hhh network activity for the next 18 months walter scandale cern care 06 frascati, 16 november 2006

4
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006

Upload: molly-mckinney

Post on 02-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006

HHH networkActivity for the next 18

months

Walter Scandale CERN

CARE 06 Frascati, 16 November 2006

Page 2: HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006

Main deliverables

Database for superconducting cable and magnets:

Manpower: a PhD student (part time) + summer students

Present status (40 % of the task completed): Basic kernel completed and documented Basic cable and magnet properties identified and organized

for data storage Approach presented and discussed with several partner

institutions during two ad hoc meetinsg of HHH-AMT Next 18 months:

Add more properties and query functionality Insert data from partner laboratories (CERN, Saclay, FNAL,

LBNL, LLBL…) Hire 2 additional summer students for ancillary

developments Push the achievement to 3/4 of the full tasks

Page 3: HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006

Main deliverables

Database for accelerator physics simulation codes:

Manpower: 2 summer students + one CERN staff (part-time)

Present status (3/4 of the task completed): Basic kernel completed and attached to the HHH web-page Collection of the existing codes almost exhausted Documentation in preparation, bench marking data

available. Next 18 months:

Complete documentation Demonstrate its use in ad hoc meetings with partner

laboratories 1 additional summer student for ancillary developments and

bench marking Push the achievement to completion of the full tasks

Database for IR and injector lattices Manpower: two CERN staff (part-time) Present status (1/4 of the task completed):

Basic kernel for IR completed and attached to the HHH web-page

Next 18 months: Push the documentation of the IR and complete the task Continue the task of the injector lattices and push it to

1/2 of the completion

Page 4: HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006

Future workshop and meetings

Annual meetings of each WP and of the full network

Contribution to LARP WP1: AMT

Thermomag workshop: thermo-dynamic of SC magnets and thermal removal

Magnet design optimization: review of SC magnet in connection to NED

WP2: ABI One topic workshop

WP3: APD 3 topic workshops on crystal collimation Co-organization of one international conference on

crystals D0/Q0 IR options: scrutiny and possible integration IR upgrade Increase of beam intensity: scenarios and limitations Optimal injector design for CERN and GSI E-cloud