INDIAN RAILWAYS
TRAINING REPORT AT AJMER LOCOMOTIVE WORKSHOP
Ankit sharma Git jaipur
INDIAN RAILWAY HISTORY▪ In 1849 GIPR (great Indian peninsula railways) was established by East India
Company.
▪ Railways were first introduced to India in the year 1853 from Mumbai to Thane.
▪ It is one of the largest networks in the world.
COUNTARY RAILWAYS LENGTH(Km)
ELECTRIFIED LENGTH (Km)
Population per kilometer track
Nationalized or private
1 United states
224,792 <1,600
1,373
private
2 China
112,000 55,811 12,119
nationalized
4 India
65,808 21,614
18,390 nationalized
Northern western railways (Ajmer)
The foundation of the prestigious Central workshop was laid in 1876 and was established in 1877.
In workshop Repairs and manufacturing of steam locomotives, carriages and wagons.
In 1979 Periodic Overhaul (POH) & Intermediate
Overhaul (IOH) of an diesel engine is started .
STATISTICS1. Sanctioned Strength - 23082. On Roll Strength - 20103. No. of Officers - 44. No. of Supervisors - 2375. Total Area - 160000 sq.mpp.6. Covered Area - 71363 sq.m.7. Power Consumption - 140000units/month8. Water Consumption - 5000 KL/month9. Annual Budget - Rs.138 Cr.
BTC Basic training center
Wheel & roller
bearing shop
Machine shop
Machine stage 1 Slack shop
Stripling & rebuilding
shop
Bogie shop
Spring
Diesel periodical overhaul
Wheel shop
Visual inspection
Remove CTRB from wheel axial
Non-destructive
tests
Wheel press Axial turning
Vertical turning Axial turning CNC
Machine Treatments
Cartridge taper roller bearing
Inspection
• visual
dismantle
• Manually
washing
• With the help of machine
Stage 1
Dimensioninspection
• With the help of measuring tape
Final assembly
• Apply grease with the help of machine .
• Grease apply in 3 stages.• Packaging, marking .
Stage 2
NBC, KOYO ,TIMKIN ,SKF
MACHINE SHOP
Machine shop stage 1 machines :-
shaper
slotter
planner
Drilling machine
Lathe machine
SLACK SHOPOperation in slack shop
Maintenances of breaking system .
WORKING OF BREAKS
BOGIE SHOP
Bogie periodic hauling is treated. Types of bogie
1. 22W(M). 2. 22NL.3. 22NLB.4. CASNUB .
Visual inspections
Inspection
With the help of tools and over head crane
Dismantle
1) Cutting2) Gas welding 3) Arc welding
operations SPRING SHOP
STRIPLING AND REBULDING SHOP
Process in stripling shop
CUTTING
Gas cutting
1 Dismantle
2 Cutting
Rebuilding Process
Vehicle use for transportation
1
2 3
Rebuilding process
ASSEMBLY
UNDERFRAME BODY SIDE DOORS BODY END ROOF
WHEELS AND BOGIE
BRAKING SYSTEM
Wagon fixed in a manipulator
Body Side Bogie mounted on wheels Breaking system testing
DIESEL PERIODICAL OVERHAUL
SECTIONS IN DIESEL SHOP
Dismantle sections Fuel oil system Compressor Turbo super charge
Dismantle sections
1) Crank case 2) Inspections of engine parts 3) Remove all big engine parts using crane
FUEL OIL SYSTEM
MANUALLYWith the help of toolsDismantle
• Kerosene Washing • Manually Assembly
TESTING OF FUEL PUMP
1) Fuel pump tester 2) Spray tester
1) Fuel pump tester is used for check to its efficiency .
2) Spray tester is used to check the spray from pump .
3) These spray pumps made in BOSCH company.
Working in fuel sections
TURBOSUPER CHARGER
MANUALLYWith the help of tools
Dismantle • MANTENCE • Manually Assembly
Turbo- supercharger consists of following main components.
Gas inlet casing. Turbine casing. Blower casing with diffuser Turbo-rundown test
- To check the free running time of turbo rotor.
- The time limit for free running is 90 to 180 seconds.