Page 1: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

Operating Experience On Ansaldo Energia V94.2 Gas Turbine In Fuel Oil

Premix Configuration Installed In Middle East

P. Pesce POWERGEN Europe2009

Page 2: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

Summary

V94.2 Gas Turbine OverviewV94.2 Gas Turbine Overview

A new project: reducing pollutant emissions in dry fuel oil A new project: reducing pollutant emissions in dry fuel oil operation operation

V94.2 GT Auxiliary SystemsV94.2 GT Auxiliary Systems

V94.2 GT Fuel Oil Premix UpgradesV94.2 GT Fuel Oil Premix Upgrades

V94.2 GT Fuel Oil Premix OperationV94.2 GT Fuel Oil Premix Operation

Page 3: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 Gas Turbine Overview

16 Compressor stages4 Turbine stages 1 Variable vane (IGV)2 Bearings2 Silos vertical combustion

chambers16 Hybrid burners (Gas&Oil,

Diffusion&Premix)50 Hz (3000 rpm) Speed

Page 4: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

A new project

Developing competitive products matching required emissions keeping high performances

MIDDLE EAST AREAV94.2

Page 5: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

Barka power plant (OMAN)

•• Three V94.2 Gas Turbines Three V94.2 Gas Turbines

•• MultyMulty Shaft ConfigurationShaft Configuration

•• Fuel Gas and Fuel Oil Operation Fuel Gas and Fuel Oil Operation

••Change Over Between FuelsChange Over Between Fuels

•• Fuel Oil Operation Dry (i.e. No Water Injection or Fuel Oil Operation Dry (i.e. No Water Injection or Emulsion)Emulsion)

V94.2 Upgrade: Gas turbine Fuel Oil Premix Operation

Page 6: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

Diffusion & Premix Flame

Diffusion flameLow dilution ratio

Highflame temperature

High NOx production

Premixed flameHigh dilution ratio

Low flame temperature

Low NOx production

Page 7: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

Hybrid Burner For Diffusion & Premix Mode

Page 8: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 Auxiliary Systems

Forwarding SystemForwarding System

Fuel Oil SkidFuel Oil Skid

Ignition Gas SkidIgnition Gas Skid

Purging Water SkidPurging Water Skid

Page 9: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Auxiliaries: Forwarding System

-Two Or More Centrifugal Pumps (One In Stand-by)

-A Duplex Filter For Each Forwarding Line

- A Couple Of Bladder Accumulators For Each Forwarding Line

Page 10: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Auxiliaries: Fuel Oil Skid

FO Injection pumps

Duplex filter

FO valves

•Two Centrifugal Injection Pumps (One In Stand By)•Two Bladders Accumulators•A Duplex Filter•A Fuel Oil Drainage Tank•A Fuel Oil Drainage Pump•Control And Emergency Stop Valves Set

Page 11: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Auxiliaries: Ignition Gas Skid

-Two Solenoid Shut Off Valves-Two Pressure Switches Upstream And Downstream Stop Valves-Automatic Pressure Control Valve-Pressure Relief Valve

Page 12: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Auxiliaries: Purging Water Skid

-Two Water Gear Pumps (One In Stand By)-Two Water Filters-Two Bladder Accumulators-Two Solenoid Water Shut Off Valves

Page 13: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Auxiliaries: Purging Water Skid_2

It avoids fuel oil cracking which can endanger fuel oil premix burners

Cooling

Before changeover DO - PO

FO Premix Burners Must Be Cooled To Avoid Coking Of Oil Due To High Burner Temperature

Purging

Before changeover PO - DOFO Premix Burners Must Be Purged to Displace Any Fuel Oil Remained in the Burners Which Could Cause Nozzles Clogging

Page 14: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Fuel Oil Premix Upgrade

Fuel ControllerFuel Controller

Fuel Oil SequencerFuel Oil Sequencer

MECHANICAL UPGRADE

FUNCTIONAL UPGRADE

FO Premix control valves and lines

FO Premix Burners

FO Premix Ball Valve

Purging Water System

Page 15: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 Fuel Oil Control Valves

A Control Valve On Diffusion Return Line

A Control Valve On Diffusion Supply Line

A Control Valve For Premix Line

Page 16: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 Fuel Oil Premix Burners

FUEL OIL PREMIX NOZZLES

Page 17: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 Fuel Oil Premix Ball Valves

Open position: this position is assumed during gas turbine premix operation

Purging position: this position is assumed during gas turbine’s cooling or purging sequences.

Closed position: this position is assumed when gas turbine is running not in premix mode. Sealing air is used to prevent any dangerous hot gases’ back flow during gas turbine operation.

Page 18: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT FUEL OIL FUNCTIONAL UPGRADE

New sequencer

Upgradated fuel controller

Page 19: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Fuel Oil Premix Operation

SpeedTETCDO_SL_ CVFO_RL_ CVDO_RL_ PRPO_CVPower

Burners Changeover FO DO-PO

Premix connection

Change over

Piping filling

Page 20: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

SpeedTETCDO_SL_ CVFO_RL_ CVDO_RL_ PRPO_CVPower

Burners Changeover FO PO-DO

V94.2 GT Fuel Oil Premix Operation

Change over beginning

Premix disconnection & purging

Page 21: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

SpeedTETCDO_SL_ CVDO_RL_ CVDO_RL_ PRPowerFG_ESVFG_CVFO_ESV

Fuel Changeover FG-FO

V94.2 GT Fuel Oil Premix Operation

Page 22: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

SpeedTETCDO_SL _CVFO_RL _CVPowerFO_ES VFG_CV

Fuel Changeover FO-FG

V94.2 GT Fuel Oil Premix Operation

Page 23: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

V94.2 GT Fuel Oil Premix Operation Data

Ambient conditions UNIT 1T amb=32 °CRH=71.25 %

P amb: 0.994 bar

UNIT 2Tamb=35 °CRH=67.8 %

P amb:0.993 bar

UNIT 3T amb=32 .4°C

RH=69.7%P amb:0.995 bar

POWER (guar. 117,1 MW)

119,4 MW 118,2 MW 118,2 MW

EFFICIENCY(guar. 31,5%)

31,8% 31,56% 31.6%

FO CONSUMPTION

9,42 Kg/s 9,34 Kg/s 9,43 Kg/s

NOX EMISSIONS(guar. 150mg/Nm3)

130 mg/Nm3 135 mg/Nm3 145 mg/Nm3

TETC 527 °C 531°C 535°C

Page 24: Operating Experience On Ansaldo Energia V94.2 Gas Turbine

Conclusions

The Experience Was Completely Successful In Terms Of:

Reliability Of The Gas Turbines

Flexibility During Operation

Respect Of Pollutant Emissions

Achievement Of The Expected Performances

ANSALDO ENERGIA Earned A New Improvement

Page 25: Operating Experience On Ansaldo Energia V94.2 Gas Turbine