Background Progress PCNA reflection in ADP 2012-13 Government’s Actions on PCNA
Recommendations Projects under MDTF Issues and Challenges PCNA Strategy
AGENDA
BACKGROUND
Peace-building strategy of the Govt. in
collaboration with the four Multilaterals (ADB, EU,
WB & UN) Adopted, endorsed and fully owned by the Govt. An integrated proposal on how to build peace in
Khyber Pakhtunkhwa and FATA. Success depends on effective implementation of the
strategy with a holistic approach. A working strategy that should be continuously
monitored and evaluated.
PROGRESSMilestones Achieved:
PCNA Implementation Support Unit (ISU) in
Planning & Development Department set up and
operationalized.
Recruitment in final stage to fully staff the ISU.
Strengthening of Health Services in Crisis Affected
Districts at implementation stage.
-Cont-
PROGRESSMilestones Achieved: Approval of the Simplified Procedure for
processing/approval of projects funded under MDTF
by Finance Minister/Chairman ECNEC on 1st
December, 2011. Ongoing interventions of the Government as well as
its International Partners being aligned with the
recommendations of PCNA, CDS and Economic
Growth Policy.
PCNA Reflection in ADP 2012-13(Billion Rs.)
PCNA Objectives Cost Allocation
Build State Responsiveness & Effectiveness to restore citizens trust
23.05286 3.563
Employment & Livelihood opportunities 5.587357 0.652
Ensure the Delivery of Basic Services 70.56673 4.053
Counter Radicalism & Fostering Reconciliation 0.094 0.071
Cross Cutting 17.94332 3.176
Total (PCNA Reflection) 117.2443 11.516
TOTAL ADP 368.600 63.323
GOVERNMENT’S
ACTIONS ON PCNA
RECOMMENDATIONS:
PCNA – Objective 1
Sector Project TotalCost Allocation
AgricultureArid Zone Small Ruminants Res. and Development Institute, Kohat 70 12.977
Agriculture Monitoring of Crops through Satellite Technology. 8 2.079
AgricultureStrengthening of Planning & Monitoring Capacity of Agriculture Department. 15 6.059
AgricultureResearch & Development on European Olive and Maintenance of Model Farm, Sangbhatti. 100 14.999
AgricultureIndigenization of hybrid research and development technology for crops, fruits & vegetables 40 20
AgricultureStandardization of improved techniques in Agricultural Research System of Khyber Pakhtunkhwa. 297.86 70
Agriculture Establishment of Agriculture Research Station at Charsadda . 63.694 35Building Strengthening & Capacity Building of C&W Department . 99.12 10
BuildingEstablishment of Project Unit for PaRSSA/USAID Project in C&W Department. 32.96 15
BuildingConstruction of Directorate of anti-corruption establishment (ACE) 97.14 30
BuildingEnhancement of existing facility of MIS/GIS for C&W Department 25.219 10
DWSSAwareness campaign for preservation of water, Health Hygiene Promotion & BCC Strategy 30 10
(Million Rs.)
PCNA – Objective 1
Sector Project Total Cost Allocation
E & SE Education Sector Reforms Programme.(EU Assisted) 616.02 0.02
E & SECapacity Building / Training of Parent Teacher Councils in Khyber Pakhtunkhwa. 65.945 23.422
E & SEMulti Level Integrated Teacher Supervision and In-service Training System 55.29 26.227
E & SEEducation Sector Reform Programme-EU Assisted (3rd and 4th Tranches). 2520.02 0.02
E & SEDFID support to the Khyber Pakhtunkhwa Education Sector Programme (1st Tranche). 1111.993 0.02
E & P Creation of Planning & Monitoring Cell. 26.08 5
Env:Raising of Environmental Awareness Among the Masses Regarding Environmental Pollution 16 3.676
EnvStrengthening of Legal / Prosecution Unit, EPA of Khyber Pakhtunkhwa. 5.102 2.206
ForestryStrengthening of Planning Section in Khyber Pakhtunkhwa, Forest Department 4.157 0.87
HealthStrengthening Health Management Information System/District Information System in Khyber Pakhtunkhwa. 90.72 20
Health Structured Human Resource Development Project 90 15
Health Health Sector Reform Unit in Health Department (Phase-II) 37.052 3.293
(Million Rs.)
PCNA – Objective 1
Sector Project Total Cost Allocation
Hig: Edu:Establishment of Pre-service Academy through Quality Assurance Programme in Higher Education Department. 100 16
Hig: Edu:
Re-engineering of Teachers engagement methodology for BS-4 Year Degree Program in Govt. Colleges in Khyber Pakhtunkhwa.(Phase II). 55 55
Hig: Edu:In-Service and Pre-Service training for teachers of Govt. Colleges in Khyber Pakhtunkhwa 60 25
Hig: Edu: PERN Connectivity to Govt Colleges of Khyber Pakhtunkhwa 20 20Home Enhancing Security of Jails in Khyber Pakhtunkhwa. 350 350Home Construction of Sub Jail Tank 150 20
HomeSpecial Development Support for Khyber Pakhtunkhwa Police (Phase-III) 1600 200
Home23 Secure armories across province and Mini Police line Hangu (P.M Package, 2nd and 3rd Tranch) 550 100
HomeSpecial Development Support for Khyber Pakhtunkhwa Police. (Phase-II) 2400 700
HomeProject Coordination Unit for Implementation of Law & Order initiatives in Khyber Pakhtunkhwa. 153.79 29.702
(Million Rs.)
PCNA – Objective 1
(Million Rs.)
Sector Project Total Cost Allocation
Home
Special Development Support for Khyber Pakhtunkhwa Police (Scheme will be completed in less than approved Cost- Rs. 325.0 Million Savings). 4500 753.3
HomeConstruction of Three Police Stations and One Police Line in Swat (NAS Assisted). 622.715 0.001
HomeConstruction of Joint Police Training Centre at Nowshera Phase-I (NAS Assisted). 773.843 0.001
Home Construction of Central Police Office in Peshawar. 395.21 80
Home Improvement of facilities at PTC Hangu 274.125 30
Home Strengthening of Prosecution Directorate Khyber Pakhtunkhwa. 150 50
Home Strengthening Rule of Law in Malakand (UNDP Assisted) 1338.75 67
HomeDevelopment of Emergency Rescue Services (Rescue 1122) in Khyber Pakhtunkhwa. (Phase-II) 974.495 144.699
PCNA – Objective 1
(Million Rs.)
Sector Project Total Cost Allocation
Law & JusticeAcquisition of land for Construction of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa. 40 40
Law & JusticeConstruction of Judicial Infrastructure in 10 Selected Districts of Khyber Pakhtunkhwa. 50 10
Law & Justice Construction of Judicial Complex Charsadda. 657.69 30
Law & Justice Construction of Judicial Complex, Chitral. 277.573 10
Law & Justice Local Justice Support Project (WB Assisted). 427.51 0.001
Law & Justice Construction of Judicial Complex, Mardan 391.233 0.001
Law & Justice
Directorate of Human Rights and its District-based Resource Centre with integrated facilities for Public Prosecutors, Government Pleaders & Probation Officers, Government of Khyber Pakhtunkhwa. (NAS Assisted) 400 10
Relief and Reh:Disaster mitigation and preparedness in Khyber Pakhtunkhwa. 300 300
Roads Road Asset Management System. 102.96 30
Social Wel: Gender Reforms Action Plan Khyber Pakhtunkhwa. 9.261 4.8
PCNA – Objective 1
(Million Rs.)
Sector Project Total CostAllocation
Sports, Tourism
Development and Restoration of properties transferred by the Provincial Govt. to the TCKP for the tourists. 60 30
Sports, Tourism
Capacity Building of Tourist Services Wing, Khyber Pakhtunkhwa. 57.654 15
ST&IT Computerization of Arms Licenses 22 14
ST&ITVideo Conferencing b/w Commissioners , CM Secretrat, CS/ACS and Cabinet Room 35 20
ST&IT Automation of Public Service Commission. Phase-II 81 25
ST&IT Automation of Home Department. 70 25
ST&IT E-enablement of Special Branch Police. 45.77 23.09
Urban Development
Construction of 6 Security Police Posts, 4 on Ring Road & 2 in Industrial Estate,Peshawar. 39.91 0.01
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
Auqaf, Hajj, Improvement of educational institutions for Minorities in Khyber Pakhtunkhwa.
17 12
Building Rehabilitation of Damages due to Floods July 2010 in District Battagram SH. C&W Rest House Banna
26.509 10
E & SE Establishment of 110 Primary Schools (B&G) on need basis
404.9 75.039
E & SE Establishment of 200 Primary Schools (B&G) in Khyber Pakhtunkhwa
960 210
E & SE Assistance to Basic Education Improvement Project for Repair/Rehabilitation of Flood Affected Schools in Khyber Pakhtunkhwa.(Norway Assisted)
450.01 0.01
E & SE Establishment of 100 Govt. Primary Schools (B&G) on need basis in Khyber Pakhtunkhwa (Phase-II)
400 100
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
E & SE Establishment of 50 Primary and 50 Middle Schools in rented buildings in Urban Areas of Khyber Pakhtunkhwa (including furniture & staff)
130 50
E & SE Provision of Basic facilities through PTCs in 100 existing Primary Schools in Khyber Pakhtunkhwa.
50 50
E & SE DFID Support to Khyber Pakhtunkhwa Education Sector Programme (2nd Tranche). 60% for Budgetary Support, 30% for Construction Component and 10% for Technical Assistance.
4026.522 0.01
E & SE Up gradation of 50 Girls Primary Schools to Middle level in Khyber Pakhtunkhwa.
375 100
E & SE Establishment of Bacha Khan Model School at Salarzai in District Buner.
128.019 50
E & SE Establishment of Dir Model School at Dir Upper. 45 20.116
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
E & SE Establishment of 50 Primary and 50 Middle Schools in rented buildings in Urban Areas of Khyber Pakhtunkhwa (including furniture & staff)
130 50
E & SE Provision of Basic facilities through PTCs in 100 existing Primary Schools in Khyber Pakhtunkhwa.
50 50
E & SE DFID Support to Khyber Pakhtunkhwa Education Sector Programme (2nd Tranche). 60% for Budgetary Support, 30% for Construction Component and 10% for Technical Assistance.
4026.522 0.01
E & SE Up gradation of 50 Girls Primary Schools to Middle level in Khyber Pakhtunkhwa.
375 100
E & SE Establishment of Bacha Khan Model School at Salarzai in District Buner.
128.019 50
E & SE Establishment of Dir Model School at Dir Upper. 45 20.116
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost AllocationE & SE Reconstruction of buildings of Govt. Middle & High
Schools in Khyber Pakhtunkhwa.650 10.56
E & SE Construction of 1000 Additional Classrooms in Primary, Middle and High Schools in Khyber Pakhtunkhwa. (Phase-II)
1144 165.424
E & SE Reconstruction / Rehabilitation of buildings of Govt. Middle & High Schools in Khyber Pakhtunkhwa. (Phase-II)
575 81.286
E & SE Reconstruction of Building in Govt. Schools in Khyber Pakhtunkhwa (DFID Assisted),
521.092 0.01
E & SE Construction of 400 Additional Classrooms in Existing Govt. Schools in Khyber Pakhtunkhwa (EU Assisted)
460.01 0.01
E & SE Construction of 300 additional classrooms in Primary, Middle and High Schools in Khyber Pakhtunkwa (Phase III)
379.5 79.5
E & SE Reconstruction of buildings of Government Middle and High Schools in Khyber Pakhtunkhwa (Phase-III),
115 45
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
E & SE Reconstruction of Govt. Schools damaged due to militancy/bomb blasts in the Province other than Malakand Division.
688.271 180
E & SE Provision of Stipends to Secondary Schools Girls students of Khyber Pakhtunkhwa (Phase-IV) (DFID Assisted).
1000.001 0.001
E & SE Completion of leftover works of reconstruction of buildings of GHS Badaber and GHS Aza Khel in District Peshawar.
94.593 38.693
E & SE Reconstruction / Rehabilitation of 1173 Govt. Primary, Middle, High & Higher Secondary Schools Completely / Partially Damaged due to floods 2010 in Khyber Pakhtunkhwa (USAID Assisted).
2040.734 0.02
Energy & Power Development of Renewable energy in Khyber Pakhtunkhwa. (ADB Assisted).
6026.42 500
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
Health Improvement/Rehabilitation of Women & Children Hospital, Karak
50.42 50.42
Health Establishment of Children & Maternity Hospital Charsadda
1183.274 200
Health Establishment of Accidents & Emergency Unit in DHQ Hopsitals of Kohat & D.I. Khan
158.722 76.34
Health Reconstruction / Rehabilitation of Health Facilities Damaged in July-August 2010 Floods (JICA Assisted).
550.955 150
Health Purchase of 7 fully equiped ambulances for Teaching hospitlas of Khyber Pakhtunkhwa
50 50
Health Strengthening of TB Control Programme in Khyber Pakhtunkhwa.
142.22 20
Health Prevention Control of Hepatitis in Khyber Pakhtunkhwa. 360.472 20
Health Promoting Safe Motherhood (WFP Assisted) 752.362 2.662
Health Support to EPI Programme 20.936 6.419
PCNA – Objective 3
(Million Rs.)Sector Project Total Cost Allocation
Health Prevention and Control Program of Dengue along with other vector related diseases in Khyber Pakhtunkhwa
265.73 85
Health Strengthening of TB Control Programme in Khyber Pakhtunkhwa - Phase-II (KfW Assisted).
944.01 0.001
Health Project for Strengthening Routine Immunization in Khyber Pakhtunkhwa (JICA Assisted).
36.01 0.001
Health Support to National MNCH Programme 39.017 0.001
Health Equipment Basic Health Services Project (KfW Assisted). 780.556 53.741
Health Strengthening of 04 MCH Centres attached to Public Health Schools in Khyber Pakhtunkhwa
9.258 7.258
Health Social Health Protection Initiative for Khyber Pakhtunkhwa (KfW Assisted).
1172 12.948
Higher Education Establishment of Project Management Unit for re-organization of Higher Education.
21 7
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
Higher Education Provision of Day Care Centers in female Govt. Colleges in Khyber Pakhtunkhwa
18.413 10.036
Industries Upgradation of Govt. Polytechnic Institutes, Bannu & Swat, to the level of College of Technology
183.305 29.14
Industries Re-construction of building for GTVC (Women) D.I.Khan.
68.769 35
Law & Justice Construction of Judicial complex Mansehra. 972.98 50
Law & Justice Construction of Judicial Complex Haripur. 547.519 30
Law & Justice Construction of Additional works inJudicial Complex Peshawar.
33.5 13.5
Law & Justice Addition / Alteration / Strengthening and balance works in Judicial Complex Bannu.
345.137 40
Law & Justice Construction of Additional works in Judicial Complex Lakki Marwat.
50.173 10
Reg: Dev: Local Development Initiatives in Districts Dir Upper and Lower (Rs 60.00 M each)
120 120
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
Reg: Dev: Conversion of Electric Street Lights into Solar Energy in the Province.
50 40
Reg: Dev: Municipal Services Delivery Project. (USAID Assisted) 8080 100
Reg: Dev: Establishment of Water and Sanitation Company (WASCo), Peshawar.
1137.92 100
R & D Establishment of Urban Policy Unit. (USAID Assisted). 929.411 39.724
Roads Rehabilitation/Repair of Roads damaged in PF-46 District Abbottabad.
123.253 30
Roads Rehabilitation/Repair of Roads Damaged in July 2010 in NA-18, District Abbottabad.
43.456 8.456
Roads Rehabilitation/Repair of Pind Gali Beer Road District Abbottabad.
90.399 15
Roads Rehabilitation/Repair of Roads Damaged in July 2010 in PF-44, District Abbottabad.
76.8 1.8
Roads Restoration of Road damaged by flood in District Abbottabad (Phase-II)
32.15 7.15
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost AllocationRoads Restoration of Road damaged by flood in District
Abbottabad (Phase-I)126.161 50
Roads Rehabilitation of Road damaged by flood in District Battagram (Package-II).
117.505 20
Roads Restoration of Road damaged by flood in District Battagram
319.904 30
Roads Restoration and Rehabilitation of Flood Damages in District Kohistan during 2010.
223.95 30
Roads Restoration of Road damaged by flood in District Dir Upper (Phase-II)
253.561 25
Roads Flood Damages Restoration of Roads / Bridges Infrasturcture in District Swat SH: (1) Kalam, Uthror, Gubral road (35-Kms) (2) Kalam, Ushu, Matilthatn, Mahodand road (35-Kms) (3) Tehsil Kalam Internal Roads (6-Kms)
107.6 30
Roads Restoration of Road damaged by flood in District Swat (Kabal Region)
478.64 100
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
Roads Restoration of Road damaged by flood in District Shangla 190.3 30
Roads Restoration of Road damaged by flood in District Nowshera
278.641 27
Roads Restoration of Road damaged by flood in District Lakki Marwat
85.467 25.467
Roads Improvement / Rehabilitation of Swarai - Sarqilla -Chowga-Puran road (Km 49.50 to 67.50) 18 Km District Shangla.
578.73 70
Roads Construction of Kanju RCC Bridge (Ayub Bridge) on River Swat at Mingora.
358.824 50
Roads Reconstruction of Bagh Dheri Bridge on River Swat 210.138 50
Roads Construction of Khwazakhela Bridge (415.3m) and Mingora Bridge (48.15m) at District Swat
415.04 70
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost Allocation
Roads Feasibility Study / Design and construction of alternate route from Malakand district to down districts. (Swat Express Way) (Phase-I) (Abu Dhabi Dev. Fund).
9000 0.1
Roads Restoration / Rehabilitation of damages in District Tank 161.97 20
Roads DFID Assisted Steel Bridges Project in Crisis Affected Districts of Malakand Division (In kind).
2196.234 100
Roads Emergency Rural roads Rehabilitation project (JICA Assisted). 14694 1
Roads Constn: of Abutments and Launching of NATO/Canadian steel bridges provided to Pak Army for Khyber Pakhtunkhwa.
364 54.58
Social Welfare Establishment of Welfare Home for Orphans at Lakki Marwat 28.55 7.055
Social Welfare Establishment of Senior Citizens Home at Peshawar 10.139 4
PCNA – Objective 3
(Million Rs.)
Sector Project Total Cost AllocationSocial Welfare Establishment of Senior Citizens Home at Peshawar 10.139 4
Social Welfare Reconstruction and establishment of a model Drug Addicts Detoxification and Rehabilitation Centre at old Rang Mala, Hospital, Malakand
42.453 8.452
Social Welfare Establishment of Halfway House for Women at Peshawar 11.776 4
Water Restoration of Flood Protection Works along Tributaries of Panjkora River at Nehag, Karo and Usherai Khwar District Dir Upper Sub Work: Restoration of Flood Protecton Work along Usherai Khawar Tributaries of Panjkora River District Dir Upper.
29.7 14.7
Water Restoration of Flood Damages 2010 of Rod Kohi System in District D.I.Khan.
107.917 25
Water Restoration of protection bund along Tank city District Tank.
27.824 8
PROJECTS UNDER MDTF Economic Revitalization for Khyber
Pakhtunkhwa and FATA Project (ERKF- $20 m) – under implementation.
Governance Support Project (GSP $6 m + Additional Financing 2.75 m) for Khyber Pakhtunkhwa and FATA- Operationalized
Up gradation/Rehabilitation of Road Garhai - Kanju, Swat , 10.5 KM (Cost $ 8.0 m) – Under Implementation.
-Cont-
PROJECTS UNDER MDTF Strengthening Health Services in Crisis
Affected Districts (Est. Cost US$ 16 m)-Under Implementation.
Southern Area Development Project SADP in district D.I.Khan, Lakki Marwat, Tank (costing $ 18 m) under preparation stage.
Five Concept Notes (Judiciary, Prov. Ombudsman Office, Home Deptt., CDD and M&E framework) approved by Provincial Steering Committee.
-Cont-
PROJECTS UNDER MDTF Concept Note of KP Judicial Academy
approved by World Bank.
Concept Note of Home Deptt. submitted to World Bank for approval.
ISU initiated a consultative process to identify focal points.
10 focal points have been identified till now(Public Health
Engineering Deptt, Finance Deptt, Human Rights Deptt, Prov.
Ombudsman Secretariat, Sports, Culture, Youth Affairs, tourism,
Archaeology & Museum Deptt, Peshawar High Court, Home &
Tribal Affairs Deptt, Energy & Power Deptt, and Environment
Deptt.)
Issues and Challenges
Coordination – Effective coordination and follow up amongst all stake holders.
Fund Flow – Enhanced and timely flow of funds.
3 Programs to be Implemented across 9 Identified Sectors
PCNA Strategic Objectives
Vision: “There is emergence of peace, greater prosperity & tolerance. A transformation is underway where the voices of all people are being heard, the rule of law is deepening & the state is increasing accountable, providing equitable opportunities for better health, education & employment”
Crisis Drivers
The Way Forward (devised in 4 stages)
PCNA STRATEGY
PCNA Strategic Objectives
Strategic Objective 1:Build state responsiveness & effectiveness to restore citizen trust
1.1 Citizens access to avenues influencing Govt. decision making
1 .1.1) Proactive role of elected officials/ community representatives on decision making bodies
1 .1.2) Enhancing mechanisms to engage citizens in the decision making process
1.2 Citizens understand their rights & entitlements
1.2.1) Number & types of awareness campaigns conducted under MDTF 1.2.2) Percentage of citizens aware of their rights and responsibilities in the major area.1.2.3) Dissemination of entitlement information by the Govt.
1.3.1) Publication/ dissemination of laws, budget and expenditure1.3.2) Mass dissemination of information on Govt actions/ interventions
1.4.1) Number of policies approved by legislatures1.4.2) Level of budget program coherence1.4.3) Extent & quality of program budget expenditure reporting1.4.4) Optimal level of Govt. spending against approved budget.
1.5 Transparency, accountability & improved management of public resources.
1.5.1) Budget & expenditure published & disseminated 1.5.2) Level of budget program coherence 1.5.3) Public Accounts Committee strengthened scrutinizing budget & expenditure
Desired Outcomes
Strategic Indicators
1.4 Govt. developing & implementing policies that improve access to health & education
1.3 Law, Govt Decisions, budget & expenditure are publically available to all
PCNA Strategic Objectives
}Strategic Objective 2:Employment & Livelihood Opportunities
2.1 An Expanding Private sector is providing local Employment
2.1.1) Increased number of private sector organizations providing employment2.1.2) Increase in number of people (MF) employed by private sector
2.2 Revitalized agriculture & livestock sector providing employment and livelihood
2.2.1 )Agriculture & Livestock Revitalized2.2.2)New jobs created in Agriculture & Livestock 2.2.3) Increase in number of service providers (Farm & off Farm)
2.4 Producers have increased access to markets for their produces
2.3.1) Consultations with chamber of commerce & industries & other relevant stakeholders.2.3.2) Enabling Laws & regulations by Govt. bodies for fostering conducive environment of commerce and business
2.3 Govt regulatory & legal environment enabling commerce & business
2.4.1) Increased number of farm to market access roads 2.4.2) Linkage developed by farm associations with market associations
2.5 Rehabilitated and expanded SME sector providing employment and Livelihoods
2.5.1) Number of SMEs supported & rehabilitated 2.5.2) Increased number of jobs created by SMEs 2.5.3) Number of capacity building support initiatives conducted
Desired Outcomes
Strategic Indicators
PCNA Strategic Objectives
Strategic Objective 3: Ensure the Delivery of Basic Services
3.1 Vulnerable groups particularly women/ girls have access to basic services
3.1.1) Increased number of women has access to basic health and mother and child care facilities.3.1.2 )Number of women / girls has access to basic education3.1.3 )Number of women / girls has access to WATSAN Facilities.
3.2 Govt. seen as primary deliverer of basic services
3.2.1) Agriculture and Livestock Revitalized3.2.2) Number of jobs created in Agriculture and Livestock 3.2.3)Increase in number of service providers (farm & off farm)
3.4 Vulnerable population has access to social safety net.
3.3.1) Number of education institutions Rehabilitated / Reconstructed 3.3.2)Number of health institutions Rehabilitated / Reconstructed 3.3.3)Number of WATSAN facilities Rehabilitated / Reconstructed3.3.4) Number of Roads Rehabilitated / Reconstructed3.3.5) Number of Energy facilities Restored/ Reconstructed
3.3 Local infrastructure restored, constructed to adequate quality standards
3.4.1) Number of safety net /cash transfer and in- kind support provided 3.4.2)Number of education fee/ TVET provisions provided to needy girls/ boys.3.4.3) Enhance number of health insurance coverage
Desired Outcomes
Strategic Indicators
PCNA Strategic Objectives
Strategic Objective 4: Counter Radicalism & Foster Reconciliation
4.1 Activities have been implemented in areas previously affected by serious conflict
4.1.1) Increased numbers of activities for counter radicalism.
4.1.2) Increased number of activities for ffostering reconciliation.
4.1.3) Persuasive communications strategies countering
radicalism and fostering reconciliation.
4.2 Communities have access to affordable, legitimate dispute resolution services
4.2.1) Number of Complaints processed by Umbudsman4.2.2) Number of Mobile Courts Established4.2.3) Number of Public Facilitation Centers Constructed
4.4 Public works and others funded projects foster collaborations across communities
4.3.1) Number of Public Sector and Citizens Dialogues initiated.4.3.2 ) Number of Community Based Participatory Planning, Budgeting Spending and Auditing Sessions.
4.3 Civil Society oversight of state functions broad & representative
4.4.1) Number of Community Based Organisations (CBO’s) set up for Public works and other funded projects.4.4.2) Number of projects executed under CBO’s.
4.5 Opportunities provided for public discourse on peace & conflict related issues
4.5.1) Number of joint dialogue sessions conducted with concerned stakeholders (Public & Private).4.5.2) Number of initiatives undertaken based on joint dialogue sessions.
Desired Outcomes
Strategic Indicators
3 Programs to be Implemented across 9 Identified Sectors
Program 1: Livelihoods & Communities Support Program
Program 2: Growth & Job Creation Program
Program 3: Policy Reforms & Governance Support Programs
The Way Forward
The Way Forward
Inputs:ISU, P&D Sections & Govt. Agencies
Stage 1: Mapping & Avoiding Duplication
Step 2:Which Strategic Objectives do these projects cover & to what extent?
Step 1:Similar Projects being implemented by Govt of KP and Partner Organisations in line with PCNA Strategic Objectives funded other than MDTF.
Step 3:Which Strategic Objectives are not covered by these projects?
Outputs:Mapping of projects prepared that addresses (including the extent of) particular Strategic Objectives of PCNA already being implemented.
Stage 1: 10 DaysTimeline
Stage 2: Identification & design of Projects to be Implemented under PCNA
Inputs:Non addressed or partially addressed Strategic Objectives of PCNA identified through Mapping of Projects in Stage 1
Step 1:Identification of non or partially addressed Strategic Objectives of PCNA.
Step 2:Identification of Projects that can be implemented under PCNA considering its Strategic Objectives and 3 Programs
Inputs:ISU, P&D Sections & Govt. Agencies
Step 3:Preparation of PC-I’sInputs:
Govt. Agencies
Outputs:Potential Projects Identified and Designed.
The Way Forward
Stage 2: 04 WeeksTimeline
Stage 3: Identification of GAPS and Approval of Projects to be implemented under PCNA
Inputs:Donor & partner organisations
Step 1:Identification of gaps in potential Projects Identified & Designed.
Step 2:Mitigation of gaps in potential Projects Identified and Designed.
Inputs:Govt. Agencies
Step 3:Projects submitted for approval after mitigation of gaps.
Inputs:ISU Outputs:
Projects Approved.
The Way Forward
Stage 3: 04 WeeksTimeline
The Way Forward
Stage 4: Implementation, Monitoring & Evalaution
Inputs:ISU, Directorate of M &E, Donor & partner organisations.
Outputs:Removal of bottlenecks/ impediments & provision of support/ guidance in project implementation & execution
Stage 4: Till Project CompletionTimeline
30/10/11
PCNA Strategic Objectives
Strategic Objective 1:Build State Responsiveness & effectiveness to Restore Citizen Trust
Strategic Objective 2:Employment and Livelihood Opportunities
Strategic Objective 3: Ensure the Delivery of Basic Services
Strategic Objective 4: Counter Radicalism & Foster Reconciliation
1.1 Citizens have access to avenues to influence Govt. decision making
1.1.1 Proactive role of Elected Officials/CS representatives on decision making bodies1.1.2 Enhancing Mechanisms to engage citizens in the decision making process
1.2 Citizens understand their rights and entitlements
1.2.1 Number and types of awareness campaigns conducted under MDTF 1.2.2 Percentage of citizen aware of their rights and responsibilities in the major area1.2.3 Dissimilation of entitlement information by the Government.
1.3 Law Govt Decision budget and expenditure are publically available to all
1.3.1 Publication/ dissemination of laws, budget and expenditure1.3.2 Mass Dissemination of Information on Govt Actions/ interventions
1.4 Govt. developing and implementing policies that improve access to health & education
1.4.1 Number of policies approved by legislatures1.4.2 Level of budget program coherence1.4.3 Extent and quality of program budget expenditure reporting1.4.4 Optimal level of Govt spending against
approved budget.
1.5 There is transparency of and accountability for the management of public resources
1.5.1 Budget and expenditure published and disseminated
1.5.2 Level of budget program coherence1.5.3 Public Accounts Committee strengthened scrutinizing budget & expenditure
2.1 An Expanding Private sector is providing local Employment
2.1.1 Increased Number of private sector organizations providing employed
2.1.2 Increase in number of people (MF) employed by private sector
2.2 Revitalized Agriculture and livestock sector providing employment and livelihood
2.2.1 Number of Agriculture and Livestock Revitalized2.2.2 Number of jobs created in Agriculture and Livestock 2.2.3 Increase in number of service providers
(Farm and Off Farm)
2.3 Govt regulatory and legal environment enabling commerce and business
2.3.1 Consultation with the chamber of c commerce & industries and other relevant stakeholders 2.3.2 Enabling laws and regulations by Govt
bodies for fostering conducive environment of commerce and business 2.4 Producers have
increasing access to markets for their produces
2.4.1 Increase in number of Farm to market roads 2.4.2 Linkage developed by farm associations
with market association
2.5 Rehabilitated and expanded SME sector providing employment and Livelihoods
2.5.1 Number of SMEs supported and rehabilitated 2.5.2 Increase in number of jobs created by SMEs2.5.3 Number of capacity building support initiatives conducted
3.1 Vulnerable groups particularly women/ girls have access to basic services
3.1.1 Increased number of women has access to basic health and mother and child
care facilities.3.1.2 Number of women / girls has access to basic education3.1.3 Number of women / girls has access to WATSAN Facilities.
3.2 Govt seen as primary deliver of basic services
3.2.1 Agriculture and Livestock Revitalized3.2.2 Number of jobs created in Agriculture and Livestock 3.2.3 Increase in number of service providers
(Farm and Non Farm)
3.3 Local infrastructure resorted, constructed to
adequate quality standards
3.3.1 Number of education institutions Rehabilitated / Reconstructed 3.3.2 Number of health institutions Rehabilitated / Reconstructed 3.3.3 Number of WATSAN facilities Rehabilitated / Reconstructed3.3.4 Number of Roads Rehabilitated / Reconstructed3.3.5 Number of Energy facilities Resorted/ Reconstructed
3.4 Vulnerable population has access to
social safety net.
3.4.1 Number of safety net /cash transfer and in- kind support provided
3.4.2 Number of education fee/ TVET provisions provided to needy girls/ boys.3.4.3 Enhance number of health insurance coverage
4.1 Activities have been implemented in areas previously affected by serious conflict
4.1.1 Increased number of activities for counter radicalism.
4.1.2 Increased number of activities for fostering reconciliation.
4.1.3 Persuasive communication strategies countering radicalism and foster reconciliation
4.2 Communities have access to affordable, legitimate dispute resolution services
4.2.1 Number of Complaints processed by Umbudsman
4.2.2 Number of Mobile Courts Established
4.2.3 Number of Public Facilitation Centers Constructed
4.3 Civil Society oversight of state functions broad and representative
4.3.1 Number of Public Sector and Citizens Dialogues initiated.
4.3.2 Number of Community Based Participatory Planning, Budgeting Spending and Auditing Sessions.
4.4.1 Number of Community Based Organization (CBO’s) set up for Public works and other funded projects.
4.4.2 Number of projects executed under CBO’s.
4.4 Public works and others funded projects foster collaborations across communities
4.5 opportunities provided for public
discourse on peace and conflict related issues
4.5.1 Number of joint dialogue sessions conducted with concerned stakeholders (Public & Private).
4.5.2 Number of initiatives undertaken based on joint dialogue sessions.
Program 1: Livelihoods & Communities Support Program
Program 2: Growth & Job Creation Program
Program 3: Policy Reforms & Governance Support Programs
Desired Outcomes
Desired Outcomes
Desired Outcomes
Desired Outcomes
Strategic Indicators
Strategic Indicators
Strategic Indicators
Strategic Indicators
Step 1:Similar Projects being implemented by Govt of KP and Partner Organisations in line with PCNA Strategic Objectives funded other than MDTF.
The Way Forward
3 Programs to be Implemented across 9 Identified Sectors
Vision: “ There is emergence of peace, greater prosperity & tolerance. A transformation is underway where the voices of all people are being heard, the rule of law is deepening & the state is increasing accountable, providing equitable opportunities for better health, education & employment”
Crisis Drivers
Step 2:Which Strategic Objectives do these projects cover & to what extent?
Step 3:Which Strategic Objectives are not covered by these projects?
Stage 1: Mapping & Avoiding Duplication
Inputs:ISU, P&D Sections & Govt. Agencies
Stage 2: Identification & design of Projects to be Implemented under PCNA
Outputs:Mapping of projects prepared that addresses (including the extent of) particular Strategic Objectives of PCNA already being implemented.
Inputs:Non addressed or partially addressed Strategic Objectives of PCNA identified through Mapping of Projects in Stage 1
Step 1:Identification of non or partially addressed Strategic Objectives of PCNA.
Step 2:Identification of Projects that can be implemented under PCNA considering its Strategic Objectives and 3 Programs
Inputs:ISU, P&D Sections & Govt. Agencies Step 3:
Preparation of PC-I’s
Inputs:Govt. Agencies Outputs:
Potential Projects Identified and Designed.
Stage 3: Identification of GAPS and Approval of Projects to be implemented under PCNA
Inputs:Donor and partner organisations
Step 1:Identification of gaps in potential Projects Identified and Designed.
Step 2:Mitigation of gaps in potential Projects Identified and Designed.
Inputs:Govt. Agencies
Step 3:Projects submitted for approval after mitigation of gaps. Inputs:
ISU
Outputs:Projects Approved.
Stage 4: Implementation, Monitoring & Evalaution
Inputs:ISU, Directorate of M&E Donor and partner organizations
Outputs:Removal of Bottlenecks/ Impediments & Provision of Support/ Guidance in Project Implementation & Execution
30/10/11
THANK YOU