industry 4 - world manufacturing foundation
TRANSCRIPT
![Page 1: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/1.jpg)
Industry 4.NOWReal case implementation scenarios of MESs and
Industrial IoT technologies
![Page 2: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/2.jpg)
MES Derga Model and enhancements
io 2017
ERP (SAP o 3rd Party) ManufacturingAnalytics
DergaSAP MII OEE Customizations
SAP MII OEEEnvironment
SAP PCO Edge Services Node JS
Shop Floor / Macchine
DergaDigital
ManufacturingApplications
IOTPredictiveAnalysys
PRODUCT QUALITY PRODUCTION MONITORING& EFFICIENCY
GREEN MANUFACTURING
![Page 3: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/3.jpg)
§ Production Order declarations
§ Quantity Confirmations
§ Components and row material consumption
§ OEE Real Time analysis in Operator Dashboard
§ Shift Management and Operator Presence
§ Multi Users log in
§ Production failure declarations
§ Production slowdowns
§ Shop floor integration (digital twin)
§ «near» real time o real time data update evisualization
§ Product configuration integration
Derga Enhancements and additional functionalities
§ «Data driven» Production Order Management
§ On line Documentation visualization
§ Custom Operator Dashboard
§ Shift supervisor Dashboard
§ Routing Changes on porduction order
§ Localizzazione in Lingua (i18n)
§ Scheduling Integration (APP Derga)
MES Derga Model & Enanchement - Functionalities
![Page 4: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/4.jpg)
Component mixselection
Quality control
Forming In-processwarehouse
Packaging
The «stove»I/O Machine Integration
Energetic andenvironmental control
Automatic count andmanagement of «brokens»
Real time control of the stock inthe two warehouses;Setup reduction
Integration with WMsystem
MES implementation Scenario: food market
![Page 5: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/5.jpg)
Operators efficiency Setup times EnergyConsumption Broken biscuits
Maintenance downtime
+15 %Thanks to machine
integration andautomatic labelling
-10 %Increased visibility of
the bottleneck capacitystatus
Calculated during the 6months after go live
-4 % -3 %From environmentalparameters analysis
-6 %Tracking of frequent
fails resulted inpreventive actions
Moreover:• End to end digital traceability
• Better alignment of physical and logical stock• Data quality and consistency
MES implementation Scenario: food market - KPIs
![Page 6: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/6.jpg)
Dashboard Example – pallet declarationMES Derga Model - Sample
![Page 7: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/7.jpg)
MES Derga Model - SampleGlobal Plant overview
![Page 8: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/8.jpg)
MES Derga Model - SampleDigital Traceability
![Page 9: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/9.jpg)
MES Derga Model - SampleReporting
![Page 10: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/10.jpg)
ü Detailed traceability for raw materials and along the whole production processü Automatic work center stoppages for maintenance
ü Real time factory overview and data acquisitionü Real time notification at shop floor level
ü Clock-in and clock-out managementü Scheduling of shop floor operators
Workforcecontrol
100%Real timevisibility
Machineintegration anddata acquisition
Notifications onany device
Maintenance andshop floorintegration
Real case MES implementation Scenario: cosmetic production
![Page 11: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/11.jpg)
Operators Clock-in and Clock-outMES Derga Model - Sample
![Page 12: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/12.jpg)
Document VisualizationMES Derga Model - Sample
![Page 13: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/13.jpg)
Workforce dispatching applicationMES Derga Model - Sample
![Page 14: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/14.jpg)
Derga Production Orders Scheduling Application
![Page 15: Industry 4 - World Manufacturing Foundation](https://reader030.vdocuments.mx/reader030/viewer/2022012804/61bd26b461276e740b0fe23c/html5/thumbnails/15.jpg)
Customer Industry Golive SolutionNTCM (Nuova TCM) Manufacturing 06/2019 SAP ERP + MES MII Custom + PCo
D. Lazzaroni & C. Food 07/2019 AS400 + MII OEE Custom+ SAP Edge Services
F.LliRotta/Prontopack
Manufacturing 06/2020 SAP ERP + MES MII Derga + PCo + Node
Casalini s.r.l. Food 10/2020 AS400 + MII OEE Custom+ SAP Edge Services + Node
Cosmoproject S.p.a. Cosmetic 10/2020 SAP ERP + MES MII Derga + PCo + Node
Marini-Fayat Manufacturing 09/201909/2020
SAP ERP + Node
PlastmeccanicaS.p.a
ManufacturingMolding
Q2/2021 SAP ERP + MES MII Derga + PCo + Node
References