rbx prr overview mar 01 - boston university physicsphysics.bu.edu/cms/hcal/rbx_prr/rbx prr overview...
TRANSCRIPT
HCAL RBX PRR: Mar 1-2, 2001 1
HCAL RBX PRR OverviewHCAL RBX PRR OverviewHCAL RBX PRR Overview
Jim Freeman
RBX PRRMarch 1-2, 2001
HCAL RBX PRR: Mar 1-2, 2001 3
Central HCAL RBX’sCentral HCAL RBX’sCentral HCAL RBX’s
HE
HB 15
16RBX
RBX
HO
HCAL RBX PRR: Mar 1-2, 2001 4
Optics-MegatilesOpticsOptics--MegatilesMegatiles
Components are the machined scintillator plates, cover plates, fiber assembly (WLS spliced to clear fiber, optical connector)
pigtails
HCAL RBX PRR: Mar 1-2, 2001 5
Optics-MegatilesOpticsOptics--MegatilesMegatiles
Cross section view of a megatile
HCAL RBX PRR: Mar 1-2, 2001 8
HPDHPDHPD
Hybrid PhotoDiode photon transducer for HB, HE, HO. Fiberoptic front window, conventional photocathode, pixelated diode (19 or 73
channels/device). From DEP, Holland. Need ~ 600 total.
HCAL RBX PRR: Mar 1-2, 2001 9
HPDHPDHPD
19 x 5.5mm 73 x 2.75mm
HCAL will use the DEP hybrid photodiodes for the photodetector.
There will be two types of tubes one with 73 and one with 19.
HCAL RBX PRR: Mar 1-2, 2001 10
HPDHPDHPD
PIN Diode arrayCeramic feedthrough
Fiber-OpticWindowPhotocathode
e
4
16 kV
Gain
0
0
4000
8
4 p.e spectrum
0
1000
2000
3000
4000
5000
6000
7000
0 50 100 150 200 250 300
HCAL RBX PRR: Mar 1-2, 2001 11
HB RBX Detail ViewHB RBX Detail ViewHB RBX Detail View
12.323 [313.00]
37.992 [965.00]
LOW VOLTAGE
AND PIPING AREA
HIGH VOLTAGEMODULE
4.173 [106.00]
CALIBRATIONMODULE
CCMMODULE
TOP VIEW
FRONT VIEW HB RBX COMPOSITE ASSEMBLY DRAWING
R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001
COOLING WATERIN & OUT
19-CHANNELRM-1
19-CHANNELRM-2
73-CHANNELRM
19-CHANNELRM-3
19-CHANNELRM-4
CHUNC
HCAL RBX PRR: Mar 1-2, 2001 12
RBX Readout ModuleRBX Readout ModuleRBX Readout Module• The readout module (RM) integrates the HPD, front end
electronics, and digital optical drivers.
HPD unit QIEs CCAs
Electronics Cards
Optical Drivers
Digital optical connector
HCAL RBX PRR: Mar 1-2, 2001 13
RBX Readout ModuleRBX Readout ModuleRBX Readout Module• The readout module (RM) integrates the HPD, front end
electronics, and digital optical drivers.
HPD unit QIEs CCAs
Electronics Cards
Optical Drivers
Digital optical connector
Electronics cards
HPD MountHV
Interface Card
Optical Sorter
HCAL RBX PRR: Mar 1-2, 2001 14
HCAL QIE-based Front EndHCAL QIEHCAL QIE--based Front Endbased Front End
ChannelControlASIC
Exponent(1:0)CapID(1:0)
Mantissa(4:0)
800 Mbit/sSerializer
VCSEL
CMS QIE
Exponent(1:0)CapID(1:0)
Mantissa(4:0)
ClockResetPedestal(3:0)
Test Pulse
Test PulseClockResetPedestal(3:0)
Data(15:0)
Clock
Control
Serial Control Bus
Global ResetBunch Crossing Zero40 MHz ClockSPLITTER
INTEGRATOR
ENCODER
FADC
CMS QIE
CMS QIE Solution
T. Shaw5/18/00
HCAL RBX PRR: Mar 1-2, 2001 15
Access to FE ElectronicsAccess to FE ElectronicsAccess to FE Electronics
End of HB wedges obscured by cables and services from HB, EB, tracker. Servicing electronics nontrivial.
53 degree end of HB wedge.
Blue = HCAL services
Green = ECAL
Red = Tracker
HCAL RBX PRR: Mar 1-2, 2001 16
HCAL Electronics OverviewHCAL Electronics OverviewHCAL Electronics Overview
HCAL RBX PRR: Mar 1-2, 2001 17
CalibrationCalibrationCalibration
Moving Wire radioactive source calibration
Source Co60, 2mC
Carries calibration from test beam to CMS detector by taking ratio of source/(test beam), then re-measuring source at CMS.
Generates about 5nA current into the electronics
Laser Calibration System
Exercise electronics over full dynamic range, get slopes/crossovers for QIE ranges.
Set up timing of detector. Hits every channel with pulse of known timing.
LED Calibration System
Useful in factory, for “heartbeat” signal
HCAL RBX PRR: Mar 1-2, 2001 18
Light Yield and NoiseLight Yield and NoiseLight Yield and Noise
Some NumbersLight Yield 10 pe / GeV
MIP Signal in HO ~10 pe
MIP Signal in Layer 0 ~ 5 pe
HPD Gain 2000X à MIP in HO is 20K e-
Desire well-separated signal from pedestal
à noise level of ~4000 e-
Radioactive Source Calibration (~5nA) uses 40Mhz path
5 nAà ~0.4 pe/25 ns.
Radioactive source appears as pedestal shift/broadening. Measure by massive oversampling. (106 samples). Nr samples increases with pedestal width.
HCAL RBX PRR: Mar 1-2, 2001 19
Influence on Ped width on Calibration measurementInfluence on Influence on Ped Ped width on width on Calibration measurementCalibration measurement
.05 DNL Interpolated .5 SrcNoise 1.0 10 M Samples
0
5
10
15
20
25
-0.0
0048
9
-0.0
0036
2655
-0.0
0023
6309
-0.0
0010
9964
1.63
818E
-05
0.00
0142
727
0.00
0269
073
0.00
0395
418
0.00
0521
764
0.00
0648
109
0.00
0774
455
Mor
e
Error
Freq
uenc
y
.05 DNL Interpolated .5 SrcNoise 3.0 10 M Samples
02468
101214161820
-0.0
0084
03
-0.0
0053
2775
-0.0
0022
525
8.22
75E
-05
0.00
0389
8
0.00
0697
325
0.00
1004
85
0.00
1312
375
Mor
e
ErrorF
req
uen
cy
HCAL RBX PRR: Mar 1-2, 2001 20
Noise vs Input CapacitanceNoise Noise vsvs Input CapacitanceInput Capacitance
Noise = 2400 + (30 * Cd)
y = 29.197x + 2358.2
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0 20 40 60 80 100
Detector Capacitance (pf)
Inp
ut
No
ise
(ele
ctro
ns)
Series1
Linear (Series1)
Spice model of QIE. 50 ohm cable ~ 1pf/cm
HCAL RBX PRR: Mar 1-2, 2001 21
HB ScheduleHB ScheduleHB Schedule
Major HB Activity 2001 2002 2003 2004 2005 20061 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
Install Scintillators in HB- (186)Install RBX HB-QIE Calibration System Study (FNAL)Move HB- to SX5Assemble HB- (SX5)HB+ arrives 186Install Scintillators in HB+ (186)Test Beam H2Move HB+ to SX5Assemble HB+ (SX5) Install RMs into RBX (SX5)Burn-in period (SX5)HB Trial Insertion into VactankHB Complete in UX5
HCAL RBX PRR: Mar 1-2, 2001 22
Design Criteria for RBXDesign Criteria for RBXDesign Criteria for RBX
• Interfaces to other subsystems• Accessibility/Serviceability• Environment for Electronics (volume,
cooling, power, clock, noise)• Safety• Manufacturability • Cost
HCAL RBX PRR: Mar 1-2, 2001 23
Some of the tasks waiting until after PRR
Some of the tasks waiting Some of the tasks waiting until after PRRuntil after PRR
• Analog optical cable factory • Optical cable shrouds• Finalize backplane, power, clock distribution• Connectors for card/backplane• Card layout• HV/LV cable procurement• HV/LV Connectors• Digital optical connectors
HCAL RBX PRR: Mar 1-2, 2001 24
RBX SituationRBX SituationRBX Situation
• Have a very complete design• Staff organized to immediately start factory• Many HCAL design issues contingent on
finalizing RBX• Electronics (geometry, card layout, backplane,
grounding, cooling, noise, …)• Optical cables (length)• HV/LV cables (acquisition)
• Need to finalize so design group can move on to next jobs (HE, HO)
• Delays = $$