india italysweden philippines dreams project - guntur realizing dreams second partners meet guntur...

26
India Italy Sweden Philippine s DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Upload: joseph-barrett

Post on 26-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 3: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Welcome to the City of Innovations

Constituted as Municipal Council in

the year 1887

Upgraded to the Corporation level in the

year 1994

Guntur City

Page 4: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Geographical Features Geographical Features : Latitude 16031 N / Longitude 800 451 E

Area of the City : 52.58 Sq.Kms.

(Proposal including 10 villages) : 104.32 Sq.Kms. (Proposed Area)

Population as per 2001 Census : 514,000

Present Population : 650,000 (estimated)

No. of Municipal Wards : 52Average annual Rainfall : 831 mmFields : Rich Field Black Cotton SoilWater Source : Krishna River ( Perennial River )Industries : Tobacco, Chilli, Cold Storage, Plants &

Cotton Zining MillsClimate Conditions :

>The climate is warm and dry. It ranges from 320 to 350 C. >During severe summer, the Temperature may go up to 450 C. >During severe winter the temperature may go down up to 120 C.

Welcome to the City of Innovations

Page 5: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Mayor

Deputy Mayor

Standing Committee[Chairman and 05 Members]

52 Elected CorporatorsAnd 5 Co-opted Members

GMC

Political Set Up

Mayor Deputy Mayor

Standing Committee

Executive Council

Executive Set Up

Commissioner

Political ScenarioB Ramanjaneyulu, IAS

Collector / Special Officer

Page 6: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

AccountsEngineering RevenueTown

PlanningPublicHealth

Education AdministrationUrban

PovertyAlleviation

GMC

Political Set Up Executive Set Up

Mayor Dy .Mayor Standing Committee

Executive Council

Commissioner

Superintendent Engineer

Examiner of Accounts

Additional Commissioner

Deputy Commissioner

BiologistDeputy City

Planner

Health Officer

Executive ScenarioM Mallikarjuna Nayak, I.A.S

Commissioner

Page 7: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Key Parameters

Eco Budget Components

Water Quantity

Water Quality

Solid Waste Management System

Improving Greenery

Energy Savings

Page 8: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Service Level Benchmarks

To know where we stand

To fix time bound targets to achieve

To fix Accountability on Administration/staff

Improve services to the Public by achieving the targets

To bring transparency in the system

Advantages of Service level Bench Marking

Page 9: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Water Quantity

No of House Holds : 1,10,000

No of House Holds with Water Connection : 60,500 [55%]

Total Quantity of Water Supplied per Day : 115 MLD

No of Filtration Plants : 4 #

Page 10: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Water Quantity

Structural improvements in the Existing water supply system, such as replacement of existing RCC pipeline with the new PSC pipelines

Construction of New Filtration Plant of 10 MGD Capacity

Laying of New Pipe Lines from Filtration Plant to main ELSR etc.,

At present 85% of the area is covered by piped water supply from 25 reservoirs, the rest of the 15% is supplied through tankers.

Page 11: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Proposed Indicator Benchmark Status 1.Coverage of Water Supply Connections 100% 55%

2.Per capita availability of water at consumer end (MLD)

135 115

3.Extent of metering of water connections

100% 2.2 %

4.Extent of non revenue water 15% 52% 5.Continuity of Water Supply 24x7 1hr 6.Efficiency in redressal of customer complaints

80% 40 %

7.Adequacy of Treatment and Disinfection and Quality of Water Supplied

100% 99%

8.Cost recovery in water supply services 100% 63%

9.Efficiency in collection of water supply related charges

90% 67%

Water Supply - Indicators

Page 12: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Before the ecoBudget project, GMC was monitoring only residual chlorine in the drinking water supplied.

GMC decided to increase the number of parameters monitored by it to 14, including fecal coliform, fluoride, nitrate, chloride, hardness, and turbidity among others.

TWO mobile water testing Jaltara kits (approved by UNICEF), were procured and tests were conducted by the GMC and the stakeholders committee to cross check the results.

Water Quality

Page 13: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Quality of Water Supplied Check for Quality at HWW

• Water Quality Testing Lab was established at Head Water Works and Qualified Lab technician was appointed.

• Every day 8 quality tests are being conducted on hourly basis by the technician. Those tests are Turbidity, Ph value, Chlorine, Electric Conductivity, Color, Odor, Taste, TDS.

• Every week 9 quality tests are being conducted. Those tests are Dissolved oxygen, Residual Chlorine, Chloride, Nitrite, Fluoride, Phosphorous, Iron, hardness, Ammonia.

• Third Party Quality check is being done by Civil Surgeon Bacteriologist, Regional Public health Laboratory

• Physico-chemical Analysis (16 tests) and Micro biological Analysis tests (1) are being conducted by TPQ

Water Testing Lab

Page 14: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

List of 14 Parameters :

1-Ph value (raw / clear water) 2-Temperature 3-Faecal Coliform

4-Fluoride 5-Dissolved Oxygen 6-Residual Chlorine

7-Phosphorous 8-Nitrate 9-Iron

10-Hardness 11-Chlorides 12-Ammonia

13-Turbidity(raw / clear water) 14-Bentos

Page 15: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Rain Water Harvesting

In the process of Eco Budget System Rain Water Harvesting is taken up as priority Item

At present 20% of the house holds are using the system of rain water harvesting in the city.

There are 700 apartments in the city out of which 10% are covered under the scheme of RWH. On the other hand 10% of the individual houses are using the process of RWH system.

GMC was planning for increase in the coverage with innovative schemes like reduction in property tax etc. the pit size should be 9ft(depth) and 5ft(width).

Two pits are been maintained in some of the apartments of the city. The houses with 100s.ft should maintain the pit accordingly with their required size.

Page 16: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Before the ecoBudget project, MSW is not Properly Structured. After ecoBudget project there is structural monitoring by fixing Benchmarks and started systematic improvement.

Garbage Collected Per Day : 350 MT

Door to Door Collection of Garbage : 65%

Segregation of Garbage at source : 15%

GMC is planning to achieve 100% Door to Door Collection of Garbage with community Participation by conducting

Awareness Camps

Door to Door Campaign by separate resource persons including NGOs, Flat Owners Associations, Rate Payers Association etc.,

Solid Waste

Page 17: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Awareness Camps on two bin system and DTD

Page 18: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Proposed Indicator Benchmark Status 1.Household level coverage of Solid Waste Management services

100% 65 %

2.Efficiency of collection of municipal solid waste

100% 85 %

3.Extent of segregation of municipal solid waste

100% 15%

4.Extent of municipal solid waste recovered/recycled

80% 0

5.Extent of scientific disposal of municipal solid waste

100% 45%

6.Extent of processing of solid waste 100% 07.Extent of cost recovery in solid waste management services

100% 0

8.Efficiency in redressal of customer complaints

80% 75 %

9.Efficiency in collection of user charges 90% 72%

Solid Waste Management - Indicators

Page 19: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Improvement of Greenery in year 2010

The green area per 1000 persons was increased to 123m2

Nearly 14,000 saplings have been planted and the survival is 45%

Renovation of existing ponds and parks, walking tracks.

Survey has been under taken by the Dept. of Botany and Microbiology of Acharya Nagarjuna University (ANU) on Enumeration of Flora

GMC has taken up a novel schemes like plantation of trees by every house in front of their residence, making the NGO’s participation along with the

public involvement for the development of the parks

Greenery

Page 20: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Peoples Participation to achieve Goals

Self Help Groups 7005

Community Organizers 12

GMC is Using Self Help Groups for Community Mobilization for awareness camps in slums on various activities.

Self Help Groups

Page 21: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

SHG’s Group Meetings and Pavala Vaddi Programe

Awareness Meeting on SHG’s

Page 22: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Energy

GMC installed 45 LED lights in major roads and junctions of the city.

GMC is planning for Solar lights in all the parks of the city.

GMC has taken up some strategies and proposals on the long run. Regarding energy conservation.

-planning to provide adequate number of street lights as per standards, in the city. -Installation of energy efficient light fixtures without reduction in lumens. -Providing adequate machinery for O&M of street lights. -Addressing Transco for provision of sufficient transformers etc.

-Conversion of all light fittings to energy efficient fixtures with the technical guidance from NEDCAP

-Regular energy audit and energy saving tips by employing suitable HR-Exploring the feasibility and implementation of remote operation of street lights.

Page 23: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Resource / Indicator

Unit of MeasureReferenc

e YearCurrent value(2009 / 2010)

Short-Term Target(2012 / 2013)

Long-Term Target(2015)

Reasons / background for target

Water (Quality / Quantity & Rain Water Harvesting)

Number of parameters monitored /

Frequency of monitoring

No of analysis per month, at

each reservoir, on a basis of 40 samples per day

2010

14 Parameter with 2 samples at each

Reservoir(40 Samples/day)

14 Parameters with 3 samples at each

Reservoir(40 Samples/day)

14 Parameters with 5 samples

at each Reservoir(with an

increase in no. samples/day)

The number of parameters checked is instrumental to a

better control and thus a better quality of water / To

monitor the water more frequently and regularly helps in identifying the

proper measures to improve the quality

Supply of drinking water

MLD 2010 115 MLD

125 MLDDrinking water supply to be covered to at least

2 Pilot areas

135 MLDDrinking water

supply to be covered to entire city

Rain water Harvesting

% 2010No. of house using

RWH system – 20%

To increase in coverage of house

holds – 40%

To increase in coverage of

house holds – 75%

Increase in the % of RWH system in the city. In the

future the whole city will be covered.

Solid waste (DTD)

Waste collection

(% of citizen served)

201070% - Collection

and 45% - Segregation

85% collectionand 65% segregation

100% DTD(Door to

Door)collection and with an

increase in % of segregation

Guntur (GMC) is improving the collection system. In the future the whole city will be

served.

The Proposed Master Budget of Guntur Municipal Corporation

Page 24: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

The Proposed Master Budget of Guntur Municipal Corporation

Resource / Indicator

Unit of MeasureReference Year

Current value(2009 / 2010)

Short-Term Target(2012 / 2013)

Long-Term Target(2015)

Reasons / background for target

Environment / Green city (% of green area / plantation)

Surface of green area

(m2 per 1000 inhabitants)

2010 123125

130

Green areas are instrumental for better quality of life

Plantation Number 201014000 – saplings with

45% survival

25000 – saplings with

50% survival

50000 saplings with increasing in the 75%

of survival

Ponds / Parks Number 2010 8 10 12

Health (slum development)

Slums

Number of slums developed

(in terms of physical /

environmental and social elements)

2010 9958

28The aim is to make slum free

city by 2017

Energy

Energy conservation

Solar lighting in parks

&LED lights in

streets

2010 0%

Solar lighting in parks

&LED lights in

streets(20%)

Solar lighting in parks&

LED lights in streetsWith increase in 60%

Climate Protection / Energy Saving

Education (municipal schools)

Municipal Schools

Result in %(high schools and primary schools)

2010

78%(High schools)

95%(High schools)

98%(High schools)

95%(Primary schools)

98%(Primary schools)

100%(Primary schools)

Page 25: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

Peoples Participation to achieve Goals

GMC is Using Self Help Groups for Community Mobilization for awareness camps in slums on various activities

GMC is Taking the help of Residential Colony Associations , Flat Owners Associations,

Rate Payers Associations & NGOs etc

Achieving Goals with Team Work

Main Objective of Corporation

‘Sarvejana Sukhinobhavatu’

‘Krishi to Nasti Durbikham’

Page 26: India ItalySweden Philippines DReAMS Project - Guntur Realizing DReAMS Second Partners Meet Guntur Municipal Corporation Cambodia Bhutan Bangladesh

We Make DReAMS Come True