L ETAL International Inc. Company, during many years engaged in the development and implementation of
energy saving technologies and alternative energy sources. The result of fruitful work has a number of
technologies for recycling of municipal solid waste, medical waste, waste water treatment, desalination, etc.
One of the devices for processing of solid waste is a gasifier, which converts municipal solid waste into
syngas.
The scheme of the gasifier:
The produced synthesis - gas has high calorific value (from 3000 to 5000
kcal / m ³)
To date completed construction of a first plant capacity of 440 tons of
MSW per day gasification and power generation in the amount of 15.8 MW.
Gasifier which are used at this plant, and more capacity gasifiers can be
successfully used in thermal power plants, which significantly lowers the
cost of producing electricity, as well as solve the question of disposal of solid
waste without the use of separate waste collection method.
First
plant
Turbines
Gasifier
Non sorting MSW goes into the Gasifier Control room
Metal separator Gasifier
The scheme of the plant:
Comparison of Regulatory Emission Limits
MSW Gasifier which is working at our plant has the unique power and performance and has no analogues.
- Gasifier can also be applied to the existing thermal power plants, as an additional module production of
synthesis gas, which greatly reduces the cost of the project. It is also possible to gasify coal, which
significantly reduces harmful emissions into the atmosphere from coal dust
Having today the technology and working a pilot plant, we can quickly and inexpensively solve the problem
of disposal of solid waste using thermal power plants.
This technology does not require any sorting that would allow municipalities to reduce costs for separate
collection.
To put the size of area businesses need 3-4 hectares.
Capacity of recycling MSW up to 440 tons per day
Producing electricity – 15.8 MWT/h
Quantity of products:
Electricity per day – 379.2 Megawatt
Aluminum per day – 4.4 tons
Ferrous per day - 26.3 tons
Thermal energy per day – 480 Megawatt
Revenue:
Electricity sales per year - 19 million Euro
Aluminum sales per year - 1milliom euro
Ferrous sales per year - 2 million euro
Thermal energy sales 175 270 megawatt per year – 8 million euro
Payback period - 4.5 years
Equipment production time and adjustment works time – 18-20 months
50 staff members are necessary for such enterprise service.
Project cost – 80 million Euros
The final value can be determined after the preparation of feasibility studies.