cy 2018 annual investment program (aip) amount (in …
TRANSCRIPT
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
I. Economic Services 3,100.00 5,400.00 8,500.00 6,000.00 - Mga proyekto upang
mapaunlad at mapaganda
ang transportansyon
patungkol sa Agrikultura ng
Brgy. Alcala
Certified Seeds MEO/PEO/NGA January OctoberPurchased 500kls. Climate
resilient Certified seeds
MLGU/PLG
U/NGA500.00 - 500.00 500.00
A114-03
Farmers Assistance MEO/PEO/NGASeptember December 100 Farmers BenefitedMLGU/PLG
U/NGA300.00 - 300.00
Gravelling Farm to Market road Barangay January MayGravelled FTMR 1,500
meters
MLGU/PLG
U/NGA500.00 500.00
Improvement of Brgy. Road Re-
GravellingBarangay May October
Improved Brgy. Road - 1,500
meters
MLGU/PLG
U/NGA200.00 - 200.00
Concreting farm to market road
(alcala to cab. East)Barangay January December
2 kms. All weather concreted
FTMR
MLGU/PLG
U/NGA5,000.00 5,000.00 5,000.00
A634-04
Brgy. Road Re- Gravelling
Purok 1 to 3Barangay January December all weather road PLGU 500.00 - 500.00 500.00
A414-04
Construction/Improvement of
Farm to Market RoadBarangay January December
Constructed Farm to Market
Road (Alcala-Cab. West)PLGU 400.00 400.00
LIVELIHOOD PROGRAM
Makatulong sa kabuhayan na
mga ka-brgy. Sa Alcala
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
BARANGAY ALCALA
Page 1
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Tulong puhunan Barangay January September 50 kalip/membersMLGU/PLG
U200.00 - 200.00
Hog Raising Dispersal Barangay January April 50 kababaihanMLGU/PLG
U/DA200.00 - 200.00
Goat Dispersal Barangay January December 20 BeneficiariesMLGU/PLG
U/DA100.00 - 100.00
Carabao Dispersal Barangay January May 10 BeneficiariesIRA/DA/PL
GU/MLGU300.00 - 300.00
Cow Dispersal Barangay January May 10 BeneficiariesIRA/DA/PL
GU/MLGU300.00 - 300.00
II.SOCIALSERVICES 3,280.00 17,140.00 20,420.00 2,030.00 100.00
A.Health & Nutrition Services
Expansion of potable water
Supply systemBarangay Januaryt MLGU 200.00 200.00
Repair of Water system Barangay October November Repaired water system MLGU/IRA 50.00 - 50.00
Purchase of feeding materials Barangay January December Purchased feeding materialsMLGU/MOO
E/DSWD100.00 - 100.00
Construction of waiting shed Barangay May July1 Unit waiting shed
constructedIRA/MLGU 100.00 100.00
Repair & Maintenance of health
centerBarangay January February Repaired health center
MLGU/MOO
E/PLGU100.00 - 100.00
Construction of Line canal Barangay January May Constructed 500 meters
MLGU/PLG
U/20%
MOOE
200.00 200.00
Page 2
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Medical
EquipmentBarangay January
Purchased Medical
Equipment
MOOE/MLG
U50.00 50.00
Purchase of Medicines Barangay January Purchased Meedicines
5%
CF/MLGU/P
LGU
30.00 30.00
Construction of 2 storey Multi-
purpose HallBarangay January December
Constructed climate resilient
multipurpose hall
MLGU/PLG
U2,000.00 2,000.00 2,000.00
Purchase of Serice XLT Barangay July Purchased service vehicle PLGU/Nat'l. 1,000.00 1,000.00
Construction of Street light Barangay January December Constructed led bulb st. light MLGU 100.00 100.00 100.00
Refer & Maintenance of street
lightBarangay July August Repaired st light
MLGU/PLG
U/NGA60.00 - 60.00
Repair & Maintenance of
service XLTBarangay Repaired Vehicle MLGU 30.00 - 30.00
Repair & Maintenance of 2
storey Multi-purpose hall Barangay January
Repaired 2 storey
multipurpose hall30.00 - 30.00
B.Education Services -
Purchase of school lot Barangay January December Purchased school lot PEO/Nat'l. 1,000.00 1,000.00
Daycare services & School proj. Barangay January December Fund ProvidedMLGU/PLG
U50.00 50.00
Repair of Daycare center Barangay April May Repaired DCCMOOE/PLG
U100.00 - 100.00
C.Insfrastructure
Const.of Drainage canal Barangay January DecemberConctructed Drakinage Canal
1,500 meters
20%
CF/MLGU100.00 100.00
Page 3
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Brgy.Site Improvement Barangay January December Improved Brgy. SitePLGU/MLG
U500.00 500.00
Plaza improvement Barangay January May Improved PlazaIRA/MLGU/
PLGU100.00 100.00
Const. of Covered Court Barangay January May Constructed Covered Court PLGU/Nat'l. 5,000.00 5,000.00
Const. of Basketball Board(fiber
Glass)Barangay May June
Constructed Basketball Boad
(Fiber Glass)
20% CF
/PLGU100.00 100.00
Const. of flag pole Barangay January February Constructed Flag Pole IRA/PLGU 100.00 100.00
Const. of tanod out post Barangay January December Constructed Tanod Outpost20%
CF/PLGU100.00 100.00
Const. of SK Hall Barangay January December ConstructedIRA/PLGU/
Nat'l.500.00 500.00
Stage Improvement Barangay April June Improved Stage10%
SK/PLGU100.00 100.00
Const. of Public Toilet Barangay January MarchConstructed Pblic Toilet -3
Units
MLGU/PLG
U100.00 100.00
Const. of Flood Control Barangay January December Constructed Flood Contro;IRA/MLGU/
PLGU/Nat'l.1,000.00 1,000.00
Concreting of Brgy. Road Barangay January JuneConcreted Brgy. Road (Purok
1 to 3)
20%
DF/PLGU500.00 500.00
Maintenance of Basketball
courtBarangay January December Improved Basketball Court
MLGU/PLG
U200.00 - 200.00
Repair & Maint. Of Covered
courtBarangay January December Repaired Covered Court
MLGU/PLG
U200.00 - 200.00
Page 4
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const.of Day care center Barangay January December Constructed Day Care CenterMLGU/PLG
U1,000.00 1,000.00
Repair & Maint. Of SC Building Barangay January December Repaired SC Building MLGU 100.00 - 100.00
Repair & Maint. Of Public
BuildingBarangay January December Repaired Public Building
MLGU/PLG
U100.00 - 100.00
D.OSCA(SENIOR CITIZEN)
Purchase of Groceries Barangay January December Purchased Groceries
1%
SCF/MLGU/
PLGU/NGA
50.00 - 50.00
Kitchen Utensils Barangay October NovemberPurchased
Kettle,plate,glass,etc.
1%
SCF/MLGU/
PLGU/NGA
50.00 - 50.00
Senior Citizan day Barangay December Cristmas Party Conducted
1%
SCF/MLGU/
PLGU/NGA
50.00 - 50.00
Supplies & Materials Barangay January MayPurchased supplies &
Materials
1%
SCF/MLGU/
PLGU/NGA
50.00 - 50.00
Page 5
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Relief goods/Medicines/Burial Barangay January DecemberProvided Relief
Goods/Medicines/Burial
1%
SCF/MLGU/
PLGU/NGA
100.00 - 100.00
Maintenance of SC Hall Barangay January April Maintained SC
1%
SCF/MLGU/
PLGU/NGA
50.00 - 50.00
E. Youth Development
Sangguniang Kabataan
Services
Capital Outlay
Purchase of Cabinet Barangay March May Purchased 2 CabinetsPLGU/10%
SKF50.00 50.00
Purchase of Computer Set &
Internet ConnectionsBarangay March May
Purchased Computer Set &
Internet Connections
PLGU/10%
SKF100.00 100.00
Infrastracture Project
Construction of SK Hall Barangay January December Constructed SK Hal PLGU 1,000.00 1,000.00
Construction of Flag Pole Barangay January March Constructed Flag Pole PLGU 1,000.00 1,000.00
Construction of welcome Arc
SignBarangay January March
Constructed Welcome Arc
Signages
PLGU/10%
SKF50.00 50.00
Rehab of Brgy. Signages Barangay January March Rehabilitated Brgy. SignagesPLGU/10%
SKF50.00 - 50.00
Page 6
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Repair Maintenance of Sound
SystemBarangay May June
Repaired & Maintained
Sound System
PLGU/10%
SKF20.00 20.00 40.00
Construction of Basketball
Board (Fiber Glass) Barangay May June
Constructed Basketball
Board (Fiber Glass
PLGU/10%
SKF100.00 100.00
Construction of Tanod Outpost Barangay January February Constructed Tanod OutpostPLGU/10%
SKF100.00 100.00
Improvement of Road
RegravellingBarangay July August Improved Road Regravelling
PLGU/10%
SKF100.00 - 100.00
F. Gender and Development
1.Day Care Services
Supplies & Materials Barangay April MayPurchased Supplies &
MaterialsMLGU 15.00 - 15.00
Travelling Expenses Barangay January December Official Travel Conducted MLGU 10.00 - 10.00
Training expenses Barangay April MayTraining & Seminars
AttendedMLGU 10.00 - 10.00
2. Health & Nutrition Services
Supplies & Materials Barangay JanuaryPurchased Supplies &
MaterialsMLGU 10.00 - 10.00
Travelling expenses Barangay January December Official Travel Conducted MLGU 10.00 - 10.00
Training expenses Barangay January AprilTraining & Seminars
Attended
MLGU/PLG
U20.00 - 20.00
Purchase of medical
equipmentBarangay January May
Purchased medical
equipment
MLGU/PLG
U50.00 - 50.00
Page 7
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Frist aid kit &
hygiene kitBarangay January
Purchased First Aid Kit &
hygiene Kit
MLGU/PLG
U20.00 - 20.00
3.Peace & order services
Supplies & Materials Barangay JanuaryPurchased Supplies &
MaterialsMLGU 15.00 - 15.00
Travelling expenses Barangay January December Official Travel Conducted MLGU 10.00 - 10.00
Training Expenses Barangay January MayTraining & Seminars
Conducted
MLGU/PLG
U20.00 - 20.00
G. BDRRM (Calamity Fund) Medicines Barangay January March 200 boxes of Medicines MLGU 50.00 - 50.00
Relief Good Barangay January December 1 Packs of Relief Goods
5% CF/
PSWD/
MLGU/
PLGU
100.00 - 100.00
Medical Assistance Barangay January December 10 Beneficiaries
5%
CF/PSWD/
MLGU/PLG
U
100.00 - 100.00
Emergency Shelter Assistance Barangay January December 10 Houses
5%
CF/PSWD/
MLGU/PLG
U/ NGA
100.00 - 100.00
Page 8
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rehabilitation of Infrastructure Barangay January December 5 Units
5%
CF/MLGU/
PLGU/Nat'l.
1,000.00 - 1,000.00
Pre-Disaster Preparedness
TrainingBarangay January December
Pre-Disaster Preparedness
Training Conducted
5%
CF/MLGU30.00 - 30.00
Chainsaw Barangay January December 3 Units for Purok 1 to 3
5%
CF/MLGU/P
LGU
60.00 60.00
Generator Barangay January December 3 Units for Purok 1 to 3
5%
CF/MLGU/P
LGU
60.00 60.00
Grass Cutter/Mower Barangay January December 3 Units for Purok 1 to 3
5%
CF/MLGU/P
LGU
20.00 20.00
Purchase of Multi-cab Barangay January May Purchased multi-cab
5%
CF/PLGU/N
at'l.
500.00 500.00
Purchase of Kitchen Utensils Barangay January December Purchased Kitchen utensilsMLGU/PLG
U/5% CF50.00 50.00
Repair and Maintain of Multi-
CabBarangay September December Repaired Multi-Cab
MLGU/PLG
U/5% CF20.00 - 20.00
Fire Extinguisher Barangay January December 2 Fire Extinguisher5%
CF/MLGU20.00 20.00
Page 9
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Stock Filling of Foods & Non-
foods itemsBarangay January December Fund Provided
MLGU/PLG
U/5% CF100.00 - 100.00
Hand-held Radio Barangay January DecemberPurchased Hand-held nRadio-
7 Units
MLGU/5%
CF50.00 50.00
Early Warning System Barangay January DecemberPurchased Early Warning
System
MLGU/5%
CF30.00 30.00 30.00
A424-10
III. GENERAL PUBLIC
SERVICES0 550.00 1,430.00 1,980.00 - -
B. Maintenance & Other
Operating Services
Training expenses Barangay January December Official Travel Attended MLGU/PLG
U100.00 - 100.00
Brgy. Officials Incentive Barangay January DecemberProvided Brgy. Officials
IncentiveMLGU 200.00 - 200.00
Foundation day-Ma. Aurora Barangay July DecemberBarangay Foundation
ImplementedMLGU 20.00 - 20.00
Feeding materials Barangay June April
Feeding Program
Implemented (Malnourished
Children)
MLGU/PLG
U100.00 - 100.00
C. Capital Outlay
Construction of SK hall Barangay January May Constructed Sk Hall MLGU 500.00 500.00
Construction Of Flag Pole Barangay January April Constructed Flag Pole PLGU 100.00 100.00
Purchase of Typewritter Barangay January February Purchased 2 Typewritter PLGU 20.00 20.00
Page 10
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Cabinet Barangay January May Purchased 2 Cabinet PLGU 30.00 30.00
Purchase of Computer &
Internet ConnectionsBarangay January December Purchased Computer Set PLGU 50.00 50.00
Purchase of CCTV Camera Barangay January DecemberPurchased CCTV Camera 2
UnitsPLGU 100.00 100.00
Purchase of Sound System Barangay January DecemberPurchased Sound System 1
UnitPLGU 30.00 30.00
Concreting of Brgy. Road Barangay January DecemberConcreted Brgy. Road (Purok
1 to 3)PLGU 500.00 500.00
Sports Development Services -
Improvement of basketball
courtBarangay January April Improved Basketball Court
MLGU/PLG
U100.00 100.00 200.00
Repair of Brgy. Signages Barangay January May Repaired Brgy. Signages PLGU 20.00 - 20.00
Repair & Maint. Of Sound
SystemBarangay January April
Repaired & Maintained
Sound SystemPLGU 10.00 - 10.00
TOTAL PROPOSED PPAs 10,760.00 42,540.00 53,300.00
I.ECONOMIC SERVICES 3,400.00 10,400.00 13,800.00 - 950.00
A. 20% DEVELOPMENT FUND
Improvement/Elec. Of Health
CenterBarangay July August Improved Health center IRA/MLGU 100.00 - 100.00 100.00
M624-06
BARANGAY BAGTU
Page 11
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const. of Portable Water Supply
SystemBarangay Oct. 15 Oct. 31 Water supply constructed IRA/MLGU 150.00 150.00 150.00
M214-03
Const. of Nutrition Post Bldg. Barangay September Sptember Nutrition post constructed IRA/MLGU 100.00 100.00
Immprovement of Multi-Purpose
HallBarangay June. 15 June. 30
Constructed CR of Day care
centerMLGU 100.00 100.00
Construction of street
lights/electrification purok 2,3,4Barangay January June
Constructed Street
Lights/Installed Purok 2,3,4
IRA/MLGU/
PLGU500.00 500.00 500.00
M624-06
Purchase of Water Tank with
Electric MotorBarangay March May
Purchased Water system w/
electric Motor'IRA/MLGU 100.00 100.00 100.00
M214-03
SENIOR CITIZEN Barangay May. 15 May. 20Repaired & Maintained Multi-
Purpose Bldg.IRA/MLGU 100.00 100.00 100.00
A634-06
B. AGRICULTURE
DEVELOPMENT
Construction of Warehouse Barangay January December Constructed Warehouse MLGU/NGA 500.00 500.00
Construction of Solar Dryer Barangay January December Constructed Solar Dryer MLGU/NGA 500.00 500.00
Construction of Brgy. Stage Barangay January December Constructed Brgy. StagePLGU/IRA/
MLGU100.00 100.00
Construction of Concrete Wall
TankBarangay January December Constructed Wall Tank IRA/MLGU 100.00 100.00
Construction of Covered Court Barangay January December Constructed Covered Court NGA 1,000.00 1,000.00
Repair & Maitenance of FTMR BarangayRepaired & Maintained
FTMR
MLGU/PLG
U/NGA3,000.00 - 3,000.00
Page 12
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Farm & garden
SprayersBarangay
Farm & Garden Sprayer
PurchasedMLGU 50.00 50.00
Construction of Line Canal Barangay Constructed Line Canal MLGU 1,000.00 1,000.00
II.SOLID WASTE
MANAGEMENT
Construction of MRF Barangay January December MRF Constructed IRA/MLGU 100.00 100.00
Dredging / de-silting of river
bedsBarangay January December
Dredged / de-silted river beds
(Sta. Lucia-Bagtu)IRA/MLGU 300.00 - 300.00
FLOOD CONTROL PROJECT
Cost. Of Flood Control (Bagtu-
Sta Lucia)Barangay Flood Control Constructed
MLGU/PLG
U5,000.00 5,000.00
Improvement of Flood Control Barangay June. 1 June. 5 Improved Flood ControlMLGU/PLG
U1,000.00 1,000.00
SOCIAL SERVICES 920.00 200.00 1,120.00 150.00 -
HEALTH AND NUTITION
SERVICES PWD (Financial assistance for
medical)Barangay January December Provided funds
MLGU/PLG
U/NGA20.00 - 20.00
5% Calamity Fund(BDRRM
FUND)
Farmers Assistance Barangay September December Provided financial assistanceMLGU/PLG
U/NGA300.00 - 300.00
Financial Assistance for victtims Barangay September December Provided financial assistanceMLGU/PLG
U/NGA300.00 - 300.00
Page 13
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rechanneling And River Beds Barangay September December Rechannelled riverMLGU/PLG
U150.00 - 150.00 150.00
A314-06
Rehab of Damage Infra Barangay September December Rehabilitated Damaged Infra. IRA/MLGU 150.00 - 150.00
SENIOR CITIZEN
Constructionof Senior Citizen
HallBarangay January February Constructed SC Hall PLGU 100.00 100.00
Purchase of Tables0and Chairs Barangay January February Tables & Chairs Purchased PLGU 100.00 100.00
TOTAL PROPOSED PPAs 5,240.00 10,800.00 16,040.00
I. ECONOMIC SERVICES 400.00 102,000.00 102,400.00 14,500.00 -
A. Agricultural Development
ProgramConstruction of
FTMR(Galam)Purok-2Barangay March June
2km. All Weather FTMR
Road ConstructedMLGU 1,000.00 1,000.00
Construction of FTMR (P-6) Barangay April May 1km. ALL Weather FTMR MLGU 2,000.00 2,000.00
Construction of Line Canal Barangay January December Constructed Line Canal MLGU 4,000.00 4,000.00
Construction of FTMR (bagtu) Barangay January December 3km.all Weather FTMR Road MLGU 2,000.00 2,000.00
Construction of FTMR (Bangco
to Ramada)Barangay March June 3km.all Weather FTMR Road MLGU 10,000.00 10,000.00
BARANGAY BANGCO
Page 14
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of FTRM (Bangco
To Cab. East)Barangay January December 3km.all Weather FTMR Road MLGU 20,000.00 20,000.00
Construction of Covered Court Barangay January December Covered Court ConstructedMLGU/PLG
U5,000.00 5,000.00
Construction of Flood Control Barangay January December Flood Control Constructed MLGU 10,000.00 10,000.00 10,000.00 A314-09
Construction of Mine
Dam/Gabion TypeBarangay January December
Constructed of Mine-Dam &
Gabion Type
MLGU/PLG
U/NGA1,000.00 1,000.00 1,000.00
A114-10
Construction of small Water
Impounding Project (DOR-
AS,SAUG,BOLTO,TUPING)
Barangay January DecemberConstructed SWIP(DOR-
AS,SAUG,BOLTO,TUPING)
MLGU/PLG
U/NGA3,000.00 3,000.00 3,000.00
A114-10
Construction Of FTMR(P-7) Barangay January December QUARRY ContructedMLGU/PLG
U1,000.00 1,000.00
Construction of FTMR(Bangco
to Florida)Barangay January December
4km. All Weather FTMR
(Bangco to Florida)
contructed
MLGU/PLG
U/NGA20,000.00 20,000.00
Purchase of Farm
Machineries(Farm
tractor,Harvester,Water Pump)
Barangay January December purchased Farm Machineries NGA 500.00 500.00 500.00 A114-03
Construction of evacuation
center w/ Complete facilitiesBarangay January December
2 storey All Weather
Evacuation Center
Constructed
NGA 5,000.00 5,000.00
Repair of Multi-Purpose hall Barangay January December Multi-purpose Hall RepairedMLGU/PLG
U300.00 - 300.00
Page 15
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Extension Of Brgy. Hall Barangay January December Brgy.Hall ExtendedMLGU/PLG
U/NGA400.00 400.00
Construction of Palay
WarehouseBarangay January December Constructed palay warehouse NGA 500.00 500.00
Construction of Line Canal
Purok 3-7Barangay January December Line canal constructed PLGU/NGA 2,000.00 2,000.00
Construction of Multi-purpose
pavement-Solar Dier Purok 3Barangay January December Multi-purpose constructed MLGU 500.00 500.00
Purchase of BAWASA
Waterworks System(pipe,water
meter, elictric motor & etc.)
Barangay January Decemberpurchased BAWASA
Waterwoks facilitiesPLGU/NGA 500.00 500.00
Dredge of Water ways Purok 7-3 Barangay January December Water ways dredgedMLGU/PLG
U/NGA200.00 200.00
Repair & Maintenance of Brgy.
Steel Bridge Purok 2Barangay January December Steel Bridge Repaired NGA 500.00 500.00
Construction of Free-
Flowing(purok-7)Barangay January December Free-Flowing Constructed
MLGU/PLG
U500.00 500.00
Construction of SK Hall Barangay January December SK Hall ConstructedMLGU/PLG
U/NGA5,000.00 5,000.00
Riprap (purok 6) Barangay January December Constructed rip-rapMLGU/PLG
U500.00 500.00
B.TOURISM DEVELOPMENT Barangay
Landscape of Brgy. Plaza Barangay January December Enhancement of Brgy. PlazaMLGU/PLG
U300.00 300.00
Page 16
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Waiting Shed Barangay January December Constructed waiting shedBLGU/MLG
U200.00 200.00
C.FLOOD CONTROL Barangay
Construction of gabion type
DikeBarangay January December Constructed Gabion Dike PLGU/NGA 1,000.00 1,000.00
Construction of Box Culvert Barangay January December Constructed Box Culvert PLGU/NGA 400.00 400.00
Construction of drainage line
canalBarangay January December
Constructed drainage line
canalPLGU/NGA 5,000.00 5,000.00
D.LIVELIHOOD PROGRAMS
Livelihood assistance(for
women)Barangay January December
Provided Livelihood
assistance
MLGU/PLG
U/NGA100.00 - 100.00
SOCIAL SERVICES 3,150.00 67,130.00 70,280.00 - -
HEALTH & NUTRITION
Construction of health center
with complete facilitiesBarangay January December Constructed health center NGA 5,000.00 5,000.00
Repair of Day Care Center Barangay January December day care center repaired MLGU 50.00 - 50.00 Improvement of BAWASA
Waterworks System with power
pump set
Barangay January DecemberWaterworks improved,safe
drinking Water
BLGU/MLG
U/PLGU/NG
A
500.00 500.00
Purchase of medical
equipment/supplies(nebulizers,the
rmometers,stethoscope,weighing
scale,meter board,etc.)
Barangay January DecemberPurchase health & nutrition
Equipments & Materials
BLGU/MLG
U/PLGU/NG
A
300.00 300.00
Page 17
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Water
pump(pitchers and pipe)Barangay January February
Enchanement of health
facilities
BLGU/MLG
U/PLGU30.00 30.00
Construction of drainage canal Barangay January December Constructed Waterways
BLGU/MLG
U/PLGU/NG
A
3,000.00 3,000.00
Pipe rehabilition Barangay January December PLGU/NGA 500.00 - 500.00
Road widening Barangay January December Road improvement PLGU/NGA 1,000.00 - 1,000.00
Medical & Dental mission Barangay December Conducted health servicesBLGU/MLG
U/PLGU150.00 - 150.00
INFRASTRUCTURE PROJECT
AND SERVICES Construction of bridge
ApproachBarangay January December Bridge approach Constructed NGA 1,000.00 1,000.00
Construction/Renovation of Box
CulvertBarangay January December Box Culvert constructed PLGU/NGA 1,000.00 1,000.00
Repair of Brgy. Stage( Ceiling
floor)Barangay January December Repaired NGA 100.00 - 100.00
Construction of basketball half
courtBarangay January December
Constructed basketball Half
courtPLGU 200.00 200.00
Provission of Additional electric
postBarangay MLGU 100.00 100.00
Brgy.road concreting Barangay NGA 30,000.00 30,000.00
Construction of Brgy.palay
warehouseBarangay January December Warehouse Constructed PLGU 2,000.00 2,000.00
Page 18
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Health and
Nutrition postBarangay January December
Enhancement of Brgy.
Facilities
MLGU/PLG
U500.00 500.00
Construction of SK Hall Barangay January December SK Hall ConstrutedBLGU/PLG
U2,500.00 2,500.00
Construction of evacuation
center w/complete facilitiesBarangay January December Evacuation center secured NGA 10,000.00 10,000.00
Construction of Brgy. Plaza
covered courtBarangay January December
MLGU/PLG
U/NGA10,000.00 10,000.00
Repair of Multi-Purpose hall Barangay January December Multi-purpose hall repairedBLGU/PLG
U200.00 - 200.00
Completion of Extension of
Brgy. Hall (kitchen)Barangay January December Brgy. Hall Completed PLGU 300.00 300.00
Repair and Maintenance of
Public Buildings and FacilitiesBarangay January December Repaired and maintained
BLGU/MLG
U/PLGU/NG
A
200.00 - 200.00
Construction of Streetlights Barangay April June Street lights constructedBLGU/MLG
U50.00 50.00
Capital Outlay
Purchase of zerox machine Barangay April June Purchased PLGU 150.00 150.00
SENIOR CITIZEN(1% OF RF)
Repair of senior citizen building Barangay January December Building repair MLGU 50.00 - 50.00
SANGGUNIANG KABATAAN
Construction of SK hall Barangay NGA 500.00 500.00
Page 19
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
GENDER AND DEVELOPMENT
PEACE AND ORDER
SERVICES
Patrol Car of Brgy.Tanod Barangay January December 1 Patrol Car providedBLGU/MLG
U/NGA250.00 - 250.00
Tulong Puhunan Barangay January December Provided NG/PLGU 100.00 - 100.00 BRGY.DISASTER RISK
REDUCTION MANAGEMENT
PLAN DISASTER RESPONSE
Livelihood assistance Barangay January December Provide source of income
5% of
GF/MLGU/P
LGU
100.00 - 100.00
Purchase Certified Seeds Barangay January DecemberPurchase of Climate risilients
seeds/farm inputs
5% of
CF/MLGU50.00 - 50.00
Medical assistance Barangay January DecemberProvided medical assistance
to In need
5% of
CF/MLGU100.00 - 100.00
Financial assistance to victims Barangay January December Victims cared
5% of
CF/MLGU/P
LGU
200.00 - 200.00
DISASTER REHABILITATION
AND RECOVERY Rehabilitation of damage
infrastructureBarangay January December
5% of
CF/MLGU100.00 - 100.00
Page 20
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
TOTAL PROPOSED PPAs 6,700.00 236,260.00 242,960.00
I. ECONOMIC SERVICES - 20,870.00 20,870.00 17,700.00 - Const. of Perimeter fence (brgy. Plaza)Barangay July October 600M complete fence MLGU 400.00 400.00 400.00 A424-12
Const. of FTMR/Brgy. Road Barangay May October 300M. Brgy. Road complete PLGU/NGA 1,000.00 1,000.00 1,000.00 A634-03
Purchase of lot for evacuation centerBarangay July October Lot paid MLGU 500.00 500.00 500.00 A424-12
Const. of Library building Barangay June November Library building PLGU 500.00 500.00 500.00 A424-12
Const.of covered court Barangay May October Covered Court Constructed PLGU 5,000.00 5,000.00 5,000.00 A424-12
Rehabilitation of stage Barangay October November Rehabilitated stage MLGU 300.00 300.00 300.00 A424-12
Constructionof Public toilet Barangay April May Constructed Puclic Toilet PLGU 100.00 100.00
Construction Irrigation canalBarangay April May Constructed Irrigation Canal
MLGU/PLG
U1,000.00 1,000.00
Construction of Multi-purpose hall(Conference room)2Barangay April May
Constructed Multi-purpose hall(Conference room)2
MLGU/PLG
U500.00 500.00
Construction of FTMR Barangay May October 5km concrete NGA 10,000.00 10,000.00 10,000.00 A634-04
Construction of line canalBarangay April May
Constructed line canal
MLGU/PLG
U500.00 500.00
Construction of ware house Barangay April May Constructed ware house PLGU 550.00 550.00 Maintenance and other operating expenses
Regravelling (FTMR/BRGY.ROAD)Barangay April May Regravelling Completed MLGU 20.00 20.00
Construction of Solar DryerBarangay April May
Constructed Solar Dryer
MLGU/PLG
U500.00 500.00
II.SOCIAL SERVICES 220.00 500.00 720.00 - - A.Health & Nutrition
BARANGAY BANNAWAG
Page 21
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
B.Education
Brgy. Scholarship programBarangay June December
Brgy. Scholarship program provided
MLGU/PLG
U/NGA100.00 - 100.00
Livelihood programBarangay Febraury June
Livelihood program Provided
MLGU/PLG
U/NGA100.00 - 100.00
A424-01
Purchase of Certified seedsBarangay May June
Purchased Certified seeds
MLGU/PLG
U10.00 - 10.00
A114-12
Purchase of Vegatables seedsBarangay May June
Purchased Vegatables seeds
MLGU/PLG
U10.00 - 10.00
A114-12
C. Infrastructure
Construction of Multi-Purpose hallBarangay May June
Constructed Multi-Purpose hall
MLGU/PLG
U/NGA500.00 500.00
TOTAL PROPOSED PPAs 440.00 21,870.00 22,310.00
I. ECONOMIC SERVICES 200.00 24,400.00 24,600.00 - -
TOURISM DEVELOPMENT
Farm To Market Road Barangay January December Contructed NGA 6,000.00 6,000.00
Installation of Electric Post at
Public CemeteryBarangay January December Electric Post Installed
MLGU/PLG
U250.00 250.00
Constructi of Public CR at Public
CemeteryBarangay January December Constructed MLGU 200.00 200.00
BARANGAY I
Page 22
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Lot Purchase(For Health Center) Barangay January December Lot Purchased/PaidMLGU/PLG
U2,500.00 2,500.00
INSFRASTRUCTURE Barangay
Construction of Multipurpose
BuildingBarangay January December Constructed PLGU 6,000.00 6,000.00
Renovation of Stage Barangay january December Renovated MLGU 500.00 500.00
Construction of Boundary Sign Barangay January December Constructed MLGU 150.00 150.00
Repair and Maintenance of
Multipurpose HallBarangay January December Repaired MLGU 200.00 - 200.00
Concreting of Brgy. Road Barangay January December constructedMLGU/PLG
U/NGA3,800.00 3,800.00
Const. of Drainage canal Barangay January December constructed PLGU/NGA 5,000.00 5,000.00
TOTAL PROPOSED PPAs 200.00 24,400.00 24,600.00
ECONOMIC SERVICES 1,300.00 4,145.00 5,445.00 - -
Repair & maintenance of Brgy.
Road(P 1-7,5km.)Barangay January December All weather Barangay Road
20% Dev't
fund/MLGU/
PLGU/NGA
100.00
- 100.00
BARANGAY II
Page 23
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Constructed of Drainage canal Barangay January December Constructed Drainage Canal
20% Dev't
fund/MLGU/
PLGU/NGA100.00 100.00
Road Concreting Barangay January December Concreted Road
20% Dev't
fund/MLGU/
PLGU/NGA4,000.00 4,000.00
Rep.& maintenance of Farm to
market Road FTMRBarangay January December Repaired/Maintained FTMR
20% Dev't
fund/MLGU/
PLGU/NGA
1,000.00
- 1,000.00
HUMAN & ECOLOGICAL
SERVICESBarangay
Solid Waste Management Barangay January December SWM Implemented
20% Dev't
fund/MLGU/
PLGU/NGA
45.00
45.00
Clean & Green Program Barangay January December Conducted Clean
20% Dev't
fund/MLGU/
PLGU/NGA
200.00 -
200.00
SOCIAL SERVICES 1,000.00 7,400.00 8,400.00 - -
Health & Nutrition
Page 24
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase Of First Aid Kit Barangay January December First Aid Kit Purchased
20% Dev't
fund/MLGU/
PLGU/NGA
30.00 -
30.00
Purchase of Medical Equipment Barangay January DecemberMedical Equipment
Purchased
20% Dev't
fund/MLGU/
PLGU/NGA
50.00 -
50.00
Repair & Maintenance of
Nutrition postBarangay January December Repaired/Maintained
20% Dev't
fund/
MLGU/PLG
U/NGA
100.00 -
100.00
Education
Repair & Maint. Of Multi-
purpose Bldg.MEO/PEO January December
Repaired/Maintained Mulit-
Purpose Bldg
MLGU/PLG
U150.00 - 150.00
INFRASTRUCTURE & SOCIAL
DEVELOPMENT
Rehab Maint. Of Street Light Barangay January December Constructed Street Light
20% Dev't
fund/MLGU/
PLGU/NGA
300.00 300.00
Page 25
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Multi-purpose
Bldg.(2 storey)-1Barangay January December Repaired,Maintained
20% Dev't
fund/MLGU/
PLGU/NGA
2,000.00 2,000.00
Construction of multi-purpose
Bldg.2Barangay January December Rehabilitated
20% Dev't
fund/MLGU/
PLGU/NGA
500.00 500.00
Construction of multi-purpose
Bldg.3Barangay January December Completed
20% Dev't
fund/MLGU/
PLGU/ NGA
500.00 500.00
Repair & Maint. Of Welcome art Barangay January DecemberMLGU/PLG
U100.00 100.00 200.00
Repair & Maint. Of Box Culvert Barangay January DecemberMLGU/PLG
U200.00 - 200.00
Repair & Maint. Of Box
Culvert(P1-7)Barangay January December
MLGU/PLG
U300.00 - 300.00
Const. of Multi-purpose Bldg.4 Barangay January DecemberMLGU/PLG
U2,000.00 2,000.00
Capital outlay Barangay January December
Const. of Waiting Shed Barangay January DecemberMLGU/PLG
U2,000.00 2,000.00
Page 26
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
BDRRM Barangay January December
Rehab of damage infrastructure Barangay January December MLGU 45.00 - 45.00
Training & Seminar Barangay January December MLGU 25.00 - 25.00
TOTAL PROPOSED PPAs 3,300.00 18,945.00 22,245.00
I. ECONOMIC SERVICES - 231,500.00 231,500.00 - -
Purchase of Lot for Angara
Silvestre Hill (viewing Deck)Barangay January December 100 sqm. PLGU/NGA 1,000.00 1,000.00
Concreting Of FTMR Purok 1-
Purok 7Barangay January December 2kms. All Weather FTMR PLGU/NGA 10,000.00 10,000.00
Construction of FTMR Purok 1-
7Barangay January December
Tranfer of Agricultural
ProductsPLGU/NGA 10,000.00 10,000.00
Construction of Mega Dike Barangay January December 500 Meters PLGU/NGA 100,000.00 100,000.00
Construction of Bridges at
Pacugao riverBarangay January December
Accessible Transfer of
ProductsPLGU/NGA 100,000.00 100,000.00
Construction of Drainage canal Barangay January December 1kms. PLGU/NGA 10,000.00 10,000.00
Riprapping of 500 mts. hillside Barangay January DecemberResponse to
disaster/landslidePLGU/NGA 500.00 500.00
II.SOCIAL SERVICES Barangay 200.00 7,750.00 7,950.00 500.00 -
Health & Nutrition
Purchase of ambulance Barangay January December Immediate Transport PLGU/NGA 1,800.00 1,800.00
Construction of health center Barangay January December Comfortable Health CenterIRA/MLGU/
PLGU100.00 100.00
Daycare Services
BARANGAY III
Page 27
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of mini Library for
Daycare centerBarangay March May Mini Library Constructed
MLGU/PLG
U500.00 500.00
Purchase of School bus for
Daycare CenterBarangay June October Transportation of DCC
MLGU/PLG
U1,500.00 1,500.00
Daycare services &
development ProgramBarangay June March Improved DCC Services
MLGU/PLG
U/NGA250.00 250.00
Infrastructure
Construction of Multi-purpose
hallBarangay January December SC Building Constructed
MLGU/PLG
U1,000.00 1,000.00
Repair & improvement of Brgy.
BuildingBarangay January December Building Repair & Improved
MLGU/PLG
U200.00 - 200.00
Construction of Multi-purpose
hallBarangay January December SC Building Constructed
MLGU/PLG
U2,000.00 2,000.00
OSCA(Senior Citizen)
Purchase of Tables & Chairs for
SC HallBarangay January December Equipment Purchased MLGU 50.00 50.00
Purchase of wheel chair for
PWDBarangay January December PLGU 50.00 50.00
BDRRM(Calamity Fund)
Purchase of vehicle Barangay June December Response to deliver goodsMLGU/PLG
U/NGA500.00 500.00 500.00
A424-08
II.GENERAL SERVICES 0 - 6,600.00 6,600.00 - -
Maintenance
Page 28
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Incinerator for
SWMBarangay January December Equipment Purchased
MLGU/PLG
U
100.00 100.00
Purchase of Payloaders Barangay January December Equipment PurchasedMLGU/PLG
U/nga5,000.00 5,000.00
Purchase of Services Car for
Brgy. OfficialsBarangay January December Service Car Purchased
MLGU/PLG
U1,500.00 1,500.00
TOTAL PROPOSED PPAs 400.00 260,200.00 260,600.00
I. ECONOMIC SERVICES - 300.00 300.00 100.00 -
Livelihood Prog.(vermin
culture)Barangay January December
Increase soil fertility use of
farmersMLGU 200.00 200.00
Const.of FTMR (500 mtrs.) Barangay June August Const. 500 mtrs. FTMR MLGU 100.00 100.00 100.00 A634-03
II.SOCIAL SERVICES - 33,790.00 33,790.00 27,500.00 -
A. Health & Nutrition
Health kit Barangay January December Health kit provided NGA 40.00 40.00
Purchase of Medicine Barangay January December Medicines provided NGA 50.00 50.00
Purchase of Ambulance Barangay January DecemberConvinient Transport the
Patient
NGA/PLGU/
DOH1,200.00
1,200.00
Infrastructure
Const. of Drainage Canal Barangay January DecemberConstructed of Drainage
canal
PLGU/MLG
U/NGA1,500.00
1,500.00 1,500.00
A634-07
Concreting of Brgy.Road Barangay January December Convinient Transportation PLGU/NGA 10,000.00 10,000.00 10,000.00 A634-04
BARANGAY IV
Page 29
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const. of covered court Barangay January December Sports/Meeting event PLGU/NGA 5,000.00 5,000.00 5,000.00 A224-02
Const.of Flood Control Barangay January December
Secured/Life & properties
Construct 500 Meters flood
Control
PLGU/Gen.
Fund10,000.00
10,000.00 10,000.00
A314-09
Construction of Multi-purpose
hallBarangay January December
Multi-Purpose Building
Constructed
MLGU/PLG
U1,000.00 1,000.00
Construction of Multi-purpose
hallBarangay January December
Multi-Purpose Building
Constructed
MLGU/PLG
U2,000.00 2,000.00
SENIOR CITIZEN PLAN
Construction of SC Hall
(2Storey Building)Barangay January December Constructed Building
PLGU/Gen.
Fund1,000.00
1,000.00 1,000.00
A424-12
Purchase of wheelchair Barangay January December Identify the PWD NGA 50.00 50.00
YOUTH DEVT. PLAN-SK
Const. of SK Hall Barangay January December Constructed SK HallMLGU/PLG
U500.00
500.00
(CBDRRM) COMMUNITY
BASED DISASTER RISK
REDUCTION MANAGEMENT
PLAN Purchased of rescue tools
(chainsaw,hoe,shovel,flashlight,ro
pe,etc.)
Barangay January DecemberPurchased rescue tools for
immediate responseMLGU 50.00
50.00
SOLID WASTE
Page 30
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchased of garbage truck BarangayGarbage collection
Implemented
MLGU/PLG
U/NGA1,400.00
1,400.00
TOTAL PROPOSED PPAs 67,880.00 67,880.00 BARANGAY BAUBO
I. ECONOMIC SERVICES - 16,200.00 16,200.00 100.00 -
A. Tourism Development
Construction of Road going to
Balete SiteBarangay January December Constructed FTMR NGA 10,000.00 10,000.00
B. Agricultural Development
Purchase of Certified Seeds Barangay January December Purchased Certified SeedsMLGU/PLG
U Construction / Improvement of
Irrigation SystemBarangay July December Improved Irrigation System
MLGU/PLG
U100.00 100.00 100.00
A224-02
Construction / Improvement of
FTMRBarangay July December
Constructed/Improved
Irrigation System
MLGU/PLG
U/NGA Purchase of Agricultural Farm
Supply / EquipmentBarangay July December
Purchased Agricultural Fam
Supply/EquipmentIRA/MLGU 70.00 70.00
Construction/Improvement of
WarehouseBarangay July December Warehouse Constructed
MLGU/PLG
U/NGA500.00 500.00
Purchase of Farm Equipment /
Thresher / Hand TractorBarangay July December Farm Equipment Purchased
IRA/MLGU/
PLGU400.00 400.00
Page 31
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction/Improvement of
Solar DryerBarangay July December
Constructed/Improved Solary
Dryer
IRA/MLGU/
PLGU400.00 400.00
C. Livelihood Program
Livelihood Program Barangay July December Provided Livelihood Program MLGU 30.00 30.00
D. Infrastructure
Construction of Gabion Dike Barangay July December Gabion Dike ConstructedMLGU/PLG
U/NGA1,200.00 1,200.00
Construction of Flood Control Barangay July December Flood Control Constructed PLGU/NGA 1,300.00 1,300.00
Construction / Completion of
Drainage Canal/ Line CanalBarangay July December
Drainage/Line Canal
ConstructedIRA/MLGU 200.00 200.00
Re-Channeling of River Flow Barangay July December Re- channelled River Flow PLGU 300.00 300.00
Rip-rapping of River/Canal Barangay July DecemberConstructed Rip-Rap
river/CanalMLGU 200.00 200.00
Construction of Bridge / Bridge
ApproachBarangay July December
Bridge/Bridge Approach
Constructed
MLGU/PLG
U150.00 150.00
Construction / Rehab.of Water
System / Spring Dev'tBarangay July December
Rehabilitation of Water
System
IRA/MLGU/
PLGU100.00 100.00
Construction of Deep Well Barangay July December Deep Well Constructed IRA/MLGU 100.00 100.00
Construction of Water Tank /
Elevated tankBarangay July December
Water Tank/Elevated Tank
Constructed
IRA/MLGU/
PLGU150.00 150.00
Page 32
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Gabion Type
Flood Control ProjectBarangay July December
Constructed Gabion Type
Flood Control Project
IRA/MLGU/
PLGU1,000.00 1,000.00
II. SOCIAL SERVICES 348.00 7,040.00 7,388.00 200.00 -
A. Health & Nutrition
Construction of Perimeter
Fence - Health CenterBarangay January December
Health Cente Perimeter
Fence Constructed
MLGU/PLG
U150.00 150.00
Improvement of Health Center Barangay January December Improved Health CenterMLGU/PLG
U200.00 200.00 200.00 A424-11
Construction / Completion of
Nutrition PostBarangay January December Nutrition Post Constructed
MLGU/PLG
U
B. EDUCATION Repair & Maint. Of Daycare
CenterBarangay January December Improved DayCare Center MLGU 100.00 100.00
Construction Completion of
School PerimeterBarangay January December
School Perimeter Fence
CompletedIRA/MLGU
Repair & Maint. Of School
stageBarangay January December
School Stage
Repaired/MaintainedMLGU 100.00 100.00
Rehabilitation of Old school Barangay January DecemberOld School
Constructed/RehabNGA 1,300.00 1,300.00
C. Infrastructure Completion / Renov. Of Brgy.
StageBarangay January December
All weather, Renovation of
Brgy.StageMLGU 50.00 50.00
Construction of Waiting Shed Barangay January December Waiting Shed ConstructedMLGU/PLG
U150.00 150.00
Page 33
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Concreting / Completion of
Brgy. RoadBarangay January December
All Weather Completed Brgy
RoadNGA 1,000.00 1,000.00
Construction / Improvement of
Brgy. PlazaBarangay January December
Brgy. Plaza
Comstructed/ImprovedMLGU 80.00 80.00
Construction / Improvement of
FTMRBarangay January December All Weather FTMR NGA 500.00 500.00
Rehabilitation of Basketball
CourtBarangay January December Basketball Rehabilitated PLGU/NGA
Construction / Completion of
Comfort CourtBarangay January December All weather Comfort Room MLGU 100.00 100.00
Construction of Boundary Sign/
Welcome ArcBarangay January December
Boundary Sign/Welcome Arc
ConstructedMLGU 50.00 50.00
Construction of Concrete Bench
in Brgy. PlazaBarangay January December All weather, 8 concrete bench MLGU 100.00 100.00
Emergency shelter Assistance /
Const. of HousesBarangay January December Constructed Houses PLGU 500.00 500.00
Relocation Site for Indigent
FamilyBarangay January December
Constructed and Re-located
sitePLGU 300.00 300.00
Construction of multi-purpose
hall buildingBarangay January December
Constructed mulit-purpose
Hall/ BuildingPLGU 500.00 500.00
Purchase of Poable / Movable
TentBarangay January December Tent Purchased MLGU 100.00 - 100.00
D. OSCA (Senior Citizen)
Page 34
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Maintenance & Other Operating
Expenses Purchase of Over the Counter
MedicinesBarangay July December
Purchased over counter
medicineMLGU 15.00 - 15.00
Provide Financial Assistance for
Bed RiddenBarangay July December Help bed Ridden MLGU 15.00 - 15.00
Purchase of Uniform for SC
OfficersBarangay July December
Uniform Purchase Active SC
OfficerMLGU 15.00 - 15.00
Capital Outlay -
Purchase of Steel Cabinet Barangay July December Steel cabinet Purchased MLGU 35.00 - 35.00
Construction of SC Hall/
BuildingBarangay July December SC Building Constructed
MLGU/PLG
U500.00 500.00
E. Youth Development
Infrastructure
Rehab. Of Basketball Court Barangay April October Basketball court rehabilitated PLGU/NGA 1,000.00 1,000.00
Repair & Maint. Of Basketball
CourtBarangay April October
Basketball court repaired &
maintainedMLGU 200.00 200.00
Repair & Maint. Of Street Lights Barangay April Octoberstreet lights repaired &
maintainedMLGU 30.00 30.00
Lighting of Basketball Court Barangay April OctoberInstalled Lights at Basket
CourtMLGU 30.00 30.00
Construction of Removable
Wooden BenchBarangay April October Conctructed Wooden Bench
MLGU/PLG
U100.00 100.00
Page 35
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase Communication
EquipmentBarangay April October
Cimmunication Equipment
PurchasedMLGU
F. Gender and Development -
Health & Nutrition Services -
Beautification of Health Center Barangay January DecemberMaintain & Improved Health
CenterMLGU 50.00 - 50.00
Purchase of Height Board Barangay January December Purchased Height Board MLGU 8.00 - 8.00
Purchase of Health Workers
UniformBarangay January December
Purchased Health Workers
UniformMLGU 10.00 - 10.00
-
G. BDRRM -
Capital Outlay -
Purchase of Pre-Disaster
EquipmentBarangay January December Purchased Equipment MLGU 50.00 - 50.00
Purchase of Const. Materials Barangay January December Purchased const. Materials MLGU 50.00 - 50.00
-
TOTAL PROPOSED PPAs 696.00 30,280.00 30,976.00
I. ECONOMIC SERVICES 340.00 21,800.00 22,140.00 12,740.00 150.00
A.Agriculture
Improvement of FTMR
Bayanihan to NurseryBarangay January December 5kms. FTMR improved
MLGU/PLG
U/NGA650.00 650.00 650.00
A634-04
BARANGAY BAYANIHAN
Page 36
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement of FTMR
Bayahinan to BuguisalaoBarangay January December 4kms. FTMR improved
MLGU/PLG
U/NGA1,200.00 1,200.00 1,200.00
A634-04
Purchase of Certified Seeds Barangay January December100 sack of certified seeds
distributed
MLGU/PLG
U/NGA100.00 - 100.00 100.00
M114-10
Improvement of FTMR
Gabgab to NurseryBarangay January December 1km. FTMR improved
MLGU/PLG
U/NGA600.00 600.00 600.00
A634-04
B. Tourism Barangay
Improvement of Kalansekagen
FallsBarangay January December Kalansekagen falls improved
MLGU/PLG
U/NGA4,000.00 4,000.00
Concreting of foot trails Barangay January December footrails improvedMLGU/PLG
U150.00 150.00 150.00
A634-04
Const.of Recreational park Barangay January December1 Recreational park
constructed
MLGU/PLG
U200.00 200.00
Const. of Hanging Bridge Barangay January December Hangging bridge ConstructedMLGU/PLG
U/NGA7,000.00 7,000.00 7,000.00
A634-04
C.Livelihood
Livestock dispersal Barangay January December dispersal distributed MLGU 80.00 - 80.00 80.00 A414-04
Livelihood training & support
fundBarangay January December training & support find given MLGU 60.00 - 60.00 60.00
A414-04
D.Infrastructure -
Improvement of river control BarangayMLGU/PLG
U/NGA3,000.00 3,000.00
Const.of concrete bridge Barangay January December 1 concrete bridge constructedMLGU/PLG
U/NGA1,500.00 1,500.00 1,500.00
A634-03
Page 37
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const. of Brgy. Library Barangay January December 1 library constructedMLGU/PLG
U700.00 700.00 700.00
A634-03
Improvement of Public
Comport RoomBarangay January December Public CR Improved PLGU 200.00 200.00 200.00
A634-03
Const. of riprap Barangay January December Riprap Constructed MLGU 600.00 600.00 600.00 A314-09
Improvement of Multi-purpose
hallBarangay January December multi-purpose hall improved
MLGU/PLG
U300.00 300.00
Const./Maint./Rehab.of street
lightsBarangay January December street lights Constructed
MLGU/PLG
U200.00 200.00
Improvement of Multi-purpose
covered CourtBarangay January December street lights Constructed MLGU 500.00 500.00
Construction of Gabion Dike Barangay January December street lights Constructed MLGU 1,000.00 1,000.00
E.Human & Ecological Services
Initiative
Community reforestation Barangay January December reforestation Conducted PLGU 50.00 - 50.00
Clean & Green campaign/tree
plantingBarangay 15-Oct. 16-Oct. tree planting conducted MLGU 50.00 - 50.00 50.00
M314-05
II.SOCIAL SERVICES - 2,375.00 2,120.00 4,495.00 - -
A.Health -
Health & Nutrition Program Barangay January Decemberhealth related program
conducted
MLGU/PLG
U60.00 - 60.00
Honoraria for BHW Barangay January December honorarium distributedMLGU/PLG
U80.00 - 80.00
Page 38
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement of Health &
Nutrition PostBarangay January December Nutrition post improved
MLGU/PLG
U600.00 - 600.00
Supplemental feeding
programBarangay January December 50 DCC pupils beneficiaries
MLGU/PLG
U/NGA40.00 - 40.00
Botika ng Brgy. Barangay January December Botika constructedMLGU/PLG
U/NGA600.00 - 600.00
Purchase of medical supplies
& equipmentsBarangay January December Medicines purchased
MLGU/PLG
U60.00 - 60.00
Honoraria for BNS Barangay January December honorarium providedMLGU/PLG
U25.00 - 25.00
Seminar & Workshop for
health workersBarangay January December Services Improved
MLGU/PLG
U60.00 - 60.00
B.Education
Purchase of Playground
Equipment & MaterialsBarangay April May
playground materials
requestedMLGU 200.00 - 200.00
Improvement of Day Care
CenterBarangay January December DCC repaired & Improved MLGU 200.00 200.00
Purchase of books for
Brgy.LibraryBarangay January December Books Purchased PLGU 60.00 - 60.00
Aid to DECS Barangay July September Aid to DECS givenMLGU/PLG
U- 20.00 - 20.00
C.Housing & Basic Utilities
Maintenance of Potable water
systemBarangay January December
potable water system
maintained
MLGU/PLG
U60.00 60.00
A234-01
Page 39
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Maintenance of Street Light Barangay January December street lights maintainedMLGU/PLG
U60.00 60.00
D.Peace & Security -
Honoraria for Tanod & Lupon Barangay January December Honorarium givenMLGU/PLG
U- 40.00 - 40.00
E.Disaster Risk Reduction -
Purchase of rubber boats with
life vestBarangay January December
Rubber Boats with life vest
PurchasedMLGU 200.00 - 200.00
Purchase of Fabricated tent Barangay January December Fabricated Tent Purchased MLGU 60.00 - 60.00
F.Gender & Development -
Wellness Program Participation Barangay January DecemberWelness Program
Implemented
MLGU/PLG
U20.00 - 20.00
Facilities for Men & Women &
Other genderBarangay January December Comport room improved MLGU 50.00 - 50.00
Skill Training for OSY Barangay January December Skills training implemented MLGU 100.00 - 100.00
G.Senior Citizen's Development -
Const.of Senior Citizen's
BuildingBarangay January December SC building constructed PLGU 500.00 500.00
H.Youth Development -
Skill Training for OSY Barangay January December Out of School Youth Trained MLGU 100.00 - 100.00
Construction of SK Building Barangay January December SK Building constructed PLGU 600.00 600.00
Const. of Brgy. Library Barangay January December Brgy. Library Constructed MLGU 700.00 700.00
Page 40
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
TOTAL PROPOSED PPAs - 5,090.00 26,040.00 31,130.00
I. ECONOMIC SERVICES 0 0 11000 11000 11000 0
A.Construction of FTMR Barangay March June Constructed FTMR 2kl.MLGU/PLG
U/NGA2,000.00 2,000.00 2,000.00
A634-04
B.Flood Control (Gabion Dike) Barangay March JuneAll Weather Flood Control
1kl.
MLGU/PLG
U/NGA2,000.00 2,000.00 2,000.00
A314-09
C.Construction of Diapdianan
BridgeBarangay January December
Constructed Diapdianan
BridgeNGA 5,000.00 5,000.00 5,000.00
A224-02
D.Rechanneling of Bazal River Barangay March June Rechannelled Bazal RiverMLGU/PLG
U/NGA1,000.00 1,000.00 1,000.00
A314-06
E.Brgy. Road Concreting Barangay March June Concreted Brgy. Road NGA 1,000.00 1,000.00 1,000.00 A634-04
2.SOCIAL SERVICES 0 0 13790 13790 900 0
A.Health & nutrition
Medicine Barangay January DecemberAssorted Medicines &
Vitamins
IRA/MLGU/
PLGU50.00 50.00
Relief Goods Barangay July December Assorted groceriesIRA/MLGU/
PLGU50.00 50.00
B. Education -
C.Infrastructure
Rehabilitation of Health Center Barangay January DecemberRehabilitated Health Center
Phase 2 100sq. Meter
IRA/MLGU/
PLGU300.00 300.00 300.00
A424-12
BARANGAY BAZAL
Page 41
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rehabilitation of Brgy.
Plaza/StageBarangay January December
Rehabilitated Brgy.
Plaza/Stage 500sq.Meter
IRA/MLGU/
PLGU/NGA200.00 200.00
Improvement Potable Water
supplyBarangay January December 1 Mainsource
MLGU/PLG
U/NGA600.00 600.00 600.00
A634-07
Rehabilitation of St. Lights Barangay January December 8 St. Lights ( 50 m. ) IRA/MLGU 100.00 100.00 Const. of recreational facilities
(Bahay Pagbabago/Evac.
Area/Senior Bldg.)
Barangay January December 2storey Bldg. 150sq. MeterIRA/MLGU/
PLGU/NGA1,000.00 1,000.00
Rehabilitation of Multi-Purpose
HallBarangay January December
Rehabilitated Multi-Purpose
HallIRA/MLGU 100.00 100.00
Concreting of Brgy. Roads Barangay January December Concreted Brgy. Roads MLGU 10,000.00 10,000.00
Completion of Multi-Purpose
Hall Barangay January December
Constructed Multi-Purpose
HallIRA/MLGU 300.00 300.00
Construction of Gabion Type
Flood Control ProjectBarangay January December
Constructed Gabion Type
Flood Control ProjectIRA/MLGU 1,000.00 1,000.00
D.OSCA(Senior Citizen)
Medicine Barangay January DecemberPurchased Assorted
MedicinesIRA/MLGU 50.00 50.00
Snack & Relief Goods Barangay July DecemberPurchased Assorted
GroceriesIRA/MLGU 20.00 20.00
E. Youth Development
Sport League
Honoraria Refferree's Barangay April December Honorarium 2 Re fferee's IRA/MLGU 20.00 20.00
Page 42
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
TOTAL PROPOSED PPAs 38,580.00 38,580.00
I. ECONOMIC SERVICES 0 935 12250 13185 12250 0
Improvement of
Brgy.Road/FTMRBarangay March December Brgy. Road Maintained MLLGU 50.00 50.00 50.00
Dredging & Distilling of river Barangay April DecemberDredged & Dessilted
Pacugao River
MLGU/PLG
U400.00 400.00 400.00
A114-10
Construction of Covered Court Barangay March December Constructed Covered Court PLGU/NGA
5,000.00 5,000.00 5,000.00 A114-05
Construction of Evacuation
CenterBarangay January December
Constructed Evacuation
Center PLGU/NGA3,000.00 3,000.00 3,000.00
A114-05
Improvement of Day Care
CenterBarangay January December improved DCC
PLGU/NGA100.00 100.00 100.00
A114-05
Construction of Brgy.Plaza Barangay January December Constructed Brgy. Plaza PLGU/NGA 1,000.00 1,000.00 1,000.00 A114-05
Construction of Brgy.Stage Barangay March December Constructed Brgy. Stage PLGU/NGA 500.00 500.00 500.00 A114-05
Construction of Multi-purpose Barangay March December Constructed Multi-Purpose PLGU/NGA 2,000.00 2,000.00 2,000.00 A114-05
Farmer assistance Barangay March DecemberProvided Farmer's
Assistance MLGU/PLGU300.00 - 300.00
Certified seeds Barangay January December Purchased Certified Seeds MLGU/PLGU 300.00 - 300.00
Improvement of tanod out post Barangay March December Improved OutpostMLGU
200.00 200.00 200.00 A114-05
Livelihood Program
Animal Swine Raising Barangay January December Animal Dispersal provided MLGU 100.00 - 100.00
Hog Raising Dispersal Barangay January December Animal Dispersal provided MLGU 85.00 - 85.00
BARANGAY CABITUCULAN EAST
Page 43
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Goat Dispersal Barangay January DecemberAnimal Dispersal provided
(30) MLGU50.00 - 50.00
Carabao Dispersal Barangay January DecemberAnimal Dispersal provided (8
carabao) MLGU100.00 - 100.00
II. SOCIAL SERVICES 0.00 0.00 13330.00 13330.00 0.00 0.00
Improvement of Brgy.
Road/FTMRBarangay March December
Improved Brgy. Road/FTMR
2klmtr.
MLGU/PLG
U100.00 100.00
Dredging & Distilling of river Barangay March December Dredged & Dessilted River PLGU/NGA 400.00 400.00
Construction of Evacuation
centerBarangay January December
Constructed evacuation
centerPLGU/NGA 1,000.00 1,000.00
Repair/ Maintenance of
Drainage canalBarangay March December
Repaired/Maintained
Drainage canalMLGU 150.00 150.00
Construction of Covered Court Barangay March December constructed covered court PLGU/NGA 5,000.00 5,000.00
Construction of Brgy. Plaza Barangay January December Constructed Brgy. Plaza PLGU/NGA 1,000.00 1,000.00
Improvement of Tanod Out post Barangay March December improved tanod outpost PLGU/NGA 100.00 100.00
Construction of Multi-purpose Barangay January December constructed multi-purpose PLGU/NGA 1,000.00 1,000.00
Construction of Brgy. Stage Barangay March December constructed brgy. StageMLGU/PLG
U/NGA500.00 500.00
Construction of SC Multi-
PurposeBarangay January December constructed SC Multi-purpose PLGU/NGA 500.00 500.00
Child care feeding program Barangay January Decemberimplemented feeding
program
MLGU/PLG
U100.00 100.00
Improvement of day care center Barangay January December improved DCC MLGU 80.00 80.00
Page 44
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Repair & maint. Public Bldg.
facilitiesBarangay January December
Repaired & maintained
Public bldg. facilities
MLGU/PLG
U200.00 200.00
Const. of Multi-purpose Barangay January December constructed multi-purposeMLGU/PLG
U/NGA2,000.00 2,000.00
Improvement of perimeter fence Barangay January December improved perimeter fence MLGU 100.00 100.00
INFRASTUCTURE PROJECT
Construction of Basketball Court Barangay March December Constructed basketball court PLGU/NGA 1,000.00 1,000.00
CALAMITY FUND(BDRRM Fund)
Repair damage Infrastucture Barangay January Decemberrepaired damage
infrastructure
MLGU/PLG
U100.00 100.00
TOTAL PROPOSED PPAs 935.00 38,910.00 39,845.00
I. ECONOMIC SERVICES 0.00 0.00 2750.00 2750.00 0.00 0.00
Certified Seeds Barangay April December Purchased Certified SeedsMLGU/PLG
U/NGA/ IRA1,000.00 1,000.00
Dredging and desilting Barangay April December Dredged & desiltedMLGU/PLG
U/IRA100.00 100.00
Farmer Assistance Barangay April DecemberProvided Farmer's
Assistance
MLGU/PLG
U/NGA/ IRA1,000.00 1,000.00
BARANGAY CABITUCULAN WEST
Page 45
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Dredging/de-silting of River
bedsBarangay January December
Dredged & desilted -Pacugao
River
MLGU/PLG
U/NGA/ IRA300.00 300.00
LIVELIHOOD PROGRAM
(Makatulong Sa Kabuhayan ng
Mamamayan ng Cab. West)
-
Tulong Puhunan Barangay Provided Tulong Puhunan IRA/MLGU 300.00 300.00
Goat Dispersal Barangay Animal Dispersal ProvidedMLGU/PLG
U50.00 50.00
-
II.SOCIAL SERVICES 0.00 0.00 90.00 90.00 0.00 0.00
Insfrastructure -
Improvement of Bgry. Stage Barangay January October Improved Brgy. Stage IRA/PLGU 50.00 50.00
-
Calamity Fund (BDRRM) -
Relief goods & Medicines Barangay200 Boxes of Medicines
ProvidedIRA/MLGU 30.00 30.00
Purchase of Blankets &
Mosquito Nets & MaterialsBarangay January December
Purchased Blankets &
Mosquito Nets & MaterialsIRA/MLGU 10.00 10.00
TOTAL PROPOSED PPAs 2,930.00 2,930.00
I. ECONOMIC SERVICES 0 0 15540 15540 15540 0
BARANGAY DEBUCAO
Page 46
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const.of mini dam cabatangan
riverBarangay January December
Constructed mini-dam
cabatangan riverNGA 5,000.00
5,000.00 5,000.00
A114-10
Concreting of FTMR brgy. Site
Sitio DicaanBarangay January December
Concreted FTMR Brgy. Site
Sitio DicaanPLGU 5,000.00
5,000.00 5,000.00
A314-09
Concreting of FTMR of purok
tahimik 2Barangay January December
Concreted FTMR purok
tahimik 2NGA 5,000.00
5,000.00 5,000.00
A424-11
Agricultural Development -
Purchase of Certified seeds &
fertilizersBarangay January December
Purchased certified seeds &
fertilizersNGA 200.00
200.00 200.00
A114-12
Const. of crop storage facilities
that consider climate change and
variability
Barangay January December
Constructed crop storage
facilities that consider
climate change & variability
NGA 340.00 340.00
340.00 A114-011
II.SOCIAL SERVICES - 2,650.00 75,379.00 78,029.00 56,380.00 30.00
Dredging of cabatangan river Barangay January December Dredged cabatangan river MLGU 200.00 200.00 A314-09
Purchase of Lot for Evacuation
centerBarangay January December
Purchased lot for Evacuation
centerMLGU 1,500.00
1,500.00 1,500.00
A424-12
Flood Control Barangay January December Constructed Flood Control NGA 50,000.00 50,000.00 50,000.00 A314-09
Vehicular services Barangay January December Purchased vehicular services MLGU 50.00 50.00
Health & Nutrition
Improvement of health center Barangay January December Improved Health center MLGU 40.00 40.00
Purchase of Vehicular services Barangay January December Purchased vehicular services MLGU 50.00 50.00
20% Development fund Barangay
Page 47
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement of Covered court
(canopy)Barangay January December
Improvement of covered
court(canopy)MLGU 300.00
300.00
Road maintenance Barangay January December Road Maintained PLGU 15.00 15.00
Dredging of cabatangan river Barangay January DecemberRechanneled cabatangan
riverPLGU 32.00
32.00
Education Barangay 32.00 32.00
Purchase of books Barangay January December Purchased books MLGU 50.00 50.00 50.00 A141-04
Infrastructure
Repair of Brgy. Road
regravelling 3kms.Barangay
Repaired Brgy. Road
regravelled 3kms.MLGU 200.00 200.00
Purchase of table & chairs Barangay January December100pcs. Chairs & 10 Tables
purchasedMLGU 50.00 50.00 50.00
A424-12
Improvement of Waiting Shed -
Purok tahimik 2Barangay January December
improved waiting shed -
purok tahimik 2PGA 100.00 100.00
Constructed of Grouted rip-rap
Debucao RiverBarangay January December
Constructed Grouted rip-rap
Debucao RiverNGA 10,000.00 10,000.00
Const.of street lights Barangay January December Constructed Street Lights MLGU 200.00 200.00
Improve of waiting shade-
purok tahimik 2 Barangay January December
Improved of waiting shade
purok bukang liwaywayPLGU 100.00 100.00 100.00
A424-08
Construction of two (2) Gabion
type box-culvert-purok bukang
liwayway
Barangay January December
Constructed two(2) Gabion
type box-Culvert-purok
bukang liwayway
PLGU 500.00 500.00 500.00 A314-09
Page 48
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of one(2) Gabion
type box-culvert-purok pag-asaBarangay January December
Constructed one(2) Gabion
type box-Culvert-purok
bukang liwayway
PLGU 400.00 400.00
Construction of Grouted rip-
rap with plastering-100 metersBarangay January December
Constructed Grouted rip-rap
w/ plastering -100mNGA 10,000.00 10,000.00
Improvement fencing of
brgy.hallBarangay January December Improved fence at brgy. Hall PLGU/IRA 300.00 300.00 300.00
A424-11
Improvement of Brgy.stage Barangay January December Improved Brgy. Stage PLGU/IRA 200.00 200.00 200.00 A424-11
Improvement of Brgy. Hall-ties
on FlooringBarangay January December Improved Brgy.hall tiles PLGU/IRA 200.00 200.00 200.00
A424-11
C. Human & Ecological
Services Purchase of Nursery facilities,
supplies, materialsBarangay January December
Provided Nursery facilities,
supplies, materialsPGA 50.00 50.00 50.00
A421-12
Improvement of MRF Barangay January December Improved MRF PGA 100.00 100.00 100.00
`
Initiated solid waste
management Labor
cost/Garbage collection
Barangay
Implemented SWM &
Provided Labor
Cost/Garbage Collection
MLGU 50.00 50.00 50.00
d.OSCA (Senior Citizen) A414-02
Improvement of Senior
Citizen HallBarangay January December Improved senior citizen Hall PLGU 50.00 50.00 50.00
A424-11
Purchase of tables and chairs
for senior citizen hallBarangay January December
Purchased tables & chairs for
Senior Citizen HallPLGU 30.00 30.00 30.00
A414-02
Page 49
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Field trip of Senior citizens Barangay January December36 Senior Citizens have field
tripPLGU 30.00 30.00 30.00
M514-03
Purchase of Uniform of Senior
Citizen T-shirtBarangay January December
Purchased Uniform of Senior
CitizenMLGU 20.00 20.00 20.00
A424-01
Burial assistance Barangay January DecemberProvided burial asst. for
senior citizenMLGU 1,500.00 1,500.00 1,500.00
A424-01
e. Youth Development
Improvement of Basketball
CourtBarangay January December Improved Basketball court
MLGU/PLG
U150.00 150.00 150.00
A224-02
Purchase of tables and Chairs
for Sangguniang Kabataan hallBarangay January December
Purchased tables & chairs for
Sangguniang Kabataan hallMLGU 40.00 40.00 40.00
A414-01
Clean & Green program Barangay January DecemberClean & Green Program
implementedPLGU 100.00 100.00 100.00
Improv./maint.Brgy.official
directoryBarangay January December
Maintained Brgy.official
directoryPLGU 200.00 200.00 200.00
A414-01
Improv./maint.SK hall Barangay January December Improved SK hall PLGU 200.00 200.00 200.00 A414-01
f. Gender and Development
Provision of livelihood program
to womenBarangay January December Program Implemented
MLGU/PLG
U60.00 60.00 60.00
A414-04
Improvement of CCTV
CAMERABarangay January December
Improvement CCTV
CAMERAPLGU 30.00 30.00 30.00
M624-06
Page 50
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchased of Nutrition supplies
& Materials/ medicinesBarangay January December
Purchased of Nutrition
supplies &
Materials/medicine
PLGU 40.00 40.00 40.00 A414-05
Purchase of peace & order
supplies & materials/equipment &
Uniform
Barangay January December
Purchased peace & order
supplies &
materials/equipment &
uniform
PLGU 40.00 40.00 40.00
A424-10
g. BDRRM Barangay Purchase of Rescue tools and
equipment(i.e.stretcher, fire
Extinguisher)
Barangay January December
Purchased rescue tools &
equipment (i.e.stretcher,fire
extinguisher)
PLGU 30.00 30.00 30.00 A424-10
Purchase of Brgy.responders
PPE'sBarangay January December
Purchased Brgy. Responders
PPE'sMLGU 30.00 30.00 30.00
A424-10
Purchase of Ambulance Barangay January December Purchased ambulance NGA 500.00 500.00 500.00 A424-01
Purchase of responders uniform Barangay January DecemberPurchased Responders
uniformMLGU 50.00 50.00 50.00
A424-10
Conduct CBDRRM training Barangay January December Conducted CBDRRM training MLGU 50.00 50.00 50.00 A421-01
Conduct tree planting Barangay January December 5000 seedlings planted PLGU 60.00 60.00 60.00 A314-09
Provision of livelihood
assistance Barangay January December
Livelihood Program
Implemented
MLGU/PLG
U50.00 50.00 50.00
A414-04
Provision of assistance to
certified seedsBarangay January December Program Implemented MLGU 50.00 50.00 50.00
A114-12
III.GENERAL SERVICES Barangay - 280.00 - 280.00 1,020.00 -
Page 51
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Tables & Chairs Barangay January December100pcs.Chairs & 10 Tables
purchasedMLGU 20.00 20.00 20.00
A424-10
Provision of Accommodation of
guest/visitorsBarangay January December
Guest/Visitors
AccommodatedMLGU - 100.00 100.00 1,000.00
A424-11
a. Other MOOE Barangay
Purchase of Communication
EquipmentBarangay January December
Purchased Communication
Equipment
MLGU/PLG
U60.00 60.00
Purchase of Xerox Machine Barangay January December Purchased Xerox machine PGA 100.00 100.00
TOTAL PROPOSED PPAs - 5,860.00 166,298.00 172,158.00
I. ECONOMIC SERVICES 0 0 20410 20410 8630 0
1.Tourism Barangay
Concreting of Brgy.Road-
3km.FTMRBarangay January December
Concreted of Brgy.Road-3kms. FTMRNGA 8,000.00 8,000.00 8,000.00
A634-03
Construction of FTMR-4kms-
purok 5Barangay January December
Constructed FTMR - 4kms.
Purok-5PLGU 5,000.00 5,000.00
Construction of Amusement park Barangay January DecemberConstructed Amusement
ParkNGA 5,000.00 5,000.00
Concreting Brgy. Roads Barangay January December Concreted Barangay Road NGA 400.00 400.00
2.Agricultural Development
Purchase of Certified Seeds
and FertilizersBarangay January December
Purchased Certified Seeds &
FertilizersMLGU 200.00 200.00
BARANGAY DECOLIAT
Page 52
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Multi- Purpose flat-
bed Drier or Mechanical Drier-rice
and corn
Barangay January December
Acquired Multi-purpose Flat-
bed Dried rice and corn(for all
farmers in Brgy. Decoliat)
NGA 600.00 600.00 600.00 A114-11
Purchase of one unit Pinnawa
Rice MillBarangay January December
Purchased one unit Pinnawa
Rice MillPLGU 600.00 600.00
Construction of water
Impounding system Solar-
kabatangan river
Barangay January December
Constructed water
impounding system Solar
Kabatangan River
NGA 30.00 30.00
Construction of communal
Irrigation system 6km. Kabatagan
river
Barangay January December
Constructed Communal
Irrigation System 6Km.
Kabatangan River
NGA 30.00 30.00
Construction of Crop storage
facilities that consider climate
change variability
Barangay January December
Contructed Crop Storages
falities that consider climate
change variability
NGA 30.00 30.00 30.00 A114-11
Provision of Livelihood program
to womenBarangay January December Provided Livelihood Program MLGU 20.00 20.00
3.Water Services
Construction of water system Barangay January December Constructed Water System MLGU 500.00 500.00
II.SOCIAL DEVELOPMENT 0.00 0.00 23161.00 23161.00 1880.00 100.00
A.Health & Nutrition
Rehab./Improve. Of health
centerBarangay January December Improve Health center PLGU 200.00 200.00 200.00
A414-02
Health & Nutrition Services Barangay January DecemberHealth & Nutrition Services
DeliveredMLGU 200.00 200.00 200.00
A414-05
Page 53
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of medicines &
SuppliesBarangay January December
Purchased medicines
suppliesPLGU 350.00 350.00
Purchase of medical
equipmentBarangay January December purchased Equipments NGA 50.00 50.00
Vehicular services Barangay January DecemberPurchased Vehicular
ServicesMLGU 400.00 400.00 400.00
A414-01
B.Education
Provision of Skill
training/seminarBarangay January December 1 DCW trained MLGU 100.00 100.00
Purchase of books Barangay January December Purchased of books PLGU 50.00 50.00
Purchase of Day Care
Facilities Barangay January December
Purchased Day care services
facilitiesPLGU 100.00 100.00
Day care Serviices Barangay January December Day care services Delivered MLGU 100.00 100.00
Provision of
Subdivision/Relocation survey and
lot titling of decoliat elementary
school site & Brgy. Site-3.2 has.
Barangay January December
Subdivided/Relocated Survey
& lot Titled of decoliat
Elem.Sch.Site & Brgy. Site
PLGU 200.00 200.00 200.00
A424-12
Purchase of IT Equipment Barangay January DecemberPurchase of IT Equipment
with printerPLGU 100.00 100.00 100.00
A424-12
C.Infrastructure
Const. of hanging bridge-purok
5-300m.Barangay January December
Constructed hanging bridge-
purok 5-300m.PLGU 200.00 200.00
Page 54
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rehab./improvement of waiting
shade purok-5Barangay January December
Rehab./improved waiting
shade purok-5MLGU 40.00 40.00
Construction of Farm to market
road from So.Salemboabo to Brgy.
Proper -4kms.
Barangay January December
Constructed Farm to market
road from So.Salemboabo to
Brgy. Proper -4kms.
NGA 5,300.00 5,300.00
Construction of hanging bridge-
Salemboabo-500m.Barangay January December
Constructed hanging bridge-
SalemboaboPLGU 300.00 300.00 300.00
A634-03
Construction of two (2)Gabion
type box-culvert-purok3Barangay January December
Constructed two (2)Gabion
type box-culvert-purok3PLGU 400.00 400.00
Const. of two Gabion type box-
culvert-purok1Barangay January December
Constructed two Gabion type
box-culvert-purok1PLGU 400.00 400.00
Construction of Grouted Rip-
rap with plastering-200 metersBarangay January December
Constructed Grouted rip-rap
with Plastering-100m.NGA 10,000.00 10,000.00
Construction of Covered Court Barangay January December Constructed covered court NGA 2,000.00 2,000.00
Construction of Brgy. Library Barangay January December Constructed Brgy. Library PLGU 400.00 400.00
Concrete fencing of Brgy. Hall-
150m.Barangay January December
Concreted fence @ Brgy.
HallPLGU 300.00 300.00
Rehab of Brgy. Stage Barangay Rehabilitated Brgy. Stage PLGU 300.00 300.00
Rehab of Brgy. Hall-ties Barangay January DecemberRehab. Brgy. Hall ties on
FlooringPLGU 300.00 300.00 300.00
A634-07
D.Environmental Management
Page 55
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Nursery
facilities,supplies,mateialsBarangay January December
Purchased
nursery,facilities,supplies,
materials
MLGU 50.00 50.00 50.00 M314-04
Purchase of waste segregation
containerBarangay January December
Purchased Waste
segregation containerMLGU 50.00 50.00 50.00
M324-01
Rehabilitation of MRF Barangay January December Rehabilitated MRF MLGU 50.00 50.00
E.OSCA(Senior Citizen)
Const.of Multi-purpose Barangay January December Constructed Multi-Purpose PLGU 80.00 80.00
Purchase of tables & Chairs for
senior Citizen hallBarangay January December Purchased table & chairs MLGU 30.00 30.00
Provision of Field trip of Senior
CitizenBarangay January December Field Trip of SC conducted PLGU 20.00 20.00
Purchase of Uniform of Senior
Citizen-T-Shirt W/COLLARBarangay January December
Purchased uniform of senior
citizenMLGU 10.00 10.00
F.Youth Development -
Rehab./Improve. Of Basketball
courtBarangay January December
Rehab/improved basketball
courtNGA 150.00 150.00 150.00
A634-03
Purchase of Tables & chairs for
Sangguniang kabataan hallBarangay January December
Purchased tables & chairs for
SK HallPLGU 30.00 30.00
Purchase of Umbrella tent Barangay January December Purchased Umbrella Tent PLGU 100.00 100.00
G.Gender and Development -
Page 56
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Provision of Lecture about
womens right/VAWS and
participation to LGU initiated
womens and mens activities
Barangay January December Program implementedIRA/MLGU/
PLGU10.00 10.00
Provision of Day care worker
honorariaBarangay January December Provided Honorarium
IRA/MLGU/
PLGU81.00 81.00
H.BDRRM -
Conduct Tree planting Barangay January December 500 Seedlings planted PLGU 50.00 50.00
Purchase of Rescue tools &
Equipment(i.e.stretcher,fire-
Extinguisher)
Barangay January December
Purchased of Rescue tools &
Equipment (i.e.stretcher,fire-
extinguisher)
PLGU 30.00 30.00 30.00
A421-01
Purchase of Brgy.responders
PPE'sBarangay January December
Purchased of Brgy.
Responders PPE'sMLGU 30.00 30.00
Purchase of Ambulance Barangay January December Purchased Ambulance NGA 500.00 500.00
Purchase of responders uniform Barangay January DecemberPurchased Responders
uniformMLGU 50.00 50.00
Conduct CBDRRM training Barangay January DecemberConducted of CDRRM
TrainingMLGU 50.00 50.00
TOTAL PROPOSED PPAs 66,732.00 66,732.00
I. ECONOMIC SERVICES 0.00 0.00 17250.00 17250.00 1000.00 0.00
BARANGAY DETAILEN
Page 57
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Irrigation Canal Barangay January December Constructed Irrigation CanalMLGU/PLG
U1,000.00 1,000.00
Flood Control-Dredging & De-
selting of river WaysBarangay January December Constructed Flood Control PLGU/NGA 1,000.00 1,000.00 1,000.00
A114-05
Construction of Dike Barangay January December Constructed Dike PLGU/NGA 2,000.00 2,000.00
II.SOCIAL SERVICES -
Construction of Additional
streetlights(Brgy.Plaza)Barangay January December
Constructed StreetLights
(Brgy. Plaza)-
Rehabilitation of Multi-purpose
hallBarangay January December 1 Multi-purpose Hall MLGU 100.00 100.00
Construction of Water Supply Barangay January December Constructed water System PLGU 100.00 100.00
Const. of Recreational Facilities Barangay January December
Constructed Recreational
Facilities
MLGU/PLG
U150.00 150.00
Const. of Evacuation Center Barangay January DecemberConstructed Evacuation
CenterPLGU/NGA 1,000.00 1,000.00
Construction of Court &
Covered CourtBarangay January December
Constructed Court & Covered
CourtPLGU/NGA 5,000.00 5,000.00
Const. of Irrigation system Barangay January December Constructed Irrigation systemMLGU/PLG
U2,000.00 2,000.00
Const.of Multi-purpose hall Barangay January DecemberConstructed Multi-purpose
hallMLGU 1,000.00 1,000.00
Const.of Potable Water Supply Barangay January DecemberConstructed Potable Water
Supply
MLGU/PLG
U1,000.00 1,000.00
Page 58
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const.of Nutrition Post Building Barangay January DecemberConstructed Nutrition Post
Building
MLGU/PLG
U500.00 500.00
Const.of Day Care Center Barangay January DecemberConstructed Day Care
CenterPLGU/NGA 1,000.00 1,000.00
Rehabilitation of Damaged
InsfrastructureBarangay January December
Rehabilitated Damaged
InsfrastructureMLGU 500.00 500.00
Const. of Additional solar Dryer Barangay January DecemberConstructed Additional solar
DryerMLGU 500.00 500.00
a. Insfrastructure -
Rehabilitation of Damaged
InsfrastructureBarangay January December
Rehabilitated Damaged
InfrastructureMLGU 100.00 100.00
Flood Control - Dredging/de-
silting of River BeaksBarangay January December
Dredged/de-silted River Beds
Diaman River @ Detailen
River
PLGU/Natio
nal/IRA300.00 300.00
TOTAL PROPOSED PPAs 16,250.00 16,250.00
I.ECONOMIC SERVICES 0.00 0.00 7000.00 7000.00 7000.00 0.00
AGRICULTURAL
DEVELOPMENT Contructionof (FTMR)-Purok
Lilingay to KaputikanBarangay March December
2Km. All Weather FTMR
Constructed
MLGU/PLG
U2,000.00 2,000.00 2,000.00
A634-04
Constructionof FTMR Diaat to
AntokanBarangay March December
1Km. All Weather FTMR
Consttructed
MLGU/PLG
U2,000.00 2,000.00 2,000.00
A634-03
BARANGAY DIAAT
Page 59
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of FTMR(Libis ng
Nayon)Barangay March December
500m. All Weather FTMR
Constructed
MLGU/PLG
U2,000.00 2,000.00 2,000.00
A634-04
Construction of Brgy. Road-
Linglingay to HilltopBarangay March December
1Km. All Weather FTMR
ConsttructedPLGU 1,000.00 1,000.00 1,000.00
A634-05
II.SOCIAL SERVICES 0.00 0.00 73670.00 73670.00 64200.00 5000.00
A. EDUCATION -
Construction of Covered
Court(Diaat Elem. Sch.)Barangay January December 1 Covered Court Constructed NGA 5,000.00 5,000.00 5,000.00
M114-10
B. INFRASTRUCTURE -
Construction of
Brgy.RoadLinglingay to HilltopBarangay January December
1Km. All Weather Brgy. Road
Constrcuted
MLGU/PLG
U2,000.00 2,000.00 2,000.00
A634-04
Construction of Barangay. Road Barangay June December1Km. All Weather Brgy. Road
Const.
MLGU/PLG
U3,000.00 3,000.00 3,000.00
A634-05
Repair of Barangay Hall Barangay February December Repaired Barangay. Hall20%
DF/PLGU100.00 100.00 100.00
A424-13
Const.of Open canal (Pag-asa I
& II )Barangay January December
Constructed Open Canal
(Pag-asa I & II)MLGU 400.00 400.00
Construction of Covered Court Barangay January April 1 Covered Court ConstructedMLGU/PLG
U20,000.00 20,000.00 20,000.00
A424-11
Const. of drainage canal -
Tagumpay norteBarangay February October Drainage canal constructred PLGU 200.00 200.00 200.00
A114-05
Exposion of potable water
Brgy.systemBarangay February December Expanded the potable water MLGU 200.00 200.00 200.00
A234-01
Page 60
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const.of Speel way ( Tagumpay
norte)Barangay February December
Speel way all Weather
Constructed
MLGU/PLG
U3,000.00 3,000.00 3,000.00
A234-01
Construction of Day Care Center Barangay January December 1Unit All Weather DC Const.20%
DF/MLGU500.00 500.00 500.00
A424-11
Construction of Multi-Purpose
PavementBarangay February December Constructed Multi-purpose
20%
DF/PLGU200.00 200.00 200.00
A424-12
Costruction of Flood Control Barangay February December Flood Control ConstructedMLGU/PLG
U20,000.00 20,000.00 20,000.00
A224-02
Construction of Bridges(Libis ng
Nayon & Tag. Norte)Barangay January December Bridges Constructed
MLGU/PLG
U10,000.00 10,000.00 10,000.00
A224-02
Construction of Riprap(Pag Asa
II,.Linglingay, & LibisBarangay January December
200m. All Weather Riprap
Const.
MLGU/PLG
U3,000.00 3,000.00 3,000.00
A224-03
Const.of Gabion dike Barangay February December Gabion Dike Constructed PLGU 2,000.00 2,000.00 2,000.00 A314-09
Construction of Multi-Purpose
HallBarangay April December
Multi-Purpose Hall
Constructed
20%
DF/MLGU/P
LGU
1,500.00 1,500.00
Const.of Gabion dike Barangay February December Gabion Dike Constructed PLGU 2,000.00 2,000.00
C. OSCA (Senior Citizen) Barangay -
Purchase of Mono Block ( Table
& Chairs )Barangay February December Purchased Tables & Chairs
MLGU/PLG
U50.00 50.00
D. Youth Development -
Equipment Barangay March March Sportmanship for the Youth PLGU 20.00 20.00
Movable tent Barangay March December Provided Movable tent MLGU/PLG
U50.00 50.00
Page 61
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rehabilitation basketball court Barangay March April Rehabilitated basketball court PLGU 100.00 100.00
E. Infrastructure Projects -
Construction of waiting shed Barangay February December1 Unit Constructed waitiing
shed
MLGU/PLG
U200.00 200.00
F. BDRRM -
30% - Quick responses fund Barangay January December Quick response fundMLGU/PLG
U50.00 50.00
Financial assistance to Victims Barangay January DecemberAssistance distribute to all
affected
MLGU/PLG
U100.00 100.00
-
TOTAL PROPOSED PPAs 154,340.00 154,340.00
I. ECONOMIC SERVICES 0.00 0.00 22010.00 22010.00 0.00 0.00
A. Tourism Development
Rehabilitation of Street Light Barangay January December Rehabilitated street light IRA/MLGU 200.00 200.00
Concretinng of Barangay
RoadsBarangay January December Concreted Brgy. Road IRA/MLGU 400.00 400.00
B.Agricultural Development -
Construction of Water
SystemBarangay January December Constructed water System
IRA/MLGU/
PLGU300.00 300.00
C. Livelihood Program -
Animal Dispersal Barangay January December Animal Dispersal Provided IRA/MLGU 200.00 200.00
BARANGAY DIALATNAN
Page 62
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Livelihood Training and
Support fundBarangay January December
Livelihood Training
Conducted & Fund ProvidedIRA/MLGU 60.00 60.00
D. Water Services -
Construction of Rip rapping
of Flood ControlBarangay January December Constructed Flood Control IRA/MLGU 100.00 100.00
Additional/Replacement of
PipelessBarangay January December Constructed Pipeless IRA/MLGU 150.00 150.00
E. Infrastructure -
Construction of Covered
CourtBarangay January December Constructed Covered Court PLGU 5,000.00 5,000.00
Construction of Bridge Barangay January December Constructed BridgeMLGU/PLG
U2,000.00 2,000.00
Construction of Brgy. Hall Barangay January December Cobstructed Brgy. Hall IRA/MLGU 200.00 200.00
Purchase of Lot (Informal
Setler)Barangay January December Lot Purchased IRA/MLGU 500.00 500.00
Concreting of Brgy. Road Barangay January December Concreted Brgy. RoadMLGU/PLG
U600.00 600.00
Construction of Multi-
Purpose Pavement Barangay January December
Constructed Multi-Purpose
PavementIRA/MLGU 300.00 300.00
Construction Drainage Canal Barangay January December Cobstructed Drainage CanalIRA/MLGU/
PLGU 500500.00
Construction of Health
CenterBarangay January December Constructed Health Center NGA
1,0001,000.00
Page 63
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Flood Control
(1km)Barangay January December
Constructed Flood Control
(1km)
MLGU/PLG
U 5,0005,000.00
Construction of Mini Dum Barangay January December Constructed Mini Dum PLGU 2,000 2,000.00
Construction of Lining Canal
(500m)Barangay January December
Constructed Line Canal
(500m)PLGU
1,5001,500.00
Construction of Solar Dryer Barangay January December Constructed Solar DryerMLGU/PLG
U 1,0001,000.00
Construction of Public School Barangay March JulyConstructed 3-Classroom
school bldg.NGA 1,000.00 1,000.00
-
II. SOCIAL SERVICES 0.00 0.00 740.00 740.00 0.00 0.00A. Health -
Botika ng Barangay Barangay January December Provided Medicine PLGU 200.00 200.00
B. Education - Multi-Purpose
Hall/Pavement-Elem.& High
School
Barangay January December
Constructed Multi-
Purpose/Pavement-Elem&
HS
PLGU 500.00 500.00
C. Human & Ecological Services
Initiative-
Solid Waste Management Program (Supplies & Materials Barangay January December
Implemented SWM &
Supplies & Materials
Provided
IRA/MLGU 40.00 40.00
TOTAL PROPOSED PPAs 23,490.00 23,490.00
Page 64
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
BARANGAY DIAMAN
I. ECONOMIC SERVICES 0.00 0.00 14930.00 14930.00 0.00 0.00
A. Tourism Development
FTMR - Debucao - Diaman -
DiomeBarangay January December
All weather FTMR (Dioaman-
Diome)
IRA/PLGU/
NGA4,000.00 4,000.00
Flood Control Barangay January December Constructed Flood ControlMLGU/PLG
U/NGA650.00 650.00
Concreting of Barangay
Proper to Purok 1&2 (Diawel)Barangay January December
All weather FTMR (Dioaman-
Diome)NGA 300.00 300.00
Concreting of Brgy. Road Barangay January December All weather Road NGA 500.00 500.00
Electrification Purok 1&2
(Diawel)Barangay January December Electrification Installed NGA 500.00 500.00
FTMR Diaman - Debucao Barangay January DecemberConstructed FTMR Diaman-
DebucaoNGA 4,000.00 4,000.00
Purchase of Lot Barangay January December Lot PurchasedMLGU/PLG
U400.00 400.00
FTMR Diaman - Dikildit Barangay January DecemberConstructed FTMR Diaman-
DikilditPLGU/NGA 500.00 500.00
B. Agricultural Development -
Handtractor with Trailer - Mini
ConoBarangay January December
Purchased Handtractor with
Trailer
IRA/MLGU/
PLGU100.00 100.00
Construction/improvement of
Farm to Market RoadBarangay January December
Constructed Farm to Market
Road (Diaman-Diawel)
IRA/MLGU/
PLGU400.00 400.00
Page 65
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
C. Water Services -
Repair and Maintenance of
Water SystemBarangay January December
Repaired & Maintained Water
System
IRA/MLGU/
PLGU 100100.00
D. Infrastracture -
Rehabilitation of Barangay
Hall/Multiporpose HallBarangay January December
Rehabilitated Barangay
Hall/Multi-MultiPurpose Hall
IRA/MLGU/
PLGU600.00 600.00
Improvement of
EvacuationCenterBarangay January December Improved Evacuation Center
IRA/MLGU/
PLGU150.00 150.00
Road Maintenance Barangay January DecemberConstructed/Maintained
RoadIRA/MLGU 30.00 30.00
Construction/ Improvement
FTMRBarangay January December
Constructed/Maintained
FTMR(Diman-Diawel)IRA/MLGU 400.00 400.00
Dredging & Desilting of River
BedsBarangay January December
Dredged & Desilted River
Beds
IRA/MLGU/
PLGU300.00 300.00
Construction of Gabion Type
Flood Control ProjectBarangay January December
Constructed Gabion Type
Flood Control Project
IRA/MLGU/
PLGU2,000.00 2,000.00
II. SOCIALSERVICES 0.00 0.00 1020.00 1020.00 0.00 0.00
Solid Waste Management -
labor cost / garbage collectionBarangay January December SWM-Labor Cost provided
IRA/MLGU/
PLGU50.00 50.00
Waste Segregation Container
MaterialsBarangay January December
Waste Segregation Container
Materials ProvidedIRA/MLGU 20.00 20.00
Const. /Improvement/Main. Of
MRFBarangay January December Constructed MRF IRA/MLGU 200.00 200.00
Page 66
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Tree Planting Program Barangay January December Tree Planting conducted IRA/MLGU 100.00 100.00
Flood Control Project Barangay January December Constructed Flood Control NGA 200.00 200.00
CALAMITY FUND (5% BDRRM
FUND)-
B. Capital Outlay -
Communication Equipment Barangay January DecemberPurchased Communication
EquipmentIRA/MLGU 50.00 50.00
Purchase of Equipment
(disaster)Barangay January December Purchased Equipment IRA/MLGU 100.00 100.00
Rehab of Property Damage Barangay January DecemberRehabilitated Property
Damage
IRA/MLGU/
PLGU200.00 200.00
Purchase of Relief Goods Barangay January December Purchased Relief GoodsIRA/MLGU/
PLGU100.00 100.00
TOTAL PROPOSED PPAs 16,970.00 16,970.00 BARANGAY DIANAWAN
I. ECONOMIC SERVICES 0.00 0.00 1000.00 1000.00 0.00 0.00
A.Agriculture
Construction of Solar Dryer Barangay June December Solar Dryer Concreted MLGU 500.00 500.00
Construction of flood control Barangay June December Constructed flood control MEO 500.00 500.00
II.SOCIAL SERVICES 0.00 0.00 3400.00 3400.00 0.00 0.00
A.Health Services -
Const. of health center Barangay January December Health center Constructed MEO 500.00 500.00
B.Education -
Page 67
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Stone Masonry
School GroundBarangay June December School ground Contructed PLGU 500.00 500.00
C.Infrastructure -
Construction of Bgry. Roads Barangay June December Bgry. Road Maintained MLGU 300.00 300.00
Construction of Covered Court Barangay February October Court Contructed MLGU 800.00 800.00
Construction of muliti- purpose
HallBarangay June December
Multi-purpose Hall
ConstructedPLGU 500.00 500.00
Construction of muliti- purpose
HallBarangay June December
Multi-purpose Hall
Constructed800.00 800.00
TOTAL PROPOSED PPAs 7,800.00 7,800.00 BARANGAY DIKILDIT
ECONOMIC SERVICES: 0.00 0.00 40500.00 40500.00 12000.00 0.00
Construction of Irrigation
CanalBarangay March June 3km. Constructed MLGU/NGA 7,000.00 7,000.00 7,000.00
A114-10
Construction of Farm to
MarketBarangay March June 2km. Constructed MLGU/NGA 2,000.00 2,000.00 2,000.00
A634-04
Construction of Free Flowing Barangay March June Constructed MLGU/NGA 3,000.00 3,000.00 3,000.00 A114-05
Concreting of Farm to Market Barangay March June 2km. Concreted FTMRMLGU/PLG
U/NGA 2,000.00 2,000.00
Construction of Lining canal Barangay March June Constructed Line CanalMLGU/PLG
U/NGA5,000.00 5,000.00
Page 68
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Drainage
canalBarangay March June Constructed Drainage Canal
MLGU/PLG
U/NGA3,000.00 3,000.00
Construction of harvest
facilitiesBarangay March June Constructed Harvest facilities NGA 10,000.00 10,000.00
Construction of multi-purpose
pavementBarangay March June
Constructed multi-purpose
pavementPLGU/NGA 3,000.00 3,000.00
Construction of bagsakan
centerBarangay March June Constructed bagsakan center NGA 3,000.00 3,000.00
Construction of talipapa Barangay March June Constructed talipapaMLGU/PLG
U500.00 500.00
Construction of warehouse Barangay March June Constructed warehouseMLGU/PLG
U/NGA1,000.00 1,000.00
Construction of Steel gate of
SWIPBarangay March June
Constructed steel gate of
SWIPNGA 1,000.00 1,000.00
SOCIAL SERVICES Barangay March June 0.00 0.00 80950.00 80950.00 60500.00 0.00
A. Health & Nutrition Barangay March June -
Repair & Maint. Of health
centerBarangay March June
Repaired & Maintained
health center
MLGU/PLG
U500.00 500.00
Feeding Program Barangay March June Feeding program provided MLGU 100.00 100.00
Construction of Nutrition post Barangay March June Constructed Nutirition postMLGU/PLG
U500.00 500.00
Construction of Botika ng brgy. Barangay March JuneConstructed Botika ng
Barangay
MLGU/PLG
U200.00 200.00
Page 69
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement of health center Barangay March June Improved health centerMLGU/PLG
U50.00 50.00
B.Education
Construction of Reading
CenterBarangay March June Constructed Reading Center
MLGU/PLG
U1,000.00 1,000.00
Construction of recreational Barangay March June Constructed recreational MLGU/PLG
U/NGA3,000.00 3,000.00
Construction of school covered
courtBarangay January December
Constructed school covered
court
MLGU/PLG
U/NGA5,000.00 5,000.00
Construction of School
NurseryBarangay January December Constructed School Nursery MLGU 100.00 100.00
Road re-gravelling (school) Barangay January December Road re-gravelled (school) MLGU 100.00 100.00
C.Infrastructure
Construction of Flood Control
(Concrete)Barangay January December
10km. Constructed Flodd
control (2 river)PLGU/NGA 57,000.00 57,000.00 57,000.00
A224-02
Construction of Potable Water
SupplyBarangay January December
Constructed Potable water
SupplyMLGU/Brgy. 500.00 500.00 500.00
A234-01
Construction /Improv. Of Brgy.
StageBarangay January December Constructed Brgy. Stage PLGU 100.00 100.00
Construction of Multi-purpose
hallBarangay January December
Constructed Multi-Purpose
HallNGA 100.00 100.00
Construction of Brgy. Nursery Barangay January December Constructed Brrgy. Nursery PLGU/NGA 100.00 100.00
Construction of Covered Court Barangay January December 1 covered court constructed PLGU/NGA 5,000.00 5,000.00
Page 70
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Evacuation Barangay January December 1 Evacuation constructed PLGU/NGA 3,000.00 3,000.00 3,000.00 A424-12
Construction/Maint. Of public
facilitiesBarangay January December Constructed Public Facilities
MLGU/PLG
U/NGA 1,000.00 1,000.00
Purchase of Lot Barangay January December Purchased 2 hectares lotMLGU/PLG
U 300.00 300.00
A424-06
Dredging/de-silting of River
BeaksBarangay January December
Dredging/de-silting of River
Beaks Diaman River
MLGU/PLG
U/NGA 300.00 300.00
Construction of Multi-Purpose
HallBarangay January December
Constructed Multi-Purpose
Hall
MLGU/PLG
U/NGA 500.00 500.00
Dredging / de silting of river
bedsBarangay January December
Dredged / de silted river
beds@ Dikildit River
MLGU/PLG
U/NGA 300.00 300.00
D. BDRRM
Relief & Medical Assistance Barangay January DecemberRelief & Medical Assistance
Provided
MLGU/PLG
U 1,000.00 1,000.00
Emergency Shelter Assistance Barangay January DecemberEmergency Shelter
Assistance Provided
MLGU/PLG
U/NGA 1,000.00 1,000.00
Rehab to damaged infra Barangay January December Rehab. damaged infraMLGU/PLG
U/NGA 100.00 100.00
Purchase of clearing
Equipment (ax, shovels)Barangay January December
Purchased clearing
Equipment (ax, shovels)
MLGU/PLG
U 100.00 100.00
GENDER AND DEVELOPMENT
FUND
Emergency Shelter Assistance Barangay January December Emergency Shelter
Assistance Provided
MLGU/PLG
U 1,000.00 1,000.00
Page 71
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rehab to infra Barangay January December Rehab. infraMLGU/PLG
U 2,000.00 2,000.00
Page 72
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
GENERAL SERVICES Barangay January December 0.00 0.00 5400.00 5400.00 100.00
B. Maintenance and other
Operating expensesBarangay January December -
Livelihood Program Barangay January DecemberLivelihood Program
Implemented
MLGU/PLG
U 100.00 100.00 100.00
A424-01
Const. of School Covered Court Barangay January DecemberConstructed School Covered
CourtPLGU/NGA 3,000.00 3,000.00
CAPITAL OUTLAY Barangay January December -
Const. of SK Hall Barangay January December Constructed 1 SK HallMLGU/PLG
U 200.00 200.00
Purchase of Lot Barangay January December Purchased Lot MLGU/PLG
U 2,000.00 2,000.00
OTHER MODE Barangay January December -
Hon.of School Janitor Barangay January December Honorarium Paid MLGU 100.00 100.00
TOTAL PROPOSED PPAs 216,200.00 216,200.00 BARANGAY DIMANPUDSO
I. ECONOMIC SERVICES 0.00 0.00 4540.00 4540.00 0.00 0.00
Tourism Development Barangay
Construction of Brgy.
Museum Barangay January December Brgy. Museum Constructed
MLGU/PLG
U100.00 100.00
Page 73
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement of Brgy. Park Barangay January December Brgy. Park ImprovedBrgy./MLGU
/PLGU100.00 100.00
Concreting of Barangay
RoadsBarangay January December Concreted Barangay Roads
MLGU/PLG
U400.00 400.00
Agricultural Development Barangay -
Purchase of Certified
Seeds/Fertilizers/InsectisidesBarangay January December
Certified
seeds/fertilizers/insecticides
purchased
Brgy./MLGU
/PLGU40.00 40.00
Purchase of Farm
Equipments(Thresher/Hand tractor
w/ trailer
Barangay January December Farm Equipment PuchasedMLGU/PLG
U100.00 100.00
Purchase of Shredder &
African Night CrawlerBarangay January December
Shredder & African Crawler
Purchased
MLGU/PLG
U100.00 100.00
Purchase of Trash Crusher Barangay January December Trash Crusher PurchasedMLGU/PLG
U100.00 100.00
Purchase of Harvester
EquipmentBarangay January December
Harvester Equipment
Purchased
MLGU/PLG
U500.00 500.00
-
Flood Control -
Construction of River Dike Barangay January December River dike ConstructedMLGU/PLG
U1,000.00 1,000.00
Rechanneling of River Flow Barangay January December River Flow RechanneledMLGU/PLG
U1,000.00 1,000.00
Page 74
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rip rapping (river) Barangay January December Rip rapping for RiverMLGU/PLG
U1,000.00 1,000.00
Purchase of Boat / Rubber
BoatBarangay January December Rubber Boat Purchased
MLGU/PLG
U100.00 100.00
-
SOCIAL SERVICES 0.00 0.00 4590.00 4590.00 0.00 0.00
Educational Services Barangay -
Construction of Library
BuildingBarangay January December Library Building Constructed
Brgy./MLGU
/PLGU100.00 100.00
Renovation of HE Building Barangay January DecemberHE Building (learning booth)
renovated
Brgy./MLGU
/PLGU50.00 50.00
-
Human & Ecological Services -
Construction of Compost Bin Barangay January December Compost pit ConstructedBrgy./MLGU
/PLGU20.00 20.00
Purchase of Mini Dumptruck
for Garbage CollectionsBarangay January December
Mini Dumptruck Purchased
for Garbage collections
MLGU/PLG
U200.00 200.00
Purchase of Motor
Vehicle/Kolong kolong for
Garbage Collections
Barangay January DecemberKolong kolong Purchased for
Garbage Collections
Brgy./MLGU
/PLGU20.00 20.00
-
Infrastructure Barangay -
Page 75
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement/Extension of
Brgy.Hall (two storey Brgy. HallBarangay January December
Brgy. Hall (2 storey brgy.hall)
improved/extended
Brgy./MLGU
/PLGU1,000.00 1,000.00
Improvemet of Brgy.
FacilitiesBarangay January December
Brgy. Road (FTMR)
regravelled 2.5 km.
Brgy./MLGU
/PLGU100.00 100.00
Improvement/Maintenance of
St.LightsBarangay January December CCTV Installed
Brgy./MLGU
/PLGU100.00 100.00
Improvement/Maintenance of
Traffic LightsBarangay January December
Nutrition Post/BHW/BPW
office Constructed
Brgy./MLGU
/PLGU100.00 100.00
Improvement of Talipapa Barangay January December Brgy. Talipapa ImprovedBrgy./MLGU
/PLGU50.00 50.00
Improvement of Brgy. Stage Barangay January December Brgy. Stage ImprovedBrgy./MLGU
/PLGU100.00 100.00
Improvement of Day Care
CenterBarangay January December Day Care Center Improved
Brgy./MLGU
/PLGU100.00 100.00
Regravelling/Improvement of
Brgy. Road / FTMRBarangay January December
Brgy. Road /FTMR
regravelled improved
Brgy./MLGU
/PLGU50.00 50.00
Rehabilitation of Water
SystemBarangay January December Water system Rehabilitated
Brgy./MLGU
/PLGU50.00 50.00
Installation of CCTV Barangay January December CCTV InstalledBrgy./MLGU
/PLGU100.00 100.00
Construction of Nutrition post
/BHW/BPW/BADAC/VAWC OfficeBarangay January December
Nutrition
Post/BHW/BPW/BADAC/Va
wc office constructed
MLGU/PLG
U200.00 200.00
Page 76
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of
Concrete/Metal perimeter fence
(brgy. Plaza /Hall/DCC0
Barangay January DecemberConcrete/metal perimeter
fence constructed
MLGU/PLG
U200.00 200.00
Construction of St. Lights Barangay January December St. Lights constructedBrgy./MLGU
/PLGU200.00 200.00
Construction/ Installation of
Traffic LightsBarangay January December
Traffic Lights
installed/constructed
MLGU/PLG
U300.00 300.00
Construction of Basketball
Court BenchBarangay January December
Basketball Court Bench
constructed
Brgy./MLGU
/PLGU150.00 150.00
Completion of Covered Court Barangay January December Cover Court Completed PEO 1,000.00 1,000.00
Completion of Boundary
Arc/Welcome Arc/Boundary signBarangay January December
Boundary arc/welcome
arc/boundary sign completed
Brgy./MLGU
/PLGU100.00 100.00
Completion of Drainage
Canal/Box CulvertBarangay January December
Drainage canal/ Culvert Box
completed
Brgy./MLGU
/PLGU300.00 300.00
-
III. GENERAL SERVICES 0.00 0.00 1350.00 1350.00 0.00 0.00
Capital Outlay -
Purchase of Air Conditioner Barangay January December Air conditioner PurchasedMLGU/PLG
U50.00 50.00
Purchase of Multi-cab Barangay January December Multi cab purchasedMLGU/PLG
U500.00 500.00
Page 77
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of
Filing/medicine/documents cabinetBarangay January December Filing Cabinet purchased
Brgy./MLGU
/PLGU50.00 50.00
Purchase of Flat TV Barangay January December Flat Tv PurchasedBrgy./MLGU
/PLGU50.00 50.00
Purchase of Wide screen
/ProjectorBarangay January December
Wide screen/Projector
purchased
Brgy./MLGU
/PLGU50.00 50.00
Purchase of Motorcycle &
Kolong kolongBarangay January December
Motorcycle & Kolong kolong
purchased
Brgy./MLGU
/PLGU80.00 80.00
Purchase of Built in
MicrophoneBarangay January December
Built in microphone
purchased
Brgy./MLGU
/PLGU50.00 50.00
Barangay -
BDRRM Barangay -
Purchase of Emergency
Equipment/ Supplies/MaterialsBarangay January December
Emergency
equipment/supplies/materials
purchased
Brgy./MLGU
/PLGU50.00 50.00
Purchase/Construction of
Emergency ShelterBarangay January December
Emergency shelter
purchased/Constructed
Brgy./MLGU
/PLGU50.00 50.00
Purchase of Rescue Vehicle Barangay January December Rescue Vehicle purchasedMLGU/PLG
U100.00 100.00
Rehabilitation for Damage
InfrastructuresBarangay January December
Damage Infrastructure
rehabilitated
Brgy./MLGU
/PLGU50.00 50.00
Page 78
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Youth Development (10% SKF) Barangay
Capital Outlay Barangay
Purchase of Buzzer Barangay January December Buzzer purchasedBrgy./MLGU
/PLGU40.00 40.00
Infrastructures Barangay
Construction of Bench
(basketball court)Barangay January December
Basketball Court bench
constructed
Brgy./MLGU
/PLGU100.00 100.00
Construction of Spot map Barangay January December Spot map constructedBrgy./MLGU
/PLGU30.00 30.00
Construction of St.Lights Barangay January December St. Lights ConstructedBrgy./MLGU
/PLGU100.00 100.00
TOTAL PROPOSED PPAs 16,420.00 16,420.00 BARANGAY DIOME
ECONOMIC SERVICES 0.00 0.00 17650.00 17650.00 12000.00 0.00
FTMR Barangay January December 3Km.All Weather FTMR MLGU 2,000.00 2,000.00 2,000.00 A634-03
Concreting of Barangay Roads Barangay January December Concreted Barangay Roads NGA 400.00 400.00
INSFRASTRUCTURE
Construction of Bridge Barangay January December 15m. Constructed Breach NGA 5,000.00 5,000.00 5,000.00 A224-02
Construction of Barangay Stage Barangay January December Constructed PLGU 250.00 250.00
Page 79
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Evacuation
CenterBarangay January December Constructed PLGU 5,000.00 5,000.00 5,000.00
A224-03
Construction of Covered Court Barangay January December Constructed PLGU 5,000.00 5,000.00
TOTAL PROPOSED PPAs 17,650.00 17,650.00 BARANGAY FLORIDA
I.ECONOMIC SERVICES 0.00 0.00 10960.00 10960.00 10700.00 0.00
A.Tourism Development
Beautification of Brgy. Plaza Barangay January DecemberMLGU/PLG
U30.00 30.00
B.Agricultural Development Barangay
Const./Improvement of
Irrigation SystemBarangay January December
Improve all Weather
irrigation systemPLGU 50.00 50.00
A114-05
Purchase of Road Lot in Purok
5Barangay January December All weather road lot purchase
MLGU/PLG
U30.00 30.00
Repair & Maintenancen of
Brgy. Road(regravelling)Barangay January December
All weather Brgy.road
regravelled
MLGU/PLG
U50.00 50.00
A634-06
Repair & Maintenancen of
FTMR(regravelling)Barangay January December
All weather FTMR
regravelled
MLGU/PLG
U50.00 50.00
A634-06
C.Flood Control Barangay
Const. of 1km.Gabion type
flood controlBarangay January December
1km.Gabion type all weather
flood controlNGA 10,000.00 10,000.00 10,000.00
A224-02
Const.of line canal Barangay January DecemberConstructed all weather line
canal
MLGU/PLG
U300.00 300.00 300.00
A224-02
Page 80
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Const./Improvement of
Drainage canalBarangay January December
improve all weather drainage
canal
MLGU/PLG
U400.00 400.00 400.00
A224-02
D.Water Services
E.Post Harvest Facilities
Const. of Solar Drier Barangay January DecemberAll weather solar drier
constructedPLGU/NGA 50.00 50.00
II. SOCIAL SERVICES 0.00 0.00 25525.00 25525.00 470.00 350.00
A.Health & Nutrition Dev't
Program
Improvement of Health &
Nutrition postBarangay January December
Implements programs
regarding to health & nutrition
post
MLGU/PLG
U/NGA120.00 120.00 120.00
A414-01
B.Education -
Const. of 1 unit School Building
w/ 2CLBarangay NGA 5,000.00 5,000.00
Const. of Hand Washing Barangay NGA 30.00 30.00 . Const. of School Stage Barangay NGA 150.00 150.00
Const. of Comfort room Barangay NGA 60.00 60.00
Const./Continuations of school
Building Barangay NGA 3,000.00 3,000.00
Const. of School door grills and
Window grills of Florida Elem.
Sch..
Barangay PLGU/NGA 50.00 50.00
Page 81
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Completion of CIBAC Building Barangay NGA 500.00 500.00
C.Infrastructure Barangay -
Const./Rehabilitation of St.
Lights purok 1-6Barangay January December
12 street light using LED
bulb
MLGU/PLG
U350.00 350.00 350.00
M624-06
Perimeter Fence of school Barangay NGA 150.00 150.00
Const. of Talipapa Barangay January DecemberConstructed all weather
talipapa
MLGU/PLG
U350.00 350.00 350.00
A514-04
Const. of Covered Court BarangayConstructed all weather
covered courtPLGU 3,000.00 3,000.00
Extension of Stage Barangay Constructed stage extensionMLGU/PLG
U50.00 50.00
Const./Rehab of Multi-purpose
Hall-2 storeyBarangay
All weather multi-purpose hall-
2 storey Cons./rehab
MLGU/PLG
U2,000.00 2,000.00
Road widening (provincial
road)Barangay widened provincial road NGA 10,000.00 10,000.00
Const.of Multi-purpose hall
(purok-06)Barangay
Multi-purpose hall-purok 06
constructed
MLGU/PLG
U150.00 150.00
Repair & Maintenance of
Public building & FacilitiesBarangay
All weather public building
and facilities maintained
MLGU/PLG
U200.00 200.00
D.Senior Citizen Barangay -
Field trip/socialization outside
the municipalityBarangay Field trip/socialization funded
MLGU/PLG
U15.00 15.00
Purchase of Cane for disable
SCBarangay Cane distributed MLGU 10.00 10.00
Page 82
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
E. BDRRM Barangay
Purchase of Brgy. First Aid
kit/hygiene kitBarangay
First Aid kit/hygiene kit
purchasedMLGU 20.00 20.00
Purchase of Brgy. Responders
PPE'sBarangay
Responders PPE's
PurchasedMLGU 50.00 50.00
Purchase of Early Warning
DeviceBarangay
Early Warning Deviced
PurchasedMLGU 50.00 50.00
F. Capital Outlay -
Purchase of 2 Potable
generatorBarangay Generator purchased
MLGU/PLG
U150.00 150.00
Purchase of 10 Hand held
RadioBarangay Hand held radio purchased PLGU 40.00 40.00
Purchase of rescue tools &
equipmentBarangay
Rescue tools & Equipment
purchased
MLGU/PLG
U30.00 30.00
Page 83
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
III.GENERAL SERVICES 0.00 0.00 220.00 220.00 0.00 0.00
Repair & Maintenance -
Repair & Maintenance of
DumptruckBarangay
MLGU/PLG
U50.00 50.00
Capital Outlay -
Purchase of Multi-Cub Vehicle BarangayMLGU/PLG
U20.00 20.00
Purchase of Dumptruck BarangayMLGU/PLG
U150.00 150.00
TOTAL PROPOSED PPAs 62,450.00 62,450.00 BARANGAY GALINTUJA
A. ECONOMIC SERVICES 0.00 0.00 28550.00 28550.00 7000.00 0.00
1. Agricultural Support and
Development Program
Concreting of FTMR Barangay March July 2.5 km. all resilent of FTMR NGA 7,000.00 7,000.00 7,000.00 A4224-02
Irrigation system Barangay March July NGA 20,000.00 20,000.00
Const. Multi- purpose
pavementBarangay March July PLGU 1,000.00 1,000.00
Const. Multi- purpose
building warehouseBarangay March July NGA 50.00 50.00
Purchase of Kulong - kulong Barangay March December PLGU 100.00 100.00
Page 84
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Concreting of baranagay
RoadsBarangay January December PLGU 400.00 400.00
B.SOCIAL SERVICE - - 212,585.00 212,585.00 8,885.00 -
1. Social Development -
Construction of Multi-
Purpose HallBarangay February December 20x30 covered PLGU 6,000.00 6,000.00 6,000.00
A22-02
Const.of Children's park Barangay February DecemberConstructed Multi-Purpose
HallPLGU 100.00 100.00
Const.of Hanging Bridge Barangay February December Constructed Children's ParkMLGU/PLG
U100.00 100.00
Rehabilitation of Brgy. Road Barangay February December Rehab. Brgy. RoadMLGU/PLG
U/NGA1,000.00 1,000.00
Purchase of Land for the
Relocation of Informer SettlersBarangay January December 75 Indigent Families MLGU 500.00 500.00
Development of Mini-Hydro Barangay January December 3 Projects MLGU 200,000.00 200,000.00
Purchase of Ambulance Barangay January December Purchased AmbulanceMLGU/PLG
U1,500.00 1,500.00
Construction of Eco-Tourism Barangay January December Development of Falls NGA 1,000.00 1,000.00 1,000.00 A514-04
2. Health Nutrition Services Barangay January December -
Construction of Water
ImpoundBarangay February December
Construction of Water
ImpoundingNGA 1,000.00 1,000.00 1,000.00
A114-10
Purchase of hose BarangayMLGU/PLG
U-
Page 85
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
C. Osca Senior Citizen Barangay -
Purchase of Table & Chairs Barangay January December PLGU 10.00 10.00 10.00 A414-04
Senior citizen tour outside
municipalBarangay October December PLGU 20.00 20.00 20.00
A414=-02
Purchase of care of Dis-
abled senior CitizenBarangay January December MLGU 5.00 5.00 5.00
A414-02
Const.of Multi-purpose Hall Barangay January December MLGU 500.00 500.00 500.00 A22-02
D. Youth Development Barangay -
Barangay -
E. Gender and Development Barangay -
Renovation of Day Care
CenterBarangay April December
MLGU/PLG
U350.00 350.00 350.00
A414-02
Const. of feeding program BarangayMLGU/PLG
U500.00 500.00
TOTAL PROPOSED PPAs 453,720.00 453,720.00 BARANGAY KADAYACAN
I. ECONOMIC SERVICES - - 18,750.00 18,750.00 14,300.00 -
A.Tourism Development
B. Agricultural Development
Improvement of Irrigation
SystemBarangay Jan. Dec.
Irrigation System
Construct/Improve
IRA/MLGU/
PLGU/NGA200.00 200.00 200.00
A114-05
Page 86
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
C.Flood control Barangay -
Contructional of Flood Control Barangay Jan. Dec.Flood Control Contructed All
Weather
MLGU/PLG
U/ NGA1,000.00 1,000.00
A314-09
Construction of Line Canal
Phase IIBarangay IRA/MLGU -
Rechanelling of River Flow Barangay Jan. Dec.River Flow rechanelled all
weather
IRA/MLGU/
PLGU/NGA1,000.00 1,000.00 1,000.00
A314-06
Concreting/Rehab of Pacugao
BridgeBarangay Jan. Dec.
Pacugao Bridge
Concreted/Rehab All weatherNGA 5,000.00 5,000.00 5,000.00
A214-05
Construction of Bridge Approach Barangay Jan. Dec.Bridge Approach Constructed
all weather
MLGU/PLG
U/ NGA2,000.00 2,000.00 2,000.00
A214-05
Dredging/Desilting of Pacugao
RiverBarangay Jan. Dec.
Pacugao River
Dredged/Desilted
MLGU/PLG
U /NGA1,000.00 1,000.00 1,000.00
A314-06
D.Insfrastructure Barangay -
Construction/Improvement of
FTMRBarangay January December FTMR Constructed/Improved
MLGU/PLG
U/NGA2,000.00 2,000.00 2,000.00
A634-06
Concreting of Barangay Roads Barangay January December Brgy. Roads ConcreatedIRA/MLGU/
PLGU/NGA1,000.00 1,000.00 1,000.00
A634-04
Rechanelling of Pacugao River Barangay January December Pacugao River RechanelledMLGU/PLG
U/NGA100.00 100.00 100.00
A314-06
Rehab of Kadayacan-Bannawag
RoadBarangay January December
Kadayacan- Bannawag Rd.
rehab
MLGU/PLG
U/NGA2,000.00 2,000.00 2,000.00
A634-06
Page 87
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement of Kadayacan-
Salay RoadBarangay January December PLGU/NGA -
Improvement of Kadayacan-
Diaat RoadBarangay January December
MLGU/PLG
U/NGA-
Improvement of Local Rd. (
Kadayacan-So. Diantucan)Barangay January December
MLGU/PLG
U/NGA-
Construction / Completion
Basketball Covered Court Barangay January December NGA 1,500.00 1,500.00
Construction of Evacuation
CenterBarangay January December PLGU/NGA 1,500.00 1,500.00
E.Water Services -
Rehabilitation of Spring
DevelopmentBarangay april Aug. Spring development rehab
MLGU/PLG
U/NGA250.00 250.00
F. Post Harvest Facilities -
Improvement / Repair of
WarehouseBarangay april Aug. Warehouse Improved PLGU/NGA -
Construction of Solar Dryer Barangay april Aug. Constructed Solar Dryer NGA -
G.Livelihood Program -
Animal dispersal Barangay Feb. Oct. Animal Dispersal ProvidedMLGU/PLG
U50.00 50.00
Cooperative development
assistanceBarangay Jan. Dec.
Livelihood assistance
provided
MLGU/PLG
U150.00 150.00
II. SOCIAL SERVICES - - 18,400.00 18,400.00 1,000.00 -
A.Health & Nutrition Program -
Page 88
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Completion / Improvement of
Health Center Phase IIIBarangay January December
Completed Health center
Phase III
IRA/MLGU/
PLGU500.00 500.00
Construction / Improvement of
Nutrition PostBarangay January December Constructed Nutrition Post
IRA/MLGU/
PLGU500.00 500.00
Construction of Health Center
Phase II Barangay January December
Constructed Health Center
Phase II
IRA/MLGU/
PLGU500.00 500.00
B.Education Development -
Completion/Improvement of
DCCBarangay January December DCC Completed/Improved
MLGU/PLG
U/NGA300.00 300.00
Construction of School Covered
CourtBarangay January December
School Covered court
ConstructedNGA 5,000.00 5,000.00
Completion School Perimeter
FenceBarangay January December
School Perimeter Fence
CompletedPLGU -
Purchase of School Sports
equipment/materialsBarangay January December
Sport Equipment/Materials
purchase
MLGU/PLG
U200.00 200.00
Purchaseof IT Equipment Barangay January December IT Equipment purchasedMLGU/PLG
U150.00 150.00
Purchase of Books Barangay January December Books purchasedMLGU/PLG
U/NGA200.00 200.00
Construction of School Library
BuildingBarangay January December Library Building constructed PLGU/NGA 500.00 500.00
Purchase of Chairs For School Barangay January December Chairs PurchasedMLGU/PLG
U/NGA50.00 50.00
Page 89
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
C.Human Ecological Services
Initiative-
Purchase of Removable Tent Barangay Jan. Dec. Removable tent PurchasedMLGU/Brgy.
/NGO500.00 500.00
D.Social Infrastructure
development-
Completion/Improvement Of
Health CenterBarangay Jan. Dec. Health Center Completed
PLGU/MLG
U/DPWH/D
OH
500.00 500.00
Construction/Improvement of
Nutrition Post Phase IIIBarangay Jan. Dec. Nutrition post constructed
PLGU/MLG
U/DPWH/D
OH
500.00 500.00
Construction/Completion of
Basketball Covered CourtBarangay Jan. Dec.
Basketball Covered Court
Constructed/Completed
PLGU/MLG
U/DPWH/N
GO/Brgy.
3,000.00 3,000.00
Construction of Evacuation
CenterBarangay Jan. Dec.
Evacuation Center
Constructed
PLGU/MLG
U/DPWH3,000.00 3,000.00
E. Sport Development -
-
F. Disaster Risk Reduction and
Management-
Page 90
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Constraction of Flood Control
Phase IIBarangay Jan. Dec.
Flood Control Phase II
Constructed
PLGU/MLG
U
/DPWH/NG
O
1,000.00 1,000.00 1,000.00
A314-09
Improvement of Water System Barangay Jan. Dec.Spring Development
Improved
PLGU/MLG
U/
DPWH/NG
O
2,000.00 2,000.00
-
III. GENERAL SERVICES - - 500.00 500.00 - -
Other MOOE -
Purchase of Removable Tent Barangay January December Removable Tent PurchasedMLGU/PLG
U/ NGA500.00 500.00
TOTAL PROPOSED PPAs 56,550.00 56,550.00 BARANGAY MALASIN
I. ECONOMIC SERVICES - - 850.00 850.00 150.00 - 1,850.00
A. Agricultural Development
Rehab/Improv. Of Irrigation
SystemBarangay January December
Improved Irrigation System-
100m.MLGU 100.00 100.00
Certified Seeds Barangay January DecemberPurcahsed Certified seeds 50
bags riceMLGU 50.00 50.00 50.00
A114-12
Re-Gravelling of FTMR Barangay January December Re-gravelled FTMR1km. PLGU 100.00 100.00
Const. of line canal Barangay January December 200m. PLGU 200.00 200.00
Page 91
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
B.Flood Control Barangay -
Gavion Dike Barangay January December 200m. PLGU 200.00 200.00
Rehab of Communal Irrigation
SystemBarangay January December 1km. PLGU 100.00 100.00
Rechanelling of River Flow Barangay January December 1km. PLGU 100.00 100.00 100.00 A224-02
SOCIAL SERVICES - - 11,815.00 11,815.00 - -
C.Human & Eco.Services
InitiativeBarangay -
Purchase of Multi Cab. Barangay January December Purchased Multi-cab PLGU 120.00 120.00
A.Infrastructure Barangay -
Const. of Street light (Solar
LED)Barangay January December
Constructed street light (solar
LED)PLGU 120.00 120.00
Const. of Line Canal 100m. Barangay January DecemberConstructed Line Canal
100m.MLGU 100.00 100.00
Const.of covered court Barangay January December Constructed covered court PLGU 5,000.00 5,000.00
Repair & Maint. Of health center Barangay January DecemberRepaired &Maint. health
centerPLGU 50.00 50.00
Const. of School Building elem. Barangay January DecemberConstructed School Building
elem.MLGU 5,000.00 5,000.00
Construction of Gabion Dike Barangay January December Constructed Gabion Dike 1,000.00 1,000.00
B. OSCA ( Senior Citizen) Barangay -
Purchase of table & chairs Barangay January December Purchased table & chairs PLGU 15.00 15.00
C.General Public Services Barangay -
Personal Services Barangay -
Page 92
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Honoraria Barangay Honorariaum PaidMLGU/PLG
U/ NGA150.00 150.00
Capital Outlay Barangay -
Purchase of Multi cab Barangay Purchased multi-Cab PLGU 120.00 120.00
Conduct CDRRMP Barangay -
Purchase of handled radio(two
way radio)Barangay January December Purchased radio MLGU 20.00 20.00
Purchase of multicab vehicle Barangay January December Purchased multi-cab vehicle PLGU 120.00 120.00
III.GENERALSERVICES Barangay - - 140.00 140.00 - -
Purchase of Pedi cab vehicle Barangay January December Purchased Pedi cab vehicle PLGU 120.00 120.00
Hand held radio(2 way radio) Barangay January DecemberPurchased Hand held radio(2
way radio)PLGU 20.00 20.00
TOTAL PROPOSED PPAs 24,760.00 24,760.00 BARANGAY PUNGLO
ECONOMIC SERVICES - - 7,900.00 7,900.00 1,000.00 -
Improvement of Barangay Road Barangay January December Improved Barangay Road MLGU/IRA 1,000.00 1,000.00 1,000.00 A634-06
Construction of Barangay Road Barangay January December Constructed Barangay Road PLGU 2,000.00 2,000.00
Construction of Flood Control Barangay January December Constructed Flood Control PLGU 1,500.00 1,500.00
Construction Of Irrigation Casual Barangay January December Constructed Irrigation Casual MLGU 1,500.00 1,500.00
Construction of Drainage Canal Barangay January December Constructed Drainage Canal MLGU/IRA 500.00 500.00
Page 93
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Concreting of Barangay Roads Barangay January December Concreted Barangay Roads MLGU/IRA 400.00 400.00
Costructionof FTMR Barangay January December Costructed FTMR MLGU 1,000.00 1,000.00
TOTAL PROPOSED PPAs 7,900.00 7,900.00 BARANGAY QUIRINO
I. ECONOMIC SERVICES - - 60,830.00 60,830.00 23,580.00 -
A. Agriculture Development
Purchase of Mechanical Dryer Barangay May June Purchased Mechanical Dryer NGA 800.00 800.00 800.00 A114-03
Purchase of Garden Tools Barangay January March Purchased Garden ToolsMLGU/PLG
U50.00 50.00
Purchase of Sprayers Barangay January March Purchased Sprayers MLGU 30.00 30.00 30.00 A114-03 Purchase of Farm
Machineries (handtractor, 4 wheel
drive farm tractor, harvester, water
pump)
Barangay March April
Purchased Farm Machineries
(handtractor, 4 wheel drive
farm tractor, harvester, water
pump)
NGA 500.00 500.00 500.00
A114-03
Purchase of Fertilizers and
PesticidesBarangay January March
Purchased Fertilizers and
Pesticides
MLGU/PLG
U/NGA120.00 120.00 120.00
A114-12
Purchase of Certified seeds Barangay February March Purchased Certified seedsMLGU/PLG
U/NGA100.00 100.00 100.00
A114-03
Training/Workshop seminar
on Bio-Organic FertilizersBarangay January December Conducted Training
MLGU/PLG
U/NGA30.00 30.00 30.00
A114-03
Deworming of Animals Barangay January February Dewormed animals PLGU 10.00 10.00
Dog Anti-rabies Vaccination Barangay January February Rabies free animal NGA 10.00 10.00
Page 94
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Multi-Purpose
pavement/Solar dryerBarangay March May
Constructed Multi-Purpose
pavement/Solar dryerPLGU 500.00 500.00 500.00
A114-011
Construction of Irrigation Dam Barangay March MayMaintained farm water
suppliesPLGU/NGA 10,000.00 10,000.00 10,000.00
A114-05
Construction of Line Canal Barangay March June Constructed Line Canal PLGU 2,500.00 2,500.00 2,500.00 A114-05
Construction of FTMR Barangay March MayRoad Development All
WeatherPLGU 5,000.00 5,000.00 5,000.00
A634-04
Construction of Agricultural
warehouseBarangay March May
Constructed Agricultural
warehousePLGU 2,000.00 2,000.00 2,000.00
A114-011
B. Tourism Development -
Landscaping of Brgy. Plaza Barangay February April Enchancement of Brgy. Plaza PLGU/NGA 500.00 500.00
Construction of Tricycle
TerminalBarangay March May
Constructed Tricycle
TerminalMLGU 150.00 150.00
Construction of Waiting Shed Barangay January March Constructed Waiting Shed IRA/MLGU 200.00 200.00
C. Flood Control Projects -
Construction of Gabion Type
DikeBarangay March May
Constructed Gabion Type
DikePLGU/NGA 10,000.00 10,000.00
Construction of Box Culvert Barangay March May Constructed Box CulvertMLGU/PLG
U500.00 500.00
Construction/Installation of
Concrete Pipe (Imburnal)Barangay March May
Constructed/Installed
Concrete Pipe (Imburnal)MLGU 150.00 150.00
Construction of Drainage Line
CanalBarangay January April
Constructed Drainage Line
CanalPLGU/NGA 10,000.00 10,000.00
Page 95
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Concreting and Riprapping of
FTMR going to Sitio Parang and
Sitio Dicaan
Barangay February April
Concreted and Riprapping of
FTMR going to Sitio Parang
and Sitio Dicaan
PLGU/NGA 10,000.00 10,000.00
D. Livelihood Programs -
Swine production Barangay May June Animal disperal provided PLGU 100.00 100.00
Large Cattle Barangay May June Animal disperal provided PLGU 200.00 200.00
Animal disperal Barangay July August Animal disperal provided PLGU 100.00 100.00
Training on Food Processing Barangay March April 100 Persons TrainedMLGU/PLG
U/NGA30.00 30.00
Livelihood Assistance Barangay April MayProvided Livelihood
Assistance
MLGU/PLG
U/NGA100.00 100.00
Cooperative Program Barangay January February
Socio-economic
Development generation of
fund
PLGU/NGA 150.00 150.00
E. Infrastructure Projects -
Construction of Brgy. Market
Bldg.Barangay January April
Constructed Brgy. Market
Bldg.NGA 2,000.00 2,000.00 2,000.00
A314-04
Construction of Training
CenterBarangay January May Constructed Training Center PLGU 5,000.00 5,000.00
-
II. SOCIAL SERVICES - - 87,942.00 87,942.00 28,030.00 -
A. Health and Nutrition Services -
Page 96
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Medical
Equipment / Supplies (Nebulizers,
thermometer, stethoscope,
spygmomameter, weighing scale,
meter board)
Barangay February March
Purchased Medical
Equipment / Supplies
(Nebulizers, thermometer,
stethoscope,
spygmomameter, weighing
scale, meter board)
IRA/MLGU/
PLGU/NGA100.00 100.00 100.00
A414-01
Purchase of Bed for Health
CenterBarangay February March
Purchased Bed for Health
CenterIRA/PLGU 15.00 15.00
Purchase of Ambulance Barangay March April Purchased Ambulance PLGU 2,500.00 2,500.00
Purchase of Medicines Barangay January March Purchased MedicinesIRA/MLGU/
PLGU 200.00 200.00 200.00
A414-01
Purchase of Medicine Cabinet Barangay September October Purchased Medicine Cabinet IRA/NGA 30.00 30.00
Purchase of Porcelain Toilet
BowlsBarangay February March
Purchased Porcelain Toilet
BowlsPLGU 50.00 50.00
Purchase of Water pump
(pitcher and pipes)Barangay May June
Purchased Water pump
(pitcher and pipes)
IRA/MLGU/
PLGU60.00 60.00 60.00
M214-03
Financial Assistance to Bed
RiddenBarangay February March Provided / Granted
MLGU/PLG
U/NGA100.00 100.00
Medical and Dental Mission Barangay April May Health Services to elderlyMLGU/PLG
U/NGA200.00 200.00 200.00
A414-01
Vaccination to Senior Citizen Barangay January December Maintain Good Health MLGU/PLG
U 20.00 20.00 20.00
A414-01
Page 97
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Repair and Maintenance of
Health CenterBarangay May June
Enhancement of Health
FacilitiesIRA/MLGU 100.00 100.00
B. Education Services Barangay -
Construction of Elementary
School GateBarangay August September Secured Area IRA/NGA 30.00 30.00
Completion of QES Mini
GrandstandBarangay February April
Development Recreational
FacilitiesNGA 3,000.00 3,000.00
Completion of ECRMNHS
Covered CourtBarangay February April
Enhancement of Educational
FacilitiesPLGU 1,500.00 1,500.00
Construction of QES Covered
CourtBarangay March May
Enhancement of Educational
FacilitiesPLGU 2,500.00 2,500.00
Construction of School
Covered PathwayBarangay July August
Enhancement of Educational
FacilitiesIRA/PLGU 200.00 200.00 200.00
A424-12
Construction of Drinking and
Washing area (ECRMNHS)Barangay July August Constructed IRA/PLGU 200.00 200.00
Construction of School Bldg. Barangay April JulyEnhancement of Educational
FacilitiesPLGU 3,000.00 3,000.00
Costruction of Water Pump
HouseBarangay March April
Enhancement of Water Pump
HouseIRA/MLGU 75.00 75.00
Purchase of Sports
Equipments / SuppliesBarangay July August Purchased
IRA/MLGU/
PLGU80.00 80.00
Purchase of TV for Day Care
CenterBarangay February March Purchased PLGU 25.00 25.00
Purchase of Books Barangay March April Lift up Learning Ability IRA/PLGU 20.00 20.00
Page 98
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Scholarship Program Barangay January December Scholarship Granted MLGU/NGA 100.00 100.00
ALS Program Barangay January December
Purchase Training materials
and honorarium of trainers
provided
IRA/MLGU/
PLGU/NGA 40.00 40.00
C. Infrastructure Projects
Barangay Road Concreting Barangay February May 3 km. road concreted PLGU 3,000.00 3,000.00 3,000.00 A634-04
Provincial Road Concreting Barangay February May 3 km. road concreted PLGU 3,000.00 3,000.00 3,000.00 A634-04
Construction of Botika ng
BarangayBarangay January May Barangay Facilities PLGU 2,500.00 2,500.00
Construction of Public Toilet Barangay March April Enhancement of Public Toilet IRA/MLGU 100.00 100.00
Construction of Barangay
warehouseBarangay January May Barangay Facilities PLGU 2,000.00 2,000.00
Construction of Gabay sa
Mamamayan Action CenterBarangay May June
Enhancement of Gabay sa
Mamamayan Action CenterIRA/MLGU 500.00 500.00
Construction of Health Nd
Nutrition postBarangay May June Barangay Facilities IRA/PLGU 1,000.00 1,000.00 1,000.00
A424-12
Construction of Cemetery
ChapelBarangay April May
Enhancement of Cemetery
ChapelMLGU 150.00 150.00
Costruction of SK Hall Barangay March May Barangay Facilities IRA/PLGU 2,500.00 2,500.00
Construction Evacuation
CenterBarangay March June
Enhancement of Evacuation
CenterNGA 16,000.00 16,000.00
Page 99
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction/Completion of
Brgy. Plaza Covered CourtBarangay March August Barangay Facilities PLGU/NGA 20,000.00 20,000.00
Repair and Maintenance of
Public Building & FacilitiesBarangay March June
Enhancement of Public Bldg.
& Facilities
IRA/MLGU/
PLGU250.00 250.00
Repair and Maintenance of
StreetlightsBarangay January December Barangay Facilities IRA/NGA 50.00 50.00
Rehabilitation of SK Hall Barangay April June Enhancement of SK Hall IRA/PLGU 10,000.00 10,000.00
Housing Project Barangay March August PLGU/NGA 10,000.00 10,000.00 20,000.00 A424-06
Electrification of Public
cemetery, Brgy. Market and other
purok
Barangay March MayEnhancement of Ellumination
ProjectNGA 300.00 300.00
M624-06
D. OSCA (Senior Citizen 1% of
RF)
Furnitures and Fixtures Barangay April MayIRA/MLGU/
PLGU/NGA25.00 25.00
Lakbay Aral Barangay April May200 members of Senior
Citizen attended
MLGU/PLG
U300.00 300.00
-
A. Youth and Development - ENVIRONMENT
PROJECTS/CLEAN AND
GREEN
-
Tree Planting Activites Barangay July September Community Reforestration IRA/NGA 50.00 50.00
Page 100
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
EDUCATIONAL SERVICES AND
MORAL ACTIVITIES/LITERACY
PROGRAM
-
Anti-Drug Abuse Campaign Barangay January DecemberAdvocacy on Drug
CommunityIRA/MLGU 100.00 100.00
B. Gender and Development Barangay -
Financial Assistance to PWD Barangay March May Provided Funds IRA/PLGU 50.00 50.00 50.00 A424-02
Tulong Puhunan Barangay March May Provided FundsMLGU/PLG
U200.00 200.00 200.00
A424-03
C. BDRRM(5% Calamity Fund) -
A. Disaster Prevention and
Mitigation-
Community Reforestation Barangay 100-1000 Seedlings planted IRA/NGA 50.00 50.00
B. Disaster Preparedness - Distribution of nursery
planting materials (seedlings,
plastics, fertilizers)
Barangay October November Distributed NGA 100.00 100.00 A114-12
Re-channeling of River beds Barangay September Rechanneled riverMLGU/PLG
U150.00 150.00
A314-06
Purchase of Rescue Vehicles Barangay February March Purchased PLGU 600.00 600.00
Purchase of Removable Tents Barangay IRA/PEO 40.00 40.00
Page 101
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Early Warning Device Barangay August SeptemberEarly Brgy.Warning to
constituentPLGU 120.00 120.00
A424-10
CBDRRM Training Barangay January December
Conducted CBDRRM
Training to all Possible
hazards in the brgy.
5%
CF/MLGU70.00 70.00
A414-05
Training on Community Base
Early warning system (CBEWS)Barangay January December
Conducted training on
CBEWS
5%
CF/MLGU70.00 70.00
A414-06
C. Disaster Response Barangay -
Purchase of Certified Seeds Barangay September DecemberPurchase of Climate resilent
seeds/farm inputs
5%
CF/MLGU60.00 60.00
A314-09
Financial Assistance to
VictimsBarangay October December Provided
5%
CF/MLGU/P
LGU/NGA
350.00 350.00
Medical assistance Barangay March April Provide medical assistance5%
CF/MLGU12.00 12.00
D.Disaster Rehabilitation and
Recovery-
Rehabilitation of Damage
InfrastructuresBarangay October December
Rehabilitated Damage
Infrastructures
5%
CF/MLGU100.00 100.00
-
TOTAL PROPOSED PPAs 236,714.00 236,714.00 BARANGAY RAMADA
I. ECONOMIC SERVICES - - 23,810.00 23,810.00 22,310.00 500.00
Page 102
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Concreting of FTMR Barangay January December 2 km FTMR climate resilent NGA 10,000.00 10,000.00 10,000.00 A634-04
Construction of Irrigation
CanalBarangay March June To manage changes due CC NGA 500.00 500.00 500.00
A114-10
Construction of Concrete
Dike (Gabion type)Barangay January December Reduce the Risk of flooding NGA/PLGU 10,500.00 10,500.00 10,500.00
A314-09
River Dredging Barangay March AprilProve Physical Performance
of River
MLGU/PLG
U250.00 250.00 250.00
A314-09
Livelihood Program Barangay January DecemberDevelopment of Livelihood
Diversification
MLGU/PLG
U/NGA150.00 150.00 150.00
A414-04
Agriculture Farm Machinery Barangay January DecemberMore & Quality aggriculture
ProductsNGA 1,000.00 1,000.00
Seeds subsidy Barangay January December Produce use of crop suited
toNGA 100.00 100.00 100.00
A114-03
Construction of Solar drier Barangay January DecemberConstruct facilities that CC
resilientNGA 500.00 500.00 500.00
A114-11
Construction of small water
impoundmentBarangay March June PLGU 300.00 300.00 300.00
A114-10
Purchase of Garbage Truck Barangay July December Impliment ESWM ProgramBDF/MLGU/
PLGU500.00 500.00 500.00
M324-04
Spring Development Barangay April DecemberServe & Protect natural
waters MLGU/NGA 10.00 10.00 10.00
A314-02
SOCIAL SERVICES - 600.00 84,700.00 85,300.00 21,220.00 2,000.00
A.health and Nutrition
Purchase of Medicine Barangay Upgrade helathe system MLGU 10.00 10.00
Page 103
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Medical
EquipmentBarangay Upgrade Health System
IRA/MLGU/
PLGU40.00 40.00 40.00
A414-05
Feeding Program Barangay To Prevent MalnutritionIRA/MLGU/
PLGU30.00 30.00 30.00
A414-01
Purchase of Ambulance BarangayImpliment Program for Health
and ResponseNGA 1,000.00 1,000.00 1,000.00
A414-05
B. Education
Honoraria of Day Care
workerBarangay January December
Honoraria of Day Care
Worker
IRA/MLGU/
PLGU50.00 50.00
Purchase of Learning Tools Barangay June DecemberMLGU/PLG
U/NGA40.00 40.00
C. Infrastructure
Concreting of Brgy. Road Barangay January December Concreted road all weather NGA 10,000.00 10,000.00 10,000.00 A634-04
Construction of Streetlights Barangay January December Constructed Streetlights MLGU 50.00 50.00
Construction of Evacuation
CenterBarangay January December
Constructed Evacuation
CenterNGA/PLGU 22,000.00 22,000.00
Completion of Senior Citizen
Bldg.Barangay January December Completed S.C. Facilities MLGU 500.00 500.00
Constraction of Covered
CourtBarangay January December Constructed Covered Court PLGU/NGA 6,000.00 6,000.00
Construction of MRF Barangay January December Constructed MRF MLGU 50.00 50.00
Constructin of waiting shed Barangay January December Constructed waiting shed MLGU 200.00 200.00
Construction of Learning
centerBarangay January December Constructed Learning center
MLGU/PLG
U/NGA500.00 500.00
Page 104
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Brgy. Stage Barangay January December Constructed Brgy. StageMLGU/PLG
U/NGA50.00 50.00
Construction of potable water
systemBarangay January December
Constructed potable water
systemPLGU/NGA 10,000.00 10,000.00 10,000.00
A224-02
Construction of Drainage Barangay January December Constructed DrainageMLGU/PLG
U500.00 500.00
Construction of Multi-
Purpose HallBarangay January December
Constructed Multi-Purpose
HallPLGU/NGA 6,000.00 6,000.00
Construction of Solar Panel Barangay January December Constructed Solar Panel NGA 1,000.00 1,000.00 1,000.00 M624-06
D. Senior Citizen
Purchase of Motor Vehicle Barangay January December Purchased Motor Vehicle MLGU/PLG
U500.00 - 500.00
Purchase of Monoblock Barangay January December Purchased MonoblockMLGU/PLG
U50.00 - 50.00
LAKBAY ARAL/TOUR Barangay January December LAKBAY ARAL/TOURMLGU/PLG
U50.00 - 50.00
E.Youth Development
F.Gender and Development Labor Cost (day care services,
health, & Nutrition, peace & order
& BPW
Barangay January December Labor Cost paidMLGU/PLG
U1,500.00 1,500.00
Livelihood Program Barangay January DecemberDevelopment of Livelihood
Diversification
MLGU/PLG
U/NGA150.00 150.00 150.00
A414-04
Page 105
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Feeding program BarangayMLGU/PLG
U/NGA10.00 10.00
Skills Training BarangayIRA/MLGU/
PLGU/NGA150.00 150.00
Conduct good lifestyle
program/activitiesBarangay MLGU 10.00 10.00
Good Lifestyle Program Barangay January December Conduct Lifestyle Program IRA/MLGU 10.00 10.00
G.BDRRM Barangay
Purchase of rescue vehicle Barangay January December Purchased rescue vehicleMLGU/PLG
U/NGA1,250.00 1,250.00
Purchase of additional
handheld radioBarangay January December
Purchased additional
handheld radio
MLGU/PLG
U50.00 50.00
Purchase of motor Barangay January December Purchased motor bancaMLGU/PLG
U250.00 250.00
G. Barangay Disaster Risk
Reduction Management
Pre-Disaster Preparedness
Purchase of Rubber
Boat/motor bancaBarangay January December
Purchased Rubber
Boat/motor banca
IRA/MLGU/
PLGU250.00 250.00
Purchase of Rescue Tools
and EquipmentBarangay January December
Purchased Rescue Tools and
Equipment
IRA/MLGU/
PLGU50.00 50.00
Construction of Solar Panel Barangay January December Constructed Solar Panel NGA 1,000.00 1,000.00 1,000.00 M624-06
Construction Evacuation
CenterBarangay January December
Constructed Evacuation
CenterNGA/PLGU 22,000.00 22,000.00
Page 106
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
TOTAL PROPOSED PPAs 193,210.00 194,410.00
I. ECONOMIC SERVICES - - 14,500.00 14,500.00 7,000.00 2,500.00 a. Construction of Farm to
Market Road @ Anggo- Diaat
Road
Barangay January DecemberConstructed Farm to Market
Road @ Anggo- Diaat RoadMLGU 2,000.00 2,000.00 2,000.00
M324-02
b. Construction of Flood
Control (Pacugao River)Barangay January December
Constructed Flood Control
(Pacugao River)PLGU 5,000.00 5,000.00
c. Construction of Flood
Control (Diaat River)Barangay January December
Constructed Flood Control
(Diaat River)PLGU 5,000.00 5,000.00 5,000.00
A314-09
d. Constration of Novillos St.-
LandfillBarangay January December
Constructed Novillos St.-
LandfillMLGU 2,000.00 2,000.00 2,000.00
A634-03
e. Contruction of MRF Barangay January December Constructed MRF PLGU 500.00 500.00 500.00 M324-01
-
II. SOCIAL SERVICES - - 20,830.00 20,830.00 20,100.00 -
A. HEALTH AND NUTRITION -
Medical assistance Barangay January December Medical assistance ProvidedMLGU/PLG
U100.00 100.00 100.00
A424-12
B. EDUCATION Barangay -
Educational assistance
(financial)Barangay January December
Educational assistance
(financial) provided
MLGU/PLG
U100.00 100.00
C. PROTECTIVE SOCIAL
SERVICESBarangay -
-
BARANGAY SAN JOAQUIN
Page 107
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
D. INFRASTRUCTURE Barangay -
Improvement of Senior
Citizen Bldg.Barangay January December
Improved Senior Citizen
Bldg.PLGU 500.00 500.00
Const. of Brgy. Plaza gate Barangay January DecemberConstructed Brgy. Plaza
gateMLGU 100.00 100.00
Perimeter fence Brgy. Plaza
stageBarangay January December
Constructed Perimeter fence
Brgy. Plaza stageMLGU 1,000.00 1,000.00 1,000.00
A424-12
Constuction of Cover
Court(Phase 2)Barangay January December
Constructed Cover
Court(Phase 2)NGA 5,000.00 5,000.00 5,000.00
A424-12
Concreting of Olpindo-
Novillos St.Barangay January December
Concreted Olpindo-Novillos
St.PLGU 5,000.00 5,000.00 5,000.00
A634-03
Concreting of Manangan St. Barangay January December Concreted Manangan St. MLGU 2,000.00 2,000.00 2,000.00 A634-03
Concreting of Diaz St. Barangay January December Concreted Diaz St. PLGU 2,000.00 2,000.00 2,000.00 A634-03
Concreting of Health Center Barangay March December Concreted Health Center PLGU 5,000.00 5,000.00 5,000.00 A424-12
E.Senior Citizen 1% RF Barangay -
Rice and Groceries Barangay Rice and Groceries providedMLGU/PLG
U30.00 30.00
-
TOTAL PROPOSED PPAs 56,160.00 56,160.00
I. ECONOMIC SERVICES - - 14,728.00 14,728.00 - -
Rechanelling of River Flow Barangay January December Rechanelled River Flow NGA 5,500.00 5,500.00
Construction of Box Culvert Barangay January December Constructed Box Culvert PLGU 250.00 250.00
BARANGAY SAN JOSE
Page 108
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Rehabilitation of Multi-Purpose
hallBarangay January December
Rehabilitated Multi-Purpose
hallNGA 2,000.00 2,000.00
II.SOCIAL SERVICES Barangay -
EDUCATION Barangay -
Contruction of Barangay Library Barangay January DecemberConstructed Barangay
Library
MLGU/PLG
U/NGA4,800.00 4,800.00
INFRSTRUCTURE & SOCIAL
DEV'T SERVICESBarangay -
Concreting of M. Esteban St
.(75m)Barangay January December
Concreted Road M. Esteban
St. (75m)NGA 2,000.00 2,000.00
SENIOR CITEZEN Barangay -
Damayan Burial Assitance Barangay January December Burial Assistance Provided MLGU 89.00 89.00
Supplies and material Barangay January DecemberSupplies & Materials
ProvidedMLGU 89.00 89.00
TOTAL PROPOSED PPAs 14,728.00 14,728.00 BARANGAY SAN JUAN
I. ECONOMIC SERVICES - - 1,730.00 1,730.00 1,000.00 30.00
A. Tourism Development
-Tourist Spot dumpsite
developmentBarangay January November
Tourist spot Damsite
ProvidedMLGU 200.00 200.00
B. Flood Control Barangay
1. Construction of
Drainage/lined CanalBarangay July November
constructed 3 km
Drainage/lined CanalIRA/MLGU 170.00 170.00
Page 109
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
2. Construction / Riprap Box
CulvertBarangay March June
Constucted/ Riprap 5 units
Box CulvertMLGU 200.00 200.00
C. Agricultural Development Barangay
Concreting FTMR's Barangay January November Concrete 5 kms. FTMR's PLGU 1,000.00 1,000.00 1,000.00 A634-04
Backyard Gardening-
Purchased of vegetable seedsBarangay January December
Establish Community garden
& Communial School Ga.
MLGU/PLG
U30.00 30.00 30.00
M114-10
Farm Inputs-Purchased
Certified seeds , Organic and
Insecticide
Barangay January DecemberImproved Farm inputs
provided
MLGU/PLG
U100.00 100.00
Purchased Fruit Trees Barangay August September Tree Planting Activities MLGU 30.00 30.00
II. SOCIAL SERVICES Barangay - - 12,793.00 12,793.00 5,000.00 -
A.Health and Nutrition Barangay -
Medical Assistant Barangay January December Medical Assistant ProvidedMLGU/PLG
U100.00 100.00
Medicine & Vitamins Barangay January DecemberPurchase Medicines &
Vitamins
MLGU/PLG
U100.00 100.00
Supplemental Feeding for
Elem,H.S.,Malnourish & DCW
Pupils
Barangay January DecemberPurchase Supplemental
FeedingMLGU 50.00 50.00
B. Education -
Educational and Scholarship
AssistanceBarangay January December
Educational & Scholarship
Provided
MLGU/PLG
U1,000.00 1,000.00
Perimeter Fence of
Elementary school Barangay September November
Concrete Perimeter Fence of
Elementary school
MLGU/PLG
U500.00 500.00
Page 110
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Function Hall-
CANHSBarangay September November
Constrcuted Function Hall of
CANHSMLGU 200.00 200.00
C.Infrastracture
Water System-Faucet &
Metro/ContadorBarangay January December
Faucet & Metro/Contador of
280 HH ProvidedMLGU 500.00 500.00
Construction of Cover Court Barangay Febrary October Constructed of Cover Court PLGU 5,000.00 5,000.00
Concreting of Brgy. Road Barangay February October Concreted 4 kms. Brgy. Road MLGU 5,000.00 5,000.00 5,000.00 A634-04
D. OSCA (Senior Citizen)
a. MOOE
b. Capital Outlay Barangay
Financial Assistance-Pension
for SCBarangay January December Pension Provided for SC NGA 40.00 40.00
Financial Assistance-Burial
for SCBarangay January December Burial Provided for SC MLGU 10.00 10.00
e.Youth Development -
-
f. Gender & Development -
Honororia of DCW Barangay January December Pre School Children TrainedIRA/MLGU/
PLGU56.00 56.00
Honoraria of BNS Barangay January DecemberPatients provided with
primary and proper nutrition
IRA/MLGU/
PLGU20.00 20.00
Page 111
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Honoraria of BHW Barangay January DecemberPatients provided with
primary care
IRA/MLGU/
PLGU48.00 48.00
IP's Rep. Honoraria Barangay January DecemberIP's Rep. for IP's People
concern
MLGU/PLG
U4.00 4.00
Honorarium of Tanod/Peace
& Order Council Barangay January December
Maintenance of Peace &
Order IRA/MLGU 85.00 85.00
Training Expenses of Tanod Barangay January DecemberTraining and Seminars
AttendedIRA/MLGU 30.00 30.00
Honoraria of BPW Barangay January December Population surveys updated IRA/MLGU 10.00 10.00
Training Seminar of BPW Barangay January December Training Seminar Attended IRA/MLGU 20.00 20.00
Travellling Expenses of BPW Barangay January DecemberProvision of BPW travelling
expensesPLGU 10.00 10.00
CDRRM Training/Seminar Barangay January December CDRRM Training provided MLGU 10.00 10.00
TOTAL PROPOSED PPA 27,316.00 27,316.00 BARANGAY SAN LEONARDO
1. ECONOMIC SERVICES - - 24,815.00 24,815.00 19,105.00 400.00
A. Agriculture Development
Construction of Irrigation Canal Barangay March JulyConstructed 800 m. Irrigation
CanalPGA/NGA 2,000.00 2,000.00 2,000.00
A114-
Construction of Dam Barangay March July Constructed Dam PGA/NGA 2,000.00 2,000.00 2,000.00 A114-
Construction of Multi-purpose
pavement/solar dryerBarangay
Constructed Multi-purpose
pavement/solar dryer
MLGU/PLG
U100.00 100.00 100.00
Page 112
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Costruction Of Farm to Market
Road (FTMR)Barangay March June
Road Development All
weather 5 km. roadPGA/NGA 8,000.00 8,000.00 8,000.00
A634-
Purchase of Sprayers Barangay February March Purchased10 pcs. Sprayers MLGU/GF 5.00 5.00 5.00 A114-
Purchase of Farm Machineries
(handtractor, 4 wheel drive farm
tractor, harvester, water pump )
Barangay April May Purchased Farm EquipmentPLGU/Natio
nal5,000.00 5,000.00 5,000.00
A114-1
Purchase of fertilizers and
pesticidesBarangay April May
Purchased fertilizers and
pesticides
MLGU/PLG
U100.00 100.00
B. Tourism Development Barangay -
-
C. Flood Control Barangay -
Construction/Rehab/Repair of
River DikeBarangay February April
Constructed 500 m. River
DikePLGU/NGA 2,000.00 2,000.00 2,000.00
A224-
Construction of Drainage Line
CanalBarangay April June
Constructed 500 m. Drainage
Line CanalPLGU/NGA 5,000.00 5,000.00
-
D. Livelihood Programs Barangay -
Training on food processing Barangay January March 50 persons trained MLGU 10.00 10.00
Livelihood Assistance Barangay May JuneProvided Livelihood
assistance
MLGU/PLG
U200.00 200.00
-
E.Infrastructure Development Barangay -
Improvement of water System Barangay March May Improved water system MLGU 400.00 400.00 400.00 M214-03
Page 113
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
-
II.SOCIAL SERVICES - - 28,835.00 28,835.00 5,630.00 -
A. Health & Nutrition Services Barangay -
Medical & Dental Mission Barangay October December Heatlh ServicesMLGU/PLG
U/NGA200.00 200.00
A414-
B.Education Services Barangay -
Construction of nursery school Barangay March July Constructed nursery school PLGU/NGA 500.00 500.00
Construction of school canteen Barangay January February Constructed school canteen MLGU 80.00 80.00
Construction of school covered
pathway/gateBarangay February March
Constructed school covered
pathway/ gatePLGU 150.00 150.00
A424-
Construction of school
perimeter fenceBarangay March May
Constructed school perimeter
fenceMLGU 50.00 50.00
C. Infrastructure Projects Barangay -
Brgy./ Provincial Road
ConcretingBarangay March June 5 km. Road Concreted PLGU/NGA 5,000.00 5,000.00 5,000.00
A634-
Construction of Evacuation
CenterBarangay February October
Constructed Evacuation
Center10,000.00 10,000.00
Construction / Completion of
Brgy. Plaza Covered CourtBarangay February May
Constructed/ Completed
Brgy. Plaza Covered CourtPLGU/NGA 6,000.00 6,000.00
Construction of Brgy. Police
OutpostBarangay July September
Constructed Brgy. Police
OutpostIRA/MLGU 400.00 400.00
Construction of Multi-Purpose
BuildingBarangay February June
Constructed Multi-Purpose
BuildingPLGU/NGA 5,000.00 5,000.00
Construction of SK Building Barangay May June Constructed SK Building IRA/PLGU 400.00 400.00
Page 114
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Repair / Maintenance of Multi-
purpose hallBarangay March May
Repaired/Maintained Multi-
purpose hall
IRA/MLGU/
PLGU/NGA300.00 300.00 300.00
A414-
D. Osca ( Senior Citizen 1% of
RF )Barangay -
Trainings / Seminar Barangay January December Senior Citizen official TrainedIRA/MLGU/
PLGU45.00 45.00
Purchase of Medicines and
VitaminsBarangay February April
100 Members of Senior
Citizens Maintaining Vitamins
and Medicines
IRA/MLGU 70.00 70.00 70.00 A414-
E. Youth Development ( SK 10
% of RF )Barangay -
Educational Services & Moral
Recovery / Literacy ProgramBarangay -
Anti-Drug Abuse Campaign Barangay January DecemberAdvocacy on Drug Free
Community
IRA/MLGU/
PLGU50.00 50.00
F. Gender & Development Barangay -
Feeding Program Barangay January December Provision of Nourishment IRA/MLGU 30.00 30.00
Tulong Puhunan Barangay January December Provided FundsMLGU/PLG
U200.00 200.00
G. BDRRM ( 5% Calamity Fund ) Barangay -
Purchase of Early Warning
DeviceBarangay April June
Purchased Early Warning
DeviceIRA/MLGU 120.00 120.00 120.00
A424-
Page 115
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Movable Tents Barangay March April Purchased Movable TentsIRA/MLGU/
PLGU100.00 100.00
Training on Community Base
Early Warning SystemBarangay March April Conducted Training
IRA/MLGU/
PLGU70.00 70.00 70.00
A414-
CBDRRM Training Barangay March April Conducted TrainingIRA/MLGU/
PLGU70.00 70.00 70.00
A414-
TOTAL PROPOSED PPA 82,485.00 82,485.00 BARANGAY STA. LUCIA
I. ECONOMIC SERVICES - - 300.00 300.00 100.00 -
Livelihood program (vermin
culture) Barangay January December
Increase soil fertility use of
farmersMLGU 200.00 200.00
Construction of FTMR (500
mtrs.)Barangay June August Construct 500 mtrs. FTMR MLGU 100.00 100.00 100.00
A634-03
II.SOCIAL SERVICES - - 28,640.00 28,640.00 - -
A.Health & Nutrition -
Purchase of Ambulance Barangay January DecemberConvinient Transport tha
patient
NGA/PLGU/
DOH1,200.00 1,200.00
Health kit Barangay January December Health kit Provided NGA 40.00 40.00
Purchase of Medicine Barangay January December Medicines provided NGA 50.00 50.00
B.Education -
-
C.Peace and Order -
-
D.Infrastructure -
Page 116
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Perimeter
Fence Barangay January December Constructed Drainage canal
PLGU/MLG
U/NGA50.00 50.00
Concreting of Bgry.Road Barangay January December Convinient transportation PLGU/NGA 10,000.00 10,000.00
Consturction of Covered Court Barangay January February Sports/Meeting Event PLGU/NGA 5,000.00 5,000.00
Construction of Flood Control Barangay January DecemberSecured/life & Properties
Construct 500 mtrs. Flood
PLGU/Gen.
Fund10,000.00 10,000.00
Dredging/De-silting of Rivers
BedsBarangay January December
Malupa River Dredging/de-
silting of Rivers BeaksNGA/PLGU 300.00 300.00
Construction of Gabion Type
Flood Control ProjectBarangay January December
Constructed Gabion Type
Flood Control ProjectNGA/PLGU 1,000.00 1,000.00
F.OSCA-Senior Citizen Barangay -
Construction of SC Hall (2
Storey Building)Barangay January December Constructed Building
PLGU/Gen.
Fund1,000.00 1,000.00
TOTAL PROPOSED PPA 57,580.00 57,580.00 BARANGAY STO. CRISTO
I. ECONOMIC SERVICES - - 61,500.00 61,500.00 - -
Construction of Irrigation
CanalBarangay June November Constructed Irrigation Canal IRA/NGA 300.00 300.00
Construction of FTMR Barangay June August Constructed FTMR MLGU/NGA 20,000.00 20,000.00
Construction of Flood
Control/Gavion DikeBarangay May November
Constructed Flood
Control/Gavion DikeNGA 20,000.00 20,000.00
Construction of Box Culvert Barangay May November Constructed Box Culvert IRA/MLGU 500.00 500.00
Page 117
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Seeds &
FertilizersBarangay May June
Purchased Seeds &
FertilizersIRA/MLGU 50.00 50.00
Repair / Maintenance of Brgy.
RoadBarangay January December
Repaired/ Maintained Brgy.
Road
IRA/MLGU/
PLGU150.00 150.00
Construction / Concreting of
Brgy. RoadBarangay January December
Constructed/Concreted Brgy.
RoadNGA 20,000.00 20,000.00
-
Livelihood Program -
Food Processing Barangay January DecemberLivelihood Program
ImplementedIRA/MLGU 500.00 500.00
-
II. SOCIAL SERVICES - - 46,840.00 46,840.00 - -
Purchase of Brgy. Dumtruck Barangay January December Purchased Vehicles MLGU 300.00 300.00
Supplemental Feeding Barangay January December Feeding Program MLGU 20.00 20.00
-
Educational Services Barangay January December -
Construction of Hand
Washing Area for DCCBarangay January December
Constructed Hand Washing
Area for DCCMLGU 50.00 50.00
Construction of Information
CenterBarangay January December
Constructed Information
CenterNGA 150.00 150.00
Alternative Learning / Training Barangay January December Skills Training Conducted MLGU 50.00 50.00
Anti-Drug Abuse Campaign /
TrainingBarangay January December
anti drug abused campaign
conductedPLGU 50.00 50.00
Page 118
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
-
Infrastructure Projects Barangay January December -
Construction 0f Lined Canal Barangay January December Constructed Line dCanal NGA 10,000.00 10,000.00
Construction of Deep Well Barangay January December Constructed Deep Well MLGU 100.00 100.00
Construction of Water System Barangay January December Constructed Water System PLGU 100.00 100.00
Construction of FTMR Barangay January December Constructed FTMR NGA 20,000.00 20,000.00
Dredging of Bazal River Barangay January December Dredged Bazal River NGA 10,000.00 10,000.00
Construction of Evacuation
CenterBarangay January December
Constructed Evacuation
CenterNGA 1,000.00 1,000.00
Construction of School
Peremeter FenceBarangay January December
Constructed School
Peremeter FenceMLGU 200.00 200.00
Construction of Covered
Court Barangay January December Constructed Covered Court NGA 2,500.00 2,500.00
Construction of Nutrition Post Barangay January December Constructed Nutrition Post MLGU 150.00 150.00
Construction of Health Center
NewBarangay January December
Constructed New Health
Center Bldg.NGA 1,500.00 1,500.00
-
Gender & Development -
Facilities for Men and Women
and other Gender Barangay January December Constructed Comfort Room PLGU 500.00 500.00
Health Services for Remote
areaBarangay January December
Health Services provided for
remote areaMLGU 20.00 20.00
Page 119
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Livelihood and Credit
FacilitiesBarangay January December
Livelihood and credit
provided facilitiesMLGU 50.00 50.00
Facilities and R.I.C.Samahan
ng KababaihanBarangay January December
Provided Facilities for women
Asso.MLGU 100.00 100.00
-
III. GENERAL SERVICES Barangay - - 2,450.00 2,450.00 - -
Maintenance &Other Operating
ExpensesBarangay -
Purchase of Lot Barangay June December Lot Purchased MLGU 1,000.00 1,000.00
Titling of Lot Barangay June December Lot Titled MLGU 100.00 100.00
Titling of School site Barangay June December School site Titiled MLGU 500.00 500.00
Capital Outlay Barangay -
Purchase Musical instrument Barangay April November MI Purchased MLGU 200.00 200.00
Office Equipment Barangay June November Office Equipment Provided MLGU 50.00 50.00
Purchace/Installation of
CCTV Barangay June December CCTV Installed MLGU 100.00 100.00
Purchase of Garbage Truck Barangay June November Purchased Vehicles MLGU 500.00 500.00
-
TOTAL PROPOSED PPAs 160,080.00 160,080.00 BARANGAY STO. TOMAS
I. ECONOMIC SERVICES - - 8,400.00 8,400.00 5,200.00 -
Agricultural services
Page 120
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Improvement/Concreting off
FTMRBarangay October December
1km. All weather FTMR
Const.
LGU/PLGU/
BRGY.1,000.00 1,000.00 1,000.00
A634-04
Farm inputs/purchase of
certified seedsBarangay March June 200 Sacks of resilient seeds MLGU 200.00 200.00
Purchasing of parmol Barangay January March Purchased parmolMLGU/PLG
U1,000.00 1,000.00
Flood Control Barangay -
Construction of Flood Control Barangay March April 100m. ConstructedLGU/PLGU/
BRGY.1,000.00 1,000.00 1,000.00
A224-02
Re-chanelling of river flow Barangay March April Rechanneled river flowLGU/PLGU/
BRGY.500.00 500.00 500.00
A314-06
Construction of gabion dike Barangay March April 100m. ConstructedLGU/PLGU/
BRGY.500.00 500.00 500.00
A314-09
Water Services Barangay -
Barangay -
Post Harvest Facilities Barangay -
Improvement of Warehouse Barangay October December Constructed WarehouseLGU/PLGU/
DA200.00 200.00 200.00
A11-03
Construction of Solar dryer Barangay January March Constructed Solar DryerLGU/PLGU/
DA900.00 900.00
Livelihood Program Barangay -
Animal dispersal Barangay February June Animal Dispersal ProvidedLGU/PLGU/
DA300.00 300.00
A634-04
Page 121
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
BarangayLGU/PLGU/
DA-
Animal poultry raising Barangay January April Animal Dispersal ProvidedLGU/PLGU/
DA300.00 300.00
Livelihood Program Barangay January DecemberLivelihood program
implemented
LGU/PLGU/
DA500.00 500.00
Housing Program Barangay -
Emergency shelter/Const. of
HouseBarangay January December
Constructed Emergencey
Shelter-10 UnitsPLGU 2,000.00 2,000.00 2,000.00
A421-02
II.SOCIAL SERVICES Barangay - - 12,740.00 12,740.00 2,300.00 -
Health & Nutrition Program Barangay -
Construction of Nutrition post Barangay January March Constructed Nutrition postLGU/PLGU/
BGRY.500.00 500.00 500.00
A424-12
Supplemental Feeding program Barangay January MarchFeeding program
Implemented 5 months
LGU/PLGU/
BGRY.40.00 40.00
Infrastructure Barangay -
Completion of perimeter fence
brgy.hallBarangay October December
Completed perimeter fence
(Brgy. Hall)
PLGU/LGU/
BRGY.500.00 500.00
Completionof perimeter fence
brgy.plazaBarangay October December
Completed perimeter fence
(Brgy. plaza)
PLGU/LGU/
BRGY.500.00 500.00
Construction of perimeter fence
health centerBarangay April May
Constructed perimeter fence
@ Health center
PLGU/LGU/
BRGY.500.00 500.00
Construction of waiting shed Barangay January February Constructed waiting shedPLGU/LGU/
BRGY.500.00 500.00
Page 122
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction/Comp. of Street
lightsBarangay October December Constructed street lights
PLGU/LGU/
BRGY.200.00 200.00
Construction of Tanod Post Barangay November December Constructed tanod postPLGU/LGU/
BRGY.300.00 300.00
Improve of farm to market road Barangay January March Improved FTMRPLGU/LGU/
BRGY.500.00 500.00 500.00
A634-04
Regravelling/Maint. Of brgy.
RoadBarangay January March Maintained Brgy. Road
PLGU/LGU/
BRGY.300.00 300.00 300.00
A634-04
Improvement of brgy.plaza Barangay January September Improved brgy. PlazaPLGU/LGU/
BRGY.500.00 500.00
Construction of Concrete bench Barangay January February Constructed concrete benchPLGU/LGU/
BRGY.200.00 200.00
Construction of Perimeter
fence(basketball court)Barangay October December
Constructed perimeter fence
@ basketball court
PLGU/LGU/
BRGY.300.00 300.00
Construction of boundary
sign/welomeBarangay January February
Constructed Boundary
sign/welcome
PLGU/LGU/
BRGY.100.00 100.00
Construction of solar Dryer Barangay February April Constructed solar dryerPLGU/LGU/
BRGY.500.00 500.00
Rehab of Basketball court Barangay January April Constructed basket ball courtPLGU/LGU/
BRGY.500.00 500.00
Construction of 2 storey multi-
purposeBarangay September December
Constructed 2 storey multi-
purpose bldg.
PLGU/LGU/
BRGY.2,000.00 2,000.00
Construction of Senior Citizen
buildingBarangay September December Constructed SC building
PLGU/LGU/
BRGY.1,000.00 1,000.00
Page 123
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Electrification Barangay January December Constructed electrificationPLGU/LGU/
BRGY.100.00 100.00
Construction of Public toilet Barangay January February Constructed Puiblic toiletPLGU/LGU/
BRGY.300.00 300.00
Construction of Covered court Barangay August December Constructed covered courtPLGU/LGU/
BRGY.2,000.00 2,000.00
Construction of lining canal Barangay April June Constructed led canalPLGU/LGU/
BRGY.100.00 100.00
Concreting of brgy. Road Barangay January April Constructed brgy. RoadPLGU/LGU/
BRGY.200.00 200.00
Construction of pressurized
water tankBarangay September October
Constructed pressurized
water tank
PLGU/LGU/
BRGY.100.00 100.00
Construction of Flood control Barangay January July Constructed flood controlPLGU/LGU/
BRGY.900.00 900.00 900.00
A224-02
Rechanelling of
riverflow/dredgingBarangay January July Constructed river flow
PLGU/LGU/
BRGY.100.00 100.00 100.00
A314-06
HUMAN & ECOLOGICAL
SERVICES INITIATIVE Barangay 50.00 50.00 - -
Ecological solid waste mngt.
ProgramBarangay September October
ESWM Program
Implemented
PLGU/LGU/
BRGY.50.00 50.00
TOTAL PROPOSED PPAs 33,980.00 33,980.00 BARANGAY SUGUIT
I. ECONOMIC SERVICES - - 13,500.00 13,500.00 - -
A. Tourism Development
Page 124
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction Of Evacuation
CenterBarangay
Constructed Evacuation
CenterPLGU 6,000.00 6,000.00
B. Agricultural Development Barangay
Concreting of FTMR Barangay Concreted FTMR PLGU 3,000.00 3,000.00
FTMR - Suguit - Diaman BarangayConstructed FTMR-Suguit-
DiamanPLGU 3,000.00 3,000.00
C. Flood Control
Construction of Flood Control Barangay Constructed Flood Control PLGU 1,500.00 1,500.00
Barangay
II. SOCIAL SERVICES - - 16,000.00 16,000.00 - -
A. Education
Construction of School Building
- ElementaryBarangay
Constructed School Building-
ESPLGU 4,000.00 4,000.00
Construction of School Building
- High SchoolBarangay
Constructed School Building -
High SchoolPLGU 6,000.00 6,000.00
B. Infrastructure
Construction of Covered Court Barangay Constructed Covered Court PLGU 6,000.00 6,000.00
TOTAL PROPOSED PPAs 45,500.00 45,500.00 BARANGAY VILLA AURORA
Page 125
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
I. ECONOMIC SERVICES - - 2,665.00 2,665.00 930.00 70.00
A. Tourism Development
Improvement of Foot Trail Barangay January December Projects ImplementedMLGU/PLG
U60.00 60.00
Construction/Rehab. Of Plaza
& ParksBarangay January December Projects Implemented NGA 60.00 60.00
Construction of Concrete
Bench/PavementBarangay January December Projects Implemented IRA/MLGU 60.00 60.00
Movable Tent Barangay January December Projects Implemented PLGU/NGA 100.00 100.00
B. Flood Control Barangay -
Construction of Line Canal Barangay January December Projects ImplementedIRA/PLGU/
NGA140.00 140.00 140.00
A314-09
C. Water Services Barangay -
Improvement/Maintenance-
Water SystemBarangay January December Projects Implemented
MLGU/PLG
U/NGA130.00 130.00 130.00
A234-01
Renovation of Water Tank Barangay January December Projects Implemented IRA/MLGU 90.00 90.00 90.00 A234-01
D.Housing Barangay -
E. Infrastructure Barangay -
Const./Maint./Rehab. Of
Street LightsBarangay January December Projects Implemented IRA/MLGU 60.00 60.00
Construction of Boundary Sign
-Purok 1-4Barangay January December Projects Implemented IRA/PLGU 60.00 60.00 60.00
A224-02
Perimeter Fence w/ Gate Barangay January December Projects Implemented IRA/PLGU 70.00 70.00 70.00 M324-02
Page 126
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Road Regravelling Barangay January December Projects ImplementedIRA/MLGU/
PLGU65.00 65.00
Construction Extension of
Brgy. Stage w/ Electrical and
Ceiling
Barangay January December Projects ImplementedMLGU/PLG
U80.00 80.00 80.00
A424-12
Construction of Concrete
Bench around brgy. PlazaBarangay January December Projects Implemented
MLGU/PLG
U80.00 80.00
Concrete Pavement Bench Barangay January December Projects Implemented IRA/MLGU 80.00 80.00
Concrete of Basketball Post Barangay January December Projects ImplementedMLGU/PLG
U80.00 80.00
Construction of Welcome Arc /
Boundary SignBarangay January December Projects Implemented IRA/MLGU 60.00 60.00 60.00
A224-02
Shed Covered Court -
Barangay Plaza Barangay January December Projects Implemented PLGU/NGA 300.00 300.00
Construction of Multi-Purpose
HallBarangay January December Projects Implemented PLGU/NGA 100.00 100.00
Construction of Multi-Purpose
pavementBarangay January December Projects Implemented NGA 500.00 500.00
F. Agricultural Development Barangay -
Plantation Of Abaca, Tambo
and SabutanBarangay January December Projects Implemented
MLGU/PLG
U60.00 60.00 60.00
A114-12
Vegetable Corn and other
Crop Production Barangay January December Projects Implemented
MLGU/PLG
U60.00 60.00 60.00
A114-12
Page 127
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Farm Inputs/Purchase of
Certified Seeds/Coconut
Seedlings
Barangay January December Projects Implemented MLGU/NGA 250.00 250.00 250.00 A114-12
G. Livelihood Program Barangay -
Animal Disperal Barangay January DecemberLivelihood program
implementedMLGU/NGA 60.00 60.00
Livelihood Training and
Support FundBarangay January December
Livelihood program
implementedPLGU 60.00 60.00
-
II. SOCIAL SERVICES - - 7,355.00 7,355.00 485.00 -
A.Health -
Hand Washing Facilities Barangay January December Project Implemented MLGU 75.00 75.00
Provision of Supplies for EHP Barangay January December Project Implemented PLGU 75.00 75.00
Improvement of Health &
Nutrition PostBarangay January December Project Implemented PLGU 75.00 75.00
Supplemental Feeding
ProgramBarangay January December Project Implemented
MLGU/PLG
U45.00 45.00 45.00
A424-01
Botika ng Barangay Barangay January December Project Implemented PLGU/NGA 200.00 200.00 200.00 A424-01
Purchase of Medicine Barangay January December Project Implemented IRA/MLGU 70.00 70.00 70.00 A424-01
B. Education Barangay -
Daycare Services &
Development ProgramBarangay January December Project Implemented PLGU/NGA 5,000.00 5,000.00
Page 128
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Skill Training Seminar /
WorkshopBarangay January December Project Implemented
IRA/MLGU/
PLGU65.00 65.00
Secondary School Building Barangay January December Project Implemented PLGU/NGA 160.00 160.00
Construction of School Stage -
High SchoolBarangay January December Project Implemented NGA 120.00 120.00
Perimeter Fence Phase I, II,
III w/ Gate - Elem. & High SchoolBarangay January December Project Implemented NGA 120.00 120.00 120.00
A424-12
Shed Covered Court -
Elementary & High SchoolBarangay January December Project Implemented NGA 400.00 400.00
C. Human & Ecological Services
InitiativeBarangay -
Community Reforestation Barangay January December Project ImplementedMLGU/PLG
U25.00 25.00 25.00
M314-05
Reforestation of Water Shed (
Tree Planting )Barangay January December Project Implemented
MLGU/PLG
U25.00 25.00 25.00
M314-05
Purchase of Garbage Truck Barangay January DecemberPurchased Garbage Truck
(counterpart)
MLGU/PLG
U900.00 900.00
-
III. GENERAL PUBLIC
SERVICES - - 310.00 310.00 80.00 -
1. Administrative & Legislative
(SK Fund)-
Infrastructure Projects -
Page 129
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Construction of Waiting
ShedBarangay January December Constructed Waitigng shed IRA/MLGU 70.00 70.00
-
2. Administrative Services (
Senior Citizen Fund )-
Maintenance and Other
Operating Expenses-
Relief Goods , Medicines, &
Medical SupportBarangay
100 boxes of medicines
provided
IRA/MLGU/
PLGU80.00 80.00 80.00
A414-02
Capital Outlay Barangay -
Rehabilitation of
Infrastructure Barangay Rehabilitated Infrastructure
IRA/MLGU/
PLGU80.00 80.00
Communication Equipment -
ICOM RadioBarangay
Purchased Comm.
Equipment-ICOM RadioIRA/MLGU 80.00 80.00
TOTAL PROPOSED PPAs 17,995.00 20,660.00 BARANGAY WENCESLAO
I. ECONOMIC SERVICES - - 15,100.00 15,100.00 10,000.00 -
A. Agriculture
Construction of FTMR Barangay June December Constructed FTMRMLGU/PLG
U/NGA5,000.00 5,000.00 5,000.00
A634-04
Purchase of certified
seeds/seedlingsBarangay January December
Purchased certified
seeds/seedlingsMLGU 100.00 100.00
Page 130
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
B.Flood Control Barangay
Flood Control-Kabatangan
RiverBarangay March December
Constructed Flood Control-
Kabatangan River
PLGU/LGU/
DPWH5,000.00 5,000.00 5,000.00
A224-02
Flood control- Binuangan river Barangay January DecemberConstructed Flood control-
Binuangan river PLGU 5,000.00 5,000.00
II.Social Services - - 8,887.00 8,887.00 5,350.00 -
C.Infrastructure
Repair and maintenance
ofpublic utility and FacilitiesBarangay March October
Repaired and Maintained
Public utility & faciltiesMLGU 200.00 200.00
Construction of Line Canal Barangay March October Constructed lined canal MLGU 100.00 100.00 100.00 A224-02
Construction Of Perimeter
Fence-PlazaBarangay March October Constructed Perimeter Fence MLGU 500.00 500.00
Construction of Covered Court Barangay March October Constructed covered courtMLGU/NGA
/DPWH5,000.00 5,000.00 5,000.00
A424-11
Purchase of PE Pipe Barangay March October Purchased PipeMLGU/20%
DF150.00 150.00 150.00
A634-03
D.Peace and Order Barangay -
Construction of Tanod Outpost Barangay March October Constructed Tanod OutpostMLGU/NGA
/DPWH150.00 150.00
Purchase of Brgy. Service Barangay March October Purchased Service NGA 1,000.00 1,000.00
Feeding Program Barangay March OctoberFeeding Program
Implemented
MLGU/MOO
E50.00 50.00
A414-05
Construction of Gabion Type
Flood Control ProjectBarangay March October
Constructed Gabion Type
Flood Control Project
MLGU/MOO
E1,000.00 1,000.00
Page 131
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
E.Capital Outlay Barangay -
Purchase of IT Equipmnet Barangay March October Purchase IT equipmentMLGU/20%
DF50.00 50.00
Purchase of Grass Cutter Barangay March October Purchased Grass CutterMLGU/20%
DF40.00 40.00
F.Human & Ecological
Services Initiative
Ecological Solid Waste
ManagementBarangay March October
ESWM Program
Implemented
MLGU/20%
DF100.00 100.00 100.00
M324-04
Improvement of Barangay Site Barangay March October Improved Barangay SiteMLGU/20%
DF100.00 100.00
Purchase of Lot/Lot Titling Barangay March October Purchase Lot/lot vTitledMLGU/20%
DF100.00 100.00
Improvement/Repair of Basket
Ball BoardBarangay March October
Improved/Repaired Basket
Ball Court
MLGU/20%
DF100.00 100.00
Construction of Perimeter
Fence PlazaBarangay March October
Contructed Perimeter Fence
Plaza
MLGU/20%
DF100.00 100.00
-
OSCA(Senior Citezen)
Purchase of Medicines and
VitaminsBarangay June September
Purchased Medicines and
VitaminsLGU/PLGU 5.00 5.00
Purchase of Goods Barangay October December Puchase Goods LGU/PLGU 5.00 5.00
Puchase of Monoblock table
and chairs-SCOBarangay
Purchase Monoblock,Chairs
& TablesLGU/PLGU 15.00 15.00
Page 132
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Purchase of Sound System for
their officeBarangay Purchased System LGU/PLGU 20.00 20.00
Conduct Assembly Meeting Barangay January December Meeting ConductedLGU/PLGU/
1% SCF5.00 5.00
GENDER & DEVELOPMENT Barangay -
Medical Assistance for PWD's Barangay June December PWD Assistance Given LGU/PLGU 25.00 25.00
Feeding Program BarangayFeeding Program
ImplementedMLGU 10.00 10.00
BDRRM Barangay -
Purchased of Medicine Barangay June October Medicine Purchased5%BDRRM/
LGU/ PLGU15.00 15.00
Purchase of Relief Godds Barangay June December Purchased Relief Goods5%BDRRM/
LGU/PLGU27.00 27.00
Purchase of First Aid kit Barangay January June Purchased First Aid Kit -
Purchase of Flashligths Barangay Purchased Flash lights -
Purchase of kapote Barangay Purchased Kapote -
Purchase of Boots Barangay Purchased of rescuing -
Purchase of 12 Volts battery Barangay Equipment and gearsMLGU/PLG
U/NGA20.00 20.00
Purchased of rescuing
equipment like Barangay
Purchased of rescuing
equipment and gears5% BDRRM -
Wooden Splint Wooden Splint -
Page 133
Budget Year: 2018
Municipality : Maria Aurora
Province : Aurora AIP Form 3
Start DateCompleti
on Date
Personal
Services
Maintenance
& Other
Operating
Expenses
Capital Outlay Total
Climate
Change
Adaptation
Climate
Change
Mitigation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXPECTED OUTPUT SOURCE
OF FUNDS
AMOUNT (in
thousand pesos)
Amount of Climate
Change Expenditures CC
Typology
Code
SCHEDULE OF
IMPLEMENTATIONAIP
REF
CODE
PROGRAM/PROJECT/ACTIVITY
/ LOCATION/DESCRIPTION
IMPLEMENT
ING
AGENCY/
OFFICE
CY 2018 ANNUAL INVESTMENT PROGRAM (AIP)
By Program / Project / Activity Sector
Person carrier Person carrier -
PPE PPE -
etc.needed (purchase of glass
cutter)
etc.needed (purchase of
glass cutter)-
TOTAL PROPOSED PPAs 32,874.00 32,874.00
Prepared by: Approved by:
AMADO M. GENETA
Municipal Mayor Municipal Planning & Development
NICASIO G. GATCHALIAN
Page 134