CASE HISTORY Ref: UK / TR / CH / SR028 - Rev: 01, July 08 SLOPE REINFORCEMENT IN LANDFILLS Product: Paragrid 100/05 & 50/05, Paralink 700, 500 & 400, Terram 1B, Macline GCL NL10, Terram 1000 & 4500, 2mm Macline SHE AYDIN UNCONTROLLED DISPOSAL SITE A YDIN, TURKEY Problem As part of the design of the new controlled disposal site in the Municipality of Aydin (in southern Turkey, near the ancient ruins of Ephesus) it was necessary to design - in addition to the bottom barrier system of the disposal site itself - two structures which acted as containment dams for the first and second cells. The gorge had to be divided into two independent cells; the first cell was constructed at the same time as the formation of the containment structures whilst the second cell will be waterproofed as soon as the first one has been completed and made safe. The cells are very deep so it has been necessary to build a series of access roads within the disposal site and for connection to the town of Aydin. Solution The solution developed by the designers has been based on the techniques and construction practices which have been in use for some time in Europe with regard to the barrier system package and considerable use has been made of geogrids for the formation of the containment structures for the two cells and for the embankments forming the site roads. The adoption of various strengths of geogrids has enabled use of the soil present on site and the grading of slopes to inconceivable angles for a loose material, thereby achieving considerable reductions, both in terms of costs and material volumes. The bottom barrier system uses a 2 mm HDPE membrane (Macline SHE) resting on a layer of low permeability clay covered by a geotextile protection layer (Terram 4500), used in combination with a bed of sand and a mineral drainage layer in which a mesh of drainage pipes has been incorporated. The clay layer has been replaced on the steep slopes by a bentonite geocomposite laminate (Macline GCL NL10), whilst a geogrid-geotextile non- woven geocomposite (Terram 1B) has been used to Paragrid 100/5 110,000m 2 , Paragrid 50/05 5,000 m 2 , Paralink 700 5,000m 2 , Paralink 500 5,000 m 2 , Paralink 400 32,000m 2 , Macline GCL N10 44,000m 2 , Terram 1B 30,000m 2 , Terram 1000 26,000 m 2 , Terram 4500 10,500m 2 , 2mm Macline SHE 45,000m 2  Construction date: Designer: Products used: November 2006 — April 2007 SERDAR Engineering (Ankara) Client name: MUNICPALITY OF AYDIN Main contractor name: CENGI CONSTRUCTION SpP (Ankara) During construction Date: November 2006 Project layout — reinforced earth works shown i n brown

Upload: david-puen

Post on 10-Apr-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geogrid Slope Case Study Case

8/8/2019 Geogrid Slope Case Study Case

http://slidepdf.com/reader/full/geogrid-slope-case-study-case 1/4

CASE HISTORY Ref: UK / TR / CH / SR028 - Rev: 01, July 08 

SLOPE REINFORCEMENT IN LANDFILLS

Product: Paragrid 100/05 & 50/05, Paralink 700, 500 & 400, Terram 1B, MaclineGCL NL10, Terram 1000 & 4500, 2mm Macline SHE

AYDIN UNCONTROLLED DISPOSAL SITE 

AYDIN, TURKEY

ProblemAs part of the design of the new controlled disposal sitein the Municipality of Aydin (in southern Turkey, nearthe ancient ruins of Ephesus) it was necessary todesign - in addition to the bottom barrier system of thedisposal site itself - two structures which acted ascontainment dams for the first and second cells. Thegorge had to be divided into two independent cells; thefirst cell was constructed at the same time as theformation of the containment structures whilst the

second cell will be waterproofed as soon as the firstone has been completed and made safe. The cells arevery deep so it has been necessary to build a series ofaccess roads within the disposal site and forconnection to the town of Aydin.

SolutionThe solution developed by the designers has beenbased on the techniques and construction practiceswhich have been in use for some time in Europe withregard to the barrier system package and considerableuse has been made of geogrids for the formation of thecontainment structures for the two cells and for the

embankments forming the site roads. The adoption ofvarious strengths of geogrids has enabled use of thesoil present on site and the grading of slopes toinconceivable angles for a loose material, therebyachieving considerable reductions, both in terms ofcosts and material volumes. The bottom barrier systemuses a 2 mm HDPE membrane (Macline SHE) restingon a layer of low permeability clay covered by ageotextile protection layer (Terram 4500), used incombination with a bed of sand and a mineral drainagelayer in which a mesh of drainage pipes has beenincorporated. The clay layer has been replaced on thesteep slopes by a bentonite geocomposite laminate

(Macline GCL NL10), whilst a geogrid-geotextile non-woven geocomposite (Terram 1B) has been used to

Paragrid 100/5 110,000m2, Paragrid 50/05 5,000 m2, Paralink 700

5,000m2, Paralink 500 5,000 m2, Paralink 400 32,000m2, MaclineGCL N10 44,000m2, Terram 1B 30,000m2, Terram 1000 26,000 m2,Terram 4500 10,500m2, 2mm Macline SHE 45,000m2 

Construction date:

Designer:

Products used:

November 2006 — April 2007

SERDAR Engineering (Ankara)

Client name:

MUNICPALITY OF AYDIN

Main contractor name:

CENGI CONSTRUCTION SpP (Ankara)

During construction Date: November 2006

Project layout — reinforced earth works shown in brown

Page 2: Geogrid Slope Case Study Case

8/8/2019 Geogrid Slope Case Study Case

http://slidepdf.com/reader/full/geogrid-slope-case-study-case 2/4

 During construction (future cell containment wall) After construction (future cell 2 containment wall)

After construction (cell 1)

Page 3: Geogrid Slope Case Study Case

8/8/2019 Geogrid Slope Case Study Case

http://slidepdf.com/reader/full/geogrid-slope-case-study-case 3/4

  Date: November 2006

Typical design section — highest section

The stability of the structures (both

internally and globally) has been checkedusing specific software called MACSTARS(Maccaferri Stability Analysis ReinforcedSlopes). This enables the use of differenttypes of reinforcement elements (syntheticand metal), with different mechanicalstrengths and with any geometricalconfiguration, thereby simulating thevarious types of external loads applied tothe structure (point loads and distributedforces, seismic forces, etc.).The diagramalongside shows the output for the externalstability checks carried out for a section ofthe embankments, in which the slip circlesare highlighted with different coloursdepending on the safety factor. Thisdiagram enables a fast visualisation of thecritical slip surfaces and becomes apowerful and effective tool for design andcontrol.

Page 4: Geogrid Slope Case Study Case

8/8/2019 Geogrid Slope Case Study Case

http://slidepdf.com/reader/full/geogrid-slope-case-study-case 4/4

Post construction, North bound off-slip

Maccaferri Ltd - Head Office7600 The Quorum,Oxford Business Park, North,

Garsington Road, Oxford, OX4 2JZTel: 01865 770555Fax: 01865 774550Email: [email protected] 

Web: www.maccaferri.co.uk 

Area officesPerth:T: 01738 621317 F: 01738 442283 E: [email protected] 

Belfast:T: 028 9026 2830 F: 028 9026 2849 E: [email protected] Dublin:T: 01 885 1662 F: 01 885 1601 E: [email protected] 

Web: www.maccaferri.ie  Oxford, Perth, Belfast

Spring 2007 — Installation of bottom barrier system

Puncture-resistant drainage geocomposite Terram B1

Granular drainage material

Non-woven geotextileTerram 4500 with sand

1m clay layer2mm HDPE geomembrane Macline SHEBentonite geocomposite laminate Macline GCL NL 10