lockout/tagout module 20. 2©2006 teex 1910.147(a)(1) scope covers servicing and maintenance of...

50
Lockout/Tagout MODULE 20

Upload: victor-dilling

Post on 30-Mar-2015

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

Lockout/TagoutMODULE 20

Page 2: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

2 ©2006 TEEX

1910.147(a)(1) Scope

Covers servicing and maintenance of machines and equipment in which Unexpected energization or start up or Release of stored energy could cause Injury to employees

Normal operation iscovered in 1910 Subpart O

Page 3: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

3 ©2006 TEEX

1910.147(a)(1)(ii) Exemptions

Construction, agriculture and maritime employment;

Electrical Utilities; Electrical equipment (covered by

Subpart S) Oil and gas well drilling and servicing So why comply?

Page 4: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

4 ©2006 TEEX

Control of Hazardous Energy

Why use lockout/tagout? Protects maintenance personnel from

power being reapplied by mistake Recommended by API RP 54 for

electrical systems in drilling and servicing operations

Recognized hazard

Page 5: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

5 ©2006 TEEX

1910.147(a)(2) Application

Service and maintenance: Employee required to remove or bypass a

guard or safety device Employee required to place part of body

into area that would be a danger zone during machine operation cycle

Page 6: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

6 ©2006 TEEX

1910.147(a)(2) Application

Exception: Minor adjustments and servicing activities during normal production if Routine Repetitive Integral to production

Provided that alternative measures provide effective protection

Page 7: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

7 ©2006 TEEX

1910.147(a)(2) Application

Does not apply to cord and plug connected equipment for which Exposure to hazard is controlled by

unplugging and Plug under exclusive control of employee

performing service or maintenance

Page 8: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

8 ©2006 TEEX

1910.147(a)(2) Application

Does not apply to hot tap operations in transmission and distribution operations in pressurized pipelines provided that: Continuity of service is essential, Shutdown of system is impractical, and Documented procedures and special

equipment provide proven effective protection for employees

Page 9: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

9 ©2006 TEEX

1910.147(a)(3) Purpose

Establish a program and utilize procedures for affixing appropriate lockout devices or tagout devices to energy isolating devices

Prevent unexpected energization, start up or release of stored energy in order to prevent injury to employees

Training and procedural requirements for other sections’ LO/TO requirements

Page 10: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

Definitions1910.147(b)

Page 11: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

11 ©2006 TEEX

Affected employee

Job requires employee to operate or use a machine or equipment

on which servicing or maintenance is being performed under lockout or tagout, or

work in an area in which such servicing or maintenance is being performed

Page 12: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

12 ©2006 TEEX

Authorized employee

Locks out or tags out machines or equipment in order to perform servicing or maintenance on that machine or equipment

Affected employee whose duties include servicing or maintenance under this section

Page 13: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

13 ©2006 TEEX

Energized

Connected to an energy source OR Containing residual or stored energy

Page 14: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

14 ©2006 TEEX

Energy isolating device

A mechanical device that physically prevents the transmission or release or energy Circuit breakers included NOT push buttons NOT selector switches NOT control circuits

Page 15: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

15 ©2006 TEEX

Energy source

Any source of: Electrical, Mechanical, Hydraulic, Pneumatic, Chemical, Thermal, or Other energy

What kind of energydid the rock have?

Page 16: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

16 ©2006 TEEX

Lockout

Placement of a lockout device on an energy isolating device, in accordance with an established procedure, ensuring that energy isolating device and equipment being controlled cannot be operated until lockout device is removed

Page 17: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

17 ©2006 TEEX

Lockout device

Device that uses a positive means such as a lock, either key or combination type, to hold an energy isolating device in the safe position and prevent the energizing of a machine or equipment

Blank flanges and bolted slip blinds included

Page 18: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

18 ©2006 TEEX

Servicing and/or maintenance

Workplace activities such as: Constructing, Installing, Setting up, Adjusting, Inspecting, Modifying, and Maintaining and/or servicing machines or

equipment

Page 19: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

19 ©2006 TEEX

Tagout

Placement of tagout device on an energy isolating device, in accordance with an established

procedure, to indicate that energy

isolating device and equipment being controlled may not be operated until tagout device is removed

Page 20: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

General Requirements1910.147(c)

Page 21: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

21 ©2006 TEEX

Energy control program

Energy control procedures Employee training Periodic inspections Any employee who services/maintains

any equipment where unexpected energizing or stored energy release could cause injury isolates and renders it inoperative first.

Page 22: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

22 ©2006 TEEX

1910.147(c)(ii) General Requirements

If an energy isolating device is capable of being locked out, the employer's energy control program shall utilize lockout, unless the employer can demonstrate that the utilization of a tagout system will provide full employee protection

Page 23: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

23 ©2006 TEEX

1910.147(c)(iii) General Requirements

Energy isolating devices designed to accept lockout devices whenever: Replacement or major repair, renovation or

modification of equipment is performed or New machines or equipment are installed

Page 24: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

24 ©2006 TEEX

1910.147(c)(3) Full employee protection

When tagout device used on energy isolation device capable of being locked out: Same location as potential lockout device Demonstrably equivalent program

May require additional safety elements

Page 25: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

25 ©2006 TEEX

1910.147(c)(4) Energy control procedure

Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. Exception with all 8 elements listed in

standard

Page 26: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

26 ©2006 TEEX

1910.147(c)(4) Energy control procedure

Outline scope, purpose, authorization, rules, techniques for control of hazardous energy, including: Specific intended use of the procedure; Specific steps for shutting down, isolating,

blocking and securing equipment Specific steps for placement, removal, transfer of

lockout/tagout devices and responsibility for them Specific requirements for testing equipment to

verify effectiveness of lockout devices, tagout devices, and other energy control measures

Page 27: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

27 ©2006 TEEX

1910.147(c)(5) Protective materials and hardware

Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall be provided by the employer for isolating, securing or blocking of equipment from energy sources

Page 28: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

28 ©2006 TEEX

1910.147(c)(5) Protective materials and hardware

Lockout and tagout devices must be: Singularly identified The only device(s) used for controlling

energy Not used for other purposes And shall meet the following

requirements:

Page 29: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

29 ©2006 TEEX

1910.147(c)(5) Protective materials and hardware

Capable of withstanding environment for maximum time period

Moisture or corrosives must not make tag deteriorate

Standardized: Color Shape Size Print/Format

Page 30: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

30 ©2006 TEEX

1910.147(c)(5) Protective materials and hardware

Lockout devices: Substantial enough to prevent removal without

excessive force or unusual techniques such as bolt cutters

Tagout devices: Substantial enough to prevent inadvertent or

accidental removal Non-reusable attachment means Attachable by hand, self-lockable At least equivalent to nylon cable tie

Page 31: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

31 ©2006 TEEX

1910.147(c)(5) Protective materials and hardware

Lockout and tagout devices indicate identity of employee applying devices

Page 32: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

32 ©2006 TEEX

1910.147(c)(6) Periodic Inspection

Energy control procedure inspected at least annually: By authorized employee not using the

procedure being inspected Correct any deviations Review employee responsibilities with:

each authorized employee – lockout each affected or authorized employee –

tagout

Page 33: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

33 ©2006 TEEX

1910.147 (c)(7) Training and communication

Ensure employees understand purpose and function of energy control program

Ensure employees acquire skills required for safe application, usage, removal of energy controls

Page 34: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

34 ©2006 TEEX

Employee Training Requirements

Authorized employee: Recognition of hazardous energy sources Type and amount of energy in workplace Methods and means for energy isolation

Affected employee: Purpose and use of procedure

Other employees in area: Procedure and prohibition on restarting

Page 35: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

35 ©2006 TEEX

Employee Training Requirements for Tagout

Train on limitations of tags: Warning devices do not provide physical

restraint that a lock would Tag not to be removed without owner’s

authorization, bypassed, ignored, defeated Must be legible / understandable to work Must withstand environmental conditions False sense of security Attach securely: avoid accidental removal

Page 36: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

36 ©2006 TEEX

Employee Retraining

For all authorized or affected employees when: Job assignment changes Equipment or processes present new

hazard Energy control procedure changes Knowledge / use of program is inadequate

Certify employee training up to date

Page 37: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

37 ©2006 TEEX

1910.147(c)(8) Energy Isolation

Only the authorized employees performing the servicing or maintenance may apply lockout/tagout

Page 38: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

38 ©2006 TEEX

1910.147(c)(9) Notification of Employees

Affected employees must be notified By employer or authorized employee Of application and removal of lockout and

tagout devices Before controls are applied After controls are removed

Page 39: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

Application of Control1910.147(d)

Page 40: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

40 ©2006 TEEX

Order of Operation for Application of Control

1. Preparation for shutdown2. Equipment shutdown – orderly3. Equipment isolation 4. Lockout or tagout device application5. Stored energy relieved; continue while

reaccumulating6. Verification of isolation

Test and return to “off” position

Page 41: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

Release from Lockout/Tagout1910.147(e)

Page 42: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

42 ©2006 TEEX

1910.147(e) Release from Lockout

Before lockout or tagout devices removed and energy restored, ensure:

Machine or equipment: Inspect area; remove nonessential items Ensure equipment components intact

Employees: Ensure all employees safe or removed Before restart, notify affected employees of

removal

Page 43: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

43 ©2006 TEEX

1910.147(e) Release from Lockout

Each lockout/tagout device removed by employee who applied the device If not available, removed under employer

direction Specific procedures and training from

energy control program must be in use! Verify that applying employee is not at facility Make all reasonable efforts to contact/notify Ensure authorized employee knows of removal

before resuming work at facility

Page 44: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

Additional Requirements1910.147(f)

Page 45: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

45 ©2006 TEEX

1910.147(f)(1) Testing or Positioning

Temporary removal of lockout/tagout devices for testing/positioning: Clear tools and materials Remove employees from equipment area Remove lockout/tagout devices (as in (e)) Energize and test or position Deenergize systems and reapply energy

control measures to continue servicing

Page 46: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

46 ©2006 TEEX

1910.147(f)(2) Outside Personnel

Contractors and other outside personnel: On-site employer and outside employer

inform each other of lockout/tagout procedures

On-site employer complies with outside employer’s energy control program

Page 47: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

47 ©2006 TEEX

1910.147(f)(3) Group Lockout or Tagout

Procedure must provide protection equivalent to personal lockout/tagout device

Primary responsibility is vested in an authorized employee for a set number of employees working under the protection of a group lockout or tagout device (such as an operations lock);

Page 48: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

48 ©2006 TEEX

1910.147(f)(3) Group Lockout or Tagout

When more than one crew, craft, department, etc. is involved: Designated authorized employee takes

lockout/tagout control responsibility Coordinates affected work forces Ensures continuity of protection

Page 49: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

49 ©2006 TEEX

1910.147(f)(3) Group Lockout or Tagout

Each authorized employee affixes personal lockout/tagout device to group lockout device when beginning work

Each removes personal device when stopping work on this equipment

Page 50: Lockout/Tagout MODULE 20. 2©2006 TEEX 1910.147(a)(1) Scope Covers servicing and maintenance of machines and equipment in which Unexpected energization

50 ©2006 TEEX

1910.147(f)(4) Shift or Personnel Changes

Specific procedures in energy control plan

Ensure continuity of lockout/tagout protection

Orderly transfer of lockout/tagout device protection between shifts

Minimize exposure to hazards from unexpected energization or release