20 years in 2020

Annual Report

Page 2: Privatization and Management Office (PMO)

PMO2 0 2 0

The Privatization and Management Office (PMO) is celebrating two decades in its given mission to take title to and possession of, conserve, provisionally manage, and dispose of assets, previously identified for privatization; and, in the process, reduce the Government’s maintenance expense on non-performing assets while generating maximum cash recovery for the National Government.

The PMO envisions to promote an orderly, coordinated and efficient privatization of identified government assets; Broaden economic base by turning state-owned enterprises and under-utilized assets over to the private sector; and Provide more investment and employment opportunities to help attain economic growth and development through successful privatization of previously identified non-performing assets/entities.

The cover page shows

the major assets

disposed for every 5-

year milestone starting

from the year 2001,

when PMO was

organized through

Executive Order No. 323

dated December 6, 2000,

up until the year 2020.

2

CONTENTS

Message from the Chief Privatization Officer …… 3

Brief Background …… 4

Privatization Process Flow …… 5

Accomplishments …… 6

Financial Statements …… 8

Budget Figures …… 12

Key Programs and Activities …… 13

PMO Structure …… 18

The PMO Team …… 19

Directory …… 20

Page 3: Privatization and Management Office (PMO)

Message from the Chief Privatization Officer

It is with great pride and honor to present the PMO Annual Report for 2020.

We, at PMO, put a year behind as we cross over a state of public health emergency throughout the whole nation asa result of the Covid crisis which affected our daily lives in one way or another. It brought challenges to the overalloperations of the business enterprises as well as other principal institutions in the country. The PMO was notexempted from the effects of the pandemic, thus hampering the privatization targets.

On its 20th year, the PMO generated total revenues of P44.08 billion, collected P44.22 billion, and remitted P28.26billion to the National Treasury. To support the fight against Covid-19, we also remitted 30% of the Maintenanceand Other Operating Expenses (MOOE) equivalent to over P3 million.

The PMO also passed the 1st Surveillance Audit conducted by DQS GmbH for the Recertification of ISO 9001:2015on November 6, 2020 as well as retained its International Certification Network (IQNet) Certificate, which indicatesthat PMO’s Quality Management System is recognized internationally.

The PMO is adapting strategies to fulfill its mandate and break uncertainties due to the effects of the pandemic.We are strengthening our capabilities, streamlining processes, and facilitating faster decision making to respondto our clients’ needs. The year 2020 has been utilized for the identification of viable assets for disposition andupdating of asset information to easily track the developments for each asset.

I would like to express my sincerest gratitude to the Privatization Council, headed by Secretary Carlos G.Dominguez, for his continued support to the Privatization Program of the National Government. I would also like tocommend the efforts of the officers and employees for being proactive in limiting the negative effects of thepandemic, for implementing cost cutting measures in the operations of the agency and preservation of assets, andensuring collection of income from other modes of disposition.

Despite these trying times, the PMO is committed to pursue its mandate to generate maximum cash recovery forthe National Government and contribute to the recovery of the economy.

Happy 20th Anniversary to PMO!

ATTY. GERARD L. CHAN, CESO IChief Privatization Officer

3

Page 4: Privatization and Management Office (PMO)

PrC

• The Privatization Council (PrC) overseesthe Philippine Government’sprivatization program. It is a cabinet-level body chaired by the Secretary ofFinance with the Secretaries of Budget,Trade, Socio-Economic Planning andJustice as Members; the NationalTreasurer and the Chairperson of thePhilippine Commission on GoodGovernment (PCGG) sit as non-votingmembers.

• The PrC approves all proposedprivatization plans prepared by PMO;and provides final approval for theproposed price and buyer for theassets.

• The Prc has a Technical Committeecomposed of the representatives of theDepartment of Finance, as Chairperson,and the Departments of Justice,Budget, Trade, Socio-EconomicPlanning, Bureau of the Treasury andthe PCGG, as members.

PMO

• The PMO is an agency attachedunder the Department of Financemandated to dispose (a)government assets and otherproperties assigned to it by the PrCfor disposition (Executive Order No.323-2000); and (b) propertiestransferred to the NationalGovernment (NG) under ExecutiveOrder (E.O.) No. 99-1947, E.O. 471(2005) and other laws. The PrC andPMO were organized effectiveJanuary 1, 2001 by virtue of E.O.323.

• The PMO submits and presentsproposed privatization plans to thePrC for approval, and PMO proceedswith the disposition only whengiven approval.

Brief Background

Land

60%

Mining

Claims

2%

Financial

Assets

24%

Machineries/

Equipment

5%

Others

6%Buildings

3%

Transferred

assets from

PNB, DBP,

PhilGuarantee

and NDC

45%

Government-

Owned and

Controlled

Corporations

7%

Transferred assets

from Board of

Liquidators23%

Assets

Reconveyed

by Land

Bank of the

Philippines

21%

Other Assets

4%

Figure 1: Sources of government assets/ properties assigned/transferred to the PMO.

Figure 2: Classification of government assets/properties assigned/transferred to the PMO.

The ARIS contains all relevant input informationon each asset for sale/disposition, e.g. AssetName, Disposition Status, Kind of Asset,Registered Owner, Description, Title Number,Lot Number, Survey Number, Land Area, FloorArea, Improvements, Location, etc.

The PMO has developed the Asset RegisterInformation System (ARIS), a comprehensiveregister that identifies assets assigned ortransferred to PMO by various entities thatinclude the properties assigned to PMO uponthe expiration of term of the AssetPrivatization Trust (APT) comprisingtransferred assets, government corporations,financial claims, assets of various entitiesabsorbed by the defunct BOL that has over22,000 landholdings and other assets, whichPMO is the designated disposition entity.

As of December 31, 2020, there are 28,756properties in PMO’s ARIS that were transferredor assigned to PMO coming from the followingsources:

4

Page 5: Privatization and Management Office (PMO)

Privatization Process Flow

Stage 1 Stage 2 Stage 3 Stage 4

Stage 3

9. Publication of Invitation to Bid/Offer for Sale.

10. Issuance/Release of Bid Documents; Due diligence period; Pre-Bid Conference; Request for Clarification/ Supplemental Bid Bulletin.

11. Public Bidding/Offer for Sale; Eligibility Check; Submission and Opening of Bids; Evaluation of Bids/Post Qualification.

12. Endorsement of Winning Bid to the PrC; Approval/ Acceptance of Offer

Stage 4

13. Issuance of Notice of Award.

14. Acceptance of payment of Bid Price.

15. Execution/ signing of sale/transaction documents.

16. Turn-over of asset to buyer/ winning bidder.

Stage 2

5. Consultation with other agencies of the plan to dispose of the particular asset and to clear up issues (e.g. OP, DOF, DAR, DENR, PMDC, BIR, PDIC, NDC, MMDA, DPWH, GCG, GOCC).

6. Endorsement of privatization plan to the PrC.

7. Approval of privatization plan and price.

8. Special audit by COA of asset for disposition, if necessary; Notification to COA of the sale.

Stage 1

1. Determination/ selection of asset for privatization.

2. Review/evaluation of legal issues that may affect the disposition of asset.

3. Procurement of appraisal services for the valuation of asset for disposition.

4. Preparation and submission of privatization plan to the Chief Privatization Officer.

The Privatization Process Flow provides anoverview and workflow chart of all the tasks,stages and steps of the disposition process ofthe PMO.

The privatization process presents a standardprocedure though the entire privatizationprocess may take longer depending on thenature and complexity of the asset involved.

Depending on the asset/property fordisposition, the issuance or release of BidDocuments could start from the publication ofInvitation to Bid until a day before the bidsubmission deadline.

5

The Due Diligence Period normally coincideswith the period for the issuance or release of BidDocuments. The period allotted for duediligence largely depends on the nature andcomplexity of the asset to be bid out.

Also, the PMO submits a notice of sale ordisposition of asset to the Commission on Audit(COA) twenty (20) days prior to the publicationof Invitation to Bid. Consultation with otheragencies of the plan to dispose of the particularasset is crucial so that issues are cleared up (e.g.OP, DOF, DAR, DENR, PMDC, BIR, PDIC, NDC,MMDA, DPWH, GCG, GOCC).

Page 6: Privatization and Management Office (PMO)

3.19 B 9.22 B 11.42 B 4.42 B

2001-2005 2006-2010 2011-2015 2016-2020

6

Accomplishments

In its 20 years of operation, 2001-2020, the PMO collected P44.2 Billion and P28.3 Billion was remitted to the

Bureau of the Treasury (BTr). EO 323 provides that all receipts from the sale of assets of PMO, except portions

thereof for reimbursable custodianship and/or operational expenses, are remitted to the BTr.

The following are the major sale/disposition of PMO forevery 5-year milestone:

1st milestone (2001 to 2005) - 1) Delta Motors Corp. –parcels of land, buildings and other improvements locatedin Pasong Tamo Extn., Makati City sold to Philippine DepositInsurance Corporation in 2004 for P.154 B; 2) Mar FishingCorp. – sub lots containing the Integrated Tuna CanningPlant and related financial interests sold via negotiated salein 2001 for P.117 B; 3) Cellophil Resources Corp. – lands,buildings, machineries and improvement sold in 2004 to thelocal government of Abra through public bidding for P.100B; 4) Manila Manor Hotel, Inc. – land, building, andmachineries sold in 2005 through a compromise agreementfor P.061 B; 5) Davao Sugar Development Corp.(DASUDECO) – land and all improvements sold in 2005 toDASUDECO through a compromise settlement for P.036 B.

2nd milestone (2006-2010) - 1) International School ManilaProperty – lands, buildings and other improvements sold in2006 to Century Properties, Inc. for 1.43 B; 2) Manila ElectricCompany‘s shares of stocks worth P6.84 B sold in 2008 tothe Government Service Insurance System throughnegotiated sale; 3) Subic Shipyard Engineering Inc.’s sharesof stocks sold in 2010 to Keppel Philippines Marine, Inc. forP.585 B; 4) NG/National Power Corporation (NPC) Property -parcels of land sold in 2009 to the City Government ofMakati thru negotiated sale for P.574 B; 5) Alfa IntegratedTextile Mills Inc. – alfa funds deposited in escrow byDevelopment Bank of the Philippines sold in 2006 to AlfaIntegrated through escrow payment for P0.256 B.

3rd milestone (2011-2015) - 1) Food Terminal, Inc.property of 74-hectare sold to Ayala Land, Inc. in 2012for P 24.3 B, which is 237% higher than its base priceof P10.25B and made a mark by setting a record inattaining one of the highest sales in the history of theprivatization program of the Philippine Governmentsince 1986; 2) NG/NPC Makati Property – parcels ofland sold to the City Government of Makati for P.441B; 3) Luzon Aggregates, Inc. – parcels of land for P.268B; 4) Reparations Commission – parcel of land forP.015 B.

4th milestone (2016-2020) – 1) NG/NPC MakatiProperty – postal and parking lots sold in 2018 to theCity Government of Makati through negotiated salefor P.687B; 2) National Coal Authority Property,Batangas City – parcels of land disposed in 2018through Settlement Offer by the Province of Batangasfor P.585 B; 3) Central Bank–Board of Liquidators – lotand improvements located in Pasay City sold in 2019to Contemporain Development Corp. for P.505 B; 4)Luzon Aggregates Inc. – parcel of land located inParanaque City sold in 2016 to Triplex Enterprises, Inc.through negotiated sale for P.291 B.

6

Page 7: Privatization and Management Office (PMO)

2020 Accomplishments

The effect of the pandemic translates todisruption in the PMO’s pre-disposition activitiesthat necessitates rescheduling of relatedplans/activities/projects and revision ofdisposition timeline.

183 183 183 183

59

206

27 32

0

50

100

150

200

250

Q1 Q2 Q3 Q4

Revenue & Other Collections

Target-.729B Actual

164 164 164 164

67

201

39 35

0

50

100

150

200

250

Q1 Q2 Q3 Q4

Remittance to BTr

Target-.656B Actual

7

Collections

For the year 2020, the PMO collected a total of

P0.324 Billion, details follow:

a. Sales – P 0.055 Billion1. Luzon Aggregates, Inc. – 0.055

b. Lease – P 0.081 Billion 1. Cultural Center of the Philippines – 0.0098 2. Central Bank–Board of Liquidators - 0.0005 3. Elorde Sports & Tourism Development Corp.

–0.0002 4. National Housing Authority – 0.017 5. NG/NPC - Mile Long Complex – 0.0537

c. Dividends – P P0.182 Billion1. Semirara Mining Corporation – 0.182

d. Others – P0.005 Billion1. Northern Cement Corporation – 0.005

Remittances

P0.341 Billion was remitted to the BTr, breakdown follows:

a. Sale – P 0.093 Billion1. Al Amanah Islamic Investment Bank – .0092 2. Interland Chemicals, Inc. – 0.0201 3. Luzon Aggregates, Inc. – 0.0616 4. Peninsula Development Bank – 0.0014 5. VRESCO – 0.0005

b. Lease – P 0.061 Billion1. NG/NPC Mile Long Complex – 0.035 2. National Housing Authority – 0.016 3. Cultural Center of the Philippines – 0.009 4. Central Bank–Board of Liquidators– 0.0005 5. Elorde Sports & Tourism Development Corp.– 0.0002

c. Others – P0.187 Billion1. Semirara Mining Corporation – 0.182 2. Northern Cement Corporation – 0.005

Further, the crisis resulted to substantial decline inrental revenues from the commercial spaces of MileLong Complex starting April 2020 as most lesseeswere forced to stop or temporarily suspend theirbusiness operations.

Special Economic Zone Complex -Caloocan City North

1. PMO took over the 20-hectare NationalHousing Authority Property in Tala, Caloocan Cityfrom Victoria Wave on October 1, 2020.

Mile Long Complex -Amorsolo St., Makati City

2. PMO executed the agreement on theassignment of disposition of Mile Long Complexwith Bases Conversion and DevelopmentAuthority.

Major Programs Implemented

Page 8: Privatization and Management Office (PMO)

8

F i n a n c i a l S t a t e m e n t s( A s o f 3 1 D e c e m b e r 2 0 2 0 )

Page 9: Privatization and Management Office (PMO)

9

Page 10: Privatization and Management Office (PMO)

10

Page 11: Privatization and Management Office (PMO)

11

Page 12: Privatization and Management Office (PMO)

12

0

20

40

60

8066.51

11.17

1.13

60

66.51

10.94

1.12

40.59

BUDGET FIGURES (IN MILLIONS)

Approved Budget Actual Expenses

Table 1. Comparison of Approved Budget and Actual

Expenses CY 2020

Budget Figures

100%

Disbursement

Rate

98%

O b l i g a t i o n

Rate

For 2020, under the GeneralAppropriations Act (GAA), theallotment for Personnel Services (PS)comprised the biggest share of thebudget amounting to P66.51 Million or84.4%.

Maintenance and Other OperatingExpenses (MOOE) is P11.17M or14.17% while the Capital Outlay (CO) isP1.13 Million or 1.43%.

The PMO was able to cover the firsttranche of increase in salary under theSalary Standardization Law V.

For three consecutive years, the PMOachieved 100% Disbursement Rate overtotal allotment. In 2020, the ObligationRate is at 98%.

The total expenses for PS is P66.51 Mor 100% of the approved budgetunder the GAA.

Aside from the approved MOOE fromthe GAA, the PMO is also allowed toutilize its Retention Fund exclusively forselling expenses and maintaininggovernment assets under themanagement of PMO. Actual expensestotaled P40.59 M.

Capital Outlay’s (CO) total expensesamounted to P1.12 M or 99% of theapproved budget.

Page 13: Privatization and Management Office (PMO)

13

Key Programs and Activities

1st Surveillance Audit for ISO 9001:2015 RecertificationAudit

The PMO successfully passed the 1st Surveillance Audit for ISO9001:2015 Recertification on November 6, 2020.

The PMO has been ISO Certified since 2016 and is one of thefirsts among government agencies to obtain such certification.

The ISO 9001:2015 Recertification was conducted by DQSGmbH.

Apart from the ISO 9001:2015 Certificate, the PMO was also

awarded with the International Certification Network (IQNet)

Certificate, which indicates that PMO’s Quality Management

System is recognized internationally.

Procurement

PMO’s procurements are implemented in accordance with RA9184 (The Government Procurement Reform Act). Theprocurement for CY 2020 covered (a) Goods and Services, (b)Property, Plant and Equipment, (c) Repairs and Maintenance, and(d) Supplies and Materials. The Annual Procurement Plan had anapproved budget of P 0.0221 Billion and P0.0116 Billion worth ofcontract was awarded.

Summary of Procurement Activities:

a) Public Bidding – 49.94%;b) Small Value Procurement (50k and up) – 29.62%;c) Shopping/SVP (below 50K) – 3.35%;d) Shopping (50k and up) – 9.27%;e) DBMPS – 7.39%; andf) Direct Contracting – 0.42%.

IQNET

RA 9184

Page 14: Privatization and Management Office (PMO)

14

Key Programs and Activities

For PMO’s IT infrastructure, the ITD configured and deployed new equipment such as

servers and wireless access points that complemented the existing internal network. New

security features for firewall appliance were also deployed that included protections for

network, email, and web servers. These were coupled with connected anti-malware for

desktops and laptops that were synchronized together for better security monitoring.

The newly created Information Technology Division (ITD) in 2020 successfully developed the

Property Inventory Monitoring System (PIMS) for faster inventory of Property, Plant and

Equipment with corresponding barcodes and descriptions per item. It has the capability of

generating the following required reports: Report on Physical Count of Property, Plant and

Equipment, Report on Physical Count of Inventories, Inventory and Inspection Report of

Unserviceable Property, Property Acknowledgement Receipt , and Inventory Custodian Slip.

Information Technology

The ITD enhanced the existing Asset Register Information System (ARIS) to include the

integration of data fields for legal cases, appraisal, inspection, and inventory. A data

analytics reporting tool was also developed to extract the relevant data from the ARIS

and present them in an executive dashboard for top management’s use.

ITD installed in its internal server and deployed in the Financial Management Division

and Commission on Audit workstations the latest version of Electronic New Government

Accounting System (eNGAS) and Electronic Budgeting System (eBudget). These are now

being used to ensure correctness, reliability, completeness, and timeliness in recording

financial transactions, and generate financial reports in accordance with the policies and

procedures of the NGAS.

For the required documents backup, the ITD created an offsite backup to the

Department of Finance Cloud Storage in coordination with their IT

Infrastructure Division.

The internet bandwidth was upgraded to meet the growing needs of all

connected devices within the agency. This was accomplished with no

additional monthly service cost to PMO.

ITD likewise installed the latest licensed office productivity software for all

officers and employees which they were able to use while working from

home; and facilitated various internal and external meetings using online

communication platforms.

ITD crafted the proposal for the 2022-2024 PMO Information Systems

Strategic Plan (ISSP) to be submitted to the Department of Information and

Communications Technology on the first month of 2021.

Page 15: Privatization and Management Office (PMO)

S k i l l s E n h a n c e m e n t

15

Key Programs and Activities

CareerExecutiveServiceLeadershipConclave

ContinuingProfessionalDevelopmentPrograms

Online Training on Data Privacy Protection Batch 2

Online Training on Digital Project Management

Practical

Taxation

and

Tax

Compliance

OrientationandOnboarding

Inte

rnal

Quality

Audit

Perf

orm

ance

Revie

w

Pla

nnin

gConfe

rence

Busi

ness

Revie

w

Managem

ent

Revie

w

Q u a l i t y M a n a g e m e n t

Page 16: Privatization and Management Office (PMO)

Internal Memorandum Circulars were issued whenneeded:

(a) Pursuant to Proclamation No. 922 (“Declaring aState of Public Health Emergency throughoutthe Philippines, enjoining all governmentagencies to undertake critical, urgent andappropriate measures in a timely manner tocurtail and eliminate the Covid-19 threat, and inaccordance with Resolution No. 11 dated 12March 2020 of the Inter-Agency Task Force forthe Management of Emerging InfectiousDiseases”);

(b) In response to the surge of COVID-19 cases, allemployees were urged to comply withprecautionary measures and isolation protocolto facilitate the management of suspected andconfirmed COVID-19 cases, and prevent thetransmission of the virus within the Officepremises;

(c) The PMO adapted an Alternative WorkArrangement (AWA) in accordance with the CivilService Commission - Memorandum Circular(CSC-MC) No. 10-2020 (“Revised InterimGuidelines for Alternative Work Arrangementsand Support Mechanisms for Workers in theGovernment During the Period of State ofNational Emergency Due to COVID-19Pandemic”) for all its personnel with requiredwork outputs to be submitted to their respectiveimmediate supervisors within a prescribed timeframe and submission of weekly/semi-monthlyaccomplishment report/s.

(d) A workforce schedule on a weekly basis was putin place to ensure uninterrupted operation andobserves health standards protocol.

(e) The PMO adopted economy measures due tothe emergency health situation pursuant toNational Budget Circular No. 580 dated April22, 2020. Appropriated programs and activitiesamounting to P3,128,299.00 or 22% of theappropriations for FY 2020 Maintenance andOther Operating Expenses were discontinuedto help fund the operations and responsemeasures related to the COVID-19 crisis.

16

Page 17: Privatization and Management Office (PMO)

Observance of Women's Month in

accordance with Proclamation Nos. 224

and 227, s. 1988 on March 1-31, 2020

DOF Exploratory Meeting and Planning

Workshop on February 26-28, 2020 at

Baler Aurora

17

Informational and campaign videos on VAW through email blast: 1. 10-Day VAWC Leave 2. Anti-catcalling Lyric Video 3. Violence Against Women Throughout the Life Cycle 4. We Can be Violence-Free (Shadow Play)

DOF-GFPS meeting on January 28,2020, presentation of each agency’sGAD accomplishments for FY 2019

DOF's Kick-off Activity on March 7,2020 (as part of celebration of NationalWomen’sMonth)

ISSUED THE FOLLOWING MEMORANDUM CIRCULARS, IMPLEMENTING RULES AND OFFICE ORDER:

PMO Memorandum Circular No. 2020-004, "Use ofGender-Fair Language in all Official Documents,Communications, and Issuances", was issued on December22, 2020.

PMO Office Order No. 2020-014 for the reconstitution ofGFPS was issued on December 11, 2020. Six (6) malepersonnel are already members of the GFPS.

The implementing rules on the HGDG for ProjectDevelopment, Implementation, Monitoring, and Evaluationwas incorporated in PMO Memorandum Circular No. 2020-02, "PMO Guidelines on GAD Mainstreaming" issued onJune 26, 2020.

PMO Memorandum Circular No. 2020-03, "Gender-Inclusivity and Diversity in the Workplace", was issued onOctober 29, 2020.

GAD Planning and Budgeting: FromPreparation to GAD Funds Audit onOctober 15, 2020

Analyzing Gender Smarter: Familiarizing

HGDG & GMEF Tools" on August 27-28,

2020

Beyond Attribution: Use of the HGDG

to Mainstream GAD Elements in the

Project Development Cycle on

October 13, 2020

FORA Communications' webinar on

Gender-Fair Language on August 4,

2020

Observance of the 18-day Campaign to

End Violence Against Women (VAW) in

accordance with RA 10398 on November

25 – December 12, 2020

PMO Memorandum Circular No. 2020-02, "PMO Guidelines onGAD Mainstreaming" was issued on June 26, 2020.

GAD Planning and Budgeting: From Preparation to GAD Funds Audit on October 15, 2020

In observance of the 18-day Campaign to End VAW, personnel wore something orange as a symbol of brighter future without violence against women.

Page 18: Privatization and Management Office (PMO)

P M O S t r u c t u r e

Office of the Deputy Privatization Officer-

LEGAL SERVICES

Office of theDeputy Privatization Officer-

MARKETING

Office of the Deputy Privatization Officer-

ASSET MANAGEMENT

Office of the Deputy Privatization Officer-

ADMINISTRATION, FINANCIAL & MANAGEMENT SERVICES

3

3

3

Marketing Division I

Custodianship Services Division

Disposition Support Services Division

Administrative Division

Financial Management

Division

5

8 6

8 10

Information Technology

Division

4

9

Office of the Chief Privatization Officer

3

Marketing Division II

Marketing Division III

5 9

18

PMO is headed by a Chief Privatization Officer(CPO) and assisted by four (4) DeputyPrivatization Officers who are in charge ofspecific operations and undertakings asdirected by the CPO.

The organizational structure was designedfollowing PMO’s major processes.

The process approach enables PMO to beoutcome-focused. PMO’s major processes are:

(a) Market and dispose assets;

(b) Manage, preserve, maintain and enhancethe assets;

(c) Collect, provide financial management aswell as administrative support services; and

(d) Provide legal services.

The operating process of the organizationinvolves close coordination among the variousgroups of the organization with the MarketingGroup leading the disposition process and theother groups providing needed support to theMarketing Group.

The PMO structure consists of five (5) majorgroups following PMO’s major processes, namely:

1. Office of the Chief Privatization Officer2. Office of the Deputy Privatization Officer for

Marketing3. Office of the Deputy Privatization Officer for

Asset Management4. Office of the Deputy Privatization Officer for

Administrative, Financial and ManagementServices

5. Office of the Deputy Privatization Officer forLegal Services.

In 2020, PMO obtained approval of theDepartment of Budget and Management andcreated the Information Technology Division withfour (4) plantilla positions under the Office of theChief Privatization Officer. With these additionalstaffing, PMO now has a total of seventy-six (76)plantilla items.

There are seven (7) divisions in the originalstaffing pattern of PMO. Three (3) MarketingDivisions report under the Office of the DeputyPrivatization Officer for Marketing. TheCustodianship Services Division and DispositionSupport Services Division are under the Office ofthe Deputy Privatization Officer for AssetManagement. The Administrative Division and theFinancial Management Division are under theOffice of the Deputy Privatization Officer forAdministrative, Financial and ManagementServices.

Page 19: Privatization and Management Office (PMO)

T h e P M O T e a m

19

OFFICE OF THE CHIEF PRIVATIZATION OFFICER

- GERARD L. CHAN

Chief Privatization Officer

AARON C. SANCHEZ

Division Chief – Information Technology Division

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER FOR MARKETING

- STEPHEN J. ARANETA

Deputy Privatization Officer for Marketing

MELINDA B. CORTEZ

Division Chief – Marketing Division I

CONCHITA Q. SAGUN

Division Chief – Marketing Division II

CESAR LUIS M. PARGAS

Division Chief – Marketing Division III

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER FOR ASSET MANAGEMENT

- TONI ANGELI V. COO

Deputy Privatization Officer

MARTHA JENNY S.T. TONG

Officer-In-Charge – Custodianship Services Division

MA. LIRIO A. ZABALA

Division Chief – Disposition Support Services Division

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER

FOR ADMINISTRATION, FINANCIAL AND MANAGEMENT SERVICES

- ELLEN H. RONDAEL

Deputy Privatization Officer

CARLA S. DEL PRADO

Chief Administrative Officer – Administrative Division

RHODORA B. TORRALBA

Chief Accountant – Financial Management Division

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER

FOR LEGAL SERVICES

- JUAN CARLO O. PIELAGO

Deputy Privatization Officer

MAAN VANESSA L. DOCTOR

Attorney V

CARLO C. TABALOC

Attorney V

Page 20: Privatization and Management Office (PMO)

D i r e c t o r y

20

Office/Division Contact Person Landline No.

OFFICE OF THE CHIEF PRIVATIZATION OFFICER

Information Technology Division

Rosalinda C. AlmadenExecutive Assistant

8893-2383

8806-2608

OFFICE OF THE DEPUTY PRIVATIZATION OFFICERFOR MARKETING

Marketing Division IMarketing Division IIMarketing Division III

Krismae M. CloresExecutive Assistant

8893-7096

8818-83058817-63318810-7578

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER FOR ASSET MANAGEMENT

Custodianship Services DivisionDisposition Support Services Division

John Robert O. BautistaExecutive Assistant

8818-4625

8817-66618818-4625

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER FOR ADMINISTRATION, FINANCIAL AND MANAGEMENT SERVICES

Administrative DivisionFinancial Management Division

Melissa Mei Lin MonterosoExecutive Assistant

8893-1886

8818-83048818-4591

OFFICE OF THE DEPUTY PRIVATIZATION OFFICER FOR LEGAL SERVICES

Bernadette D. AriasExecutive Assistant

8817-1103