m tool set vfinal 2

Upload: odyfils

Post on 09-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 m Tool Set Vfinal 2

    1/35

    M-Tool SET

    1 / 35

    CONTENTS

    Sec tion INA Contex t to Deve lop Monitoring Visits to LLP Partnerships 2

    Section IIM-Too l Strateg y for Monitoring Educ ationa l Partnerships 4

    Sec tion II. AM-Tool Strateg y - Methodo logy 4

    Sec tion II. BM-Tool Strategy - Too ls 5

    1. NA Memo 52. Letter to the institution 63. Qualitative techniques for collecting data 74. Summ ary of the Interview Gu ide 105. General interview Guide 156. Guide for analysis of monitoring data 31

    Example of the ana lysis g rid fo r the interview 32

    Example of the ana lysis g rid fo r observa tion 32

    7. NA Monitoring report 338. Follow-up rep ort 35

  • 8/8/2019 m Tool Set Vfinal 2

    2/35

  • 8/8/2019 m Tool Set Vfinal 2

    3/35

    M-Tool SET

    3 / 35

    2. Estab lish a na tional m onitoring strateg y acc ording to the EC orientations:2.1. Structured ap proac h c onsidering, a t na tional leve l, the o bjec tives and target groups of the LLP sec toral program me (nationa l

    c riteria to selec t p rojec ts for monito ring).

    2.2. NA Purpose : Co llec ting information on the quality in mana ge ment of the LLP Sec torial Prog ram me and the e ffic iency o f the

    impleme nta tion of the projec t in the institution / organizat ion and in the ed uc a tional comm unity.

    2.3. NA Aims: To c ollec t informat ion rega rd ing the qua lity in ma nag eme nt of the p rojec ts. To suppo rt the bene fic iaries in p rojec t imp lementa tion. To lea d the b ene fic ia ries to possible solutions of the prob lems de tec ted in the implem enta tion. To be fam iliar w ith the rea l resources (huma n, ma terial a nd institutiona l) a pp lied to the p rojec ts. To assess the p rogress of the p rojec ts. To dissem inate exam ples of g oo d prac tices. To e stab lish a c lose relation b etw een the be neficiaries and the NA by rec og nising their projec t w ork.

    2.4. Use of the monitoring results (NA Rep orts, Institution Follow-up Rep orts and NA sta ff experienc e): To e nlarge a nd imp rove the pe da go gica l and te c hnic al supp ort given b y the NA to be nefic iaries and po tential projec t

    ma kers in orde r to enha nc e the pa rtnerships qua lity.

    To identify suc cess sto ries and exam ples of best p rac tice s useful for va lorisa tion p urposes (d issem ination and exp loitation ofresults).

    To e sta b lish imp ac t assessme nt ind ica to rs.

  • 8/8/2019 m Tool Set Vfinal 2

    4/35

    M-Tool SET

    4 / 35

    Sec tion II.

    M-TOOL STRATEGY FOR MONITORING EDUCATIONAL PARTNERSHIPS

    Sec tion II. A

    M-TOOL STRATEGY - METHODOLOGY

    WORK PHASE PROCEDURE TOOL / OUTCOME

    1 Memo with information ab out the monitoring strate gy. NA Mem oPrepa ration o f the

    field monitoring

    process

    2 Letter to the institution

    (At lea st one wee k before the visit) to inform a bo ut the a im a nd method ology of

    the visit.

    Letter to the

    institution

    Field wo rk /

    Collec ting data

    3 Monitoring visit in agreement with the principles of qualitative techniques for

    c ollec ting da ta (interview and ob servation).

    Using the General Interview Guide during the visit and carrying out direct

    ob servation of do c uments and premises.

    One da y or half-day visit.

    General Interview

    Guide

    Data analysis and

    interpretation

    4 Guide for ana lysis/ interpretation of mo nitoring d ata :

    Rec ord the co llec ted da ta in written a nd organize them subseq uent to thevisit.

    Emp loy a c omm on me thod to ana lyse a nd to interpret the da ta (Conte ntAna lysis).

    Guide for ana lysis of

    monitoring da ta

    Reporting 5 NA Report to the institution with feed bac k on the mo nitoring visit. NA Monitoring Rep ort

    Follow-up 6 Follow-up Rep ort on the impleme ntation of the NA rec om me nda tions. Follow -up Rep ort

  • 8/8/2019 m Tool Set Vfinal 2

    5/35

    M-Tool SET

    5 / 35

    Sec tion II.B

    M-TOOL STRATEGY - TOOLS

    1. NA MEMOTOPICS

    General selection criteria of the institution (regarding the NA Guide orientations). Specific selection criteria reg arding a c onc rete p roject:

    o Defining the purpose of the visit (due to difficulties detected, using the criterion visits to coordinators, to choose aspe c ific thema tic , etc ).

    o Selec ting spec ific p rojec t loc al a c tivities and mobilities em pha sized in the wo rk plan / c ontrac t (one or seve ral ma inactivities; e.g. the more recent, the ones that involved more persons, the one with more visibility, the only ones

    imp lemente d), by using a princ iple of p urposive sam pling.

    Basic Data ab out the projec t:o Institution data (identific at ion, typ e, level, nature, co ntac ts);o Projec t basics (cod e, typ e, title, coun tries);o Projec t c ontent (co nc rete aims, ta rge t-group s, thema tic a rea s);o Qua lity assessme nt (sc ore a nd ove ra ll c om me nts).

    Definition o f NA staff. Lette r to the institution.

  • 8/8/2019 m Tool Set Vfinal 2

    6/35

    M-Tool SET

    6 / 35

    2. LETTER TO THE INSTITUTIONTOPICS

    Communicating the objectives, bo th general (regarding the General Interview Guide) and specific (concerning the specificselec tion c riteria related to the c ase study i.e. this c onc rete projec t).

    Informing a bo ut the m ethod of the visit, reg a rding the use o f the g roup interview . Defining the pa rticipa nts in the monitoring visit a nd their role (institution ma nage ment, project c oo rd ina tor, other sta ff direc tly

    involved , pup ils/ learners d irec tly invo lved ).

    Request of documentation for observation regarding one or several finalized activities of the work plan (local activities andage nda of the mob ilities).

    Guidance to gather quantifiable data about the level of participation in activities (local, mobilities anddissemination/valorisation).

    Request for a written confirmation of the ava ilability of the pa rticipa nts on the da y of the v isit (to e nsure the presenc e o f therelevant pa rticipa nts involved in the projec t ac tivities and to ha ve a n ag reem ent in ad vanc e o n the ag enda and c ond itions

    of the visit).

  • 8/8/2019 m Tool Set Vfinal 2

    7/35

    M-Tool SET

    7 / 35

    3. QUALITATIVE TECHNIQUES FOR COLLECTING DATATOOL FOR COLLECTION DATA INTERVIEW

    Typ e of interview

    Fac e-to-fac e verba l interc hang e by group interviewing. Sem i-struc tured (using a ge neral interview guide in a flexib le ap p roa c h):

    - Interview que stions are p lanned but no t stand ardized in ad vance b ec ause spe c ificquestions w ill em erge during t he interview;

    - There a re no p re-set response c a teg ories. Group interview :

    - Seve ra l pe op le simultane ously (manage me nt, projec t co ordinator, p rojec t team,pup ils/ learners, other pa rticipant sta ff);

    - Definition o f who will be interviewed , why and how ma ny pe rsons.Purpose

    Understanding the project progress. Ga thering c umulative da ta w ith the group situat ion. Stimulat ing peo p le to make their views, mo tives and rea sons exp lic it.

    Strategy

    One-time interview (variable d uration). Use of t he General Interview Guide :

    - Use the p re-set q uestions (Summ ary of the Interview G uide) to know how to a sk andga ther relevant informa tion (related t o the o bjec tives);

    - Flexib le use a nd o rde r of q uestions, adapte d t o the mo nitoring o b jectives and projec tlife c yc le;

    - Ma ke use o f the Guiding Top ics to m ana ge the a nswe r and avo id d eviations from theobjectives.

    The role o f NA sta ff: inte rviewer as a fac ilitato r, who supp lies the questions and top ics foranswe rs and group interac tion.

    Managing the interview- In the NA:

  • 8/8/2019 m Tool Set Vfinal 2

    8/35

    M-Tool SET

    8 / 35

    TOOL FOR COLLECTION DATAINTERVIEW

    prep aring a nd sc hed uling the interview; rea d ing the a pp lica tion form, the c ontrac t, rep orts (if any) or othe r do cuments

    related to the p roject.

    - In the institution: having the a pp lica tion form a nd the c ontrac t a vailab le d uring the visit; be ginning the interview with their state d ob jectives; giving o ral feed-ba c kduring the visit; c losing the interview w ith a n ove rall view of the strong and we ak p oints,

    including rec omm end ations;

    writing do wn note s ab out the p a rticipa nts' spe ec h (during and afte r theinterview).

    Data from the group interviews Written rec ords of the NA sta ff

    TOOL FOR COLLECTION OF DATA OBSERVA TION

    Approach Qua litat ive a pp roa ch, not using predete rmined ca teg ories and c lassifica tions. Ob servation in a natural op en-ended wa y.

    Purpose

    Triangulation b etw een ob servational d at a and the interview ees disc ourse t o e nsuredifferent angles.

    Ma king w ider links related t o the projec t impleme ntation.

    Scope

    Direc t o bservation o f:- Institution premises;- Spa c e used for project ac tivities and d issem inat ion;- Doc ume ntary da ta , like project m ate rials and (fina l) produc ts.

  • 8/8/2019 m Tool Set Vfinal 2

    9/35

    M-Tool SET

    9 / 35

    TOOL FOR COLLECTION OF DATAOBSERVA TION

    Strategy

    Ob serving and listen ing to the institution s env ironm ent . Rea d ing d ifferent types of d oc uments:

    - of d ifferent autho rship (te ac hers/ trainers, pup ils/ learners);- and d ifferent availability (c losed , restricted or op enly published ).

    Definition of what w ill be ob served a nd w hy, taking into ac count the objec tives of themonitoring visit.

    Ca teg ories for desc ribing and analysing the o bservab le da ta (d esc riptive and foc uscategories). Key c ate go ries to a nalyse d oc umentary da ta : credibility, rep resenta tiveness and meaning

    (who writes them , for wha t p urpo se, who rea d them , what is om itted , what is

    accomplished).

    Data from the observation Written rec ords of observab le da ta .

  • 8/8/2019 m Tool Set Vfinal 2

    10/35

    M-Tool SET

    10 / 35

    4. SUMMARY OF THE INTERVIEW GUIDECATEGORIES QUESTIONS

    How did you know about Comenius/Grundtvig/Leonardo Programmes?

    How d id you c om e a c ross the p artners for your projec t?

    Was there a projec t tea m to be gin the wo rk?

    How did you c ollab orate within the p artnership to c onc eive the co mmo n projec t?

    Conception

    When and how d id you inform the institution ab out the p rojec t?

    How d o you co mmunicate a mong pa rtners?

    How do you share the information w ith a ll pa rtners?

    What tools do you use to c omm unica te?Which are the c omm unic ation languag es used during the p roject?

    Was there any linguistic p rep aration nee de d?

    Comm unica tion inthe pa rtnership

    How d id you sa tisfy those nee ds?

    How is the p rojec t included in the institution s wo rk plan?

    Which project activities are included in the curriculum of pupils/learners?

    Whic h ac tivities have you a lrea dy ca rried out?

    Present ly, in wha t ac tivity a re you working?

    What w as the mo st c rowd ed / po pular project a c tivity?

    What c hange d in the pa rtnership p lanned ac tivities?

    Partnership Local

    activities

    Will you b e a ble to c omp lete the planned ac tivities?

  • 8/8/2019 m Tool Set Vfinal 2

    11/35

    M-Tool SET

    11 / 35

    CATEGORIES QUESTIONS

    What kind of c om mon ac tivities have you a lrea dy ca rried o ut with your pa rtners?

    Whic h mobilities have you a lrea dy c arried o ut?

    What c hange d in your mobility plan?

    Ca n you c omp lete the planned mob ilit ies?

    What kind o f prepa rato ry ac tivities we re d evelop ed be fore the mob ility?

    Could you qua ntify the pa rticipa ting sta ff?

    How d id you c hoo se sta ff for mob ility?

    Could you q uantify the p a rticipa nt p upils/ learners?

    How did you choose pupils/learners for mobility?

    How d id you tw in pup ils during their foreign sta y/ when ho sting p artners?

    How d id you involve your pup ils/ learners in the impleme ntat ion o f the a c tivities during mob ility and / or when

    hosting pa rtners?

    Which w as the c ontribution given b y the p arents/ fam ilies to t he m ob ility ac tivities?

    Which w as the c ontribution given by the Assoc iated Pa rtners to the mo b ility a c tivities?

    Whic h ac tivities we re d eve lope d during m ob ility and / or pa rtners hosting?

    How muc h time was spe nt in eac h kind of a c tivity during m ob ility and / or pa rtners hosting?

    Mobilities

    What kind o f follow -up ac tivities we re d evelop ed afte r mo bility?

    How ma ny pe rsons a re p resently involved in the project, including the p rojec t tea m?

    How is the p roject tea m formed at the m ome nt?

    Institutions

    involvement

    How o ften does the projec t team m eet?

  • 8/8/2019 m Tool Set Vfinal 2

    12/35

    M-Tool SET

    12 / 35

    CATEGORIES QUESTIONS

    Whic h c hannels do es the p rojec t tea m use to inform / guide the o ther institution s pa rticipa nts?

    How is the institutions ma nage ment involved in the p rojec t?

    Which responsibilities were taken by the relevant staff regarding the project?

    In w hich ta sks we re pup ils/ learners involved ?

    In wh ich ta sks were parents / fam ilies involved in the p rojec t?

    Have you involved o ther institution(s)/ orga niza tion(s) from t he loc a l c om munity?

    In wh ich ta sks we re the institution(s)/ orga niza tion(s) of the loc a l comm unity invo lved ?

    Did they assume the role o f assoc iated p artners?

    Community

    involvement

    Are you planning to involve othe r institution(s)/o rga nization(s) from the loca l com munity?

    Whic h fina l prod uc ts have you a lrea dy finalized ?In wha t stage a re you, c onc erning the c om mon fina l prod uc t(s)?Outcomes

    What a re the tasks and roles for eac h p artner institution c onc erning the final com mon p rod uc t(s)?

    What knowled ge did you ga in through the projec t rega rding its thema tic area?

    What know led ge did you a c hieve throug h the p rojec t reg a rding Europ ea n issues?

    What c hange d in your langua ge skills due to the p rojec t?

    What c ha nged in your ICT skills due to the p rojec t?

    What c hanged co ncerning the implementation of p eda gog ica l methods due to the projec t?

    What c hange d in the orga nizat ion of the institution due to the p rojec t?

    What c hange d c onc erning m otivation in lea rning / teac hing?

    Projec t results

    What c hang ed in the rela tionships within the institutions partic ipants due to t he p rojec t?

  • 8/8/2019 m Tool Set Vfinal 2

    13/35

    M-Tool SET

    13 / 35

    CATEGORIES QUESTIONS

    What c hange d in the establishment of links with othe r institutions of the loca l comm unity due to the p rojec t?

    What c hange d c onc erning p upils/ learners sc hoo l/training suc cess mo tivated by the p rojec t?

    How do you eva luate the p rog ress of the p rojec t?

    Who p artic ipate s in the eva luat ion proc ess?

    What kind o f feedb ac k rea c hed the p articipa nts?

    Which a re the results from your eva luation?

    Evaluation

    What have you c hang ed as a c onseq uenc e of your eva luation results?

    In which events / initiatives did/ will you p a rticipa te to p resent / ma ke known your project ac tivities/ expe rience s

    and or results?

    What kind o f informat ion wa s prod uc ed to use in the dissem inat ion a c tivities?

    What a c tivities did / will you sta rt and imp lement, on your ow n initiative, to p resent / ma ke pub lic the p rojec t?

    Have you d eve lop ed any a c tivity in c om mo n with other institutions to p resent/ pub lic ize the p rojec t?

    How ma ny pa rticipa nts we re p resent in ea c h d issem inat ion a c tivity?

    Dissemination

    How do you intend to c ontinue to spread / share informa tion a bo ut your project?

    Whic h a c tivities have you d eve loped to p rom ote the a pp licat ion o f your projec t results by o ther institutions /

    individuals?

    Whic h p rojec t results were app lied by othe r institutions and / or ind ividua ls?

    What kind o f institutions / g roup of individua ls have d irec tly benefited from your projec t results?

    What p rojec t result(s) turned to be the most signific ant one (s) in terms of b eing ap plica ble in similar ed uc at iona l

    contexts?

    Valorisation

    Do you c onsider that yo ur projec t results a re in ha rmony w ith the LLP Prog ramm e?

  • 8/8/2019 m Tool Set Vfinal 2

    14/35

  • 8/8/2019 m Tool Set Vfinal 2

    15/35

    M-Tool SET

    15 / 35

    5. GENERAL INTERVIEW GUIDE

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    Leg itima ting the

    interview

    To expla in the p rocess of a

    mo nitoring v isit.

    To expose the a ims of the

    visit.To d escribe the

    metho do log y used in the

    mo nitoring v isit.

    To reinforce the

    imp ortanc e of the

    institution s co llaboration.

    To motiva te the

    pa rticipa nts in the project

    on the importanc e of themonitoring p roc ess.

    To inform a bo ut the feed-

    ba ck proce ss reg arding the

    monitoring results.

    Conception To rec og nise ho w thepub lic ha s access to the

    Sec toria l Prog ramm e.

    To ident ify the channel(s)used to o bta in information

    about the Programme

    How d id you know ab outComenius/Grundtvig/Leonardo

    Programmes?

    Internet / NA website

    Personnal /

    Professiona l co ntac ts

    Previous pa rticipa tionin other Europ ea n

    Programmes

    Participa tion in NA

    events

  • 8/8/2019 m Tool Set Vfinal 2

    16/35

    M-Tool SET

    16 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To be fa miliar with the

    pa rtner finding p roc ed ure.

    To und erstand how the

    conta c ts are estab lished to

    be gin a pa rtnership.

    To c om prehend the c riteria

    to selec t the p artners.

    How did you com e a c ross the

    pa rtners for your project?

    Participa tion in a VP

    or Contac t Seminar

    Use o f an we bsite for

    partner finding

    Networks

    Previous partners in a

    different projec t

    To rec og nize how the

    institution o rganized

    interna lly the p roc ess of

    project conception.

    To und erstand the initial

    motivation for the p rojec t.

    To know w ho is the sta ff

    involved in the p rojec t

    team.

    Was there a projec t team to b egin

    the work?How , whom

    To b e a wa re o f the

    comm on concep tion of

    the partnerships project.

    To identify the tasks of each

    partner institution during

    the co ncep tion proc ess.

    To know the measures

    taken by the partnership

    mem be rs to elab orate the

    project.

    To identify the a rticulation

    between pa rtnerinstitutions.

    How did you c ollab orate within

    the p artnership to c onc eive the

    comm on p roject?

    Comm on fill-in of the

    joint sections of the

    application form

  • 8/8/2019 m Tool Set Vfinal 2

    17/35

    M-Tool SET

    17 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To know the awa reness of

    the institution c om munity

    ab out the project.

    To ide ntify the op portunities

    given to the institution

    com munity to be involved

    in the projec t co ncep tion.

    To rec og nise the

    involvement of othe r

    pe rsons besides the p rojec t

    team.

    When and how d id you inform the

    institution ab out the project?

    In teac her/trainer

    meetings, through

    institutions posters or

    newspaper articles,

    on a web site, etc

    To identify a flow ing

    co mmunica tion throughout

    the p roject.

    To identify a reg ular

    co mmunica tion throughout

    the p roject.

    How d o you co mmunica te among

    partners?

    When (every da y,

    every week, every

    month)

    Whom (project tea m,

    tea chers/ trainers,

    management,

    pup ils/ learners, o ther

    staff)To ident ify the m ea sures

    unde rtaken to share

    informa tion am ong the

    partnership.

    How do you share the informa tion

    with all partners?

    Written confirma tion

    of activities and

    decisions

    To know the too ls used to

    co mmunica te with the

    partners.

    What to ols do you use to

    communicate?

    Fax, phone , e-ma il,

    regular ma il, etc

    Comm unication in

    the partnership

    To be a c qua inted w ith the

    communication strategy

    implemented among

    partners.

    To be a c qua inted w ith the

    lang uag es used toco mmunica te with the

    partners.

    Which are the c ommunicationlang uag es used during the

    project?

    Curricular, non-curricular

  • 8/8/2019 m Tool Set Vfinal 2

    18/35

    M-Tool SET

    18 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To rec og nize the need for

    linguistic p rep arat ion.

    Was there a ny linguistic

    preparation needed ?

    Why

    Who

    (teachers/trainers,

    management,

    pup ils/ learners, o ther

    sta ff, pa rents/ families)

    To iden tify resources used

    for linguistic prep ara tion.How d id you sa tisfy those nee ds?

    Using a ud iovisua l

    ma teria ls, making alang uage c ourse,

    hosting a Com enius

    Assista nt , etc

    To b e a wa re o f the wa ys to

    integ rate the p rojec t in the

    institutions work plan.

    How is the p roject inc lude d in the

    institutions work plan?

    To rec og nize the

    integ ration of the project in

    the institution.

    To ident ify the m ea sures

    taken to integrate theprojec t ac tivities in the

    curriculum of

    pupils/learners.

    Which p rojec t ac tivities areinc luded in the c urriculum o f

    pupils/learners?

    Which subjects

    Which a c tivities have you a lrea dy

    carried out?

    Partnership Loc al

    activities

    To ve rify the

    imp leme ntation of the

    local activities at the

    institution and / or in the

    loc al c ommunity.

    To ide ntify the d eg ree of

    accomplishment of the

    planned ac tivities. Presently, in w hat a c tivity a re you

    working?

    Where, when a nd

    with whom

    (tea chers/ tra iners,

    management,

    pupils/learners,

    parents/families,assoc iated partners,

    other participants)

  • 8/8/2019 m Tool Set Vfinal 2

    19/35

    M-Tool SET

    19 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To b e a wa re o f the most

    visible projec t ac tivity.

    What was the m ost

    crowde d/ po pular projec t ac tivity?

    How m any

    participants of each

    kind

    (tea chers/ tra iners,

    management,

    pupils/learners,

    parents/families,

    assoc iated partners,other participants)

    To identify changes in the

    partnership s wo rk p lan.

    What c hang ed in the p artnership

    planned ac tivities?Why

    To b e a wa re o f the

    ca pa c ity to ac co mp lish the

    partnership s wo rk p lan.

    To identify the c ond itions

    that influenc e the projec ts

    implementation.

    Will you be a ble to c omp lete the

    planned ac tivities?

    Why (enough

    resources, time, et c )

    To understand the

    consistenc y of the

    co ope rative w ork done in

    the p artnership.

    To identify the c omm on

    ac tivities in the pa rtnership.

    What kind o f commo n ac tivities

    have you alrea dy c arried out with

    your partners?

    When and ho w

    To ide ntify the d eg ree ofaccomplishment of the

    mob ility plan.

    Which mobilities have you already

    carried out?

    When, where and

    who

    (teachers/trainers,

    management,pup ils/ lea rners,

    parents/families,

    assoc iated partners,

    other participants),

    how many

    MobilitiesTo ve rify theimp leme ntation of the

    mob ility a c tivities.

    To identify changes in the

    pa rtnership s mo bility p lan.

    What chang ed in your mobility

    plan?Why

  • 8/8/2019 m Tool Set Vfinal 2

    20/35

    M-Tool SET

    20 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To b e a wa re o f the

    ca pa c ity to ac co mp lish the

    mob ility plan.

    To b e a wa re o f the

    cond itions that influenc e

    the implementation of

    mobilities.

    Can you co mplete the planned

    mobilities?

    Why (enough

    resources, time, et c )

    To b e a wa re o f theplanning process regarding

    mob ility a c tivities.

    What kind of p rep aratory ac tivitieswere developed before the

    mobility?

    Who

    To know ab out the

    comp osition of the

    participant staff in

    mobilities.

    Could you q uantify the

    pa rtic ipating staff?

    Number of

    tea chers/ trainers,

    management,

    assoc iated partners,

    other participants

    To ident ify the c riteria fo rchoosing the staff for

    mobility.

    How did you c hoose staff formobility?

    Sta ff from d ifferentsub jec ts, sta ff w ith

    disabilities, etc

    To know ab out the

    comp osition of the

    participant pupils/learners

    in m ob ilities.

    Could you qua ntify the pa rtic ipa nt

    pupils/learners?

    Number of

    pup ils/ lea rners,

    schoo l leve l/ type o f

    training, age

    To ident ify the c riteria fo r

    choosing thepupils/learners for mobility.

    How did you c hoose

    pupils/learners for mobility?

    Pup ils/ lea rners age,

    schoo l leve l/ type o f

    training,pup ils/ lea rners with

    d isab ility, etc

    To und erstand the strateg yto impleme nt mobility

    activities.

    To be fa miliar with the

    c riteria t o twin p up ils.

    How d id you twin pup ils during

    their foreign stay/ whe n hosting

    partners?

    App lica ble to

    Comenius Bilateral

    Partnerships

    Host fa milies and

    rec iproc al twining

  • 8/8/2019 m Tool Set Vfinal 2

    21/35

    M-Tool SET

    21 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To know the d irec t

    contribution of

    pupils/learners to the

    imp leme ntation o f mob ility

    activities.

    How did you involve your

    pup ils/ lea rners in the

    imp leme ntation of the a c tivities

    during mo bility and / or when

    hosting partners?

    To know the d irec t

    contribution of

    parents/ fam ilies to t heimp leme ntation of mob ility

    activities.

    Which wa s the c ontribution g iven

    by the parents/ fam ilies to themobility ac tivities?

    To know the d irec t

    contribution of the

    Associated Partners to the

    imp leme ntation of mob ility

    activities.

    Which wa s the c ontribution g iven

    by the Assoc iated Partners to the

    mobility ac tivities?

    To know the kind of

    ac tivities de velope d during

    mobility.

    Which a c tivities were d evelope d

    during m ob ility and / or partners

    hosting?

    Who

    Visiting other

    institutions, time spent

    as trainer or trainee,

    attending lessons,

    wo rking toge ther on

    the p rojec t, time

    spent for leisure

    To b e a wa re o f the

    co herenc e of the workag enda of the mob ility

    activities.

    How muc h time w as spe nt in each

    kind o f ac tivity during mob ilityand / or partners hosting?

    To rec og nize the

    consistenc y of the mobility

    planned ac tivities.

    To ident ify the follow -up

    ac tivities conseq uently to

    the mobility.

    What kind of follow-up activities

    were developed a fter mob ility?

  • 8/8/2019 m Tool Set Vfinal 2

    22/35

    M-Tool SET

    22 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To ve rify the d eg ree of

    involvement in p rojec t

    activities.

    To spot the volume of

    institutions participants.

    How ma ny p ersons are p resently

    involved in the project, including

    the projec t team?

    Tea chers/ trainers,

    management,

    pup ils/ learners, o ther

    sta ff pa rticipa nts.

    To know the c omp osition of

    the institution s p rojec t

    team.

    How is the project team formed at

    the moment?

    Who

    How m any

    What subjec tsTo know the wo rk reg ularity

    of the project team .

    How o ften doe s the project tea m

    meet?

    To rec ognize the dyna mics

    of t he institution s p rojec t

    team.To identify the c hannels

    used to inform / guide the

    institution s pa rtic ipants

    ab out the project.

    Which c hanne ls do es the p rojec t

    tea m use to inform / guide the

    othe r institution s pa rtic ipants?

    Comenius Corner

    E-mail

    Meetings

    To b e a wa re o f the

    managements support to

    the p roject.

    To identify measures

    regarding management

    support.

    How is the institution s

    mana gem ent involved in the

    project?

    Visit othe r pa rtner

    institutions

    Links to other

    institutions (loca l

    community,

    educational

    authorities, etc )

    To be a c qua inted w ith the

    sta ffs involvem ent in the

    project.

    To c a teg orize the m a in

    responsibilities of the staff

    involved in the p rojec t.

    Which responsibilities we re taken

    by the relevant staff rega rding the

    project?

    Tea chers/ trainers and

    other institution staff

    Institutions

    involvement

    To b e a wa re o f thepupils/learners

    involvement in the p rojec t.

    To c lassify the ma in tasks ofthe pup ils/ lea rners involved

    in the p roject.

    In which tasks we re pup ils/ lea rners

    involved?Pupils association

    Community

    involvement

    To rec og nize the

    parents/families

    involvement in the p rojec t.

    To identify synergies

    be twee n the institution and

    fam ilies, ac c om plished

    throug h the projec t.

    In which tasks were parents /

    fam ilies involved in the p rojec t?Parents Assoc iation

  • 8/8/2019 m Tool Set Vfinal 2

    23/35

    M-Tool SET

    23 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To identify synergies

    be twee n the institution and

    the loca l com munity,

    accomplished through the

    project.

    Have you involved o ther

    institution(s)/ organiza tion(s) of the

    loc al c ommunity?

    Type o f institut ions/

    organizations

    To c a teg orize the m a in

    tasks of the loca l

    comm unitys involvement.

    In which tasks were the

    institution(s)/ organiza tion(s) of the

    loc al community involved?To identify the existenc e o f

    an associated partners

    network.

    Did they a ssume the role o f

    assoc iated partners?

    Named in the

    application form

    To rec og nize the officia l

    relationships betw een the

    institution and the loc alcommunity.

    To know ab out the p ossible

    enlargement of c ommunity

    involvement.

    Are you p lanning to involve other

    institution(s)/ organiza tion(s) from

    the loca l com munity?

    To ide ntify the d eg ree of

    accomplishment of theplanned outc omes.

    Which final p rod uc ts have you

    alrea dy fina lized ?

    Final p rod uc ts with

    Europe an Logo

    To c ollec t evidenc e o f the

    existenc e of the comm on

    fina l produc t(s).

    In wha t stag e a re you, co ncerning

    the c omm on final produc t(s)?

    What

    WhomOutcomes

    To ve rify the

    imp leme ntation of the

    projec t outco mes.

    To rec og nize the

    comp leme ntary of tasks

    within the p artnership.

    What a re the tasks and roles for

    ea ch pa rtner institution

    co ncerning the final co mmon

    product(s)?

    Projec t results

    To und ersta nd the results of

    the projec ts

    implementation.

    To know the imp rovem ents

    in knowledg e in the

    thematic a rea o f the

    project.

    What knowledge did you ga in

    through the p rojec t reg arding its

    thematic area?

    Tea chers/ trainers,

    pupils/learners,

    manag ement, other

    institution sta ff,

    pa rents/ fam ilies, et c

  • 8/8/2019 m Tool Set Vfinal 2

    24/35

    M-Tool SET

    24 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To rec og nize the

    imp rovem ents ma de in the

    Europe an Dimension o f

    Educ at ion/ Tra ining .

    What knowledge did you a chieve

    through the p rojec t reg arding

    Europ ea n issues?

    Tea chers/ trainers,

    pup ils/ lea rners,

    manag ement, other

    institution sta ff,

    pa rents/ fam ilies, et c

    To know the imp rovem ents

    in langua ge skills achieved

    through the projects

    implementation.

    What c hange d in your langua ge

    skills due to the projec t?

    Tea chers/ trainers,

    pup ils/ lea rners,

    manag ement, otherinstitution sta ff,

    pa rents/ fam ilies, et c

    To identify the

    improvements

    acc om plished in ICT skills

    through the projects

    implementation.

    What c ha nged in your ICT skills

    due to the p roject?

    Tea chers/ trainers,

    pup ils/ lea rners,

    manag ement, other

    institution sta ff,

    pa rents/ fam ilies, et c

    To know the imp rovem ents

    in ped agog ica l methodswith the projec ts

    implementation.

    To identify the

    imp leme ntation of new

    ped agog ica l methods due

    to the p roject.

    What c hange d c onc erning the

    implementation of pedagogical

    method s due to the p roject?

    Tea chers/ trainers,

    manag ement, other

    institution sta ff

    To identify the

    improvements in themanagement approach.

    To know the ne w

    orga niza tion strateg ies

    implemented due to the

    project.

    What cha nged in the orga nization

    of the institution d ue to the

    project?

    Tea chers/ trainers,

    manag ement, other

    institution sta ff

  • 8/8/2019 m Tool Set Vfinal 2

    25/35

    M-Tool SET

    25 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To identify the

    imp rovem ents on

    motivation of the projec t

    participants.

    What cha nged c once rning

    motivation in lea rning / tea ching?

    Pup ils/ lea rners /

    teachers/trainers

    To know the imp rovem ents

    in interpersonal

    relationships stimulated bythe p roject.

    To identify the

    reinforcem ent o f the

    institution s interna l

    cohesion.

    What c hang ed in the relationships

    within the institution s pa rticipa nts

    due to the p roject?

    Between

    tea chers/ trainers and

    pup ils/ lea rners,

    amongpup ils/ lea rners,

    among

    tea chers/ trainers,

    be twee n staff in

    general, betwee n

    tea chers/ trainers and

    parents/families

    To rec og nize the

    improvements on linkingthe institution to the loc a l

    co mmunity due to the

    project.

    What c hanged in the

    establishment of links with other

    institutions of the loc a l community

    due to the p roject?

    To know the imp rovem ents

    in pup ils/ learners

    school/training

    performa nce due to the

    project.

    What cha nged c once rning

    pup ils/ lea rners school/ training

    success mo tivate d b y the p rojec t?

  • 8/8/2019 m Tool Set Vfinal 2

    26/35

  • 8/8/2019 m Tool Set Vfinal 2

    27/35

    M-Tool SET

    27 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To kno w the institution s

    eva luat ion results (self-

    evaluation).

    To be fa miliar with the

    strong / wea k po ints of the

    projec t ac co rding to the

    institution s view.

    To know therec om mendations resulting

    from the self-eva luation

    proc ess.

    Which are the results from your

    evaluation?

    At institution level and

    a t the p artnership

    levelTo b e a wa re o f the self-

    eva luation results.

    To identify the ado ption of

    rec omme nda tions ma de a t

    eva luation repo rting stag e.

    What have you c hange d a s a

    co nseq uence of your evaluation

    results?

    At institution level and

    a t the p artnership

    level

    To ide ntify the d eg ree ofaccomplishment of the

    planned dissemination

    activities.

    In which e vents / initiatives d id/ willyou pa rticipate to p resent / ma ke

    known your project activities/

    experiences and or results?

    Conferences,

    sem inars, mee tings,exhibitions

    Where, whe n, how, to

    whom

    Who presented

    Dissemination

    To rec og nize thedeve lopm ent of the

    dissemination strategy.

    To know the too ls used to

    disseminate the project.

    To be fa miliar with the

    c riteria used to selec t theinformation for

    d issem inat ion p urposes.

    What kind o f informa tion was

    produc ed to use in the

    dissemination activities?

    Conte nt of: a

    webpag e, a

    new spa pe r, a

    PowerPoint

    presenta tion, anexhibition, a

    pe rforma nce , etc

  • 8/8/2019 m Tool Set Vfinal 2

    28/35

    M-Tool SET

    28 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To d istinguish the na ture o f

    the initiative regarding the

    dissemination activities.

    To ident ify the m ea sures

    taken to d issem inate the

    project.

    What a c tivities d id/ will you sta rt

    and implement, on your ow n

    initiative, to present / ma ke pub lic

    the p roject?

    Auto-initiative

    Co -autho rship with

    other institutions

    (who)

    To identify the existenc e o fco ope rative w ork

    regarding the

    implementation of

    dissemination activities.

    Have you deve lope d a ny ac tivity

    in comm on w ith other institutions

    to p resent/ pub licize the project?

    Common

    organization a tpartnership leve l

    Sha red orga nizat ion

    with the associated

    partners or other

    organizations

    To b e a wa re o f the level ofpub lic knowledg e ab out

    the p roject.

    How ma ny pa rticipa nts we represent in each d issem ination

    activity?

    Tea chers/ trainers,

    management,

    pup ils/ learners, o ther

    sta ff, representa tives

    from the ed uca tional

    authorities, from the

    assoc iated partners,

    etc

    To identify the c hannels

    used to d issem inate

    informa tion abo ut the

    project.

    To know the kind of

    institution s pa rtic ipants

    taking part in the

    dissemination activities.

    How d o you intend to continue to

    spread / share information abo utyour projec t?

    Sprea d e xperienc es,

    ac tivities and project

    results

    What, when, where,

    how, by who and to

    whom

  • 8/8/2019 m Tool Set Vfinal 2

    29/35

    M-Tool SET

    29 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To ide ntify the d eg ree of

    accomplishment of the

    planned valorisation

    activities.

    Which activities have you

    deve lope d to promote the

    application of your project results

    by other institutions / individua ls?

    Training courses,

    seminars,

    conferences,

    pedagogical

    ma teria ls offe rs

    To identify the kind of

    projec t results mo re

    valuab le to be transferredto other educ ational

    contexts.

    To know the e xtent of the

    projec t results a t na tiona l /

    interna tiona l sca le.

    Which p rojec t results we re a pp lied

    by o ther institutions and / or

    individuals?

    When, where, how

    and by whom

    At individual, local,

    reg ional or nationa l

    level.

    To understand the transfer

    possibilities of the p rojec t

    results (apprenticeships

    and / or final produc ts).

    To ide ntify the ta rge t

    group(s) that c ould benefitfrom the project results.

    What kind o f institutions / group of

    individuals have directly benefitedfrom yo ur projec t results?

    Distinction between

    the pa rticipants

    (internal target

    group) and theexternal individua ls

    How m any

    To rec og nize how the

    project results are linked to

    the expec ted impact.

    What p rojec t result(s) turned to b e

    the most significant one(s) in terms

    of b eing a pp licable in similar

    educational contexts?

    Targe t g roup (s) of the

    project

    Valorisation

    To be a c qua inted w ith the

    contribution of the project

    results to achieve Lisbon

    ob jectives and / or the

    op erational objec tives andpriorities of the LLP

    Programme.

    To identify the

    ac hievement of the projec tresults in fac e o f the

    ob jec tives and priorities of

    the LLP Programme

    Do you c onsider that your projec tresults a re in ha rmony w ith the LLP

    Programme?

    How

    Why

    Projec t influenc es

    To b e a wa re o f the

    d iffic ulties in p rojec t

    development.

    To identify spec ific fac tors

    that nega tively influenc ed

    the projec ts

    implementation.

    Which p rob lems/ ob stac les did you

    enc ounter during the p rojec t?

    At the institution and

    a t the p artnership

    level

  • 8/8/2019 m Tool Set Vfinal 2

    30/35

    M-Tool SET

    30 / 35

    CATEGORIES OBJECTIVES SPECIFIC OBJECTIVES QUESTIONS GUIDING TOPICS

    To know the solving

    problem p roc edures

    imp leme nted in the

    partnership.

    To spot the effec tiveness of

    the comm unica tion

    strategy.

    To ident ify the level ofco ope ration betw een the

    project pa rtic ipa nts.

    Did you sha re the p rob lems with a ll

    the peop le involved in the

    project?

    Who (projec t team ,

    management,

    partnership

    c oordinator, all

    partners, NA,

    authorities, etc )

    To identify conc rete

    solutions in fac e of t he

    projec t s difficulties.

    How did you solve the p rob lems

    detec ted d uring the projec ts

    implementation?

    Who, when

    To b e a wa re o f the level of

    deviation from the initial

    projec t p lan.

    How did the m entioned problems

    chang e, in some wa y, the original

    project?

    Application form

    To be fa miliar with the

    fac tors in favour of the

    projec t development.

    To know spec ific fac tors

    that positively contribute to

    the p roject

    implementation.

    Which we re the most favo urab le

    cond itions to the project

    implementation?

    At the institution and

    a t the p artnership

    level

    To spot the strong / weak

    po ints in the support given

    by the NA to the

    bene ficiary institution.

    Are you satisfied with the c onta c ts

    you had with your NA?Contac ts with the

    NA

    To be a c qua inted w ith the

    de gree o f sa tisfac tion o f

    the institution c onc erning

    the NA. To identify wa ys to improveNA best support and

    guidance.

    How do you think they could be

    improved?

  • 8/8/2019 m Tool Set Vfinal 2

    31/35

    M-Tool SET

    31 / 35

    6. GUIDE FOR ANALYSYS OF MONITORING DATAMETHODOLOGICAL

    FRAMEWORK TO

    QUALITATIVE ANALYSIS

    CONTENT ANALYSIS

    Purpose

    Estab lishing ho w the NA rea c hes the find ings about the m onito ring visit. Organizat ion, ca teg orizat ion a nd interpreta tion of the informat ion c ollec ted (throug h interview and

    observation).

    Strategy

    Cod ing the da ta co llec ted in the interview to d o their lab elling:- The p re-cod ed cat eg ories will be used to validate the interview respo nses, bec ause the se

    c ate go ries are b ased on a c lear definition of a ims (inc luded in the Gene ra l Interview Guide ).

    - For comp lem enting the use o f the c a teg ories pre-spe c ified (on the G ene ral Interview Guide ),othe r da ta cate go ries (either desc riptive or highe rinference) w ill be develop ed if nece ssa ry.

    - The a im of orga nizing the d at a by c a teg ories is to red uc e d ata without significant loss ofinformation, summ arizing the d a ta by pulling tog ethe r them es and identifying pa tterns and

    regularities.- The d ata c ollec ted is orga nized by sma ll or large sentences labelled by the c ate go ries and

    ob jec tives (units of sense), filled in the c olumn Monitoring Rec ord of the Ana lysis Grid .

    Develop ing propo sitions based on the p atte rns and c onnec tions evidenced with the co d ing, req uiringsome d egree of inferenc e be yond the da ta.

    - Draw ing the find ings to estab lish a m ea ningful and c ohe rent p icture o f the projec timpleme ntat ion, putting in evide nce the strong a nd wea k po ints and de fining

    rec om me nda tions (filled in the c olumn Comm ents for the Rep ort of the Ana lysis Grid

    ac c ording to the items of the NA M onitoring Rep ort).- Crossing the da ta c ollec ted in the interview w ith the ob servation da ta to c rea te a

    c orrespo ndenc e b etwe en verbal respo nses (what p eop le say) and wha t they do and wha t

    they say they do .

    - The findings will be supp orted by c rossing the ob servation evide nc e (from direc t o bservationand from the interview) with the spec ific ob ject ives established for ea c h cate go ry in the

    General Interview Guide .

  • 8/8/2019 m Tool Set Vfinal 2

    32/35

    M-Tool SET

    32 / 35

    EXAMPLE OF THE ANALYSIS GRID FOR THE INTERVIEW

    Categories Ob jec tives Monitoring Rec ord Com ments for the Report

    To recog nise how the p ublic has

    ac c ess to the Sec torial

    Programme.

    Filled in w ith top ics c onstituted by

    units of sense from the notes

    c ollec ted by the NA sta ff, during a nd

    a fter the mo nitoring visit.

    Filled in with inferences (findings)

    ob ta ined by c rossing the

    ob servation evidenc e with the

    spec ific ob jectives defined in the

    General Interview Guide .

    Conception

    To be fam ilia r with the partner

    finding proce dure.() ()

    Comm unica tion in

    the Partnership() () ()

    EXAMPLE OF THE ANALYSIS GRID FOR OBSERVATION

    Observed Dime nsions Ob jec tives Monitoring Rec ord Com ments for the Rep ort

  • 8/8/2019 m Tool Set Vfinal 2

    33/35

    M-Tool SET

    33 / 35

    7. NA MONITORING REPORT Com bination of results from da ta c ollec ted d irec tly (observation) and indirectly (interview). Possib ility g iven to the institution to refute ma tte rs of fac t or inte rp reta tions sta ted in the c onc lusions of the NA Rep ort (existenc e o f

    a 1st draft).

    Report structure (final version)

    Identifica tion o f the institution a nd the projec t

    Objec tives of the report phase:

    o Good prac tices em pha sis;o Counselling and ad vice .

    Monitoring visit:

    Introduction (ab out the visit):o Date of visit, identifica tion of the pe rsons interviewed (mana ge ment, coordination,

    other staff and pupils/learners), place;

    o Context and othe r relevant c ircumstantial information;o Ide ntifica tion of the NA mo nitoring team .

    Observed data :o Doc uments, ma teria ls and othe r aspe c ts ob served in situ;o Evidenc e o f projec t ac tivities (artefa c ts, rep orts, boo klets, log b oo ks, multimed ia

    products, etc).

    Findings:o Results of the content analysis of the interview(s);o Reference to important observation evidence, stressing the strengths and the

  • 8/8/2019 m Tool Set Vfinal 2

    34/35

    M-Tool SET

    34 / 35

    Report structure (final version)

    we aknesses identified with referenc e to the p re-de fined param ete rs/ c ate go ries;

    o Ide ntifying p rob lems and the ir c auses;o Ide ntifying seeds of innovation o r exce llenc e;o Conc lusion (gene ra l app rec iation of the sta te o f project imp lem enta tion; lessons

    learned).

    Rec omme ndationso What shall be do ne to solve the identified prob lems? To ad just a c tivities and/ or

    resources? To improve ac tion? To ma ke the projec t b ette r?

    Contribution of the projec t to the LLP Program me (ob jec tives and p riorities).Institution c omm ents ab out NA c onc lusions (in ca se there a re any regarding the 1st draft).

    Request for a Follow-up Report:

    o Informa tion reg ard ing its minimum req uirem ents;o Establishing a deadline to its submission to the NA.

    Date of nex t visit (optiona l).

  • 8/8/2019 m Tool Set Vfinal 2

    35/35

    M-Tool SET

    35 / 35

    8. FOLLOW-UP REPORT Aims:

    o To ensure that the recom mendations have p rac tica l c onseq uenc es in projec t imp lementa tion.o To ma ke ce rta in that rec om mendations a re impleme nt during the p rojec t lifec ycle.o To g uarante e imp rovem ents in the qua lity of the p rojec t.

    Content:o Different from institution fo r institut ion;o Op en forma t, c hosen b y eac h institution.o Minimum requirements:

    The institution ha s to prop ose c onc rete follow -up m ea sures foc used on the NA rec om me nda tions; These c onc rete m ea sures have to b e established within a c onc rete t ime fram e d uring p rojec t imp lem enta tion.