TRAINING AT NTPC I was appointed to do 4 week training at this esteemed organization from 13th June to 9th July, 2016. I was assigned to visit various division of the plant, which were: BMD (BOILER MAINTANANCE DEPARTMENT) TMD (TURBINE MAITAINANCE DEPARTMENT) These 4 weeks training was a very educational adventure for me. It was really amazing to see the plant by yourself and learn how electricity, which is one of our daily requirements of life, is produced. This report has been made by my experience at NTPC. The material in this report has been gathered from my textbook, senior student reports and trainers manuals and power journals provided by training department. The specification and principles are as learned by me from the employees of each division of NTPC.

Upload: aditya-narain

Post on 10-Apr-2017

48 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: ntpc unchahar

TRAINING AT NTPC

 I was appointed to do 4 week training at this esteemed organization from 13th June to 9th July, 2016. I was assigned to visit various division of the plant, which were:

BMD (BOILER MAINTANANCE DEPARTMENT) TMD (TURBINE MAITAINANCE DEPARTMENT)

 

These 4 weeks training was a very educational adventure for me. It was really amazing to see the plant by yourself and learn how electricity, which is one of our daily requirements of life, is produced. This report has been made by my experience at NTPC. The material in this report has been gathered from my textbook, senior student reports and trainers manuals and power  journals provided by training department. The specification and principles are as learned by me from the employees of each division of NTPC.

Page 2: ntpc unchahar

ABOUT NTPC

NTPC Limited (previously known as National Thermal Power Corporation Limited) is an Indian central Public Sector Undertaking (PSU) under the Ministry of Power, Government of India, engaged in the business of generation of electricity and allied activities. It is a company incorporated under the Companies Act 1956 and a "Government Company" within the meaning of the act. The headquarters of the company is situated at New Delhi. NTPC's core business is generation and sale of electricity to state-owned power distribution companies and State Electricity Boards in India. The company also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management and operation and management of power plants.

The company has also ventured into oil and gas exploration and coal mining activities. It is the largest power company in India with an electric power generating capacity of 45,548 MW.Although the company has approx. 16% of the total national capacity it contributes to over 25% of total power generation due to its focus on operating its power plants at higher efficiency levels (approx. 80.2% against the national PLF rate of 64.5%).

It was founded by Government of India in 1975, which now holds 74.96% of its equity shares on 30.09.2015 (after divestment of its stake in 2004, 2010, 2013, and 2014)

In May 2010, NTPC was conferred Maharatna status by the Union Government of India. It is ranked 424th in the Forbes Global 2000 for 2014.

Page 3: ntpc unchahar
Page 4: ntpc unchahar

History

1975 to 1994

The company was founded in November 1975 as "National Thermal Power Corporation Private Limited". It started work on its first thermal power project in 1976 at Shaktinagar (named National Thermal Power Corporation Private Limited Singrauli) in Uttar Pradesh. In the same year, its name was changed to "National Thermal Power Corporation Limited". In 1983, NTPC began commercial operations (of selling power) and earned profits of INR 4.5 crores in FY 1982-83. By the end of 1985, it had achieved power generation capacity of 2000 MW.

In 1986, it completed synchronisation of its first 500 MW unit at Singrauli. In 1988, it commissioned two 500 MW units, one each in Rihand and Ramagundam. In 1989, it started a consultancy division. In 1992, it acquired Feroze Gandhi Unchahar Thermal Power Station (with 2 units of 210MW capacity each) from Uttar Pradesh Rajya Vidyut Utpadan Nigam of Uttar Pradesh. By the end of 1994, its installed capacity crossed 15,000 MW.

1995 to 2004

In 1995, it took over the Talchar Thermal Power Station from Orissa State Electricity Board. In the year 1997, Government of India conferred it with "Navratna" status. In the same year it achieved a milestone of generation of 100 billion units of electricity in a year. In 1998, it commissioned its first naptha-based plant at Kayamkulam with a capacity of 350 MW. In 1999, its plant in Dadri, which had the highest plant load factor (PLF) in India of 96%, was certified with ISO-14001. During 2000, it commenced construction of its first hydro-electric power project, with 800 MW capacity, in Himachal Pradesh.

In 2002, it incorporated 3 subsidiary companies: "NTPC Electric Supply Company Limited" for forward integration by entering into the business of distribution and trading of power; "NTPC Vidyut Vyapar Nigam Limited" for meeting the expected rise in energy trading; "NTPC Hydro Limited" to carry out the business of implementing and operating small and medium hydro-power projects. In the same year its installed capacity crossed 20,000 MW.

Listing: NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of INR 62 per share, it closed the first day of listing with INR 75.55 per share. On the day of listing, it become the third largest company in India in terms of market capitalisation.

2005 to present

Page 5: ntpc unchahar

In October 2005, the company's name was changed from "National Thermal Power Corporation Limited" to "NTPC Limited". The primary reason for this change was the company's foray into hydro and nuclear based power generation along with backward integration by coal mining. In 2006, it entered into an agreement with Government of Sri Lanka to set up two units of 250 MW each in Trincomalee in Sri Lanka.During 2008 and 2011, NTPC entered into Joint Ventures with BHEL, Bharat Forge, NHPC, Coal India, SAIL, NMDC and NPCIL to expand its business of power generation.By the end of 2010, its installed capacity crossed 31,000 MW.

The company in 2009 joined forces with other state enterprises Rashtriya Ispat Nigam, Steel Authority of India, Coal India, National Minerals Development Corporation and National Thermal Power Corporation to invest in coal mining operations through a joint venture vehicle named International Coal Ventures Private Limited (ICVL). In July 2014 ICVL acquired a 65 percent stake in the Bengal coal mine in Mozambique from the Rio Tinto Group

Technological Initiatives

Introduction of steam generators (boilers) of the size of 800 MW. Integrated Gasification Combined Cycle (IGCC) Technology. Launch of Energy Technology Centre -A new initiative for development of technologies

with focus on fundamental R&D. The company sets aside up to 0.5% of the profits for R&D. Roadmap developed for adopting µClean Development. Mechanism to help get / earn µCertified Emission Reduction.

Page 6: ntpc unchahar

Corporate Social Responsibility

As a responsible corporate citizen NTPC has taken up number of CSR initiatives. NTPC Foundation formed to address Social issues at national level  NTPC has framed Corporate Social Responsibility Guidelines committing up to0.5% of

net profit annually for Community Welfare. The welfare of project affected persons and the local population around NTPC projects

are taken care of through well drawn Rehabilitation and Resettlement policies. The company has also taken up distributed generation for remote rural areas

Partnering government in various initiatives

Consultant role to modernize and improvise several plants across the country. Disseminate technologies to other players in the sector. Consultant role 'Partnership in Excellence' Programme for improvement of PLF of 15

Power Stations of SEBs. Rural Electrification work under Rajiv Gandhi Garmin Vidyutikaran.

Page 7: ntpc unchahar

About Feroze Gandhi Unchahar Thermal Power Station

Approved capacity :1050 MW Installed Capacity :Stage I & II= 840 MW (2 x 210 + 2 x 210 MW) Stage III : 210

MW (1 x 210 MW) Location: Raibareli, Uttar Pradesh Coal Source : North Karanpura. Water Source: Sarda Sahayak Canal Beneficiary States :Uttar Pradesh, Haryana, Himachal Pradesh, J&K, Punjab,

Rajasthan, Chandigarh, Delhi, Uttaranchal Unit Sizes:

5x210 MWUnits CommissionedUnit I : 210 MW November 1988Unit II : 210 MW March 1989Unit III : 210 MW January 1999Unit IV : 210 MW October 1999Unit V : 210 MW September 2006

International Assistance: ADB Approved cost : Stage I & II : Rs.2337.09 Crores Stage III : Rs. 938.61 Crores.

Page 8: ntpc unchahar

Basic steps for electricity generation coal to steam steam to mechanical power mechanical power to electrical power

TYPICAL COAL POWER GENERATING PLANT

Page 9: ntpc unchahar

For units over about 200 MW capacity, redundancy of key components is provided by installing duplicates of the forced and induced draft fans, air preheaters, and fly ash collectors. On some units of about 60 MW, two boilers per unit may instead be provided. The list of coal power stations has the 200 largest power stations ranging in size from 2,000MW to 5,500MW.

Page 10: ntpc unchahar

BASIC POWER PLANT CYCLE: RANKINE CYCLE

The Rankine cycle is a cycle that converts heat into work. The heat is supplied externally to a closed loop, which usually uses water. This cycle generates about 80% of all electric power used throughout the world, including virtually all solar thermal, biomass, coal and nuclear power plants. It is named after William John Macquorn Rankine, a Scottish polymath. The Rankine cycle is the fundamental thermodynamic underpinning of the steam engine.

Overview of NTPC Unchahar Thermal Power Project:-

A thermal power station consists of all the equipments and a subsystem required to produce electricity by using a steam generating boiler fired with fossil fuels or biofuels to drive an electric generator. Some prefer to use the term ENERGY CENTER because such facilities convert form of energy like nuclear energy, gravitational potential energy or heat energy (derived from the combustion of fuel) into electrical energy.

The description of some of the components of the thermal power plant is as follows:

1 Cooling towers. -

Cooling towers are eveporative coolers used for cooling water. Cooling tower uses the concept of evaporation of water to reject heat from processes such by cooling the circulaing water used in oil refineries, chemical plants, power plants, etc. Smaller towers are normally factory built while larger ones are constructed on site. The primary use of large, industrial cooling tower system is to remove the heat by circulating the hot water used by the plants

The absorbed heat is rejected to the atmosphere by the evaporation of some of the cooling water in mechanical forced – draft or induced draft towers or in natural draft hyperbolic shaped cooling towers as seen at most nuclear power plants.

4 Nos Induced draft cooling towers with 10 fans each tower are installed at NTPC Unchahar for the above said pupose.

2. Three phase transmission line& step- up transformer

Three phase electric power is a common method of electric power transmission. It is a type of polyphase system mainly used for power motors and many other devices. In a three phase system, three circuits reach their instantaneous peak values at different times. Taking one conductor as reference, the other two conductors are delayed in time by one-third and two-third of cycle of the electrical current. This delay between phases has the effect of giving constant power over each cycle of the current and also makes it impossible to produce a rotating magnetic field in an electric motor. At the power station, an electric generator converts mechanical power into a set of electric currents one from each electromagnetic coil or winding of the generator. The currents are sinusoidal functions of time, all at the same frequency but offset in time to give

Page 11: ntpc unchahar

different phases. In a three phase system, the phases are spaced equally giving a phase separation of one-third of one cycle. Generators output at a voltage that ranges from

hundreds of volts to 30,000 volts at the power station. Transformers step-up this voltage for suitable transmission after numerous further conversions in the transmission and distribution network, the power is finally transformed to standard mains voltage i.e. the household voltage. This voltage transmitted may be in three phase or in one phase only where we have the corresponding step-down transformer at the receiving stage. The output of the transformer is usually star connected with the standard mains voltage being the phase neutral voltage.

3. Electrical generator-

An electrical generator is a device that coverts mechanical energy to electrical energy, using electromagnetic induction whereas electrical energy is converted to mechanical energy with the help of electric motor. The source of mechanical energy may be a rotating shaft of steam turbine engine. Turbines are made in variety of sizes ranging from small 1 hp(0.75 kW) used as mechanical drives for pumps, compressors and other shaft driven equipment to 2,000,000 hp(1,500,000 kW) turbines used to generate electricity.

4. STEAM TURBINE A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into rotary motion. Its modern manifestation was invented by Sir Charles Parsons in 1884.

It has almost completely replaced the reciprocating piston steam engine primarily because of its greater thermal efficiency and higher power-to-weight ratio. Because the turbine generates rotary motion, it is particularly suited to be used to drive an electrical generator – about 80% of all electricity generation in the world is by use of steam turbines. The steam turbine is a form of heat engine that derives much of its improvement in thermodynamic efficiency through the use of multiple stages in the expansion of the steam, which results in a closer approach to the ideal reversible process.

4. Steam condenser -

The condenser condenses the steam from the exhaust of the turbine into liquid to allow it to be pumped. If the condenser can be made cooler, the pressure of the exhaust steam is reduced and efficiency of the cycle increases. The surface condenser is a shell and tube heat exchanger in which cooling water is circulated through the tubes. The exhaust steam from the low pressure turbine enters the shell where it is cooled and converted to condensate (water) by flowing over the tubes as shown in the adjacent diagram. Such condensers use steam ejectors or rotary motor-

Page 12: ntpc unchahar

driven exhausters for continuous removal of air and gases from the steam side to maintain vacuum.

5. Boiler Feed Pump-

A Boiler Feed Pump is a specific type of pump used to pump water into steam boiler. The water may be freshly supplied or retuning condensation of steam produced by the boiler. These pumps are normally high pressure units that use suction from a condensate return system and can be of centrifugal pump type or positive displacement type. Construction and Operation feed water pumps range from sizes upto many horsepower and the electric motor is usually separated from the pump body by some form of mechanical coupling. Large industrial condensate pumps may also serve as the feed water pump. In either case, to force water into the boiler, the pump must generate sufficient pressure to overcome the steam pressure developed by the boiler. This is usually accomplished through the use of centrifugal pump. Feed water pumps usually run intermittently and are controlled by a float switch or other similar level-sensing device energizing the pump when it detects a lowered liquid level in the boiler substantially increased. Some pumps contain a two stage switch. As liquid lowers to the trigger point of the first stage, the pump is activated.

If the liquid continues to drop (perhaps because the pump has failed, its supply has been cut-off or exhausted, or its discharge is blocked),the second stage will be triggered. This stage may switch off the boiler equipment (preventing the boiler from running dry and overheating), trigger an alarm or both.

6. Control valves-

Control Valves are the valves used within industrial plants and elsewhere to control operating conditions such as temperature, pressure, flow and liquid level by fully or partially opening or closing in response to signals received from controllers that compares a “set point” to a “process variable” whose value is provided by sensors that monitor changes in such conditions. The opening or closing of control valves is done by means of electrical, hydraulic or pneumatic systems.

7. De-aerator-

A De-aerator is a boiler feed device for air removal and used to remove dissolved gases from water to make it non-corrosive. A de-aerator typically includes a vertical domed de-aeration section as the de-aeration feed water tank. A steam generating boiler requires that the circulating steam, condensate and feed water should be devoid of dissolved gases, particularly corrosive ones and dissolved or suspended solids. The gases will give rise to corrosion of the metal (due to cavitations). The solids will deposit on heating surfaces giving rise to localized heating and tube ruptures due to overheating. De-aerator level and pressure must be controlled by adjusting control valves-the level by regulating condensate flow and pressure by regulating steam flow.

Page 13: ntpc unchahar

Most de-aerators guarantee that if operated properly, oxygen in de-aerated water will not exceed 7ppb by weight.

8. Feed Water Heater-

A feed water heater is a power plant component used to pre heat water delivered to a steam generating boiler. Feed water heater improves the efficiency of the system. This reduces plant operating costs and also helps to avoid thermal shock to boiler metal when the feed water is introduced back into the steam cycle. Feed water heaters allow the feed water to be brought upto the saturation temperature very gradually. This minimizes the inevitable irreversibility associated with heat transfer to the working fluid(water). A belt conveyer consists of two pulleys, with a continuous loop of material- the conveyer belt that rotates around them. The pulleys are powered, moving the belt and the material on the belt forward. Conveyer belts are extensively used to transport industrial and agricultural material, such as grain, coal, ores, etc.

9. Pulverizer-

A pulverizer is a device for grinding coal for combustion in a furnace, in a coal based fuel power plant.

10. Boiler Steam Drum-

Steam Drums are a regular feature of water tube boilers. It is reservoir of water/steam at the top end of the water tubes in the water-tube boiler. They store the steam generated in the water tubes and act as a phase separator for the steam/water mixture. The difference in densities between hot and cold water helps in the accumulation of the “hotter”-water/and saturated –steam into steam drum. Made from high-grade steel (probably stainless) and its working involves temperatures 411’C and pressure well above 350psi (2.4MPa). The separated steam is drawn out from the top section of the drum. Saturated steam is drawn off the top of the drum. The steam will re-enter the furnace in through a super heater, while the saturated water at the bottom of steam drum flows down to the mud- drum /feed water drum by down comer tubes accessories include a safety valve, water level indicator and fuse plug. A steam drum is used in company of a mud-drum/feed water drum which is located at a lower level. So that it acts as a sump for the sludge or sediments which have a higher tendency at the bottom.

11. Super Heater-

A Super heater is a device in a steam engine that heats the steam generated by the boiler again increasing its thermal energy and decreasing the likelihood that it will condense inside the engine. Super heaters increase the efficiency of the steam engine, and were widely adopted. Steam which has been superheated is logically known as superheated steam; non-superheated steam is called saturated steam or wet steam; Super heaters were applied to steam locomotives in

Page 14: ntpc unchahar

quantity from the early 20th century, to most steam vehicles, and so stationary steam engines including power stations.

12. Economizers-

Economiser is mechanical devices intended to reduce energy consumption, or to perform another useful function like preheating a fluid. The term economizer is used for other purposes as well, e.g. air conditioning. Boiler heating in power plants. In boilers, economizer are heat exchange devices that heat fluids , usually water, up to but not normally beyond the boiling point of the fluid. Economizers are so named because they can make use of the enthalpy and improving the boiler’s efficiency. They are a device fitted to a boiler which saves energy by using the exhaust gases from the boiler to preheat the cold water used for feed into the boiler (the feed water). Modern day boilers, such as those in coal fired power stations, are still fitted with economizer which is decedents of Green’s original design. In this context they are turbines before it is pumped to the boilers. A common application of economizer is steam power plants is to capture the waste hit from boiler stack gases (flue gas) and transfer thus it to the boiler feed water thus lowering the needed energy input , in turn reducing the firing rates to accomplish the rated boiler output . Economizer lowers stack temperatures which may cause condensation of combustion gases (which are acidic in nature) and may cause serious equipment corrosion damage if care is not taken in their design and material selection.

13. Air Preheater-

Air preheater is a general term to describe any device designed to heat air before another process (for example, combustion in a boiler). The purpose of the air preheater is to recover the heat from the boiler flue gas which increases the thermal efficiency of the boiler by reducing the useful heat lost by the flue gases. As a consequence, the flue gases are also sent to the flue gas stack (or chimney) at a lower temperature allowing simplified design of the ducting and the flue gas stack. It also allows control over the temperature of gases leaving the stack (chimney).

14. Electrostatic Precipitator-

An Electrostatic precipitator (ESP) or electrostatic air cleaner is a particulate device that removes particles from a flowing gas (such As air) using the force of an induced electrostatic charge. Electrostatic precipitators are highly efficient filtration devices, and can easily remove fine particulate matter such as dust and smoke from the air steam. ESP’s continue to be excellent devices for control of many industrial particulate emissions, including smoke from electricity-generating utilities (coal and oil fired), salt cake collection from black liquor boilers in pump mills, and catalyst collection from fluidized bed catalytic crackers from several hundred thousand ACFM in the largest coal-fired boiler application. The original parallel plate-Weighted wire design (described above) has evolved as more efficient ( and robust) discharge electrode designs were developed, today focusing on rigid discharge electrodes to which many sharpened

Page 15: ntpc unchahar

spikes are attached , maximizing corona production. Transformer –rectifier systems apply voltages of 50-100 Kilovolts at relatively high current densities. Modern controls minimize sparking and prevent arcing, avoiding damage to the components. Automatic rapping systems and hopper evacuation systems remove the collected particulate matter while on line allowing ESP’s to stay in operation for years at a time.

15. Fuel gas stack-

A Fuel gas stack is a type of chimney, a vertical pipe, channel or similar structure through which combustion product gases called fuel gases are exhausted to the outside air. Fuel gases are produced when coal, oil, natural gas, wood or any other large combustion device. Fuel gas is usually composed of carbon dioxide (CO2) and water vapor as well as nitrogen and excess oxygen remaining from the intake combustion air. It also contains a small percentage of pollutants such as particulates matter, carbon mono oxide, nitrogen oxides and sulfur oxides. The flue gas stacks are often quite tall, up to 400 meters (1300 feet) or more, so as to disperse the exhaust pollutants over a greater aria and thereby reduce the concentration of the pollutants to the levels required by governmental environmental policies and regulations.

Page 16: ntpc unchahar

BMD (Boiler Maintenance Department)

BOILER

MAKE : Doosan Heavy Industries & Construction Co LTD, Korea.

DESIGNATION : Once-Thru in super Super-critical and Two-pass, balanced draft,

Outdoor, Radiant Reheat, Top support in sub-critical.

FURNACE SPECIFICATIONS

VOLUME : 21,462 m³

TYPE OF BOTTOM : Coutant

WIDTH : 18,816 mm

DEPTH : 18,144 mm

WATER WALL

Spiral Wall Tubes

Material : SA213T22

NO : 440

OD : 38.0 mm

Spacing : 50 mm

Vertical Wall

Material : SA213T22

NO : 1,320

OD : 34.0 mm

Spacing : 56 mm

Page 17: ntpc unchahar

SUPERHEATER

TYPE :Multi-stage with panel, Platen and pendant sections

REHEATER

TYPE :Multi-stage

ECONOMIZER

TYPE :Bare tube, Inline, Counter flow; 4 banks;

Assemblies :163

Tube O.D :50.8 mm

Type Material

Economizer SA210

Evaporator

Tube

Spiral SA213T22

Vertical SA213T22

Super heater

Tube

Primary SA213T23,

Secondary SA213T12, T23,

Final SA213T23, T91

Re-heater

Tube

Primary SA210C, T12,

Final SA213T23, T91

SUPER304H

Separator SA302C

Page 18: ntpc unchahar

Header SH SA335P9

RH SA335P9

A boiler is the central or an important component of the thermal power plant which focuses on producing superheated steams that is used for running of the turbines which in turn is used for the generation of electricity. A boiler is a closed vessel in which the heat produced by the combustion of fuel is transferred to water for its conversation into steam of the desired temperature & pressure.

The heat-generating unit includes a furnace in which the fuel is burned. With the advantage of water-cooled furnace walls, super heaters, air heaters and economizers, the term steam generator was evolved as a better description of the apparatus.

Boilers may be classified on the basis of any of the following characteristics:

Use Pressure Materials Size Tube Content Tube Shape and position Firing Heat Source Fuel Fluid Circulations Furnace position Furnace type General shape Trade name Special features.

Use: The characteristics of the boiler vary according to the nature of service performed.

Customarily boiler is called either stationary or mobile. Large units used primarily for electric power generation are known as control station steam generator or utility plants.

Pressure: To provide safety control over construction features, all boilers must be constructed in accordance with the Boiler codes, which differentiates boiler as per their characteristics.

Materials: Selection of construction materials is controlled by boiler code material specifications. Power boilers are usually constructed of special steels.

Size: Rating code for boiler standardize the size and ratings of boilers based on heating surfaces. The same is verified by performance tests.

Tube Contents: In addition to ordinary shell type of boiler, there are two general steel boiler classifications, the fire tube and water tube boilers. Fire tube boiler is boilers with straight tubes that are surrounded by water and through which the products of combustion pass. Water tube boilers are those, in which the tubes themselves contain steam or water, the heat being applied to the outside surface.

Firing: The boiler may be a fired or unfired pressure vessel. In fired boilers, the heat applied is a product of fuel combustion. A non-fired boiler has a heat source other than combustion.

Heat Source: The heat may be derived from (1) the combustion of fuel (2) the hot gasses of other chemical reactions (3) the utilization of nuclear energy.

Page 19: ntpc unchahar

Fuel: Boilers are often designated with respect to the fuel burned.

Fluid: The general concept of a boiler is that of a vessel to generate steam. A few utilities plants have installed mercury boilers.

Circulation: The majority of boilers operate with natural circulation. Some utilize positive circulation in which the operative fluid may be forced 'once through' or controlled with partial circulation.

Furnace Position: The boiler is an external combustion device in which the combustion takes place outside the region of boiling water. The relative location of the furnace to the boiler is indicated by the description of the furnace as being internally or externally fired.

The furnace is internally fired if the furnace region is completely surrounded by water cooled surfaces. The furnace is externally fired if the furnace is auxiliary to the boiler.

Furnace type: The boiler may be described in terms of the furnace type.

General Shape: During the evaluation of the boiler as a heat producer, many new shapes and designs have appeared and these are widely recognized in the trade.

Trade Name: Many manufacturers coin their own name for each boiler and these names come into common usage as being descriptive of the boiler.

Special features: some times the type of boiler like differential firing and Tangential firing are described.

Categorization of Boilers:

Boilers are generally categorized as follows:

• Steel boilers

• Fire Tube type

• Water tube type

• Horizontal Straight tube

The boiler is generally used for power production are two types:-

1. Corner boiler

2. Front fire boiler

The boiler mainly has natural circulation of gases, steam and other things. They contain vertical membrane water. The pulverized fuel which is being used in the furnace is fixed tangentially.

Page 20: ntpc unchahar

They consume approximately 700 ton.\hr of coal of about 1370kg\cm2 of pressure having temperature of 540оC.

The first pass of the boiler has a combustion chamber enclosed with water walls of fusion welded construction on all four sides. In addition there are four water platens to increase the radiant heating surface.

Beside this platen super heater reheater sections are also suspended in the furnace combustion chamber. The first pass is a high heat zone since the fuel is burn in this pass.

The second pass is surrounded by steam cooled walls on all four sides as well as roof of the boiler. A horizontal super heater, an economizer & two air heaters are located in the second pass.

The main components of a boiler and their functions are given below:

a) DRUM: It is a type of storage tank much higher placed than the level at which the boiler is placed, and it is also a place where water and steam are separated. First the drum is filled with water coming from the economizer, from where it is brought down with the help of down-comers, entering the bottom ring headers. From there they enter the riser, which are nothing but tubes that carries the water (which now is a liquid-vapor mixture), back to the drum. Now, the steam is sent to the super heaters while the saturated liquid water is again circulated through the down-comers and then subsequently through the risers till all the water in the drum turns into steam and passes to the next stage of heating that is superheating.

NOTE: for a 660 MW plant, the boiler does not employ any drum; instead the water and steam go directly into the super heater because the pressure employed being higher than the critical pressure of water on further stages of heating will eventually turn completely into steam without absorbing any latent heat of vaporization since the boiling part in the T-s curve no longer passes through the saturation dome rather its goes above the dome.

Fig 1 : typical non regenerative rankine cycle followed by sub - critical power plants.

Fig 2 : typical non regenerative rankine cycle followed by super critical power plants.

b) SUPER HEATERS: The steam from the boiler drum is then sent for superheating. This takes place in three stages. In the first stage, the steam is sent to a simple super heater, known as the low temperature super heaters (LTSH), after which the second stage consists of several divisional panels super heaters (DPSH). The final stage involves further heating in the Platen super heaters (PLSH), after which the steam is sent through the Main Steam (MS) piping for driving the turbine.

Page 21: ntpc unchahar

Superheating is done to increase the dryness fraction of the exiting steam. This is because if the dryness fraction is low, as is the case with saturated steam, the presence of moisture can cause corrosion of the blades of the turbine. Super heated steam also has several merits such as increased working capacity, ability to increase the plant efficiency, lesser erosion and so on. It is also of interest to know that while the super heater increases the temperature of the steam, it does not change the pressure. There are different stages of super heaters besides the sidewalls and extended sidewalls. The first stage consists of LTSH (low temperature super heater), which is conventional mixed type with upper & lower banks above the economizer assembly in rear pass. The other is Divisional Panel Super heater which is hanging above in the first pass of the boiler above the furnace. The third stage is the Platen Super heater from where the steam goes into the HP turbine through the main steam line. The outlet temperature & pressure of the steam coming out from the super heater is 540 degrees Celsius & 157 kg/cm2. After the HP turbine part is crossed the steam is taken out through an outlet as CRH(Cold Re-heat steam) to be re-heated again as HRH(Hot Re-heat steam) and then is fed to the IPT(Intermediate pressure turbine) which goes directly to the LPT(Low pressure turbine) through the IP-LP cross-over.

c) WATER WALLS: The water from the bottom ring header is then transferred to the water walls, where the first step in the formation of steam occurs by absorbing heat from the hot interior of the boiler where the coal is burned continuously. This saturated water steam mixture then enters the boiler drum.

In a 500 MW unit, the water walls are of vertical type, and have rifled tubing whereas in a 660 MW unit, the water walls are of spiral type till an intermediate ring header from where it again goes up as vertical type water walls. The advantage of the spiral wall tubes ensures an even distribution of heat, and avoids higher thermal stresses in the water walls by reducing the fluid temperature differences in the adjacent tubes and thus minimizes the sagging produced in the tubes.

d) ECONOMIZER: The economizer is a tube-shaped structure which contains water from the boiler feed pump. This water is heated up by the hot flue gases which pass through the economizer layout, which then enters the drum. The economizer is usually placed below the second pass of the boiler, below the Low Temperature Super heater. As the flue gases are being constantly produced due to the combustion of coal, the water in the economizer is being continuously being heated up, resulting in the formation of steam to a partial extent. Economizer tubes are supported in such a way that sagging, deflection & expansion will not occur at any condition of operation.

Figure depicting the difference between the vertical water wall and the spiral water wall type of tubing where the vertical water walls have the rifle type of tubes to increase the surface area unlike the spiral ones that have plain, smooth surfaces.

Page 22: ntpc unchahar

e) DEAERATOR:

A deaerator is a device that is widely used for the removal of air and other dissolved gases from the feedwater to steam-generating boilers. In particular, dissolved oxygen in boiler feedwaters will cause serious corrosion damage in steam systems by attaching to the walls of metal piping and other metallic equipment and forming oxides (rust). Water also combines with any dissolved carbon dioxide to form carbonic acid that causes further corrosion. Most deaerators are designed to remove oxygen down to levels of 7 ppb by weight (0.005 cm³/L) or less.

There are two basic types of deaerators, the tray-type and the spray-type:

The tray-type (also called the cascade-type) includes a vertical domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as the deaerated boiler feedwater storage tank.

The spray-type consists only of a horizontal (or vertical) cylindrical vessel which serves as both the deaeration section and the boiler feedwater storage tank.

In addition to these there are several other smaller components attached to a boiler, including several safety valves, which have their own special significance.

So briefly, the boiler functions this way. The water enters the boiler through the economizer. From there it passes to the drum. Once the water enters the drum it comes down the down comers to the lower inlet water wall headers. From the headers the water rises through the water walls and is eventually turned into steam due to the continuous heat being generated by the burners. As the steam is formed it enters the steam drum. Here the steam and water is separated. The separators and dryers remove the droplets of water and the cycle through the water walls is repeated. This cycle is known as natural circulation cycle. In the forced circulation of water pumps are used to maintain the flow of water.

the overall figure of the boiler depicting the flow of the fuel and the gases along the given direction of the arrows .

ASSOCIATED SYSTEMS IN A POWER PLANT

There are several systems in a power plant which assist the main units to carry out their functions properly:

1) PA FANS: The primary air fans are used to carry the pulverized coal particles from the mills to the boiler. They are also used to maintain the coal-air temperature. The specifications of the PA fan used at the plant under investigation are: axial flow, double stage, reaction fan.

Page 23: ntpc unchahar

The PA fan circuit consists of:

a) Primary air path through cold air duct

b) Air pre-heater

c) Hot air duct

d) Mills

The model no. of the PA fan used at NTPC Sipat is AP2 20/12, where A refers to the fact that it is an axial flow fan, P refers to the fan being progressive, 2 refers to the fan involving two stages, and the numbers 20 and 12 refer to the distances in decimeters from the centre of the shaft to the tip of the impeller and the base of the impeller, respectively. A PA fan uses 0.72% of plant load for a 500 MW plant.

2) FD FANS: The forced draft fans, also known as the secondary air fans are used to provide the secondary air required for combustion, and to maintain the wind box differential pressure. Specifications of the FD fans are: axial flow, single stage, impulse fan.

The FD fan circuit consists of:

a) Secondary air path through cold air duct b) Air pre-heater c) Hot air duct d) Wind box The model no. of the FD fan used at NTPC Sipat is AP1 26/16, where the nomenclature has been described above. FD fans use 0.36% of plant load for a 500 MW plant.

3) ID FAN: An induced fan circuit consists of

a) Flus gas through water walls b) Superwater c) Re-heater d) Platen super heater e) low temperature super heater f) Air pre-heater g) Electrostatic precipitator

The main purpose of an ID fan is to suck the flue gas through all the above mentioned equipments and to maintain the furnace pressure. ID fans use 1.41% of plant load for a 500 MW plant.

4) AIR PRE-HEATERS: Air pre-heaters are used to take heat from the flue gases and transfer it to the incoming air. They are of two types:

a) Regenerative

b) Recuperative

The APH used at NTPC Sipat is a Ljungstrom regenerative type APH. A regenerative type air pre-heater absorbs waste heat from flue gas and transfers this heat to the incoming cold air by

Page 24: ntpc unchahar

means of continuously rotating heat transfer elements of specially formed metal sheets. A bi-sector APH preheats the combustion air. Thousands of these high efficiency elements are spaced and compactly arranged within sector shaped compartments of a radially divided cylindrical shell called the rotor. The housing surrounding the rotor is provided with duct connections at both ends, and is adequately sealed by radial and axial sealing members forming an air passage through one half of the APH and a gas passage through the other.

As the rotor slowly revolves the elements alternately pass through the air and gas passages; heat is absorbed by the element surfaces passing through the hot gas stream, then as the same surfaces pass through the air stream, they release the heat to increase the temperature of the combustion of process air.

A single APH is divided into 4 parts: 2 PAPHs and 2 SAPHs. The P and S refer to primary and secondary respectively. Each part is divided into two slots, one slot carrying the primary/secondary air, and the other slot carrying the hot flue gases coming from the 2nd pass of the boiler. The PAPH is connected to the mills, whereas the SAPH is connected to a wind box.

5) ELECTROSTATIC PRECIPITATORS: They are used to separate the ash particles from the flue gases. In this the flue gas is allowed into the ESP, where there are several metallic plates placed at a certain distance from each other. When these gases enter, a very high potential difference is applied, which causes the gas particles to ionize and stick to the plates, whereas the ash particles fall down and are collected in a hopper attached to the bottom of the ESP. The flue gas is allowed to cool down and is then released to the ID fan to be sent to the chimney.

6) MILL: As the name suggests the coal particles are grinded into finer sized granules. The coal which is stored in the bunker is sent into the mill, through the conveyor belt which primarily controls the amount of coal required to be sent to the furnace. It on reaching a rotating bowl in the bottom encounters three grinding rolls which grinds it into fine powder form of approx. 200 meshes per square inch. the fine coal powder along with the heated air from the FD and PA fan is carried into the burner as pulverized coal while the trash particles are rejected through a reject system.

Types of coal pulverizers:

Impact Attrition Crushing

Sometimes these pulverizers employ all the three techniques all together.

7) SEAL AIR FAN: The seal air fan is used near the mill to prevent the loss of any heat from the coal which is in a pulverized state and to protect the bearings from coal particle deposition.

Page 25: ntpc unchahar

8) WIND BOX: these acts as distributing media for supplying secondary/excess air to the furnace for combustion. These are generally located on the left and and right sides of the furnace while facing the chimney.

9) IGNITER FAN: Igniter fans which are 2 per boiler are used to supply air for cooling Igniters & combustion of igniter air fuel mixture.

10) CHIMNEY: These are tall RCC structures with single & multiple flues. Here, for I & II we have 1 chimney, for unit III there is 1 chimney & for units IV & V there is 1 chimney. So number of chimneys is 5 and the height of each is 275 metres.

11) COAL HANDLING PLANT: This part of the thermal power plant handles all the requirements of coal that needs to be supplied to the plant for the continuous generation of electricity. Coal is generally transported from coal mines ( mostly located in peninsular regions of India ) to Thermal power plant with the help of rail wagons. A Single rail wagon can handle upto 80 tons of coal( gross weight) . When these rail wagons reach the thermal plant the coal is unloaded with the help of wagon tipplers. A wagon tippler is actually a huge J shaped Link pinned at its top. Powerful motors are used to pull the ropes attached to an end which lets the wagon to rotate at an angle of 135 degree. The coal falls down due to action of gravity into the coal bunkers. Vibration motors then are used to induce the movement the coal through its way. as the coal reaches the hopper section of the bunker , it is taken away by conveyer belts to either the storage yard or to the assembly points where the coal gets distributed on different conveyers. Initially, the size of coal is taken as 250mm in size. The macro coal has to be converted into micro ( 25mm ) size coal for the actual combustion. This is attained by using high pressure crushers located at the coal handling plants. Here various metal are separated by various mechanisms. There are various paths through which a coal can go to boiler section. These paths are alternative such as A and B and only one is used at a time letting the other standby.

The conveyor belts are monitored with various mechanisms such as:

Emergency stop swaying Slipping metal detectors

Coal on the conveyer belts moves into raw coal bunkers known as RC bunkers. There are six raw coal bunkers for each unit of the plant. The coal from six RC bunkers falls onto six RC feeders and moves to six Ball mills.

12) COAL BUNKER: These are in process storage used for storing crushed coal from the coal handling system. Generally, these are made up of welded steel plates. Normally, these are located on top of mills to aid in gravity feeding of coal. There are 10 such bunkers corresponding to each mill.

13) ASH HANDLING PLANT: The ash produced in boiler is transported to ash dump area by means of sluice type hydraulic ash handling system, which consists of:

Page 26: ntpc unchahar

Bottom Ash System: In the Bottom Ash system the ash slag discharged from the furnace bottom is collected in two water impounded scraper troughs installed below bottom ash hoppers. The ash is continuously, transported by means of the scraper chain conveyor, on to the respective clinker grinders which reduce the lump sizes to the required fineness. Fly Ash System: In this system, Fly ash gets collected in these hoppers drop continuously to flushing apparatus where fly ash gets mixed with flushing water and the resulting slurry drops into the ash sluice channel. Low pressure water is applied through the nozzle directing tangentially to the section of pipe to create turbulence and proper mixing of ash with water. Ash Water System: High pressure water required for B.A hopper quenching nozzles, B.A hopper`s window spraying, clinker grinder sealing scraper bars, cleaning nozzles B.A hopper seal through flushing, Economizer Hoppers` flushing nozzles and sluicing trench jetting nozzles is tapped from the high pressure water ring main provided in the plant area. Ash Slurry System: Bottom Ash and Fly Ash slurry of the system is sluiced up to ash slurry pump along the channel with the aid oh high pressure water jets located at suitable intervals along the channel. Slurry pump section line consisting of reducing elbow with drain valve, reducer and butterfly valve and portion of slurry pump delivery line consisting of butterfly valve, Pipe and fitting has also been provided.

14) REHEATER: The function of reheater is to reheat the steam coming out from the high pressure turbine to a temperature of 540 degrees Celsius. It is composed of two sections: the rear pendant section is located above the furnace arc & the front pendant section is located between the rear water hanger tubes & the Platen superheater section.

15) BURNERS: There are total 20 pulverised coal burners for the boiler present here, & 10 of the burners provided in each side at every elevation named as A,B,C,D,E,F,G,H,J,K. There are oil burners present in every elevation to fire the fuel oil (LDO & HFO) during lightup.

Apart from these units and systems, piping is another important system which is essential for the proper transfer of fluids of different types from one unit to another. In a power plant, pipes are used to transfer steam, water, oil, air etc. from one unit to the other. Some criteria for the selection of the pipes are given below:

1) The piping should be of necessary size to carry the required flow of fluids.

2) Pipes should be able to withstand the high temperatures and expansions due to changes in temperatures.

3) Piping system should withstand the high pressures to which it may be subjected.

For smooth and safe operation of the power plant it is desirable to use minimum length of pipes, and they should be as direct and straight as possible.

Ways to increase the thermal efficiency of power plants:

Page 27: ntpc unchahar

The basic idea behind all the modifications to increase the thermal efficiency of a power cycle is the same: Increase the average temperature at which heat is transferred to the working fluid in the boiler, or decrease the average temperature at which heat is rejected from the working fluid in the condenser. That is, the average fluid temperature should be as high as possible during heat addition and as low as possible during heat rejection.

Lowering the Condenser Pressure (Lowers Tlow,avg): Steam exists as a saturated mixture in the condenser at the saturation temperature corresponding to the pressure inside the condenser. Therefore, lowering the operating pressure of the condenser automatically lowers the temperature of the steam, and thus the temperature at which heat is rejected. The effect of lowering the condenser pressure on the Rankine cycle efficiency is illustrated on a T-s diagram in Fig.1. For comparison purposes, the turbine inlet state is maintained the same. The colored area on this diagram represents the increase in net work output as a result of lowering the condenser pressure from P4 to P4’. The heat input requirements also increase (represented by the area under curve 2_-2), but this increase is very small. Thus the overall effect of lowering the condenser pressure is an increase in the thermal efficiency of the cycle.

Fig:1 Effect of lowering of the condenser pressure on efficiency

Superheating the Steam to High Temperatures (Increases Thigh,avg): The average temperature at which heat is transferred to steam can be increased without increasing the boiler pressure by superheating the steam to high temperatures. The effect of superheating on the performance of vapor power cycles is illustrated on a T-s diagram in Fig.2. The colored area on this diagram represents the increase in the net work. The total area under the process curve 3-3_ represents the increase in the heat input. Thus both the net work and heat input increase as a result of superheating the steam to a higher temperature. The overall effect is an increase in thermal efficiency, however, since the average temperature at which heat is added increases.

Increasing the Boiler Pressure (Increases Thigh,avg): Another way of increasing the average temperature during the heat-addition process is to increase the operating pressure of the boiler, which automatically raises the temperature at which boiling takes place. This, in turn, raises the average temperature at which heat is transferred to the steam and thus raises the thermal efficiency of the cycle. The effect of increasing the boiler pressure on the performance of vapor power cycles is illustrated on a T-s diagram in Fig.3. Notice that for a fixed turbine inlet temperature, the cycle shifts to the left and the moisture content of steam at the turbine exit increases. This undesirable side effect can be corrected, however, by reheating the steam, as discussed in the next section.

Fig:2 Effect of superheating the steam to high temperatures

Page 28: ntpc unchahar

LOSSES DURING OPERATION & MAINTAINANCE OF PLANT

1) SURFACE ROUGHNESS: It increases friction & resistance. It can be due to Chemical deposits, Solid particle damage, Corrosion Pitting & Water erosion. As a thumb rule, surface roughness of about 0.05 mm can lead to a decrease in efficiency of 4%.

2) LEAKAGE LOSS:

Interstage Leakage Turbine end Gland Leakages About 2 - 7.5 kW is lost per stage if clearances are increased by 0.025 mm depending upon LP or HP stage.

3) WETNESS LOSS:

Drag Loss: Due to difference in the velocities of the steam & water particles, water particles lag behind & can even take different trajectory leading to losses. Sudden condensation can create shock disturbances & hence losses. About 1% wetness leads to 1% loss in stage efficiency.

Fig:3 Effect of increasing boiler pressure to increase efficiency

4) OFF DESIGN LOSSES: Losses resulting due to turbine not operating with design terminal conditions. Change in Main Steam pressure & temperature. Change in HRH pressure & temperature. Condenser Back Pressure Convergent-Divergent nozzles are more prone to Off Design losses then Convergent nozzles as shock formation is not there in convergent nozzles.

5) PARTIAL ADMISSION LOSSES:

In Impulse turbines, the controlling stage is fed with means of nozzle boxes, the control valves of which open or close sequentially. At some partial load some nozzle boxes can be partially open / Completely closed. Shock formation takes place as rotor blades at some time are full of steam & at some other moment, devoid of steam leading to considerable losses.

6) LOSS DUE TO EROSION OF LP LAST STAGE BLADES:

Erosion of the last stage blades leads to considerable loss of energy. Also, It is the least efficient stage. Erosion in the 10% length of the blade leads to decrease in 0.1% of efficiency.

CONCLUSION

All the minor & major sections in the thermal project had been visited & also understood to the best of my knowledge. I believe that this training has made me well versed with the various processes in the power plant. As far as I think there is a long way to go till we use our newest of ever improving technologies to increase the efficiency because the stocks of coal are dwindling

Page 29: ntpc unchahar

and they are not going to last forever. Its imperative that we start shouldering the burden together to see a shining and sustainable future INDIA.