of terms used-Following is a glossary of the terms which the Railway Administrations should use in their estimates and other connected documents. The terminology given in the glossary should be followed uniformly by all Railway Administrations and no departure should be made therefrom under any circumstances:

GLOSSARY OF TERMS (i) Coaching Earnings (less refunds) (ii) Goods Earnings (less refunds) (iii) Traffic Earnings = (i)+(ii) (iv) Sundry Other Earnings (less refunds)=Other than Traffic Earnings. (v) Gross Earnings = (iii)+(iv) = true or accrued earnings in an accounting

period whether or not actually realised. (vi) Suspense. (vii) Gross Receipts = (v)+(vi) = Earnings actually realised during an accounting

period. (viii) Miscellaneous Receipts = Guarantee recoverable from State Governments +

Other Miscellaneous Receipts, such as Government share of surplus profits, sale of land of subsidized companies, receipts from surcharge on Passenger fares, etc.

(ix) Total Revenue Receipts = (vii)+(viii). (x) Ordinary Working Expenses = Expenses booked under final heads, excluding

appropriation to Depreciation Reserve Fund, and Pension Fund. (Payments on account of accident compensation and Pensionary Payments should also be excluded).

(xi) Appropriation to Depreciation Reserve Fund. (xii) Appropriation to Pension Fund. (xiii) Gross Working Expenses = (x)+(xi)+(xii) = True expenses in an accounting

period whether or not actually disbursed.)

Page 18: Results Framework Document 2014-15

1.1.2 Yield per NTKM: Yield per Net Tonne Kilometers is the average revenue earned per Net Tonne Kilometers of goods carried. 1.1.3 Yield per PKMs: Yield per Passenger Kilometers is the average revenue earned per

Passenger Kilometers. 1.1.4 Finalisation of Accounting Reforms Accounting Reforms for Indian Railways is one

of the first steps towards accrual based commercial accounting by large government entities. Implementation of Accounting Reforms will lead to implementation of recommendations for Accounting Standards of GASAB (General Accounting Standards Advisory Board) and compliance with IGAS (Indian Government Accounting Standards) and IGFRS (Indian Government Financial Reporting Standards). Accounting Reforms). Successful implementation in IR will pave the way for others to follow. Accounting reforms coupled with commercial architecture, cost and profit centres and profitability analysis will empower the management with critical business information to take decisions. The project will enable availability of accurate and timely financial information, which when coupled with operational data can provide the tools for cost benchmarking for control purposes.

Presently, development of train costing model for costing of train operations is underway to bring in section costing methodology and other aspects to actually move into train costing. The consultants have provided models for costing train journeys between any two pair of points.

2.1.1 Originating Loading: At every loading point, individual wagon of the rake are subjected to weighment and record of loading is usually available on a computerized electronic weighing machine. This loading is authentically declared, documented and used as the basis for billing. Accumulated data of originating loading is reported to the division, zone and Railway Board. Hence, this improved index of success indicator is adopted in the RFD.

2.1.2 Net Transportation: The Net Transportation is measured in Net Transportation

Kilometers and is denoted as NTKM. The NTKM is the product of net weight of the loaded commodity and the distance in kilometers over which it is moved.

2.2.1 Productive utilization of available wagons: This refers to the Average Net tonnage handed by a wagon for coverage kilometers in a given day, i.e. Nete Tonne Kilometer per day per wagon

2.3.1. Establishment of Agri Rail Network-Movement of perishable trains: Setting up of

temperature controlled warehouses for enabling perishable module features

2.4.1. Diamond Quadrilateral Project of High Speed Trains: Taking up of preliminary feasibility

study on the quadrilateral level

3.1.1 Passenger Kilometers (Non-Suburban): The passenger kms is the most commonly used index of the quantum of passenger transportation. It is arrived at by statistics of ticket sales. Each ticket has the no. of passengers as well as distance in KM between originating and destination station. This statistics pertains to Non-suburban section and is a summation of the product of number of passengers and the kilometer mentioned on each ticket sold.

3.1.2 Passenger Kilometers (Suburban): The passenger kms is the most commonly used

index of the quantum of passenger transportation. It is arrived at by statistics of ticket sales. Each ticket has the no. of passengers as well as distance in KM between originating and destination station. This statistics pertains to suburban section and is a summation of the product of number of passengers and the kilometer mentioned on each ticket sold.

Page 19: Results Framework Document 2014-15

3.1.3 Customer Satisfaction Index Survey: Customer Satisfaction Index survey has already been conducted in 2013-14 to assess the satisfaction evels of rail users. Report is awaited and any further implementation of continued survey will be done after study of the report. However, for 2014-15, one more round of survey is proposed to be initiated at around 100 stations.

3.2.1 Tourist Rail (including Pilgrimage Rail): Introduction of additional trains to tourist/pilgrims stations 4.1.1 New lines: This pertains to construction of New Lines. 4.1.2 Doubling: This pertains to doubling/tripling/quadrupling of track on single line section. 4.1.3 Electrification: This pertains to electrification of the track fo that traffic can also move on

electric locomotive.

4.1.4 Flagship projects: Projects which are of strategic and paramount importance for the country for bringing hitherto unconnected areas into the mainstream as wll as providing connectivity to North Eastern areas etc. have been marked as flagship projects, even where viability has not been the prime target. 4 projects have been selected based on their impact on the Railways image and Financial Health in the long run.

i. Lumding-Silchar Gauge Conversion : Completion of Lumding-Silchar Gauge Conversion

(121 km)

ii. Suratpura-Hanumangarh-Sriganganagar Gauge Conversion : Completion of

Hanumangarh-Ellanabad Gauge Conversion (43 km)

iii. Koderma-Ranchi New Line : Completion of Bes-Mandu & Bes-Kuju (balance portion)

New Line (14 km)

iv. Utretia-Zafrabad Doubling : Completion of Utretia-Zafrabad Doubling (60 km)

4.1.5 Progress in Critical Projects (>Rs 150 crores): Projects which are critical to the immediate operational needs of the Railways for the purpose of enhancement of throughput and also included in the list of projects monitored by Ministry of Statistics and Programme Implementation. 4 projects have been selected based on criticality in the present scenario.

i. Villupuram-Dindigul Doubling : Completion of 42 km doubling on Villupuram-

Dindigul

ii. Gorakhpur-Gonda Gauge Conversion :Completion of Barhni-Gonda Gauge

Conversion (83 km)

iii. Ranchi-Lohardaga with extension to Tori Gauge Conversion : Completion of

Bangaruram-Ras (20 km) new line

iv. Bhagat ki Kothi-Luni Doubling : Completion of Delang-Puri Doubling (28.7 km)

4.1.6 High Density Network Project: Projects which are critical for de-bottlenecking in the High Density Networks have been selected. 4 projects have been selected based on their possible contribution to improvement.

i. Daund-Gulbarga Doubling part (47 km)= 31.03.2015

ii. Khurda Road-Barang 3rd line Doubling part (6.3 km)= 31.03.2015

iii. Bhopal-Bina 3rd line Doubling (balance 7.7 km)= 31.03.2015

iv. Vizianagaram-Kottavalasa 3rd line Doubling part (27 km)= 31.03.2015

4.1.7 Dedicated Freight Corridor Project: Indian Railways have taken up the task of completion of Dedicated Freight corridors, Eastern and Western and it is expected that this will be a game changer for a significant modal shift. It is expected that the DFC

Page 20: Results Framework Document 2014-15

should be ready in 2018-19, provided the funds availability position for the same is comfortable. Targets for 2014-15 are as follows.

i. Award of civil contract for Iqbalgarh-Vadodara (305km) of Western DFC :

31.03.2015

ii. Award of electrical contract for Rewari –Vadodara section (930 km) of Western

DFC : 31.03.2015

iii. Award of signaling contract for Rewari – Vadodara section (930 km) of Western

DFC : 31.03.2015

iv. Award of civil contract for Kanpur-Mughalsarai section (390 km) section of

Eastern DFC : 31.03.2015

v. Award of systems contract for khurja-Kanpur (343 km) section of Eastern DFC :

31.03.2015

Also, tentative timelines for Dedicated Freight Corridor upto 2018-19 can be considered

as follows, with the proviso, outlined above.

A. Eastern DFC

1. 2014-15

(i) Award of Civil Contract for Package-201 of EDFC-2 (Mughalsarai-Allahabad section). (ii) Award of Civil Contract for Package-2O2 of EDFC-2 (Allahabad-Kanpur section). (iii) Award of Systems Contract for Package-104 (Kanpur-Khurja section).

2. 2015-16

(i) Award of Electrical Contract for Package-204 of EDFC-2 (Mughalsarai-Kanpur Section). (ii) Award of S&T Contract for Package-203 of EDFC-2 (Mughalsarai-Kanpur Section). (iii) Award of Civil Contract for Package 301 of EDFC-3 (Pilkhani Ludhiana Section). (iv) Award of Civil Contract for Package 302 of EDFC-3 (Khurja -Dadri Section). (v) Award of System Contract for Package 304 of EDFC-3 (Pilkhani Ludhiana Section). (vi) Award of System contract for Package 305 of EDFC-3 (Khurja-Dadri Section). 3. 2016-17

(i) Award of Civil Contract for Package 303 of EDFC-3 (Khurja -Pilkhani Section). (ii) Award of System Contract for Package 306 of EDFC-3 (Khurja-Pilkhani Section). (iii) Commissioning of 66 Km of Mughalsarai -Sonnagar section. (iv) 70% Progress of EDFC-(Khurja-Kanpur Section). (v) Completion of 3.0 Kms long SON Bridge. (vi) 35% Progress of EDFC-2 (Mughalsarai-Kanpur Section). (vii) 10% Progress of Package 301 & 302 of EDFC-3 (Khurja-Dadri and Pilkhani- Ludhiana

section). 4. 2017-18

(i) Commissioning of Khurja- Kanpur section. (ii) Commissioning of M ughalsarai-Sonnagar section. (iii) 70% Progress of EDFC-2 (Mughalsarai-Kanpur Section). (iv) 35% Progress of Package 301 & 302 EDFC-3 (Khurja- Dadri and Pilkhani- Ludhiana

section). (v) 20%o Progress of Package 303 of EDFC-3 (Khurja -Pilkhani section).

5. 2018-19

Page 21: Results Framework Document 2014-15

(i) Commissioning of Mughalsarai -Kanpur Section (EDFC-2). (ii) Commissioning of Pilkhani-Ludhiana and Khurja -Dadri section (EDFC-3). (iii) 70% Progress of Package -301 & 302 of EDFC-3 (Khurja-Dadri and Pilkhani-Ludhiana

section). (iv) 60% Progress of Package 303 of EDFC-3 (Khu rja-Pilkhani section).

B. Western DFC

1. 2014-15

(i) Award of Civil Contract for Package-3 (Iqbalgarh- Makarpura section-290Km). (ii) Award of Civil Contract for Package-3A (Mahi& Sabarmati important Bridges). (iii) Award of Electrical Contract for Package-4 (Rewari-Makarpura section). (iv) Award of Systems (S&T) Contract for Package -5 (Rewari-Makarpura section). (v) Award of Special Bridges Package (15A, 15B & 15 C). (vi) Award of Civil Works of Package-13 (Makarpura – Sachin section).

Award of Civil Works of Package-12 (Sachin–Vaitarana section).

2. 2015-16

(i) Award of Contract for Package – 14 (Rewari-Dadri Section -123 Km.) (ii) Award of Civil Contract for Package-11 (JNPT-Vaitarna section -102 Km.). (iii) Award of Electrical Contract for Package -16 (Makarpura-JNPT section – 428 Km.) (iv) Award of S&T Contract for Package -17 (Makarpura-JNPT section – 428 Km.) (v) Progress of Civil Works (Rewari-Iqbalgarh) – Target overall -35%. (vi) Progress of Special Bridge Package – 15A, 15B, 15C – Target – 10%. (vii) Progress of Civil Works – (Iqbalgarh- Makarpura) – Target -10%. (viii) Progress of Civil works – (Makarupura- Sachin) – Target – 10%. (ix) Progress of Civil works – (Sachin –Vaitarana) –

3. 2016-17

(i) Progress of Civil Works – (Rewari – Iqbalgarh) – Target -70%. (ii) Progress of Civil Works – (Iqbalgarh-Makarpura) –Target – 35%. (iii) Progress of Civil works – (JNPT-Vaitarna)- Target -10%. (iv) Progress of Civil works –(Makarpura-Sachin) - Target – 35%. (v) Progress of Civil works – (Sachin – Vaitarna) - Target – 35%. (vi) Progress of Package-14- (Rewari- Dadri) - Target -10%. (vii) Progress of Special Bridge Package – 15A, 15B, 15 C – Target – 35%

4. 2017-18

(i) Commissioning of (Rewari-Iqbalgarh) Section of WDFC-1 (ii) Progress of Civil works – (Iqbalgarh-Makarpura) –Target – 70%. (iii) Progress of Civil works – (JNPT-Vaitarna) - Target -35%. (iv) Progress of Civil works – (Makarpura – Sachin) –Target – 70%. (v) Progress of Civil works – (Sachin – Vaitarna) - Target –70%. (vi) Progress of Package-14- (Rewari – Dadri) - Target -35%. (vii) Progress of Special Bridge Package – 15A, 15B, 15 C – Target – 70% 5. 2018-19

(i) Commissioning of Iqbalgarh-Makarpura Section. (ii) Progress of Civil works – (JNPT-Vaitarna) - Target -70%. (iii) Commissioning of Makarpura – Sachin Section. (iv) Commissioning of Sachin – Vaitarna Section.

Page 22: Results Framework Document 2014-15

(v) Progress of Package-14- (Rewari – Dadri) - Target -70%.

Note : % progress given are cumulative progress.

4.1.8 Loco Manufacturing: These are the total number of locomotives proposed to be manufactured at the Railways‟ owned facilities.

4.1.9 Wagon Manufacturing: These are the total number of wagons proposed to be

manufactured at the Railways‟ owned facilities. 4.1.10 Coach manufacturing: These are the total number of coaches proposed to be

manufactured at the Railways‟ owned facilities. 4.2.1 Value of Projects (Investment through PPP): The figures indicate the amount of

capital investment which the Indian Railways expects to attract from the Public-Private Partnership model for its various works.

4.3.1 Hinterland connectivity to ports through new networks: Completion of milestones indicated in the list of port connectivity projects

(i) Dedicated freight line between Wadala and Kurla (ii) Panvel-Pen doubling (iii) Rajatgarh-Barang doubling (iv) Khurda Road-Barang 3

rd line

5.1.1 Improvement in productivity of all staff: The unit for measuring performance in

relation to the objective as a measure of staff productivity has been suggested as million traffic units per employee for RFD in FY 2012-13 onwards. In our Vision 2020 document also, Million traffic units (PKM+NTKM) per employee has been used for international comparison.

5.2.1 Special focus on developing skilled human resources to meet future demand:

Initial/Refresher training of technical staff in Railways‟ Training Centres 6.1.1 IT in passenger reservations - e-tickets, i-tickets sold (in lakhs Nos.) : As a part of

making the railway reservation more user friendly and transparent, this initiative has been taken.

6.1.2 Increase in capability of issuing e-ticket/i-ticket on the internet (per minute) : As a

part of speeding up the railway reservation for rail users, this initiative has been taken. 6.1.3 Facilities for differently abled - Provision/augmentation of amenities at station,

including those for differently abled passengers is a continuous process. Facilities for persons with disabilities at stations have been divided into two categories, viz. short term and long term facilities.

1. Short term facilities are (i) standard ramp for barrier free entry (ii) earmarking at least two parking lots (iii) non-slippery walk-way from parking lot to building (iv) signages of appropriate visibility (v) at least one drinking water tap suitable for use by differently abled persons (vi) at least one toilet on the ground floor and (vii) „May I help you‟ Booth.

Provision of short term facilities has been planned at all stations beginning with „A1‟, „A‟ and „B‟ category stations.

2. Long term facilities are

(i) Provision of facility for inter-platform transfer and

Page 23: Results Framework Document 2014-15

(ii) Engraving on edges of platform. (iii) Long term facilities are planned after provision of short term facilities at A-1, A and

B category stations.

6.1.4 Provision of bio/ controlled discharge toilets in trains: Indian Railways are the first and only railway system in the world that is using a combination of design and technology to provide environment friendly toilets. Unlike adoption of proven technology, such new technology poses fresh technological challenges and safety issues that need to be solved along the way during its implementation. Hence, year-wise targets will need to be kept flexible to enable mid-course correction whenever design/ fitment/ maintenance problems affect pace of fitment. As far as fitment in all new coaches is concerned, it is being planned that all new coaches, manufactured after 2016-17, will be turned out fitted with bio-toilets by the production units. Year-wise targets of fitment of bio-toilets in the whole fleet of existing coaches, even if predicted based on current experience, may change because of design evolution, as explained above.

6.1.5 Introduction of Premium Trains: In order to ease rail travel, Indian Railways has come

up with the idea of running dedicated fast trains between significant stations with less stoppages, no wai-listed passengers and dynamic pricing concept. Initial results have been very encouraging and more such trains are proposed to be introduced.

6.1.6 Stations provided with improved amenities under upgradation scheme (Adarsh

Station): All stations have been provided prescribed amenities as per the class of station and standard norms and there is a continuous internal scrutiny of availability of amenities vis-à-vis the stipulated norms. However, for effecting further improvement, numbers of stations are being taken up under Upgradation scheme “Adarsh Station” which will lead to improvements in already existing facilities.

7.1.1 Improvement in fuel efficiency (SFC Diesel): Specific fuel consumption (Diesel) is a

measure of the fuel efficiency of diesel locomotives.

7.1.2 Improvement in fuel efficiency (SEC Electrical): Specific energy consumption (Electrical) is a measure of the energy efficiency of electric locomotives.

7.2.1 Trees Planted – Afforestation: It refers to the number of trees that are proposed to be

planted in the available area. It is highlighted that with each passing year, area available for plantation is progressively coming down.

6.3.1 Production of wind energy: Installation of wind energy plants has been taken up on a pilot basis to assess its wider scope on Indian Railways as an environment-friendly measure.

7.3.2 No. of Stations provided with solar energy panels during the year: As a measure of

saving energy from conventional sources, Indian Railways have taken up the task of fitting solar energy panels at various stations, including wayside and remote stations to the extent feasible.

7.3.3 No. of level crossing provided with solar energy panels during the year: As a

measure of saving energy from conventional sources and also to provide power to such remote and isolated areas where power connectivity is not existing, Indian Railways have taken up the task of fitting solar energy panels at various level crossing gates to the extent feasible.

8.1.1 Initiatives to reduce accidents (On Board Installations): In order to make the train

operation safer, efforts are being made to put in systems like TPWS, TCAS, VCDs on locomotives etc. Following targets have been fixed for 2014-15. (i) Train Protection & Warning System (TPWS)

50 kms:2 (Basin Bridge-Arrakkonam)

Page 24: Results Framework Document 2014-15

25 kms:1

(ii) Train Collision Avoidance System (TCAS): Extended trials on South Central Railway:

>200 Km : 3

100 to 200 Km : 2

50 to 100 Km : 1 (iii) Global System for Mobile Communication/Railways (GSM/R):

>200 Km : 2 (Gaziabad-Mughalsarai & Jalandhar-Jammu Tawi)

150-200 Km : 1 (iv) Vigilance Control Device (VCD) on Diesel Loco – 100% (v) Vigilance Control Device (VCD) on Elec. Loco – 100%

Above initiatives are being tried on a pilot basis and the results and feedback obtained from the above exercise will be analyzed before any further proliferation can be carried over larger areas.

8.1.2 Initiatives to reduce accidents (Fixed Installations): In order to make the train

operation safer, efforts are being made to improve the signaling systems, standards of interlocking, isolations etc. over various sections of Indian Railways. Following targets have been fixed for 2014-15.

(i) Centralised interlocking: 250 stations (min)=1

(ii) Multiple Aspect Colour Light Signalling (MACLS) with Light Emitting Diode (LED)

lamps: 120 stations (min) =1

(iii) Complete track circuiting of station sections: 500 locations (min)= 2

(iv) Block proving by axle counters: 250 block sections (min) =2

(v) Interlocking and provision of telephones at Level Crossings (LCs): 250 nos. (min)=2

(vi) Isolation in old crossing stations: 30 stations (min)=2

8.2.1 Elimination of Level Crossing gates (Completed in the year): In order to bring down

the occurrences of mishaps at the level crossings, Indian Railways have taken up the job of eliminating the level crossings as a mission area. This is being done through putting in overbridges or underbridges, as feasible.

8.3.1 No. of stations having Integrated Security at Stations:- Integrated Security System is

being implemented to strengthen surveillance mechanism over selected sensitive

stations of the Indian Railways. The System has been envisaged to put in place a

multiple checking system starting from entry to the station premises till the boarding of

the train by passengers. Area to be covered under the above System include entry/exit

points, circulating area, concourse, platforms, parcel area, foot over bridge, washing line,

vehicle entry point etc. Automatic vehicle scanners and X-ray baggage scanners have

been envisaged under the above System for scanning of vehicles and baggage. For

explosive detection, provision of explosive vapour detector and sniffer dogs is being

made at nominated railway stations. The Integrated Security System comprises of

following four broad areas-

(i) Internet protocol based CCTV system (ii) Access control system

(iii) Personal & baggage screening system (iv) Explosive detection & disposal system

9.1.1 Give necessary support and clearance (Additional Capacity installed): Information

has to be provided by other responsible ministries.

9.1.2 Give necessary support and clearance (Total power generated): Information has to

be provided by other responsible ministries.

Page 25: Results Framework Document 2014-15

Section 5: Specific performance requirements from other departments that are

critical for delivering agreed results.

1. Other Ministries and Departments: Railway Traffic demand specially in

Freight traffic is a derived demand. This means that the demand for Railway Freight

Traffic depends on demand for various commodities carried by Railways which in turn

depend on the extent of economic activity in the related sectors. These commodities

includes coal, iron ore, finished steel, cement, fertilizers, food grains etc.. Hence, the

performance of Ministry of Railways will depend also on the performance of other

Ministries viz. Ministry of Coal, Ministry of Steel, Ministry of Mining, Ministry of Food

and Ministry of Commerce.

2. Budgetary Support: Indian Railways is a Ministry of the Government of India.

The tariff structure is, therefore, a matter of Government policy decided, taking into

account not only the commercial considerations of operating the service but also of

social and people oriented objectives of the Government of India. The internal

resources, therefore, are constrained by the overall view taken by the Government as

a whole. Under these circumstances, it is imperative that adequate budgetary support

is extended to the infrastructure development plans drafted to create the necessary

infrastructure for sustaining the growth. Hence, budgetary support from Government

of India (Finance Ministry) in the right proportion is essentially required.

3. Ministry of Environment & Forest: Forest and environment clearance needs

to be given in time from Ministry of Environment & Forest for timely initiation and

completion of Railway projects.

4. Land Acquisition: As land acquisition for Railway projects is done through

state government agencies, there is dependency on state government machinery for

timely land acquisition.

5. Law & Order: Indian Railways traverses through the individual States in its

day to day operations. It is also highly vulnerable to disturbances due to agitations

and vandalism. Therefore, there is heavy dependency on the State Government‟s

support and adequate empowerment of the Government Railway Police (GRP) to

ensure freedom from obstruction and vandalism.

Page 26: Results Framework Document 2014-15

Section 6: Outcome/activities of department/ministry

1 2 3 4 5 6 7 8 9

S.N Outcome/

Impact

Jointly responsible for influencing this outcome/impact with the following organisation (s)/ Department/ ministry(ies)

Success Indicator(s)

Unit

2012-13

2013-14 2014-15

(Provisional) 2015-16

(Provisional) 2016-17

(Provisional)

1 Improved

Freight

services

State Governments for law

and order, Ministry of Coal,

Ministry of Steel, Ministry of

Mining, Ministry of Food &

Ministry of Commerce

1.1 Growth in

volume of

traffic

Net transportation

in billion NTKMs NTKMs

644 654 688 712 738

1.2 Improvement

in quality

Average speed of

freight trains

KMPH 25 25 25 25 25

2. Improved

Passenger

services

State Governments for law

and order

2.1 Growth in

volumes

No. of passengers

travelling by rail Nos

(million) 8501 8641 8900 9100 9300

2.2 Improvement

in quality of

service

Number of stations

taken up under

upgradation

scheme

Nos 181 98 100 100 16

Page 27: Results Framework Document 2014-15

1 2 3 4 5 6 7 8 9

S.N Outcome/

Impact

Jointly responsible for influencing this outcome/impact with the following organisation (s)/ Department/ ministry(ies)

Success Indicator(s)

Unit

2012-13

2013-14 2014-15

(Provisional) 2015-16

(Provisional) 2016-17

(Provisional)

2.3 Punctuality

Performance

Punctuality of

passenger trains

(on percent basis)

% 80.14 82.96 82 83 84

2.4 Clean Train

Stations

No. of Train

Cleaning Stations Nos. 29 36 39 42 45

3. Safety State Governments for law

and order

No. of accidents

per million train km Nos 0.12 0.115 0.11 0.105 0.10

Casualties in a

year-Reduction Nos. 204 149 0 0 0

4. Improved

Railway

Infrastructure

Finance Ministry and

Planning Commission for

Budgetary support, Ministry

of Environment & Forest

and State Govt. for Land &

Acquistion

4.1 Connectivity to

North Eastern

Region

Total No. of

districts covered Nos. 3 7 7 4 4

4.2

Connectivity to

Jammu &

Kashmir

Total No. of

districts covered Nos. 2 3 2 2 2