hcal status

40
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 1 HCAL Status HCAL Status CMS HCAL Status Jim Freeman

Upload: umed

Post on 13-Jan-2016

62 views

Category:

Documents


3 download

DESCRIPTION

HCAL Status. CMS HCAL Status Jim Freeman. Outline. Absorber Optics Status at CERN HPDs Front End Electronics Higher Level readout Radioactive Source Test Milestone HF Summer 2002 Testbeam Longer Term Schedule. HB wedge design. Absorber. HB- at SX5 at CERN  - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 1

HCAL StatusHCAL StatusHCAL StatusHCAL Status

CMS HCAL Status

Jim Freeman

 

Page 2: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 2

OutlineOutlineOutlineOutline

• Absorber • Optics• Status at CERN• HPDs• Front End Electronics• Higher Level readout• Radioactive Source Test Milestone• HF• Summer 2002 Testbeam• Longer Term Schedule

Page 3: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 3

HB wedge designHB wedge designHB wedge designHB wedge design

Page 4: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 4

AbsorberAbsorberAbsorberAbsorber

HB- at SX5 at CERN

•17 HB+ wedges at CERN in Building 186. (Wedge 16 being repaired)

•Optics installed, QC Testing in progress

Page 5: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 5

HB Wedges at Bldg 186HB Wedges at Bldg 186HB Wedges at Bldg 186HB Wedges at Bldg 186

Page 6: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 6

HB- wedge 16 DamageHB- wedge 16 DamageHB- wedge 16 DamageHB- wedge 16 Damage

Page 7: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 7

HE + at MinskHE + at MinskHE + at MinskHE + at Minsk

Page 8: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 8

Megatile design, top viewMegatile design, top viewMegatile design, top viewMegatile design, top view

Components are the machined scintillator plates, cover plates, fiber assembly (WLS spliced to clear fiber, optical

connector) pigtails

Page 9: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 9

Megatile cross-sectional Megatile cross-sectional viewview

Megatile cross-sectional Megatile cross-sectional viewview

Page 10: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 10

Protvino - Pig Tail QCProtvino - Pig Tail QCProtvino - Pig Tail QCProtvino - Pig Tail QC

RMS of the light yield transmission is less

than 5%.

Page 11: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 11

Megatile Manufacture -HEMegatile Manufacture -HEMegatile Manufacture -HEMegatile Manufacture -HE

10 megatiles/day at Protvino

Page 12: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 12

HB Megatile ProductionHB Megatile ProductionHB Megatile ProductionHB Megatile Production

CMS HCAL Production

01836547290

108126144162180198216234252270288306324342360378396414432450468486504522540558576594612630

week of

Me

ga

til

es

Scintillator "Goal"

Final Assy. "Goal"

Covers "Goal"

Scintillator Machined

Covers Machined

Completed Megatiles

18 megatiles per layer 17 layers per wedge18 wedges per HB2 HB's

80% 490 tiles

90% 551 tiles

100% 612 tiles

P r epar ed by: T odd Nebel week ending 09/30/01

( HB+ / HB-) HB- leftScint=576 94% (100% / 88%) 12% leftCover=612 100% (100% / 100%) 0% leftTile=573 94% (100% / 88%) 12% left

L09 Delay forQuartz f iber

Scheduled to be completed end of 01.

Total labor estimate ~ 1.8 M$

Page 13: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 13

Installation at CERNInstallation at CERNInstallation at CERNInstallation at CERN

Page 14: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 14

Optics Factory at FNALOptics Factory at FNALOptics Factory at FNALOptics Factory at FNAL

• HB Optics factory in final phase. Will be finished in 2 weeks.

• Reduce staffing from 13 to 5.

• Factory will redirect to work on components for RBX’s, HV, LV, electronics components.

Page 15: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 15

HPD Delivery ScheduleHPD Delivery ScheduleHPD Delivery ScheduleHPD Delivery Schedule

Letter of Intent received by DEP Oct 12, 01

Spare Tubes (20) Dec 20, 01

Spare Tubes (30) Mar 1, 02

HB- (72) May 12, 02

HE- (72) Aug 23, 02

HB+ (72) Nov 3, 02

HE+ (72) Jan 28, 03

HO (146) Jun 23, 03

So far, 20 at Minnesota. ~ on schedule

First Production HPD

Page 16: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 16

HPD Anti-Reflective CoatingHPD Anti-Reflective CoatingHPD Anti-Reflective CoatingHPD Anti-Reflective Coating

3 layer coating on top of HPD Diode.

100 nm

Al Al Al

ka p to n

Bias Voltage

Aluminum with no anti-reflective coating

New Diode Structure

Page 17: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 17

RBX StatusRBX StatusRBX StatusRBX Status

• HB RBX in production (Mississippi). Should be complete by April 02.

• ODU’s for HB complete (Notre Dame) 2-3% rms.

• HE RBX in design. Design should be complete by April 02

• Production of HE RBXs late spring• HE ODUs to be built in ND factory in

summer.• Design HO RBX. Build over summer• HO ODUs in fall (ND)

Page 18: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 18

HB RBX AssemblyHB RBX AssemblyHB RBX AssemblyHB RBX Assembly

Full RBX with 19 ch RMs

RBX Interior -- HV distributor and backplane

Page 19: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 19

Readout Module (RM) Readout Module (RM) OverviewOverview

Readout Module (RM) Readout Module (RM) OverviewOverview

INTERFACE

BOARD

HPD

ODU

FIBERS In

6 CHANNELFRONT ENDREADOUT

CARD

12 COAX

HVCABLE

12 COAX

12 COAX

Page 20: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 20

InterfaceCard

HPD Mount

RBX Readout ModuleRBX Readout ModuleRBX Readout ModuleRBX Readout Module

• The readout module (RM) integrates the HPD, front end electronics, and digital optical drivers.

Electronics cards

HV

Optical Sorter

ODU

Page 21: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 21

ODU production at Notre ODU production at Notre DameDame

ODU production at Notre ODU production at Notre DameDame

Page 22: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 22

ODU QC ODU QC ODU QC ODU QC

Page 23: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 23

FE/DAQ ReadoutFE/DAQ ReadoutFE/DAQ ReadoutFE/DAQ Readout

QIE

QIE

QIE

QIE

QIE

QIE

CC

AC

CA

CC

A

TX

TX

Shield W all

CPU

DCC

HTR

HTR

HTR

HTR

HTR

HTR

LEVEL 1TRIGGER

TTC

DDU/FED

HPD

CONTROL MODULE

FE READOUTMODULE

VR

1600 Mbit/s

L1 Accept

1 Gbit/s16 1600M bit/s fiber per

H TR

18 HTRs per HCALReadout Crate

Page 24: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 24

FE ChannelsFE ChannelsFE ChannelsFE Channels

Page 25: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 25

FE StatusFE StatusFE StatusFE Status

Past 6 months• Tested proto CCA Asic – looks good• Tested proto QIE Asic

• Does not run at 40MHz (easy fix)• Noise levels under study

• 3000e- rms with soldered coax connections btw HPD and QIE

• HB Backplane layout complete• Proto GOL (serializer) tested - OK

• Gigabit Ethernet protocol• 1600 Mbits/s

• Proto VCSEL and custom package tested – ok• Rad qualified “glue” logic parts

Page 26: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 26

CMS QIE StatusCMS QIE StatusCMS QIE StatusCMS QIE Status

Full chip submitted 3/13/01

Received 5 wafers 6/1/01

Testing shows chip fully functional• Chip does not run at 40 MHz

• Noise as a function of input capacitance being studied

• Noise of 3000e- rms achieved with soldered coax connections btw HPD and QIE

Goal is to submit production part by April ‘02

Page 27: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 27

CCA StatusCCA StatusCCA StatusCCA Status

CCA submitted June 25, 2001

25 parts back Oct 11, 2001

Chips under test• Problem with reads/writes to internal registers

• Problem with writes fixed with repair on chip (jumped out inverter)

• Problem with reads under study

• Other than reads, the CCA appears to be fully functional

Engineering run chip submitted on Feb 11. Due back April 8.

Page 28: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 28

CCA ASIC RepairCCA ASIC RepairCCA ASIC RepairCCA ASIC Repair

Page 29: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 29

Radioactive Source Vertical Radioactive Source Vertical SliceSlice

Radioactive Source Vertical Radioactive Source Vertical SliceSlice

• Exercise a single channel of HCAL readout from scintillator to computer

• Radioactive Source• Scintillator• Optical Fiber• HPD• QIE• Digital optical readout• HTR• DCC• Computer

• First complete ~40Mhz readout of HCAL Channel

• Successful demonstration of radioactive source measurement for calibration.

Page 30: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 30

QIE under testQIE under testQIE under testQIE under test

QIE TestBoard

TTCrxClockdistributor

Page 31: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 31

DAQ SystemDAQ SystemDAQ SystemDAQ System

Page 32: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 32

Radioactive Source TestRadioactive Source TestRadioactive Source TestRadioactive Source Test

Response as source is removed from scintillator

Shift of 180 electrons

Page 33: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 33

HF StatusHF StatusHF StatusHF Status

• 10 HF absorber wedges finished. 5 at CERN

• Fiber ordered. First delivery to CERN

• Phototubes ordered.

• Expect first complete wedge (fibers, pmts) at CERN in early June 02.

• Expect to test in H2 test beam this summer.

Page 34: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 34

First Production HF WedgeFirst Production HF WedgeFirst Production HF WedgeFirst Production HF Wedge

Page 35: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 35

Idea to use HO for muon Idea to use HO for muon trigger, vertical slice triggertrigger, vertical slice trigger

Idea to use HO for muon Idea to use HO for muon trigger, vertical slice triggertrigger, vertical slice trigger

Expect ~ 2 p.e. of noise and ~ 8 p.e. of signal for a single muon at normal incidence.

Toy montecralo with 5000 e- noise, 8 pe/mip in HO

Page 36: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 36

Testbeam MotivationTestbeam MotivationTestbeam MotivationTestbeam Motivation

• HB- assembled in September 01

• HB+ will be assembled in September 02

• Only chance for testing production wedges with fast (engineering run ASICS) electronics is Summer 02.

• Desire to test 2 to 4 production wedges from HB+.

• Get absolute calibrations to carry from H2 to UX5.

Page 37: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 37

Testbeam GoalsTestbeam GoalsTestbeam GoalsTestbeam Goals

• Prepare test beam DAQ to read out prototype HTR cards.

• Electronics will be 6-channel RBX cards, using first run QIE and engineering run CCA. GOL and fiber-optic readout.

• Rochester ECAL module on table, with new motion mechanism.

• Take ~ 4 production wedges into beam.

• Measure radioactive source fingerprints.

• Scan with pions as function of eta and phi.

Page 38: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 38

Testbeam ResponsibilitiesTestbeam ResponsibilitiesTestbeam ResponsibilitiesTestbeam Responsibilities

• H2 Test beam beamline, DAQ – Laza• RBX FE cards – Terri Shaw• RBX mechanics, optics – Randy Ruchti• Check out / test RBX’s – Anatoly Ronzhin• System integration FE card to HTR – Jim

Rohlf• Radioactive source system – Virgil• Calibration System --Vasken, Sergey Los• Refurbish table – George Ginther• ECAL Module, new motion – Pawel• HV System – Sergey Los• HPD checkout and setup – Arjan Heering

Page 39: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 39

Testbeam ConclusionsTestbeam ConclusionsTestbeam ConclusionsTestbeam Conclusions

• Test Beam 2002 very important goal for HB group.

• Only chance to test production wedges

• Important step in system integration in preparation for SX5 activities in late 02, early 03.

Page 40: HCAL Status

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 2002 40

ConclusionsConclusionsConclusionsConclusions

• HCAL absorber and optics making good progress

• Front end and Higher level electronics progressing

• Finished with absorber, optics.

• HPDs under control

• ASICs under control

• HF fibers and pmts ordered.

• Looking forward to test beams in summer 02

• Install electronics Spring 03

• Vertical Slice Tests in SX5 in 03