109 substation pre- energization checklist _energization1

Upload: akhileshkumar-pandey

Post on 06-Jul-2018

308 views

Category:

Documents


3 download

TRANSCRIPT

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    1/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    1 of 10 

    CLIENT:

    LOCATION: START DATE: SUBSTATION: PROJECT MANAGER: 

    JOB NO.:

    Power Transformers TRANSFORMER I.D.

    DATE Initials DATE Initials DATE Initials

    A. Power Factor  

    B. TTR  

    C. Excitation 

    D. Oil Samples 

    E. Lightning ArrestorsF. DC Winding Resistance

    G. Current Transformer  

    1. Ratio/Polarity/Saturation

    2. CT Resistance/Burden Check  

    3. Single Point Grounding  H. Electrical Ops/Control Circuits 

    1. Fan temp. Control

    2. On load tap changer  

    3. 49 Winding Temperature Devices 

    4. 63 Bucholtz and Pressure Relief Devices 

    5. 26 Liquid Temperature Device

    6. 71 Liquid Level

    I. Grounding 

    J. Connections/Hardware 

    K. Test Forms Complete and Printed

    Notes: 

    Auxiliary Power Transformers TRANSFORMER I.D.

    DATE Initials DATE Initials DATE Initials

    A. Power Factor  

    B. TTR  C. Excitation 

    D. DC Winding Resistance 

    E. Oil Samples 

    F. Electrical Ops/Control Circuits 

    3. 49 Winding Temperature Devices 

    4. 63 Bucholtz and Pressure Relief Devices 

    5. 26 Liquid Temperature Device

    6. 71 Liquid Level

    G. Grounding 

    H. Connections/Hardware 

    I. Test Forms Complete and Printed

    Notes: 

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    2/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    2 of 10 

    Potential Transformers(PT’s/CCVT’s)

    TRANSFORMER I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Insulation Quality 

    B. Ratio/Polarity 

    C. Circuit/Burden Check  

    D. Single Point Grounding (Secondary) 

    G. Frame/Equipment Grounding

    K. Connections/Hardware 

    J. Test Forms Complete and Printed

    Notes:

    Current Transformers TRANSFORMER I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Ratio 

    B. Polarity 

    C. Saturation 

    D. Insulation Resistance

    E. CT Secondary Resistance 

    F. Burden Check  

    G. Primary Injection Tests

    H. Single Point Grounding (Secondary)

    I. Frame/Equipment Grounding  J. Connections/Hardware

    K. Test Forms Complete and Printed  Notes:

    Current Transformers TRANSFORMER I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Ratio 

    B. Polarity 

    C. Saturation 

    D. Insulation Resistance

    E. CT Secondary Resistance 

    F. Burden Check  

    G. Primary Injection Tests

    H. Single Point Grounding (Secondary)

    I. Frame/Equipment Grounding  J. Connections/Hardware

    K. Test Forms Complete and Printed  

    Notes:

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    3/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    3 of 10 

    Motor OperatedDisconnect Switches

    SWITCH I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Contact Resistance 

    B. Auxiliary Contacts 

    C. Adjustment and Alignment  D. Check operation Before Coupling 

    E. Check Control Fuse

    F. Connections/Hardware 

    G. Motor Operator grounded

    H. Test Forms Complete and Printed  

    Notes:

    Earthing Switches SWITCH I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Contact Resistance 

    B. Auxiliary Contacts 

    C. Adjustment and Alignment  D. Check operation Before Coupling 

    E. Connections/Hardware F. Test Forms Complete and Printed

    Notes:

    132 kV Circuit Breakers CIRCUIT BREAKER I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Breaker Timing Analysis

    B. Contact Resistance

    C. Insulation Resistance

    D. Pressure Switches

    E. Electrical Ops/Control Circuits 

    F. Grounding

    G. Connections/Hardware

    H. Test Forms Complete and Printed

    Notes:

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    4/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    4 of 10 

    MV Switchgear PANEL I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Current Transformer Tests

    B. Voltage Transformer Tests

    C. Breaker Timing Analysis

    D. Contact Resistance

    E. Insulation Resistance of Bus & CB

    F. Electrical Ops/Control Circuits 

    G. Grounding

    H. Connections/Hardware

    I. Test Forms Complete and Printed

    J. Switchgear Inspection checklist

    Notes:

    MV Switchgear PANEL I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Current Transformer Tests

    B. Voltage Transformer Tests

    C. Breaker Timing Analysis

    D. Contact Resistance

    E. Insulation Resistance of Bus & CB

    F. Electrical Ops/Control Circuits 

    G. Grounding

    H. Connections/Hardware

    I. Test Forms Complete and Printed

    J. Switchgear Inspection checklist

    Notes:

    MV Switchgear PANEL I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Current Transformer Tests

    B. Voltage Transformer Tests

    C. Breaker Timing Analysis

    D. Contact Resistance

    E. Insulation Resistance of Bus & CB

    F. Electrical Ops/Control Circuits 

    G. Grounding

    H. Connections/Hardware

    I. Test Forms Complete and Printed

    J. Switchgear checklist Complete

    Notes:

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    5/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    5 of 10 

    Battery Charger and Battery BATTERY I.D.

    DATE Initials DATE Initials DATE Initials

    A. Intercell Contact Resistance  B. Measure Cell Voltages 

    C. Specific Gravity 

    D. Set Float and Equalize Voltage 

    E. Complete Equalize Charge

    F. Capacity Test 

    G. Alarm Functions 

    H. Test Forms Complete and Printed  

    Notes: 

    Approved by: ME: GRD-E: GR _______________

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    6/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    6 of 10 

    Miscellaneous Items

    DATE Initials DATE Initials DATE Initials

    A. Earthing Grid Resistance Measurement 

    B. Surge Arrester testing

    C. AIS Bus testing completed  

    D.

    E.

    F.G.

    H.

    Notes: 

    Miscellaneous Items

    DATE Initials DATE Initials DATE Initials

    A. 

    B. 

    C. 

    D.

    E.

    F.

    G.

    H.

    Notes: 

    Miscellaneous Items

    DATE Initials DATE Initials DATE Initials

    A. 

    B. 

    C. 

    D.

    E.

    F.

    G.

    H.

    Notes: 

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    7/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    7 of 10 

    Wire Check of Panels PANEL I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Check relay Style/Model 

    B. Tighten all Hardware 

    C. Complete Point to Point Checks 

    D. Secondary Current Checks of CTCircuits, CT Shorting Blocks 

    E. Secondary Voltage Checks of PTCircuits

    F. Connections/Hardware 

    G. Verify Proper DC Polarity

    H. Check Panel Labeling and MimicBus

    I. Label all Knife switches and Fuse blocks 

    J. Earthing of Cable shields

    K. Earthing of panels

    L. Test Forms Complete and Printed  

    Notes:

    Wire Check of Panels PANEL I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Check relay Style/Model 

    B. Tighten all Hardware 

    C. Complete Point to Point Checks 

    D. Secondary Current Checks of CTCircuits, CT Shorting Blocks 

    E. Secondary Voltage Checks of PTCircuits

    F. Connections/Hardware 

    G. Verify Proper DC Polarity

    H. Check Panel Labeling and MimicBus

    I. Label all Knife switches and Fuse

     blocks 

    J. Earthing of Cable shields

    K. Earthing of panels

    L. Test Forms Complete and Printed  

    Notes:

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    8/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    8 of 10 

    RELAY SETTINGS AND TEST

    RELAY I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Verify nameplate data of relay tosetting order  

    B. Check for damage 

    C. Verify proper Control VoltagePolarity 

    D. Check CT Shorting Switches  E. Install Settings 

    F. Complete Acceptance Testing

    G. Complete Logic Function Test 

    H. Clear History Logs

    I. Verify Remote Monitoring(DCS)

    J. Test Forms Complete and Printed

    Notes:

    RELAY SETTINGS AND TEST

    RELAY I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Verify nameplate data of relay to

    setting order  B. Check for damage 

    C. Verify proper Control VoltagePolarity 

    D. Check CT Shorting Switches  E. Install Settings 

    F. Complete Acceptance Testing

    G. Complete Logic Function Test 

    H. Clear History Logs

    I. Verify Remote Monitoring(DCS)

    J. Test Forms Complete and Printed

    Notes:

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    9/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    9 of 10 

    OPERATIONAL AND TRIP

    TEST

    CIRCUIT I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Verify proper fuses 

    B. Verify nameplate data of relay tosetting order  

    C. Verify proper trip of each lockout

    device 

    D. Check all interlocks E. Check tripping of CB’s and MOD’s

    (Highlight, in yellow, control

    schematics) F. Check Annunciator points

    G. Check reclose/Block reclose  H. Microwave and transfer Trip

    Schemes

    I. Verify Supervisor Control

    (DCS/SCADA)

    J. Test Forms Complete and Printed

    Notes:

    METERING CIRCUIT I.D.

    DATE Initials DATE Initials DATE Initials DATE Initials DATE Initials

    A. Verify proper fuses 

    B. Check Meter Style/Model 

    C. Verify proper InstrumentTransformer ratios and Multipliers 

    D. Complete Calibration Checks  E. Verify Supervisor Control

    Indication (DCS/SCADA) 

    F. Test Forms Complete and Printed

    Notes:

  • 8/17/2019 109 Substation Pre- Energization Checklist _Energization1

    10/10

    SUBSTATION PRE-ENERGIZATION CHECKLIST

    109 Substation Pre- Energization Checklist (Energization1)

    DOC# (Energization1)

    10 of 10 

    AC & DC Distribution PANEL I.D.

    DATE Initials DATE Initials DATE Initials

    A. All parts of the assembly are free of dust, scrap metal,

    wire cuttings, screws and miscellaneous hardware and

    debris? 

    B. Complete assembly of all components? C. Bolted connections are tight and screw connections for out going

    leads are tight? D. Ground cable connection Secure. 

    E. Rigidity and firmness of mounting good?

    F. Trip ratings correspond to required value on drawings.  G. Panel identification nameplate installed? 

    H. Circuit Directory installed and filled out? 

    I. Megger readings taken of the main and branch circuits (AC

    Panels only)? 

    J. All temporary power connections are removed? 

    Notes: 

    AC & DC Distribution PANEL I.D.

    DATE Initials DATE Initials DATE Initials

    A. All parts of the assembly are free of dust, scrap metal,wire cuttings, screws and miscellaneous hardware and

    debris? 

    B. Complete assembly of all components? C. Bolted connections are tight and screw connections for out going

    leads are tight? 

    D. Ground cable connection Secure. E. Rigidity and firmness of mounting good?

    F. Trip ratings correspond to required value on drawings.  G. Panel identification nameplate installed? 

    H. Circuit Directory installed and filled out? 

    I. Megger readings taken of the main and branch circuits (ACPanels only)? 

    J. All temporary power connections are removed? 

    Notes: