PERI UP Rosett Flex The modular system scaffolding flexible – safe – fast

Upload: others

Post on 03-Apr-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett FlexThe modular system scaffoldingflexible – safe – fast

Page 2: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

Edition 02 | 2014

PERI GmbHFormwork Scaffolding EngineeringRudolf-Diesel-Strasse 1989264 WeissenhornGermanyTel. +49 (0)7309.950- 0Fax +49 (0)7309.951- [email protected]

Important Notes:

Without exception, all current safety regulations must be observed in those countries where our products are used.

The photos shown in this brochure feature con struction sites in progress. For this reason especially safety and anchor details cannot always be considered as conclu-sive or final. These are subject to the risk assessment carried out by the contractor.

The systems or items shown are not necessarily available in all countries.

Safety instructions and load specifications are to be strictly observed at all times. Separate structural calculations are required for any deviations from the standard design data.

The information contained herein is subject to technical changes in the interests of progress. Errors and typographical mistakes reserved.

Page 3: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

1

Contents

Quickly erected and safe working areas 2 PERI UP fulfils the requirements of the industry

Modular scaffold with new flexibility 4 Uniform grid dimensions for maximum adjustment

PERI UP Rosett – a strong node connection 6 High load-bearing capacity through high rigidity

Ledger with “Gravity Lock” 8 Fast, simple and safe

Ledgers for all tasks 10 As guardrail or ledger for material storage

Optimized safety and cost-effectiveness 12 Scaffold decking with grid system

Fast assembly of platforms 14 Decking installed in “almost any position”

Safety measures recognizable from afar 16 Toe board painted in signal colour

Small additional components with big effects 18 PERI connections ensure flexibility

Ledger to ledger coupler makes circular scaffolding easier

20 Continuous side protection

Widening platforms with new possibilities 22 Rosetts at the ends of brackets

Access up to 90 m high 24 Lightweight stair towers for fast assembly

Site stairs with easily mountable steps 26 Convenient access even with tools

28 Components

Page 4: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

2

Quickly erected and safe working areasPERI UP fulfils the requirements of the industry

For use in industry, a scaffolding sys-tem must be extremely flexible. At the same time, all working areas which have been erected must fulfil the highest safety requirements and naturally must be assembled very quickly.

In order to fully meet these three impor-tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The re-sult is a flexible system scaffold which leaves almost nothing to be desired for scaffolders.

PERI UP Rosett Flex provides:– Optimal adaptability– High level of working safety– Fast assembly

Through the adaptability of the system scaffold, com-plicated scaffolding assign-ments are also quickly real-ized.

Page 5: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

3

Areas for installation and maintenance work are quickly assembled with PERI UP. Decking is only installed in those places where it is actu-ally required.

End-to-end guardrails and toe boards provide high levels of working safety throughout.

Page 6: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

4

Modular scaffold with new flexibilityUniform grid dimensions for maximum adjustment

The main components of the modu-lar scaffold, such as standards, ledg-ers and decking, have a uniform length and width grid dimension of 25 or 50 cm.

This allows almost any adjustments to be made to suit site conditions which has only been possible up to now with tube and couplers.

PERI UP Rosett Flex offers:– System dimensions of 25 and 50 cm– Metric grid dimensions for optimal

adaptability

50 – 300 cm

5025 – 400 cm

25

Toe boards with lengths cut according to grid dimen-sions, border the inner and outer edges of all decking.

Lattice girders and decks are available in different lengths. This means that optimal adjustment to the geometry is possible as well as to the permissible load.

150

75

75

15075

75

150

150300 300

300

150

150

Page 7: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

5

Openings and pipe penetra-tions are circumvented with system decking, guardrails and toe boards.

Page 8: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

6

PERI UP Rosett – a strong node connectionHigh load-bearing capacity through high rigidity

The PERI UP nodes provide a maxi-mum of twelve connection possibili-ties for:– four ledgers,– four ledger diagonal braces and– four node braces.

The high rigidity of the ledger connec-tion allows only small deformations on the standards. This results in high standard loads and it means that braces are not required in many cases – the ledgers provide sufficient reinforcement.

8080

8080

80 80

The UP Rosett allows for connecting at up to 45°.

The shape of the rosett pre-vents the standards from rolling away and makes stacking very easy.

The PERI UP scaffold node has been approved by the Deutsches Institut für Bautechnik.

Construction

Approval

Page 9: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

7

Ledger moment

My, d = 89.1 kNcm

Ledger horizontal force

Nd = 24.7 kN

Ledger shear force

Vy, d = 11.3 kN

Ledger shear force

Vz, d = 30.4 kN

Brace force

Nv, d ≤ 9.6 kN

My

N

VY VY

VZ VZ

NV

NV

Ledger diagonal braces are inserted directly into the holes of the ledger.

Node braces are mainly required for cantilevers.

2 · My 1h ϕ

Pki Pki

My

Pki

Design values of the German Technical Approval Z-8.22-863

PERI UPOthers

The high rigidity of the PERI UP node allows very high leg loads.

h

Pki =

ϕ

Page 10: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

8

The PERI UP gravity lock allows easy and safe assembly.

When inserting the wedge head into the rosett, the wedge drops through the force of gravity into the hole and locks. The rectangular profile of the ledger prevents the assembly of tubes and couplers to parts not suitable.

Gravity lock, the self-secur-ing ledger connection, rigidly connects the ledger to the rosett.

Ledger with “Gravity Lock”Fast, simple and safe

Simple, safe assembly of the UH ledger thanks to PERI UP gravity lock.

The ledger can be easily in-stalled from a safe position. The wedge drops by gravity and secures automatically.

High node rigidity due to the large pressure point spacing of 116 mm.

116

Page 11: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

9

The ledger fulfils several func-tions:– Above the decking it is used as a

guardrail.

The small width of the UH ledger means that up to 4 ledgers can be carried man-ually at any one time.

– On the level of the decking, the same ledger serves as a support for the decks.

This means the number of different components is reduced.

Page 12: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

10

Ledgers for all tasksAs guardrail or ledger for material storage

The lengths and type of horizontal components can be selected accord-ing to the load.

All ledgers have a rectangle profile on the top side which is approx. 30 % lighter compared to a round tube with same load-bearing capacity.

For minimum loads and small spans, the standard ledger is sufficient. For higher loads, the reinforced ledger is used.

Covering of gaps is not necessary. Each ledger length can be completely cov-ered with system decking.

Platform completely covered with PERI UP system decking.

Lightweight ledger used as a guardrail. For platforms, re-inforced or standard ledg-ers are used depending on the load requirements.

Page 13: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

11

Reinforced UHV ledgers designed as a lightweight construction.

The reinforced UHV ledger is the right choice for spans of 1.50 m and more. Depending on the load, there are two versions available.

Ledger UH.

The lightweight UH ledger is available in lengths increments of 25 or 50 cm. This means that all lengths can be used as guardrails as well as decking support.

UHV-L 250 12.60 6.3 * 4.5 300 15.30 5.8 * 3.8

UHV 150 11.10 13.3 19.9 200 14.80 11.6 13.1 250 18.00 9.9 * 8.5 300 21.80 9.0 * 6.9

F [kN] q [kN/m]Wgt. [kg]

UH 25 1.40 – 18.5 50 2.00 – 18.5 75 2.60 6.3 18.5 100 3.40 4.5 9.3 125 4.00 3.8 6.7 150 4.80 3.3 4.8 200 6.10 2.6 2.8 250 7.50 2.1 1.9 300 8.80 1.8 1.3 400 11.50 1.4 0.7

F [kN] q [kN/m]Wgt. [kg]

*held laterally by the decking or similar

Page 14: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

12

Optimized safety and cost-effectivenessScaffold decking with grid system

For the new PERI UP industrial decks, a system width of 25 cm was selected. Due to this, working plat-forms are completely covered with-out any gaps.

All decks have an integrated lock against lifting as well as a non-slip per-forated surface.

The small overall height and specially selected profile cross-section, allow er-gonomical transport by hand.

Through the mounting of the ledger between the decks, each field can be divided in order to be able to accom-modate props or pipes.

Decking areas can be com-pletely covered. Projecting steel columns can be built around using system compo-nents.

Page 15: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

13

The deck is mounted to the profile of the ledger. A separate ledger is not required for the decking.

... and is secured through the force of gravity. This means the deck is prevented from lifting.

The clamp of the deck opens when engaged ...

The UDI industrial decking is available in lengths of 50 cm up to 3.0 m in 25 cm or 50 cm increments.

50/75/100/125/150/200/250/300 cm

25 cm

Page 16: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

14

Fast assembly of platformsDecking installed in “almost any position”

Depending on the required direction of the deck span, ledgers are installed as support.

As the ledger fits between two adjoin-ing decks, the most favourable laying direction can always be selected.

For protruding pipes or diagonals, open-ings can be created by overlapping the decks.

The tremendous flexibility of the decking is fully uti-lized, in particular, for com-plicated industrial plants with guaranteed fast as-sembly.

Piping installations can be integrated in such a way so that safe and gap-free working plat-forms are created.

Page 17: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

15

40.0

26.7

20.0

16.0

13.3

10.0

7.5

5.2

The PERI UP industrial decking in detail:

– Overlapping of decks is possible (erecting past the pipes).

– Complete covering of all levels.– Deck widths of 25 and 37.5 cm.– Integrated protection against lifting.– Non-slip surface.– Easy to carry and transport

(attach to clamp).– Deck clamp for connecting two

decks.

*without deflection limitation.

Loading of UDI steel deck

Weight [kg] Load

ClassPerm. load

[kN/m2]

acc. to DIN EN 12811-1 max. possiblesurface load*

[kN/m²]

4.00

5.40

6.70

8.10

9.50

12.30

15.00

17.80

6

6

6

6

6

6

5

4

6.00

6.00

6.00

6.00

6.00

6.00

4.50

3.00

40.0

26.7

20.0

16.0

13.3

10.0

8.0

6.3

5.10

6.80

8.50

10.20

11.80

15.20

18.50

21.90

6

6

6

6

6

6

5

4

6.00

6.00

6.00

6.00

6.00

6.00

4.50

3.00

A ledger can be placed between two decks if required.

For small openings, decks can be over-lapped.

UDI 25 x 50

UDI 25 x 75

UDI 25 x 100

UDI 25 x 125

UDI 25 x 150

UDI 25 x 200

UDI 25 x 250

UDI 25 x 300

UDI 37,5 x 50

UDI 37,5 x 75

UDI 37,5 x 100

UDI 37,5 x 125

UDI 37,5 x 150

UDI 37,5 x 200

UDI 37,5 x 250

UDI 37,5 x 300

Length[cm]

30 mm(= 2 x 15 mm)

15 mm 15 mm

Page 18: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

16

Safety measures recognizable from afarToe board painted in signal colour

The toe board borders the working platforms on all sides. Due to the bright signal colour, the completed scaffold can be easily checked at a distance.

The toe board is always mounted be-tween two vertical scaffold tubes.

It can also be used over corners – for this, only one of the toe boards has to be turned.

Toe boards do not burn, have a very low weight and can be easily stacked on top of each other.

End-to-end toe boards provide safety on the platforms.

Easy transport due to the lightweight com-ponents and simple stacking.

Page 19: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

17

For intermediate lengths, the UPY 50 and UPY 75 boards can be screwed to longer toe boards.

The hatch of the ac-cess opening is also able to be opened even with end-to-end toe boards.

L

L

L + 25 cm

L + 50 cm

UPY 50

UPY 75

Page 20: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

18

Small additional components with big effectsPERI connections ensure flexibility

With the PERI connections, ledgers (ledger-to-ledger) or standards (standard-to-ledger) can be attached to the available ledgers.

Assembly is simple: ledgers are divided so that the industrial decking as well as the standards can be arranged as re-quired.

Opening can be very easily accommo-dated with system components.

The decking can be moved up very closely to the obstruction, the edges of the decks are then secured with guard-rails and toe boards.

Erecting around pipe in-stallations. No problem with PERI connecting parts.

Decks can be arranged as required around openings.

Page 21: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

19

Ledger-to-ledger coupler with one or two con-necting possibilities.

Ledger spigot with or without connection of ledgers.

Ledger-to-ledger connecton.

Standard-to-ledger connection.

Guardrails and toe boards can be adapt-ed to suit site condi-tions.

Page 22: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

20

Ledger to ledger coupler makes circular scaffolding easierContinuous side protection

Circular structures frequently require the use of tube and couplers. With Rosett Flex, the complete scaffolding can be carried out with system com-ponents. This results in a clear reduc-tion in assembly times.

On the outer side of the scaffold, side protection is mounted consisting of guardrails and toe boards in the grid system.For supporting the decks, ledgers are installed transversely using a ledger to ledger coupler. The trapezoidal-shaped remaining area is closed using the PERI UP Corner Sheeting UPD.

The PERI Corner Sheet-ing UPD closes all gaps in the decking between the turned scaffold fields.

Only one Corner Sheet-ing UPD is sufficient to cover every diameter of circular structures.

Page 23: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

21

≤ 30°

Circular container scaffold-ed with a three-part side protection complete with system components.

The ledger to ledger coupler is used for the installation of the horizontal ledger. The Corner Sheeting is firmly connected with this ledger, it closes the gap to the next scaffold bay which can be adapted to the radius of the structure.

0.50 m

Page 24: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

22

Widening platforms with new possibilitiesRosetts at the ends of brackets

With the brackets, platforms are wid-ened or gaps to existing buildings are reduced.

The industrial decks are also secured on the brackets against lifting and close tightly with the main decking.

At the ends of the brackets, ledgers and verticals can be attached. Through this, internal corners can be completely covered with decking.

Brackets on the inside of a platform around a circular container. The decking is laid on ledgers and the brackets.

On the internal corners of the building, the brackets can be attached to a vertical simultaneously – without any height offset.

Page 25: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

23

Bracket with half Rosett for small wall distances.Ledgers can be mounted on the left and right.

Bracket with complete Rosett.Ledgers can be attached in three directions.

Bracket with Rosett and pressed-in spigot.For attaching ledgers and verticals e.g. as guardrails.

UCM 50 with half RosettUCM 75 with half Rosett

Point LoadF

[kN]

F3.93.9

UCM 50-2UCM 75-2

3.93.9

UCM 50 with SpigotUCM 75 with Spigot

3.93.9

Table with bracket bearing capacities

Page 26: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

24

Access up to 90 m highLightweight stair towers for fast assembly

PERI UP Rosett Flex site stair towers can be used as free-standing and pre-assembled units up to heights of 90 m.

Simple and fast assembly due to high-strength aluminium staircase units with a width of 75 cm.

The permissible load is 2,00 kN/m2.

Alternating staircase units of-fer larger headroom and short-er routes between levels.

Staircase units in the same direc-tion is the preferred type for erecting and offers additional working platforms.

1.50 m

1.50 m

1.50 m

0.50

m

0.50

m

1.0

0 m

StaircaseUAS 75 x 150/50T

StaircaseUAS 75 x 150/50S

StaircaseUAS 75 x 150/100

Adjustments required for exit heights are carried out with 50 or 100 cm high staircase units on laterally-mounted brackets. For intermediate heights, the staircase units can also be positioned in the middle of a scaffold field.

Page 27: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

25

The lateral height adjust-ments leave the landings free for climbing up or down.

Height adjustments on building openings are in-stalled independent of the floor height.

Page 28: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

26

Site stairs with easily mountable stepsConvenient access even with tools

For construction sites with high load and accessibility requirements.

The PERI UP site stair is erected as a 10-leg tower with landing widths of 100 or 125 cm. Together with the step widths of 100 or 125 cm, it provides easy and comfortable access – with room enough to pass.

With a permissible load of 3.0 kN/m², it can be assembled up to a height of 50 m.

Erection is simple and fast. The string-ers are mounted first followed by the steps which interlock during installation. The top step secures all the others.

The site stairs are ideal as an entrance facility. The permissi-ble load amounts to 3.0 kN/m².

200

100 100250

450

The maximum live load of a tower is 40 kN. This mean the stairs can be used by up to 50 people simultaneously.

Site stairs with a choice of landing widths – 100 or 150 cm.

Page 29: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

27

The stair width of 100 cm allows the transportation of injured persons.

Assembly without toolsLightweight individual steps interlock during in-stallation and are self-se-curing.

Non-slip, perforated steps and decking make ice formation more diffi-cult in winter.

Page 30: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

28

Item no. Weight kg

019780 5,250 Base Spindle TR 38-70/50For heavily loaded shoring.

NoteWith captive silver Quick Jack Nut.

535

min

47m

ax 710

38

80

140

Ø14

Ø21

Ø19

Ø10

110

100242 4,610 Adj. Base Plate UJB 38-80/55 NoteWith captive yellow Quick Jack Nut.

595

min

45m

ax 805 100

150

38

Ø10

Ø17

30

100411 3,420 Adj. Base Plate UJB 38-50/30 NoteWith captive red Quick Jack Nut.

505

38100150

Ø10

Ø17

355

min

45m

ax30

116762 2,870 Adj. Base Plate UJB 38-36/17 NoteWith captive white Quick Jack Nut.

365

100 150

Ø10

Ø17

min

45m

ax21

530

38Ø

Page 31: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

29

Item no. Weight kg

117194 3,980 Base Standard UVB 49For assembly directly on the base spindle. Reduces necessary spindle extension lengths through distance between rosettes of 25 cm.

120

250

115

235

720

Ø11

48,3Ø

160

100014 2,470 Base Standard UVB 24For assembly directly on the base spindle.

120

120

230

470

160

Ø11

48,3Ø

100863 1,020 Spindle Locking UJSSecures the adjustable base plates Ø 38 mm in the leg while moving.

138

7067SW 19

100244 1,230 Base Plate UJPWithout height adjustment.

105 13

0

31,8

Ø13 Ø10

Ø17

100

150

100159 5,150 Adj. Base Plate UJS 38-80/50 Swivel NoteWith captive yellow Quick Jack Nut.

613

min

110

max 82

3

38

100 150

Ø10

Ø17

30

Page 32: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

30

Item no. Weight kg

101309100000117195100003100005100007

2,510 4,610 7,590 6,920 9,230 11,500

Top Standards UVHTop Standard UVH 50Top Standard UVH 100Top Standard UVH 125Top Standard UVH 150Top Standard UVH 200Top Standard UVH 250Without spigot for supporting head spindles.

L 500 1000 1250 1500 2000 2500

380

Nx5

0012

0L

160

Ø11

48,3Ø

Ø11

102859101306102860100009100012100013

3,080 5,380 7,690 9,990 14,700 19,200

Standards UVRStandard UVR 50Standard UVR 100Standard UVR 150Standard UVR 200Standard UVR 300Standard UVR 400

L 500 1000 1500 2000 3000 4000

380

Nx5

0012

0L

160

160

Ø11

Ø13

48,3Ø

Page 33: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

31

Item no. Weight kg

114613125840114595114629114632114638114641117032114645116356114648114651

1,420 1,770 2,070 2,730 4,460 5,430 4,710 5,380 6,040 6,700 7,360 8,680

Ledgers UH PlusLedger UH 25 PlusLedger UH 37,5 PlusLedger UH 50 PlusLedger UH 75 PlusLedger UH 100 PlusLedger UH 125 PlusLedger UH 150 PlusLedger UH 175 PlusLedger UH 200 PlusLedger UH 225 PlusLedger UH 250 PlusLedger UH 300 Plus

L X Sticker 204 250 329 375 454 500 704 750 White 954 1000 White 1204 1250 1454 1500 1704 1750 1954 2000 White 2204 2250 2454 2500 Red 2954 3000 BlackNoteLongitudinally-stamped and with coloured label for easier identification.

LX

125 125Ø22 60

30

111053 0,059 Locking Pin Ø 48/57 As tension-proof connection of standards with a diameter of 48 up to 57 mm.

Ø1068

49 25

113726 0,908 Flange Coupler UECFor connecting Scaffold Tubes to Steel Girders with flange.

39

13SW 19

116306 1,700 Rosett Coupler UEV 180°

176

40

127

Page 34: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

32

Item no. Weight kg

409107409108409109409110

10,900 14,800 18,000 21,800

Ledgers UHVLedger UHV 150 Ledger UHV 200 Ledger UHV 250 Ledger UHV 300 For high loads, e.g. material storage.

L X 1454 1500 1954 2000 2454 2500 2954 3000 NoteLedgers UHV can be replaced by ledgers UHV Plus.

X

Ø22

L

180

30

125 125 40/20

114681114687114691114695

11,000 14,900 18,100 21,800

Ledgers UHV PlusLedger UHV 150 PlusLedger UHV 200 PlusLedger UHV 250 PlusLedger UHV 300 PlusFor high loads, e.g. material storage.

L X 1454 1500 1954 2000 2454 2500 2954 3000

LX

12518

030

125 40/20

Ø22

404780404779400017401159410347400021400023400025400027

1,390 2,040 2,710 3,370 4,020 4,690 6,020 7,340 8,670

Ledgers UHLedger UH 25Ledger UH 50Ledger UH 75Ledger UH 100Ledger UH 125Ledger UH 150Ledger UH 200Ledger UH 250Ledger UH 300

L X Sticker 204 250 454 500 704 750 White 954 1000 White 1204 1250 1454 1500 1954 2000 White 2454 2500 Red 2954 3000 BlackNoteLongitudinally-stamped and with coloured label for easier identification. Ledgers UH can be replaced by ledgersUH Plus.

X

Ø22

L

6030

125 125

Page 35: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

33

Item no. Weight kg

109764 1,220 UH Spigot

Ø39

6060

317

100

Ø13

110792 1,880 Ledger to Ledger Coupler UHA Half w. Spigot

39

6060 34

5

100

Ø13

32

110793 1,090 Ledger to Ledger Coupler UHA Half

6013

0

32

101731 0,841 Ledger to Ledger Coupler UHAFor connecting ledger to ledger at right-angles.

30

6213

3

83

Page 36: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

34

Item no. Weight kg

115156115513115157107867100055102846100057109034104391100059102862100061117689100063102861100065104762100067104766100069

2,660 4,640 5,810 3,790 4,440 5,340 6,380 6,740 5,000 5,500 6,240 7,160 7,580 6,640 7,260 8,050 7,490 7,830 8,360 9,050

Ledger Braces UBLLedger Brace UBL 100/50Ledger Brace UBL 100/150Ledger Brace UBL 100/200Ledger Brace UBL 150/50Ledger Brace UBL 150/100Ledger Brace UBL 150/150Ledger Brace UBL 150/200Ledger Brace UBL 175/200Ledger Brace UBL 200/50Ledger Brace UBL 200/100Ledger Brace UBL 200/150Ledger Brace UBL 200/200Ledger Brace UBL 225/200Ledger Brace UBL 250/100Ledger Brace UBL 250/150Ledger Brace UBL 250/200Ledger Brace UBL 300/50Ledger Brace UBL 300/100Ledger Brace UBL 300/150Ledger Brace UBL 300/200Mounted in the holes of the ledger.

L X Y Sticker 901 1000 500 1677 1000 1500 2136 1000 2000 1347 1500 500 1601 1500 1000 1953 1500 1500 2358 1500 2000 2500 1750 2000 1820 2000 500 2016 2000 1000 2305 2000 1500 2658 2000 2000 White 2829 2250 2000 2462 2500 1000 2705 2500 1500 3010 2500 2000 Red 2795 3000 500 2926 3000 1000 3133 3000 1500 3400 3000 2000 BlackNoteLongitudinally-stamped and with coloured label for easier identification.UBL 150/250 identical to UBL 300/50, UBL 225/150 identical to UBL 175/200,UBL 250/50 identical to UBL 200/150,UBL 100/100 identical to Diagonal Strut ST 100 (Item no. 019940).

XY

Ø42,4

L

25

25

L

25

Page 37: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

35

Item no. Weight kg

114818114904114821114908114912114820124097114916114896114819124101114996114920114928114900114892124105114924114932114936

4,580 5,620 5,720 6,160 6,650 7,000 7,770 8,730 8,120 8,350 8,990 8,640 9,830 10,800 9,540 9,730 10,300 11,000 11,900 12,900

H-Braces UBH FlexH-Brace UBH Flex 100/100H-Brace UBH Flex 125/125H-Brace UBH Flex 150/100H-Brace UBH Flex 150/125H-Brace UBH Flex 150/150H-Brace UBH Flex 200/100H-Brace UBH Flex 200/150H-Brace UBH Flex 200/200H-Brace UBH Flex 250/75H-Brace UBH Flex 250/100H-Brace UBH Flex 250/150H-Brace UBH Flex 250/125H-Brace UBH Flex 250/200H-Brace UBH Flex 250/250H-Brace UBH Flex 300/75H-Brace UBH Flex 300/100H-Brace UBH Flex 300/150H-Brace UBH Flex 300/200H-Brace UBH Flex 300/250H-Brace UBH Flex 300/300For horizontal bracing of towers. Also useable underneath deckings UDI and UDG.

L X Y 1335 1000 1000 1689 1250 1250 1725 1500 1000 1874 1500 1250 2042 1500 1500 2161 2000 1000 2422 2000 1500 2749 2000 2000 2541 2500 750 2620 2500 1000 2838 2500 1500 2720 2500 1250 3123 2500 2000 3456 2500 2500 3025 3000 750 3092 3000 1000 3279 3000 1500 3528 3000 2000 3826 3000 2500 4163 3000 3000

X

Y

L

50

7

10

7

L

Page 38: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

36

Item no. Weight kg

124170112926115354112765100981100973100572100985106630100573100989106624100574100993100575

6,780 6,990 5,220 7,260 5,710 6,580 7,600 6,790 7,510 8,390 7,940 8,540 9,310 9,130 10,300

Node Braces UBKNode Brace UBK 75/200Node Brace UBK 100/200Node Brace UBK 125/100Node Brace UBK 125/200Node Brace UBK 150/100Node Brace UBK 150/150Node Brace UBK 150/200Node Brace UBK 200/100Node Brace UBK 200/150Node Brace UBK 200/200Node Brace UBK 250/100Node Brace UBK 250/150Node Brace UBK 250/200Node Brace UBK 300/100Node Brace UBK 300/200

L X Y Sticker 2190 750 2000 2285 1000 2000 1625 1250 1000 2401 1250 2000 1821 1500 1000 2152 1500 1500 2539 1500 2000 2246 2000 1000 2521 2000 1500 2860 2000 2000 White 2696 2500 1000 2930 2500 1500 3226 2500 2000 Red 3131 3000 1000 3625 3000 2000 Black

X

Y

L

Ø42,4

47

47

400042407815400047406931404356400049400051423483402617400053

7,350 8,700 9,870 10,200 11,300 12,400 11,800 12,700 13,800 15,000

Horizontal Braces UBHHorizontal Brace UBH 150/150Horizontal Brace UBH 200/150Horizontal Brace UBH 200/200Horizontal Brace UBH 250/150Horizontal Brace UBH 250/200Horizontal Brace UBH 250/250Horizontal Brace UBH 300/150Horizontal Brace UBH 300/200Horizontal Brace UBH 300/250Horizontal Brace UBH 300/300

L X Y 2042 1500 1500 2422 2000 1500 2749 2000 2000 2838 2500 1500 3123 2500 2000 3456 2500 2500 3279 3000 1500 3528 3000 2000 3826 3000 2500 4164 3000 3000

10

L

X

Ø48,3

Y

10

L

7

Page 39: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

37

Item no. Weight kg

111685111687111686111860111863111864111865111969

5,110 6,790 8,460 10,100 11,800 15,200 18,500 21,900

Industrial Decks UDI 37.5Industrial Deck UDI 37.5 x 50Industrial Deck UDI 37.5 x 75Industrial Deck UDI 37.5 x 100Industrial Deck UDI 37.5 x 125Industrial Deck UDI 37.5 x 150Industrial Deck UDI 37.5 x 200Industrial Deck UDI 37.5 x 250Industrial Deck UDI 37.5 x 300Mounted on Ledgers UH.

X perm. p [kN/m²] max. p [kN/m²] 500 6.0 40.0 750 6.0 26.7 1000 6.0 20.0 1250 6.0 16.0 1500 6.0 13.3 2000 6.0 10.0 2500 4.5 7.5 3000 3.0 5.2 NoteUDI 37.5 is offered as a „safe assembly“. perm. p according to DIN EN 12811-1.max. p = maximum possible load withoutdeflection limitation.

X37

060 96

104029105925106092106880107002108380108540108689

4,090 5,520 6,950 8,380 9,790 12,700 15,500 18,400

Industrial Decks UDI 25Industrial Deck UDI 25 x 50Industrial Deck UDI 25 x 75Industrial Deck UDI 25 x 100Industrial Deck UDI 25 x 125Industrial Deck UDI 25 x 150Industrial Deck UDI 25 x 200Industrial Deck UDI 25 x 250Industrial Deck UDI 25 x 300Mounted on Ledgers UH.

X perm. p [kN/m²] max. p [kN/m²] 500 6.0 40.0 750 6.0 40.0 1000 6,0 40.0 1250 6.0 28.4 1500 6.0 19.6 2000 6.0 10.9 2500 4.5 6.9 3000 3.0 4.7 Noteperm. p according to DIN EN 12811-1.max. p = maximum possible load withoutdeflection limitation.

X

6024

596

Page 40: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

38

Item no. Weight kg

111101112809

7,780 10,900

Bottom Sheetings UDPBottom Sheeting UDP 75Bottom Sheeting UDP 100Mounted on UH Ledgers. Closes gaps between bays during scaffold installation on circular structures.

760

615

/865

678

/928

137

111011 0,797 Deck Link Plate UDCConnects two industrial decks.

61180 119

124124124121124118124115124112124109123771124915

3,810 5,180 6,550 7,940 9,330 12,200 14,900 17,700

Steel Decks UDG 25Steel Deck UDG 25 x 50Steel Deck UDG 25 x 75Steel Deck UDG 25 x 100Steel Deck UDG 25 x 125Steel Deck UDG 25 x 150Steel Deck UDG 25 x 200Steel Deck UDG 25 x 250Steel Deck UDG 25 x 300Mounted on Ledgers UH.

X perm. p [kN/m²] max. p [kN/m²] 500 6.0 40.0 750 6.0 40.0 1000 6.0 40.0 1250 6.0 28.4 1500 6.0 19.6 2000 6.0 10.9 2500 4.5 6.9 3000 3.0 4.7 Noteperm. p according to DIN EN 12811-1.max. p = maximum possible load withoutdeflection limitation.

65 9624

5

X

Page 41: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

39

Item no. Weight kg

109879 3,820 Ladder UAF 200, AluFor mounting to Hatch UAF.

16806 x 280 = 2170

213

350

109783109755

9,330 15,700

Hatches UAFHatch UAF 50 x 75Hatch UAF 75 x 100Mounted on UH Ledgers.

700 / 950

554

/805

500

/750

120

1720

109879 3,820AccessoriesLadder UAF 200, Alu

114148113358

4,890 10,000

Corner Sheetings UDCCorner Sheeting UDC 75Corner Sheeting UDC 100Mounted on UH Ledgers. For internal corners of platforms on circular containers.

107705 / 965

705

/965

Page 42: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

40

Item no. Weight kg

100265100266100267100268

2,410 3,220 4,020 4,820

Guardrails UPGGuardrail UPG 150Guardrail UPG 200Guardrail UPG 250Guardrail UPG 300

L X Sticker 1546 1500 2046 2000 White 2546 2500 Red 3046 3000 BlackNoteLongitudinally-stamped and with coloured label for easier identification.

LX

Ø38

117495117938117518117981123597123694123696123698123700

0,927 1,380 1,440 1,960 2,040 3,000 4,030 5,060 6,100

Toeboards Steel UPY, galv.Toeboard Steel UPY 50, galv. Toeboard Steel UPY 72, galv. Toeboard Steel UPY 75, galv. Toeboard Steel UPY 100, galv. Toeboard Steel UPY 104, galv. Toeboard Steel UPY 150, galv. Toeboard Steel UPY 200, galv. Toeboard Steel UPY 250, galv. Toeboard Steel UPY 300, galv.

L X 486 500 706 720 736 750 986 1000 1026 1040 1486 1500 1986 2000 2486 2500 2986 3000 NoteSurface: galvanized.

LX

66

163

110213110526110514110073110076110160110176110208110211

0,928 1,380 1,440 1,960 2,050 3,000 4,030 5,060 6,100

Toeboards Steel UPYToeboard Steel UPY 50Toeboard Steel UPY 72Toeboard Steel UPY 75Toeboard Steel UPY 100Toeboard Steel UPY 104Toeboard Steel UPY 150Toeboard Steel UPY 200Toeboard Steel UPY 250Toeboard Steel UPY 300

L X 486 500 706 720 736 750 986 1000 1016 1040 1486 1500 1986 2000 2486 2500 2986 3000 NoteSurface: galvanized and yellow coated.

LX

163

66

Page 43: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

41

Item no. Weight kg

115959115962

1,150 1,480

Supports UCSupport UC 25Support UC 37.5

NoteSmall console with end stop for the secure positioning of the decks.

348223 / 375250 /

6030

125

110072116695117192

4,050 4,630 4,310

Swing Ledgers UPKSwing Ledger UPK 75Swing Ledger UPK 100Swing Ledger UPK 125Upwards opening ledger.

L X 704 750 954 1000 1204 1250

X

125

60

L 30

Ø22

115655 11,100 End Guardrail in Advance UPA Rosett NoteWith extendible Guardrail, fits in R72, R75, R100 and R104.

1015

763 174

104412 0,711 Guardrail Coupler UPWFor mounting the Guardrail UPG to the rosettes.

NoteAssembly with guardrail in advance.

79 60

15560

Page 44: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

42

Item no. Weight kg

112690112693

4,380 5,620

Consoles UCM with half RosettConsole UCM 50 with half RosettConsole UCM 75 with half RosettWith connection for Console Bracket Brace UCM.

500 / 750531 / 781

415

203

180

111053 100301

0,059 1,020

AccessoriesLocking Pin Ø 48/57 Spigot ULT 32

112676112678

5,270 6,510

Consoles UCM with SpigotConsole UCM 50 with SpigotConsole UCM 75 with SpigotWith connection for Console Bracket Brace UCM.

500 / 750579 / 829

635

160

Ø39

203

100

110483111128

4,480 5,720

Consoles UCMConsole UCM 50-2Console UCM 75-2With connection for Console Bracket Brace UCM.

500 / 750579 / 829

415

160

203

111053 100301

0,059 1,020

AccessoriesLocking Pin Ø 48/57 Spigot ULT 32

Page 45: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

43

Item no. Weight kg

113228 10,100 Staircase UAS 75 x 75/50, AluAssembly on Ledgers UH.

Technical DataPermissible load 2.0 kN/m2.

179

500

750

111117111124

28,000 32,900

Staircases UAS 75, AluStaircase UAS 75 x 250/200, AluStaircase UAS 75 x 300/200, AluAssembly on Ledgers UH.

Technical DataPermissible load 2.0 kN/m2.

350 / 600

2000

2500 / 3000

112717 7,000 Console Bracket Brace UCMFor increasing the load-carrying capacity of Consoles UCM 50 and UCM 75 with yellow cou-pling.

500 / 750

1790

Page 46: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

44

Item no. Weight kg

114536 17,900 Staircase UAS 75 x 150/100 S, AluAssembly on Ledgers UH.

Technical DataPermissible load 2.0 kN/m2.

178

1000

1500

111103 17,900 Staircase UAS 75 x 150/100, AluAssembly on Ledgers UH.

Technical DataPermissible load 2.0 kN/m2.

590

1000

1500

111095 17,500 Staircase UAS 75 x 150/50 S, AluAssembly on Ledgers UH.

Technical DataPermissible load 2.0 kN/m2.

1500

500

210

111087 17,500 Staircase UAS 75 x 150/50 T, AluAssembly on Ledgers UH.

Technical DataPermissible load 2.0 kN/m2.

1500

500

750

Page 47: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

45

Item no. Weight kg

100830 4,970 Stair Guardrail UAHFor fixing to the stringers of the Staircase Units UAS 64 x 250/200, UAS 64 x 300/200, UAS 75 x 250/200, UAS 75 x 300/200.

519

976 82

100742 10,000 Stair Guardrail UAGSuitable for Staircases UAS 64 x 250/200, UAS 64 x 300/200, UAS 75 x 250/200 and UAS 75 x 300/200 as internal and external guardrails.

1294

2309

288

115189 3,080 Waler on Staircase UAS 75Mounted on the treads of the staircase. Allows installation of Industrial Decks Steel UDI or UDG.

698

95

217

Page 48: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

46

Item no. Weight kg

109208114180

5,610 6,590

End Steps UAEEnd Step UAE 100End Step UAE 125Last step for the Stair Stringer UA. Secures all steps.

Technical DataPermissible load 3.0 kN/m2.

940 / 11901000 / 1250

200

57

109198114179

7,390 9,250

Stair Steps UARStair Step UAR 100Stair Step UAR 125Tread for Stair Stringer UA. Non-slip due to perforated surface.

Technical DataPermissible load 3.0 kN/m2.

1044 / 1294

252

293

1000 / 1250

114731109219

9,780 15,800

Stair Stringers UAStair Stringer UA 125/100Stair Stringer UA 250/200

Technical DataPermissible load 3.0 KN/m2.

2500 / 1250

1948

/947

200

200

2453 / 1203

1500

/500

500

Page 49: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

47

Item no. Weight kg

124813 4,050 Ladder Connection UAC-2 Complete with1 pc. 051410 Ladder 180/6, galv.NoteFor connection of ladder 180/6 (Art.-No 051410) with PERI UP standards.

704

452 3023

060

051410 051460 103724 104132 051450

11,700 2,180 10,400 15,600 25,200

AccessoriesLadder 180/6, galv.Ladder Base, galv.End Ladder 180/2, galv.Ladder Safety Cage 75, galv.Ladder Safety Cage 150, galv.

114349114621

0,770 0,997

Edge Profiles UHEdge Profile UH 100Edge Profile UH 125Assembly on UH Ledger for anti-slip protec- tion on the first step at start of stairs with Stair Stringer UA.

850 / 1100 48391000 / 1250

124266 1,240 Distance Piece UA 76 NoteAllows connection of Node Braces UBK as guard-rail with 76 mm distance to all crossing parts.

115

155

140

Page 50: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

48

Item no. Weight kg

124805 6,480 End Element ULS 50 Flex NoteEnd element for the extension of Additional Element ULS Flex.

500

560

447500

124781124790124795

15,400 12,700 10,500

Additional Elements ULS FlexAdditional Element ULS 150 FlexAdditional Element ULS 125 FlexAdditional Element ULS 100 Flex

L X 1441 1500 1191 1250 941 1000 NoteOnly usable with End Element ULS 50 Flex and Connector ULS Flex.

560

L

500

X

100870 40,700 Base Beam UVA 250For free-standing and mobile scaffold units. For symmetric and antimetric assembly of UP T 72/T 104 and Rosett 72, 75, 100, 104 and symmetric assembly of Rosett b = 75, 100, 150, 200 and 250 cm.

720

1040150020002500

720

1040

720

1040

Ø14

390

160

2660

1000750

1000 1000750 750

Page 51: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

49

Item no. Weight kg

113832 0,035 PERI UP Scaffold TagTo cordon off scaffolding areas not yet authorized for use. With the exception of inserting the PERI UP Assembly Certificate.

.

124806 5,990 Connector ULS Flex Complete with8 pc. 124771 Bolt Ø 12 x 44, galv.8 pc. 018060 Cotter Pin 4/1, galv.

380

500

550 48,3Ø

Ø11

160

Page 52: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

PERI UP Rosett Flex Modular Working Scaffold

50

Item no. Weight kg

113833113834113829113835113836113837113838113839115739115729125180124052124645117692126647

0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,005 0,010 0,005

PERI UP Assembly CertificatePERI UP Assembly Certificate, DPERI UP Assembly Certificate, EXPERI UP Assembly Certificate, FPERI UP Assembly Certificate, CDNPERI UP Assembly Certificate, ESPERI UP Assembly Certificate, PTPERI UP Assembly Certificate, PLPERI UP Assembly Certificate, CZPERI UP Assembly Certificate, TRPERI UP Assembly Certificate, SKPERI UP Assembly Certificate, AUS/NZPERI UP Assembly Certificate, ESTPERI UP Assembly Certificate, FINPERI UP Assembly Certificate, LTPERI UP Assembly Certificate, HInserted into the PERI UP Scaffold Tag.

NoteFront side:Assembly report for release of scaffolding.Rear side:Test report

.

Name

Signature

Date, Time

Remarks

Installation location

Position

Client

Scaffolder

Date

Signature

Working scaffold according toEN 12811, for Load Class

Any modifications made to the scaffold, e.g. removal of anchors, may only be carried out by the scaffolder.

Date Time Signature

Date:

Scaffold is no longer authorized for use:

1-2: maintenance work 1.50 kN/m 3: paint/plaster work 2.00 kN/m4-6: brickwork ≥ 2.00 kN/m

Width Class W

W06 0.6 ≤ w ≤ 0.9 mW06 0.9 ≤ w ≤ 1.2 mW12-W24 w ≥ 1.2 m

kN/m2

To be completed by the supervisorInspection by qualified person only

Important

To be completed by the inspecting person

Assembly CertificateInspection Record

Handing-Over Certificate

© 2007 PERI GmbH All Rights Reserved 113834

Page 53: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

51

Page 54: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

2

1

3

4

5

6

9

11

12

1316

17

18

19

20

22

21

24

2829

30

32

33

34

38

41

42

46

48

52

44

53

60

52

02 PERI S.A.S. 77109 Meaux Cedex [email protected] www.peri.fr

03 PERI AG 8472 Ohringen [email protected] www.peri.ch

04 PERI S.A.U. 28110 Algete - Madrid [email protected] www.peri.es

05 N.V. PERI S.A. 1840 Londerzeel [email protected] www.peri.be

06 PERI Holding B.V. 5480 AH-Schijndel [email protected] www.peri.nl

07 PERI Formwork Systems, Inc. Elkridge, MD 21075 [email protected] www.peri-usa.com

08 PT Beton Perkasa Wijaksana Jakarta 10210 [email protected] www.peri.com

09 PERI S.p.A. 20060 Basiano [email protected] www.peri.it

10 PERI Japan K.K. Tokyo 103-0015 [email protected] www.perijapan.jp

11 PERI Ltd. Rugby, CV23 0AN [email protected] www.peri.ltd.uk

12 PERI Kalip ve Iskeleleri Sanayi ve Ticaret Ltd. Esenyurt / İstanbul 34510 [email protected] www.peri.com.tr

13 PERI Kft. 1181 Budapest [email protected] www.peri.hu

14 PERI Formwork Malaysia Sdn. Bhd. 43300 Seri Kembangan, Selangor Darul Ehsan [email protected] www.perimalaysia.com

15 PERI Asia Pte Ltd Singapore 387355 [email protected] www.periasia.com

16 PERI Ges.mbH 3134 Nußdorf ob der Traisen [email protected] www.peri.at

17 PERI spol. S r.o. 252 42 Jesenice u Prahy [email protected] www.peri.cz

18 PERI Danmark A/S 2670 Greve [email protected] www.peri.dk

19 PERI Suomi Ltd. Oy 05460 Hyvinkää [email protected] www.perisuomi.fi

20 PERI Norge AS 3036 Drammen [email protected] www.peri.no

21 PERI Polska Sp. z o.o. 05-860 Płochocin [email protected] www.peri.com.pl

22 PERIform Sverige AB 30262 Halmstad [email protected] www.periform.se

23 PERI (Korea) Ltd. Seoul 135-936 [email protected] www.perikorea.com

24 Pericofragens Lda. 2790-326 Queijas [email protected] www.peri.pt

25 PERI S.A. B1625GPA Escobar – Bs. As. [email protected] www.peri.com.ar

26 PERI Formas e Escoramentos Ltda. Vargem Grande Paulista – SP [email protected] www.peribrasil.com.br

27 PERI Chile Ltda. Colina, Santiago de Chile [email protected] www.peri.cl

28 PERI România SRL 077015 Baloteşti [email protected] www.peri.ro

29 PERI Agency 2000 Maribor [email protected] www.peri.com

30 PERI spol. s. r.o. 903 01 Senec [email protected] www.peri.sk

31 PERI Australia Pty. Ltd. Glendenning NSW 2761 [email protected] www.periaus.com.au

32 PERI AS 76406 Saku vald Harjumaa [email protected] www.peri.ee

33 PERI Hellas Solely Owned Ltd. 194 00 Koropi [email protected] www.perihellas.gr

34 PERI SIA 2118 Salaspils novads, Rigas rajons [email protected] www.peri-latvija.lv

35 PERI (L.L.C.) Dubai U.A.E. [email protected] www.perime.com

36 PERI Formwork Systems, Inc. Bolton, ON – L7E 1K1 [email protected] www.peri.ca

01 Germany PERI GmbH Rudolf-Diesel-Strasse 19 89264 Weissenhorn [email protected] www.peri.com

France

Switzerland

Spain

Belgium/Luxembourg

Netherlands

USA

Indonesia

Italy

Japan

United Kingdom/Ireland

Turkey

Hungary

Malaysia

Singapore

Austria

Czech Republic

Denmark

Finland

Norway

Poland

Sweden

Korea

Portugal

Argentina

Brazil

Chile

Romania

Slovania

Slovakia

Australia

Estonia

Greece

Latvia

United Arab Emirates

Canada

PERI International

Page 55: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

8

10

1415

23

67

31

35

3739 40

43

44

45

47

50 51

585457

5659 55

64

63

65

7

25

26

66

27

36

49

61

62

53

37 PERI Lebanon Sarl 90416 – Jdeideh [email protected]

38 PERI UAB 02300 Vilnius [email protected] www.peri.lt

39 PERI S.A.U. Tanger [email protected] www.peri.ma

40 PERI Formwork Engineering Ltd. Rosh Ha‘ayin, 48104 [email protected] www.peri.co.il

41 PERI Bulgaria EOOD 1839 Sofia [email protected] www.peri.bg

42 Armar ehf. 220 Hafnarfjörður [email protected] www.armar.is

43 TOO PERI Kazakhstan 050000 Almaty [email protected] www.peri.kz

44 OOO PERI 142407, Noginsk District [email protected] www.peri.ru

45 PERI (Pty) Ltd 7600 Stellenbosch [email protected] www.peri.co.za

46 PERI Ukraina 07400 Brovary [email protected] www.peri.ua

47 Egypt Branch Office 11341 Nasr City /Cairo [email protected] www.peri.com.eg

48 PERI – Oplate d.o.o. 22310 Šimanovci [email protected] www.peri.rs

49 PERI Cimbras y Andamios, S.A. de C.V. Estado de México, Huehuetoca [email protected] www.peri.com.mx

50 PERI Repesentative Office Baku [email protected] www.peri.com.tr

51 PERI Kalıp ve İskeleleri Aşgabat [email protected] www.peri.com.tr

52 IOOO PERI Belarus 220100 Minsk [email protected] www.peri.by

53 PERI oplate i skele d.o.o. 10 250 Luöko-Zagreb [email protected] www.peri.com.hr

54 PERI (India) Pvt Ltd Mumbai – 400064 [email protected] www.peri.in

55 PERI GmbH - Jordan 11947 Amman [email protected] www.peri.com

56 PERI Kuwait W.L.L. 13011 Kuwait [email protected] www.peri.com.kw

57 PERI Saudi Arabia Ltd. 21463 Jeddah [email protected] www.peri.com.sa

58 PERI Qatar LLC P.O.Box: 31295 - Doha [email protected] www.peri.qa

59 Sarl PERI Kouba 16092, Alger [email protected] www.peri.com

60 PERI Representative Office Tirane [email protected] www.peri.com.tr

61 PERI Peruana S.A.C. Villa El Salvador, Lima [email protected] www.peri.com.pe

62 PERI Panama Inc. 0832-00155 Panama City [email protected] www.peri.com.pa

63 Pericofragens, Lda. Luanda [email protected] www.peri.pt

64 PERI Nigeria Ltd. Lagos [email protected] www.peri.ng 65 PERI (L.L.C.) Muscat [email protected] www.perime.com

66 PERI S.A.S. Colombia Briceño, Cundinamarca [email protected] www.peri.com.co

67 PERI-Asia Philippines, INC. Makati City [email protected] www.peri.com.ph

Lebanon

Lithuania

Morocco

Israel

Bulgaria

Iceland

Kazakhstan

Russian Federation

South Africa

Ukraine

Egypt

Serbia

Mexico

Azerbaijan

Turkmenistan

Belorussia

Croatia

India

Jordan

Kuwait

Saudi Arabia

Qatar

Algeria

Albania

Peru

Panama

Angola

Nigeria

Oman

Colombia

Philippines

Page 56: PERI UP Rosett Flex The modular system scaffolding ...a730357d-b0d4-4771...tant requirements, the proven PERI UP Rosett modular scaffolding was supple-mented with new components. The

The optimal System for every Project and every Requirement

PERI GmbHFormwork Scaffolding EngineeringRudolf-Diesel-Strasse 1989264 WeissenhornGermanyTel. +49 (0)7309.950-0Fax +49 (0)[email protected]

System-Independent Accessories

Wall Formwork Column Formwork

Slab Formwork Climbing Systems Tunnel Formwork Bridge Formwork

Shoring Systems Facade ScaffoldConstruction Scaffold Industrial Scaffold

Access Protection Scaffold Services

DE

en 0

5 | 2

015

5eb

792

144

© P

ER

I Gm

bH