  • PERI UP Rosett 72Working Scaffold with Deck UDS

    Assembly Instructions for Standard Conguration

    Edition 09/2008

    D e

    10/

    2007

    1m

    a A

    rt. N

    r.: 7

    9163

    0

    Cop

    yrig

    ht b

    y P

    ER

    I Gm

    bH

    00_UP_Titel_und_U4_AuV.indd 2 15.09.2008 13:15:41 Uhr

  • Dokument 1 28.04.2005 12:48 Uhr Seite 1

  • Assembly Instructions PERI UP Rosett 72 Guidelines

    Overview 1Product features, Remarks 3

    Part AErecting and Dismantling Manual

    A1 Erecting the baseA1.1 Load distributing base area 4A1.2 Adjustable base plates UJB, base plates UJP 4A1.3 Changes in height and sloping surfaces 4A1.4 Collar UVB 5A1.5 Ledger UH, Decking Transom UHD 5

    A2 Erecting the first levelA2.1 Vertical Standards UVR 6A2.2 Decking Transom UHD and Steel Decks UDS 6A2.3 Diagonals 7A2.4 Erecting further scaffold bays 7

    A3 Erecting a cornerA3.1 Outside corners 8

    A4 Internal scaffold accessA4.1 Access deck with ladder UAL 9

    A5 External scaffold accessA5.1 Access deck with ladder UAL 10A5.2 Staircase UAS 10

    A6 Erecting further scaffold levelsA6.1 Transport according to German regulations 11A6.2 Erection sequence 12A6.3 Anchors 14A6.3.1 General 14A6.3.2 Single wall ties 14A6.3.3 Wall ties 15A6.3.4 Triangulated anchors 16A6.3.5 Pressure resistant ties 16

    A7 Erecting and adapting sectionsof scaffold

    A7.1 Modifying and refitting system decksin individual bays 17

    A7.2 Subsequent closing of scaffold areas 18

    A8 Combining PERI UP Rosett 72and PERI UP T72

    A8.1 Combining side by side 20A8.2 Combining one above the other 21A8.2.1 Rosett 72 on T 72 21A8.2.2 T 72 on Rosett 72 21A8.3 Interlocking combinations 22A8.3.1 T 72 in Rosett 72 22A8.3.2 Rosett 72 in T 72 23

    A9 Installing supplementary componentsA9.1 Extending with scaffold brackets 24A9.1.1 Console brackets UCB 32 and UCB 36 24A9.1.2 Console brackets UCB 72 and UCB 104;

    Console bracket brace UCP72/104 25A9.2 Protection panel UPP 26A9.3 Overhead protection fans 27A9.4 Bridging 28A9.4.1 Assembling lattice girders ULS/ULA 28A9.4.2 Assembling lattice girders ULS/ULA

    with a scaffold 29A9.4.3 Bracing and anchoring the lattice girders

    ULS/ULA 30

    A9.4.4 Bracing with scaffold tube 30A9.4.5 Bracing with wall tie UWT 30A9.4.6 Bridging with twin lattice girders ULS/ULA 31A9.5 Pavement gantry UVG 32A9.6 Sheeting 33A9.6.1 Covering with nets 33A9.6.2 Covering with tarpaulin 33

    A10 Dismantling 34

    Part BUsed as a working scaffold

    B1 Load capacityB1.1 Decks 35B1.2 Lattice girder 36

    B2 Anchor forcesB2.1 Triangulated anchors or single wall ties 37B2.2 Wall ties 38

    B3 Reaction forces 39

    B4 Anchor patternsB4.1 General 41B4.2 Key 42B4.3 Overview of equipment combinations 43B4.4 Legend 46B4.5.1 Unclad minimum anchor positions 47B4.5.2 Unclad basic arrangement 1 48B4.5.3 Unclad version 1 49B4.5.4 Unclad version 2 50B4.5.5 Unclad version 3 51B4.5.6 Unclad version 4 52B4.5.7 Unclad version 5 53B4.5.8 Unclad 4.00m bridging 54B4.5.9 Unclad 6.00m bridging 55B4.5.10 Unclad 8.00m bridging 56B4.5.11 Unclad pavement gantry 57B4.5.12 Unclad pavement gantry 58B4.5.13 Unclad top level not anchored 59B4.6.1 Net closed faade minimum

    anchor positions 60B4.6.2 Net closed faade version 1 61B4.6.3 Net closed faade version 2 62B4.6.4 Net closed faade version 3 63B4.6.5 Net open faade basic arrangement 2 64B4.6.6 Net open faade version 1 65B4.6.7 Net open faade version 2 66B4.6.8 Net open faade version 3 67B4.7.1 Tarpaulin closed faade minimum

    anchor positions 68B4.7.2 Tarpaulin closed faade version 1 69B4.7.3 Tarpaulin open faade minimum

    anchor positions 70B4.7.4 Tarpaulin open faade version 1 71

    B5 VariationsB5.1 Component combinations 72B5.2 Use of lattice girders 73

    Part CComponent list PERI UP Rosett 72 74

    Page

    Contents

    Page

    Legend

    Important safety Hints Visual Check Site Tipsinstructions

  • 18

    14

    22

    21

    15

    20

    19

    10b

    1

    3

    4

    6

    16

    12

    17

    7

    10a

    2

    5

    8 9

    1124

    1

    Overview

    1a Adjustable base plate UJB

    1b Base plate UJP

    1c Heavy duty ajustablebase plate TR 38-70/50

    2 Collar UVB 24

    3 Ledger UH

    4 Decking Transom UHD

    5 Standard UVR

    6 Top Standard UVH

    7 Decks

    8 Guardrail post UVP 100

    9 Guardrails UPG

    10a Ledger bracing UBL

    10b Node brace UBK

    10c Coupler brace UBC(shown later)

    10d Horizontal brace UBH(shown later)

    11 Console bracket UCB

    12 Console bracket brace UCP

    13 Pavement gantry UVG(shown later)

    14 Transom coupler UHC

    15 Access decks UAL

    16 Toe boards UPT

    17 End guardrail frames UPX

    18 Protection panel connection UPC

    19 Protection panel UPP

    20 Wall tie UWT

    21 Lattice girder

    22 Starter tube ULB

    23 Decking gap filler UD(shown later)

    24 Spigot ULT 32

    25a Guardrail coupler UPR(shown later)

    25b Guardrail holder UPW (shown later)

    Stairs(shown later)

    26 Staircase UAS

    27 Stair guardrail UAG

    28 Inside stair guardrail UAH

    29 Landing link panel UAB 30

    PERI UP T 72 components(shown later)

    T2a Base frame UVF 72/124

    T2b Base frame UVF 72/174

    T4 T-frame UVT

    T5 L-frame UVL

    T6 Spigot tube UV 165

    T10 Standard diagonalbracing UBF

    Assembly Instructions PERI UP Rosett 72 Guidelines

  • Assembly Instructions PERI UP Rosett 72 Guidelines

    system width: 72 cm

    used as working scaffold in LoadClasses 1-3 according to DIN 4420-1orLoad Classes 1-3 according to EN 12811-1:

    0.75 2.00 kN/m2

    fulfills the requirements for protectionscaffolds (roof protection for fallingheights ) 2.0 m, protection fans)

    bay lengths:72/104/150/200/250/300 cm,400 cm (as bridging)

    Standard configuration accordingto EN 12810for a scaffold assembly: 24 m high plusmaximum spindle extension / internalbrackets at every level / external brackets/ protection fans / roof protection panels /pavement gantries / bridging / nets /tarpaulins

    Product designation accordingto EN 12810:

    PERI UP Rosett 72EN 128103DSW06/300-H1-B-LS

    Key:3 = Service Load Class 3 (2.00 kN/m2)D = Platforms with drop test

    (suitable as protection scaffold)SW06 = Width Class 06 (72 cm width)300 = Bay length ) 300 cmH1 = Headroom classB = with cladding facilitiesLS = vertical access by ladders and

    by stairs

    Faade ScaffoldPERI UP Rosett 72

    Important safety information:The use of PERI UP Rosett 72 is intendedonly for industrial applications in theconstruction sector as facadescaffolding in accordance withEN 12810 - 1:2003 (intended use).

    Only PERI UP original componentscomplete with the manufacturerslabel are to be used. The use of otherproducts and spare parts represents amisapplication with associated safetyrisks.

    Any deviation from the standardconfiguration when assembling and/oruse present a potential safety risk andtherefore may only be undertaken aftera separate risk assessment has beencarried out by the scaffolding contractor.

    Appropriate measures are to beimplemented regarding operational safetyand stability on the basis of the riskassessment (Extension of the assemblyinstructions as well as safety provisionsduring assembly, e.g. guardrails; proofof stability using draft and designspecifications in accordance withApproval Z-8.1-890 and taking intoaccount EN 12811-1).

    Note:Appropriate proof of stability can beordered from PERI, if the risk assessmentand measures deriving from this areavailable. For loads from other load classes,and for wider scaffolding up to 150 cm,proofs of stability have already beenissued which can be ordered from PERI.

    These assembly instructions applytogether with Approval Z-8.1-890.

    They describe the standard designfor facade scaffold according to theprovisions set down in DIN 4420-1as well as the requirements assystem scaffolding according toEN 12810 and EN 12811.

    Deviations from technically-functioninginstructions, especially assemblysequences, require separate static proof.

    OverviewThese assembly instructions serve as abasis for the compilation of a building-related assembly instruction by thescaffolding contractor these do nothowever replace this.

    The assembly instructions regulate the intended use provide the scaffolding contractor with

    guidance for safe assembly,modifications and dismantling

    give details regarding stability andworking safety requirements withinthe framework of the standardconfiguration

    The assembly instructions are arrangedas follows: general information assembly of the base assembly of supplementary

    components combination with PERI UP T 72

    BasisApproval Z-8.22-863:PERI UP Rosett Modular System

    Approval Z-8.1-865:PERI UP T 72 Scaffold System

    Approval Z-8.1-890:PERI UP Rosett 72 Scaffold System

    2

  • Dokument 1 28.04.2005 12:48 Uhr Seite 1

  • 3Assembly Instructions PERI UP Rosett 72 Guidelines

    Technical suitabilityPERI UP may only be assembled,modified and dismantled by technicallyskilled scaffolding contractors and sitepersonnel who also possess sufficientskill and experience (hereafter referredto as scaffolding contractor).

    Stability requirementsThe scaffolding contractor has toguarantee on site that the bearingreactions of the scaffold indicated inthe Part B of the assembly instructionscan be reliably carried in the foundationand anchorage.

    The load-bearing capacity of the fixingmaterial between the wall ties andanchorage must be verified for theanchoring forces. Proof must beprovided by official approval, staticcalculation or test loading accordingto a recognized method.

    Load-distributing support, e.g. planks,is to be placed accordingly to matchthe ground conditions. If several layersare required, planks are to be arrangedcrosswise.

    Condition of the materialThe material is to be regularly checkedfor any signs of damage particularlybefore any assembly takes place.Damaged components must beexchanged immediately on site andmay no longer be used.

    Scaffold tubes and couplers formounting and bracingSteel tubes and couplers are to beused in the standard configuration asanchors and as bracing for the latticegirders. Steel tubes with a 48.3 mmexternal diameter and at least 3.2 mmwall thickness according to DIN 4427as well as couplers according toEN 74 with appropriate markings areto be used.

    Bolted couplers must be tightenedwith a moment of 50 Nm (correspondsto a force of 20 kg with a 25 cm leverarm). Wedge couplers are to besecurely fitted using a 500 g hammer.

    Personal protective equipmentagainst falls from a heightWhen using personal protectiveequipment against falls from a height,all valid standards and safetyregulations are to be taken intoconsideration by the scaffoldingcontractor.

    Currently, the following are of particularimportance:

    DIN EN 354:Personal protective equipmentagainst falls from a height; Lanyards

    DIN EN 355: ... Energy absorbers DIN EN 360: ... Retractable type

    fall arresters DIN EN 361: ... Full body harness DIN EN 362: ... Connectors DIN EN 363: ... Fall arrest systems

    Availability of the assemblyinstructionsThese assembly instructions, togetherwith the assembly instructions fromthe scaffolding contractor, must bemade available for the entire period,from the beginning of the assemblywork through to the end of dismantlingand including the service life at thepoint of use (see EN 12811 - 1:2003(D) Clause 8)

    Additional regulations:The scaffolding contractor mustobserve all valid laws and safetyregulations regarding assembly anduse.

    Currently, the following is of particularimportance: Council Directive 89/655/EEC of

    the European Parliament concerningthe minimum safety and healthrequirements for the use of workequipment by workers at work.

    Signs

    If certain parts of the scaffolding arenot ready for use - in particular duringassembly, alteration work anddismantling - a warning sign restrictedaccess must be clearly displayed, seeSign 1. In addition, it must be madeclear by appropriate physical meansthat the scaffold is not complete whichprevents unauthorized access to thedanger zone.

    Sign 1

    After handover, the scaffolding is to bemarked in such a way that the intendeduse is clearly visible e.g. installingSign 2 at the scaffold access points.

    The signs do not replace theinspection record!

    Sign 2

    GeneralInformation

  • 13

    30

    55

    4 Assembly Instructions PERI UP Rosett 72 Guidelines

    UJB 38-50/30(red handle)

    UJB 38-80/55(yellow handle)

    A1 Erectingthe base

    Erecting the scaffold must follow thesequence described below!

    A1.1 Load distributing base area

    Always begin erecting at the highestpoint, preferable at an internal corner.

    Lay the ledgers UH 3 down todetermine the length of the surface tobe scaffolded. This will fix the distancebetween the adjustable baseplatesUJB 1a (for loads see Part B).

    The scaffold must only be erected withload distribution plates on ground orstructures capable of withstanding allimposed loads!

    Settlement must be avoided!

    A1.2 Adjustable base plates UJB,base plates UJP.

    Position adjustable base platesUJB 1a or base plates UJP 1b atthe ends of the ledgers UH 3.

    Adjustable base plates UJB 1a withyellow and red handles can beextended a maximum of 55 and30 cm respectively.

    Adjustable base plates TR 38-70/50 1ccan be used instead of adjustable baseplates UJB 1a. They can be extendedto 47cm.

    A1.3 Changes in height andsloping surfaces.

    Steps, slopes and changes in heightcan be overcome using longer verticalstandards UVR.

  • 72

    1

    3

    4

    5Assembly Instructions PERI UP Rosett 72 Guidelines

    A1.4 Collar UVB

    Place the collar UVB 24 2 over theadjustable base UJB 1.

    This allows a scaffolder to work aloneup to a height of 6.50 m.Place collar UVB 24 2 and adjustablebase plates UJB 1 at the requireddistance from the wall (deck to buildingdistance must not exceed 30 cm)

    Alternatively vertical standards UVR 5can be fitted directly on the adjustablebase plates UJB 1. This reduces thepermissible extension length in theanchor patterns (section B4) by 26 cm.

    A1.5 Ledger UH,Decking Transom UHD

    Form a base frame by connecting thecollar UVB 24 2 transversely with thedecking transom UHD 4 andlongitudinally with the ledger UH 3.

    Fit the decking transom UHD 4 withthe red marker to the outside.

    Ensure all ledgers UH 3 and deckingtransoms UHD 4 are level by adjustingthe adjustable base plates UJB 1.

    Then securely fix all the wedges usinga 500 g hammer.

    Place steel deck UDS 7 in a deckingtransom UHD 4 as an assembly aid tocheck squareness (see next page fordeck assembly).

    The decks used at the base are an aidto erection only, they can be removedlater. This does not apply to bays whereaccess decks with ladders UAL arefitted, in these bays two steel decksshould be fitted to support the ladder.

    A1 Erectingthe base

  • 52

    7

    5

    4

    4

    7

    6 Assembly Instructions PERI UP Rosett 72 Guidelines

    red mark

    A2.1 Vertical Standards UVR

    Insert vertical standards UVR 5 intothe collars UVB 24 2.

    The joints in the inner and outer UVRstandard 5 must be staggered!

    PERI recommends using UVR 200 onthe inside and UVR 300 on the outside and then continuing with the samelength (either UVR 200 or 400).

    Depending on the supplementarycomponents fitted, additional deckingtransoms may need to be fixed to thefirst rosette on the standard UVR.Alternatively base frame UVF 124 maybe used. (see section B4)

    A2.2 Decking Transom UHD andSteel Decks UDS

    For the next level fit the deckingtransom UHD 4 in the rosette of thevertical standard UVR 5 with the redmarking to the outer standard. Securethe wedges.(maximum spacing betweenlevels = 2.00 m)

    Fit steel decks UDS 7 by lining up thecentre lug with the cut-out in thedecking transom UHD 4. To preventdecks lifting off slide the steel deckUDS 7 towards the building as far asit will go (the same applies to all decks).

    Decks have a structural function and,therefore, must be installed across thefull width of the scaffold!

    Advantage:System deckingPosition slide ready!

    Incorrectly fitted or unsecure deckswill rock on the longitudinal axis whenwalked on, and is an indication to thescaffolders that the deck is notfunctioning properly.

    A2 Erecting thefirst level

  • 10a

    3

    10a

    3

    7

    A2.3 Diagonals

    Diagonals are fixed to the outside faceof the scaffold at the base and act asbracing.

    Either ledger braces UBL 10a ornode braces UBK 10b can be used.

    If node braces UBK 10b are used, theupper UH ledger 3 is not needed.

    See section B4 for the position andnumber of diagonals to be fitted.

    A2.4 Erecting of furtherscaffold bays

    The erection of all further baysis as previously described.

    A2 Erecting thefirst level

    Assembly Instructions PERI UP Rosett 72 Guidelines

  • 45

    8

    A3 Erectinga corner

    Assembly Instructions PERI UP Rosett 72 Guidelines

    A3.1 Outside corners

    Always erect corners to the full widthof the scaffold.

    The corner is formed with four verticalstandards UVR 5 and decking transomsUHD 4 and continued all the way tothe top of the scaffold as a cornertower.

  • 715

    9

    Before commencing work on the firstscaffold lift, a means of access mustbe installed.

    A4.1 Access deck with ladder UAL

    Select the most suitable bay in whichto install the ladder access.

    In this bay steels decks UDS 7 shouldbe fitted at the lowest level to supportthe ladder.For the following levels access deckswith ladders UAL 15 are used insteadof steel decks UDS 7.

    Alternate the direction of the laddersfor each level! When the ladder accessis not being used the access hatchmust remain closed.

    Access decks with ladders UAL havingplywood surfaces must be inspectedfor any damage before use!

    A4 Internalscaffold access

    Assembly Instructions PERI UP Rosett 72 Guidelines

  • 10b10a

    7

    15

    3

    34

    27

    26

    28

    10 Assembly Instructions PERI UP Rosett 72 Guidelines

    A5.1 Access deck with ladder UAL

    Scaffold access using access deckswith ladder UAL 15 can also be fittedto the outside of the scaffold. Theseare connected to the main scaffoldwith decking transoms UHD 4.

    At the base level a ledger UH 3 andsteel decks UDS 7 (as footing for theladder) are fitted in the outer bay.

    A5.2 Staircase UAS

    Scaffold access positioned on theoutside can be fitted with the staircaseUAS 26.

    The staircase is positioned in thedecking transom UHD 4 in the sameway as the steel deck UDS 7 is fittedand pushed sideways towards thebuilding.The stair guardrail UAG 27 is fixed onthe staircase stringer and pusheddownwards to lock behind a tread.The inside stair guardrail UAH 28serves as a safety feature on the innerface of the staircase UAS 26.

    A5 Externalscaffold access

  • 311Assembly Instructions PERI UP Rosett 72 Guidelines

    Every possible step must be taken tominimise the possibility of men ormaterials falling during the erection ofthe scaffold.

    Transport according to Germanregulations.

    For scaffolds with a top platform heightgreater than 8.00 m (deck height abovefixing level), scaffold hoists must beused. The use of a rope and wheel ispermitted for this purpose.

    However, if the scaffold to be erectedis not longer than 10.00 m, it ispermitted to erect to a height of14.00 m without the use of a hoist.

    In those bays where materials are tobe transported manually, both ledgersUH must be fitted as side protection.When transporting material manually,a scaffolder must be positioned oneach scaffolding level.

    Guardrail fitted at base level!

    If the material is stacked in each bay,the whole team can move from bayto bay supporting the erector withmaterial in advance.

    A6 Erecting furtherscaffold levels

  • 416

    3

    517

    3

    5

    12 Assembly Instructions PERI UP Rosett 72 Guidelines

    As end side protection, two ledgersUH 72 3 together with a toe boardUPT 16 can be fitted instead of theend guardrail frame UPX 17.

    A complete scaffold level is nowready!

    A6.2 Erection sequence

    The erection sequence begins in thebay in which the material is beingraised.

    The procedure is as follows:

    1. Fit handrailWhen setting foot on the next scaffoldlevel, a ledger UH 3 must be fitted toserve as a handrail.

    Before moving into the adjoining bayfit the ledger UH 3. Fit both ends ofthe ledger UH 3 into the rosette onthe outside standard UVR 5 andsecurely fix the wedges.

    Ledgers UH 3, which are fitted asguardrails, have a structural functionand therefore must be installed for thefull elevation of the scaffold. There arecases where the ledger UH 3 isintermittent and still has a structuralfunction please see B4 anchor details.

    2. Completion of the side protection

    In every bay, fit the second ledgerUH 3 and the toe board UPT 16.

    Place the pins on the toeboardUPT 16 into the holes in the top plateof the decking transom UHD 4.At the end of the scaffold fit the verticalstandard UVR 5 and the end guardrailUPX 17.

    From the second scaffold levelupwards diagonal braces are notrequired due to the use of ledgersUH 3.

    On the top level at the end of thescaffold guardrail posts UVP 8 may beused instead of top standards UVH 6.

    The end guardrail UPX 17 is fitted tothe outer vertical standard UVR 5 usingthe attached coupler.

    A6 Erecting furtherscaffold levels

  • 57

    5

    4

    13Assembly Instructions PERI UP Rosett 72 Guidelines

    A6.2 Erection sequence

    3. Fitting the vertical standards UVR

    Fit the vertical standards UVR 5 overthe spigots of the lower verticalstandards UVR 5 ensuring that theholes in the spigot and the holes inthe bottom of the vertical standardUVR 5 line up.

    If vertical standards UVR 200 5 areused a standard will always be availableon the next level for the side protectionto be fitted to.

    4. decking transom UHD andsteel decks UDS

    For the next scaffold level fit thedecking transom UHD 4 in the rosettesof the vertical standards UVR 5 withthe red marking to the outside standard(maximum height between levels is2.00 m)

    Continue to fit steel decks UDS 7sliding them towards the building toengage the lock preventing lift off.Fit access deck UAL 15 on eachscaffold level.

    Repeat steps 1 to 4 until all scaffoldlevels are complete.

    A6 Erecting furtherscaffold levels

  • 44

    20

    5

    A

    ) 300 320 720

    14 Assembly Instructions PERI UP Rosett 72 Guidelines

    singlewall tie

    A6.3 Anchors

    A6.3.1 General

    Anchoring is carried out progressivelyduring the erection of the scaffoldaccording to the relevant anchorpattern (see section B4). Ring boltsUFE are used for fastening to thefaade. Wall ties UWT 20 fitted directlyto the tube of the vertical standardUVR 5 immediately beneath thedecking transom UHD 4 with couplerscomplying with DIN EN 74 are usedto connect the scaffold to the ring boltsUFE. Individual wall ties UWT 20 maybe fitted up to 40 cm above or belowthe decking transom UHD 4.

    Anchors do not carry vertical loads!

    German regulations:Guidelines for Safety and HealthProtection in the Erection of ScaffoldingSystems (BGR 166)

    A6.3.2 Single wall ties

    The wall tie UWT 20 is fixed to thevertical standards UVR 5 using a rightangled coupler.Tensile and compressive forcesare carried at right angles to thefacade. (A)

    A6 Erecting furtherscaffold levels

  • 420

    5

    11

    A

    A II

    ) 300 320 720

    15Assembly Instructions PERI UP Rosett 72 Guidelines

    wall tie

    A6.3.3 Wall ties

    The wall tie UWT 20 is fixed to bothinner and outer vertical standardsUVR 5 with right angled couplers.Tensile and compressive forces arecarried at right angles and parallelto the facade (A and A II)

    Wall ties UWT 20 should be fitted asclose as possible to the deckingtransom UHD 4 to give the greatestheadroom through the scaffold lift andso that console brackets UCB 11 canbe fitted without difficulty.

    In exceptional cases, the wall tieUWT 20 can also be fitted above thedecking transom UHD 4.

    A6 Erecting furtherscaffold levels

  • 20

    5

    20

    20

    20

    5

    ) 300 320 720

    A

    ) 300 320 720

    A III

    ca.90

    A I

    16 Assembly Instructions PERI UP Rosett 72 Guidelines

    Triangulatedanchors

    pressure-resistant ties

    ca.45

    ca.45

    A6.3.4 Triangulated anchors

    Two wall ties UWT 20 are fixed at anangle of 45 to the ledger line withright angled couplers.

    They can either: both be connected to the vertical

    standard UVR 5 with right angledcouplersor

    the first wall tie UWT 20 connectedto the vertical standard UVR 5 and thesecond wall tie UWT 20 connected tothe first wall tie UWT 20 at 90 bothconnections with right angled couplers.

    Triangulated anchors carry tensileand compressive forces at rightangles and parallel to the facade(A I und A III).

    A6.3.5 Pressure-resistant ties

    The wall tie UWT 20 is fixed to thevertical standard UVR 5 with a rightangled coupler.The tube end, without a hook, ispositioned against the faade.

    This arrangement can only carrycompressive forces at right anglesto the facade (A ).

    A6 Erecting furtherscaffold levels

  • 17

    17

    17Assembly Instructions PERI UP Rosett 72 Guidelines

    A7.1 Modifying and refitting systemdecks in individual bays

    The integrated protection against liftingallows individual decks to be removedand refitted anywhere on the scaffold.

    This allows:

    individual bays to be removed or

    openings left during erection tobe closed

    In bays which are left open, endguardrail frames UPX 17 should befitted either side of the plannedopening.

    As end protection, two ledgersUH 72 3 and a toe board UPT canbe used instead of the end guardrailUPX 17.

    Steel decks UDS 7 can be removedsafely when standing on the scaffoldlevel beneath.

    The opening can be closed by refittingthe steel decks UDS 7 and the sideprotection.

    A7 Erecting andadapting sectionsof scaffold

  • 318 Assembly Instructions PERI UP Rosett 72 Guidelines

    A7.2 Subsequent closing ofscaffold areas

    If a U-shaped enclosure of anobstruction has to be allowed for duringerection, e.g for a formwork bracket,then the resulting opening in thescaffold can be closed afterwards withPERI UP.

    The scaffold is erected, as describedin sections A1 A6, either side of theplanned opening as independentscaffolds and anchored to the building.

    When the opening is to be closedproceed as described in section A6Erecting further scaffold levels.

    Insert the UH ledger 3 for the next bayfrom a safe position. This means fittingthe guardrail before entering the newscaffold bay.

    A7 Erecting andadapting sectionsof scaffold

  • 4T425b

    9

    25a

    5

    2

    3

    1a

    5

    T4

    T2a

    T6

    19Assembly Instructions PERI UP Rosett 72 Guidelines

    Compatibility with PERI UP T 72

    The PERI UP Rosett 72 modularscaffold system can easily becombined with PERI UP T 72 facadescaffolding due to the coordinatedsystem design and dimensions of thecomponents.

    The integrated protection against liftingof the decks eliminates any risk oftripping at the interchange betweenthe modular and frame variants andno additional components are requiredto prevent lifting. Thus any combinationeither vertically or horizontally ispossible.

    PERI UP T 72 and PERI UP Rosette 72must be erected according to theofficial assembly and use instructions.

    Possible applications: Variations in height Adding loading platforms

    to existing faade scaffolds Enclosing obstacles e.g. bay

    windows

    The areas of interface betweenPERI UP Rosett and PERI UP T 72 aredescribed in the following sections.

    A8 CombiningPERI UP Rosett 72and PERI UP T 72

  • 25b

    3

    9

    553

    9

    25a

    9

    T4

    47

    20 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI

    UP T 7

    2

    P

    ERI U

    P Rose

    tt 72

    A8.1 Combining side by side

    PERI UP Rosett 72 modular scaffoldis connected to PERI UP T 72 facadescaffold with steel decks UDS 7 andguardrails UVG 9.

    One end of the steel deck UDS 7 sitsin the T-frame UVT T4 and the otherin the decking transom UHD 4.

    Guardrail couplers UPR 25a andguardrail holders UPW 25b are fixedto the vertical standard UVR 5 to allowguardrails UPG 9 to be fitted.

    For this either a guardrail couplerUPR 25a can be inserted into therosette and the bolt fastened oralternatively a guardrail holderUPW 25b is inserted in the rosette ready.

    A8 CombiningPERI UP Rosett 72and PERI UP T 72

  • T 72

    R 72

    T4

    5

    R 72

    T 72

    10c

    T4

    T10

    21Assembly Instructions PERI UP Rosett 72 Guidelines

    A8.2 Combining one abovethe other

    The transition can take place at anyheight.

    A8.2.1 Rosett 72 on T 72

    Fit vertical standards UVR 5 e.g.UVR 200, over the inner and outerspigots of the T- frame UVT T4and continue erecting according to theassembly and use instructions forPERI UP Rosett 72.

    The longitudinal bracing using facebraces UBF T10 is fitted on the lowerPERI UP T 72 only.(See T 72 instructions for assemblyand use Part B anchor pattern).

    At the interface with PERI UP Rosetta coupler brace UBC 10c is fitted abovethe last face brace UBF T10.

    Due to the high rigidity and stiffnessof the PERI UP Rosette/Ledgerconnection no further diagonals arerequired.

    A8.2.2 T 72 on Rosett 72

    Fit T-frame UVT T4 over the spigotsof the vertical standards UVR 5 andcontinue erecting according to theassembly and use instructions forPERI UP T 72.

    A8 CombiningPERI UP Rosett 72and PERI UP T 72

  • T10

    22 Assembly Instructions PERI UP Rosett 72 Guidelines

    A8.3 Interlocking combinations

    PERI UP T 72 faade scaffolding canbe interwoven with Rosett 72 and viceversa.

    There is no restriction to extent orlocation.

    A8.3.1 T 72 in Rosett 72

    Connections at the interface aredescribed in A8.1 and A8.2.

    One face brace UBF T10 must be fittedin every five T 72 bays.

    A8 CombiningPERI UP Rosett 72and PERI UP T 72

  • 23Assembly Instructions PERI UP Rosett 72 Guidelines

    A8.3.2 Rosett 72 in T 72

    Connections at the interface aredescribed in A8.1 and A8.2.

    No diagonals are required in bayserected in Rosett 72 as the ledgersUH 3 fitted as guardrails brace thescaffold.

    A8 CombiningPERI UP Rosett 72and PERI UP T 72

  • 11

    8

    24

    5

    11

    11

    8

    24

    Schutzwand UPP

    Assembly Instructions PERI UP Rosett 72 Guidelines

    Bolt M10

    A9.1 Extending with scaffoldbrackets

    Scaffold brackets allow externalwidening of the scaffold levels by 32,36, 72 or 104 cm.

    Open the integrated coupler to fit theconsole bracket UCB 32 11a, UCB 7211c and UCB 11d. Angle the consolebracket UCB 11 slightly and place thehook around the vertical standard UVR5, and then push back the consolebracket as far as possible, close thecoupler gate and tighten the bolt.

    When fitting console bracket decks atthe same level as the main deck theunderside of the console bracketUCB 11 transom sits on the rosetteof the vertical standard UVR 5.

    The console bracket UCB 36 11b fitson a rosette in the same way as aledger UH 3 and the wedge securedwith a hammer blow.

    A9.1.1 Console bracketsUCB 32 and UCB 36

    A guardrail post UVP 100 8, with aspigot ULT 24 fitted prior to erectionis required on console bracketsUCB 32 11a and UCB 36 11b.

    When attached with bolts the spigotULT 24 cannot fall through the endtube of the console bracket UCB 11and cause damage or injury to scaffoldpersonnel or become detached duringtransportation.

    Vertical standards UVR 5 or topstandards UVH 6 can be used insteadof guardrail posts UVP 100 8.

    A9 Installingsupplementarycomponents

  • 12

    11

    5

    12

    25Assembly Instructions PERI UP Rosett 72 Guidelines

    A9.1.2 Console brackets UCB 72 andUCB 104; Console bracket braceUCP 72/104

    The console brackets UCB 72 11c andUCB 104 11d can, according to useand loads, be used with or without theconsole bracket brace UCP 72/104 12.(See Part B anchor patterns).

    Fit console bracket UCB 11 aspreviously described.

    To fit the console bracket braceUCP 72/104 12 first loosen the bolt tothe attached half swivel coupler. Insertthe spigot into the console brackettube and then turn the console bracketbrace UCP 72/104 12 until the luglocates under the hook. Then fix theconsole bracket brace UCP 72/104 12to the vertical standard UVR 5 usingthe attached half swivel coupler.

    A vertical standard can be attached tothe UCB 72 11c and UCB 104 11dconsole brackets instead of theguardrail post UVP 8.

    A9 Installingsupplementarycomponents

  • 619

    8

    3

    3

    5

    26

    Schutzwand UPP

    Assembly Instructions PERI UP Rosett 72 Guidelines

    A9.2 Protection panel UPP

    The protection panel UPP 19 issuspended from the ledger above thenext scaffold level.

    Suspend the protection panel UPP 19from the ledger UH 3 above using bothhooks.The hooks either side of the protectionpanel UPP 19 must engage the verticalstandard UVR 5 to prevent theprotection panel UPP 19 from comingoff.

    To extend the protection panelUPP 19 fit a vertical standard UVR 5or top standard UVH 6 link with a ledgerUH 3 and suspend the protection panelUPP 19 as before.

    Alternatively vertical standardsUVR 200 5 can be fitted to take twolevels of protection panels UPP 19.

    A9 Installingsupplementarycomponents

  • 18

    3

    1111

    7

    5 7

    23 7

    11

    518

    3

    27Assembly Instructions PERI UP Rosett 72 Guidelines

    A9.3 Overhead protection fans

    Integrated protection fans arenecessary to protect people walkingbelow from falling objects.The covering must be tight fitting tothe building with no gaps.

    Fit a console bracket UCB 72 11c orUCB 104 11d to the external verticalstandard UVR 5, insert the steel decksUDS 7 and slide them towards thebuilding until it locks.

    Loading requirements may prove thatconsole bracket braces UCP 72/10412 have to be fitted.

    Insert the deck gap filler DU 23between the main decking and theconsole bracket decking to close allgaps.

    Then place the protection panelconnector UPC over the spigot on theconsole bracket UCB 11. Fit steeldecks UDS 7, with the upper surfacefacing the building, into the gap in theprotection panel connector 18.

    The fitting of a ledger UH 3 as sideprotection at this level will separatethe working area from the protectionarea.

    For scaffolds without internal bracketsa protection fan can be erected withoutdeck gap fillers UD 23.

    This is achieved by fitting the deckingtransom UHD 4 with the red marks tothe inside and pushing the steel decksUDS 7 to the outside edge (max.distance between deck and buildingno greater than 30 cm).

    A9 Installingsupplementarycomponents

  • 2122

    5

    3

    7

    4

    5

    5

    4

    22

    14 21

    2

    28 Assembly Instructions PERI UP Rosett 72 Guidelines

    A9.4 Bridging

    To bridge openings or entrances tobuildings decks up to 4.00 m can beused. For greater spans scaffold bayscan be erected off steel ULS 21a oraluminium ULA 21b lattice girders(50 or 70 cm deep girders can be useddepending on the loads to be carried).Only couplers complying with DINEN 74 may be used.

    A9.4.1 Assembling of lattice girdersULS/ULA

    Fix right angled couplers to connectthe top chord of the lattice girdersULS/ULA 21 to the vertical standardsUVR 5 either side of the opening atthe required height. With ropes lift thelattice girder ULS/ULA 21 into thecouplers and secure, then connect thebottom chord of the lattice girderULS/ULA to the vertical standardUVR 5 with right angled couplers.

    If the right angled couplers connectingthe lattice girder ULS/ULA 21 to thevertical standard UVR 5 are fitted2 cm beneath the decking transomUHD 4 the steel decks UDS 7 acrossthe girders ULS/ULA 21 will be at thesame level as those in the adjoiningbays.

    Working from within the main scaffoldfit the starter tube ULB 22 over thelattice girder ULS/ULA 21 and placethe collar UVB 24 2 over the spigot ofthe starter tube ULB 22. Then connectinner and outer starter tubes ULB 22with a decking transom UHD 4 andinsert a vertical standard UVR 5 intothe outer collar UVB 24 2.

    In this situation we recom-mend usinga 1.00 m long vertical standard UVR 5.

    Fit a ledger UH 3 at the upper guardraillevel in the outer lattice girder standardand insert a steel deck UDS 7 in thedecking transom UHD 4 connectingthe starter tubes ULB 22.

    Then from the same safe position slidethis assembly on the top chord of the

    lattice girder ULS/ULA 21 using theledger UH 3 and steel deck UDS 7 intothe middle of the span. Then fit thissteel deck UDS 7 and ledger UH 3 intothe already erected bay.

    Link the starter tubes ULB 22 with acoupler transom UHC 14 and thencomplete the decking and guardrailsto all bays.

    A9 Installingsupplementarycomponents

  • 529

    21

    Assembly Instructions PERI UP Rosett 72 Guidelines

    A9.4.2 Assembling lattice girdersULS/ULA with a scaffold

    For fast and safe assembly of latticegirders at low levels.

    As an alternative to the previousmethod, lattice girders may also beinstalled from a scaffold.

    Here, the vertical standards UVR 5 inthe opening are erected approxi-mately5 cm out of line.

    After erecting the second scaffoldlevel, the lattice girders ULS/ULA 21,can be introduced across the openingfrom the first scaffold level platform.

    Continue erecting as previouslydescribed and on completion dismantlethe temporary scaffold in the opening.

    A9 Installingsupplementarycomponents

  • 14

    20

    22

    21

    5

    14

    20

    22

    21

    5

    ) 30

    19

    A

    B

    L

    A

    B

    L

    ) 30

    19

    2

    21

    20

    a 3a 2

    a 1a 3

    a 2a 1

    21

    20

    a 3a 2

    a 1a 3

    a 2a 1

    2

    A B

    30 Assembly Instructions PERI UP Rosett 72 Guidelines

    Bracing withscaffold tubebraces

    Bracing withUWT wall tie

    A9.4.3 Bracing and anchoring thelattice girder ULS/ULA

    The following illustrations show therequired bracing and anchorage for thelattice girders ULS/ULA 21 when usedin the standard configuration detailedin section B4.

    A9.4.4 Bracing with scaffold tube

    The top chord of the lattice girdersULS/ULA 21 are braced with scaffoldtube and swivel or right angledcouplers.

    Anchors and diagonals on the mainscaffold are to be erected accordingto section B.

    When console brackets UCB 11 arerequired they should be fixed to thestarter tube ULB 22.

    A9.4.5 Bracing with wall tie UWT

    As an alternative to bracing withscaffold tubes, the lattice girderULS/ULA 21 can be braced using wallties UWT 20 and right angled couplers.

    A9 Installingsupplementarycomponents

  • a 3

    21

    5

    204

    21

    5

    20

    22

    450

    50

    1619

    ) 30

    50

    50

    1619

    ) 30

    A

    B

    L

    A

    B

    L

    2

    21

    20

    22

    2

    21

    20

    a 1a 2

    a 3a 2

    a 1

    A B

    a 3a 1

    a 2a 3

    a 2a 1

    31Assembly Instructions PERI UP Rosett 72 Guidelines

    Bracing withscaffold tubebraces

    Bracingwith UWTwall tie

    A9.4.6 Bridging with twin latticegirders ULS/ULA

    All four top chords of the lattice girdersULS/ULA 21 must be braced withscaffold tube and swivel couplers.

    Alternatively the top chord of the latticegirders ULS/ULA 21 can be bracedwith wall ties UWT 20 and right angledcouplers.

    Bridging with twin lattice girdersULS/ULA 21 doubles the permissibleload as allowed on individual girders.

    A9 Installingsupplementarycomponents

  • 213

    13

    5

    24

    10a

    1 3

    13

    7

    9

    23

    23

    32 Assembly Instructions PERI UP Rosett 72 Guidelines

    Arrangement 1 Arrangement 2

    A9.5 Pavement gantry UVG

    Safe conditions for pedestrians arecreated using the pavement gantryUVG 13.

    Insert spigots ULT 32 24 in thepavement gantry UVG 13 and securewith bolts. Place the pavement gantryUVG 13 over the adjustable base platesUJB 1.

    Connect pavement gantries UVG 13with ledgers UH 3 fixed at the top andbottom of both inner and outer leg. Tofurther protect pedestrians guardrailsUPG 9 can be fitted to both inner andouter legs. Starting in the middle ofthe transom of the pavement gantryUVG 13 and working outwards fit steeldecks UDS 7 to cover the completepassageway.

    Bracing with ledgers UH 3 anddiagonals 10 is described in the B4anchor patterns.

    Face braces UBF T10 may be fitted tothe pavement gantries UVG 13 in placeof ledger braces UBL 10a.

    Arrangement 1

    From the pavement gantry UVG 13the scaffold is erected firstly withcollars UVB 24 2 fitted over the spigotsULT 32 24. The standards UVR 5 arethen inserted as described in section2.1 and braced with ledgers UH 3.

    If plastic sheeting is to be laid directlyon the pavement gantry decks thisarrangement eliminates the risk ofdamage to the membrane by providingan independent walkway.

    Arrangement 2

    Alternatively erect the verticalstandards UVR 5 directly of the spigotsULT 32 24.

    A9 Installingsupplementarycomponents

  • 33Assembly Instructions PERI UP Rosett 72 Guidelines

    A9.6 Sheeting

    When using nets or tarpaulins ascovering careful attention must be paidto the scaffold anchorage. Thepermeability of the netting and theratio of openings in the faade willdetermine the number of anchorsrequired (see section B4 anchorpatterns).

    The whole scaffold must be cladincluding ends.

    A9.6.1 Covering with nets

    The standard configuration shown insection B4 considers netting with thecoefficients (cf ) 0,6 and cf II ) 0,2). Thenets should have eyelets so that theycan be fitted to the vertical standardUVR 5 with ties at centres no greaterthan 50 cm.

    A9.6.2 Covering with tarpaulin

    The tarpaulin should have eyelets sothat they can be fitted to the verticalstandards UVR 5 with ties at centresno greater than 50 cm.

    A9 Installingsupplementarycomponents

  • 17

    16

    3

    4

    7

    7

    34 Assembly Instructions PERI UP Rosett 72 Guidelines

    To dismantle the scaffold follow steps1 to 6 in reverse.

    In order to ensure the safety of thescaffolders working on the upper levelsof the scaffold the following stepsshould be adhered to.

    1.Remove the toeboard UPT 16, endguardrail frames UPX 17 and the lowerledger UH 3 (middle guardrail). Releaseand remove the top ledger UH 3 (topguardrail) successively working backto the access ladder bay. Remove thelast ledger UH 3 from the access ladderbay only when leaving that level.

    2.Dismantle the steel decks 7 anddecking transom UHD 4 from below.

    3.Then remove the verticalstandard UVR 5.

    4.Repeat steps 1-3.

    A10 Dismantling

  • 35

    6

    6,00

    xxxxx

    xxx

    xxxxx

    x

    Assembly Instructions PERI UP Rosett 72 Guidelines

    B1.1 Belge

    1

    0,75

    xxxxxxx

    xx

    xxxxxx

    xxxxxx

    xxxx

    Weight[kg]

    5,2 7,111,214,117,019,925,9

    25,429,3

    6,28,313,316,720,123,4

    4,55,97,910,313,015,2

    13,316,719,522,0

    2

    1,50

    xxxxxxx

    xx

    xxxxxx

    xxxxxx

    xxxx

    3

    2,00

    xxxxxxx

    xx

    xxxxxx

    xxxxxx

    xxxx

    4

    3,00

    xxxxxx

    xxxxx

    xxxxxx

    xxx

    5

    4,50

    xxxxxx

    xxxx

    xxxxxx

    xx

    Scaffold deck

    Steel decks UDS

    Access deck withladder UAL

    Timber decks UDT

    Aluminium decks UDA

    Length[m]

    0,721,041,502,002,503,004,00

    2,503,00

    0,721,041,502,002,503,00

    0,721,041,502,002,503,00

    1,502,002,503,00

    Width[m]

    0,320,320,320,320,320,320,32

    0,640,64

    0,320,320,320,320,320,32

    0,320,320,320,320,320,32

    0,640,640,640,64

    Load class according toEN 12811

    Uniformly distributed load p [kN/m2]

    x = permissible = not permissible

    B1.1 Decks

    The standard configurationconsidered in theseinstructions limit the use toload classes 1-3 due to the70 cm width of the scaffold.

    B1 Load capacity

  • La1

    a2

    a3

    a3

    a2

    a1

    36 Assembly Instructions PERI UP Rosett 72 Guidelines

    B1.2 Lattice girders

    Span L = 600 cm

    Span L = 800 cmTwo single loads at distance of 250 cm from the supports

    Type

    Depth /Length

    [cm/cm]

    50/42550/52570/52550/42550/52570/525

    50/52550/62550/52550/62570/52570/62570/52570/625

    50/62570/62570/82550/62570/62570/825

    70/82570/825

    70/82570/825

    Endchord

    connection

    bottom/top

    []

    NK/NKNK/NK

    NK/NKNK/NK

    NK/NKNK/NKNK/NKNK/NK

    NK/NK

    NK/NKNK/NK

    NK/NK

    NK/NKNK/NK

    NK/NKNK/NK

    Centrepointload

    perm. F

    [kN]

    6,36,3

    16,316,3

    6,36,315,615,6

    3,5

    5,013,1

    15,9

    2,213,2

    2x 2,52x 8,2

    Endchord

    connection

    bottom/top

    []

    NK/NKNK/NKNK/NKNK/NK

    NK/UNKNK/UNK

    NK/NKNK/NKNK/NK

    UNK/NKNK/NKNK/NK

    UNK/NKUNK/NK

    NK/NKNK/NKNK/NKNK/NK

    NK/UNKNK/UNK

    NK/NKNK/NK

    NK/NKUNK/NK

    a2

    [cm]

    100100100

    100100

    100100

    100100100

    4x100

    300

    a3

    [cm]

    100100100

    250

    Span L = 400 cm

    a1

    [cm]

    200200200100100100

    250250150150250250150150

    300300300100100100

    400

    250

    Aluminiumlattice girder

    ULA HD

    Steel latticegirder ULS

    NK: Right angled coupler class B, EN 74 (SWL 9 kN)UNK: Right angled coupler with a check coupler class BB (15kN)

    Span L = 500 cm

    Span L = 800 cm

    Spacing ofgirder bracing

    2x125 + 3x100 + 2x125

    Centrepointload

    perm. F

    [kN]

    15,115,120,730,730,731,1

    15,115,127,227,420,720,729,129,1

    8,812,112,123,226,826,6

    5,422,5

    2x 6,02x 14,6

    B1 Load capacity

  • 37Assembly Instructions PERI UP Rosett 72 Guidelines

    Anchorpattern

    8,0 m offset

    4,0 moffset

    2,0 m

    Baylength

    1,0

    1,2

    2,3

    2,8

    1,2

    1,4

    2,5

    3,0

    5,0

    6,0

    2,3

    2,3

    3,2

    3,4

    1,6

    1,7

    3,4

    3,6

    3,4

    3,6

    2,3

    2,3

    3,2

    3,4

    1,6

    1,7

    3,4

    3,6

    3,4

    3,6

    Standard configurationwith open facade*

    Standard configurationwith closed facade*

    Cladding

    with nets

    with nets

    withtarpaulin

    withtarpaulin

    PERI UP Rosett 72

    A[kN]

    A'[kN]

    A'II[kN]

    A[kN]

    A'[kN]

    A'II[kN]

    Anchor load for

    Singlewall ties Triangulated anchors

    2,3

    2,3

    2,6

    2,8

    3,4

    3,6

    3,1

    3,6

    3,5

    4,2

    5,0

    6,0

    2,3

    2,3

    2,6

    2,8

    3,4

    3,6

    B2.1 Triangulated anchorsor single wall ties

    Singlewall ties Triangulated anchors

    * open facade - closed facade dependson the ratio of net area of the facade An(with the openings deducted) and thegross area of the facade Ag:

    = 1,0 : closed facade

    = 0,4 : open facade

    AnAgAnAg

    AnAg

    B2 Anchor forces

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    2,5 m

    3,0 m

  • 38 Assembly Instructions PERI UP Rosett 72 Guidelines

    B2.2 Wall ties

    Anchorpattern

    8,0 moffset

    4,0 moffset

    2,0 m

    1,5

    1,5

    1,7

    1,9

    2,2

    2,4

    1,0

    1,2

    2,3

    2,8

    1,2

    1,4

    2,5

    3,0

    5,0

    6,0

    1,5

    1,5

    2,1

    2,3

    1,1

    1,1

    2,2

    2,4

    2,2

    2,4

    Cladding

    with nets

    with nets

    withtarpaulin

    withtarpaulin

    PERI UP Rosett 72

    A[kN]

    Baylength

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    2,5 m

    3,0 m

    3,1

    3,6

    3,5

    4,2

    5,0

    6,0

    Standard configurationwith open facade*

    Standard configurationwith closed facade*

    AII[kN]

    A[kN]

    AII[kN]

    Anchor load for

    Wall tie

    * open facade - closed facade dependson the ratio of net area of the facade An(with the openings deducted) and thegross area of the facade Ag:

    = 1,0 : closed facade

    = 0,4 : open facade

    AnAgAnAg

    AnAg

    B2 Anchor forces

  • 0,72

    Fi

    0,72

    Fa

    39Assembly Instructions PERI UP Rosett 72 Guidelines

    Internal leg load

    External leg load

    16 m24 m 8 m

    Equipment

    Without internalconsole bracket

    With internal consolebracket UCB 32

    Without externalconsole bracket

    With external consolebracket UCB 32

    With external consolebracket UCB 72

    With external consolebracket UCB 104

    Protection panel (additionalto console bracket or frame)

    Protective fan on consolebracket UCB 72 (includesconsole bracket UCB 72)

    Protective fan on consolebracket UCB 104 (includesconsole bracket UCB 104)

    Baylength

    [m]

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    2,5

    3,0

    Fi[kN]

    7,0

    8,0

    12,8

    14,9

    Fa[kN]

    10,7

    12,1

    Fi[kN]

    5,5

    6,3

    10,2

    11,8

    Fa[kN]

    7,9

    9,0

    Fi[kN]

    3,9

    4,6

    7,5

    8,8

    Fa[kN]

    5,2

    6,0

    Height of scaffold

    Additional to Fa per level [kN]

    1,9

    2,3

    4,0

    4,7

    6,3

    7,4

    0,6

    0,7

    1,4

    1,6

    1,6

    1,8

    PERI UP Rosett 72For use up to load class 3 (2,00 kN/m2)(One working platform)

    B3 Reaction forces

  • 1,76

    0,72

    Fa Fi

    FDa FDi

    40 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI UP T 72For use up to load class 3 (2,00 kN/m2)(One working platform)

    Pavement Gantry

    FDa[kN]

    0,4 x Fa

    FDi[kN]

    Fi+0,6 x Fa

    Bridgings

    FUa[kN]

    FUi[kN]

    L

    Fa Fi

    FUa FUi

    F F F F F

    FU FUL L

    Bay lengthL [m]

    L = 8,0 m

    2,10 x Fa

    1,85 x Fa

    2,10 x Fi

    1,85 x Fi

    2,50

    3,00

    Fa , FI to be choosen forrequired bay length L.

    L = 6,0 m

    1,70 x Fa

    1,50 x Fa

    1,70 x Fi

    1,50 x Fi

    2,50

    3,00

    L = 5,0 m

    1,50 x Fa

    1,35 x Fa

    1,50 x Fi

    1,35 x Fi

    2,50

    3,00

    L = 4,0 m

    1,30 x Fa

    1,20 x Fa

    1,30 x Fi

    1,20 x Fi

    2,50

    3,00

    F F

    B3 Reaction forces

  • 41Assembly Instructions PERI UP Rosett 72 Guidelines

    B4.1 General

    On the following pages variousanchor patterns, for use on PERI UPRosett 72, are shown for differentcombinations of components i.e.inside console brackets, fans etc. forboth unclad scaffolds and scaffoldswith nets or tarpaulins.

    The diagrams indicate the anchortype, position and number togetherwith any additional ledgers/transomsand braces as well as maximum jackextension for different combinationsof supplementary components.

    There are two basic arrangements:Basic arrangement 1 (page 48)For unclad scaffolds andNetted scaffolds in front of closedfacadesBasic arrangement 2 (page 64)For netted scaffolds in front of openfacades andTarpaulin clad scaffolds

    Please note:

    All anchors, diagonals and horizontalledgers in the basic arrangements(shown in grey) must be fitted.

    When fitting supplementarycomponents additional anchors,diagonals and horizontal ledgers(shown in black) must also be fitted.

    Where console brackets are shownexternally they may only be fitted onone level but that level may be atany height.

    If the scaffold is erected withoutcollars UVB 24 the maximum jackextension, as shown in the diagrams,must be reduced by 26 cm.

    Where the diagram shows 2 deckingtransoms UHD, one 50 cm abovethe other, a base frame UVF may besubstituted.

    Application:The scaffold, for the appropriateload class, may be used inaccordance with the minimumrequirements of the EuropeanSafety and Health Directive for theuse of work equipment by workersat work (89/655/EEC).

    The following applies to allanchor patterns:Scaffolding to the standardconfiguration with a maximumheight of 24.00 m and max. jackextension.3.00 m bay lengthsLoading up to scaffold group 3(2.00 kN/m2) with working load onone platform level only.Scaffold in front of open, where upto 60% of the face area containsopenings, or closed facades.

    For unclad scaffolds in front ofclosed facades the followingvariations are allowed at theend bays.

    Anchor loads and support reactionscan be taken from Table B2.

    In the basic arrangement 1two single wall ties and onetriangulated anchor in place of threewall ties every 5th bay.

    or

    In the basic arrangement 2, twotriangulated anchors can beused in place of three wall ties every5th bay.This means that the plan bracecan be omitted.

    or

    8 m

    4 m

    8 m

    8 m

    n * 5 baysor

    n * 5 bays

    B4 Anchor patterns

  • 104

    Rosett72

    GG3

    h

    32

    32

    72

    104

    104

    72

    72

    72

    4m

    8m

    72

    6m

    104

    72

    32

    42 Assembly Instructions PERI UP Rosett 72 Guidelines

    B4.2 Key

    on console bracket UCB 104 withconsole bracket brace

    PERI UP Rosett 72load class 3(2,0 kN/m2)

    Maximum jack extensionHeight h (including plate and nut)

    without console bracket

    External console brackets UCB 32or UCB 36, UCB 72

    Internal console bracketUCB 32 or UCB 36

    Internal console bracket UCB 32 / UCB 36and external console bracket UCB 72

    Protective fan

    on console bracket UCB 72

    Protection panel

    on console bracket UCB 72 withconsole bracket brace

    on frame

    on console bracket UCB 32

    on console bracket UCB 104 withconsole bracket brace

    Bridging

    4,0 m, with steel decks

    6,0 m, with lattice girders

    8,0 m, with lattice girders

    Pavement gantry

    Scaffolding with nets

    for closed facade

    for open facade(with 60% openings)

    for open facades(with 60% openings)

    Extension console brackets

    Internal console bracket UCB 32 / UCB 36External console bracket UCB 32 / UCB 36

    Scaffolding with tarpaulin

    for closed facades

    Internal console bracket UCB 32 / UCB 36and external console bracket UCB 104with console bracket brace

    nets

    tarp

    sta

    rps

    nets

    External console bracket UCB 104with console bracket brace

    on console bracket UCB 72 withconsole bracket brace

    B4 Anchorpatterns

  • 32 104

    104

    104 104

    104

    72

    32

    32

    4m

    104

    6m

    8m

    32

    72

    32

    104

    104

    104

    72

    32

    32

    32

    72

    72

    72

    72

    43Assembly Instructions PERI UP Rosett 72 Guidelines

    or protectionpanel

    B4.3 Overview of equipmentcombinations

    PERI UP Rosett 72: For use up to scaffold group 3

    Page

    B4.5.1 Minimum anchorpositions 46

    B4.5.2 Basicarrangement 1 478 m offsetanchor pattern

    B4.5.3 Version 1 48

    B4.5.4 Version 2 49

    B4.5.5 Version 3 50

    B4.5.6 Version 4 51

    B4.5.7 Version 5 52

    B4.5.8 4.00 m bridging 53

    B4.5.9 6.00 m bridging 54

    B4.5.10 8.00 m bridging 55

    Unclad

    or protectionfan

    Extensionconsole brackets

    BridgingPavement

    gantrycladding

    The grey fields are possible but arenot featured here.

    Further combinations are listed in B5.

    B4 Anchorpatterns

  • 104

    104

    72

    72

    32

    104104

    72

    104104

    32

    32

    104

    32

    72

    104

    104

    104

    7272

    44 Assembly Instructions PERI UP Rosett 72 Guidelines

    B4.3 Overview of equipmentcombinations

    PageBridgingPavementgantry

    cladding

    PERI UP Rosett 72: For use up to scaffold group 3

    B4.5.11 Pavement gantry 56

    B4.5.12 Pavement gantry 57

    B4.5.13 Top level notanchored 58

    B4.6.1 Closed facade,min. anchoringpositions 598.00 m offset anchor pattern

    B4.6.2 Closed facadeVersion 1 60

    B4.6.3 Closed facadeVersion 2 61

    B4.6.4 Closed facadeVersion 3 62

    B4.6.5 Open facadeBasicarrangement 2 634.00 m offset anchor pattern

    B4.6.6 Open facadeVersion 1 64

    B4.6.7 Open facadeVersion 2 65

    B4.6.8 Open facadeVersion 3 66

    Extensionconsole brackets Unclad

    Nets

    or protectionpanel

    or protectionfan

    The grey fields are possible but arenot featured here.

    Further combinations are listed in B5.

    B4 Anchorpatterns

    nets

    nets

    nets

    nets

    nets

    nets

    nets

    nets

  • 104

    104

    104

    104

    104

    104

    104

    104

    104

    104

    45Assembly Instructions PERI UP Rosett 72 Guidelines

    B4.3 Overview of equipmentcombinations

    PageBridgingPavementgantry

    cladding

    PERI UP Rosett 72: For use up to scaffold group 3

    B4.7.1 Closed facadeMin. anchorpositions 67

    B4.7.2 Closed facadeVersion 1 68

    B4.7.3 Open facadeMin. anchorpositions 69

    B4.7.4 Open facadeVersion 1 70

    Extensionconsole brackets Tarpaulin

    or protectionpanel

    or protectionfan

    tarp

    sta

    rps

    tarp

    sta

    rps

    The grey fields are possible but arenot featured here.

    Further combinations are listed in B5.

    B4 Anchorpatterns

  • 46 Assembly Instructions PERI UP Rosett 72 Guidelines

    B4.4 Legend

    protectionpanel

    single wall tie

    wall tie

    triangulated anchor

    pressure-resistant ties

    anchor type:

    ledger UHledger brace UBL

    tie

    clos

    ed f

    acad

    e

    internalconsolebracket

    open

    fac

    ade

    access ladder bay

    externalconsolebracket

    2 x ledger UH

    horizontal brace UBH

    ledger brace UBL

    consolebracketbrace

    protectivefan

    deckingtransom

    protective fan

    2. deckingtransoms UHD

    Ledger UH asguardrail

    deck level

    ledger UH in thelevel of deck

    AB A B

    Cladding(nets, tarpaulin)

    Ledger UH asintermediateguardrail

    cladding(nets, tarpaulin)

    B4 Anchorpatterns

  • 32

    ) 0,30m0,72m

    8m

    ) 0,3m

    ) 0,3m

    4m8m

    0,72m0,72m

    "A" "B" "A" "B"

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    50

    32

    UHUHUHUH

    47Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    H )

    24m

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    UH UBL 2x UHDUHUH

    or

    Rosett72

    GG3

    UBL

    B4.5.1 Unclad,minimumanchor positions

  • ) 0,3m

    ) 0,62m0,72m

    8m

    4m8m

    0,72m0,72m

    "A" "B" "A" "B"

    30

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    ) 0,3m

    48 Assembly Instructions PERI UP Rosett 72 Guidelines

    wall tie

    single wall tie

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Note: The side protection is not complete shown for static purposes only

    Standard configuration for open and closed facades

    H )

    24m

    UH UBL

    8 m offset anchor pattern

    UH2x UHD

    Rosett72

    GG3

    UH

    2x UH

    UBL

    B4.5.2 UncladBasic arrangement 18.00 m offset pattern

  • ) 0,62m0,72m

    8m

    4m8m

    ) 0,3m

    0,72m0,72m

    "A" "B""A" "B"

    ) 0,3m

    35

    32

    32

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    49Assembly Instructions PERI UP Rosett 72 Guidelines

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    H )

    24m

    UH 2x UH

    or

    UH

    2x UHD

    Rosett72

    GG3

    UBL

    UBL UH

    UH

    B4.5.3 UncladBasic arrangement 1Version 1

  • ) 0,62m0,72m

    8m

    4m8m

    ) 0,3m

    0,72m0,72m

    "A" "B" "A" "B"

    ) 0,3m

    35

    32

    32

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    72

    72

    72

    50 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    UH UBL

    or

    UH

    2x UHD

    Rosett72

    GG3

    UH

    2x UHUH

    UBLUH

    B4.5.4 UncladBasic arrangement 1Version 2

  • ) 0,62m0,72m

    0,72m

    8m

    4m8m

    0,72m

    "A" "B" "A" "B"

    0,72m 0,72m

    72

    72

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    ) 0,3m

    ) 0,3m

    30

    51Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    H )

    24m

    UH UBLUH

    or

    UH

    2x UHD

    Rosett72

    GG3

    UH

    UH

    UH UBL

    2x UH

    B4.5.5 UncladBasic arrangement 1Version 3

  • ) 0,62m0,72m

    0,72m

    8m

    4m8m

    0,72m

    "A" "B" "A" "B"

    1,04m 1,04m

    20

    104

    104

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    ) 0,3m

    ) 0,3m

    52 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-690Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    UH UBL

    or

    UH

    2x UHD

    Rosett72

    GG3

    UH

    UH

    UBL2x UH

    UBL

    B4.5.6 UncladBasic arrangement 1Version 4

  • 104

    0,72m

    8m

    4m8m

    0,72m

    "A" "B" "A" "B"

    ) 0,3m

    ) 0,3m

    0,72m

    104 104

    1,04m

    104

    104

    ) 0,62m0,72m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    20

    53Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    H )

    24m

    UH UBL

    or

    2x UHD

    UH

    Rosett72

    GG3

    UH

    UH

    2x UH

    UBL

    B4.5.7 UncladBasic arrangement 1Version 5

    Rosett72

    GG3

  • ) 3,0m

    ) 0,3m

    ) 0,62m0,72m

    2,5m 4,0m 2,5m ) 3,0m 2,0m 4,0m 2,0m ) 3,0m

    "A" "B""A" "B"

    8m

    4m8m

    ) 0,3m

    0,72m0,72m

    35

    4m

    54 Assembly Instructions PERI UP Rosett 72 Guidelines

    wall tie

    single wall tie

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Note: The side protection is not complete shown for static purposes only

    Standard configuration for open and closed facades

    H )

    24m

    UH

    UH

    2x UHD

    Rosett72

    GG3

    UH

    2x UH UH UBL

    UH UBL

    with adjoining bays2,5 m

    with adjoining bays) 2,0 m

    B4.5.8 UncladBasic arrangement 14.00 m bridging

  • 104

    ) 0,62m0,72m

    0,72m

    "A" "B""A" "B"

    8m

    4m8m

    ) 0,3m

    0,72m

    1,04m

    6,0m

    6m

    104

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    1,04m

    ) 0,3m

    104

    104

    72

    20

    55Assembly Instructions PERI UP Rosett 72 Guidelines

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    H )

    24m

    UH

    UH

    2x UHD

    2x UH

    or

    Rosett72

    GG3

    2x UH UBL

    UBL

    UH

    UH

    UH

    B4.5.9 UncladBasic arrangement 16.00 m bridging

  • 32

    32

    ) 0,62m0,72m

    ) 0,3m

    "A" "B""A" "B"

    4m8m

    ) 0,3m

    0,72m0,72m3,0m 2,5m 3,0m 2,5m 3,0m

    (3,0m) (2,0m) (3,0m)

    20

    8m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    8m

    104

    0,32m 0,32m

    104

    72

    56 Assembly Instructions PERI UP Rosett 72 Guidelines

    wall tie

    single wall tie

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Note: The side protection is not complete shown for static purposes only

    Standard configuration for open and closed facades

    H )

    24m

    UH 2x UH

    UH

    or

    2x UHD

    Rosett72

    GG3

    UH

    UBL

    UBL

    B4.5.10 UncladBasic arrangement 18.00 m bridging

  • ) 0,3m

    ) 0,30m

    1,76m

    "A" "B""A" "B"

    4m8m

    2m8m

    32

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    ) 0,3m

    1,76m

    0,72m

    1,76m

    0,72m

    32

    25

    72

    57Assembly Instructions PERI UP Rosett 70 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 70

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    H )

    24m

    UH 2x UBL transverse diagonals

    UBL

    or

    Rosett70

    GG3

    UH

    2x UH

    UH

    B4.5.11 UncladPavement gantrymin. anchor positions

  • 104

    ) 0,62m1,76m

    "A" "B""A"

    ) 0,3m

    ) 0,3m

    4m8m

    2m8m

    0,72m

    "B"

    1,04m

    20

    72

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    104

    1,76m

    0,72m

    1,76m

    0,72m

    58 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    UH 2x UBL transverse diagonals

    UBL

    or

    Rosett72

    GG3

    UH

    2x UH

    UH

    B4.5.12 UncladBasic arrangement 1Pavement gantry

  • "A" "B" "A" "B"

    ) 0,3m

    ) 0,3m

    59Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facades

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    UVR 200

    locking pin

    UVR 200

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Note: The side protection is not complete shown for static purposes only

    locking pin

    UCB 32(UCB 36)

    UH

    UHD 72UWT 110

    UPT

    Rosett72

    GG3

    UH

    B4.5.13 UncladBasic arrangement 1Top level not anchored

  • ) 0,3m0,72m

    "A" "B""A" "B"

    4m8m

    ) 0,3m

    0,72m0,72m

    8m

    ) 0,3m

    50

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    60 Assembly Instructions PERI UP Rosett 72 Guidelines

    wall tie

    single wall tie

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Note: The side protection is not complete shown for static purposes only

    Standard configuration for open and closed facades

    H )

    24m

    UH UBL

    nets

    nets

    UBL2x UHD

    Rosett72

    GG3

    UH

    UH nets

    UH

    B4.6.1 Net closedfaade, minimumanchor positions

    nets

  • 32

    ) 0,62m0,72m

    "A" "B""A" "B"

    4m8m

    ) 0,3m

    0,72m0,72m

    ) 0,3m

    8m

    35 32

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    61Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    UH

    H )

    24m

    nets

    nets

    UH

    2x UHD

    or

    Rosett72

    GG3

    UH

    2x UH

    UBL

    UHUBL

    UH nets

    B4.6.2 Net closed faadeVersion 1

    nets

  • 72

    ) 0,62m0,72m

    0,72m

    "A" "B""A" "B"

    8m

    4m8m

    ) 0,3m

    0,72m

    ) 0,3m

    0,72m 0,72m

    30 72

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    62 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    UH 2x UH

    nets

    nets

    UH

    2x UHD

    or

    Rosett72

    GG3

    UH

    UH

    UBL

    UH

    UH

    UBL nets

    B4.6.3 Net closed faadeVersion 2

    nets

  • 104

    ) 0,62m0,72m

    "A" "B""A" "B"

    4m8m

    ) 0,3m

    0,72m0,72m

    ) 0,3m

    1,04m1,04m

    20 104

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    8m

    104

    104104

    63Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    UH

    H )

    24m

    UBL

    nets

    nets

    2x UH

    UH

    or

    2x UHD

    2x UH

    Rosett72

    GG3

    UH

    UH

    UH

    UBL UH nets

    B4.6.4 Net closed faadeVersion 3

    nets

  • 2m4m

    4m

    4m4m

    ) 0,30m0,72m

    0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    ) 0,3m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    50

    64 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    H )

    24m

    nets

    nets

    2x UHD

    Rosett72

    GG3

    nets

    UH

    4 m offset anchor pattern

    B4.6.5 Net - open faadeBasic arrangement 24.00 m offset anchor pattern

    nets

  • 104

    ) 0,30m0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    ) 0,3m

    1,04m1,04m

    0,72m

    4m2m

    4m

    4m4m

    4m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    20 104

    65Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    H )

    24m

    nets

    nets

    UH

    or

    2x UHD

    Rosett72

    GG3

    UH

    netsUH

    B4.6.6 Net - openfaade, Basic arrange-ment 2, Version 1

    nets

  • ) 0,62m0,72m

    0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    ) 0,3m

    2m4m

    4m

    4m4m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    50

    66 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    UBH

    nets

    nets

    UH 2x UHD

    Rosett72

    GG3

    UH

    nets

    UH UBL

    UBL UH

    B4.6.7 Net - openfaade Basic arrange-ment 2, Version 2

    nets

  • 104

    ) 0,62m0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    ) 0,3m

    1,04m1,04m

    0,72m

    4m2m

    4m

    4m4m

    4m

    20 104

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    104

    104104

    67Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    wall tie

    single wall tie

    Note: The side protection is not complete shown for static purposes only

    H )

    24m

    nets

    nets

    UHUBH

    or

    2x UHD

    Rosett72

    GG3

    UH

    UH UBL

    UBL UH nets

    B4.6.8 Net - openfaade, Basic arrange-ment 2, Version 3

    nets

  • ) 0,30m0,72m

    0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    ) 0,3m

    2m4m

    4m

    4m4m

    50

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    104

    1,04m

    104

    68 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only

    wall tie

    H )

    24m

    tarp

    aulin

    tarp

    aulin

    pressure-resistant ties

    or

    2x UHD

    Rosett72

    GG3

    UH

    tarpaulin

    UH

    UH

    B4.7.1 Tarpaulin -closed faade,min. anchor positions

    tarp

    s

  • 104

    ) 0,62m0,72m

    0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    2m4m

    4m

    4m4m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    20 104 104

    ) 0,3m

    1,04m

    104104

    69Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Note: The side protection is not complete shown for static purposes only

    wall tie

    pressure-resistant ties

    H )

    24m

    tarp

    aulin

    tarp

    aulin

    UBH

    or

    2x UHD

    Rosett72

    GG3

    UH

    UH

    UH

    UBL

    UBL

    UH

    UH tarpaulin

    B4.7.2 Tarpaulin -closed faadeVersion 1

    tarp

    s

  • 104

    4m

    ) 0,30m0,72m

    0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    2m4m

    4m

    4m4m

    50

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    104

    1,04m

    ) 0,3m

    70 Assembly Instructions PERI UP Rosett 72 Guidelines

    PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Standard configuration for open and closed facades

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    tarp

    aulin

    tarp

    aulin

    or

    Rosett72

    GG3

    UH

    UH

    UH tarpaulin

    B4.7.3 Tarpaulin -open faade,min. anchor positions

    tarp

    s

  • 104

    104

    ) 0,62m0,72m

    "A" "B""A" "B"

    ) 0,3m

    0,72m

    ) 0,3m

    1,04m1,04m

    0,72m

    4m2m

    4m

    ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m

    104

    4m4m

    4m

    20

    104104

    71Assembly Instructions PERI UP Rosett 72 Guidelines

    Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / [email protected]

    Modular Scaffolding PERI UP Rosett 72

    Note: The side protection is not complete shown for static purposes only wall tie

    single wall tie

    H )

    24m

    tarp

    aulin

    tarp

    aulin

    UHUBH

    or

    Rosett72

    GG3

    UH

    UH

    UH tarpaulin

    UBLUH

    UBL

    B4.7.4 Tarpaulin -open faadeVersion 1

    tarp

    s

  • 72

    - x x x x x x x x x - x x - x x x - - x x - x - x

    x - x x x x x - x x x x - x x x - x - x x x x x

    - - - - x x 51 - x - - x - - x x - x - x x x x x

    - - - - - x x - x - - x - - - x - x - x x x x x

    x 50 x x x x x - x x x x x x x x 50 x x x x x x x

    50 50 50 x 50 50 x 50 x x - - 50 50 50 x 50 50 50 x 50 x 50 x

    53 53 53 53 53 53 x 53 x x - - 53 53 53 x 53 53 53 x 53 x 53 x

    x

    x

    x

    x x

    Assembly Instructions PERI UP Rosett 72 Guidelines

    key to page

    cladding without

    open

    nets

    closed open closed openfacades

    internal console bracketUCB 32/36

    external consolebracket

    max. one levelon any level +top level pro-tection panel

    tarpaulin

    x Permitted in accordance with this instruction booklet

    - Not permitted according to this instruction booklet

    49 Additional ties and components as detailed on page 49

    protection panel onexternal standard

    fan protection

    bridging

    pavement gantry

    UCB32

    UCB72

    UCB104

    UCB72

    UCB104

    4 m

    6 m

    8 m

    B5.1 Componentcombinations

    47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71

  • 50 / 525 50 / 625 70 / 525 70 / 625 50 / 525 50 / 625 50 / 525 50 / 625 50 / 625 70 / 625 70 / 825 50/ 625 70/ 825 70/ 825

    250 100 250 100 250 100 250 100 100 100 250 250 300 100 300 100 300 100 300 100 300 100 100

    x x x x x x x x x x x x x x - x - x - - - x x x

    x x x x x x x x x x - - x x - x - x - x1) - x x2) x

    x x x x x x x x x x - - x2) x - x - x - - - x1) - x

    - x - x x x x x - - - - - x - x - x - - - - - -

    x x x x x x x x x x x x x2) x x x x x - - - - x2) x

    - x - x x x x x - - x x x x - x - x - - - - x -

    - x - x x x x x - - - - x x - x - x - - - - - -

    73Assembly Instructions PERI UP Rosett 72 Guidelines

    Spacing ofadditionalbracing [cm]

    size

    internal consolebracket UCB 32/36

    externalconsolebracket

    max. onelevel on anylevel + toplevelprotectionpanel

    UCB32

    UCB72

    UCB104

    span

    5 m 6 m 8 m

    lattice girderst

    eel U

    LS

    alu

    min

    ium

    ULA

    twin

    alu

    min

    ium

    ULA

    twin

    alu

    . ULA

    stee

    l ULS

    alu

    min

    ium

    ULA

    stee

    l ULS

    twin

    alu

    . ULA

    Protection panel onexternal standard

    fan pro-tection

    UCB72

    UCB104

    x Permitted for the standard configuration

    - Not permitted on the standard configuration

    1) Protection panel on external console bracket not permitted

    2) Protection panel on external console bracket not permitted with protection fan

    B5.2 Use oflattice girders

  • 74 Assembly Instructions PERI UP Rosett 72 Guidelines

    Item no. Description Weight [kg]

    Adjustable base plates

    100411 Adjustable base plate UJB 38-50/30 3,3

    100242 Adjustable base plate UJB 38-80/55 4,5

    100159 Swivel base spindle UJS 38-80/55 4,8

    100863 Handle lock UJS 1,0

    019780 Heavy duty adjustable base plate TR 38-70/50 5,2

    100244 Base plate UJP 1,2

    Frames T 72

    100200 Base frame UVF 72/124 12,4 100170 Base frame UVF 72/174 20,6 100212 T-frame UVT 72/200 14,7 100217 L-frame UVL 72/100 8,1

    Tubes T 72

    100220 Spigot tube UV 165 7,5

    100222 Guardrail post UVP 100 4,5

    Bracing UBF

    100247 Standard diagonal bracing UBF 150/200 5,4

    100253 Standard diagonal bracing UBF 200/200 6,0

    100257 Standard diagonal bracing UBF 250/200 6,8

    100261 Standard diagonal bracing UBF 300/200 7,5

    Components listPERI UP

  • 75Assembly Instructions PERI UP Rosett 72 Guidelines

    Item no. Description Weight [kg]

    Steel decks UDS

    100488 Steel deck UDS 32 x 72 5,2

    100486 Steel deck UDS 32 x 104 7,1

    100355 Steel deck UDS 32x150 11,2

    100373 Steel deck UDS 32x200 14,1

    100375 Steel deck UDS 32x250 17,0

    100377 Steel deck UDS 32x300 19,9

    100820 Steel deck UDS 32x400 25,9

    102605 Deck link plate UED 0,4

    Timber decks UDT

    on request Wood deck UDT 32 x 72 6,2

    on request Wood deck UDT 32 x 104 8,3

    on request Wood deck UDT 32x150 13,3

    on request Wood deck UDT 32x200 16,7

    on request Wood deck UDT 32x250 20,1

    on request Wood deck UDT 32x300 23,4

    Aluminium decks UDA

    on request Aluminium deck UDA 32 x 72 4,5

    on request Aluminium deck UDA 32x104 5,9

    on request Aluminium deck UDA 32x150 7,9

    on request Aluminium deck UDA 32x200 10,3

    on request Aluminium deck UDA 32x250 13,0

    on request Aluminium deck UDA 32x300 15,2

    on request Aluminium deck UDA 64x150 13,2

    on request Aluminium deck UDA 64x200 16,4

    on request Aluminium deck UDA 64x250 19,5

    on request Aluminium deck UDA 64x300 22,6

    Access decks UAL

    100524 Access deck with ladder 64 x 250/3 25,5

    100523 Access deck with ladder 64 x 300/3 29,4

    Decking gap fillers UD

    101360 Decking gap filler UD 7/150 2,4

    101372 Decking gap filler UD 7/200 3,2

    101373 Decking gap filler UD 7/250 3,9

    101375 Decking gap filler UD 7/300 4,7

    on request Decking gap filler UD 7/400 6,2

    Components listPERI UP

  • 76 Assembly Instructions PERI UP Rosett 72 Guidelines

    Item no. Description Weight [kg]

    Guardrails UPG

    100265 Guardrail UPG 150 2,4

    100266 Guardrail UPG 200 3,2

    100267 Guardrail UPG 250 4,0

    100268 Guardrail UPG 300 4,8

    100810 Guardrail UPG 400 9,1

    Toe boards UPT

    100381 Toe board UPT 150 4,5

    100390 Toe board UPT 200 5,5

    100393 Toe board UPT 250 6,5

    100396 Toe board UPT 300 7,5

    100816 Toe board UPT 400 9,5

    108068 Toe board wood UPT-2 150 4,1

    108114 Toe board wood UPT-2 200 4,9

    108117 Toe board wood UPT-2 250 6,3

    108120 Toe board wood UPT-2 300 7,3

    108204 Toe board wood UPT-2 400 9,5

    End guardrail frames UPX

    101579 End guardrail frames UPX 32 4,0

    100444 End guardrail frames UPX 72 7,3

    100349 End guardrail frames UPX 104 9,3

    Components listPERI UP

  • 77Assembly Instructions PERI UP Rosett 72 Guidelines

    Item no. Description Weight [kg]

    Vertical and horizontal elements

    100014 Collar UVB 24 2,5

    102859 Standard UVR 50 3,1

    101306 Standard UVR 100 5,5

    102860 Standard UVR 150 7,8

    100009 Standard UVR 200 10,1

    100012 Standard UVR 300 14,8

    100013 Standard UVR 400 19,4

    101309 Top standard UVH 50 2,3

    100000 Top standard UVH 100 4,7

    100003 Top standard UVH 150 7,0

    100005 Top standard UVH 200 9,3

    100007 Top standard UVH 250 11,7

    100440 Ledger UH 72 2,4

    100192 Ledger UH 104 3,3

    100021 Ledger UH 150 4,7

    100023 Ledger UH 200 6,0

    100025 Ledger UH 250 7,3

    100027 Ledger UH 300 8,7

    100029 Ledger UH 400 11,4

    100017 Ledger UH 75 2,5

    101159 Ledger UH 100 3,2

    100031 Decking transom UHD 72 4,3

    100039 Decking transom UHD 104 5,2

    100076 Decking transom UHD 150 8,1

    100079 Decking transom UHD 200 10,0

    100082 Decking transom UHD 250 12,1

    100085 Decking transom UHD 300 14,2

    Components listPERI UP