    Annex A. The Impact of environmental awareness and training on Green PNPM

    Indicator 1. Well trained [PNPM] facilitators and other local [PNPM] stakeholders, who

    can ignite and facilitate green projects within [PNPM], not limited to those within [GreenPNPMs target locations]

    1. A. Table listing all of the Green PNPM and PNPM-Rural NMC consultants and facilitators working inyour target location. In examining progress the CSOs are making against this indicator, it is useful for the

    World Bank to know how many consultants/facilitators you are working with/providing training to

    including those who are financed through Green PNPM and PNPM-Rural.

    Number of Green PNPM/PNPM-Rural Consultants/Facilitators within Target Area

    NMC

    Facilitators/Con

    sultant Position

    Title

    # Male

    #

    Femal

    e

    Total Location Stationed

    Green PNPM

    Community

    Facilitators (FKL)

    4 0 4 One FKL station at each sub district, One FKLscoordinator station at District level (ASTAL)

    PNPM-Rural

    facilitator at

    district Level (FK

    and FT )

    5 1 6 One FT and one FK station at each sub district

    PNPM-Rural

    Communityfacilitator at

    District Level (

    Faskab, Fastekab,

    Faskeu)

    4 1 5 Three facilitator station at district level (Faskab,

    Fastekab and Faskeu), each Faskab and Fastekabis with an assistant.

    MUNA DISTRICT

    Green PNPMCommunity

    Facilitators (FKL)

    2 2 4 One FKL station at each sub district, One FKLscoordinator station at District level (ASTAL)

    PNPM-Rural

    facilitator at

    district Level (FK

    and FT )

    6 0 6 One FT and one FK station at each sub district

    PNPM-Rural

    Community

    facilitator atDistrict Level (

    Faskab, Fastekab,Faskeu)

    5 0 5 Three facilitators station at district level (Faskab,

    Fastekab and Faskeu), each Faskab and Fastekab

    is with an assistant.

    KOLAKA DISTRICT

    Green PNPM

    Community

    Facilitators (FKL)

    4 0 4 One FKL station at each sub district, One FKLscoordinator station at District level (ASTAL)

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    2/22

    PNPM-Rural

    facilitator at

    district Level (FK

    and FT )

    5 1 6 One FT and one FK station at each sub district

    PNPM-Rural

    facilitator at

    District Level(Faskab, Fastekab,

    Faskeu) PNPM-P2SPP facilitator.

    5 1 6 Four facilitators station at district level (Faskab,

    Fastekab and Faskeu and P2SPP (PNPM

    Integration facilitator), each Faskab and Fastekabis with an assistant.

    1.B. Table listing all trainings that were delivered to Green PNPM/PNPM-Rural consultants/

    Facilitators

    Training for Green PNPM/PNPM-Rural Consultants/Facilitators

    1.C. Please provide a brief narrative impact statement indicating any observations you have noted in

    regards to training provided has led to improved performance by Green PNPM/PNPM-Rural consultantsand facilitators in the areas where you work.

    1.D. Please provide a brief statement indicating how any of your CSOs interventions have

    impacted/attracted attention in Green PNPM from facilitators/consultants outside of Green

    PNPMs target areas.

    Workshop and trainings, either organized by OWT or in-collaboration NMC/PMD and District and

    province government which mostly attended by PNPM facilitators and the widely distributed or our

    awareness materials (especially documentary and tutorial films) have strongly inspired facilitators to

    replicate the Green-PNPM smart practices.

    Example: PNPM facilitators from Mangolo Village, Latambaga (Kolaka) and Tobimeita Village,(Kendari) have requested us to train apiculture (honey bees farming) development at PNPM sub

    project (2010). As the impact of District agencies and Parliament workshop in Kolaka (Kolaka 15 and

    16 December 2010), technical facilitator from Poleang Timur Sub-District (Bombana District) andLasusua Sub-district (Kolaka Utara District) have requested to act as a trainer for development of

    Coconut Shell Charcoal Briquette (CCB) sub project budget year 2010.

    2. A. Table listing all trainings that were delivered to Green PNPM community beneficiaries over

    this reporting period.

    Training provided to Community Beneficiaries

    Title/Focus of

    Training

    Module

    Date/Location

    Community

    Group

    Targeted

    Number of ParticipantsResults of

    TrainingMen Women Children

    BUTON DISTRICT

    Training of

    Trainer on

    Permanent Biogas

    Kancinaa

    Village,

    Pasarwajo (17-

    Villagers 7 3 0 The villagers

    understood

    installing

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    3/22

    Installation 18 January

    2011)

    permanent biogas

    MUNA DISTRICT

    Training on

    Making Energy

    Saving Stove andCCB

    in Lalemba

    Village, Lawa

    Sub district (8January 2011)

    Villagers 20 15 0 The villagers

    understood: (1)

    making CCB andenergy saving stove

    (2) businesspotential of CCB

    and energy saving

    stove

    Training on

    Catchment

    Management to

    KPMD in

    Lawa Sub

    district (13

    January 2011

    and Tongkuno

    Sub district

    (15 January2011)

    KPMD 33 33 0 (1) Refresh KPMD

    knowledge on

    Catchment

    management (2)Making organic

    fertilizer (3)

    Nurserydevelopment

    technique (4)

    Vegetative and

    generativepropagation (5)

    Making herbicide

    (6) Identification of

    mother trees

    Development of

    Bokashi

    Wamelai

    Village, Lawa

    Sub district

    (28 February2011)

    Farmer group 20 15 0 The result of the

    training were :(1)

    Participants

    understood the useand the benefit of

    using bokashi (2)

    Participants

    understood

    technique of

    making bokashi(3) Participants

    form an economic

    group of bokashi

    making . The

    participants

    consist of 11 maleand 4 female. The

    material uses for

    making bokashi

    are mixing of

    manure, rice husk,

    EM4, sugar.

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    4/22

    Practical Exercise

    on Making Biogas

    Outflow

    Langkumapo

    Village,

    Napabalano (9

    March 2011),

    Lahontohe

    Village,

    Tongkuno (10March 2011)

    Villagers 10 2 0 The participants

    were able to make

    gas storage

    container made of

    PE plastic so that

    the biogas are able

    to use by threehouseholds

    Training for

    Maintenance

    Team (TPS)

    Tongkuno Sub

    district (31

    March 2011)

    TPS 46 7 (1) provide

    technical

    instruction on the

    maintenance ofGreen PNPM Sub

    projects (2)

    Remind the TPS

    the reason behind

    each sub projects

    such as Spring

    waterrehabilitation, teak

    planting etc (3)

    Develop action

    plan for TPS, FKL

    and CSO

    Develop Patchouli

    Nursery

    Wamelai

    Village, Lawa

    Sub district (1

    March 2011)

    Farmer group 10 4 0 The nursery group

    has developed

    patchouli nursery

    KOLAKA DISTRICT

    TOT on makingNata de Coco and

    CCB

    Baula Village,Baula Sub

    district ( 21-22

    January 2011)

    Villagewomen group

    2 20 0 From this training,the participants

    learnt: (1) Making

    Nata de Coco and

    CCB (2)

    Understood

    business potentialof Nata de Coco

    and CCB (3) to

    utilize the coconut

    waste as income

    generation

    activitiesOn the Job

    Training to Madu

    Rasa Apiculture

    group

    Tandebura

    Village,

    Watubangga

    Sub district

    (11-13 January

    2011) and (18-

    19 February

    Farmer group 15 1 0 As the result, the

    group has

    managed to move

    twelve honey bee

    from its natural life

    into the box

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    5/22

    2011)

    Training on

    Making Handy

    Craft from

    Garbage to

    Village WomanGroup

    Gunung Sari

    Village,

    Watubangga

    Sub district

    (23-24 January2011)

    Village

    woman group,

    school

    children

    20 30 15 The benefit of the

    training: (1) The

    woman group

    understood making

    handicraft such asflower vases,

    pencil cases, bags

    etc (2) The woman

    group understood

    the importance toseparate organic

    and non-organic

    garbage

    Proceeding OJT

    to Community

    Radio (CR) Green

    Trust Crew

    Ladongi (28

    February

    2011)

    CR staff 8 3 0 The staff

    understood (1)

    broadcasting

    technique andequipment

    operating (2) up to

    date issues of radio

    management

    Training on

    Making Bokashi

    to Sumber Sari

    farmer Group

    Atula Village,

    Ladongi Sub

    District (12

    February

    2011)

    Farmer group 12 2 0 The participants

    has produced

    bokashi for their

    personal use

    Training on

    Making Bokashi

    and and OrganicPesticide to

    Sidomuncul

    farmer group

    Watubangga

    Sub district

    (18 March2011)

    Farmer group 18 7 0 The underlying

    result of the

    training are: (1)The farmer group

    understood

    technical on

    making bokashi

    and organic

    pesticide (2) Thefarmer group

    produce bokashi

    for their personal

    us

    Strengthening

    RGS CommunityRadio (CR)

    Institution

    Gunung Sari

    Village,Watubangga

    Sub district

    (20-25 March

    2011)

    Radio crew 4 2 0 The result of the

    meeting are (1) tomove the radio

    station to the SPH

    from the previous

    studio, the

    previous studio

    was at Pak

    Mades house,

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    6/22

    and the crew was

    reluctant go there

    (2) Increase the

    coverage areas (3)

    restructure the

    radio

    organization, anddevelop strategies

    for good

    management.

    Fixing BiogasDemplot

    LalowosulaVillage

    Ladongi Sub

    district (14-19

    March 2011)

    Villagers 7 1 0 Villagersunderstood types

    of fiber water tank

    to be used for

    permanent biogas

    installation

    2.B. Table listing all public/community environmental awareness-raising/demonstration events

    facilitated.

    Public Environmental Awareness Raising/Demonstration Events

    Title/type of Public

    Event/Demonstra

    tion Facilitated

    Date/Locati

    on

    Communit

    y Groups

    Targeted

    Number of ParticipantsPurpose/Result of

    EventMen Women Child

    ren

    NATIONAL/PROVINCE LEVEL

    Facilitating

    journalist trip

    Kolaka and

    Muna

    District

    General

    public

    Publication on the

    newspaper

    BUTON DISTRICT

    Participated MAD I

    /organized by

    consultant

    Pasarwajo

    Sub District

    (27 January2011)

    General

    public

    50 50 0 The underlined results of

    the meeting were: (1) All

    PNPM proposals shouldrefer to RPJMdes

    document (2) KPMD

    work outline was

    defined

    Garbage Separation

    Movement

    Socialization

    Laburunci

    Village,

    Pasarwajo

    Sub district

    (11 February

    2011)

    Villagers 15 20 0 (1) Participants will

    separate organic and non

    organic garbage starting

    from their home (2)

    OWT will provide

    training on making

    handicraft from garbage

    when the home plastic

    garbage are in

    considerable amount (3)

    OWT will conduct

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    7/22

    training for making

    compost for food

    remnants.

    Monitoring and

    Evaluation the

    Mahoni PlantationSub-project

    Implementation

    Jaya Bakti

    Village,

    SampolawaSub District

    (8 and 15

    January

    2011)

    Villagers 15 5 0 Improved knowledge on

    the project maintenance

    Monitoring Green

    PNPM Project

    Implementation of

    Sengon and Mahoni

    plantation

    Bangun and

    Wawaongi

    Village,

    Sampolawa

    Sub District

    (16 and 23

    January

    2011)

    Villagers 17 3 0 Improved knowledge in

    planting technique and

    vegetative propagation

    Monitoring Green

    PNPM Solar Panel

    (PLTS) Sub project

    Implementation

    Mawasangka

    Village,

    Mawasangka

    Sub District(16 January

    2011)

    Project

    beneficiari

    es

    3 2 0 Villagers understood

    maintenance of Solar

    panel

    Participated Sub

    district

    Musrembang

    Pasarwajo (2

    February

    2011)

    PNPM

    actors

    46 20 0 The objective of our

    involvement were (1) to

    ensure environmental

    issues discussed and

    taken into prioritieswithin village

    development plan (2) to

    socialize OWT smart

    practices and lesson

    learned of Green PNPM

    to inspire thegovernment (3) to

    present future awareness

    raising and training

    strategies to get input

    from the

    government/Musrembang forum.

    Awareness during

    Inter-kecamatan

    Sub project

    Handover Meeting

    (MDST)

    Holja (10

    February

    2011)

    Villagers 30 20 0 The objective of the

    meeting: (1) to witness

    the hand over the project

    implementation result

    from TPK to the

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    8/22

    beneficiaries; (2) to

    remind the village

    government to formulate

    regulation relating with

    rumpon management;

    (3) to assert

    responsibilities ofmaintenance team (Tim

    pemelihara/TP).

    Conducted Green

    PNPM One DayEvaluation

    Workshop at Sub

    district Level

    Pasarwajo 17

    February2011),

    Sampolawa

    (24

    February

    2011) and

    Mawasang

    ka (28February

    2011)

    PNPM

    actors

    35 5 0 (1) to socialize the three

    years implementation ofGreen-PNPM to various

    parties; (2) to socialize

    the principles of Green-

    PNPM sub-projects; (3)

    to learn the success and

    failure of Green-PNPM

    sub-projects and itsunderlined causes; (4) to

    learn good and bad

    practices of Green-

    PNPM sub-projects

    implementation; (5) to

    improve coordination

    among Green PNPM

    actors, facilitators and

    stakeholders.

    Assisting Perdes

    Formulation

    Holja,

    Pasarwajo

    Sub district(18 February

    2011)

    Village

    governmen

    t

    15 2 0 The underlying results

    are: (a) enhanced in

    participation ofcommunities in

    maintaining the sub

    project; (2)

    establishment of

    informal regulation and

    management which will

    be follow up into perdes

    document, punishment

    will be imposed to those

    who violated; (3) the

    BPD understood

    procedure and phases ofdeveloping village

    regulation-Perdes; (4)

    The BPD, KPMD and

    TPK started to draft the

    village regulation-Perdes.

    Group Discussion

    on Coastal AbrasionKancinaa (20 Villagers 17 5 0 The discussion results

    are as follows: (1) The

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    9/22

    with Key Villages February

    2011)

    coastal dwellers are

    aware on the coastal

    abrasion (2) the villagers

    has started to overcome

    the problem with

    planting mangrove at

    river banks/muara andthe beach even though

    they havent succeed (3)OWT will assist them on

    developing mangrove

    nursery.

    Awareness during

    MD Sosialisasi

    Gunung

    Sejuk,

    Lipumangau

    and Jaya

    Bakti Village

    (2-3

    February2011)

    95 63 0 The villagers understood

    up date progress of

    Green PNPM

    implementation

    Awareness on

    Spring Water

    Protection

    Makolo

    Hamlet,

    Jaya Bakti

    Village

    (10-14

    February

    2011)

    Villagers 26 2 0 As the result, the

    meeting are; (1)

    increased in awareness

    of protecting Makolo

    spring, the villagers will

    start to plant information

    board (2) The villagers

    will continue tree

    plantation and will

    develop villageregulation relating to the

    spring protection (3) the

    village will set up

    voluntary work regular

    schedule for the spring

    protection.

    Garbage Separation

    Movement

    Campaign

    Saragi

    Village,

    PasarwajoSub district

    (19 March2011)

    Villagers 20 15 0 Increased knowledge on

    garbage management

    Participated Reguler

    Village Quarterly

    Meeting organized

    by village

    government

    Jayabakti

    Village (18

    March

    2011)

    Village

    governmen

    t

    38 10 0 The objective of the

    meeting was to discuss

    village development

    plan. We made use the

    meeting to share

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    10/22

    environmental isuses and

    Green PNPM sub project

    implementation.

    Handover of Village

    Library and

    Regreening

    movement

    Gunung

    Sejuk

    Village (26

    March 2011)

    Villagers 36 13 32 (a) socializing the

    importance of the

    libraries (2) signatories

    of hand over legaldocument by the village

    government (3)

    installing announcement

    board of for the

    protection of Laloyaspring water and

    endemic species of

    wildlife such as Andoke,

    Phyton, kuskus and

    birds.

    Group Discussionwith Beringin

    Farmer

    Group inOengkolaki

    Village,

    Mawasang

    ka Sub

    district (26

    March

    2011)

    Farmergroup

    17 8 0 1) introduce smartpractices developed by

    OWT in Green PNPM

    (2) encourage the

    farmer group to actively

    participate in

    development program

    within the village such

    as PNPM (3) discuss

    activities of the farmer

    group and training plan

    for the group

    Awareness Raisingthrough Informal

    discussion with

    Village Government

    All Villagesin

    Mawasangka

    Sub district

    (26-27

    March 2011)

    VillageGovernme

    nt

    30 14 0 To understand trend ofgreen village proposal

    MUNA DISTRICT

    Intensive

    Facilitation on

    Honey Bee Culture

    Napalakura

    Village,

    Napabalano

    Sub District

    (15 January

    2011)

    Apiculture

    group

    10 2 0 Increased in knowledge

    of honey bee culture

    Mainstreaming

    Environmental

    Issues through

    Village

    Development Plan

    Meeting

    (Musrembang)

    Lawa (14

    February

    2011) and

    Tongkuno

    (15 February

    2011)

    District,

    Sub district

    and Village

    Governme

    nt.

    141 73 0 (1) to ensure that the

    environmental issues

    of Green PNPM

    discussed in the

    meeting (2) to ensure

    that any development

    plan and development

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    11/22

    implementation in the

    village will consider

    environmental impact

    (3) to ensure that

    OWTs best practicessuch as biogas, CCB,

    village nursery, cashewnut processing is

    further discussed and

    adopted by the

    government (4) to

    inspire the government

    at District level to

    consider including

    environmentalpreservation into

    Districts governmentpolicy.

    Participated

    Discussion to

    Develop

    Collaborative

    Action Plan with

    BAPPEDA in

    Garbage

    Management.

    Raha 22

    February

    2011

    BLH,

    BAPPEDA

    and NGO

    16 0 0 OWTs smart practicesis socialized among

    BLH and NGO

    Regreening

    Movement for

    Senior High School

    Student

    Barangka

    Sub district

    (4 March

    2011)

    School

    Student

    32 18 0 Green PNPM objective

    is socialized among

    school students

    Develop CCB

    Production Unit

    Lambiku

    Village,

    Napabalano

    Sub district

    (12 March

    2011)

    General

    public

    100 80 0 We support with

    promoting the CCB to

    wider community by

    ordering 150 kg

    distributed them freely

    to the villagers. We

    expect the villagers

    aware the effectiveness

    of use of CCB, so thatthey will either produce

    or purchase from theproduction unit.

    Development of

    Environmental

    Kiosk (Warling)

    In Wamelai

    Village,

    Lawa Sub

    District (2731 March

    2011).

    Villagers 7 1 0 Objectives: (1) sell

    community green

    products such as CCB,

    organic fertilizer, EM-

    4, Virgin Coconut Oil,

    honey bee, Jantropa

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    12/22

    Stove, Energy Saving

    Stove, coconut shell

    charcoal, tree seedlings

    and nentu handicraft,

    (2) promote

    environmental issues

    by displaying books,brochure, factsheets

    etc. We aim to develop

    one environmental

    kiosk at all sub

    districts.

    Awareness through

    factsheets

    distribution

    Tongkuno,

    Lawa and

    Napabalano

    Sub districts

    (25 March

    2011)

    General

    public

    150 50 0 We distributed five

    various factsheets

    entitled: (1) Shoot

    Cutting Propagation

    Technique, (2)

    Generative andvegetative propagation,

    (3) Agar wood

    Cultivation, (4)

    Introduction of Coconut

    shell Charcoal Briquette

    (CCB) (5) Planting

    technique. We

    distributed 50 pages at

    each sub districts

    (Tongkuno, Lawa, andNapabalano).

    Distributing Sticker Napabalano,

    Lawa and

    Tongkuno

    Sub district

    (10 March

    2011).

    General

    public

    75 50 0 We distributed Green

    stickers at public

    transportation, public

    places and at villagers

    house aimed to: (1) to

    raise knowledge of

    communities on Green

    PNPM (2) to socialize

    green issues to a wider

    community.

    KOLAKA DISTRICT

    Introducing OWT

    Best Practices on

    Garbage Separation

    during Health

    Socialization

    Puulemo

    Village,

    Baula Sub

    district (19

    January

    2011)

    Village

    women

    group

    3 13 0 To inspire Health agency

    with garbage

    management

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    13/22

    Facilitated Focus

    Group Discussion

    on Biogas

    Installation with

    MASSEDDIADA

    farmer group

    in Sumber

    Rejeki

    Village,

    Watubangga

    Sub district

    (03 January

    2011)

    Villagers 13 4 0 The result of the

    discussion: (1) The

    group understood the

    meaning of Sustainable

    and Self-sufficient

    energy Village (2) The

    group understood biogasas an alternative energy

    potential in Sumber

    Rejeki Village

    Participated

    Meeting withPNPM Stakeholder

    and Facilitators at

    Sub district Level

    Ladongi (03

    January2011)

    Sub district

    head, UPK,KPMD

    20 15 0 The outputs of the

    meeting were: (1)commitment to

    enhancing transparency

    and accountability of

    PNPM implementation

    in 2011 (2) commitment

    to consider as lesson

    learned ofimplementation failure

    occurred within the

    previous years

    Awareness during

    KPMD Monthly

    Meeting

    Ladongi Sub

    District (23

    January

    2011)

    KPMD 17 13 0 Objective of the

    meeting: (1) to

    strengthen KPMD rules

    as an important

    facilitator who plays an

    important role in

    determining the direction

    of village development

    (2) Synergize theintegration of

    Musrembang Desa and

    implementation of

    PNPM (3) Socialize

    OWT awareness plan

    and intensify the use of

    Green Trust Radio (CR)

    to socialize PNPM to

    enhance participation of

    the communities.

    Awareness duringMAD I PNPM-MP

    2011

    Ladongi Subdistrict (30

    January

    2011)

    Villagers 40 20 0 (1) to remind theparticipant the urgency

    and benefit of sub

    project for thecommunities, especially

    targeted beneficiaries of

    PNPM (2) to remind

    appropriateness of

    village proposal and

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    14/22

    existing problem and

    potential

    Awareness on

    Garbage Separation

    with DistrictsHealth Agency

    Watalara and

    Puulemo

    Village

    Baula (05-08

    February2011)

    Village

    woman

    group

    5 40 0 The result of the training

    were: (1) they

    understood simply

    practical way of health

    living (2) theydifferentiated types of

    garbages (2) theyseparate different type of

    garbage, between

    organic and an organic(3) They made garbage

    bin from rices sacks

    Organized Green

    PNPM exhibition at

    Gelora Football

    Field

    Kolaka (21-

    28 February

    2011)

    General

    public

    250 118 33 We made the event to

    socialize: (a) Pilot

    Green-PNPM in terms of

    its specific strategies andapproaches; (b) Green-

    PNPM smart practices(biogas, CCB, Jantropa

    stove, energy saving

    stove, Nentu, high

    quality seedlings)

    produced by SPH and

    FLER; (c) Market home

    industries products

    Socializing GreenMenu during MAD

    I in WatubanggaSub district

    We participated MAD Iin Watubangga

    conducted at the subdistrict meeting hall.

    We made use the

    meeting to (1)

    Socialize Green Menu

    (2) Presented lesson

    learned of previous

    implementation.

    Participated

    Musrenbang Desa at

    all villages

    Watubangga

    Sub district

    (14-17

    February2011)

    Village

    headmen,

    BPD,

    KPMD,FK-L

    (1) ensure the villages

    discussed environmental

    issues in Musrembang

    and considerenvironmental impact

    when proposing any

    development subject (2)

    to review the RPJMdes,

    as noted in the RPJMdes

    document that all

    villages are given time to

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    15/22

    review the document

    until April 2001

    Socializing the Role

    of OWT in Green

    PNPM during MAD

    Lambandia

    Sub District

    2011 (24

    March 2011)

    PNPM

    actor

    38 26 0 (1) Introduce Green

    PNPM (2) Introduce

    Green Menu (3)

    Introduce the role of

    OWT in Green PNPM(4) Introduce OWT

    smart practices.

    2.C. Table/description illustrating any relationship between trainings delivered/awareness-raising

    events facilitated and sub-projects selected by communities

    CSO Interventions related to Community green Sub-Project Selection Process

    Type of training, demonstration,

    environmental event facilitated

    (intervention) by CSO

    Specific sub-projects selected by communities

    related to CSO intervention (please include

    location)BUTON DISTRICT

    Developing mahoni nursery demplot in

    Waangu-angu village

    Lapodi village (10.000 seedling), Kombeli village

    (50 ha)

    Workshop on Village preservation area in

    Pasarwajo Sub district

    Spring Water rehabilitation in Kambula-bulana

    village, Laburunci and Awainulu village

    Kambula-bulana village, Laburunci andAwainulu village

    Head water rehabilitation in Kancinaa Village

    Developing janthropa nursery Planting janthropa (20.000 seedling) in

    Oengkolaki Village

    Socializing spring water as village

    preservation area, Gunung Sejuk village.

    Developing Laloiya spring water eco tourism

    object in Gunung Sejuk Village

    Training on nursery development in Gunung

    Sejuk Village, attended by all village

    representative from Sampolawa Sub district

    Planting mahoni trees, Planting mango , Planting

    Sengon Bangun Village, Wawoangi Village, Jaya

    Bakti Village , Lipu Mangau Village and Sandang

    Pangan Village.

    MUNA DISTRICT

    Awareness to protect and replicate mangrove

    planting campaigns in Bahari, Renda ,

    Wangkulabu, Lakarama village

    Mangrove planting in Bahari, Wangkulabu, Renda

    and Kombikuno Village

    Awareness protection of spring water in Sub-

    district Hall

    Planting campaigns surrounding Lambiku Spring-

    water

    Facilitation the establishment of teak nursery

    demonstration pilot in Napalakura Village

    Teak planting in Lakarama, Pentiro, Moasi,

    Tangkumaho, Latawe VillagesFacilitating Demplot development of cashew

    nut processing in Lalemba village

    Training on cashew nut processing Katobu

    ,Kampani, and Lindo village

    Awareness and training toward self sufficient

    energy village

    Training on making energy saving stove Lalemba

    village ( 35 people)

    Facilitating teak nursery demplot in Lalemba

    village

    Teak planting in Madampi and Watumela village

    Socializing critical land rehabilitation Sengon planting Wakontu village (10 ha)

    Lailangga village(25 ha)

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    16/22

    Demplot monoculture community forestry

    (Hutan Rakyat) at Lianosa village

    Planting teak in Lawama ,Waleale, and Lianosa

    village

    Facilitating apiculture (Avis cerana) demplot

    development

    Apiculture development in UP Wuna Village

    Spring rehabilitation Rehabilitation of Makantona spring water in

    Kulidawa Village and Oempu Springwater in

    Oempu VillageKOLAKA DISTRICT

    Biogas training and demplot development Three villages (Atula, Raara and Gunung Jaya)

    implemented Biogas installation.

    Awareness at 2010 PNPM cycle on Catchment

    area,

    Puundoho village (Planting Gmelina arborea and

    durian), Puulemo village (Planting manggis),

    Watalara village (planting jati putih,18 Ha)

    Planting campaign on World Environmental

    day

    Re-greening the house yard with fruit plantation

    Awareness on water catchment rehabilitation

    in PNPM cycle in 2010

    Mataosu village (planting teak, 40 ha and durian,

    5 ha), Polenga village (Gmelina arborea 25 ha and

    durian, 5 ha) Kastura village (Planting mango 15

    ha), Sumber Rejeki village (planting teak, 47 ha)

    2.D. Listing of all environmental information, education, communication (IEC) material producedover this reporting period.

    Green PNPM IEC Material Produced

    NoTypes of IEC &

    training materials

    Title of IEC/training

    materials

    Produced

    by and year

    of

    production

    No of IEC

    materials

    produced

    Disseminated

    in what areas

    1

    Radio Community

    service advertisement(ILM)

    Empowering

    Community forconservation

    01/03/111 day/

    week

    Ladongi, Poli-

    polia,

    Lambandia,

    Loea, Tirawutaand Lambuya

    Sub district

    Sustainable

    management of 15/03/113 day /

    week

    Ladongi, Poli-

    polia,

    Lambandia,

    Loea, Tirawuta

    and Lambuya

    Sub district

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    17/22

    2 Radio newsLove the environment

    with Green PNPM01/03/20

    3 day /

    week

    Ladongi, Poli-

    polia,Lambandia,

    Loea, Tirawuta

    and Lambuya

    Sub district

    Prioritizing woman sub

    project proposal01/03/11

    2 day /

    week

    Ladongi, Poli-

    polia,

    Lambandia,

    Loea, Tirawutaand Lambuya

    Sub district

    3 Factsheet

    Intensifying the use of

    community radio associalization media of

    Green PNPM

    01/03/11 2 day /week

    All KPMD and

    facilitator inLadongi Sub

    district

    4Community Radio Talk

    show, RGS Fm

    Developing Honey bee

    culture to preserve

    Environment

    02/03/11 Weekly

    Ladongi, Poli-

    polia,

    Lambandia,

    Loea, Tirawuta

    and Lambuya

    Sub district

    Toari

    5 Radio dialogueEnvironment, religious,culture.

    22/03/134 day /

    week

    Ladongi, Poli-

    polia,

    Lambandia,Loea, Tirawuta

    and Lambuya

    Sub district

    3.A. Table listing all trainings that were delivered to Green PNPM government officials over this

    reporting period.Title/Focus of

    Training

    Module

    Date/Location

    Positions of

    Government

    Officials

    Attended

    Number of

    ParticipantsResult of Training

    Men Women

    NATIONAL/PROVINCE LEVEL

    Training onGreen PNPM

    NRM and RE

    10/06/2010 Swiss Bell

    Hotel,

    Green PNPMStakeholders at

    District and Sub

    243 7 The participant were veryenthusiastic and inspired,

    they were aimed to develop

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    18/22

    Best Practices

    during PNPM

    evaluation

    workshop SE-

    Sulawesi

    Kendari district Level related practices for their

    agencies

    Workshop on

    OWTs Green-PNPM NRM and

    RE Smart

    Practices for

    Government and

    NGO

    12/11/2010

    ImperialHotel

    Kendari

    BAPPEDA and

    BAPPEDALDArepresentatives at

    provincial level,

    NGO

    17 5 Government agencies and

    NGOs are aware on theprogress of Green PNPM

    and strategies taken by OWT

    BUTON DISTRICT

    Training for Inter

    sub district

    verification team

    10/29/2010 -

    OWT office,

    Bau Bau

    Forestry agency,

    Life environment

    agency, Dinas

    Sosial, BPMD,

    Marine and

    Fishery agency

    8 0 The team whom represented

    related government agencies

    are aware of Green PNPM,

    NR potential and problem at

    targeted area. The

    representative of Lifeenvironment agency was

    seeking to work in

    partnership with OWT in

    guiding the communities andlocal government in

    developing environmental

    impact assessment.

    Training on NRM

    and RE Best

    practices during

    Workshop for

    DPR

    11/30/2010 BAPPEDA

    office, Buton

    SKPD, DPR, NGO 36 5 DPRD aware on the Green

    PNPM and best practices

    developed by the program

    Training on

    Green PNPM

    NRM and RE

    Best Practices

    during Workshop

    for SKPD

    12/1/2010-

    Buton

    SKPD,UPK Related government agencies

    at district level are aware on

    Green PNPM, and they

    become more concern with

    environmental issues

    Training on

    Green PNPM

    NRM and RE

    Best Practices for

    Setrawan

    12/15/2010-

    Lina Hotel,

    Baubau

    Setrawan, PMD

    district officer

    Setrawan are now fully

    aware of the Program, they

    know in which they should

    take apart

    MUNA DISTRICTTraining for Intersub district

    verification team

    10/14/2010-OWT Office,

    Muna

    Forestry agency,Life environment

    agency, Dinas

    Sosial, BPMD,

    Marine and

    Fishery agency

    4 0 The team whom representedrelated government agencies

    are aware of Green PNPM,

    NR potential and problem at

    targeted area. The

    representative of Lifeenvironment agency was

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    19/22

    seeking to work in

    partnership with OWT in

    guiding the communities and

    local government in

    developing environmental

    impact assessment

    Training onGreen PNPM NR

    and RE Best

    Practices for

    Setrawan

    12/16-17/2010-

    Rosidah

    Hotel, Muna

    Setrawan, BPMD 25 2 Setrawan are now fullyaware of the Program, they

    know in which they should

    take apart

    KOLAKA DISTRICT

    Training on

    community basedre-greening for

    Forestry agency

    11/13/2010-

    OWT Office,Kolaka

    KABID Forest and

    land rehabilitation,Community based

    nursery (KBR)

    committee.

    3 1 The development of Village

    based nursery in Kolakatakes several lessons from

    Green PNPM practices.

    Training on RE 11/14/2010-

    Baula,Kolaka

    Agriculture district

    agency

    10 20 This training aims to inspire

    Agriculture agency to applyrenewable energies of

    biogas.

    Meeting with

    PMD Kolaka to

    discuss the

    nationals

    appropriate

    technology

    exhibition 2011

    in Kolaka

    11/30/2010-

    PMD Office

    Kolaka

    Kabid TTG, PMD

    officer

    3 2 Green PNPM smart practices

    will be replicated by PMD at

    different sub district in

    Kolaka to prepare the

    national program.

    Training on

    Green PNPMNRM and RE

    Best Practicesduring workshop

    for DPRD

    12/15-16/2010

    Zam ZamHotel,

    Kolaka

    SKPD, DPRD,

    Camat

    67 31 OWT is trusted to assist the

    national exhibition onAppropriate Technologies

    on Renewable energy whichwill be conducted in Kolaka

    in 2011.

    3.B. Table listing CSO contributions to preparation of RPJM-Desa, Village Regulations/Perdes,

    other local/policy decisions regarding the promotion environmental issues in development

    planning/implementation procedures.

    Type of CSO intervention related topreparation of RPJM-Desa, Village

    Regulations/Perdes, other local/policy

    decisions

    Results related to CSO intervention

    BUTON DISTRICT

    PASARWAJO SUB DISTRICT

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    20/22

    Training on local NR potential and NR

    problem for RPJMdes team (08/01/2010)

    The teams are with emphasized to consider

    Green issues to be included in RPJMdes

    document, the facilitation timetable was set.

    Assisted RPJMdes team village meeting

    in Wangu angu, Wasaga, Kancinaa,

    Wakaokili (08/02-05/2010)

    4 villages assisted have completed RPJMdes

    document while other is 85 % progress.

    SAMPOLAWA SUB DISTRICT

    Training on local NR potential and NR

    problem for RPJMdes team (08/26/2010)

    The team are aware on the need to include

    green consideration within RPJMdesdocument

    Facilitated RPJMdes team village meeting

    (08/28-30/2010) in Gunung Sejuk,

    Bangun, Wawoangi Village)

    Villages assisted completed earlier the

    RPJMDes document

    MAWASANGKA SUB DISTRICT

    Training on local NR potential and NRproblem for RPJMdes team (08/24/2010)

    The teams are with emphasized to considerGreen issues to be included in RPJMdes

    document, the facilitation timetable was set.Facilitated RPJMdes team village meeting

    (08/25-29/2010) in Oengkolaki, Watolo,

    Kancebungi, Mawasangka Village

    Villages assisted by OWT completed earlier

    the RPJMDes document, in which the

    document taken as a sample for othervillages.

    MUNA DISTRICT

    NAPABALANO SUB DISTRICT

    Training on local NR potential and NR

    problem for RPJMdes team(07/31/2010)

    The team are aware on the need to include

    green consideration within RPJMdesdocument

    Facilitated RPJMdes meeting 10/19-

    30/2010) in Napalakura, langkumapo,Lambiku, Pentiro, Napabalano and Bahari

    village, facilitated Perdes on Mangroveprotection in Bahari Village

    100% RPJMdes document of all villages have

    been submitted. Perdes for Bahari Villagehas been 25% completed. These villages

    assisted by OWT completed earlier theirdocument and taken by PMD as an example

    during presentation at district level.

    LAWA SUB DISTRICT

    Training on local NR potential and NRproblem for RPJMdes team (07/31/2010)

    The team are aware on the need to includegreen consideration within RPJMdes

    document

    Facilitated RPJMdes team (08/1-20/2010)

    in Lassosodo, Lalemba, Latugho and

    Wamelai Village, Facilitated Perdes ofSpring water protection in LatughoVillage

    The RPJMdes has been 100% completed,

    Perdes 25%.

    TONGKUNO SUB DISTRICT

    Training on local NR potential and NRproblem for RPJMdes team (07/31/2010)

    The RPJMdes with good comprehension onthe local NR problem and potential

    Facilitated RPJMdes team village meeting

    in Lawama, Lapadindi, Lamorende and

    Four village has submitted RPJMdes Lawama,

    Lapadindi,Lamorende, Waleale, 15 villages

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    21/22

    Waleale Village(08/01-20/2010) has finished 85%, Perdes progress is 15 %

    for Kulidawa village.

    KOLAKA DISTRICT

    BAULA SUB DISTRICT

    Training on local NR potential and local

    NR Problem (09/24/2010)

    The RPJMdes teams are with consideration on

    the environmental issues.Facilitated RPJMdes Meeting in Puulemo,Longori, Puubenua, Pewutaa, Pundoho

    and Watalara Village.

    All villages have submitted RPJMdesdocument with more emphasize on the

    environmental issues.

    LADONGI SUB DISTRICT

    Training for RJM-Des team (10/01-02/2010) Ladongi Sub district.

    The RPJMdes teams are with consideration onthe environmental issues

    Facilitated RPJMdes team village meeting Nine RPJMdes with emphasize on Greenissues have been completed by the RPJMdes

    team. Anggaloosi Perdes has been 70 %

    progress

    WATUBANGGA SUB DISTRICTTraining on local NR potential and NRproblem for RPJMdes team in

    Watubangga Sub district (10/20/2010)

    The RPJMdes with good comprehension onthe local NR problem and potential

    Facilitated RPJMdes team village meetingin Gunung Sari, Peoho, Tandebura Village

    (10/21-23)

    100% RPJMdes document has beencompleted

    Indicator 4. A sustainable capacity among both [PNPM] facilitators and [PNPM]

    stakeholders of all levels to continue the implementation of locally-driven greendevelopment investment and to expand its geographic coverage to new areas.

    4.A Please provide any notable observations from the field that communities/government officialsare continuing to manage sub-projects funded with Green PNPM block grants after funding has

    been fully disbursed.

    Based on our notable observations, the enabling conditions that communities/government officials are

    continuing to manage sub-projects after Green-PNPM block grants funding disbursed are:

    (a)the sub-projects are useful for local communities . especially useful to generate income generation or

    reduce their daily domestic costs. For examples: (1) the making of CCB and organic fertilizer

  • 8/2/2019 OWT QR Jan March 2011 Annex Perfomance Indicator

    22/22

    development (income generation); (2) The use of Jantropa seeds for renewable energy (reduce theirdaily domestics cost);

    (b) the sub-projects are useful to support the better yield of the existing livelihoods or the recurrenceof the lost livelihoods.For examples: Mangrove planting has supported the success of seaweeds

    production (existing livelihoods) and the crab mangrove collections (the recurrence of livelihood);

    (c)replicated by government program. For instances:(1) Muna government in 2011 will facilitate the

    replication on the building of permanent biogas; (2) Kolaka Government in 2011 will allocate IDR 500

    millions facilitate on the replication of CCB development for women groups; (3) Sulawesi Province

    government (Bappeda/Planning Development Agency) allocate one billion rupiah of village grant from

    SE Sulawesi Province Government (Bahteramas) to replicate the Green-PNPM smart practices on 20

    sub-districts in Kolaka District.

    4.B. Please provide any notable observations of communities selecting to fund green sub -projects

    which are aligned/related to work supporting RPJM-Desa preparation. These should include any

    income generating activities which community members have used Green PNPM block grants to

    fund related training activities.

    We facilitated the formulation and the document preparation of RPJM-Desa on the basis on: (a)RonaLingkungan Desa (Profile of village environmental problems and its natural resources potential)

    developed in collaboration with villagers in 2008; (b) Knowledge Attitude and Practices (KAP) Survey

    conducted in 2008; (c) the success implementation of Green-PNPM sub-projects (smart-practices) onthe village and surrounding areas during 2008 and 2009; (d) List of potential sustainable

    livelihoods/income generating activities/Green-PNPM smart-practices which have not yet been funded

    by any fund sources until the end of 2010. Understanding this, the communities selecting to fund

    green sub-projects are much aligned to work supporting RPJM Desa preparation !