Page 1: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 0

DETAIL PROJECT

REPORT

(DPR)

IWMP - 5 VISAVDAR CLUSTER, JUNAGADH

[email protected]

Page 2: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 1

Table of Contents

Chapter 1 PROJECT BACKGROUND

1.1 Project Background: ……………………………………………………………………………………………………………………………………………………………………………………….13

Table No. 1.1 Basic Project Information about Govindpara: …………………………………………………………………………………………………………………..…..13

Table No. 1.2 Basic Project Information about Mandavad: …………………………………………………………………………………………………………………….…..14

Table No. 1.3 Basic Project Information about Vekariya: ..……………………………………………………………………….…………………………………………………15

Table No. 1.4 Basic Project Information about Lalpur: ………………………………………………………………………………………………………………………………..16

1.2 Need of Watershed Development Programme: ……………………………………………………………………………………………………………………………………………..18

Table No. 2 Weightage of the project: ………………………………………………………………………………………………………………………………………………………..19

Table No. 2.1 Criteria and weightage for selection of watershed: ……………………………………………………………………………………………………..……….19

Table No. 3 Watershed Information: ……………………………………………………………………………………………………………………………………………….…………21

1.3 Other developmental projects/schemes running in the Villages: ………………………………………………………………………………………………………………….21

Table No. 4 Developmental programmes running in the project area: ………………………………………………………………………………….……………………22

Table No. 5 Previous Watershed programmes in the project area: …………………………………………………………………………………………………………….23

Page 3: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 2

Chapter 2 PROJECT IMPLIMENTING AGENCY

2.1. Project Implementing Agency ………………………………….………………………………………………………………..………………………………………………………………….28

2.2 About Gir (West) forest division, Junagadh(PIA) …………………………….……………………………………………….…………………………………………………………….28

2.2.1 The organization and its objectives: …………………………………………………………………………………………………………………………………………………..28

2.2.2 Programmes/projects of PIA, Junagadh: …………………………………………………………………………………………………………………………………………….28

2.3 SWOT Analysis of the DCF Gir west division (PIA): ……………………………………………………………………………………..………………………………………………….29

Table No. 6 PIA: ……………………………………………………………………………………………………………………………………….…………………………………………………30

Table No. 7 Staff at PIA level: ……………………………………………………………………………………………………………………………………..………………………………30

Chapter 3 BASIC INFORMATION OF THE PROJECT AREA

3.1. Geography and Geo-hydrology: …………………………..………………………………………………………………………………………………………………………………………..32

3.1.1 Land use pattern: …………………………………………………….…………………………………………………………………………………………………………………………32

Table No. 8 Land use pattern: ……………………………………………….…………………………………………………………………………………………………………33

3.1.2 Soil and topography: ………………………………………………………………………………..………………………………………………………………………………………..33

Table No. 9 Soil type and topography: ..………………………………………………………………….……………………………………………………………………….33

Table No. 10 Flood and drought condition: …………………………………………………………………………….……………………………………………………….34

Page 4: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 3

Table No. 11.1 Soil Erosion: ….………………………………………………………………………………………………………………….……………………………………..35

Table No. 11.2 Soil Salinity/Alkalinity (Salinity ingress): ..………………………………………………………………………………………….……………………..35

Table No. 12 Climatic conditions: …………………………………………………………………………………………………………………………………………….………35

Table No. 13 Physiography and relief: ……………………………………………………………………………………………………………………………………………..36

3.1.3 Land and Agriculture: ………………………………………………………………………………………………………………………………………………………………………..36

Table No. 14 Land ownership details: ………………………………………………………………………………………………………………………………………………37

Table No. 15 Agriculture: ………………………………………………………………………………………………………………………………………………….……………..37

Table No. 16 Irrigation: …………………………………………………………………………………………………………………………………………………………………….37

Table No. 17 Crop details: ……………………………………………………………………………………………………………………………………………………………….38

3.1.4 Livestock: …………………………………………………………………………………………………………………………………………………………………………………………..39

Table No. 18 Livestock: ……………………………………………………………………………………………………………………………………………………………………39

Table No. 19 Drinking water: …………………………………………………………………………………………………………………………………………………………..39

Table No. 20 Details of Common Property Resources: …………………………………………………………………………………………………………………….40

3.2. Socio-Economic Profile: …………………………………………………………………………………………………………………………………………………………………………………40

3.2.1 Demographic Status: …………………………………………………………………………………………………………………………………………………………………………40

Table No. 21 Demographic information: ……………………………………………………………………………………………………………………………………….…41

Page 5: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 4

Table No. 22 Literacy rank: ………………………………………………………………………………………………………………………………………………………………41

3.2.2 Migration Pattern: ……………………………………………………………………………………………………………………………………………..….…………...42

Table No. 23 Migration details: ………………………………………………………………………………………………………………………………………………………..42

Table No. 24 Poverty: ……………………………………………………………………………………………………………………………………………………………………...43

3.2.3 Infrastructure facilities: ……………………………………………………………………………………………………………………………………………………………………..43

Table No. 25 Village infrastructure: ………………………………………………………………………………………………………………………………………………….44

Table No. 26 Facilities / HH assets: …………………………………………………………………………………………………………………………………………………..44

3.3 Livelihood pattern: …………………………………………………………………………………………………………………………………………………………………………………………45

Table No. 27 Per Year Income: ………………………………………………………………………………………………………………………………………..………………45

3.3.1 Dependence on Common Property Resource: ……………………………………………………………………………………………………………………………………45

Table No. 28 Dependence on Forest/CPR: ……………………………………………………………………………………………………………………………………….45

Table No. 29 Livelihood pattern (Occupational distribution): …………………………………………………………………………………………………………..46

3.4. Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country vs. World: ……………………………………….46

The IWMP - 5 Visavadar Cluster project area: ……………………………………………………………………...…………………………………………………………………….49

Chapter 4 WHATERSHED ACTIVITIES

4.1. Scientific Planning: ……………………………………………………………………………………………………………………………………………………………………..53

Page 6: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 5

Table No. 30 Details of Scientific Planning and Inputs in IWMP projects: …………………………………………………………………………….………….59

4.2. Institution building :…………………………………………………………………………………………………………………………………………………………………....61

4.2.1 Watershed Committee (WC): ………………………………………………………………………………………………………………………….…………………61

Table No. 31.1 Watershed Committee details For Govindpara: ……………………………………………………………………………………………………….61

Table No. 31.2 Watershed Committee details For Mandavad: …………………………………………………………………………………………………………63

Table No. 31.3 Watershed Committee details For Vekariya: …………………………………………………………………………………………………………….64

Table No. 31.4 Watershed Committee details For Lalpur: ………………………………………………………………………………………………………………..65

4.2.2 Self Help Group: …………………………………………………………………………………………………………………………………………………………………………………67

Table No. 32 SHG detail: ………………………………………………………………………………………………………………………………………………………………….68

4.2.3 User Group: ……………………………………………………………………………………………………………………………………………………………………………………….69

Table No. 33 UG detail: ……………………………………………………………………………………………………………………………………………………………………69

4.3. Physical activities to be undertaken under IWMP - 5 Visavadar Cluster project area: ………………………………………………………………………………...69

4.3.1 Entry Point activity (EPA): ………………………………………………………………………………………………………………………………………………………………….69

Table No. 34.1 Entry point activities (EPA) for Govindpara: ………………………………………………………….………………………………………………….71

Table No. 34.2 Entry point activities (EPA) for Mandavad: ……………………………………………………………………………………………………………….71

Table No. 34.3 Entry point activities (EPA) for Vekariya: ………………………………………………………………………………………………………………….72

Page 7: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 6

Table No. 34.4 Entry point activities (EPA) for Lalpur: ………………………………………………………………………………………………………………………72

4.3.2. Watershed Development Works: ………………………………………………………………………………………………………………………………………………………73

Table No. 35 Details of activities of preparatory phase (All financial figures in lakh Rs.): …………………………………………………………………75

Table No. 36.1 Details p of engineering structure to Surface water resources in the project areas Govindpara: ...…………………………..75

Table No. 36.2 Details p of engineering structure to Surface water resources in the project areas Mandavad:……………………….……….76

Table No. 36.3 Details p of engineering structure o Surface water resources in the project areas Vekariya: ……………………………………76

Table No. 36.4 Details p of engineering structure to Surface water resources in the project areas Lalpur: ….…………………………………..77

Table No. 37 Activities related to recharging ground water resources in the project areas: …………………………………………………………….78

Table No. 38 Activities related to livelihoods by Self Help Groups (SHGs) in the project areas: ………………………………………………………..78

Table No. 39 Other activities of watershed works phase – project target: ……………………………………………………………………………………….79

Table No. 40.1 Details of engineering activity in watershed works Govindpara: ………………………………………………………………………………81

Table No. 40.2 Details of engineering activity in watershed works Mandavad: ………………………………………………………………………………..81

Table No.40.3 Details of engineering activity in watershed works Vekariya: …..……………………………………………………………………………….82

Table No.40.4 Details of engineering activity in watershed works Lalpur: ……..…………………………………………………………………………………82

Table No. 40.5 Technical Details of Check Dam: ………………………………………………………………………………………………………………………………83

Table No. 40.6 Technical Details of Nala Plug: …………………………………………………………………………………………………………………………………83

Page 8: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 7

Table No. 40.7 Technical Details of Farm Bund: ………………………….…………………………………….…………………………………………………………….87

Table No.40.8 Quantity Excavation for Farm bund: ………………………………………………………………………………………………………………………….87

Table No.41 Details of activities connected with vegetative cover in watershed works: ………………………………………………………………….88

Table No. 41.1 Technical Details of afforestration Activities: ……………………………………………………………………………………………………………89

Table No. 41.2 Cost Estimation for afforestation activity: ..………………………………………………………………………………………………………………89

Table No. 42.1 Details of allied / other activities for Govindpara: ………………….…………………………………………………………………..…………….90

Table No. 42.2 Details of allied / other activities for Mandavad: …………………………………….………………………………………………..……………..91

Table No. 42.3 Details of allied / other activities for Lalpur: ………………………………………………………….…………………………………………………92

Table No. 42.4 Details of allied / other activities for Vekariya: ………………………………………………………………………….………………………..……93

Production System – 1: Garage: ………………………………………………………………………………………………………………………….…………………………………..…95

Table No. 42.5 Details about Infrastructures: …………………………………………………………………………………………………………………………………..96

Table No. 42.6 Monthly Production Expenditure: ……………………………………………………………………………………………………..…………………….97

Table No. 42.7 Net Profits: ……………………………………………………………………………………………………………………………………………………………….98

Production System - 2: Vermicompost unit for Mandavad village: …………………………………………………………………………………………………………..98

Table No. 42.8 Model for A Vermi-compost Unit: .………………………………………………………………………………………………………………………….101

Table No.42.9 Returns from vermicomposting: ……………………………………………………………………………………………………………………………..102

Page 9: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 8

Production System – 3: Handicraft unit: .…………………………………………………………………………………………………………………………………………………102

Table No. 42.10 Monthly Production Expenditure: ………………………………………………………………………………………………………………………..103

Table No. 42.11 Net Profit: …………………………………………………………………………………………………………………………………………………………….104

Production System - 4: Groundnuts Packaging: …………………………………………………………………………………………………………………………………….…105

4.4. Capacity Building: ……………………………………………………………………………………………………………………………………………………………………………………..…106

Table No. 43 Details of Activities in the CPRs in the Project Areas: …………………………………………………………………………………………………107

Table No. 44 Capacity Building Institution: …………………………………………………………………………………………………………………………………….107

Table No. 45 Capacity Building plan: …..………………………………………………………………………………………………………………………………………….108

Table No. 46 Information, education and Communication Activities: …………………………………………………………………………………………….108

Chapter 5 BUDGETING

Table No. 47 Budget at a glance for the project: ……………………………………………………………………………………………………………………………110

Table No. 48 Village wise- component wise budget available under IWMP: ………………………………………………………………………………….111

Table No. 49 Village wise gap in funds requirement: ……………………………………………………………………………………………………………………..111

Table No. 50 Details of convergence of IWMP with other schemes: ………………………………………………………………………………………………112

Chapter 6 EXPECTED OUTCOMES

6.1 Expected Outcomes: …………………………………………………………………………………………………………………………………………………………………………………….114

Page 10: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 9

6.1.1 Employment: ……………………………………………………………………………………………………………………………………………………………………………………114

Table No. 52 Employment in Project area: …………………………………………………………………………………………………………………………………….114

6.1.2 Migration: ………………………………………………………………………………………………………………………………………………………………………………………..115

Table No. 53 Details of seasonal migration from Project area: ……………………………………………………………………………………………………….115

6.1.3 Ground water table: …………………………………………………………………………………………………………………………………………………………………………115

Table No. 54 Details of average ground water table depth in the project areas (in meters): ………………………………………………………….116

6.1.4 Drinking water: ………………………………………………………………………………………………………………………………………………………………………………..116

Table No. 55 Status of Drinking water: …………………………………………………………………………………………………………………………………………..116

6.1.5 Crops: ………………………………………………………………………………………………………………………………………………………………………………………………117

Table No. 56 Details of crop area and yield in the project area: …………………….……………………………………………………………………………….117

6.1.6 Horticulture: …………………………………………………………………………………………………………………………………………………………………………………….118

Table No. 57 Area under horticulture: ……………………………………………………………………………………………………………………………………………118

6.1.7 Vegetative cover: .……………………………………………………………………………………………………………………………………………………………………………118

Table No. 58 Forest/vegetative cover: ……………………………………………………………………………………………………………………………………………118

6.1.8 Livestock: …………………………………………………………………………………………………………………………………………………………………………………………118

Table No. 59 Details of livestock in the project areas (for fluids please mention in liters, for solids please mention in

Page 11: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 10

kgs. And income in Rs.): …………………………………..…………………………………………………………………………………………………………………………….119

6.1.9 Linkages: ………………………………………………………………………………………………………………………………………………………………………………………….119

Table No. 60 Backward-Forward linkage: ……………………………………………………………………………………………………………………………………….119

Logical Framework Analysis: ………………………………………………………………………………………………………………………………………………………….121

Chapter 7 QUALITY AND SUSTAINABILITY ISSUES

7.1 Plans for Monitoring and Evaluation: ………………………………………………………………………………………………………………………………………………….127

7.2 Plans For Project management: ………………………………………………………………………………………………………………………………………………………….128

7.3 Watershed Development Fund: ………………………………………………………………………………………………………………………………………………………….128

7.4 User Charges: ……………………………………………………………………………………………………………………………………………………………………………………..128

Chapter 8 MAPS

Page 12: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 11

IWMP-5 Project Area in Ha.

Figure: 1 Project Area Budget at the project

Page 13: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 12

CHAPTER – 1

Page 14: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 13

P RO JE C T B AC K GRO U ND

Page 15: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 14

1.1 Project Background GOVINDPARA :

(IWMP-5) project is located in Visavadar Taluka, Junagadh District of Gujarat state. The project cluster respective micro

watershed codes 5G1C5c4 ,C2k code - 120050083100000.The total project area of the watershed is about 403.80 Ha., has been undertaken

to be treated under Integrated Watershed Management Programme (IWMP) starting year 2009-10.

The nearest town is Visavadar which is about 7 Km from Govindpara and is well connected by pacca road. The project area is

near by world famous wild Gir area. His also famous are Asiatic lion’s.

Only one Patel and OBC communities are here present in village. The livelihood of these people is primarily based on Rainfaid

agriculture, animal husbandry.

The Project area falls under the Gir west Division. Many Year ago Govindpara Village famous of Nurgadh village. Now change

of his name Govindpara.

Table No.1.1 Basic Project Information about Govindpara:

SR No.

Name of the Project

Village Gram

Panchayats Taluka District

Area of the

project

Area proposed

to be treated

Total project

cost(Rs.in Lakh)

PIA Name C2k code

Page 16: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 15

1 IWMP-5 Govindpara 120050083100000 Govindpara Visavadar Junagadh 403.80Ha. 44.90Ha. 48.46 D.C.F.-

Gir(West) Junagadh

MANDAVAD :

(IWMP-5) project is located in Visavadar Taluka, Junagadh District of Gujarat state. The project cluster respective micro

watershed codes 5G1C5c5b, 5G1C5c5c, 5G1C5c5d, C2k code - 120050082930000.The total project area of the watershed is about 682.60

Ha., has been undertaken to be treated under Integrated Watershed Management Programme (IWMP) starting year 2009-10.

The nearest town is Visavadar which is about 4 Km from Mandavad and is well connected by pacca road. The project area is

nearby world famous wild Gir area. His also famous are Asiatic lion’s.

Prajapati, Darbar, Koli, Patel, Brahmin, Rabari, Harijan, Aahir, communities are here present in village. The livelihood of these

people is primarily based on Rainfaid agriculture, animal husbandry and Labour work.

The Project area falls under the Gir west Division.

Table No.1.2 Basic Project Information about Mandavad:

SR No.

Name of the Project

Village Gram

Panchayats Taluka District

Area of the

project

Area proposed

to be treated

Total project

cost(Rs.in Lakh)

PIA Name C2k code

Page 17: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 16

1 IWMP-5 Mandavad 120050082930000 Mandavad Visavadar Junagadh 682.60Ha. 65.80 Ha. 81.91 D.C.F.-

Gir(West) Junagadh

VEKARIYA :

(IWMP-5) project is located in Visavadar Taluka, Junagadh District of Gujarat state. The project cluster respective micro

watershed codes 5G1C5c5k, 5G1C5d1d, 5G1C5d1c,5G1C5d1f ,C2k code - 120050083070000.The total project area of the watershed is about

2102.50 Ha., has been undertaken to be treated under Integrated Watershed Management Programme (IWMP) starting year 2009-10.

The nearest town is Dhari which is about 13 Km and Visavadar 18 Km from Vekariya. And is well connected by pacca road.

The project area is nearby world famous wild Girarea. His also famous are Asiatic lion’s.

Aahir, Darbar, Prajapati, Koli, Patel, Brahmin, Rabari, Harijan, Muslim, Bavaji communities are here present in village. The

livelihood of these people is primarily based on Rainfaid agriculture, animal husbandry and Labour work.

The Project area falls under the Gir west Division.

Table No.1.3 Basic Project Information about Vekariya:

SR No.

Name of the project

Village Gram

Panchayats Taluka District

Area of the

project

Area proposed

to be

Total project

cost(Rs.in PIA

Name C2k code

Page 18: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 17

treated Lakh)

1 IWMP-5 Vekariya 120050083070000 Vekariya Visavadar Junagadh 2102.50Ha. 220.00Ha. 252.30 D.C.F.-

Gir(West) Junagadh

LALPUR :

(IWMP-5) project is located in Visavadar Taluka, Junagadh District of Gujarat state. The project cluster respective micro

watershed codes 5G1C5c5j, 5G1C5c5h, 5G1C5c5m, C2k code - 120050083080000.The total project area of the watershed is about

1125.50Ha.,has been undertaken to be treated under Integrated Watershed Management Programme (IWMP) starting year 2009-10.

The nearest town is Visavadar which is about 9 Km from Lalpur. And is well connected by pacca road. The project area is

nearby world famous wild Gir area. His also famous are Asiatic lion’s.

Aahir, Darbar, Prajapati, Koli, Patel, Brahmin, Rabari, Harijan, Muslim, Bavaji communities are here present in village. The

livelihood of these people is primarily based on Rainfaid agriculture, animal husbandry and Labour work.

The Project area falls under the Gir west Division.

Table No.1.4 Basic Project Information about Lalpur:

SR No.

Name of the

project

Village Gram

Panchayats

Taluka District Area of

the project

Type of the Project

Area proposed to be

Total project cost(Rs.

PIA Name C2k code Other Forest

Page 19: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 18

Ha. Ha. treated Ha.

in Lakh)

1 IWMP-5 Lalpur 120050083

080000 Lalpur Visavadar Junagadh

1125.50

1059.50 66.00 147.20 135.06 D.C.F.-Gir

(West) Junagadh

Junagadh Dist.

Page 20: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 19

Figure 2, Geographic location of Visavadar Watershed Visavadar watershed

1.2 Need of Watershed Development Programme: Watershed Development Programmer is prioritized on the basis of thirteen parameters namely Poverty Index, Percentage of

SC/ST, Actual wages, Percentage of small and marginal farmers, Ground water status, Moisture Index, Area under rainfaid agriculture,

Drinking water situation in the area, Percentage of the degraded land, Productivity potential of the land, Continuity of another watershed

Page 21: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 20

that has already developed/treated, Cluster approach for plain or for hilly terrain. Based on these thirteen parameters a composite ranking

was given to IWMP - 5 Visavadar Cluster given in table no. 2.

The total number of families under BPL which is less than 20 percent of the total households of the every village. Hence a

score of 2.5 is allotted. The percentage of schedule castes in the village is about 30 percent to the total population; hence a score of 5 was

allotted. Rainfaid agriculture forms the primary occupation of the village due to the fact that ground water is saline and hence unfit for

usage. More than 60 percent of the farmers are small and marginal by nature and the actual wages earned by the Labour is less than the

minimum wages hence a composite rank of 5, 3 and 5 are allotted respectively.

Since the rainfall received is erratic and irregular, the moisture index is low and the area is classified under DPAP block.

Drinking water is in good condition, so nothing problem in the village. The soil is very permeable and production of the land can be

significantly enriched with the availability of timely irrigation. Cluster approach was followed taking into consideration this micro

watershed covering a total area of 4314.40 Ha. Thus a cumulative score of 88.5.

All the parameters taken together give a cumulative score of 88.5 to the watershed (reference Table 2.1 below).

Table no. 2: Weightage of the project

Name of the Project

Project type

Weightage

IWMP-5 FLAT i ii iii iv V vi vii viii ix x xi xii xiii

Page 22: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 21

& HILLY

2.5 3 5 5 3 10 15 5 10 10 0 15 5

Table no. 2.1: Criteria and weightage for selection of watershed:

No Criteria Maximum

score Ranges & scores

i Poverty index(% of poor to population)

10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20 %

(2.5)

ii % of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)

iii Actual wages 5 Actual wages are

significantly lower than minimum wages (5)

Actual wages are Equal to or higher Than minimum Wages (0)

iv % of small and marginal farmers

10

More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)

V

Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)

vi Moisture index/ DPAP/ DDP Block

15 -66.7 & below (15)

DDP Block -33.3 to -66.6 (10)

DPAP Block 0 to -33.2 (0)

Non DPAP/ DDP Block

vii Area under rain-fed agriculture

15 More than 90 % (15)

80 to 90 % (10)

70 to 80% (5)

Above 70 %

(Reject)

viii Drinking water 10 No source(10) Problematic village (7.5)

Partially covered (5) Fully covered

(0)

ix Degraded land 15 High – above 20 % (15)

Medium – 10 to 20 %

(10) Low- less than 10 % of

TGA (5)

x Productivity potential of the land

15 Lands with low production

& where productivity can be significantly enhanced with

Lands with moderate production & where productivity can be

Lands with high production & where productivity can be

Page 23: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 22

reasonable efforts (15)

enhanced with 11reasonable efforts (10)

marginally enhanced with reasonable

efforts (5)

xi

Contiguity to another watershed that has already been developed/ treated

10

Contiguous to previously treated watershed &

contiguity within the micro watersheds in the project

(10)

Contiguity within the micro watersheds in the

project but noncontiguous to previously treated

watershed (5)

Neither contiguous to previously treated

watershed nor contiguity within the micro watersheds in

the project (0)

xii

Cluster approach in the plains (more than one contiguous micro-watersheds in the project)

15

Above 6 micro-watersheds in cluster (15)

4 to 6 micro watersheds in cluster (10)

2 to 4 micro watersheds in cluster

(5)

xiii

Cluster approach in the hills (more than one contiguous micro-Watersheds in the project)

15

Above 5 micro-watersheds in cluster (15)

3 to 5 micro watersheds in cluster (10)

2 to 3 micro watersheds in cluster

(5)

Total 150 150 91 41 2.5

Table no.3: Watershed information

No. Of watersheds to be treated Watershed code Watershed regime/type/order

11 5G1C5c4,5G1C5c5j, 5G1C5c5h, 5G1C5c5m,5G1C5c5b, G1C5c5c,5G1C5c5d,5G1C5c5k, 5G1C5d1d, 5G1C5d1c,

Mini Watershed

Page 24: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 23

5G1C5d1f

1.3 Other developmental projects/schemes running in the villages : (Govindpara, Mandavad, Vekariya, Lalpur) This villages being very back ward, has been on top priority of a number of developmental projects. These programmes are

Eco Development Commity (EDC), Gokul Gram Yojana, Sampurna Gramin Rojagar Yojana(SGRY),Mahatma Gandhi National Rural

Employment Guarantee Scheme(MGNREGS), Bajpai Yojana, TSC Yojana, Sardar Awas Yojana(SAY), Javahar Rojgar Yojana (JRY), Indira

Awas Yojana (IAY),WASMO.

1. EDC: Construction of Check Deam and Agriculture land leveling has been taken of under EDC.

2. Gokul Gram Yojana : Contraction of CC Road, Community Hall, Play house, Tube well, Pipeline and Aveda

3. Sampurna Gramin Rojagar Yojana (SGRY): Contraction of Primary school compound, Metal Road and Metal Road Repairing. Activity has been Taken-up under SGRY.

4. Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS): Boribandhs and Road Activity has been taken-

up under NREGA.

5. Bajpai Yojana: Contraction of Dammar Road under Bajpai Yojana.

6. TSC Yojana: individual toilets are constructed under TSC programme. All the remaining house hold will be covered under the

scheme.

7. Sardar Awas Yojana (SAY): House has been constructed under Sardar Awas Yojana.

Page 25: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 24

8. Javahar Rojgar Yojana (JRY): Construction of the Tree Stand in Public Place.

9. Indira Awas Yojana (IAY): House has been constructed under Indira Awas Yojana.

10. WASMO: Construction of water storage tank, underground water storage tank and water pipe line etc. in this Project.

Table no.4: Developmental programmes running in the project area:

Name of the Project

SR no

Name of the Programme/scheme

Sponsoring agency Objectives of the

Programme/scheme Year of

commencement Villages covered

Estimated number of

beneficiaries

IWMP - 5

1 EDC Forest central Gov. Check Dams & Agriculture Land Leveling

1998-99 1 240 Persons

2 Gokul gram yojana Gujarat Gov. CC road & Community hall

2002-03 3 3240Persons

3 SGRY Central Gov. Metal road & Primary School Compound

2002-03 2 440 Persons

4 MGNREGS Central Gov. Boridandh & Road 2007-08 4 920 Persons

5 TSC Central Gov. Sanitation 2007-08 1 60 Persons

6 Bajpai Yojana Central Gov. Dammar road 2009-10 1 240 Persons

7 SAI Central Gov. Housing

2010-11 2 5 Person

8 IAS Central Gov. Housing 2007-08 1 4 Person

9 JRY Gujarat Gov. Tree Stand 1999-00 1 250 Persons

Page 26: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 25

10 IAY Gujarat Gov. Housing 2008-09 1 125 Persons

11 WASMO Central Gov. Water Pipe Line 2008-09 1 1000 Persons

12 Sakhi Mandal Gujarat Gov. Create SHG Group 2006-07 4 255 Persons

Table no. 5: Previous Watershed programmes in the project area:

SR no

Project

name

Year starte

d

Name of

villages

No. Of micro

watershed

Watershed codes

Area under

treatment

Funding

source

Nodal agenc

y

PIA

Total cost

Expenditure incurred up to start of IWMP

% financial completi

on

% physical completion

- - - - - - - - - - - - - -

Page 27: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 26

Field visit by D.C.F sir and R.F.O sir

Page 28: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 27

0Visit by C.C.F sir at Visavadar cluster

officeVisit by pro. Expert, Technical Expert and M.D.Ts

Page 29: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 28

Mamlatdar sir,ACF sir, RFO sir, Sarpachshri, Forest & Police staff and

W.D.Ts in Gram sabha at Lalpur. M.D.T staff visits at Visavadar cluster

Page 30: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 29

Page 31: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 30

CHAPTER - 2

P RO JE C T I MP L EME N TI N G A GE NC Y

2.1. Project Implementing Agency

Page 32: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 31

The Project Implementing Agencies (PIA) is selected by an appropriate mechanism by Gujarat State Watershed Management

Agency (GSWMA), the State Level Nodal Agency (SLNA) for Integrated Watershed Management Programme (IWMP) in Gujarat. The PIAs

are responsible for implementation of watershed project. These PIAs may include relevant line departments, autonomous organizations

under State/ Central Governments, Government Institutes/ Research bodies, Intermediate Panchayats, Voluntary Organizations (VOs).The

PIA for IWMP- 5,Junagadh Watershed project is Gir(West) forest division, Junagadh.

2.2 About Gir (West) forest division, Junagadh(PIA). 2.2.1 The organization and its objectives: The Project Implementing Agencies (PIA), Junagadh is a district level nodal agency and was established on 17 Feb 2010 to

oversee the smooth implementation of watershed projects in the district. The District Development Officer (DDO) is the chairman of

theDWDU.The DWDU has dedicated and experienced staff comprising one Project manager(deputation from Gujarat Forest Department), a

technical expert and a multidisciplinary team of agriculture expert, community mobilization expert and Data Entry Operator, civil

engineer, surveyor, accountant and Messenger, The objectives of the DCF Gir West Division, Junagadh are supervising, planning,

implementing, documenting and promoting watershed development projects and related developmental activities in the district as per

guidelines.

2.2.2 Programmes/projects of PIA, Junagadh:

At present 6 IWMP projects have been sanctioned by Government of India for Junagadh district. The entry point activities of

all the six IWMP projects have been identified by the respective PIAs in the district. DCF Gir west division Junagadh is PIA for 3 projects

(IWMP- 2, 4, 5) and Gir east division Dhari is PIA forIWMP-1 and DWDU itself is PIA for rest of the two projects (IWMP-3,6).

2.3 SWOT Analysis of the DCF Gir west division (PIA):

Page 33: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 32

Strength:

(1) Dedicated and experienced staff and a multidisciplinary team

(2) Independent District Level Nodal Agency.

(3)Strong linkages with national and state level institutions, agricultural universities, for capacity building and guidance

(4)Scientific planning in watershed projects with the help of BISAG, Gandhinagar,

(5)District level monitoring, coordination & Co-operation Committee

Weakness:

(1) No permanent office building. Opportunities: (1)A number of different other development schemes of the government are running; so, there can be horizontal integration and convergence of programmes (2) Better financial provision under IWMP Threats:

(1) Rainfall being very scarce and unreliable in the project area, the activities planned to be taken up may yield limited impact

(2) Irregularities in fund flow can derail the smooth functioning

(3) Lack of contribution and cooperation from local people

(4) Low literacy rate in the project are

Page 34: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 33

Table no. 6: PIA:

SR. No. Names of the project Details of PIA

1 IWMP-5

VISAVADAR

(i) Type of organization Line Department (ii) Name of organization D.C.F. Gir West Junagadh

(iii) Designation & Address D.C.F. Gir. West Sardar bag, Gir west division, Junagadh.

(iv) Telephone 2631044 (v) Fax 2631044 (vi) E-mail [email protected]

Table no. 7: Staff at PIA level:

SR no

Name Age Sex Designation Qualification Experience Job assigned Monthly

remuneration

1 R.D.Katara 53 M D.C.F Inter science With B.A

32 Year Project Management

44,000

3 N.M.Jadeja 50 M R.F.O. B.A. with economics 27 Year Implementation 30,000

4 Vegad Girishkumar K. 35 M W.D.T.-Surveyor ITI-Surveyor 14 Year Surveying 6,000

5 Odedra Karan M. 20 M W.D.T-Eng. D.C.E. - Engineering work 8,000

6 Naghera Mahendrabhai R. 24 M W.D.T.-Agri. M.R.S 3 Year Agriculture 8,000

7 Ladani Bhaveshbhai V. 28 M W.D.T.-Accountant

M.Com 15 Months Accountant 7,000

8 Garala Hemaxiben V. 21 F W.D.T.-Com.Mobi. B.Sc.(HSc.) 6 Months Community 8,000

9 Purohit Krutiben M. 25 F W.D.T.- D.E.O M.Com, P.G.D.C.A 6 Months Data Entry 5,000

Page 35: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 34

CHAPTER – 3

BASIC

INFORMATI

ON OF THE

PROJECT

AREA

B AS I C I NF O RM A TI O N OF TH E P RO JE C T A REA

Page 36: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 35

3.1 Geography and Geo-hydrology 3.1.1 Land use pattern: A. Govindpara:

The net geographical area of Govindpara watershed is about 403.80ha.,about90% land is under Agriculture which is

completely rain-faid. Mainly a Kharif crop is taken. About 10% of the total land is classified under wasteland of which 60 percent is

cultivable and rest is uncultivable.

B. Mandavad:

The net geographical area of Mandavad watershed is about 682.60 Ha., about 80% of land is under Agriculture which

is completely rain-faid. Mainly a Kharif crop is taken. About 20% of the total land is classified under wasteland of which 60 percent is

cultivable and rest is uncultivable.

C. Vekariya:

The net geographical area of Vekariya watershed is about 2102.50 Ha., about 75% of land is under Agriculture which

is completely rain-faid. Mainly a Kharif crop is taken. About 22% of the total land is classified under wasteland of which 60 percent is

cultivable and rest is uncultivable and hilly, and 3 % is Permanent pasture.

D. Lalpur:

The net geographical area of Lalpur watershed is about 1125.50 Ha., out of which 5.86% is forest area. About 75% of

land is under Agriculture which is completely rain-faid. Mainly a Kharif crop is taken. About 19.14% of the total land is classified under

wasteland of which 50 percent is cultivable and rest is uncultivable and hilly.

Page 37: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 36

Table no. 8: Land use pattern:

SR. No.

Names of the villages

Geographical Area of the

village Ha.

Forest Area Ha.

Land under agricultural

use Ha.

Rainfaid area Ha.

Permanent pastures

Ha.

Wasteland

Cultivable Ha.

Non-cultivable

Ha.

1 Govindpara 403.80 - 363.42 363.42 - 24.228 16.152

2 Mandavad 682.60 - 546.08 546.08 - 81.912 54.608

3 Vekariya 2102.50 - 1576.875 1576.875 63.075 277.53 185.02

4 Lalpur 1125.50 66 844.125 844.125 - 107.710 107.710

3.1.2 Soil and topography:

IWMP - 5 Visavadar Cluster watershed project falls under South-West Gujarat Agro Climatic Zone. The soil is mainly loam and saline. The soil is black and red color. The depth of soil is moderate too deep about 25 to 75 cm. The predominant texture of soil is loamyand silt and clay. The soil fertility is very poor with low nitrogen, phosphorus and potash. The topography of the area is moderate ranging from 0-10% slope.

Table no. 9: Soil type and topography:

SR.

No.

Name of the Agro-climatic zone

covers project area

Area in

Ha.

Names of the

villages

Major soil types

Topography a)Type

b) Area in

Ha.

1 South-West Gujarat Agro climatic zone 403.80 Govindpara Black-Red 403.80 Flat to Moderate Slope

2 South-West Gujarat Agro climatic zone 682.60 Mandavad Black-Red 682.60 Flat to Moderate Slope

3 South-West Gujarat Agro climatic zone 2102.50 Vekariya Black-Red 2102.50 Flat to Moderate Slope

4 South-West Gujarat Agro climatic zone 1125.50 Lalpur Black-Red 1125.50 Flat to Moderate Slope

Page 38: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 37

Table no. 10: Flood and drought condition:

SR. No. Name of the Villages Flood (Incidence) Drought (Incidence)

1 Govindpara NIL Once in 5 Years

2 Mandavad NIL Once in 5 Years

3 Vekariya NIL Once in 5 Years

4 Lalpur NIL Once in 5 Years

Information given by R.F.O sir to Village people in gram sabha at

Vekariya

Page 39: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 38

Table no. 11.1: Soil Erosion

Cause Type of erosion Area affected (Ha.) Run off

(mm/ year) Average soil loss

(Tones/ Ha./ year) Water erosion

A Sheet 2500 200 200 Tones B Rill 900 450 40 Tones C Gully 100 300 60 Tones

Sub-Total 3500 Wind erosion 3500 NIL

Total 10500

Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)

Name of the Villages Survey Number Soil pH Type of Salinity(Inherent/Ingress)

Govindpara - 7.3 -

Mandavad - 7.5 -

Vekariya - 7.6 -

Lalpur - 7.5 -

Table no. 12: Climatic conditions:

Name of the

project Year Rain fall in mm.

Temperature (c. ) Highest intensity of Rain

fall (mm in a day) Max Min

IWMP-5

2005 1410 43 10 160 2006 1293 43 11 150 2007 1610 42 10 205 2008 1523 42 11 210

Page 40: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 39

2009 524 44 13 48

The rainfall is scanty which has resulted in recurrent phenomenon of drought in every three to four years. The average rainfall

of this area is about 1270 mm (from past five year data) with a highest intensity of 155 mm within span of a day.

Table no. 13: Physiography and relief

Name of the villages Elevation Slope range (%) Major streams

Govindpara 70 Meters 0-15 % Popatadi

Mandavad 66 Meters 0-15% Dhraphad

Vekariya 56 Meters 0-15% Haiyafutali

Lalpur 48 Meters 0-15 % Dhraphad

3.1.3 Land and Agriculture:

Lack of surface water source and high salinity of ground water has limited the sufficient base for irrigation as well as for

drinking purpose. The average land holding is about 5 ha. The major crops cultivated by the farmers are Groundnut and Cotton. Some of

the farmers take up rain-faid castor crop if rainfall is good. The land conservation measures such as earthen bunds and farm bunds in the

area will help them to take up a rabi crop of mustard or cumin in the residual moisture.

Page 41: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 40

Table no. 14: Land ownership details

SR.

No. Name of the Villages

Total owned land (in ha.)

Gen OBC SC ST

1 Govindpara 245 14 - -

2 Mandavad 213 124 5 -

3 Vekariya 688 758 47 -

4 Lalpur 397 820 6 -

Table no. 15: Agriculture

SR. No. Name of the Villages Net sown area

One time Two times Three times

1 Govindpara 195.40 187.4 7

2 Mandavad 191 124.5 27

3 Vekariya 1405.50 726.5 57

4 Lalpur 791.00 692.7 30

Table no. 16: Irrigation

SR.

No.

Name of the

Villages

Source 1 : Canal Source 2 : Check dam / Pond Source 3 : Well/Tube well

Availability

months Net area

Gross

area

Availability

months Net area

Gross

area

Availability

months Net area

Gross

area

Page 42: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 41

1 Govindpara - - - - - - 7 251.5 259

2 Mandavad - - - - - - 7 281.554 342.65

3 Vekariya - - - - - - 7 715.5 750.00

4 Lalpur - - - - - - 7 684.20 690.00

Table no. 17: Crop details

SR.

No.

Name of the

Villages

Kharif (Monsoon)

Groundnut Cotton Black Gram

Area

(Ha.)

Production

(kg.)

Productivity

(Kg. /ha.)

Area

(Ha.)

Production

(Kg.)

Productivity

(Kg. /ha.)

Area

(Ha.)

Production

(Kg.)

Productivity

(Kg. /ha.)

1 Govindpara 193.4 257535 1331.6 2 3600 1800 - - -

2 Mandavad 134 171520 1280 51 87680 1719 6 4200 700

3 Vekariya 1309 1698014 1297.18 96.5 193110 2001.13 - - -

4 Lalpur 775.7 1054290 1359.53 15.3 24140 1577.78 - - -

SR. no.

Name of the Villages

Rabi (Winter) Wheat Castor Pearl millet

Area (Ha.)

Production (Kg.)

Productivity (Kg./Ha.)

Area (Ha.)

Production (Kg.)

Productivity (Kg./Ha.)

Area (Ha.)

Production (Kg.)

Productivity (Kg./Ha.)

1 Govindpara 182.9 416900 2279.39 4.5 1989 442 - - -

2 Mandavad 117.5 295320 2513.36 - - - 7 3940 420

3 Vekariya 715.5 1750550 2446.61 11 4763 453 - - -

4 Lalpur 684.2 1777240 2597.54 8.5 3910 460 - - -

SR. no.

Name of the Villages

Zaid (Summer) Til

Area (Ha.) Production (Kg.) Productivity (Kg. /Ha.) 1 Govindpara 7 5880 840

Page 43: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 42

2 Mandavad 27 17052 812 3 Vekariya 57 46626 818 4 Lalpur 30 24120 804

3.1.4 Livestock: The village has 1126 cows, 1711buffaloes, 836 bullocks, 1030 goats and 190 sheep and other 1170. Majority of rabari

community depends on goat and sheep rearing for their livelihood. Cows and buffaloes are of local breed. Lack of rain and surface water has reduced the fodder and pasture availability for their animals. Milk production is so low that there is no dairy cooperative in the village.

Table no. 18: Livestock

SR.

No.

Name of the

Villages

Buffalo

(Lit/Annum)

Cow

(Lit/Annum) Total Milk

(Buffalo+Cow)

Goat

No

Sheep

No

Bullock

No

Others

No Total

No milk No Milk

1 Govindpara 44 30824 11 7706 38530 0 0 49 23 127

2 Mandavad 42 37824 77 30947 68770 18 50 33 39 259

3 Vekariya 1392 691998 824 461332 1153330 709 135 595 932 4587

4 Lalpur 233 135359 214 90240 225599 303 5 159 176 1090

Table no. 19: Drinking water

SR.

No.

Name of the

Villages Ground water table (mt) Source of drinking water

Availability in

months Quality

1 Govindpara 91 Nal 09 Good

Page 44: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 43

2 Mandavad 121 Nal 08 Good

3 Vekariya 137 Nal 08 Good

4 Lalpur 125 Nal 09 Good

Table no. 20: Details of Common Property Resources

SR.

No.

Names of

the project

CPR

Particulars

Total Area (Ha.)

Area owned/ In possession of Area available for treatment (Ha.)

Pvt. persons

Govt.

(specify

deptt.)

PRI

Any other

(Pl.

Specify)

Pvt.

persons

Govt.

(specify

deptt.)

PRI

Any other

(Pl.

Specify)

IWMP-5

Visavadar

Wasteland/ degraded land - 170 - - - 391.20 - -

Pastures - 179.80 - - - - - -

Orchards - 271.53 - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - 66 - -

Village Ponds/ Tanks - 4 - - - 2 - -

Community Buildings - 3 - - - - - -

Weekly Markets - - - - - - - -

Permanent markets - 1 - - - - - -

Temples/ Places of worship - 8 - - - - - -

Others (Pl. specify) - - - - - - - -

3.2. Socio-Economic Profile 3.2.1 Demographic Status:

Page 45: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 44

IWMP - 5 Visavadar Cluster watershed project has a total of 919 households with a population of 5121 (as per base-line

survey) out of which 2649 are male and 2422 female .The sex ratio is 914 female to 1000 male. There are 198 BPL families. The average

family size is 5. The literacy rate is average 67.44 percent; male literacy rate is 71.23 percent (of total male population) and female literacy

rate is 64.03 percent (of total female population). It is noticeable that only 302 persons have reached up to 12th standard. The major castes

in the village are Koli, Patel, Prajapati, Darbar, Ahir, Brahmin, Bavaji, Rabari, Schedule Caste and Muslim communities. Majority of

population is involved in agriculture and animal husbandry.

Table no. 21: Demographic information

SR.

No.

Name of the

Villages

SC ST OBC OTHER Population

M F % M F % M F % M F % M F Total

1 Govindpara 0 0 0 0 0 0 11 11 11.11 88 88 88.88 99 99 198

2 Mandavad 137 120 33.72 2 1 0.39 204 200 53.01 53 45 12.86 396 366 762

3 Vekariya 292 291 25.21 0 0 0 644 595 53.59 252 238 21.20 1188 1124 2312

4 Lalpur 37 35 3.88 0 0 0 760 694 78.38 172 157 17.74 969 886 1855

Table no. 22: Literacy rank

SR. No.

Name of the

Villages Year

SC ST OBC OTHER TOTAL %

M F % M F % M F % M F % M F TOTAL

1 Govindpara 1to14 0 0 0 0 0 0 2 0 1.01 5 9 7.07 7 9 16 8.08

Page 46: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 45

>14 0 0 0 0 0 0 6 7 6.57 68 51 60.10 74 58 132 66.66

2 Mandavad 1to14 30 21 6.69 1 0 0.13 40 40 10.50 5 5 1.31 76 66 142 18.64

>14 75 41 15.22 1 1 0.26 123 77 26.25 37 24 8.00 236 143 379 49.74

3 Vekariya 1to14 60 70 5.62 0 0 0 120 96 9.34 37 34 3.07 217 200 417 18.04

> 132 82 9.26 0 0 0 335 240 24.87 156 128 12.28 623 450 1073 46.41

4 Lalpur 1to14 9 6 0.81 0 0 0 124 105 12.35 28 18 2.48 161 129 290 15.68

> 13 8 1.13 0 0 0 369 263 34.07 113 96 11.27 495 367 862 46.62

3.2.2 Migration Pattern: People migrate during summer season to different parts of the state like Surat, Junagadh, Amareli and Suarashtra as daily wagers, agricultural labours, construction workers and diamond polishing. Lack of fodder availability and grazing land for smaller ruminant force these people to migrate to other places.

Table no. 23: Migration details

SR.

No.

Name of

the

Villages

Total

population

Migration Migration by months Main reason

for

migration

Income

during

migration

/ month

Total Male Female Up to 3

months

3-6

months

More than

6 months

1 Govindpara 198 4 3 1 4 - - Employment 12000

2 Mandavad 762 55 31 24 18 26 11 Employment 1,65,000

Page 47: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 46

3 Vekariya 2312 172 92 80 53 61 58 Employment 5,16,000

4 Lalpur 1849 137 80 57 55 49 33 Employment 4,11,000

Table no. 24: Poverty

SR. No

Name of the Villages

Total Household

BPL % of BPL

HH Total Land less HH

% of land less HH 0-16 16-20 Total

1 Govindpara 35 1 - 1 2.85 1 2.85

2 Mandavad 144 8 18 26 18 103 71.52

3 Vekariya 410 28 88 116 28.29 205 50

4 Lalpur 331 15 40 55 16.66 144 43.50

3.2.3 Infrastructure facilities:

IWMP-5 watershed area is well connected with Visavadar Taluka with pucca roads. The village has electricity connectivity

under Jyotigram Yojana of the State Government. Nearly 75 percent of households in the village have their personal electric meters. IWMP

- 5 Visavadar Cluster project area has a primary school with all facilities like personal computers. For middle and higher secondary

education, the students have to go to Visavadar village which is about 7 to 18kilometers away. This also contributes to lower education

level of the people. The villages do not have a Primary Health Centre for which villagers have to go to Visavadar which is 7 to 18 Km. away.

Page 48: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 47

Table no. 25: Village infrastructure

SR.No.

Name of the Villages

Pacca road

to the villag

e (Y/N)

Schools

Colleges (Number)

Post Office (Distance)

Banks (Number

)

Distance from

nearest market

yard

Milk collection

center (Number

)

Milk cooperative (Number)

Other cooperative

s / CBIs (Number)

Any other institutio

n LP UP HS

1 Govindpara Y Y Y N N N N 11 Km N N N N

2 Mandavad Y Y Y Y N N N 1 Km N N N N

3 Vekariya Y Y Y Y N 1 N 12 Km 1 N N N

4 Lalpur Y Y Y N N N N 13 Km 1 1 N N

Table no. 26: Facilities / HH assets

SR.

No.

Name of the

Villages

HHs with

electricity

HHs

with

safety

latrines

HHs with phones HHs with vehicle HHs

with TV

set

HHs

with

cooking

gas

HHs with

Drinking

water

HHs

with

fridge

Land

line Mobile

2-

wheeler

4-

wheeler

1 Govindpara 35 25 6 34 27 1 26 15 35 19

2 Mandavad 142 46 51 109 49 5 55 38 129 19

3 Vekariya 400 118 66 315 108 7 196 72 379 44

4 Lalpur 400 100 42 315 108 7 196 65 331 26

Page 49: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 48

3.3 Livelihood pattern:

Table no. 27: Per Year Income

SR. No. Name of the Villages Agriculture

(In Rs.)

Animal

husbandry

(In Rs.)

Casual Labour

(In Rs.)

Others

(In Rs.)

Total

(In Rs.)

1 Govindpara 2507000 - 11600 54000 2572600

2 Mandavad 1737000 87000 1161000 983000 3968000

3 Vekariya 8785500 130200 243550 1401000 10560250

4 Lalpur 9769000 508000 2021000 696000 12994000

3.3.1 Dependence on Common Property Resource Table no.28: Dependence on Forest/CPR

SR. No. Name of the

Villages

Benefit type 1 Benefit type 2 Benefit type 3 Total

income % sells Income % sells Income % sells Income

- - - - - - - - -

- - - - - - - - -

Page 50: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 49

Table no. 29: Livelihood pattern (Occupational distribution)

SR.No Name of the

Villages

Total

workforce Agriculture

Animal

husbandry

(AH)

Agriculture

+ AH

Casual

labour Services

Diamond

Polishing Others

1 Govindpara 113 50 3 30 10 - 20 -

2 Mandavad 445 205 33 57 70 20 30 30

3 Vekariya 1357 480 83 289 200 55 200 50

4 Lalpur 1294 437 70 280 202 10 205 90

3.4. Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country vs. World: “The term productivity in general means the total output per unit of factor input. For example land productivity means output

per hectare of land. Productivity is an average and is calculated by dividing the total output of a particular crop by the total cultivated area

under that crop.”

Data are made available by the Baseline survey (for IWMP - 5 Visavadar Cluster), Some data collect for Gujarat Krushi

university junagadh. The results indicate that IWMP - 5 Visavadar Cluster has very low productivity compared to world, India, Gujarat and

Junagadh. The productivity is low not only because that the land is unproductive or the farmer’s lack the skills to manage their crop but

also due lack to of source of irrigation, and irregularly of rain.

The Junagadh area comes under arid zone. So farmers grow crop according to the rainfall. If they get good rainfall they

generally grow high value crops like Groundnut, wheat, Cotton and Vegetable’s etc. In case of low rainfall they go for black gram, sorghum

and sesame. So we can say that monsoon decides cropping patterns of IWMP - 5 Visavadar Cluster area.

Page 51: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 50

Figure 3, Comparative Productivity of Groundnut, IWMP-5

The world productivity of Groundnuts is 1550 Kg/ha. In India. It is grown in about 65.90 lakh ha. With a production of 96.15

lakh tones and productivity of 1459 kg./ha. Gujarat alone produced about 25% of the total Groundnut of our country from 50% of the area

with a record productivity of about 1776 kg/ha. Junagadh district has very good productivity 1806 kg /ha. The IWMP - 5 Visavadar Cluster

project area has only 1280 kg/ha productivity. It is very low compare to district, State, India and world.

Page 52: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 51

Figure4, Comparative Productivity of Wheat, IWMP-5

The world productivity of Wheat is 2760 Kg/ha. In India. It is grown in about 2,80,40,000 ha. With a production of

7,85,68,000 lakh tones and productivity of 2802 kg. /ha. In Gujarat productivity of wheat about 3013 kg/ha. Junagadh district has very

good productivity 4225 kg /ha. The IWMP - 5 Visavadar Cluster project area has only 2530 kg/ha productivity. It is very low compare to

district, State, India and world.

Page 53: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 52

The IWMP - 5 Visavadar Cluster project area has low productivity because of the following reasons:

i) Full dependence on monsoon:

IWMP-5 Junagadh area is dependent on monsoon. Water is essential input in agriculture. Due to the absence of proper

irrigation facility, 100% of the total cultivated area depends on the uncertain monsoon. Therefore, the success or failure of the monsoon

determines the success or failure of agriculture production.

ii) Low use of fertilizer per unit cropped area: Farmers do not use sufficient fertilizer due to lack of water, scarcity of fertilizer in market and insufficient money for

fertilizer. Many a times they don’t get fertilizer at the right time.

iii) Traditional farming methods: This also leads to low productivity. There is a lot of ignorance about the use of new farming methods and technologies such as

multiple cropping. They don’t use FYM and other input in a proper way; that is why they don’t get 100% output. So these factors contribute

to low productivity.

iv) Lack of adequate farm machinery: Even today a large number of farmers in IWMP - 5 Visavadar Cluster project area use wooden ploughs and bullocks. They

don’t have adequate machinery like seed drill. So, old machineries take more time in tillage practices.

v) Lack of finances for farmers:

In WMP-5 Junagadh project area most of the farmers are marginal and small. They do not have enough money to buy good

quality seeds, machinery and other inputs.

Page 54: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 53

vi) Lack of good quality seeds and fertilizers: Good quality seed, fertilizer and pesticide are important factor in agriculture productivity. The use of good quality leads to

higher land productivity. In IWMP - 5 Visavadar Cluster project area, however, there are two limitations in the use of fertilizer. First these

fertilizers are most useful in irrigated condition. But in IWMP - 5 Visavadar Cluster project area 100 percent of land depend on rainfall. In

IWMP - 5 Visavadar Cluster project area mostly farmers use nitrogenous fertilizers especially urea. This has resulted in disproportionate

use of fertilizer depleting the quality of land.

vii) Lack of other facilities such as storage and marketing: 5-10% of agriculture product damage after harvesting due to scarcity of proper storage and proper market for sale. So he sells

to local traders at the low prices. Farmers mainly face proper means of transportation and roads. And second problem is farmers don’t

have proper storage facilities.

Page 55: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 54

Committee people are selected by village people for Gram Sabah

W.D.T. Staff Give information to watershed committee’s President

Page 56: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 55

WATERSHED ACTIVITIES

CHAPTER - 4

Page 57: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 56

Watershed Activities

Watershed management as a strategy has been adopted by Government of India especially in the rain-fed regions of semi-arid

tropics. These regions are characterized by low and undependable rain, low soil fertility, poor infrastructure development, low literacy and

high incidence of migration. Several studies have identified that there is a dire need of a systematic and scientific approach to deal with

watershed development. The common guidelines generate a fresh and flexible framework for the next generation watershed development.

4.1. Scientific Planning: i) Cluster Approach This envisages a broader vision of Geo-hydrological unit which involves treating a cluster of micro-watershed. The IWMP - 5

Visavadar Cluster Project consists of 11 micro- watersheds namely 5G1C5c4,5G1C5c5j, 5G1C5c5h, 5G1C5c5m,5G1C5c5b,

G1C5c5c,5G1C5c5d,5G1C5c5k, 5G1C5d1d, 5G1C5d1c, 5G1C5d1f as their respective codes. Further IWMP - 5 Visavadar Cluster watershed

project is in continuation with other watershed projects namely Govindpara, Mandavad, Vekariya and Lalpur Projects this gives an element

of continuation of the programme.

ii) Base line Survey To access the impact of any watershed development programme a detailed baseline survey has to be conducted. This acts a

benchmark for any intervention during and posts implementation of any development programme. A detailed baseline survey was

undertaken which involved household census survey, Bio-physical survey and Village level data collection from Talati–cum mantri.

Household census survey includes a detailed questionnaire which was been filled by visiting each and every household in the village. This

gave in the details of the demographic profile of the village, the literacy percentage, SC/ST population, number of BPL household, cattle

Page 58: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 57

population, and net consumption rate in the village, average milk production of the cattle and various schemes running and their benefits

Bio-physical survey was undertaken to identify various natural resources available in the village. It included the soil typology,

well in the area, crop taken in the field, Cropping pattern, fertilizer used and various sources of irrigation in the field.

iii) Participatory Rural Appraisal (PRA)

W.D.Ts Give information about agri to farmer. Bio-physical survey during by watershed committee

member& WDTs.

Page 59: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 58

The past experience of watershed has given tremendous input to focus on creating accountability of the stakeholders towards

the programme. This has created an emphasis to include all the stakeholder communities and their local and indigenous Technological

Knowledge (ITK) while planning for any activity. Participatory approach provides a new path for planning, implementing, monitoring and

post- withdrawal activities with a complete accountability of the stakeholders. Various PRA techniques like resource mapping, social

mapping, and season calendars were used to understand the physical and social orientation of the village in general and watershed in

specific. These tools put the villagers in ease than the complicated questionnaires. Various tools like Matrix ranking, Venn diagram were

used to identify various local vegetation (apt for afforestation), Fodders crops, various institution and their significance in the life of the

farmers

Page 60: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 59

Social Map:

Social Map is different from other regular maps in significant ways. For one, it is made by local people and not by experts. For

another, it is not drawn to scale. It depicts what the local people believe to be relevant and important for them.

The chief feature of a social map is that it is a big help in developing a broad understanding of the various facets of social

reality, viz., social stratification, demographics, settlement patterns, social infrastructure, etc.

Resource map draw by local people in PRA Social map draw by local people in PRA

Page 61: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 60

The map neatly depicts the lanes, sub-lanes, school, railway track, temple, post-office, well, community hall, etc. in the village.

In addition, using different symbols, it provides house hold-wise details on the educational status of children both by age and by gender.

Resource Map :

Resource map is one of the most commonly used PRA methods next to social map. While the social map focuses on habitation,

community facilities, roads, temples, etc., the resource map focuses on the natural resources in the locality and depicts land, rivers, fields,

vegetation, etc. A resource map may cover habitation as well.

A resource map in PRA is not drawn to scale. It is not done by the local people. The local people are considered to have an in

depth knowledge of the surroundings where they have survived for a long time.

Topography, terrain and slops

Forest, vegetation and tree species

Land and land use, command area, tenure, boundaries and ownership

Water, water bodies, irrigation sources, rivers and drainage

Agricultural development, cropping pattern, productivity, etc.

Resource maps have been found specially useful because they provide a focused spatial structure for discussion and analysis. They help to create a common understanding amongst the participants as well as a baseline for monitoring and evaluation.

The mapping was followed by a detailed discussion on the present status of natural resources in the village, in which the

problems and impact of the structures were brought up.

Page 62: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 61

The resource map helped them realize that the mismanagement of natural resources and the neglect of traditional water

harvesting structures had led to a perennial drought like situation in their village.

Daily Activity Chart:

Daily activity schedule also referred to as daily schedule, daily activity profile, daily routine and 24-hour method, is a

popular PRA method used to explore the activities of an individual, group or community, on a daily basis. This method forms part of the family of temporal PRA methods.

In seasonal diagrams the temporal analysis is done on a seasonal or monthly basis, while in daily activity schedule the

basis of temporal analysis is hours or periods of the day. It depicts not only the various activities but also the duration of those activities.

Its visual nature makes it an attractive method.

Daily activity schedule has been used to:

Enhance an understanding of who does what, when and for how long, in the community.

Increase gender sensation, and create an awareness about who is responsible for what activities in the community and why

Finalise timings of interventions, e.g., training classes, literacy classes, on-formal education, etc. for the target group, based on

their convenience and availability of leisure.

Preference Chart :

Preference chart during by village people they have ranked their preference for a number of different income generating

activities. Preference chart is detailed what is requirement of village people. the village people identified their own, criteria including the

amount of time required by the activity and the level of profit possible.

Page 63: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 62

Growth the village people skill.

What activity gives the maximum income in short production time?

How many required material and man power.

iv)Use of GIS and remote sensing for planning Use of various high science tools has been promoted at various stages of watershed development. a) Prioritization

Geographical Information System (GIS) has been used for prioritization process. Various layer maps were created like Geo-

morphological, Soil, BPL Population, SC/ST population, Ground water Status, Drinking water situation Slope percent. These were all given

proper weightage according to the DOLR specification. This helped in prioritization of various watershed areas.

b) Planning An action plan matrix was formulated by State Level Nodal Agency (SLNA) taking into account various features like the slope percent, soil Depth, Soil Texture, Soil erosion in the area for wasteland, forest land and agricultural land. Global positioning System (GPS) was used to identify each and every water conservation structures available in the project area. This was used to create a map. Contour Map of vertical interval of 1 meter at a scale of 1:5000 was used for identifying various locations for soil and water conservation structures. c) Hydrological modeling Hydrology modeling technique was used for locating drainage, stream length, flow direction, sink, and Flow accumulation.

This model overlaid over cadastral map to calculate the catchment area of each structures like the check dam etc. This has helped to

remove the human error which generally occurs while calculating the catchment area of a check dam.

Page 64: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 63

Table no. 30: Details of Scientific Planning and Inputs in IWMP projects

SR.

No. Scientific criteria/ inputs used

Whether scientific criteria was

used

(A) Planning

Cluster approach Yes

Whether technical back-stopping for the project has been arranged? If yes, mention the name

of the Institute

Baseline survey Yes

Hydro-geological survey Yes

Contour mapping Yes

Participatory Net Planning (PNP) Yes

Remote sensing data-especially soil/ crop/ run-off cover

Ridge to Valley treatment Yes

Online IT connectivity between

(1) Project and DRDA cell/ZP Yes

(2) DRDA and SLNA Yes

(3) SLNA and DOLR Yes

Availability of GIS layers -

1. Cadastral map Yes

2. Village boundaries Yes

3. Drainage Yes

4. Soil (Soil nutrient status) Yes

Page 65: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 64

5. Land use Yes

6. Ground water status Yes

7. Watershed boundaries Yes

8. Activity Yes

Crop simulation models# No

Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for

high speed soil nutrient analysis No

Normalized difference vegetation index (NDVI)# No

Weather Station -

(B) Inputs

1. Bio-pesticides No

2. Organic manures Yes

3. Vermicompost Yes

4. Bio-fertilizer Yes

5. Water saving devices Yes

6. Mechanized tools/ implements Yes

7. Bio-fencing Yes

8. Nutrient budgeting No

9. Automatic water level recorders & sediment samplers No

Any other (please specify)

4.2. Institution building 4.2.1 Watershed Committee (WC)

Page 66: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 65

It is a committee that is constituted by Gram Sabha to implement the watershed project with technical support of WDT

in the village. This committee is registered under society Registration Act 1860. The Gram Sabha of the village selects the chairman of the

watershed committee with the secretary who will be a paid functionary. A watershed Committee was formed accordingly in IWMP- 5

Junagadh project area. Since the watershed has only one village so no separate watershed sub-committee was formed in the village.

Capacity building training to the watershed committee is given by WDT.

The watershed committee has a pivotal role to play during and after the project implementation period. Table no. 31.1: Watershed Committee details For Govindpara

SR

. No

.

Date of Registrati

on as a Society

(dd/mm/ yyyy)

Name Designati

on M/F

SC

ST

OBC

OTH

ER

SF

MF

LF

Land-less

UG

SHG

GP

Any othe

r

Educa-tional

qualifi-cation

Function/s

assigned#

1 Under

Progress

Sanjaybhai Vallabhai Mathukiya

President M - - 0 1 - 1 - - - - 1 - 10 E/F

2 Prafulbhai Dhirubhai Nakrani

Secretary

M - - 0 1 - 1 - - - - - - 10 C

3 Hemaxiben Veljibhai Garala

W.D.T F - - - 1 - 1 - - - - - - B.Sc.

(H. sc.) E/A

4

Vallabhabhai Manjibhai Dudhat

Member

M - - 0 1 - - 1 - - - - - 4 F

5 Bhikhubhai Shambhubhai Dudhat

Member

M - - 0 1 - - - - 1 - - - 12 B

6 Sanjaybhai Manjibhai Dudhat

Member

M - - 0 1 - 1 - - - - - - 9 H

Page 67: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 66

7 Vishnubhai Jerambhai Gondaliya

Member

M - - 1 - - - - 1 - - - - 7 H

8 Dhirubhai Dharamashibhai Sukhadiya

Member

M - - 0

1 1 - - - - - - - 11 B

9 Hemiben Bhikhubhai Damodiya

Member

F - - 0

1 - 1 - - - - - - 2 J

10 Harshaben Prafulbhai Nakrani

Member

F - - 0

1 - 1 - - - - - - 10 H

11 Hansaben Bhaveshbhai Mathukiya

Member

F - - - 1 - 1 - - - 1 - - 2 J

12 Vijyaben Narshibhai Sukhadiya

Member

F - - - 1 - 1 - - - - - - 3 J

13 Kanjibhai Ratnabhai Chuhan

Member

M - - 1 - 1 - - - - - - - 4 B

Table no. 31.2: Watershed Committee details For Mandavad

SR. No.

Date of Registratio

n as a Society

(dd/mm/ yyyy)

Name Designation M/F

SC

ST

OBC

OTHER

SF MF LF Land-less

UG SHG GP Any

other

Educa-tionalqualifi-cation

Function/s assigned#

Page 68: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 67

1

Under Progress

Vikma Dineshbhai Shantibhai

President M - - 0 1 - - - 1 - - - - 10 E/F

2 Nimavat Jayneshvar Ramniklal

Secretary

M - - 1 0 - - - 1 - - - - T.Y C

3 Naghera Mahendra Rambhai

W.D.T

M - - 1

0 - 1 - - - - - - M.R.S A/E

4 Dhandhal Dakubhai Devatbhaihat

Member

M - - 1 0 - - - 1 - - - - 7 G

5 Vikma Prabhasankar Galabhai

Member

M - - 0 1 - 1 - - - - - - 12 B

6 Chandigara Jinabhai Premjibhai

Member

M - - 0 1 - - - - 1 - - - 4 H

7 Parmar Dayaben Keshubhai Member

F - - 1 0 - - - - 1 - - - 5 J

8 Dafada Buddaabhai Aalabhai

Member

M 1 - 0 0 - - - - - - 1 - - H

9 Ribadiya Dayaben Virjibhai Member

F - -

0

1 - - - - - - - - 8 J

10 Toliya Nirmalaben Masabhai

Member

F - - 1 0 - - - 1 - - - - 3 J

11 Ravaiya Dilipbhai Dhirubhai Member

M - - 0 1 - - - - - 1 - - S.Y.B.A F

12 Babariya Ranchodbhai Karshanbhai

Member

M - - 0 1 - - 1 - - - - - 3 H

Table no. 31.3: Watershed Committee details For Vekariya

SR.

No.

Date of Registration as

a

Name Designati

on

M/F

SC

ST

OBC

OTHER

SF

MF

LF

Land-

less

UG

SHG

GP

Any other

Educa-tional

qualifi-cation

Function/s

assigned#

Page 69: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 68

Society (dd/mm/ yyyy)

1

Under Progress

Valabhai Dilipbhai Dosalbhai

President M - - 1 0 - 1 - - - - - - B.A,L.L.B F/E

2 Shaileshbhai Ramkubhai Mala

Secretary M - - 0 1 - 1 - - - - - - 12 C

3 Girishkumar Khimabhai Vegad

W.D.T

M - - 1 0 - - - 1 - - - - ITI

Surveayor E/A

4 Babubhai Becharbhai Sanchaniya

Member

M - - 1 0 1 - - - - - - - 2 H

5 Durlabhabhai Rambhai Hirapara

Member

M - - 0 1 - 1 - - - - - - 6 B

6 Vala Dhirubhai Hathibha

Member M - - 1 0 - 1 - - 1 - - - 9 F

7 Nathiben Khimabhai Parmar

Member

F 1 - 0 0 - - - 1 - - - - - J

8 Nanjibhai Jivabhai Parmar

Member

M - - 1

0 - 1 - - - - - - 1 H

9 Rameshbhai Punjabhai Rathod

Member

M 1 - -

- 1 - - - - - - - B.A,L.L.B G/I

10 Kachiya Devshibhai Bhovanbhai

Member

M - - 1 0 - - - 1 - - 1 - 8 H

11 Namuben Shamjibhai Parmar

Member

F 1 - 0 0 - - - 1 - 1 - - - J

12 Renukaben Bhrugeshbhai Desani

Member

F - - 1 0 - - - 1 - - - - 10 B

Page 70: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 69

Table no. 31.4: Watershed Committee details For Lalpur

SR. No.

Date of Registration as a Society

(dd/mm/ yyyy)

Name Designati

on

M/F

SC

ST

OBC

OTHER

SF

MF

LF

Land-

less

UG

SHG

GP

Any

other

Educa-tional

qualifi-cation

Function/s

assigned#

1

Under Progress

Dilsukhabhai Valabhai Kotadiya

President M - - - 1 - - 1 - - - - - 9 E/F

2 Shaileshbhai Kantilal Maheta

Secretary

M - - - 1 - - - 1 - - - - T.Y C

3 Girishkumar Khimajibhai Vegad

W.D.T M - - 1 - - - - 1 - - - - ITI-

Surveriyor A/E

4 Himmatlal Parshotambhai Dave

Member

M - - - 1 - - - 1 - 1 - - 4 I

5 Puriben Popatlal Jalera

Member F - - 1 - - 1 - - - - - - - J

6 Virabhai Golabhai Luvar

Member

M 1 - - - - - - 1 - - - - 2 H

7 Rajabhai Bhurabhai Zargaliya

Member

M - - - 1 - 1 - - 1 - - - 4 B

8 Nathiben Ravjibhai Kotadiya

Member

F - - 1 - - 1 - - - - - - - J

9 Mahmadhusen Jalalbhai Bloch

Member

M - - 1 - - - - 1 - - - - 4 I

Page 71: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 70

10 Vimlaben Dhirubhai Kikani

Member

F - - 1 - 1 - - - - - 1 - - J

11 Pravinbhai Jivabhai Baldaniya

Member

M - - 1 - - 1 - - - - - - 9 G

12 Devarajbhai Narshibhai Jalera

Member

M - - 1 - 1 - - 1 - - 1 - 4 H

13 Dhanabhai Shadarbhai Baldaniya

Member

M - - 1 - - 1 - - - - - - 2 B

# Only the letter assigned, as below, needs to be typed, except for `J’, where the type may be specifically mentioned. A. PNP and PRA B. Planning C. Maintenance of Accounts D. Signing of cheques and making payments E. Supervision of construction activities F. Cost Estimation G. Verification & Measurement H. Record of labour employed I. Social Audit J. Any other (please specify). 4.2.2 Self Help Group

Self Help Groups are motivated, small homogenous groups organized together through credit and thrift activities. Self-help

group initiatives for Mel and women help uplift their livelihood. Generally self-help groups include landless and poor men and women.

Before formation of the SHGs, during PRA activities, Focused Group Discussions (FGDs) were held with the men and women,

which came up with the following observations:

a) Lack of proper credit facilities due to low intervention of formal financial credit institution.

Page 72: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 71

b) Excessive exploitation of weaker section by money lenders

c) Lack of attitude for saving among poor people

d) Lack of knowledge on credit and thrift activity and banking. It was planned to have some capacity building training regarding SHG activities. It was also proposed to have some livelihood

activities which will promote men and women empowerment.

Table no. 32: SHG detail

SR. No. Total no. of registered SHGs No. of members

No. of SC/ST/OBC/Other in

each category

No. of BPL in each

category

With With only With Total Categories M F Total M F Total M F Total

Page 73: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 72

only Men Women both

1 12 12 3 27

(i) Landless 70 60 130 40 37 77 30 23 53

(ii) SF 56 40 96 56 40 96 - - -

(iii) MF 20 23 43 20 23 43 - - -

(iv) LF 10 10 20 10 10 20 - - -

Total 12 12 3 27 156 133 289 131 110 236 30 23 53

4.2.3 User Group:

User Groups are normally formed to manage an activity or asset created under the programme on a long term basis. The user group collects user charges from their members, oversee the works and manage the benefits.

Focused Group Discussion (Women)

Page 74: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 73

It was decided that each group would formulate certain internal rules and have a feeling of ownership with community Spirit. Table no. 33: UG detail

SR. No. Total no. of UGs No. of members

No. of SC/ST/OBC/Other in each category

No. of BPL in each category

Men Women Both Total Categories M F Total M F Total M F Total

15 10 5 30

(i)Landless 65 60 125 45 32 60 20 28 48 (ii) SF 56 40 96 56 40 96 - - -

(iii) MF 20 25 45 20 25 45 - - - (iv) LF 9 - 9 9 - 9 - - -

Total 15 10 5 30 150 125 275 130 97 210 20 28 48

4.3. Physical activities to be undertaken under IWMP - 5 Visavadar Cluster project area 4.3.1 Entry Point activity (EPA)

EPA activities are taken up under watershed projects to build a rapport with the village community at the beginning of the

project; generally, certain important works which are in urgent demand of the local community are taken up. A group Discussion was

conducted with watershed Development Committee regarding the EPA activity, It was conveyed to the WC that an amount of Rs. 20.7092

Lakh was allotted for EPA activity, which was 4 per cent of total allocated budget. The villagers discussed various activities which they felt

is important but after a brief discussion it was conveyed to them that only those activities can be taken, which revive the common natural

resources. It was also taken into priority that there should be an instrument of convergence which will result in sustainability of activities.

Page 75: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 74

Local people with WDT in the Cemetery open well

Table no.34.1: Entry point activities (EPA) for Govindpara (All financial figures in lakh Rs.)

Page 76: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 75

SR.

No. Names of the Village Amount earmarked for EPA Entry Point Activities planned Nos. Estimated cost

1

Govindpara 1.94

Cemetery Renovation, facilities,

Benches& Plantation 1 1.05

2 Stand post 1 0.18

3 Solar light 3 0.60

4 Repairing of Animal water trough 1 0.10

Total : 1.93

Table no.34.2: Entry point activities (EPA) for Mandavad (All financial figures in lakh Rs.)

SR.

No. Names of the Village Amount earmarked for EPA Entry Point Activities planned Nos. Estimated cost

1

Mandavad 3.28

Cemetery Renovation, facilities,

Benches& Plantation 2 1.68

2 Tube well with Hand pump set 1 0.28

3 Repairing of well parapet 1 0.10

4 Solar light 6 1.20

Total : 3.26

Table no.34.3: Entry point activities (EPA) for Vekariya (All financial figures in lakh Rs.)

SR.

No. Names of the Village Amount earmarked for EPA Entry Point Activities planned Nos. Estimated cost

1 Vekariya 10.09 Cemetery Renovation, facilities, 2 4.49

Page 77: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 76

Benches& Plantation

2 Tube well with Hand pump set 2 2.18

3 Solar light 14 2.80

5 Water Tank (Syntax) 1 0.26

6 Travish 1 0.15

7 Repairing of Animal water trough 1 0.20

Total : 10.08

Table no.34.4: Entry point activities (EPA) for Lalpur (All financial figures in lakh Rs.)

SR.

No. Names of the Village Amount earmarked for EPA Entry Point Activities planned Nos. Estimated cost

1

Lalpur 5.40

Cemetery Renovation, facilities,

Benches& Plantation 1 1.90

2 Check dam repairing 1 1.09

3 Stand post 1 0.19

4 Solar light 10 2.00

5 Toilet Facilities of school 2 0.21

Total : 5.39

4.3.2. Watershed Development Works: Watershed development works are to be done during second phase of watershed project. A multi-tier ridge to valley sequence approach should be approached towards implementation of watershed development projects. A net budget of 50 percent is allotted for this work.

Page 78: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 77

Ridge Area Treatment Plans: It is very important to treat the ridge as this is where the major water resources originate. This involves mainly hilly and forest region in IWMP - 5 Visavadar Cluster watershed. For the ridge area treatment of IWMP - 5 Visavadar Cluster watershed following structure are been Proposed after interaction between the watershed committee, Range Forest Officer (RFO) and other field staff of forest. 1. Stone Banding 2. Staggered Contour Trenches 3. Border Contour Trenching with Tree plantations 4. Grass seeding 1. Stone Bunding

A bund constructed out of stone along the contour or across the stream is called as stone wall. It is adopted where the water velocity is high and where basically stone of radius 100-150 mm is available. It helps in:

Control of erosion by reducing the slope of the cultivated land Increasing the infiltration of rainwater

Main advantages as compared to the normal contour banding in IWMP - 5 Visavadar Cluster Project are:

IWMP-5 has much steeper slopes The region has shallow soil depth. It is a more permanent structure if well maintained It is self – stabilizing

2. Staggered contour Trenches

Page 79: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 78

Trenches are any form of depression or micro pit constructed over the land surface in order to prevent soil erosion and to absorb rainwater in non-arable lands. Trenches are constructed along the contours (called contour trenches) on hill slopes above 15% with vegetative supports for forestry and horticulture land uses. Contour trenches are used both on hill slopes as well as on degraded and barren waste lands for soil and moisture conservation and afforestation purposes. The trenches break the slope and reduce the velocity of surface runoff. It can be used in all slopes irrespective of rainfall conditions (i.e. in both high and low rainfall conditions), varying soil properties. For vegetative support forage grasses as well as economic trees can be planted. Periodical maintenance by way of unearthing of the trenches and depositing on the downhill side ought to be given due attention by the beneficiaries themselves. SCT are been planned to be drawn in the hilly terrain where slope is not so steep. 3. Border Contour Trenching: It is planned to draw a border contour trench with the following specifications (table no.40.4 and 40.5) to collect the runoff below the hills so that plantation of trees can be taken up. Slope treatment: The second tier treatment is the slope treatment. This is generally done on agricultural land or waste land. This generally includes water conservation or surface water storage structures. This being highly labour intensive, will involve more of manual labour; so, funds from National Rural Employment Guarantee Scheme (NREGS) can be taken. Following structures are been proposed in these areas a. Earthen Bund b. Waste Weir c. Afforestation Table no.35: Details of activities of preparatory phase (All financial figures in lakh Rs.)

SR.

No.

Name of the

villages

Initiation of

village level

institution

Capacity

building

IEC

activities

Baseline

survey

Hydro-

geological

survey

Identifying

technical

support

Printing

DPR and

mapping of

Estimated

Cost (Rs. in

lakh)

Page 80: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 79

agencies project area

1 Govindpara 0.2 1.92 0.3 0.08 0.15 0.09 0.16 2.9

2 Mandavad 0.42 2.87 0.8 0.2 0.22 0.18 0.21 4.9

3 Vekariya 1.2 8.6 2.8 0.7 0.55 0.52 0.72 15.09

4 Lalpur 0.9 4.65 1.2 0.6 0.4 0.15 0.2 8.1

Table no.36.1: Details of engineering structure to Surface water resources in the project areas Govindpara (all financial figures in lakh Rs.)

SR. No.

name of the Village

Type of structures

Proposed target Augmentation/ repair of

existing structures Construction of new structures Total target

No.

Area to be

irrigated (Ha.)

Storage capacity

Estimated cost

No.

Area to be

irrigated (Ha.)

Storage capacity (cumec)

Estimated cost

Area to be

irrigated (Ha.)

Storage capacity (cumec)

Estimated cost

1 Govindpara

(i) Check dam 8 33.6 25,600 24.0 33.6 24,500 24.0

(ii) Nala plug 2 4 30,400 3.00 4 30,400 3.0

TOTAL 27.00

Table no.36.2: Details of engineering structure to Surface water resources in the project areas Mandavad (all financial figures in lakh Rs.)

SR. No.

name of the Village

Type of structures

Proposed target Augmentation/ repair of

existing structures Construction of new structures Total target

Page 81: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 80

No.

Area to be

irrigated (Ha.)

Storage capacity

Estimated cost

No.

Area to be

irrigated (Ha.)

Storage capacity (cumec)

Estimated cost

Area to be

irrigated (Ha.)

Storage capacity (cumec)

Estimated cost

1 Mandavad

(i) Check dam 7 29.4 22,400 24.00 29.4 22,400 24.0

(ii) Causeway cum check dam

4 16.4 12,600 15.0 16.4 12,600 15.0

TOTAL 39.0

Table no.36.3 Details of engineering structure to Surface water resources in the project areas Vekariya (all financial figures in lakh Rs.)

SR. No.

name of the Village

Type of structures

Proposed target Augmentation/ repair of

existing structures Construction of new structures Total target

No.

Area to be

irrigated (Ha.)

Storage capacity (Cumec)

Estimated cost

No.

Area to be

irrigated (Ha.)

Storage capacity (Cumec)

Estimated cost

Area to be

irrigated

(Ha.)

Storage capacity (Cumec)

Estimated cost

1

Vekariya

(i) Check dam 24 113.4 86,400 82.59 113.4 86,400 0.72

(ii) Causeway cum check dam

1 4.1 1150 1.50 4.1 1150 1.50

(iii) Nala Plug 9 21 1,52,000 12.50 21 1,52,000 11.06

(iv) earthen band

1 13 95,000 2.00 13 95,000 2.00

(v) Pound 1 15.3 13,000 4.00 16 7,00,000 4.00

Page 82: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 81

deepening

TOTAL 90.56

Table no.36.4 Details of engineering structure to Surface water resources in the project areas Lalpur (all financial figures in lakh Rs.)

SR. No.

name of the

Village

Type of structures

Proposed target Augmentation/ repair of

existing structures Construction of new structures Total target

No.

Area to be

irrigated (Ha.)

Storage capacity (Cumec)

Estimated cost

No.

Area to be

irrigated (Ha.)

Storage capacity (Cumec)

Estimated cost

Area to be

irrigated (Ha.)

Storage capacity (Cumec)

Estimated cost

1 Lalpur

(i) Check dam 12 71.4 54,400 34.20 71.4 54,400 34.20

(ii) Causeway cum check dam

5 20.5 15,750 16.30 20.5 15,750 16.30

(iii) Nala Plug 4 8.5 60,800 5.25 8.5 60,800 5.25

(iv) Earthen Band

1 13 95,000 2.80 13 95,000 2.80

(v) Pound repearing

1 12.2 6,500 2,00,000 20 3,55,000 2.00

TOTAL 60.55 Table no.37: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)

SR. No.

Name of the Project

Type of structures

Proposed target Augmentation/ repair of

existing recharging structures

Construction of new recharging structures

Total target

Page 83: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 82

No. Area to be irrigated

(Ha.)

Estimated cost

No. Area to be irrigated

(Ha.)

Estimated cost

Area to be irrigated

(Ha.)

Estimated cost

1

Vekariya

(i)Open wells - - - - - - - -

(ii)Bore wells - - - 1 15.3 2.63 15.3 2.63 (iii)Any others (Pl. specify)

- - - - - - - -

Total for the village - - - - - - - -

Total for the

Project - - - 1 15.3 2.63 15.3 2.63

Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas

SR. No. Names of the

Villages

Major activities of the SHGs

Name of activity No. of SHGs involved Average annual income from

activity per SHG

1 Govindpara Mandap service 1 48,000

Grafted Amala Plantation, Processing and Packing 2 1,00,000

2 Mandavad

Handicraft unit 1 80,000

Animal husbandry 2 1,00,000

Washing powder unit 2 60,000

Kitchen kits 1 42,000

3 Vekariya

Floor Mill 1 54,000

Handicraft unit 2 78,000

Animal husbandry 3 56,000

Soda Processing unit 1 73,000

Page 84: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 83

Mandap service 3 1,00,000

4 Lalpur

Floor mill 1 49,000

Groundnut Processing & Packaging unit 2 50,000

Soda processing unit 1 33,000

Sev Machine 1 36,000

Table no. 39: Other Activities of watershed works phase – Project Target

SR. No.

Name of the villages

Ridge area treatment

Nursery raising

Land development Crop demonstrations

Fodder Land development

Total Estimated cost (Rs. In

lakhs) (in

Ha.) (in

Lakh) (in

Ha.) (in

Lakh) (in Ha.) (in Lakh) (in Ha.) (in Lakh) (in Ha.)

(in Lakh)

1 Govindpara 37.60 27.00 7.30 8.10 35.10 2 Mandavad 45.80 39.00 20.00 10.55 49.55 3 Vekariya 182.1 101.79 37.40 24.36 0.5 2.05 134.30 4 Lalpur 125.7 60.55 21.50 8.88 69.43

TOTAL 391.20 228.34 86.20 51.89 0.5 2.05 288.38

Page 85: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 84

Field survey by W.D.T.

Survey no. wise data collection

Page 86: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 85

Table no.40.1: Details of engineering Activity in watershed works Govindpara

SR. No.

Name of the Village

Name of Activity

Type of treatment Type of land Executing

agency Target

(i) Ridge area (R)

(ii) Drainage

line (D)

(iii) Land dev.

(L)

(i) Pri-vate

(ii) Com munity

(iii) Others

(pl. specify)

(i) UG (ii)SHG

(iii)Others (private Person)

(iv)WC

No. of units (No./ cum./ rmt)

Estimated cost (Rs. in lakh)

Expected month & year of completion

(mm/yyyy) M W O T

1 Govindpara

Waste weir L P Other 3 0.80 Fencing L P Other 1450rmt 2.54 Land leveling L P Other 1.5ha. 0.35 Farmbund L P Other 90 rmt. 0.91

TOTAL 4.60 Table no.40.2: Details of engineering Activity in watershed works Mandavad

SR. No.

Name of the Village

Name of Activity

Type of treatment Type of land Executing

agency Target

(i) Ridge area (R)

(ii) Drainage

line (D)

(iii) Land dev.

(L)

(i) Pri-vate

(ii) Commu

nity

(iii) Others

(pl. specify)

(i) UG (ii)SHG

(iii) Others (private person)

(iv)WC

No. of units (No./ cum./ rmt)

Estimated cost (Rs. in lakh)

Expected month & year of completion

(mm/yyyy) M W O T

1 Mandavad

Farm bund L P Other 450rmt 1.20 Land leveling L P Other 10.90ha. 2.50 Fencing L P Other 1700rmt 2.97 Well Parapet L P Other 3 0.18

TOTAL 6.85

Page 87: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 86

Table no.40.3: Details of engineering Activity in watershed works Vekariya

SR. No.

Name of the Village

Name of Activity

Type of treatment Type of land Executing

agency Target

(i) Ridge area (R)

(ii) Drainage

line (D)

(iii) Land dev. (L)

(i) Pri-vate

(ii) Commu

nity

(iii) Others

(pl. specify)

(i) UG (ii)SHG

(iii)Others (private person)

(iv)WC

No. of Units

(No./ cum./ rmt)

Estimated cost (Rs. in lakh)

Expected month

& year of completion (mm/yyyy)

M W O T

1 Vekariya

Waste weir L P Other 5 0.80 Land leveling L P Other 9.20ha. 2.20 Fencing L P Other 13940rmt. 25.40 Well Parapet L P Other 2 0.12 Farm bund L P Other 1370rmt. 3.64

Afforestation L C SHG 1 ha. 0.80 TOTAL 32.96

Table no.40.4: Details of engineering Activity in watershed works Lalpur

SR. No.

Name of the Village

Name of Activity

Type of treatment Type of land Executing

agency Target

(i) Ridge area (R)

(ii) Drainage

line (D)

(iii) Land dev. (L)

(i) Pri-vate

(ii) Commu

nity

(iii) Others

(pl. specify)

(i) UG (ii)SHG

(iii)Others (private person)

(iv)WC

No. of Units (No./cum. / rmt)

Estimated cost (Rs. in lakh)

Expected month

& year of completion (mm/yyyy)

M W O T

1 Lalpur Waste weir L P Other 9 1.80 Land leveling L P Other 1.5 Ha. 0.35 Fencing L P Other 2730 rmt. 4.83

TOTAL 6.98

Page 88: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 87

Table no. 40.5: Technical Details of Check Dam SR. No Particulars Value Unit

1 Type of check dam CC 1:3:6

2 Length 12 M.

3 Height above the river Bed 2 M.

4 Foundation Depth 1.35 M.

5 Top width 0.60 M.

6 Bottom width 1.00 M.

7 Apron width 3.00 M.

8 Storage Capacity 43,12,500 lit.

9 Catchment area 0.80 sq.km

10 Discharge 12.00 Cmec

11 Type of river Bank Hart strata

Table no. 40.6: Technical Details of Nala Plug SR. No Particulars Value Unit

1 Type of Nala Plug CC 1:3:6 2 Length 8 M. 3 Height above the river Bed 1.50 M. 4 Foundation Depth 1.00 M. 5 Top width 1.00 M. 6 Bottom width 2.00 M. 7 Apron width 2.00 M. 8 Storage Capacity 6,00,000 lit. 9 Catchment area 0.50 sq.km

10 Discharge 12.25 Cmec 11 Type of vodka bank Hardstrata

Page 89: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 88

Design of Nala plug:

1) Catchment area=0.5 km2

2) HFL = 2.50m

3) Length = 8m

4) Height = 1.50m

Calculation:

V = 2R2/32S 1/2 Where: N = Mining’s constant = 0.03

= 23.5 2/320.01½ R = Height of Flood = 2.5

= 11.41 m/sec S = Slope = 100:1

= 37.46 Feet/sec

Q = 0.8 2 a 2 A6 Where: a = Constant = 29.0402

= 0.8 229.0402 2 0.5 0.9232 b = Constant = 0.9232

= 12.25 cusec A = Catchment area

Length of Nala Plug = 8 m

Top width = 0.552

=0.552

=1.03 m

Page 90: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 89

=1.00 m

Bottom width =

=

= 1.45 m

=2 m

Slope start in upstream = 2 2 top width 2

= 2 2 1.03 2

= 3.14 m

Upstream slope’s end height = 3.1 2top width 2

= 3.1 2 1.46 2

= 3.1 2 1.46 2 1.54

= 6.97 m

Upstream projection =

=

= 0.091 m

Discharge passing through the weir:

Q = C 2 L 2 h 3/2 Where: C = Constant = 3.10

Page 91: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 90

= 3.10 2 821 3/2 L = Length = 8 m

= 24.8 H = 1 m Head over crest

Which h is greater than SPF 12.25 cumec. Hence O.K.

Page 92: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 91

Table no. 40.7: Technical Details of Farm Bund

SR.

No. Particulars Value Unit

1 Bund Length 20.96 M.

2 Proposed Area(area of farm) 285 Ha.

3 Total Bund Length For Proposed Area 5975 M.

4 Top Width 0.50 M.

5 Side Slope 1:1

6 Height 1 M.

7 Base Width 1.5 M.

8 Cross-Section of Farm bund 1 SqM.

Table no.40.8: Quantity Excavation for Farm bund

SR. No. Description Unit Quantity

1 Earth Work

Construction of Farm bund (dry of moist) excavation and laying in 15 cm layer, breaking of

clods, separating leaves and small stones, dressing and compaction with sheep foot roller of

hand rammer, up to 1.5 meter lift and 50 meter lead.

Cum 14,418

2 Vegetative Work

Sowing of seed on the constructed ridge M 5,975

3 Supply of Stylo/ Dhaman Seed @ 4gm/m in (single line) Kg 23.90

Page 93: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 92

Table no.41: Details of activities connected with vegetative cover in watershed works

SR. No.

Name of the

Villages

Name of structure/

work

Type of treatment Type of land Executing

agency Target

(i) Ridge area (R)

(ii) Drainage

line (D)

(iii) Land dev. (L)

(i) Private

(ii) Community

(iii) Others

(pl. specify)

(i) UG (ii)SHG

(iii) Others

(pl. specify)

Area (Ha.)

No. of plants

Estimated cost

(Rs. in lakh)

Expected month & year of

completion (mm/ yyyy)

1 Govindpara

Horticluter Plantation

L P

Other 1

40000

1.50

Amala Plantation

L C SHG/UG 0.5 2.00

2 Mandavad

Horticluter Plantation

L C

Other 1.3 2.00

Alovera Plantation

L C SHG/UG 0.2 0.90

3 Vekariya

Afforestation R L C

Other/UG 1 0.80

Mango Plantation

L P SHG 1 2.50

Plantation P UG 0.5 2.00 Crops Demon- stration Plot

L P WC 0.5 2.05

4

Lalpur Plantation L C F Forest 3 1.90

Total 15.11

Page 94: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 93

Table No. 41.1: Technical Details of Afforestation Activities Particulars Value Unit

Crop Name Ailanthus

Plant To Plant Spacing 5.00 M

Row to Row Spacing 5.00 M

Pit Length 0.6 M

Pit Width 0.6 M

Pit Depth 0.6 M

No. of Plants 400 Nos.

Plantation Area 5.0 Ha.

No. of Plants per ha 400 Nos.

Gap Filling 20 %

Table No.41.2: Cost Estimation for A forestation activity SR. No. Description No. Length(m.) Width(m) Depth(m.) Unit Quantity Rate Amount

1 Digging of pits for plants in hard soil 400 0.60 0.60 0.60 M3 86.4 50 4,320

2 Plants samplings for plantation in Govt. pasture area, sampling not less than 30 cm. height

400 - - - Nos. 400 30 12,000

3 Transportation of plants from nursery to camp site up to 15Km

400 - - - Nos. 400 2 800

4 Loading and unloading of plants 400 - - - Nos. 400 2 800

5 Rehandling of plants from camp site to actual planting site upto 200m.

400 - - - Nos. 400 1 400

6 Cost of fertiliser& insecticides incl. application 400 - - - Nos. 400 30 12,000

7 Weeding and Hoeing two times (Twice in year) 400 - - - Nos. 400 25 10,000 Total 79,200

Page 95: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 94

Table no.42.1: Details of allied / other activities for Govindpara

SR. No.

Name of the village

Name of activity

Type of land Executing

agency Target

(i) Private

(ii) Community

(iii) Others

(pl. specify)

(i) UG (ii)SHG

Estimated cost

(Rs. in lakh)

Expected month & year of

completion (mm/yyyy)

1 Govindpara LIVELIHOOD INTERVENTION

Viterinary Camp (3 Times) Community WC/UG 0.90 Horticulture Plantation Private UG 1.25 Scientific approach for agro productivity Training,visit

Community WC/UG 0.95

Groundnut seeds kits (15 unit) Private Community UG 0.30 Training for youth(Ex.Stitching,beautyparlour,computer)

Community WC/SHG 0.80

Farm-Machinery repairing training Community UG 0.40 TOTAL 4.60

PRODUCTION SYSTEM AND MICRO ENTERPRISE DEVLOPMENT

Grafted amla plantation processing andpacking unit/Training/Exposure

Community WC/UG 2.00

Mandap Service Private Community UG 1.00 Embroidery/Stiaching Machinery Private SHG 1.00 Farm machinery Private WC/ UG 1.10 SHG revolving fund / Training/Expous Community WC/SHG 0.60 Garej Private UG 0.55

TOTAL 6.25

Page 96: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 95

Table no.42.2: Details of allied / other activities for Mandavad

SR. No. Name of the

village Name of activity

Type of land Executing

agency Target

(i) Private

(ii) Community (iii) Others (pl.

specify)

(i) UG (ii)SHG

Estimated cost

(Rs. in lakh)

Expected month & year of completion

(mm/yyyy) 1 Mandavad LIVELIHOOD INTERVENTION

Viterinary Camp (3 Times) Community WC/ UG 1.00 Horticulture Plantation Community WC/UG 2.00 Scientific approach for agro productivity Training, visit

Community WC/UG 1.00

Training for women(Ex. Handicraft ,beauty parlour,computer)

Community WC/SHG 1.05

Farm-Machinery repairing training Community WC/UG 0.80 Virmicomposting/Floricluture Training/Explose

Community UG 1.00

Alovera Processing unit /Training Private Community UG 1.20 TOTAL 8.05

PRODUCTION SYSTEM AND MICRO ENTERPRISE DEVLOPMENT

Animal Husbandry Community UG 2.00 Kitchen Set Community UG/SHG 0.50 Farm machinery Private Community UG/SHG 2.50 SHG revolving fund / Training/Expous Community SHG 1.10 Handicraft unit Private SHG 0.90 Washing powder Unit Private UG 0.75 Embroidery/Steaching Machine Private Community SHG 1.00 Beauty Parlor kit(Land Less Women) Private SHG 0.25 Vermi Composting unit Private Community UG 1.00

TOTAL 10.00

Page 97: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 96

Table no.42.3: Details of allied / other activities for Lalpur

SR. No.

Name of the village

Name of activity

Type of land Executing

agency Target

(i) Private

(ii) Community

(iii) Others

(pl. specify)

(i) UG (ii)SHG

Estimated cost

(Rs. in lakh)

Expected month & year of

completion (mm/yyyy)

1 Lalpur LIVELIHOOD INTERVENTION

Drip Irrigation Training Private Community WC/UG 1.85 Viterinary Camp (5 Times) Community WC/UG 1.80 Plantation Community WC/UG 2.00 Handicraft/Stitching/Embroidery Training

Community SHG 1.00

Groundnut seeds Kits(80 unit) Private Community UG 1.60 Seasonal Training (Ex. Jam, Pickle) Community WC/UG 1.00 Scientific approach for agro productivity training, visit

Community WC/UG 1.20

Floriculture/Training Community WC/UG 0.50 Animal Husbandry Training Community SHG/UG 0.70

TOTAL 11.65

PRODUCTION SYSTEM AND MICRO ENTERPRISE DEVLOPMENT

Groundnut Processing unit Private Community WC/SHG 3.10 SHG rivaling fund / Training/Expose Private Community SHG 2.50 Mandap Service Community UG/UG 1.80 Handicraft Unit Community WC/SHG 1.00 Farm machinery Private WC/UG 2.10

Page 98: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 97

Soda Processing Unit Private UG 1.25 Garej Private Community UG 0.50 Flour Mill Unit Private Community WC/UG 1.00 Moti Work Community UG 0.60 Dairy Unit Private Community UG 1.00 Vegetable Shop Private SHG 0.50 Beauty parlour kit-2(Poor Women) Private UG 0.50

Animal Husbandry Community WC/ UG 1.35 Sev Machine Private SHG/UG 0.30

TOTAL 17.50

Table no.42.4: Details of allied / other activities for Vekariya

SR. No.

Name of the village

Name of activity

Type of land Executing

agency Target

(i) Private

(ii) Community

(iii) Others

(pl. specify)

(i) UG (ii)SHG

Estimated cost

(Rs. in lakh)

Expected month & year of

completion (mm/yyyy)

1 Vekariya LIVELIHOOD INTERVENTION

Seasonal Activities Training for Sauce Jam, Pickle, Jelly

Community UG/SHG 2.00

Mango Production Training(Ex. Pickles, Amchoorpavdar, Mukhavas)

Community SHG/UG 2.50

Training for youth (Ex. Computer) Community SHG/UG 1.10 Plantation Private Community SHG 2.25

Page 99: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 98

Scientific approach for agro productivity training, visit

Community WC/UG 2.00

Groundnut seeds kits(120 unit) Private Community UG 2.45 Handicraft /Agarbati/Candle Making Training/Explosur

Private Community SHG 2.15

Crops Demonstration Plot Private Privet Person 2.05 Vermicomport training/Explosur Community WC/UG 2.00 Viterinary Camp (5 Times) Community UG 3.50 Steanching /Embroidery Training Private Community UG/SHG 1.00 Animal husbandry Training Community UG/SHG 1.00

TOTAL 24.00 PRODUCTION SYSTEM AND MICRO ENTERPRISE DEVLOPMENT

Fooder Bank Unit Community WC/UG 6.00 SHG revolving fund / Training/Expousvisit

Community SHG 5.25

Mandap Service unit Community SHG/UG 3.65 Mango Plantation unit Private UG 2.50 Farm machinery Private Community Wc/UG 4.00 Animal Husbandry Private SHG 3.50 Sev Machine Private UG 1.00 Handicraft Unit Community UG 2.00 Embroidery Unit /Steaching Private Community UG 1.35 Vegetable shop Community WC/UG 0.80 Floor Mill Unit Private Community WC/SHG 1.50 Soda Processing unit Private Community SHG 1.00

TOTAL 32.55

Page 100: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 99

Production System – 1: Garage

Usefulness:

Utility of Vehicles increased day by day in city & villages like bicycle, Scooter, Moped, Auto rickshaw, Metador and Motorcar

etc. The repairing and services are also necessary to use the vehicles for repairing of vehicles service sing stations are includes in micro-

enterprises.

Processing of Production:

In this unit there is no production of material. In auto repairing petrol and diesel vehicles are repairing by order wise depend

on its necessity. In service station vehicles are clean by spring of water and diesel.

Production Capacity:

In the work of scooter, Moped, Rickshaw. There is no production of any items but every day only 7 vehicles are repairing/

service.

Infrastructures: For this work only 15’ 2 10’ lease land is necessary. This unit can be work in city or taluka. The rent of land is Rs.500

Approximately.

Table No. 42.5: Details about Infrastructures

Page 101: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 100

Monthly Production Expenditure:

Table No. 42.6 Monthly Production Expenditure

SR. No. Expenses Rs.

1 Raw material ,petrol, oil, grease, kerosene 1500

2 Salary expenses for 2 person

Rs. 80 per day * 25 days

4000

3 Power fuel 1000

4 Installment with interest of bank 1700

5 Depreciation 500

6 Repairing 500

SR. No. Description of Tools No. Rate Rs.

1 Air compressor 100 pound with motors 1 20000

2 Air pipe 10 met. And Spree gun 1 2000

3 Bench Grainer 1 5000

4 Spanner set fix pana ,Ring pana, Box pana , Tape set, Oil cane etc. - 5000

5 Scro Driver set ,Hemar set, Pakkad set - 3000

6 Tablewise, Different type of Kansi - 3000

7 Water pump - 5000

Total 43000

Office Furniture etc.

Working table, Board for Spenar etc. Water tank etc.

- 10000

Total Cost : 53000

Page 102: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 101

7 Rent 500

8 Other Expenses 500

Total Production Expenses : 10200

Monthly Total Sales:

Suppose 7 vehicles repairing or service per day

Average 80 Rs. Per vehicle service charge. So that 80 2 7 = 560 Rs. Income per day.

Average 25 days working day in a month, so that Rs. 560 2 25 = 14000 Rs. Income per month.

Net Profit :

Table No. 42.7 Net Profits

Total sales per month 14000 Rs. - Monthly Production Expenditure 10200 Rs.

Net Profit per month: 3800 Rs.

Production System - 2: Vermicompost unit for Mandavad village

Page 103: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 102

One of the important occupations of the villagers is animal husbandry. At present, the animal waste is not used by the

villagers as agricultural input. If the farmers start realising the benefits of compost and vermicompost in particular, the productivity of

their land can increase manifold. As part of direct livelihood support, the villagers (mainly land less) are going to receive cows, buffaloes

and small ruminants. These animals in turn are going to produce more waste, which can be used to prepare vermicompost.

It is planned that a vermicompost unit by another UG would be supported by the project. The UG members, with the help of

hired manpower, can collect animal-dung. They would process this dung to prepare vermicompost and sell it to the farmers in the village

or outside, as per demand.

The process of composting crop residues using earthworms comprise spreading the agricultural wastes and cow dung in

layers of 1.5 m wide and 0.9 m high beds of required length. Earthworms are introduced in between the layers @ 350 worms per m3 of

bed volume. The beds are maintained at about 40 - 50% moisture content and a temperature of 20 - 30o C by sprinkling water over the

beds. The earthworms being voracious eaters consume the biodegradable matter and give out a part of the matter as excreta or vermi-

castings. The vermi-casting containing nutrients are rich manure for the plants.

About The Worms:

Eiseniafetida, Eudriluseugeniae, and Perionyxexcavatiusare some of the species for rearing to convert organic wastes into

manure. The worms feed on any biodegradable matter ranging from coir waste to kitchen garbage and Vermicomposting units are ideally

suited to locations / units with generation of considerable quantities of organic wastes. One earthworm reaching

Reproductive age of about six weeks lays one egg capsule (containing 7 embryos) every 7 - 10 days. Three to seven worms

emerge out of each capsule. Thus, the multiplication of worms under optimum growth conditions is very fast. The worms live for about 2

years. Fully grown worms could be separated and dried in an oven to make 'worm meal' which is a rich source of protein (70%) for use in

animal feed.

Page 104: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 103

Use: Vermi compost has more nutrient compare to other manures and fertilizer; so, by the use of vermicompost we can reduce use

of chemical fertilizer. Vermicompost not only supply nutrient but also improve quantity of hormones for plant growth, improves the soil structure leading to increase in water and nutrient holding capacities of soil. Components of a commercial unit: Sheds:

A Mandavad and Vekariya village has high temperature in summer; so, a shed structure is needed for the vermicompost unit.

It can be made by the use of concrete pillars. While designing the sheds adequate room has to be left around the beds for easy movement of

the labourers attending to the filling and harvesting the beds.

Vermi-beds:

Scientific bed side is 75 cm - 90 cm thick depending on the provision of filter for drainage of excess water. The whole bed area

should be above the ground. The bed should have a uniform height over the entire width to the extent possible to avoid low production

owing to low bed volumes. The proper bed width should not be more that 1.5 m to allow easy access to the center of the bed.

Land: About 125 square meter of land will be required to set up a vermin compost production unit in Mandavad and Vekariya

village. It should have at least 2-3 sheds each of about 180-200 sq.ft. It should have a good watering arrangement and other equipment as

required because moisture is very essential for vermicompost production.

Seed Stock:

This is very important thing because worms multiply at the rate of 350 worms per m3 of bed space over a period of 6 month to

a year.

Fencing:

Page 105: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 104

The entire area has to be fenced to prevent the animals and other unwanted elements. These could be estimated based on the length of the periphery of the farm. Water Supply System:

50% moisture content has to be maintained all the time. Water for the purpose would come from a well nearby.

Machinery:

Farm machinery and implements are required for cutting the raw material in small pieces, conveying shredded raw material

to the vermi-sheds, loading, unloading, collection of compost, loosening of beds for aeration, shifting of the compost. Costs of providing

necessary implements and the machinery have to be included in the project cost.

Estimate for a vermicompost unit: Requirement of nitrogen for 1 hectare sorghum fodder production=90 kg.

1.6% N available in vermi compost .

90 kg N fulfill by the use of 90/1.6*100= 5625 kg vermicompost (5.5 ton).

Need of vermicompost to fulfill the requirement of nitrogen for 15 hectare 5.5*15 =82.5 (80 ton).

45 kg phosphorus required for 1 hectare sorghum fodder production.

Requirement of phosphorus for 15 hectare fodder production 15*45=675 kg.

Supply of phosphorus through vermin compost 0.7/100*80000=560 kg.

Remaining requirement of phosphorus 675-560=115 kg.

Page 106: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 105

Remaining dose of phosphorus will be supplied by rock phosphate. One compost cycle need 45 days so we need 7 cycles for 70 ton vermin compost production.

Table No. 42.8: Model for a vermi-compost Unit

SR. No Particulars Quantity Rate (Rs.) Amount (Rs.)

1 Wooden ballies (3 m long) 20 60 1100

2 Wooden (4 m long) 25 70 1700

3 Shade mats for covering the roof 125 30 3225

4 Binding wire for tying wooden ballies& mats 20 Kg 60 1100

5 Labour charges for erection of sheds 20 100 2500

6 Shovels, spades, crowbars, iron baskets, 2500

7 Weighing scale (100 kg capacity) 1 2000 2000

8 Cow dung 10 ton 900 9000

9 Worms @ 3 kg per ton 30 kg 90 2500

10 Formation of vermin bed with agro-waste, cow dung and worms 20 bed 260 5500

11 Miscellaneous

Total cost 31,125 Rs.

Cost for 7 cycle 2,17,875 Rs.

Table No.42.9: Returns from vermicomposting

Benefits

1 Sale of vermin compost of 70 tones @ Rs.3500/- per ton 70*3500=2,45,000 Rs.

2 Sale of worms @ 5 kg per ton of compost and Rs. 50 per kg 400*50=20,000 Rs.

Total 2,65,000 Rs/-

Net benefit 2,65,000-2,17,875=47,125 Rs/-

Page 107: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 106

Production System – 3: Handicraft unit

Usefulness:

Today in fast life there is so much demand of handicraft work, so micro-enterprises provide facility to create handicraft work,

at one place only, so that we must give importance to micro-enterprises for handicraft work. It planned that a handicraft unit by another

SHG would be supported by this project.

Process:

To start handicraft unit, we should have row material like

Moti Colour Leather Wood Velvet Thread Decorative Mirror Sparcal Cotton Fevical

We can create more attractive handicraft items to be using our new creative ideas.

Production: We should create some items like...

Flower vase Moti work Anklet Show pies Bracelet Dust cleaner Candles Curtain Wall pies Wood work Batic/Bandhani/Vegetable Print Hanging pies

Page 108: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 107

Monthly Production Expenditure:

Table No. :42.10 Monthly Production Expenditure

SR. No. Expenses Rs.

1 Velvet 2000

2 Colour 500

3 Thread 500

4 Moti 2000

5 Decorative mirror 500

6 Fevical 200

7 Cotton 200

8 Ribbin 200

9 Wood 1000

10 Sparcal 200

Total Production Expenses : 8600

Total Sales:

You can create Batic / Bandhani / Vegetable Print, Wall pies, Candles, Bracelet, Anklet, Flower vase, Moti work, Show pies,

Dust cleaner, Curtain, Wood Work, Hanging show pies etc. monthly sales of creativity of handi craft items is 13000 Approximately.

Net Profit :

Page 109: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 108

Table No. 42.11 Net Profits:

Total sales per month 13000 Rs.

- Monthly Production Expenditure 8600 Rs.

Net Profit per month: 4400 Rs.

Before formation of the SHGs, during PRA activities focused group discussions (FGDs) was held with the women, which came

up with the following observations:

Page 110: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 109

Production System - 4: Groundnuts Packaging

Groundnut is an important crop of the area. Though very few farmers produce groundnut in the village, there is ample scope

for groundnut cultivation in the village as demonstrated by a leading farmer who owns a fresh water open-well and can irrigate his fields.

With availability of good quality ground water due to the watershed activities, many a farmer can cultivate groundnut as Junagadh district

Page 111: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 110

has a high productivity of groundnut. This groundnut can be cleaned, graded and packed at the village level to fetch better price in the

market.

Equipment like Thresar machine etc. Will be provided after training. Groundnut seeds can be packaged in polythene bags of

various sizes according to the market demand.

1. Grading of groundnut: Grading of groundnut seed will be done according to size of cumin seed and moisture content.

2. Packaged in polythene bags of various sizes (5kg, 10kg, 20kg, and 40kg) according to the market demand.

3. The bags should be sealed to prevent moisture entering ct.

4. Labelling of it with following information the name of the product, brand name (if appropriate), details of the

Manufacturer (name and address), date of manufacture, expiry date, weight of the contents

4.4. Capacity Building: Capacity Building is the process of assisting the group or individuals to identify and address issues and gain the insights, knowledge and experience needed to solve problems and implement change. There is a realization in the development sector that there is a need to appraise the success of development interventions by going beyond the conventional development targets and measures of success (e.g. in the form of commodities, goods and services) to take into account improvements to human potential. Capacity building of stakeholders is also increasingly viewed as an important factor in developmental projects that involve participation of stakeholders at all levels for effective implementation of projects. Scope of capacity building at IWMP-5 Visavadar

Scientific Approach for agro productivity Training Training for youth(Ex. Stitching, beauty parlour, computer) Batik, Bandhani, Block Printing Visit & Training Farm-Machinery repairing training

Page 112: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 111

Seasonal Activities Training for Sauce, jam, Pickle, Jelly Income Generation Activities

Stitching Handicraft

Table no.43: Details of activities in the CPRs in the project areas

SR. No. Name of the

Project CPR

particulars Activity proposed

Target

Target area under the activity (ha)

Estimated expenditure (Rs.)

Expected no. of beneficiaries

IWMP -5 Waste land Plantation 4 3,20,000 60 Persons

Horticulture Plantation 2.3 1,84,000 32 Persons

Afforestation 1 80,000 -

Table no. 44: Capacity Building Institution:

SR. No. Organization Training Modules

1 KrishiVigyanKendra, junagadh Betaer Farming Practices 2 Krushi University Junagadh Agriculture-Soil Conservation

3 Ami textile diening processing unit, Jetpur Community based activity/Microenterprise planning

4 VRTI, Kutch Agriculture/ Horticulture/ Animal Husbandry livelihoods

5 BISAG, Gandhinagar GIS in planning

Page 113: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 112

Early and ongoing stakeholder collaboration and communication in capacity building is also important from the point

viewpoint of “leveling the playing field” in anticipation of disputes that may arise. Filling strategic skills/capacity gaps supports integrated

water resources management, facilitates dispute resolution, and builds practical understanding of the scope of sustainable natural resource

development challenges and opportunities.

Table no. 45: Capacity Building plan:

SR. No.

Name of the

Project Project Stakeholders

Total no. of persons

No. of persons to be trained

No. of training programmes

Estimated cost

1

IWMP-5

PIA 10 10 2 40000 WDTs 7 7 3 45000

UGs 61 61 6 100000 SHGs 114 110 9 370000 WCs 50 50 5 180000

Community 60 60 3 110000

Table no.46: Information, education and Communication Activities:

SR. No. Activity Executing agency Estimated expenditure

(Rs.)

Outcome (may quantify, wherever

possible) 1 Street Plays Local Drama Groups 8000

Awareness for the importance of watershed project

2 Video Shows IWMP-5 10000 3 Pamphlets and posters IWMP-5 15000 4 Banners, Hoardings IWMP-5 15000 5 FGD IWMP-5 8000 6 Wall Painting IWMP-5 25000

Page 114: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 113

BUDGETING

CHAPTER - 5

Page 115: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 114

Budgeting

The first step in budgeting is dividing the cost of the project into various components as detailed in the common guidelines

and done accordingly in table no. 47. It helps us in further identifying activities under different components and allocate appropriate funds.

Table no. 47: Budget at a glance for the project

SR.

No. Budget component Govindpara Mandavad Vekariya Lalpur

Cost

requirement

NET PROJECT COST 48,46,000 81,91,000 2,52,30,000 1,35,06,000 5,17,73,000

1 Administrative costs 4,84,600 8,19,100 25,23,000 13,50,600 51,77,300

2 Monitoring 48,460 81,910 2,52,300 1,35,060 5,17,730

3 Evaluation 48,460 81,910 2,52,300 1,35,060 5,17,730

PREPARATORY PHASE :

4 Entry Point activity 1,93,840 3,27,640 10,09,200 5,40,240 20,70,920

5 Institution and Capacity Building 2,42,300 4,09,550 12,61,500 6,75,300 25,88,650

6 Detailed Project Report 48,460 81,910 2,52,300 1,35,060 5,17,730

WATERSHED WORK PHASE :

7 Watershed Development Works 24,23,000 40,95,500 1,26,15,000 67,53,000 2,58,86,500

8 Livelihood activities for asset less 4,84,600 8,19,100 25,23,000 13,50,600 51,77,300

9 Production systems and micro-

Enterprises 6,29,980 10,64,830 32,79,900 17,55,780 67,30,490

10 Consolidation phase 2,42,300 4,09,550 12,61,500 6,75,300 25,88,650

TOTAL 48,46,000 81,91,000 2,52,30,3000 1,35,06,000 5,17,73,000

Page 116: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 115

Table no. 48: Village wise- component wise budget available under IWMP

SR no

Name of the Villages

Activity

EPA Institution

and CB DPR

Watershed development

Work

Livelihood for asset

less

Production system and

Microenterprises Consolidation Total

1

Govindpara 1,93,840 2,42,300 48,460 24,23,000 4,84,600 6,29,980 2,42,300 42,64,480

2

Mandavad 3,27,640 4,09,550 81,910 40,95,500 8,19,100 10,64,830 4,09,550 72,08,080

3

Vekariya 10,09,200 12,61,500 2,52,300 1,26,15,000 25,23,000 32,79,900 12,61,500 2,22,02,400

4

Lalpur 5,40,240 6,75,300 1,35,060 67,53,000 13,50,600 17,55,780 6,75,300 1,18,85,280

Total 20,70,920 25,88,650 5,17,730 2,58,86,500 51,77,300 67,30,490 25,88,650 4,55,60,240

Table no. 49: Village wise gap in funds requirement SR. No Name of the Villages Total cost requirement Total funds available

under IWMP Gap in funds requirement

1 Govindpara 55,83,000 48,46,000 7,37,000 2 Mandavad 86,80,500 81,91,000 4,89,500 3 Vekariya 2,52,30,000 2,52,30,000 Nil 4 Lalpur 1,35,06,000 1,35,06,000 Nil Total 5,29,99,500 5,17,73,000 12,26,500

Page 117: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 116

Table no.50: Details of Convergence of IWMP with other Schemes

SR. No. Name of the

Villages Activity to be

carried out

Fund made available to

IWMP due to convergence (Rs.

in lakh)

Scheme with which

convergence took place

Reference no. of activity/ task/

structure in DPR

Level at which decision for

convergence was taken

1 Govindpara Check Dam 6,00,000 NREGA Dis Level

Fencing 1,37,000 NREGA 783 Rmt. Dis Level

2 Mandavad

Check Dam 3,00,000 NREGA 1 Dis Level

Fencing 1,71,500 NREGA 980 Rmt. Dis Level

Well Parapet 18,000 FOREST 3 Dis Level

Total 12,26,500

Page 118: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 117

EXPECTED OUTCOMES

CHAPTER - 6

Page 119: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 118

6.1 Expected Outcomes 6.1.1 Employment Employment has always been a problem in the village. The principal occupations of the people are dry land agriculture,

animal husbandry and casual labour work. However, rain fall being very limited and erratic, agriculture suffers, i.e. at best they can take

only a single crop, which keeps them partially engaged for about 4 months. Lack of fodder makes animal husbandry very difficult too. So,

animal husbandry does not keep them engaged full time. Thus the people mainly depend upon casual labour, either in the village itself or

outside it.

The project plans for creation of both wage employment and self-employment opportunities. Wage employment would be

created by engaging people in watershed physical works like construction of earthen bunds, farm bunds, Check dam, village pond,

plantation, etc. Self-employment would be created by providing the people with cash support in the form of direct livelihood activities like

agriculture, animal husbandry and enterprise development.

Table no. 52: Employment in Project area:

S.

NO.

Names of

the

Villages

Wage employment Self-employment

No. of man-days No. of beneficiaries No. of beneficiaries

SC ST OBC Others Women Total SC ST OBC Others Women Total SC ST Others OBC Women Total

1 Govindpara 0 0 190 265 115 570 0 0 10 15 5 30 0 0 10 5 20 35

2 Mandavad 150 200 210 90 65 715 15 2 60 9 7 93 30 2 40 10 20 102

3 Vekariya 190 0 180 240 30 640 9 0 60 24 3 96 60 0 50 12 30 152

4 Lalpur 140 0 220 170 35 565 14 0 30 17 4 65 10 0 60 9 20 99

Page 120: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 119

6.1.2. Migration

Low rainfall results in very little fodder availability in the locality. The relatively well-off farmers bring fodder from Junagadh

(approximately 42 kms away) collectively; but the resource poor cannot afford it. On account of agriculture and animal husbandry

providing only part time employment for some part of the year, the people migrate for a better half of the year for wage labour.

Employment opportunities in the local area as mentioned above will ensure lessening seasonal migration from the area.

Table no. 53: Details of seasonal migration from Project area

SR. No. Names of the

villages

No. of persons migrating No. of days per year of migration

Pre-project Expected post project Pre-project Expected post project

1 Govindpara 4 1 90 30

2 Mandavad 55 14 160 30

3 Vekariya 172 60 163 30

4 Lalpur 137 42 152 30

6.1.3 Ground water table

Rainfall has been scanty but demand for ground water has been increasing all the time. The ground water table thus has

depleted over the years. Presently it stands at 28 m.

Proper water harvesting structures and percolation tanks would go a long way in increasing water table depth from 28 m in

the pre-project level to 25 m in the post project period.

Page 121: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 120

Table no. 54: Details of average ground water table depth in the project areas (in meters)

SR. No. Name of the Project Sources Pre-Project level Expected Increase/decrease

(Post- Project)

1 IWMP-5

Open wells 25 22

Bore wells

Others (specify)

6.1.4 Drinking water The village has wells and tube well on which they depend for their drinking water, but their ground water table is to Profound

Many an effort at finding sweet water at different other places in the same village has failed. IWMP-5 construction many check dam and

farm bund to try ground water depth increased.

As a result of the watershed activities, it is expected that the quantity and quality of drinking water would improve.

Table no. 55: Status of Drinking water

SR.

No.

Names of the

Villages

Availability of drinking water

(no. of months in a year) Quality of drinking water

Comments

Pre-project Expected Post project Pre-project Expected Post-

project

1 Govindpara 9 12 Normal TDS Portable

2 Mandavad 8 12 Normal TDS Portable

3 Vekariya 8 12 Normal TDS Portable

4 Lalpur 9 12 Normal TDS Portable

Page 122: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 121

6.1.5 Crops

Agriculture primarily depends upon water; but this is what is lacking in IWMP-5. The surface water is scanty due to low

rainfall and ground water is saline, which is unfit for crop production.

All this can change with the integrated land and water management during the watershed project. The planned earthen bunds

check dam, farm bund, is storage the sweet rain water and also help percolate sweet water underground, and preserve some moisture in

the soil. This will help in additional area coming under cultivation and increasing productivity too. The farmers can take more than one

season of crops. Different varieties of crops can be taken.

Table no. 56: Details of crop area and yield in the project area

Name of the

Project Name of crops

Pre-project Expected Post-project

Area

(Ha.) Average Yield (Kg.) per Ha.

Area

(Ha.)

Average Yield per

Ha. (Kg.)

IWMP-5

Kharif

Groundnut 2412.1 1280 12 1550

Cotton 164.00 1527 7 1850

Black Gram 6 700 4 780

Rabi

Wheat 1700 2530 16 2850

Castor 24 533.87 31 580

Pearl millet 7 420 10 435

Zaid

Sesame 115 314.59 7.5 830

Page 123: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 122

6.1.6 Horticulture Table no. 57: Area under horticulture

SR. No. Name of the Project Existing area under horticulture (Ha.) Area under horticulture proposed to be

covered through IWMP Ha.

1 IWMP-5 10 15

6.1.7 Vegetative cover

There is negligible area under tree cover. The village has a forest area of 66ha which consists of only Sag, Seasam.

It is planned that 10 ha land to be covered under new plantation.

Table no. 58: Forest/vegetative cover

SR. No. Name of the Project Existing area under tree cover (Ha.) Area under tree cover proposed

1 IWMP-5 66 76

6.1.8 Livestock

IWMP-5 Visavadar has quite a good of livestock population. These include cows, bullocks, buffaloes, goats, and sheep. The

interventions like provision of good quality cows and buffaloes, the establishment of a fodder bank and other such related activities would

spur up the dairy development in the village. It is expected that the post project period would see a substantial increase in livestock

population and yield from them.

Page 124: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 123

Table no. 59: Details of livestock in the project areas (for fluids please mention in liters, for solids please mention in kgs. and

income in Rs.)

SR.

No.

Name of the

Project Type of Animal

Pre-Project Expected Post-project Remarks

No. Yield Income No. Yield Income

IWMP-5

Visavadar

Cow (Milk: Rs/lit.) 1126 1.5 15 1141 4 48 -

Buffalo (Milk: Rs/lit.) 1627 2 20 1650 6 96 -

Draught Purpose animal

Goat (Meat: Rs/kg.) 1030 1.5 50 1050 2 60 -

Sheep (Meat: Rs/kg.) 190 2 60 210 2.5 70 -

6.1.9 Linkages

The direct livelihood activities need good forward and backward support. Without such support system the activities may fail

to deliver the desired results. These machinery, input supply, marketing, etc.

Table no. 60: Backward-Forward linkages

SR.

No.

Name of

the Project Type of Marketing Facility

Pre-project

(no.) During the project (no.) Post-project (no.)

1 IWMP-5

Visavadar

Backward linkages - - -

Seed certification - - -

Seed supply system - 1 1

Fertilizer supply system 1 - 1

Page 125: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 124

Pesticide supply system 1 - 1

Credit institutions - 1 1

Water supply - - -

Extension services - Kvk kvk

Price Support system - - -

Labour - - -

Any other (please specify) - - -

Forward linkages

Harvesting/threshing machinery 9 Harvesting/Machinery(3) 12

Floor mill unit 4 2 6

Handicraft unit - 3 3

Vegetable shop 2 1 3

Soda Processing unit - Soda Processing unit (2) 2

Agro and other Industries - Groundnut/

Processing/packaging

1

Milk and other collection centers - Milk collection centre-1 1

Mandap Service 2 3 5

Any other (please specify) - Fodder bank-1 1

Vermi-Compost unit - Vermi-Compost unit-1 2

Page 126: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 125

Logical Framework Analysis

Components Activities Output Effect Impact Village Institution Formation

Formation of Watershed Committee, User Group

One Watershed Committee each village

Number of User group

depending on the coverage of particular intervention

Project can be implemented and managed in a democratic and participatory way ensuring equity.

Unity and prosperity in the village management.

People's

Participation and positive perception towards the programme

Strengthening Village Institutions

Organize training and awareness programme for Village institutions

Capacity building workshops and

exposure visits User Group and Watershed Committee

Failitating and monitoring the

functioning of UGs and WCs Strengthen linkages between UGs

and WCs and Panchayat Institutions.

Gender sensitisation of UGs and

WCs to increase inclusiveness of samuh decision-making.

Awareness camps to be organized.

trainings and exposure visits

UGs and WCs to be held Capacity building workshops

to be organized 1 Federations of UGs and WC

to be formed.

Quality of management of common resources improved.

Quality of distribution

of benefits between people improved.

Increased awareness

amongst women about village resources.

Women participation

in micro enterprise Involvement of youth

and children in village development increased.

Page 127: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 126

Sensitise village communities to involve children and youth in development.

Fund Management

Improve management and utilization of UGs and WCs.

Prepare communities to explore

other sources of income for UGs and WCs.

UGs and WCs operating bank account and managing resources on their own

Purpose, frequency and volume of use of the fund enhanced.

Volume of funds

generated for UGs and WCs from other sources of income increased.

Ecological Restoration

Protection, treatment and regeneration of common and private lands

Protection, treatment and

regeneration of forest lands Plantation of fruits and forest

species

Common and private lands to be brought under new plantations and agro-horti-forestry like Amala, Mango, Alovera.

Forest lands to be brought under new plantations and protection

Trainings, exposure visits

and meetings to be organized for communities, village volunteers and staff

Fodder availability from common and private lands increased

Accessibility to

common and forest lands increased with removal of encroachments and resolution of conflicts.

Better Ecological order in the area

Increase in the

proportion of households having more security of fodder

Reduction in

drudgery of fodder and fuel collection, especially women

Page 128: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 127

Impart trainings, conduct meetings and organize exposure visits for communities, village volunteers and staff to effectively plan, execute and monitor activities

Identification and promotion of

non-timber forest produce based income generation activities

Income generation intervention promoted.

Rainfaid Area Development

Treatment of land through improved soil and moisture conservation practices on watershed basis

Promotion of good agricultural

practices- horticulture, improved crop and vegetable

Promotion of organic farming

practices

Land to be brought under improved soil moisture conservation practices.

Good agricultural practices to

be promoted. Organic farming to be

promoted. Fodder banks to be

established. Agriculture based livelihood

income generation activities to be promoted.

Improved productivity of treated land.

Increased availability

of water in wells . Increase in annual

agriculture production.

Farmers adopt organic

farming practices. Fodder security of

farmers enhanced.

Increase in proportion of households having more security of food

Increase in

contribution of agricultural income to the household income

Page 129: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 128

Formation of Fodder banks to increase fodder security and promote dairy development among communities

Identification and promotion of

agri-produce based income generation activities like grading, processing and packaging.

Promotion of better Irrigation

practices like drip irrigation Impart trainings, conduct

meetings and organize exposure visits of communities, village volunteers and staff to effectively plan, execute and monitor activities

Water harvesting structures to be constructed.

Drip Irrigation facilities to be

distributed among farmers. Approx 15000 person days of

employment to be generated. Trainings, exposure visits

and meetings to be organized for communities, village volunteers and staff.

Increase availability of water for 9 to 12 months.

Increased availability

of water for livestock. Availability of

irrigation water established.

Farmers take three

crops in a year. Increase in

agricultural productivity of land

Availability of drinking water enhanced

Women’s Socio-political and economic empowerment

Formation & Strengthening of women’s SHG groups

Women’s SHG groups to be formed.

Enhanced capacities of leaders of women's group in taking initiatives to solve problems at different levels.

Position of women in household, community, society (politically, socially and economically) as perceived by women and community at large

Page 130: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 129

Capacity building of womenfolk Capacity building of SHG leaders

and accountants Linking SHGs with external

financial institutions

Federation of Women’s SHGs

to be formed. Trainings to be conducted for

preparation of Animal husbandry.

Improved access to

credit for livelihood purposes.

Increased household

income.

Performance

enhancement of SHGs in terms of participation, decision-making, leadership and fund management.

Equality & Equity

in gender relations at home (decision making, expenditure, children’s education, health)

Page 131: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 130

Q U A L I T Y A N D S U S T A I N A B I L I T Y I S S U E S

Q U A L I T Y A N D S U S T A I N A B I L I T Y I S S U E S

CHAPTER -7

Page 132: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 131

7.1 Plans for Monitoring and Evaluation

A Web-based GIS System is being developed for monitoring and evaluating the project in its planning & implementation

phases. The system would be available on a public domain and can be accessed by all the stakeholders of the project. The system shows the

entire state of Gujarat and all of those areas selected over the next 18 years. Filtering allows the user to zoom onto one particular project.

Details related to soil type, Land-use classification, inhabitation etc., can be obtained village-wise. Furthermore, survey-number wise

details related to ownership, irrigation source, yield etc., can also be accessed by the users of the system. This system is being used for

pooling up the details obtained from the DPR. In other words, the DPR is made available online in the form of a database which will help

the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for

further treatment and planning. The system would also show the satellite imageries of various years from the project inception stage to the

project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the

project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.

Yet another component of the Web-based GIS system is the Mobile based Monitoring & Evaluation System, which will help the

ground staff alias WDTs (Watershed Development Team) to transmit information from the ground level to the central server. Also, any

higher-up official in charge of the project can obtain information regarding the project area on their mobile phone by means of an SMS. The

system works in the following manner. The WDT equipped with a GPS instrument marks the latitude-longitude information of various

treatment areas during the DPR. The probable sites are then transferred onto the central server. During the works phase, any progress in

the treatment areas is reported to the server by means of an SMS by the WDT. Similarly, any nodal officer or higher-up official can view the

progress in a project by means of summarized reports generated over frequent periods of time.

Page 133: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 132

7.2 Plans for Project management:

The Project management of any watershed programme is very important. It mainly depends upon the community

organization and the village level institutes .In IWMP - 5 Visavadar Cluster, watershed committee and various user groups have been

formulated for post project operation and maintenance of assets created during project period. Major emphasis will be on equity and

sustainable benefit of the project even after implementation stage. A proper link-up will be built during project period with various

institutes and capacity building organization. They will act as a major kingpin during post implementation for scaling up the successful

experience during project.

7.3 Watershed Development Fund:

The major source of financial assistance after post implementation period is watershed Development Fund. The contribution

of it will comes mainly fund the following:

7.4 User Charges:

Various user groups will be formed in village. These user groups will collect user charges according to the designated rules

formed during the formation of user group. These funds will be transferred to the WDF funds as per these formulated rules. The secretary

of watershed committee (WC) shall maintain the records of the following.

Page 134: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 133

MAPS

CHAPTER -8

Page 135: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 134

Page 136: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 135

Page 137: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 136

Page 138: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 137

Page 139: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 138

Page 140: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 139

Page 141: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 140

Page 142: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 141

Page 143: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 142

Page 144: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 143

Page 145: DETAIL PROJECT REPORT (DPR) - Gujarat State Portalgswma.gujarat.gov.in › pfile › DPR › 2009-10 › Junagadh › ... · nearby world famous wild Gir area. His also famous are

IWMP-5 VISAVADAR CLUSTER Page 144