detailed project report (dpr) - gujaratgswma.gujarat.gov.in/pfile/dpr/2010-11/junagadh/dpr iwmp-11...
TRANSCRIPT
GUJARAT STATE WATERSHED MANAGEMENT AGENCY
DETAILED PROJECT REPORT (DPR)
IWMP-11 TALALA YEAR : 2010-11
Contents Table no.1: Basic project information .................................................................................................................................................................................................................................................. 5
Table no.2: Weightage of the project .................................................................................................................................................................................................................................................... 5
Table no.3: Watershed information ...................................................................................................................................................................................................................................................... 5
Table no.4: Developmental programmes running in the project area: .................................................................................................................................................................................. 6
Table no. 5: Previous Watershed programmes in the project area: ........................................................................................................................................................................................ 6
Table no. 6: PIA:............................................................................................................................................................................................................................................................................................. 7
Table no. 7: Staff at PIA level: .................................................................................................................................................................................................................................................................. 7
Table no. 8: Land use pattern: ................................................................................................................................................................................................................................................................. 8
Table no. 9: Soil type and topography: ................................................................................................................................................................................................................................................ 8
Table no. 10: Flood and drought condition: ...................................................................................................................................................................................................................................... 8
Table no. 11.1: Soil Erosion ...................................................................................................................................................................................................................................................................... 9
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress) .......................................................................................................................................................................................................... 10
Table no. 11.3: Waterlogging Conditions .......................................................................................................................................................................................................................................... 10
Table no. 12: Climatic conditions: ........................................................................................................................................................................................................................................................ 11
Table no. 13: Physiography and relief ............................................................................................................................................................................................................................................... 11
Table no. 14: Land ownership details ................................................................................................................................................................................................................................................ 12
Table no. 15: Agriculture ......................................................................................................................................................................................................................................................................... 12
Table no. 16: Irrigation ............................................................................................................................................................................................................................................................................. 13
Table no. 17: Crop details: ...................................................................................................................................................................................................................................................................... 13
Table no. 18: Livestock ............................................................................................................................................................................................................................................................................. 14
Table no. 19: Drinking water ................................................................................................................................................................................................................................................................. 14
Table no. 20: Details of Common Property Resources ................................................................................................................................................................................................................ 15
Table no. 21: Demographic information ........................................................................................................................................................................................................................................... 15
Table no. 22: Literacy rate ...................................................................................................................................................................................................................................................................... 16
Table no. 23: Migration details ............................................................................................................................................................................................................................................................. 16
Table no. 24: Poverty ................................................................................................................................................................................................................................................................................ 17
Table no. 25: Village infrastructure .................................................................................................................................................................................................................................................... 17
Table no. 26 : Facilities / HH assets .................................................................................................................................................................................................................................................... 18
Table no. 27: Income ................................................................................................................................................................................................................................................................................. 18
Table no.28: Dependence on Forest/CPR ......................................................................................................................................................................................................................................... 19
Table no. 29: Livelihood pattern (Occupational distribution) ................................................................................................................................................................................................. 19
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects* ........................................................................................................................................................................ 19
Table no. 31: Watershed Committee details ................................................................................................................................................................................................................................... 22
Table no. 32: SHG detail ........................................................................................................................................................................................................................................................................... 27
Table no. 33: UG detail .............................................................................................................................................................................................................................................................................. 28
Table no.34: Entry point activities (EPA) (All financial figures in lakh Rs.) ...................................................................................................................................................................... 29
Table no.35: Details of activities of preparatory phase (All financial figures in lakh Rs.) .......................................................................................................................................... 21
Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.) ............................................................................................ 30
Table no.37: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.) ..................................................................... 34
Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas ............................................................................................................................... 40
Table no. 39: Other activities of watershed works phase – Proposed target ....................................................................................................... Error! Bookmark not defined.
Table no.40: Details of engineering structures in watershed works* ..................................................................................................................... Error! Bookmark not defined.
Table no.41: Details of activities connected with vegetative cover in watershed works ............................................................................................................................................. 41
Table no.42: Details of allied / other activities .............................................................................................................................................................................................................................. 38
Table no.43: Details of activities in the CPRs in the project areas ......................................................................................................................................................................................... 44
Table no. 44: Capacity Building Institution: .................................................................................................................................................................................................................................... 45
Table no. 45: Capacity Building plan: ................................................................................................................................................................................................................................................. 45
Table no.46: Information, education and Communication Activities: .................................................................................................................................................................................. 46
Table no. 47: Village wise- activity wise budget ............................................................................................................................................................................................................................ 47
Table no. 48: Budget at a glance ........................................................................................................................................................................................................................................................... 47
Table no.49: Details of Convergence of IWMP with other Schemes ...................................................................................................................................................................................... 48
Table no. 50: Public-Private Partnership in the IWMP projects* ........................................................................................................................................................................................... 49
Table no. 51: Employment in Project area: ...................................................................................................................................................................................................................................... 52
Table no. 52: Details of seasonal migration from Project area ................................................................................................................................................................................................ 53
Table no. 53: Details of average ground water table depth in the project areas (in meters) ..................................................................................................................................... 53
Table no. 54: Status of Drinking water* ............................................................................................................................................................................................................................................ 50
Table no. 55: Details of Kharif crop area and yield in the project areas .............................................................................................................................................................................. 51
Table no. 56: Area under horticulture ............................................................................................................................................................................................................................................... 51
Table no. 57: Forest/vegetative cover ................................................................................................................................................................................. Error! Bookmark not defined.
Table no. 58: Details of livestock in the project areas * (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.) ............................ 51
Table no. 59: Backward-Forward linkages ...................................................................................................................................................................................................................................... 56
Table no.1: Basic project information
Sl No.
Name of the project
Villages Gram
Panchayats Taluka District Area of the project
Total project
cost PIA
Name Census
code
1
IWMP-11 TALALA
DHAVA DHAVA
TALALA JUNAGADH
1861.30 223.356
DWDU Junagadh
2 HADMATIYA HADMATIYA 1704.40 204.528
3 MORUKA MORUKA 1000.60 120.072
4 SURVA SURVA 1440.30 136.836
5 VADLA VADLA 1260.40 151.248
Area proposed to be treated
Table no.2: Weight age of the project
Project name
Project type
Weight age
IWMP-11 FLAT &
HILLY
i ii iii iv v vi vii viii ix x xi xii Xiii
7.5 3 0 5 5 15 5 5 10 15 10 5 5
Project type: Hilly/desert/Other
Table no.3: Watershed information
Name of the project No. Of watersheds to be
treated Watershed code Watershed regime/type/order
IWMP-11 DHAVA 7
5G1D3e1c ,5G1D3e2c,
5G1D3e2b,5G1D3e2a,5G1D3e2g,5G1D3e1e,5G1D3e2h Micro watershed
Table no.4: Developmental programmers running in the project area:
SR.no Name of the
programme/scheme Sponsoring agency
Objectives of the programme/scheme
Year of commencement Villages covered
Estimated number of
beneficiaries
1
WASMO
Govt of Gujarat
Drinking water pipeline
2006
2
6700
2 NREGS
CRD
Employment
2009
5
2055
3 IAY
CRD Housing
2005
4
197
4 Sakhi Mandal Govt of Gujarat Savings and Employment
2004
5 1265
5 TSC Govt of Gujarat Sanitation 2006 5
420
6 Sardar Patel Awas
Yojana Govt of Gujarat Housing 2005
5 239
Table no. 5: Previous Watershed programmes in the project area :( Not applicable)
Sl no
Project name
Year started
Name of villages
No. Of micro
watershed
Watershed codes
Area under
treatment
Funding source
Nodal agency
PIA Total cost
Expenditure incurred up to start of
IWMP
% financial completion
% physical completion
Table no. 6: PIA: Sl. No. Names of project Details of PIA
1 IWMP-11 TALALA
Type of organization District Level Nodal Agency
Name of organization DWDU, Junagadh
Designation & Address Project Director.DWDU, Junagadh
Telephone 0285-2635974
Fax 0285-2635974
E-mail [email protected]
Table no. 7: Staff at PIA level: SR. no
Name Age Sex Designation Qualification Experience Job assigned Monthly
remuneration
1 KASUNDRA RENISH M. 25 M WDT ENGI. D C E 2 YEARS Phsical Works supervision and report 12000/-
2 KADU EBRAHIMBHAI M. 28 M WDT AGRI. 4.5 YEARS Agriculture activity supervisin and
Motivation programmes
3 RITABEN DOBARIYA F WDT C.M. MRS 1 YEARS
4 MAKWANA MRUDULABEN
31 F WDT ACC M.COM 2 YEARS
5 GADHECHA SUMAN M 21 F WDT DEO PGDCA,MCOM 1 YEARS 5750/-
6
7
8
9
10
11
Table no. 8: Land use pattern:
S. No. Names of villages
Geographical Area of the village
Forest Area Land under
agricultural use Rainfed area
Perm-anent pastu-res
Wasteland
Cultivable Non-cultivable
1 Dhava
1861.30 382.40 1297.30 1080.00 0.00 120.20 91.40
2 Hadmatiya
1704.40 616.40 933.30 668.90 0.00 48.30 126.40
3 Moruka
1000.60 83.00 815.70 786.20 0.00 17.90 84.10
4 Surva
1440.30 0.00 843.60 702.00 0.00 232.90 73.70
5 Vadla
1260.40 124.20 637.90 470.90 0.00 50.50 41.90
Table no. 9: Soil type and topography:
S. No. Name of the Agro-climatic zone
covers project area Area in ha
Names of the villages
Major soil types Topo-graphy
a)Type b) Area in ha
# Flat, undulating, moderate slope, Steep slope
Table no. 10: Flood and drought condition: Sl no Village Flood (Incidence) Drought (Incidence)
1 Dhava Once in a Year Once in 5 Year
2 Hadmatiya Once in a Year Once in 5 Year
3 Moruka Once in a Year Once in 5 Year
4 Surva Once in a Year Once in 5 Year
5 Vadla Once in a Year Once in 5 Year
11. Edaphic Factors
Table no. 11.1: Soil Erosion
Cause Type of erosion Area affected (ha) Run off
(mm/ year) Average soil loss (Tonnes/ ha/
year)
Water erosion
a Sheet
b Rill
c Gully
d Ravenous
Sub-Total
Wind erosion NA
Total
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)
Name of the Village Survey Number Soil pH Type of Salinity
(Inherent/Ingress)
1 Dhava Once in a Year Once in 5 Year
2 Hadmatiya Once in a Year Once in 5 Year
3 Moruka Once in a Year Once in 5 Year
4 Surva Once in a Year Once in 5 Year
5 Vadla Once in a Year Once in 5 Year
Table no. 11.3: Water logging Conditions Name of the Village Survey Number Reasons
Dhava - Na
Hadmatiya - Na
Moruka - Na
Surva - Na
Vadla - Na
Table no. 12: Climatic conditions:
Sr.No. AveragE Rainfall-last 5 years Average Temperature (°C)
Year Rainfall (in mm) summer winter
Max. Min. Max. Min.
IWMP-
11
2005 635 41°C 32°C 28°C 15°C
2006 834 42°C 34°C 27°C 18°C
2007 1746 42°C 33°C 29°C 21°C
2008 972 44°C 35°C 28°C 20°C
2009 1091 45°C 36°C 30°C 22°C
Table no. 13: Physiographic and relief Project name Elevation Slope range (%) Major streams
Dhava 20metres 5-6% Sarasvati
Hadmatiya 25 metres 6.5-8% -
Moruka 5-6 metres 5-6% Sarasvati
Surva 6-7 metres 6.5-8% Sarasvati
Vadla 7-8 metres 7-8% -
Table no. 14: Land ownership details
Sl no Village Total owned land HHs giving land
on lease HHs taking land
on lease Gen OBC SC ST
1 Dhava 370 50 0 30
2 Hadmatiya 220 51 15 16
3 Moruka 177 18 8 31
4 Surva 218 60 11 10
5 Vadla 87 18 8 21
Total 1072 197 42 108
Table no. 15: Agriculture
Sl no Village Net sown area
One time Two times Three times
1 Dhava 1297.30 - -
2 Hadmatiya 933.30 - -
3 Moruka 815.70 - -
4 Surva 843.60 - -
5 Vadla 637.90 - -
Table no. 16: Irrigation
Sl no
Village
Source 1 : Canal Source 2 : Check dam / Pond Source 3 : Well
Availability months
Net area Gross area Availability
months Net area Gross area
Availability months
Net area Gross area
1 Dhava NA NA NA NA NA NA NA NA NA
2 Hadmatiya NA NA NA NA NA NA NA NA NA
3 Moruka NA NA NA NA NA NA NA NA NA
4 Surva NA NA NA NA NA NA NA NA NA
5 Vadla NA NA NA NA NA NA NA NA NA
Table no. 17: Crop details: Sl no
Village Kharif (Monsoon)
GROUNDNUT COTTON ALAD
Area Production Productivity Area Production Productivity Area Production Productivity
1 Dhava 226.31 1313770 2320.20 - - - - - -
2 Hadmatiya 174.68 366440 1261.93 98.32 45506 3450.00
3 Moruka 78.69 720000.00 960.00 29.32 55650 4523.00
4 Surva 38.32 437560 1086.84 32.30 66440 1261.93
5 Vadla 44.35 269100 1762.16 32.13 56440 1261.93
Sl no
Village Rabi (Winter)
SUGARCANE WHEAT KATHOD
Area Production Productivity Area Production Productivity Area Production Productivity
1 Dhava 101.10 839370 2293.17 98.65 562000 3746.67 21.06 45506 3450.00
2 Hadmatiya 132.06 1293540 4665.46 19.18 589620 1852.05 18.49 55650 4523.00
3 Moruka 65.32 562000 3746.67 31.06 349800 3277.74 70.82 23455 2550.00
4 Surva 29.39 589620 1852.05 50.42 839370 2293.17 9.18 5650 3542.00
5 Vadla 69.98 349800 3277.74 47.18 1293540 4665.46 40.18 38450 3840.00
Sl no
Village Zaid (Summer)
MANGO BAJARI TAL
Area Production Productivity Area Production Productivity Area Production Productivity
1 Dhava 842.36 Ha. 720000.00 9600.00 - -
2 Hadmatiya 465.94 437560 1086.84 5.06 452 3325 -
3 Moruka 404.21 269100 1762.16 9.90 555 5625 -
4 Surva 538.35 153750 775.30 4.35 325 4560 0.89 38.32 383
5 Vadla 207.91 239122 1707.28 30.32 6587 55870 0.93 13.49 134
Table no. 18: Livestock Sl no
Village Buffalo Cow Total Milk
(Buffalo+Cow) Goat Sheep Bullock Hen Others
No milk No Milk No Milk - - - -
Dhava 338 20300 298 17800 38100 86 105 - 31 - -
Hadmatiya 313 18800 268 16000 34800 32 45 - 56 - -
Moruka 177 10650 136 8100 18750 - - - 25 - -
Surva 254 15200 168 10080 25280 - - - 44 - -
Vadla 142 8500 97 5800 14300 - - 35 - -
Table no. 19: Drinking water Sl no Village Ground water table (mt) Source of drinking water Availability in months Quality
1 Dhava 31 Mt. NAL Connection 11 month GOOD
2 Hadmatiya 28 Mt. NAL Connection 11 month GOOD
3 Moruka 25 Mt. NAL Connection 11 month GOOD
4 Surva 25 Mt. NAL Connection 11 month GOOD
5 Vadla 21 Mt. NAL Connection 11 month GOOD
Table no. 20: Details of Common Property Resources
S. No.
Names of project
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons Govt.
(Specify deptt.)
PRI Any other
(Pl. Specify) Pvt.
persons
Govt. (Specify deptt.)
PRI Any other
(Pl. Specify)
Wasteland/ degraded land
Pastures
Orchards
Village Woodlot
Forest
Village Ponds/ Tanks
Community Buildings
Weekly Markets
Permanent markets
Temples/ Places of worship
Others (Pl. specify)
Table no. 21: Demographic information
Sr. no.
Village Population SC ST
Total Male Female Total Male Female % Total Male Female %
1
Dhava 4212 2205 2007 191 102 89 4.53 87 46 41 2.07
2 Hadmatiya 2994 1555 1439 126 59 67 4.21 342 168 174 11.42
3 Moruka 2398 1257 1141 469 243 226 19.56 24 12 12 1.00
4 Surva 2256 1186 1070 88 47 41 3.90 212 108 104 9.40
5 Vadla 947 483 464 84 41 43 8.87 205 102 103 21.65
Table no. 22: Literacy rate
Sl no Village Literacy Literacy % above
age 14 Literacy % below
age 14 Total % Male % Female %
1 DHAVA 3213 76.28 1829 43.42 1384 32.86 20.18 56.10
2 HADMATIYA 2054 68.54 1176 39.24 876 29.23 12.73 55.88
3 MORUKA 1735 72.35 983 40.99 752 31.40 19.64 52.71
4 SURVA 1679 74.42 957 42.42 722 32.00 11.70 62.72
5 VADLA 648 68.43 338 35.70 310 32.73 8.45 59.98
Table no. 23: Migration details
Sr.No
Village
Total
population
Migration
Migration by months
Main reason
for migration
Income during
migration /
month
Total
Male
Female
Up to 3
months
3-5 months
More than 6
months
1
Dhava 4212 110 70 40 0 110 0 better
employment
prospects
Rs 4000-5000
2 Hadmatiya 2994 48 30 18 0 48 0
3 Moruka 2398 87 60 27 0 87 0
4 Surva 2256 150 90 60 0 150 0
5 Vadla 947 38 22 16 0 38 0
Table no. 24: Poverty
Sl no Village Total Household BPL
% of BPL HH Total Land less HH % of land less HH 0-16 16-20 Total
1 Dhava 919 34 140 174 18.93 468 49.08
2 Hadmatiya 603 107 150 257 42.62 301 49.92
3 Moruka 469 57 160 217 46.27 235 50.11
4 Surva 408 24 80 104 25.50 109 36.45
5 Vadla 193 23 60 83 43.00 59 30.57
Table no. 25: Village infrastructure
Sl
no Village
Pucca
road to
the
village
(Y/N)
Schools
Colleges
(Number)
Post Office
(Distance)
Banks
(Number)
Distance
from
nearest
market
yard
Milk
collection
centre
(Number)
Milk
cooperative
(Number)
Other
cooperatives
/ CBIs
(Number)
Any other
institution LP UP HS
1 DHAVA Y Y Y Y N Y Y 8 K.M. Y N N N
2 HADMATIYA Y Y Y Y N Y Y 16 K.M. Y N N N
3 MORUKA Y Y Y N N N N 15 K.M. Y N N N
4 SURVA Y Y Y N N Y N 12 K.M. Y N N N
5 VADLA Y Y Y N N N N 19 K.M. Y N N N
Table no. 26: Facilities / HH assets
Sl no Village HHs with
electricity
HHs with
safety latrines
HHs with phones HHs with vehicle HHs with
TV set
HHs with
cooking gas
HHs with
Drinking
water
HHs with
freedge Land line Mobile 2-wheeler 4-wheeler
1 DHAVA 919 579 58 783 542 66 750 778 919 575
2 HADMATIYA 603 480 42 550 378 25 558 483 603 305
3 MORUKA 469 419 68 413 248 15 465 365 469 112
4 SURVA 408 378 52 378 226 28 408 380 408 158
5 VADLA 193 180 32 189 92 8 157 148 193 83
Table no. 27: Per capita Income
Sl no Village Agriculture Forestry Animal
husbandry
Casual
labour Services Handicraft Others Total
1 DHAVA 6096500 46750 1446200 1785000 4260000 522300 1628250 15785000
2 HADMATIYA 2632000 32600 742000 2828000 720000 326500 948900 8230000
3 MORUKA 1916000 18250 656000 2568000 550000 222800 1000950 6932000
4 SURVA 1904000 32500 45000 285000 725600 235200 45000 6720000
5 VADLA 913200 15800 34500 185200 852400 658400 552000 2316000
Table no.28: Dependence on Forest/CPR
Sl no Village Benefit type 1 Benefit type 2 Benefit type 2
Total income % sells Income % sells Income % sells Income
1 DHAVA - - - - - - -
2 HADMATIYA - - - - - - -
3 MORUKA - - - - - - -
4 SURVA - - - - - - -
5 VADLA - - - - - - -
Table no. 29: Livelihood pattern (Occupational distribution)
Sl no
Village Agriculture Animal
husbandry (AH)
Agriculture + AH
Casual labour
Services Handicraft Others
1 DHAVA 25332000 129000 4567000 1680000 45000 205000 31958000
2 HADMATIYA 11527000 20000 1506000 563000 30000 596000 14242000
3 MORUKA 12000000 400000 3000000 1780500 100000 3500000 20780500
4 SURVA 14878000 31500 1760000 888000 20000 1010000 18587500
5 VADLA 5738000 0 1099000 40000 15500 430000 7322500
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects
S. No. Scientific criteria/ inputs used Whether scientific criteria was
used
(A) Planning
Cluster approach YES
Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute
NO
Baseline survey YES
Hydro-geological survey -
Contour mapping YES
Participatory Net Planning (PNP) YES
Remote sensing data-especially soil/ crop/ run-off cover YES
Ridge to Valley treatment YES
Online IT connectivity between
(1) Project and DRDA cell/ZP YES
(2) DRDA and SLNA YES
(3) SLNA and DoLR YES
Availability of GIS layers YES
1. Cadastral map
2. Village boundaries YES
3. Drainage YES
4. Soil (Soil nutrient status) YES
5. Land use YES
6. Ground water status YES
7. Watershed boundaries YES
8. Activity YES
Crop simulation models# NO
Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil nutrient analysis
NO
Normalized difference vegetation index (NDVI)# NO
Weather Station
(B) Inputs
1. Bio-pesticides NO
2. Organic manures YES
3. Vermicompost YES
4. Bio-fertilizer YES
5. Water saving devices YES
6. Mechanized tools/ implements YES
7. Bio-fencing YES
8. Nutrient budgeting NO
9. Automatic water level recorders & sediment samplers NO
Any other (please specify)
#NDVI - Ratio of the differences of the response of vegetation in the near infrared & red regions of the electromagnetic spectrum
Table no.31: Details of PRA Activities conducted in the project area Sr.
No.
Name of the PRA
Activity / FGD Date
Number of
people present Lessons learnt / Understanding of the problem/situation
1 PRA DHAVA 17-11-2011
82
Facilities Not Available :- Problem of Drainage facility, Sanitation
facility,
2 PRA HADMATIYA 11-10-2011
60
Facilities Not Available :- Problem of Drainage facility,
3 PRA MORUKA 15-03-2012
54 Facilities Not Available :- Problem of Drainage facility
4 PRA SURVA 7-12-2011 58
Facilities Not Available :- Problem of Drainage facility
5 PRA VADLA 10-10-2011 48
Facilities Not Available :-Problem of Cause way repairing, Drainage
facility, Protection wall, Pipeline facility, pump room repairing,
Note:
1. After this table, add the problem tree analysis
2. Then add the object tree analysis
Table no. 32.1: Watershed Committee details for DHAVA
Sl. No.
Names of WCs
Date of Registrati
on as a Society
(dd/mm/ yyyy)
Designation
M/F
SC ST
SF MF LF Land-less
UG SHG
GP Any other
Educa-tional qualifi-cation
Function/s assigned#
1 HARSUKHBHAI M.GADHESARIYA
Gujarat/3
372/JND
DT.24/2/2
012
President M - - Y SECONDARY B,E
2 MANISHABEN A. PANDYA
Secretary F - - Y primary A
3 KANCHANBEN N. PARMAR
Member F Y - Y primary A
4 VIJAYBHAI K. KANERIYA
Member M - - - Y primary H
5 JYOTSANABEN V.KANERIYA
Member F - - Y primary B
6 LALJIBHAI M. SAVLIYA
Member M - - Y - H
7 HARIBHAI R. MAKWANA
Member M - - Y primary G
8 ROHIT A. VISAVADIA
WDT M - - ITI SURV. B,E
9 MULJIBHAI B.SUTRAIYA
Member M - - Y primary C,F
10 MINAXIBEN V. DALSANIYA
Member F - - Y Y - E,D
11 LAXMIDAS G. AGHERA
Member M - - Y primary I,G
Table no. 32.2: Watershed Committee details for HADMATIYA
Sl. No. Names of WCs
Date of Registration as a Society (dd/mm/
yyyy)
Designation M/F SC ST
SF MF LF
Land-less
UG
SHG GP
Any
other
Educa-tional
qualifi-cation
Function/s assigned#
1 BALKRUSHNA C.VAIDH
Gujarat/3372/
JND
DT.24/2/2012
President M - - - Y - - B.S.A.M.
2 AASHRAFBHAI U.THAKARIYA Secretary M - - - - Y B.S.A.M.
3 NITABEN S. CHUDASAMA Member F - - - Y - - SECONDARY
4 VAJUBHAI R. RATHOD Member M - - Y - - - Primary
5 SAMINABEN V.BAJRANI Member F Y - - - - Y Primary
6 VIJYABEN M.MAHIDA Member F - Y Y - - - M.A.
7 HAJABHAI P.KATODIYA Member M - - - - Y - Primary
8 ROHIT A. VISAVADIA WDT - - - - - - ITISURV.
9 KANTABEN N.SHINGALA Member F - - - - Y - Primary
10 HARIBHAI M. BHANDERI Member M - - Y - - - Primary
11 NGAJANBHAI T.VADHER
Member M - - - Y - -
Primary
Table no. 32.3: Watershed Committee details for MORUKA
Sl. No.
Names of WCs
Date of Registration as a Society (dd/mm/
yyyy)
Designation
M/F SC ST SF MF LF Land-less
UG SHG GP
Any other
Educa-tional
qualifi-cation
Function/s assigned#
1 HEMANTBHAI H.MANDAVIYA
Gujarat/339
3/JND
DT.23/5/20
12
President M Y
2 SURESHBHAI H. BHALODIYA
Secretary M Y
3 CHANDABEN J.PADHADAR
Member F Y
4 HARSUKHBHAI G.BHALODIYA
Member M Y
5 VALLABHBHAI M. CHOTHANI
Member M Y
6 RASILABEN S.GOHEL
Member F Y
7 ARJANBHAI C.MAKWANA
Member M Y
8 KALUBEN R.VALA
Member F Y Y
9 BHAGVANBHAI J.BUDA
Member M Y
10 BHAVNABEN J.VADODARIYA
Member F Y
11 ROHIT A. VISAVADIA WDT M Y Y ITISURV.
Table no. 32.4: Watershed Committee details for SURVA
Sl. No.
Names of WCs
Date of Registration as a Society (dd/mm/
yyyy)
Designation
M/F SC ST SF MF LF
Land-
less UG SHG
GP
Any other
Educa-tional
qualifi-cation
Function/s assigned#
1 HARESHBHAI N. AKABARI
Gujarat/3373
/JND
DT.24/2/201
2
President M Y
SECONDARY
2 HARESHBHAI R.AASHODARIYA
Secretary M Y
3 JAGDISHBHAI M. AKABARI
Member M Y primary
4 DYABEN J. NASIT
Member F Y primary
5 NAYNABEN S. NASIT
Member F Y primary
6 GULMAMAD U.DARJADA
Member M Y primary
7 HIRABHAI M. GADHESARIYA
Member M Y primary
8 RENISHBHAI KASUNDRA
Member M Y Y DCE
9 MALTIBEN H.RAVAL
Member F primary
10 MAGANLAL H. RAVAL
Member M Y primary
11 JAYASHREEBEN M.SIDDHPARA
Member F Y primary
12 ROHIT A. VISAVADIA
WDT ITISURV.
Table no. 32.5: Watershed Committee details for VADLA
Sl. No. Names of WCs
Date of Registration as
a Society (dd/mm/ yyyy)
Designation
M/F
SC ST SF MF LF Land-less
UG
SHG
GP
Any
other
Educa-tional
qualifi-cation
Function/s
assigned#
1 Kadubhai H. Solanki
Gujarat/3374/J
ND
DT.24/2/2012
President M
2 Vijaybhai M. Dhamesariya
Secretary M
3 Manuben M. Magzul
Member F
4 Rameshbhai H. Koyani
Member M
5 Urmilaben V. Khara
Member F
6 Hansaben G. Mahida
Member F
7 Sakinaben M. Makwana
Member F
8 Devdharbhai G. Aasodariya
Member M
9 Ukabhai Ajudiya
Member M
10 Renishbhai Kasundra
WDT M
11 Budiben S. Vasenga
Member F
12 Dinubhai Sabera Darjada
Member M
# Only the letter assigned, as below, needs to be typed, except for `J’, where the type may be specifically mentioned. A. PNP and PRA B. Planning C. Maintenance of Accounts D. Signing of cheques and making payments E. Supervision of construction activities F. Cost Estimation G. Verification & Measurement H. Record of labour employed I. Social Audit J. Any other (please specify).
Table no. 33: SHG detail
Sr. No.
Name of Village
Total no. of Registered SHGs No. of Members No. of SC/ST in each
Category No. of BPL in each
Category
With only Men
With only
Women
With both
Total Categories M F Total M F Total M F Total
(i)Landless 39 8 47 24 2 26 28 2 30
1 DHAVA 5 1 1 7 (ii) SF 10 5 15
(iii) MF 14 0 14
(iv) LF 2 2
(i)Landless 0 13 0 10 0 10
2 HADMATIYA 2 1 1 4 (ii) SF 15 5 20
(iii) MF 5 5
(iv) LF 2 2
(i)Landless 20 18 38 10 10 20 10 10 20
3 MORUKA 3 2 2 7 (ii) SF 22 5 27
(iii) MF 1 4 5
(iv) LF
(i)Landless 15 20 35 5 5 10 5 5 10
4 SURVA 4 2 1 7 (ii) SF 18 4 22
(iii) MF 12 1 13
(iv) LF
(i)Landless 15 10 25
5 VADLA 2 2 1 5 (ii) SF 7 5 12
(iii) MF 11 1 12
(iv) LF 1 1
(i)Landless 8 4 12
Total 19 9 9 37 0 258 121 366 44 39 73 46 31 67
Table no. 34: UG detail
S. No. Name of Village Total no. of UGs No. of Members
No. of SC/ST in each Category
No. of BPL in each Category
Men Women Both Total Categories M F Total M F Total M F Total
1
DHAVA
07 0 0 7
(i)Landless 0 0 0 20 0 20 0 0 0
(ii) SF 40 0 40 12 0 12 0 0 0
(iii) MF 16 0 16 5 0 5 0 0 0
(iv) LF 50 0 50 8 0 8 0 0 0
2
HADMATIYA
5 0 0 5
(i)Landless 0 0 0 0 0 0 0 0 0
(ii) SF 16 0 16 7 0 7 0 0 0
(iii) MF 13 0 13 0 0 0 0 0 0
(iv) LF 27 0 27 6 0 6 0 0 0
3
MORUKA
8 0 0 8
(i)Landless 0 0 0 0 0 0 0 0 0
(ii) SF 25 0 25 9 0 9 0 0 0
(iii) MF 10 0 10 5 0 5 0 0 0
(iv) LF 23 0 23 4 0 4 0 0 0
4
SURVA
12 0 0 12
(i)Landless 0 0 0 0 0 0 0 0 0
(ii) SF 17 0 17 7 0 7 0 0 0
(iii) MF 15 0 15 4 0 4 0 0 0
(iv) LF 26 0 26 0 0 0 0 0 0
5 VADLA 6 0 0 6
(i)Landless 0 0 0 0 0 0 0 0 0
(ii) SF 12 0 12 3 0 3 0 0 0
(iii) MF 8 0 8 2 0 2 0 0 0
(iv) LF 17 0 17 1 0 1 0 0 0
Total 45 00 00 45 356 0 356 95 0 95 0 0 0
Table no.35: Entry point activities (EPA) (All financial figures in lakh Rs.)
S. No. Names of Villages Amount earmarked for EPA Entry Point Activities
planned Estimated cost
Expected
outcome
1
DHAVA
CAUSE WAY -01 3.95 -
CAUSE WAY -02 3.80 -
PROTECTION WALL -01 0.83 -
PROTECTION WALL -02 1.15 -
2 HADMATIYA
CAUSE WAY -01 2.74 -
CAUSE WAY -02 0.87 -
CAUSE WAY -03 1.08 -
WATER PIPE LINE 0.91 -
WASHING GHAT 1.26 -
OPEN WELL COVER 1.00 -
5 MORUKA CAUSE WAY -01 3.77 -
ROOF AT HAVADA -
4 SURVA
OPEN WELL COVER -01 0.60 -
OPEN WELL COVER - 02 0.47 -
CAUSE WAY -01 3.00 -
3 VADLA CAUSE WAY -01 3.80 -
PUMP ROOM REPAIRING 0.68 -
Table no.36.1: Details of ridge line treatment / land based activities in watershed works*
SR. No.
Village name
Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl. specify)
No. of units (No./ cu.m./
rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
1 DHAVA
FARM Bunding -- -- YES YES -- -- 8000Rmt. 16.00
PASTURE Devlopment -- -- YES -- YES -- 13 HA. 13.00
Wire Fencing with afforestation -- -- YES YES -- -- 4000 Rmt. 12.00
Land Leveling -- -- YES YES -- -- 20 HA. 8.00
Loose boulder -- -- YES -- YES -- 175 NOS. 12.50
Coutour trenches -- -- YES -- YES -- 200 Rmt. 0.50
Total
(M – Materials, W- wages, O- others, T – Total)
Table no.36.2: Details of ridge line treatment / land based activities in watershed works*
SR. No.
Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
2 HADMATIYA
FARM Bunding -- -- YES YES -- -- 8000Rmt. 16.00
PASTURE Development -- -- YES -- YES -- 13 HA. 13.00
Field outlet -- -- YES YES -- -- 3 NOS. 0.30
Land Levelling -- -- YES YES -- -- 20 HA. 8.00
Loose boulder -- -- YES -- YES -- 250 NOS. 19.00
Total
(M – Materials, W- wages, O- others, T – Total)
Table no.36.3: Details of ridge line treatment / land based activities in watershed works*
SR. No.
Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
3 MORUKA FARM Bunding -- -- YES YES -- -- 6000Rmt. 12.00
Field outlet -- -- YES YES -- -- 6 NOS. 0.60
Total
(M – Materials, W- wages, O- others, T – Total)
Table no.36.4: Details of ridge line treatment / land based activities in watershed works*
SR. No.
Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
4 SURVA
FARM Bunding -- -- YES YES -- -- 1000Rmt. 2.00
PASTURE Development -- -- YES -- YES -- 13 HA. 13.00
Loose boulder -- -- YES -- YES -- 90 NOS. 6.60
Total
(M – Materials, W- wages, O- others, T – Total)
Table no.36.5 Details of ridge line treatment / land based activities in watershed works*
SR. No.
Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
5 VADLA
FARM Bunding -- -- YES YES -- -- 7000Rmt. 14.00
PASTURE Development -- -- YES -- YES -- 2 HA. 2.00
Field outlet -- -- YES YES -- -- 20 NOS. 2.00
Land Levelling -- -- YES YES -- -- 22 HA. 8.80
Loose boulder -- -- YES -- YES -- 99 NOS. 7.60
Total
(M – Materials, W- wages, O- others, T – Total
Table no.37.1: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
Area to be irrigated
(ha)
Storage capacity
Estimated cost
1 DHAVA
Check dam -- -- -- -- 2 -- -- 8.00 -- -- 8.00
Cause way cum check dam
-- -- -- -- 6 -- -- 22.30 -- -- 22.30
paka plug -- -- -- -- 1 -- -- 1.00 -- -- 1.00
Farm pond -- -- -- -- 10 -- -- 4.00 -- -- 4.00
Deepening of pond -- -- -- -- 1 -- -- 3.10 -- -- 3.10
Repairing of check dam
-- -- -- -- 4 -- -- 5.30 -- -- 5.30
De-siltation of check dam
-- -- -- -- 7 -- -- 5.50 -- -- 5.50
Total
Table no.37.2: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
Area to be irrigated
(ha)
Storage capacity
Estimated cost
2 HADMATIYA
Check wall -- -- -- -- 2 -- -- 1.70 -- -- 1.70
Check dam -- -- -- -- 2 -- -- 8.00 -- -- 8.00
Cause way cum check dam
-- -- -- -- 4 -- -- 12.70 -- -- 12.70
paka plug -- -- -- -- 4 -- -- 5.00 -- -- 5.00
Deepening of pond -- -- -- -- 5 -- -- 10.20 -- -- 10.20
Repairing of check dam
-- -- -- -- 5 -- -- 6.55 -- -- 6.55
De-siltation of check dam
-- -- -- -- 6 -- -- 4.50 -- -- 4.50
Total
Table no.37.3: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
Area to be irrigated
(ha)
Storage capacity
Estimated cost
3 MORUKA
Protection wall -- -- -- -- 1 -- -- 1.60 -- -- 1.60
Check wall -- -- -- -- 3 -- -- 2.90 -- -- 2.90
Check dam -- -- -- -- 2 -- -- 6.50 -- -- 6.50
Cause way cum check dam
-- -- -- -- 2 -- -- 7.80 -- -- 7.80
Farm pond -- -- -- -- 2 -- -- 1.00 -- -- 1.00
Deepening of pond -- -- -- -- 1 -- -- 4.00 -- -- 4.00
Repairing of check dam -- -- -- -- 9 -- -- 9.70 -- -- 9.70
De-siltation of check dam
-- -- -- -- 9 -- -- 7.35 -- -- 7.35
Cause way repairing -- -- -- -- 1 -- -- 1.90 -- -- 1.90
Total
Table no.37.4: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
Area to be irrigated
(ha)
Storage capacity
Estimated cost
4 SURVA
Check dam -- -- -- -- 3 -- -- 11.10 -- -- 11.10
Cause way cum check dam
-- -- -- -- 4 -- -- 14.30 -- -- 14.30
paka plug -- -- -- -- 2 -- -- 2.40 -- -- 2.40
Farm pond -- -- -- -- 3 -- -- 1.40 -- -- 1.40
Diversion drainage line in waste land
-- -- -- -- 600 rmt.
-- -- 2.00 -- -- 2.00
Deepening of pond -- -- -- -- 2 -- -- 4.00 -- -- 4.00
Repairing of check dam
-- -- -- -- 3 -- -- 2.90 -- -- 2.90
De-siltation of check dam
-- -- -- -- 6 -- -- 3.10 -- -- 3.10
Total
Table no.37.5: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
Area to be irrigated
(ha)
Storage capacity
Estimated cost
5 VADLA
Check wall -- -- -- -- 2 -- -- 1.60 -- -- 1.60
Gally plug -- -- -- -- 3 -- -- 0.30 -- -- 0.30
Check dam -- -- -- -- 1 -- -- 3.90 -- -- 3.90
Cause way cum check dam
-- -- -- -- 6 -- -- 22.40 -- -- 22.40
paka plug -- -- -- -- 5 -- -- 6.30 -- -- 6.30
Farm pond -- -- -- -- 5 -- -- 2.50 -- -- 2.50
Repairing of checkdam
-- -- -- -- 4 -- -- 3.70 -- -- 3.70
De-siltation of check dam
-- -- -- -- 4 -- -- 2.80 -- -- 2.80
Total
Table no.38.1: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Name of Villages
Type of structures
Proposed target
Augmentation/ repair of existing recharging structures
Construction of new recharging structures
Total target
No. Area to be
irrigated (ha) Estimated
cost No.
Area to be irrigated (ha)
Estimated cost
Area to be irrigated (ha)
Estimated cost
1 DHAVA
Percolation bore -- -- -- 18 -- 9.90 -- 9.90
Connection diversion drainage line -- -- -- 600 rmt.
-- 4.00 -- 4.00
Total
Table no.38.2: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Name of Villages
Type of structures
Proposed target
Augmentation/ repair of existing recharging structures
Construction of new recharging structures
Total target
No. Area to be
irrigated (ha) Estimated
cost No.
Area to be irrigated (ha)
Estimated cost
Area to be irrigated (ha)
Estimated cost
2 HADMAIYA Percolation bore -- -- -- 16 -- 8.80 -- 8.80
Dug well recharge -- -- -- 2 -- 0.80 -- 0.80
Total
Table no.38.3: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Name of Villages
Type of structures
Proposed target
Augmentation/ repair of existing recharging structures
Construction of new recharging structures
Total target
No. Area to be
irrigated (ha) Estimated
cost No.
Area to be irrigated (ha)
Estimated cost
Area to be irrigated (ha)
Estimated cost
3 MORUKA Percolation bore -- -- -- 18 -- 9.90 -- 9.90
Dug well recharge -- -- -- 5 -- 2.00 -- 2.00
Total
Table no.38.4: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Name of Villages
Type of structures
Proposed target
Augmentation/ repair of existing recharging structures
Construction of new recharging structures
Total target
No. Area to be
irrigated (ha) Estimated
cost No.
Area to be irrigated (ha)
Estimated cost
Area to be irrigated (ha)
Estimated cost
4
SURVA
Percolation bore -- -- -- 18 -- 9.90 -- 9.90
Dug well recharge -- -- -- 5 -- 2.00 -- 2.00
Mining recharge structure -- -- -- 400 rmt.
-- 2.00 -- 2.00
Total
Table no.38.5: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
Sr. No. Name of Villages
Type of structures
Proposed target
Augmentation/ repair of existing recharging structures
Construction of new recharging structures
Total target
No. Area to be
irrigated (ha) Estimated
cost No.
Area to be irrigated (ha)
Estimated cost
Area to be irrigated (ha)
Estimated cost
5 VADLA Percolation bore -- -- -- 8 -- 4.40 -- 4.40
Dug well recharge -- -- -- 6 -- 2.40 -- 2.40
Total
Table no.39: Details of activities related to livelihood, production system and micro-enterprises
S. No.
Name of village Name of activity
Type of land Executing
agency Target
(i) Private (ii)
Community (iii) Others (pl. specify)
(i) UG (ii)SHG
(iii) Others (pl. specify)
Estimated cost
(Rs. in lakh)
Expected month & year of completion
(mm/yyyy)
Agriculture productivity enhancement - Comm. - SHG 7.72 2012-13
- - - - -
Agro-processing - Comm. - SHG 3.30 2012-13
- - - - -
Animal Husbandry/ dairy development - Comm. - SHG 3.30 2013-14
- - - - - -
Handicraft - - - - - -
- - - - - -
Ecotourism - - - - - -
- - - - - -
Minor Activities- upto maximum 10% of Total Livelihood funds
- Comm. - SHG 2.97 2012-13
Note:
1. Please provide the list of works and names of beneficiaries in the annexure
2. Ensure that 10% of the total project funds go to the assetless- give separate list in the annexure
Table no. 40: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas Sr. No. Names of Major activities of the SHGs
Villages Name of activity No. of SHGs involved Average annual income from activity per SHG
1
DHAVA
Mandap Service 1 30000.00
Ground Nut Expeller Machuine 1 25000.00
Animal Nutrition Selling Unit 1 50000.00
Poetry Farm 1 50000.00
Senting Mixchar Machine 1 40000.00
Agro Shop 1 45000.00
Masala Making Unit 1 20000.00
2 HADMATIYA
Masala Mill 1 30000.00
Ground Nut Expeller Machuine 1 25000.00
Animal Nutrition Selling Unit 1 50000.00
Agro Shop 1 50000.00
3
MORUKA
Masala Mill 1 30000.00
Ground Nut Expeller Machuine 1 25000.00
Wheat Grading Machine 1 20000.00
Grain Bank 1 30000.00
Agro Shop 1 50000.00
Animal Nutrition Selling Unit 1 60000.00
Senting Mixchar Machine 1 40000.00
4
SURVA
Masala Mill 1 30000.00
Agro Shop 1 40000.00
Animal Nutrition Selling Unit 1 50000.00
Catering Unit 1 25000.00
Groundnut Greading Unit 1 100000.00
Groundnut Explorer Machine 1 35000.00
5
VADALA Mandap Service 1 25000.00
Agro Shop 1 30000.00
Ground Nut Expeller Machine 1 25000.00
Animal Nutrition Seling Unit 1 40000.00
Total 1269000.00
Table no. 41: Linkages developed at village level
Sr. No. Village Name of activity Forward/Backward linkage Linkage with Outcome
1 DHAVA - - - -
2 HADMATIYA - - - -
3 MORUKA - - - -
4 SURVA - - - -
5 VADLA - - - -
Table no.42-1: Details of activities connected with vegetative cover in watershed works
S. No.
Name of village Name of
structure/ work
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
(i) UG (ii)SHG
(iii) Others (pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of completion (mm/ yyyy)
1 DHAVA
Afforestation 3ha - L Community - SHG 3 ha 100 1.50 2013-14
Regeneration - - - - - - - - - - -
Agro-forestry - - - - - - - - - - -
Fuel wood - - - - - - - - - - -
Fodder - - - - - - - - - - -
Horticulture - - - - - - - - - - -
Pasture dev. 8 ha - L Community _ SHG 8 ha 50 8.00 2013-14
Nursery raising - - - - - - - - - - -
Others (pl. specify)
Table no.42-2: Details of activities connected with vegetative cover in watershed works
S. No.
Name of village Name of
structure/ work
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
(i) UG (ii)SHG
(iii) Others (pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of completion (mm/ yyyy)
2 HADMATIYA
Afforestation 2 ha - L Community - SHG 2 ha 100 1.50 2012-13
Regeneration - - - - - - - - - - -
Agro-forestry - - - - - - - - - - -
Fuel wood - - - - - - - - - - -
Fodder - - - - - - - - - - -
Horticulture - - - - - - - - - - -
Pasture dev. 3 ha - L _ Community - SHG 3 ha 1000 2.50 2012-13
Nursery raising - - - - - - - - - - -
Others (pl. specify)
- - - - - - - - - - -
Table no.42-3: Details of activities connected with vegetative cover in watershed works
S. No.
Name of village Name of
structure/ work
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
(i) UG (ii)SHG
(iii) Others (pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of completion (mm/ yyyy)
3 MORUKA
Afforestation 7 ha - L - Community - Others 7 ha 150 3.50 2012-13
Regeneration - - - - - - - - - - -
Agro-forestry - - - - - - - - - - -
Fuel wood - - - - - - - - - - -
Fodder - - - - - - - - - - -
Horticulture - - - - - - - - - - -
Pasture dev. 8 ha - L _ Community - Others 8 ha 250 8.00 2013-14
Nursery raising - - - - - - - - - - -
Others (pl. specify)
- - - - - - - - - - -
Table no.42-4: Details of activities connected with vegetative cover in watershed works
S. No.
Name of village Name of
structure/ work
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
(i) UG (ii)SHG
(iii) Others (pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of completion (mm/ yyyy)
4 SURVA
Afforestation 3 ha - L _ Community - Others 3 ha 50 1.00 2013-14
Regeneration - - - - - - - - - - -
Agro-forestry - - - - - - - - - - -
Fuel wood - - - - - - - - - - -
Fodder - - - - - - - - - - -
Horticulture - - - - - - - - - - -
Pasture dev. 6 ha - L _ Community - Others 6 ha 200 5.50 2013-14
Nursery raising - - - - - - - - - - -
Others (pl. specify)
- - - - - - - - - - -
Table no.42-5: Details of activities connected with vegetative cover in watershed works
S. No.
Name of village Name of
structure/ work
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
(i) UG (ii)SHG
(iii) Others (pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of completion (mm/ yyyy)
5 VADLA
Afforestation 7 ha - L - Community - Others 7 ha 150 3.50 2012-13
Regeneration - - - - - - - - - - -
Agro-forestry - - - - - - - - - - -
Fuel wood - - - - - - - - - - -
Fodder - - - - - - - - - - -
Horticulture - - - - - - - - - - -
Pasture dev. 8 ha - L _ Community - Others 8 ha 250 8.00 2013-14
Nursery raising - - - - - - - - - - -
Others (pl. specify)
- - - - - - - - - - -
Table no.43: Details of activities in the CPRs in the project areas
Sr. No. Name(s) of the
Villages CPR Particulars Activity Proposed
Target
Target area under the activity (ha)
Estimated Expenditure (Rs.)
Expected no. of Beneficiaries
1 DHAVA
Affrorestion in Wast Land 3.00 1.50 All Villagers
Deepening of pond 2.00 4.88 All Villagers
Pasture Devlopment 8.00 8.00 All Villagers
Total for village - - -
2 HADMATIYA
Affrorestion in Wast Land 2.00 1.50 All Villagers -
Deepening of pond 2.00 2.10 30 Farmers
Pasture Devlopment 3.00 2.50 All Villagers
Total for village - - -
3 MORUKA
Affrorestion in Wast Land 7 ha 3.50 All Villagers
Deepening of pond 1.00 3.00 25 Farmers
Pasture Devlopment 8 ha 8.00 All Villagers
Total for village - - -
4 SURVA
Affrorestion in Wast Land 2.00 1.20 All Villagers
Deepening of pond 2.00 2.00 All Villagers
Pasture Devlopment 1.50 1.50 All Villagers
Total for village - -
5 VADLA
Affrorestion in Wast Land 0.50 0.50 All Villagers
Deepening of pond 1.00 2.00 25 Farmers
Pasture Devlopment 1.50 1.50 All Villagers
Total for village - - -
Table no. 44: Capacity Building Institution:
S. No. Name of the
Training Institute
Full Address with contact no., website &
Type of Institute#
Area(s) of speciali-zation$
Accredita-tion details
Trainings
Reference Year No. of trainings
assigned No. of trainees to be trained
1
Junagadh Agriculture University
junagadh Agriculture - - - Soil
Conversation
2
Krushi Vigyan Kendra,
Junagadh
junagadh Agriculture - - -
Better Farming practices
3 SPIPA - - - - - - -
4 BISAG,
Gandhinagar Gandhinagar GIS - - -
GIS In Planning
6
5 AKRSP,I Saila - - - -
Participatory Methods in
Planning and Implementation of Watershed
Project
5
Table no. 45: Capacity Building plan:
S. No. Name of the
Training Institute
Full Address with contact no., website &
Type of Institute#
Area(s) of speciali-zation$
Accredita-tion details
Trainings
Reference Year No. of trainings
assigned No. of trainees to be trained
1 Junagadh junagadh Agriculture - - - Soil
Agriculture University
Conversation
2
Krushi Vigyan Kendra,
Junagadh
junagadh Agriculture - - -
Better Farming practices
3 SPIPA - - - - - - -
4 BISAG,
Gandhinagar Gandhinagar GIS - - -
GIS In Planning
6
5 AKRSP,I Saila - - - -
Participatory Methods in
Planning and Implementation of Watershed
Project
5
Table no.46: Information, Education and Communication Activities:
Sr. No. Activity Executing Agency Estimated expenditure (Rs.) Outcome
(may quantify, wherever possible)
1 Street Play
Local artists 0.50
Awareness for water conservation and sanitation as well as employment and
motivation
2 Banners & Hoardings
PIA 0.90
3 Wall paintings PIA
1.10
4 Video Show PIA
1.25
5 Posters PIA
1.55
6 School Programmes PIA
0.50
Table no. 47: Budget at a glance for the project
Sr. no. Budget component Cost requirement 1 Administrative costs 83.605
2 Monitoring 8.3605
3 Evaluation 8.3605
4 Entry Point activity 33.442
5 Institution and Capacity Building 41.8025
6 Detailed Project Report 8.3605
7 Watershed Development Works 468.188
8 Livelihood activities for asset less 83.605
9 Production systems and micro-enterprises 75.2445
10 Consolidation phase 25.0815
TOTAL 836.05
Table no. 48: Village wise- component wise budget available under IWMP Sr.
no. Village
Activity
EPA Institution
and CB
DPR Watershed
development
Work
Livelihood
for asset
less
Production
system and
Microenterprises
Consolidation Total
1 DHAVA 8.93 11.17 2.23 125.08 22.34 20.10 6.70 196.55
2 HADMATIYA 8.18 10.23 2.05 114.54 20.45 18.41 6.14 180.00
3 MORUKA 4.80 6.00 1.20 67.24 12.00 10.81 3.60 105.65
4 SURVA 5.47 6.84 1.37 76.63 13.68 12.32 4.11 120.42
5 VADLA 6.05 7.56 1.51 84.70 15.13 13.61 4.54 133.1
TOTAL 33.43 41.8 8.36 468.19 83.60 75.25 25.09 735.72
Table no. 49: Village wise gap in funds requirement
Sr.
No.
Village Total cost requirement Total funds available
under IWMP
Gap in funds
requirement 1 DHAVA - - -
2 HADMATIYA - - -
3 MORUKA - - -
4 SURVA - - -
5 VADLA - - -
TOTAL - - -
Table no.50: Details of Convergence of IWMP with other Schemes
Sr. No. Village Phase/Type of
Work Activity to be
carried out
Fund made available to
IWMP due to convergence (Rs.
in lakh)
Scheme with which convergence took
place Reference no. of activity/ task/
structure in DPR
Level at which decision for
convergence was taken
1 DHAVA Watershed
Development Work
Lake Deepening 4.00 MGNREGA - -
2 HADMATIYA Livelihood Masala Mill 0.30 Mission Mangalam
3 MORUKA - - - - - -
4 SURVA
Livelihood Ground nut
Grading Unit 12.50 Mission Mangalam
Watershed Development
Work Lake Deepening 4.00 MGNREGA - -
5 VADLA Livelihood Mandap Service
Unit 0.70 Mission Mangalam
Total - - - - - -
*Phase/Type of work: EPA, Land base, Surface water, Ground water, Livelihood
Table no. 51: Public-Private Partnership in the IWMP projects (Not applicable)
S. No. Name of Private Sector Partner
Agency
Type of agreement signed Financial contribution Partnership
Interventions Expected Outcomes
Comments a)MoU b)Contract
c) Any other (pl. specify)
IWMP Private sector
1 - - - - - - -
2 - - - - - - -
3 - - - - - - -
4 - - - - - - -
5 - - - - - - -
OUTCOMES
Table no.52: Environmental Benefits
Sr.
No. Village
Soil loss
(tonne/ha.)
Water storage
(Cmt) Ground water table (mt) Tree cover
Pre-project
Expected post-project
Pre-project
Expected post-project
Open well: pre-project
Open well: post-project
Bore well: pre-project
Bore well: post-project
Area in Ha.: pre- project
Area in Ha.: post-project
Tree count: pre-project
Tree count: post-project
1 14 11 16 18 15.75 18 9.5 10 4.3 7 250 600
2 15 12 15.5 17.5 15 17.5 8.75 9 4 8 325 700
3 15 12 15 17 13.75 15.5 8 8.5 2.5 5.5 450 850
4 16 14 14.5 16.5 14.5 16 8.5 9 3.5 6 425 750
5 15.5 13.5 12 14.5 14.75 16.5 8.75 9.5 3 7 170 300
Table no. 53: Status of Drinking water
Sr.
No.
Names of
Villages
Availability of drinking water
(no. of months in a year) Quality of drinking water
Comments
Pre-project Expected Post project Pre-project Expected Post-project
1 DHAVA 12 12 Potable Potable -
2 HADMATIYA 12 12 Potable Potable -
3 MORUKA 12 12 Potable Potable -
4 SURVA 12 12 Potable Potable -
5 VADLA 12 12 Potable Potable -
Table no. 54:Crop area and yield in the project area
Sr. No.
Name of village Name of
crops
Pre-project Expected Post-project
Area (ha)
Production in Qtl Average Yield (Qtl) per
ha. Area (ha)
Production in Qtl
Average Yield per ha (qtl)
IWMP-11
Kharif 587.87 1363975.97 2320.2 600 1401000 2335
Rabi 402.29 890191.335 2212.81 415 919225 2215
Zaid 0.81 500.6205 618.05 625 390625 625
Village total 990.97 2254667.93 5151.06 1640 2710850 5175
Project total
Table no. 55: Area under horticulture / other crops S. No. Name of Village Crop Existing area under the crop Area post project
1 DHAVA Lemon, Mango, Chikoo 8.00 10.50
2 HADMATIYA Coconut, Lemon, Mango 6.75 8.75
3 MORUKA Mango, Awala, Chikoo 5.25 8.00
4 SURVA Lemon, Mango, Awala 4.00 6.25
5 VADLA Coconut, Lemon, Mango 6.50 9.00
Table no. 56: Details of livestock in the project areas (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.)
Sr. No. Name of Village Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
1 DHAVA Milk-animals 319 638 12760.00 319 650 13000.00 -
Draught Purpose animals 209 - - 209 - - -
Animals for other purpose 78 - - 78 - - -
2 HADMATIYA
Milk-animals 114 228 4560.00 114 240 4800.00 -
Draught Purpose animals 103 - - 103 - - -
Animals for other purpose 28 - - 28 - - -
3 MORUKA
Milk-animals 1183 2276 45520.00 1183 2300 46000.00 -
Draught Purpose animals 438 - - 438 - - -
Animals for other purpose 42 - - 42 - - -
4 SURVA
Milk-animals 222 432 8640.00 222 440 8800.00 -
Draught Purpose animals 116 - - 116 - - -
Animals for other purpose 111 - - 111 - - -
5 VADLA
Milk-animals 102 200 4000.00 102 220 4400.00 -
Draught Purpose animals 65 - - 65 - - -
Animals for other purpose 73 - - 73 - - -
Table no. 57: Employment to be supplemented in the Project area:
S. NO.
Names of Villages
Wage employment Self employment
No. of mandays No. of beneficiaries No. of beneficiaries
SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total
1 DHAVA 250 50 500 150 950 25 5 50 15 95 25 5 50 15 95
2 HADMATIYA - 250 700 200 1150 - 30 70 20 120 - 25 55 10 90
3 MORUKA - - 500 200 700 - - 50 20 70 - - 50 20 70
4 SURVA 70 50 300 100 520 20 50 30 10 110 15 25 10 10 60
5 VADLA 40 60 400 100 600 20 25 60 15 120 20 20 35 20 95
Table no. 58: Seasonal migration from Project area Sl. No. Names of villages No. of persons migrating No. of days per year of migration
Pre-project Expected post project Pre-project Expected post project
1 DHAVA 7 5 195 95
2 HADMATIYA 5 2 200 110
3 MORUKA 12 6 130 75
4 SURVA 9 5 225 105
5 VADLA 2 1 195 90
Table no.59: Per capita Income
Sr. No. Village Source of Income Pre-project Expected post project
DHAVA Agriculture 12000.00 12500.00
Forestry 0.00 0.00
Animal Husbandry 8000.00 8500.00
Casual Labour 10000.00 12000.00
Services 10000.00 10000.00
Handicraft 0.00 0.00
Business 7200.00 7200.00
Others 8000.00 8500.00
Total 55200.00 58700.00
Sr. No. Village Source of Income Pre-project Expected post project
HADMATIYA Agriculture 11500.00 12300.00
Forestry 0.00 0.00
Animal Husbandry 7800.00 8300.00
Casual Labour 9500.00 10300.00
Services 10000.00 10000.00
Handicraft 0.00 0.00
Business 7500.00 7800.00
Others 8000.00 8500.00
Total 54300.00 57200.00
Sr. No. Village Source of Income Pre-project Expected post project
MORUKA Agriculture 12300.00 12700.00
Forestry 0.00 0.00
Animal Husbandry 8800.00 9200.00
Casual Labour 10200.00 12000.00
Services 9000.00 9000.00
Handicraft 0.00 0.00
Business 7500.00 7700.00
Others 8200.00 8600.00
Total 56000.00 59200.00
Sr. No. Village Source of Income Pre-project Expected post project
SURVA Agriculture 11500.00 12300.00
Forestry 0.00 0.00
Animal Husbandry 7800.00 8300.00
Casual Labour 9500.00 10300.00
Services 10000.00 10000.00
Handicraft 0.00 0.00
Business 7500.00 7800.00
Others 8000.00 8500.00
Total 54300.00 57200.00
Sr. No. Village Source of Income Pre-project Expected post project
VADLA Agriculture 11000.00 11500.00
Forestry 0.00 0.00
Animal Husbandry 0.00 0.00
Casual Labour 9000.00 11000.00
Services 10000.00 10000.00
Handicraft 0.00 0.00
Business 7000.00 7300.00
Others 7500.00 8000.00
Total 44500.00 47800.00
Table no. 60: Backward-Forward linkages S. No. Project Type of Marketing Facility Pre-project (no.) During the project (no.) Post-project (no.)
Backward linkages 0 0 0
Seed certification 03 03 0
Seed supply system 02 02 02
Fertilizer supply system 04 04 06
Pesticide supply system 06 06 06
Credit institutions 8 8 10
Water supply 0 0 0
Extension services 04 04 32
Nurseries 04 04 05
Tools/machinery suppliers 0 0 0
Price Support system 253 253 120
Labour 0 0 0
Any other (please specify)
Forward linkages 25 25 30
Harvesting/threshing machinery 00 01 01
Storage (including cold storage) 01 01 01
Road network 0 0 0
Transport facilities 0 0 0
Markets / Mandis 03 03 05
Agro and other Industries 07 07 07
Milk and other collection centres 0 0 0
Labour 0 0 0
Any other (please specify)